High-efficiency folding method for vehicle-roller ship

The method for efficiently closing roll-on/roll-off ships through slipway and dock integration with precise positioning and inclined structures addresses the inefficiencies in ship construction, reducing closure time and costs.

CN119058906APending Publication Date: 2024-12-03CHINA MERCHANTS JINLING SHIPBUILDING (JIANGSU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411269541.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The construction period of roll-on/roll-off ships in the dock is lengthy, occupying valuable resources and affecting efficiency and safety, leading to increased production costs.

Method used

A method combining slipway and dock closing techniques, utilizing a special inclined bottom structure, precise positioning benchmarks, and temporary water gauges to ensure accurate ship movement and launching, employing inclined pads and trolleys for stability, and precise alignment to shorten the dock closure cycle.

Benefits of technology

The method efficiently closes roll-on/roll-off ships by addressing the challenges of ship movement and launching on an inclined bottom, reducing the dock closure period and enhancing production efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119058906A_ABST
    Figure CN119058906A_ABST
Patent Text Reader

Abstract

The invention provides an efficient folding method for a vehicle-rolling ship. The efficient folding method specifically comprises the following steps that S1, the draught condition of a half-ship structure folded in a slipway at the launching position is determined when the half-ship structure is launched; s2, the size of the half-ship structure folded in the slipway is determined, and whether the draft condition of the half-ship structure meets the water level requirement of the launching position during launching or not is determined; s3, simulating the state that the half-ship structure of the half-ship folded in the slipway passes through the flood control wall, and checking whether the launching requirement is met or not; s4, simulating the state that the bilge section transportation support passes through the flood control wall, and determining whether the launching requirement is met or not; s5, a half-ship folding pier position is arranged in the slipway, and the segmented structure is folded to form a half-ship structure; s6, the half-ship structure is moved into the dock; and S7, the remaining segmented structures are folded in the dock. The problems that the in-dock folding period is shortened and in-dock positioning is not accurate in two different folding sites of slipway folding ship moving, launching, slipway folding and dock folding by the outer bottom bidirectional inclination of the roll-on-roll-off ship are solved, and a standard and a basis are provided for follow-up efficient folding of the roll-on-roll-off ship.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shipbuilding, and in particular relates to a method for efficiently closing a roll-on / roll-off ship. Background Art

[0002] With the development of shipbuilding and shipping industry, and the gradual popularization of efficient ships, people pay more and more attention to the dock as the core resource of the shipyard. At present, most of the ships undertaken by the company are ro-ro ships. The construction period of ships in the dock is relatively long. The period of assembling ships in the dock determines the production efficiency of the company. The ships assembled in the dock occupy a lot of effective resources, such as cranes, supporting auxiliary materials, dock piers, manpower, etc. The longer the period of assembling in the dock, the lower the work efficiency, which affects the safety production to a certain extent and increases the production cost of the company.

[0003] In order to change this state of closure in the dock, it is necessary to improve the efficient closure in the dock, effectively improve the turnover rate of the dock, improve work efficiency, reduce production costs, and enhance the company's competitiveness in the shipbuilding market. Therefore, a method for efficient closure of roll-on / roll-off ships is proposed to solve the above-mentioned problems. Summary of the invention

[0004] In view of the above problems, the present invention provides a method for efficiently closing a roll-on / roll-off ship, which utilizes the characteristics of slipway closing and dock closing, and combines the special inclined bottom structure of the roll-on / roll-off ship to maximize the advantages of the two closing sites, with the main purpose of shortening the dock closing cycle; the present invention also solves the problems of the bidirectional slope of the outer bottom of the roll-on / roll-off ship in the slipway closing and ship shifting, launching, slipway and dock two different closing sites to shorten the dock closing cycle, and inaccurate positioning in the dock. While preventing the deformation of the bottom outer plate, efficient closing can be carried out to provide standards and basis for the efficient closing of subsequent roll-on / roll-off ships.

