Construction device and construction method for assembling variable cross-section steel shell tower sections
By designing a construction device including bottom platform adjustment components, steel pipe inclination adjustment components, internal and external working platforms and hydraulic loading components, the problems of inaccurate positioning, low labor efficiency and high safety risks in the assembly of traditional steel shell tower segments are solved, and the problem of inaccurate positioning, low labor efficiency and high safety risks in the assembly of traditional steel shell towers is achieved. The rapid and precise positioning and efficient assembly of steel shell tower segments reduce the risks of high-altitude operations and improve the appearance quality.
Patent Information
- Application Number
- CN202411461890.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-12-03
AI Technical Summary
The traditional steel shell tower segment assembly method has problems such as unfixed adjustment of single-segment tooling, large measurement and positioning workload, low accuracy, difficult installation deviation, low craft efficiency, high safety risks, and serious external wall pollution.
A construction device including bottom platform adjustment components, steel pipe inclination adjustment components, internal working platforms, external working platforms and hydraulic loading components was designed. The precise positioning of the end face size and oblique angle of the steel shell tower segment is achieved through CNC hydraulic devices. Reduces positioning errors and improves assembly efficiency and safety.
The rapid and precise positioning of the steel shell tower segments is achieved, positioning errors are reduced, construction efficiency is improved, high-altitude operation risks are reduced, and appearance quality is improved.
Smart Images

Figure CN119061801A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge engineering, and in particular relates to a construction device and a construction method for assembling variable-section steel shell tower segments. Background Art
[0002] At present, the cross-section of steel tower shells is rectangular, trapezoidal, elliptical and various special shapes. When assembling the segments, firstly, an assembly platform is set at the bottom, and then the working platform support frames are set inside and outside. During positioning welding, the steel tower unit parts or block parts are assembled from the inside to the outside in sequence, and the support frame also serves as the positioning and connection device of the steel tower unit parts.
[0003] This traditional steel shell tower segment assembly method mainly relies on the lower assembly platform and the working platform support frame for positioning. The unit parts or blocks are positioned and assembled in sequence from the inside to the outside, and inclined supports are set inside and outside for limiting. This assembly method has the following main problems: ① The tooling is adjusted reciprocatingly for a single segment, the tooling position is not fixed, the measurement and positioning workload is large, the segment assembly accuracy is low, and the assembly measurement takes a long time. The numerical law of the installation deviation is difficult to grasp, and it cannot guide the subsequent segment assembly work well; ② There are many segment size accuracy control points, and the point distribution law is difficult to grasp. Factors such as the environment and working space have a great influence on the measurement accuracy of the control points; ③ The segment assembly efficiency is low, the discreteness of the steel shell web plate unit and block size directly affects the assembly efficiency, and the stability of personnel and equipment is poor; ④ The segment assembly is mostly high-altitude work, and jacks, hand hoists, tooling, etc. are prone to falling, and the safety risk of operators is high; ⑤ After the segment assembly is completed, the workload of repeated dismantling operations is large when assembling the next segment, and the construction efficiency is low; ⑥ Since the steel shell tower unit is fixedly connected to the support frame, the surface of the steel shell tower is greatly polluted during dismantling. In view of the above problems existing in the prior art, it is an urgent task to design a construction device for assembling the segment of a variable-section steel shell tower. Summary of the invention
[0004] In view of the problems existing in the prior art, the present invention designs a construction device and a construction method for assembling variable-section steel shell tower segments, which can quickly realize the precise positioning of the upper and lower end surface dimensions of the steel shell tower segments, meet the changing requirements of the port dimensions and oblique angles of different steel shell tower segments, and solve the many problems existing in the traditional steel shell segment assembly.