[0005] To achieve the above object, the present invention adopts the following technical solution:

[0006] A method for efficiently closing a roll-on / roll-off ship comprises the following steps:

[0007] S1. Determine the draft at the launching position when the half-ship structure is launched in the slipway;

[0008] S2. Determine the size of the half-ship structure closed in the slipway, and determine whether the draft of the half-ship structure meets the water level requirements of the launching position during launching;

[0009] S3. Simulate the state of the half-ship structure of the half-ship closed in the slipway passing the flood control wall to see whether it meets the launching requirements;

[0010] S4. Simulate the state of the bilge section transport support passing the flood control wall to determine whether it meets the launching requirements;

[0011] S5. A half-ship closure position is set up in the slipway, and the segmented structure is closed to form a half-ship structure;

[0012] S6. Move the above-mentioned half-ship structure to the dock;

[0013] S7. Assemble the remaining segment structures in the dock according to the dock assembling plan.

[0014] Furthermore, in said S5, there are three piers in the slipway, which are arranged at 6m in the middle, left and right of the ship (see the overall arrangement of the three trolleys), and the transport support is cut off after the half-ship structure is closed.

[0015] Furthermore, the S6 specifically includes the following steps:

[0016] S61. Multiple ship-moving trolleys for longitudinal and transverse movement of half ships are arranged in the slipway;

[0017] S62. On the launching slide, multiple inclined ship frames are arranged at intervals along the length direction of the ship. Inclined pads are used to pad the upper end surface of the inclined ship frame at the inclined bottom of the half-ship structure and the inclined bottom of the half-ship structure. Before moving the ship, the inclined pads on the launching side are fixed to the outer plate by bolts, and the inclined pads on the slipway side are fixed to the inclined ship frame by nails. After the half-ship structure is moved to the inclined ship frame, the inclined pads are fixedly connected to the outer plate of the half-ship structure.

[0018] S63. Temporary water gauges are set at the bow and stern of the half-ship structure. The temporary water gauges are directly painted with paint and are directly engraved on the designated positions of the bow, midship and stern outer plates based on the hull baseline;

[0019] S64. Two groups of positioning inspection marks are symmetrically arranged on the left and right sides of the uppermost deck of the half-ship structure. The height of the positioning inspection marks is the same as the height of the docking platform. Each group includes 3 positioning inspection marks. The 3 positioning inspection marks are located at the bow, midship and stern respectively. The positioning inspection mark located at the midship is used as the longitudinal mark, and the positioning inspection marks located at the bow and stern are used as both the longitudinal mark and the transverse mark;

[0020] S65. Move the ship and place the half-ship structure in the dock;

[0021] S66. Set up theodolites on the left and right platforms of the dock to measure and check the scale of the benchmark to ensure that the front and rear error of the bottom of the ship is less than 5mm and the centerline error of the half-ship structure is less than 15mm.

[0022] Furthermore, in the S61, there are four ship moving trolleys, including two middle ship moving trolleys located at the two L2 strong longitudinal girder positions and two side ship moving trolleys located at the two 7500 longitudinal girder positions; the number of the two side ship moving trolleys is 16, and the number of the middle ship moving trolleys is 19; a welding platform is set at the jacking position of the four ship moving trolleys located at the head and tail ends of the two side ship moving trolleys, and the tops of the other 12 side ship moving trolleys are jacked up using inclined wooden piers.

[0023] Furthermore, six beam lifting panels are provided in the S61, and the beam lifting panels are arranged in the outer plate area with large bow and stern lines. Their function is to make the bow and stern lines sharp and thin, and the contact area with a single ship-moving trolley is small, resulting in uneven force, which may easily cause the top plate of the ship-moving trolley to slip. By using the beam lifting panels, the force on the beam lifting panels is evenly distributed during the ship-moving process, thereby ensuring the stability of the panels during the ship-moving process.

[0024] Furthermore, in the S62, the inclined cradle is provided with 25 paths; the inclined pads are located at the strong longitudinal girder position of the half-ship structure, and the length and width of the inclined pads are consistent with the length and width of the inclined cradle.

[0025] Furthermore, in S64, a precision scale line is provided on the positioning inspection mark rod, the line width of the precision scale line is 10 mm, and the distance between two adjacent precision scale lines is 20 mm.

[0026] Furthermore, the S7 specifically includes the following steps:

[0027] S71. Arrange 11 piers in advance in the dock according to the pier layout diagram, and place only the inclined pads of the 5 piers in the middle;

[0028] S72. After the half-ship structure is positioned in the dock, place the inclined pads for the remaining 6 piers;

[0029] S73. Close the remaining segmented structures according to the in-dock closing plan.

[0030] Furthermore, in S1, the draft of the ship is less than the lowest water level at the launching site at that time - the height of the inclined ship frame + 1.8 meters below the zero position of the lowest point of the launching slide.

[0031] Furthermore, the half-ship structure is formed by combining the segmented structures below the third deck of the ship; the length of the half-ship structure is less than the length of the launching area of ​​the inclined gantry; and there must be a certain safety distance between the side outer plate and the flood control wall during the launching process of the half-ship structure on the launching slide.

[0032] The efficient closure method of a roll-on / roll-off ship described in the present invention solves the technical problems of closure, ship movement and launching of a roll-on / roll-off ship with an inclined bottom on a slipway, and achieves the purpose of ship movement and launching of a roll-on / roll-off ship with an inclined bottom on a slipway. The closure method of a roll-on / roll-off ship is innovative, and a closure method combining slipways and docks in two places is used, which shortens the closure period of the entire ship in the dock. The main technical difficulties in closing a slipway for a ship with an inclined bottom lie in two points: moving the ship with an inclined bottom and launching it with an inclined bottom. The precision control of the half-ship entering the dock lies in two points: positioning the inspection benchmark and setting the temporary water gauge.

[0033] Sloping bottom ship moving: Normal slipway closing and moving ship is mainly for flat-bottomed ships. The outer plate of the flat-bottomed ship is flat, and the panel of the boat moving trolley is also flat. The panel of the boat moving trolley directly contacts the plane of the outer plate of the bottom of the ship to complete the ship moving action. The outer bottom plate of the inclined bottom ship has a slope, and the boat moving trolley cannot directly contact the inclined bottom. The arrangement of the trolley needs to be more precise. The slipway trolley at the inclined bottom position uses inclined wooden piers for lifting. In order to ensure the safety of the inclined bottom ship moving, the 4 boat moving trolleys at the bow and stern inclined bottom positions are set up with welding platforms for lifting. The boat moving trolley method using inclined wooden piers and welding platforms solves the technical problems of moving inclined bottom ships. That is: S61 (In S61, there are 4 boat moving trolleys, including two middle boat moving trolleys located at two L2 strong longitudinal girder positions and two side boat moving trolleys located at two 7500 longitudinal girder positions; the number of the two side boat moving trolleys is 16, and the number of the middle boat moving trolleys is 19; a welding platform is set at the jacking position of the 4 boat moving trolleys located at the front and rear ends of the two side boat moving trolleys, and the tops of the other 12 side boat moving trolleys are jacked up using inclined wooden piers.)

[0034] Sloped bottom launching: When launching a flat-bottomed ship, the outer bottom plate is in direct contact with the panel of the inclined gantry to ensure the stability of the ship without tilting, and then the ship is launched through the slide. The outer bottom plate of the inclined bottom ship has a slope, and only the middle part of the ship is flat. After the inclined gantry is installed, only the flat bottom of the outer bottom in the middle of the ship contacts the inclined gantry. Sloped pads are set at the port and starboard strong component positions of the outer bottom plate corresponding to the inclined gantry. The length and width of the inclined pads are consistent with the length and width of the inclined gantry to ensure the stability requirements of the half-ship in the inclined gantry. At the same time, in order to meet the launching requirements, the starboard inclined pads on the launching side are fixed to the outer hull plate with bolts, and the positioning and installation are completed before the ship is moved. After the half-ship is moved to the inclined gantry, the port side inclined pads on the slipway side are fixed to the inclined gantry with nails. The inclined pads connected to the outer plate on the starboard side are launched as a whole with the half-ship and removed after docking. By using the method of using inclined pads and the connection form between the launching side and the outer plate, and the berth side and the inclined berth, the stability and launching problems of the inclined berth on the half-ship are solved. That is: (S62. On the launching slide, multiple inclined berths are arranged at intervals along the length of the ship, and the upper end surface of the inclined berth located at the inclined bottom of the half-ship structure and the inclined bottom of the half-ship structure are padded with inclined pads; before moving the ship, the inclined pads on the launching side are fixed to the outer plate by bolts, and the inclined pads on the berth side are fixed to the inclined berth by nails. After the half-ship structure is moved to the inclined berth, the inclined pads are fixedly connected to the outer plate of the half-ship structure;)