[0005] One aspect of the present invention provides a construction device for assembling variable-section steel shell tower segments, characterized in that it includes a bottom platform adjustment component, a steel pipe inclination adjustment component, an internal working platform, an external working platform, and a hydraulic loading component, wherein: ① the bottom platform adjustment component is provided with a pair of forward track beams and a pair of transverse track beams, the forward track beams are fixed to the ground, the transverse track beams are leaning against the forward track beams in a tic-tac-toe shape, each of the forward track beams is provided with a pair of forward sliding seats that can move on the forward track beams, the corresponding transverse track beams are connected to the forward sliding seats, each of the transverse track beams is provided with a pair of transverse sliding seats that can move on the transverse track beams, and the forward track beams are provided with a forward collecting A contraction rod, the forward contraction rod is connected to the forward sliding seat, used for changing the displacement of the forward sliding seat, a transverse contraction rod is arranged on the transverse track beam, the transverse contraction rod is connected to the transverse sliding seat, used for changing the displacement of the transverse sliding seat, a steel pipe joint seat for placing the steel pipe to be spliced is arranged on the transverse sliding seat, the steel pipe joint seat is hinged to the transverse sliding seat in the inner transverse bridge direction, the outer side of the steel pipe joint seat can be raised, used for changing the inclination angle of the steel pipe to be spliced in the transverse bridge direction, a limited baffle is arranged on the steel pipe joint seat to ensure that the bottom of the steel pipe to be spliced will not be displaced when the steel pipe to be spliced is tilted; ② There are four groups of steel pipe inclination adjustment components, each group of steel pipe inclination adjustment components is provided with a forward sliding rail A forward sliding track is provided on the forward sliding track, and a forward sliding bracket that can move on the forward sliding track is provided. The height of the forward sliding bracket matches the steel pipe to be spliced. A U-shaped end is provided on the upper end of the forward sliding bracket for clamping the steel pipe to be spliced. The steel pipe inclination adjustment components correspond to four steel pipes to be spliced respectively and are arranged along the longitudinal direction of the bridge. The U-shaped end is facing the corresponding steel pipe to be spliced. When the forward sliding bracket moves inward along the longitudinal direction of the bridge, the U-shaped end will push the middle and upper part of the steel pipe to be spliced to change its inclination in the longitudinal direction of the bridge; ③ The internal working platform is provided with a central working layer. The plane size of the central working layer matches the cross-sectional size of the steel shell tower and a gap is reserved. The central working layer consists of four structural scaffolds installed at the four corners. Supported on the ground, the height of the central working layer matches the height of the steel pipes to be spliced, a vertical ladder leading to the ground is arranged in the middle of the central working layer, protective railings are arranged around the central working layer, and connecting beams are arranged between the structural scaffoldings; ④ There are four groups of external working platforms, corresponding to four steel pipes to be spliced respectively, arranged along the bridge direction beside the steel pipes to be spliced, and each group of external working platforms is provided with a rectangular personnel operation layer, and a load-bearing scaffold is supported on the ground below the personnel operation layer. The height of the personnel operation layer matches the height of the steel pipes to be spliced, and an oblique step ladder is arranged downward on one side of the personnel operation layer, and the other three sides of the personnel operation layer are provided with protective railings, and the oblique step ladder is provided with handrails;⑤ The hydraulic loading component includes a computer terminal module, a PLC control module, and an oil pump module. The computer terminal module sends the loading displacement to the PLC control module through the network. The PLC control module controls the flow and direction of the oil pump module through the PID algorithm. The oil pump module has several sets, and the number is configured according to the number of the forward contraction rods and the transverse contraction rods. The forward contraction rods are connected to the corresponding oil pump modules to control the displacement of the forward sliding seat, and the transverse contraction rods are connected to the corresponding oil pump modules to control the displacement of the transverse sliding seat. ;
[0006] Furthermore, a slope which gradually becomes lower from the inside to the outside along the transverse bridge is provided on the back side of the steel pipe joint seat, and an inclination adjustment pad is provided between the steel pipe joint seat and the transverse sliding seat. A roller is provided at the front end of the inclination adjustment pad facing inward along the transverse bridge, and the roller is pressed against the slope. When the inclination adjustment pad is squeezed inward along the transverse bridge, the outer side of the steel pipe joint seat is lifted up.