[0035] Positioning inspection benchmark: The main function of the positioning benchmark is to serve as a basis for positioning the half-ship when it enters the dock. The half-ship has an inclined bottom, and the pier positions in the dock vary according to the height of the inclined bottom. The pier positions are consistent with the height of the inclined bottom. In order to arrange them in the dock in advance according to the corresponding positions of the inclined bottom, the inclined bottom ship has high requirements for the accuracy of the half-ship landing. The deviation in the landing position will cause the outer plate to deform. The positioning benchmark is set to ensure the accuracy of the half-ship landing. The height of the benchmark is consistent with the height of the dock platform to facilitate the measurement of the theodolite on both sides of the dock. The benchmark is set with longitudinal and transverse scales. The line width of the precision scale line is 10mm, and the distance between two adjacent precision scale lines is 20mm to ensure accurate landing accuracy. By setting the positioning benchmark, the problem of accurate positioning of the half-ship landing piers when entering the dock is solved.

[0036] Temporary water gauge: The temporary water gauge is based on the lowest outer plate position in the middle of the ship as the 0 reference, and is surveyed and drawn according to the vertical height. It is set at half bow, half midship, and half stern. The temporary water gauge has two functions: 1. When half of the ship is launched, it determines whether the draft of half of the ship is consistent with the calculated draft; 2. When half of the ship is docked, it determines the water level when the pier is dropped. The water level is read by the temporary water gauge and compared with the water level gauge in the dock to grasp the state and timing of half of the ship dropping the pier, and provide a water level reference for the pier drop. Water level in the dock = half of the ship draft + the lowest pier height in the middle of the ship. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of the folding of the half-ship structure of the present invention;

[0038] Figure 2This is a schematic diagram of the transverse launching of the half-ship structure of the present invention;

[0039] Figure 3 This is a schematic diagram of the half-ship structure passing through the flood control wall of the present invention;

[0040] Figure 4 It is a schematic diagram of the bilge transport support passing through the flood control wall according to the present invention;

[0041] Figure 5 It is a schematic diagram of the arrangement of the berth piers of the present invention;

[0042] Figure 6 It is a schematic diagram of the transverse arrangement of the slipway piers according to the present invention;

[0043] Figure 7 It is a schematic diagram of the arrangement of the longitudinal and transverse ship moving trolleys of the present invention;

[0044] Figure 8 It is a schematic diagram of the transverse arrangement of the longitudinal and transverse ship moving trolleys of the present invention;

[0045] Fig. 9 is a schematic diagram of the welding platform of the present invention;

[0046] Fig.10 is a longitudinal section schematic diagram of the oblique ship frame of the present invention;

[0047] Fig.11 is a transverse schematic diagram of the inclined ship frame of the present invention;

[0048] Fig.12 is a schematic diagram of the inclined pads of the present invention;

[0049] Fig.13 It is a schematic diagram of the temporary water gauge and the pole cloth of the present invention;

[0050] Fig.14 It is a schematic diagram of the temporary water gauge of the present invention;

[0051] Fig.15 is a schematic diagram of the positioning pole of the present invention;

[0052] Fig.16 It is a schematic diagram of the detection of the half-ship structure of the present invention being placed in a dock;

[0053] Fig.17 It is a transverse schematic diagram of the pier position in the dock according to the present invention.