[0007] Another aspect of the present invention provides a construction method using the above-mentioned construction device, characterized in that the construction steps are as follows: ① adjust the displacement of the forward sliding seat and the transverse sliding seat according to the size of the lower port of the steel shell tower segment, and temporarily fix them; ② adjust the lifting height of the outer side of the steel pipe joint seat according to the inclination angle of the transverse bridge direction of the steel pipe to be spliced, and temporarily fix it, and adjust the displacement of the forward sliding bracket on the forward sliding track according to the inclination angle of the steel pipe to be spliced in the longitudinal direction, and temporarily fix it; ③ hoist the first steel pipe to be spliced, correct the position of its bottom in the transverse bridge direction and the longitudinal direction and its own inclination angle, and then install the limit baffle; ④ hoist the second steel pipe to be spliced, correct the position of its bottom in the transverse bridge direction and the longitudinal direction and its own inclination angle, and then install the limit baffle, and temporarily connect the second and first steel pipes to be spliced with steel sections at the upper port of the segment. ⑤ Hoist the third steel pipe to be spliced, correct the position of its bottom in the transverse direction and along the bridge direction and its own inclination angle, and then install the limit baffle, and temporarily bolt and fix the third and the first two steel pipes to be spliced in pairs with steel at the upper end of the segment; ⑥ Hoist the fourth steel pipe to be spliced, correct the position of its bottom in the transverse direction and along the bridge direction and its own inclination angle, and then install the limit baffle, and temporarily bolt and fix the fourth and the first three steel pipes to be spliced in pairs with steel at the upper end of the segment; ⑦ Remove the temporary connection steel between the first and the second steel pipes to be spliced, hoist the first segment web, position and temporarily fix it; ⑧ And so on, complete the hoisting of subsequent webs in sequence, and weld after the overall splicing inspection of the segment is completed. After welding is completed, remove the connecting steel between the first and the third, and the second and the fourth steel pipes to be spliced.
[0008] Compared with the prior art, the outstanding effects of the present invention are: ① A CNC hydraulic device is used to meet the precise adjustment of the port size and the oblique angle of the steel shell segment, with a high degree of digitization, and each component of the segment can be quickly positioned; ② Compared with the traditional positioning method, there are fewer segment size accuracy control points, no error superposition will occur, the positioning accuracy is guaranteed, and the segment size deviation accuracy can be controlled within 1mm; ③ The method of splicing single segments on the ground and then hoisting and assembling is fast and efficient, and reduces the safety risks of high-altitude operations; ④ It has strong applicability, not only suitable for variable-section steel shell towers, but also various special-section steel shell towers; ⑤ The damage and pollution to the outer wall of the steel shell tower is greatly reduced, and the appearance quality is greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a structural schematic diagram of the construction device of the embodiment;
[0010] Figure 2 is a structural schematic diagram of a bottom platform adjustment component of an embodiment;
[0011] Figure 3 is a schematic structural diagram of an inclination adjustment pad block of an embodiment;
[0012] Figure 4 2 is a schematic structural diagram of a steel pipe inclination adjustment component of an embodiment;
[0013] Figure 5 It is a schematic diagram of the structure of the internal working platform of the embodiment;
[0014] Figure 6 It is a structural schematic diagram of the external working platform of the embodiment;
[0015] Figure 7 is a schematic structural diagram of a hydraulic loading component of an embodiment;
[0016] Figure 8 2 is a construction schematic diagram of hoisting the first steel pipe to be spliced in the embodiment;
[0017] Fig. 9 2 is a construction schematic diagram of hoisting the second and third steel pipes to be spliced in the embodiment;
[0018] Fig.10 2 is a construction schematic diagram of hoisting the fourth steel pipe to be spliced in the embodiment;
[0019] Fig.11 It is a construction schematic diagram of hoisting the first web in the embodiment. DETAILED DESCRIPTION
[0020] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.
[0021] like Figure 1As shown, an embodiment of the construction device for assembling variable-section steel shell tower segments of the present invention includes a bottom platform adjusting component 1, a steel pipe inclination adjusting component 2, an internal working platform 3, an external working platform 4 and a hydraulic loading component 5. The bottom platform adjusting component 1 is used to adjust the horizontal positions of the steel pipes to be spliced in the transverse and longitudinal directions and the inclination angles in the transverse direction. The steel pipe inclination adjusting component 2 is used to adjust the inclination angles of the steel pipes to be spliced in the longitudinal direction. The internal working platform 3 and the external working platform 4 are used for personnel operations during splicing construction. The hydraulic loading component 5 provides power and displacement for the longitudinal contraction rods 1-5 and the transverse contraction rods 1-6 in the bottom platform adjusting component 1.
[0022] like Figure 2 As shown, the bottom platform adjustment component 1 in the embodiment is provided with a pair of forward track beams 1-1 and a pair of transverse track beams 1-2, the forward track beams 1-1 are fixed to the ground, and the transverse track beams 1-2 are placed on the forward track beams 1-1 in a tic-tac-toe shape. Each forward track beam 1-1 is provided with a pair of forward sliding seats 1-3 that can move thereon, and the corresponding transverse track beams 1-2 are connected to the forward sliding seats 1-3. Each transverse track beam 1-2 is provided with a pair of transverse sliding seats 1-4 that can move thereon. The forward track beam 1-1 is provided with a forward contraction rod 1-5, which is connected to the forward sliding seat 1-3 and is used to change the displacement of the forward sliding seat 1-3. The transverse track beam 1-2 is provided with a transverse contraction rod 1-6, which is connected to the transverse sliding seat 1-4 and is used to change the displacement of the transverse sliding seat 1-4. A steel pipe joint seat 1-7 for placing the steel pipes to be spliced is arranged on the transverse sliding seat 1-4. The steel pipe joint seat 1-7 is hinged to the transverse sliding seat 1-4 in the inner transverse direction. The outer side of the steel pipe joint seat 1-7 can be raised to change the inclination angle of the steel pipes to be spliced in the transverse direction. A limited baffle 1-8 is arranged on the steel pipe joint seat 1-7 to ensure that the bottom of the steel pipes to be spliced will not be displaced when the steel pipes to be spliced are tilted.
[0023] like Figure 3 As shown, in order to raise the outer side of the steel pipe joint seat 1-7, in this embodiment, a slope 1-9 which gradually becomes lower from the inside to the outside along the transverse bridge direction is provided on the back side of the steel pipe joint seat 1-7, and an inclination adjustment pad 1-10 is provided between the steel pipe joint seat 1-7 and the lateral sliding seat 1-4. A roller 1-11 is provided at the front end of the inclination adjustment pad 1-10 facing inward along the transverse bridge direction, and the roller 1-11 is supported on the slope 1-9. When the inclination adjustment pad 1-10 is squeezed inward along the transverse bridge, the outer side of the steel pipe joint seat 1-7 is lifted up, thereby changing the inclination angle of the steel pipe to be spliced in the transverse bridge direction.
[0024] like Figure 4As shown, the steel pipe inclination adjustment component 2 is provided with a forward sliding track 2-1, on which a forward sliding bracket 2-2 is provided which can move thereon, and the height matches the steel pipe to be spliced. A U-shaped end 2-3 is provided at the upper end of the forward sliding bracket 2-2 for clamping the steel pipe to be spliced. Figure 1 As shown, there are four groups of steel pipe inclination adjustment components 2, corresponding to four steel pipes to be spliced, arranged along the longitudinal direction of the bridge, and the U-shaped end 2-3 faces the corresponding steel pipes to be spliced. When the longitudinal sliding bracket 2-2 moves inward along the longitudinal bridge, the U-shaped end 2-3 will push the middle and upper parts of the steel pipes to be spliced to change their inclination angles along the longitudinal direction of the bridge.