[0054] Among them, 1-flood prevention wall, 2-horizontal rail, 3-temporary extension rail, 4-support cutting, 5-fixed pier position, 6-slipway ship moving track, 7-slipway ship moving trolley, 8-welding platform, 9-inclined ship rack, 10-launching slide, 11-inclined pads, 12-temporary water gauge, 13-positioning inspection benchmark, 14-dock platform, 15-positioning ruler, 16-laser theodolite, 17-dock pool. DETAILED DESCRIPTION

[0055] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0056] like Figure 1 As shown, a method for efficiently closing a roll-on / roll-off ship comprises the following steps:

[0057] S1. Determine the draft of the half-ship structure closed in the slipway when launching in the Yangtze River in Nanjing, specifically:

[0058] According to the half-ship launching time in December, the average water level of the Yangtze River in Nanjing is 3.5 meters, the height of the inclined gantry is 2.8 meters, and the lowest point of the slideway is 1.8 meters below the zero water level. The ship's draft = the lowest water level of 3.5 meters - the height of the inclined gantry is 2.8 meters + 1.8 meters below the zero level = 2.5 meters. The draft needs to be less than 2.5 meters. Considering the water level, the half-ship draft of the slipway is controlled within the range of 2.1 meters;

[0059] S2. Determine the size of the half-ship structure closed in the slipway, and determine whether the draft of the half-ship structure meets the water level requirements of the launching position during launching; the half-ship structure is formed by closing the segmented structures below the third deck of the ship; the length of the half-ship structure is less than the length of the launching area of ​​the inclined ship frame; during the launching process of the half-ship structure on the launching slide, there must be a certain safety distance between the side outer plate and the flood control wall;

[0060] The length of the inclined gantry launching area is 210 meters, and the half-ship is controlled within the range of 200 meters. The length of the half-ship is determined as: tail shaft hole ~ bow, with a length of 191 meters.

[0061] The outer bottom plate of the roll-on / roll-off ship is an inclined bottom, and the center of gravity of the half ship should not be too high. The height of the half ship is: hull baseline ~ 3 decks, a total of 9.1 meters. According to the range of the half ship, the weight of launching is calculated as follows:

[0062]

[0063] The floating state is as follows:

[0064]

[0065] In summary, the draft of the half-ship structure meets the water level requirements for December;

[0066] S3. Simulate the state of the half-ship structure of the half-ship closed in the slipway passing the flood control wall to see whether it meets the launching requirements;

[0067] The half-ship width is 38 meters, the height of the flood wall is 1.45 meters, and the launching slide is a sloped type. During the launching process of the slide, the side outer plate has been simulated to have a safety distance of 688mm from the flood wall, which meets the launching requirements;

[0068] S4. Simulate the state of the bilge section transport support passing the flood control wall to determine whether it meets the launching requirements;

[0069] The bilge has segmented transport supports. Through simulation, when launching the slide, the supports will hit the flood control wall, and the supports need to be completely cut off before launching;

[0070] S5. A half-ship closure position is set up in the slipway, and the segmented structure is closed to form a half-ship structure, as follows:

[0071] like Figure 6 As shown, the weight of half a ship is about 5,000 tons, and a single slipway pier bears 50 tons. A total of 176 slipway piers are used. The slipway piers bear a load that meets the requirements for half a ship closure. The bottom of the ship is inclined, and the slipway piers are arranged in three piers. The three piers are arranged at 6m in the middle, left, and right of the ship (see the overall arrangement of the three-way trolley). Combined with the side segmented transport support, the half ship closure is completed. The slipway piers are arranged in only three ways to reduce the use of inclined pads. Transport supports are used on the side instead of slipway piers. After the half ship is closed, the side transport supports are cut off;

[0072] S6. Moving the above-mentioned half-ship structure to the dock specifically includes the following steps:

[0073] S61. Arrange 4-way half-ship longitudinal transfer trolleys in the slipway, as follows:

[0074] The 4-way ship moving trolley includes two middle ship moving trolleys located at two L2 strong longitudinal girder positions and two side ship moving trolleys located at two 7500 longitudinal girder positions; the number of the two side ship moving trolleys is 16, and the number of the middle ship moving trolleys is 19; a welding platform is set at the jacking position of the 4 ship moving trolleys located at the head and tail ends of the two side ship moving trolleys, and the tops of the other 12 side ship moving trolleys are jacked up with inclined wooden piers; the bottom of the ship is inclined, and the inclined bottom is adjusted to reduce the need for lateral movement and replacement of vehicles. The bottom pads, the trolley position is shared by the lateral and longitudinal movements, the inclined bottom pads are immovable, the trolley is turned 90 degrees, and then moved horizontally; in the S61, 6 lifting beam panels are also provided, and the 6 lifting beam panels are arranged in the outer plate area with large bow and stern lines. Their function is that the bow and stern positions have thin lines and the contact area with a single boat-moving trolley is small and the force is uneven, which can easily cause the top plate of the boat-moving trolley to slip off. The lifting beam panels are used, and the lifting beam panels are used during the ship moving process. Even force is applied to ensure the stability of the panels during the ship moving.