[0025] like Figure 5 As shown, the internal working platform 3 is provided with a central working layer 3-1, the plane size of the central working layer 3-1 matches the cross-sectional size of the steel shell tower and a gap is reserved. The central working layer 3-1 is supported above the ground by four structural scaffolds 3-2 installed at the four corners, and the height matches the height of the steel pipes to be spliced. A vertical ladder 3-3 leading to the ground is arranged in the middle of the central working layer 3-1, and guardrails 3-4 are arranged around it. Connecting beams 3-5 are arranged between the structural scaffolds 3-2.
[0026] like Figure 1 As shown, there are four groups of external working platforms 4, corresponding to four steel pipes to be spliced, and arranged beside the steel pipes to be spliced along the longitudinal direction of the bridge. Figure 6 As shown, each set of external working platforms 4 is provided with a rectangular personnel operating layer 4-1, and a load-bearing scaffold 4-2 is provided below the personnel operating layer 4-1 to support the ground, and the height matches the height of the steel pipes to be spliced. An inclined step ladder 4-3 is provided downward on one side of the personnel operating layer 4-1, and protective railings 4-4 are provided on the other three sides. The inclined step ladder 4-3 is provided with a handrail 4-5.
[0027] like Figure 7 As shown, the hydraulic loading component 5 includes a computer terminal module 5-1, a PLC control module 5-2, and an oil pump module 5-3. The computer terminal module 5-1 sends the loading displacement to the PLC control module 5-2 through the network, and the PLC control module 5-2 controls the flow and direction of the oil pump module 5-3 through the PID algorithm. The number of oil pump modules 5-3 is configured according to the number of the forward contraction rods 1-5 and the transverse contraction rods 1-6. The forward contraction rods 1-5 are connected to the corresponding oil pump modules 5-3 to control the displacement of the forward sliding seat 1-3, and the transverse contraction rods 1-6 are connected to the corresponding oil pump modules 5-3 to control the displacement of the transverse sliding seat 1-4.
[0028] In this embodiment, the construction device is carried out in the following order in actual operation:
[0029] like Figure 8As shown, the displacement of the forward sliding seat 1-3 and the transverse sliding seat 1-4 is adjusted according to the size of the lower port of the steel shell tower segment, and temporarily fixed; the lifting height of the outer side of the steel pipe joint seat 1-7 is adjusted according to the inclination angle of the steel pipe to be spliced in the transverse direction, and temporarily fixed; the displacement of the forward sliding bracket 2-2 on the forward sliding track 2-1 is adjusted according to the inclination angle of the steel pipe to be spliced in the longitudinal direction, and temporarily fixed; the first steel pipe to be spliced is hoisted, and the position of its bottom in the transverse direction and the longitudinal direction as well as its own inclination angle is corrected, and then the limit baffle 1-8 is installed.
[0030] like Fig. 9 As shown, the second steel pipe to be spliced is hoisted, and the position of its bottom in the transverse direction and along the bridge as well as its own inclination angle is corrected before installing the limit baffle 1-8, and the second and first steel pipes to be spliced are temporarily bolted and fixedly connected at the upper end of the segment with steel sections; the third steel pipe to be spliced is hoisted, and the position of its bottom in the transverse direction and along the bridge as well as its own inclination angle is corrected before installing the limit baffle 1-8, and the third and the first two steel pipes to be spliced are temporarily bolted and fixedly connected in pairs at the upper end of the segment with steel sections.
[0031] like Fig.10 As shown, the fourth steel pipe to be spliced is hoisted, and the position of its bottom in the transverse direction and along the bridge direction and its own inclination angle are corrected, and then the limit baffle 1-8 is installed, and the fourth steel pipe to be spliced is temporarily bolted and fixed in pairs with the first three steel pipes to be spliced at the upper end of the segment with steel sections;
[0032] like Fig.11 As shown, the temporary connecting steel between the first and second steel pipes to be spliced is removed, and the first segment web is hoisted, positioned and temporarily fixed; and so on, the hoisting of subsequent webs is completed in sequence, and welding is carried out after the overall segment splicing inspection is completed. After the welding is completed, the connecting steel between the first and third, and the second and fourth steel pipes to be spliced are removed.
[0033] Finally, the finished steel tower segments are transferred to a temporary storage site to start assembly of the next segment.
Claims
1. A construction device for assembling variable-section steel shell tower segments, characterized in that: It comprises a bottom platform adjustment component (1), a steel pipe inclination adjustment component (2), an internal working platform (3), an external working platform (4), and a hydraulic loading component (5), wherein: ① The bottom platform adjustment component (1) is provided with a pair of forward track beams (1-1) and a pair of transverse track beams (1-2), wherein the forward track beams (1-1) are fixed to the ground, and the transverse track beams (1-2) are placed on the forward track beams (1-1) in a tic-tac-toe shape, and each of the forward track beams (1-1) is provided with a pair of forward sliding seats (1-3) movable on the forward track beams (1-1), and the forward sliding seats (1-3) are connected to the corresponding transverse track beams (1-2), and each of the transverse track beams (1-2) is provided with a pair of transverse sliding seats (1-4) movable on the transverse track beams (1-2), and the forward track beams (1-1) are provided with a forward contraction rod (1-5), and the forward contraction rod (1-5) is connected to the A lateral contraction rod (1-6) is arranged on the forward sliding seat (1-3) for changing the displacement of the forward sliding seat (1-3); the lateral track beam (1-2) is provided with a lateral contraction rod (1-6); the lateral contraction rod (1-6) is connected to the lateral sliding seat (1-4) for changing the displacement of the lateral sliding seat (1-4); a steel pipe joint seat (1-7) for placing the steel pipes to be spliced is arranged on the lateral sliding seat (1-4); the steel pipe joint seat (1-7) is hinged to the lateral sliding seat (1-4) in the inner transverse direction; the outer side of the steel pipe joint seat (1-7) can be raised to change the transverse inclination of the steel pipes to be spliced; a limit baffle (1-8) is arranged on the steel pipe joint seat (1-7) to ensure that the bottom of the steel pipes to be spliced will not be displaced when the steel pipes to be spliced are tilted; ② There are four groups of the steel pipe inclination adjustment components (2), each group of the steel pipe inclination adjustment components (2) is provided with a forward sliding track (2-1), on which a forward sliding bracket (2-2) that can move on the forward sliding track (2-1) is provided, the height of the forward sliding bracket (2-2) matches the steel pipe to be spliced, and the upper end of the forward sliding bracket (2-2) is provided with a U-shaped end head (2-3) for clamping the steel pipe to be spliced, the steel pipe inclination adjustment components (2) respectively correspond to four steel pipes to be spliced, and are arranged along the longitudinal direction of the bridge, and the U-shaped end head (2-3) is directly opposite to the corresponding steel pipe to be spliced, when the forward sliding bracket (2-2) moves inward along the longitudinal direction of the bridge, the U-shaped end head (2-3) will push the middle and upper part of the steel pipe to be spliced to change its inclination angle along the longitudinal direction of the bridge; ③ The internal working platform (3) is provided with a central working layer (3-1), the plane size of the central working layer (3-1) matches the cross-sectional size of the steel shell tower and a gap is reserved, the central working layer (3-1) is supported above the ground by four structural scaffolds (3-2) installed at the four corners, the height of the central working layer (3-1) matches the height of the steel pipe to be spliced, a vertical ladder (3-3) leading to the ground is arranged in the middle of the central working layer (3-1), guardrails (3-4) are arranged around the central working layer (3-1), and connecting beams (3-5) are arranged between the structural scaffolds (3-2); ④ There are four groups of the external working platforms (4), corresponding to four steel pipes to be spliced respectively, and arranged beside the steel pipes to be spliced along the longitudinal direction of the bridge. Each group of the external working platforms (4) is provided with a rectangular personnel operating layer (4-1), and a load-bearing scaffolding (4-2) is provided below the personnel operating layer (4-1) to support it above the ground. The height of the personnel operating