[0075] S62. On the launching slide, 25 inclined cradles are arranged at intervals along the length of the ship. The half-ship structure has an inclined bottom. At the straight position of the K plate on the inclined cradle, the bottom of the half-ship structure directly contacts the inclined cradle (see Fig.11 ), the inclined bottom position opposite to the No. 9 to No. 19 inclined scaffolds is padded with inclined wood between the inclined scaffolds to ensure that the half-ship has sufficient stability on the inclined scaffolds. The inclined wood is located at the position of the strong longitudinal girder. The length and width of the inclined wood are consistent with the length and width of the inclined scaffolds. The starboard inclined wood on the launching side is fixed to the hull outer plate with bolts and is positioned and installed before the ship is moved. The port side inclined wood on the slipway side is fixed to the inclined scaffold with nails. When the half-ship is closed to Figure 1 After the temporary water gauge, inspection pole and the inclined cradle pads on the lower side are set up, the half-ship structure is moved to the inclined cradle, and the inclined cradle pads are fixedly connected to the outer plate of the half-ship structure;

[0076] S63. Temporary water gauges are set at the bow and stern of the half-ship structure to facilitate water level reading; the temporary water gauges are directly painted with paint and directly engraved on the designated positions of the bow, midship and stern outer plates based on the hull baseline.

[0077] S64. Two groups of positioning inspection marks are symmetrically arranged on the left and right sides of the uppermost deck of the half-ship structure. The height of the positioning inspection marks is the same as the height of the docking platform. Each group includes 3 positioning inspection marks, which are located at the bow, midship and stern respectively. The positioning inspection mark located at the midship is used as the longitudinal mark, and the positioning inspection marks located at the bow and stern are used as both the longitudinal mark and the transverse mark; precision scale lines are arranged on the positioning inspection marks, the line width of the precision scale lines is 10mm, and the distance between two adjacent precision scale lines is 20mm;

[0078] S65. Move the ship and place the half-ship structure in the dock;

[0079] S66. Set up theodolites on the left and right platforms of the dock to measure and check the scale of the benchmark to ensure that the front and rear error of the bottom of the ship is less than 5mm and the centerline error of the half-ship structure is less than 15mm.

[0080] S7. Closing the remaining segmented structures in the dock according to the dock closure plan, specifically including the following steps:

[0081] S71. Arrange 11 piers in advance in the dock according to the pier layout diagram, and place only the inclined pads of the 5 piers in the middle;

[0082] S72. After the half-ship structure is positioned in the dock, place the inclined pads for the remaining 6 piers;

[0083] S73. Close the remaining segmented structures according to the in-dock closing plan.

[0084] Those skilled in the art should understand that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for efficiently closing a roll-on / roll-off ship, characterized in that: The specific steps include: S1. Determine the draft at the launching position when the half-ship structure is launched in the slipway; S2. Determine the size of the half-ship structure closed in the slipway, and determine whether the draft of the half-ship structure meets the water level requirements of the launching position during launching; S3. Simulate the state of the half-ship structure of the half-ship closed in the slipway passing the flood control wall to see whether it meets the launching requirements; S4. Simulate the state of the bilge section transport support passing the flood control wall to determine whether it meets the launching requirements; S5. A half-ship closure position is set up in the slipway, and the segmented structure is closed to form a half-ship structure; S6. Move the above-mentioned half-ship structure to the dock; S7. Assemble the remaining segment structures in the dock according to the dock assembling plan.

2. The method for efficiently closing a roll-on / roll-off ship according to claim 1, characterized in that: In the above S5, three piers are provided in the slipway, and the three piers are arranged at 6m positions in the middle, left and right of the ship, respectively. After the half-ship structure is closed, the transport support is cut off.

3. The method for efficiently closing a roll-on / roll-off ship according to claim 2, characterized in that: The S6 specifically comprises the following steps: S61. Multiple ship-moving trolleys for longitudinal and transverse movement of half ships are arranged in the slipway; S62. On the launching slide, multiple inclined ship frames are arranged at intervals along the length direction of the ship. Inclined pads are used to pad the upper end surface of the inclined ship frame at the inclined bottom of the half-ship structure and the inclined bottom of the half-ship structure. Before moving the ship, the inclined pads on the launching side are fixed to the outer plate by bolts, and the inclined pads on the slipway side are fixed to the inclined ship frame by nails. After the half-ship structure is moved to the inclined ship frame, the inclined pads are fixedly connected to the outer plate of the half-ship structure. S63. A temporary water gauge is set at the bow and stern of the half-ship structure. The temporary water gauge is directly painted with paint on the hull baseline to the designated positions of the bow and stern outer plates; S64. Two groups of positioning inspection marks are symmetrically arranged on the left and right sides of the uppermost deck of the half-ship structure. The height of the positioning inspection marks is the same as the height of the docking platform. Each group includes 3 positioning inspection marks. The 3 positioning inspection marks are located at the bow, midship and stern respectively. The positioning inspection mark located at the midship is used as the longitudinal mark, and the positioning inspection marks located at the bow and stern are used as both the longitudinal mark and the transverse mark; S65. Move the ship and place the half-ship structure in the dock; S66. Set up theodolites on the left and right platforms of the dock to measure and check the scale of the benchmark to ensure that the front and rear error of the bottom of the ship is less than 5mm and the centerline error of the half-ship structure is less than 15mm.

4. The method for efficiently closing a roll-on / roll-off ship according to claim 3 is characterized in that: In the S61, there are 4 ship moving trolleys, including two middle ship moving trolleys located at the two L2 strong longitudinal girder positions and two side ship moving trolleys located at the two 7500 longitudinal girder positions; the number of the two side ship moving trolleys is 16, and the number of the middle ship moving trolleys is 19; a welding platform is set at the jacking position of the 4 ship moving trolleys located at the head and tail ends of the two side ship moving trolleys, and the tops of the other 12 side ship moving trolleys are jacked up using inclined wooden piers.

5. The method for efficiently closing a roll-on / roll-off ship according to claim 4, characterized in that: In the S61, six raised beam panels are also provided, and the six raised beam panels are arranged in the outer plate area with large bow and stern lines.

6. The method for efficiently closing a roll-on / roll-off ship according to claim 5, characterized in that: In the S62, the inclined cradle is provided with 25 paths; the inclined pads are located at the strong longitudinal girder position of the half-ship structure, and the length and width of the inclined pads are consistent with the length and width of the inclined cradle.

7. The method for efficiently closing a roll-on / roll-off ship according to claim 3 is characterized in that: In the step S64, a precision scale line is provided on the positioning inspection mark rod, the line width of the precision scale line is 10 mm, and the distance between two adjacent precision scale lines is 20 mm.

8. The method for efficiently closing a roll-on / roll-off ship according to claim 1, characterized in that: The S7 specifically includes the following steps: S71. Arrange 11 piers in advance in the dock according to the pier layout diagram, and place only the inclined pads of the 5 piers in the middle; S72. After the half-ship structure is positioned in the dock, place the inclined pads for the remaining 6 piers; S73. Close the remaining segmented structures according to the in-dock closing plan.

9. The method for efficiently closing a roll-on / roll-off ship according to claim 1, characterized in that: In S1, the draft of the ship is less than the lowest water level at the launching site at that time - the height of the inclined ship frame + 1.8 meters below the zero position of the lowest point of the launching slide.

10. The method for efficiently closing a roll-on / roll-off ship according to claim 3, characterized in that: The half-ship structure is formed by combining the segmented structures below the third deck of the ship; the length of the half-ship structure is less than the length of the launching area of ​​the inclined gantry; and during the launching process of the half-ship structure on the launching slide, there must be a certain safety distance between the side outer plate and the flood control wall.