layer (4-1) matches the height of the steel pipes to be spliced. An inclined step ladder (4-3) is provided downward on one side of the personnel operating layer (4-1), and protective railings (4-4) are provided on the other three sides of the personnel operating layer (4-1). The inclined step ladder (4-3) is provided with a handrail (4-5); ⑤ The hydraulic loading component (5) comprises a computer terminal module (5-1), a PLC control module (5-2), and an oil pump module (5-3). The computer terminal module (5-1) sends the loading displacement to the PLC control module (5-2) through the network. The PLC control module (5-2) controls the flow and direction of the oil pump module (5-3) through a PID algorithm. The oil pump module (5-3) has a plurality of sets, and the number of sets is configured according to the number of the forward contraction rods (1-5) and the transverse contraction rods (1-6). The forward contraction rods (1-5) are connected to the corresponding oil pump modules (5-3) to control the displacement of the forward sliding seat (1-3). The transverse contraction rods (1-6) are connected to the corresponding oil pump modules (5-3) to control the displacement of the transverse sliding seat (1-4).
2. The construction device according to claim 1, characterized in that: The back of the steel pipe joint seat (1-7) is provided with an inclined surface (1-9) which gradually becomes lower from the inside to the outside along the transverse bridge direction. An inclination adjustment pad (1-10) is provided between the steel pipe joint seat (1-7) and the transverse sliding seat (1-4). The front end of the inclination adjustment pad (1-10) facing inward along the transverse bridge direction is provided with a roller (1-11). The roller (1-11) is pressed against the inclined surface (1-9). When the inclination adjustment pad (1-10) is squeezed inward along the transverse bridge, the outer side of the steel pipe joint seat (1-7) is lifted up.
3. A construction method using the construction device according to claim 1, characterized in that: The construction steps are as follows: ① adjusting the displacement of the forward sliding seat (1-3) and the transverse sliding seat (1-4) according to the size of the lower port of the steel shell tower segment, and temporarily fixing them; ② adjusting the lifting height of the outer side of the steel pipe joint seat (1-7) according to the inclination angle of the steel pipe to be spliced in the transverse direction and temporarily fixing it, and adjusting the displacement of the forward sliding bracket (2-2) on the forward sliding track (2-1) according to the inclination angle of the steel pipe to be spliced in the longitudinal direction and temporarily fixing it; ③ hoisting the first steel pipe to be spliced, correcting the position of its bottom in the transverse direction and along the bridge direction and its own inclination angle, and then installing the limit baffle (1-8); ④ hoisting the second steel pipe to be spliced, correcting the position of its bottom in the transverse direction and along the bridge direction and its own inclination angle, and then installing the limit baffle (1-8), and temporarily bolting and fixing the second and first steel pipes to be spliced at the upper end of the segment with steel; ⑤ hoisting the third steel pipe to be spliced, correcting the position of its bottom in the transverse direction and along the bridge direction and its own inclination angle, and then installing the limit baffle (1-8), and temporarily bolting and fixing the third steel pipe to be spliced with the first two steel pipes in pairs at the upper end of the segment with steel; ⑥ hoist the fourth steel pipe to be spliced, correct the position of its bottom in the transverse direction and along the bridge direction and its own inclination angle, and then install the limit baffle (1-8), and use steel sections to temporarily bolt and fix the fourth steel pipe to be spliced with the first three steel pipes in pairs at the upper end of the segment; ⑦ Remove the temporary connecting steel between the first and second steel pipes to be spliced, hoist the first segment web, position it and temporarily fix it; ⑧ Similarly, the subsequent webs are hoisted in sequence, and welding is carried out after the overall segment splicing inspection is completed. After welding is completed, the connecting steels between the first and third, and the second and fourth steel pipes to be spliced are removed.