Gas well production pipe column preset type blocking device and under-pressure operation method

By designing a pre-installed blocking device for gas well production pipe columns, the controllable switching function is achieved by using the breakage of sliding sleeves and pins, the problems of frequent blocking and well repairs in gas well belt pressure operations are solved, and the operation reliability and stability are improved. Avoid mechanical blockage and realize the pre-installed blockage function.

CN119062271APending Publication Date: 2024-12-03CHINA NAT PETROLEUM CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310637415.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-31
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Frequent blocking and well repairs are required during the gas well belt pressure operation, resulting in cumbersome operations and poor reliability of blocking, and the preset controllable switch blocking function cannot be realized. Especially in the early stages of the development of shale gas and tight gas wells, the wellhead pressure is high, making it difficult to prevent oil and gas. Squirt out.

Method used

Design a pre-installed blocking device for gas well production pipe columns, including upper joints, steel balls, upper shear pins, upper sliding sleeves, lower shear pins, lower sliding sleeves, outer cylinders and lower joints, and the sliding sleeves and The pin breaks, realizes the controllable switch blocking function, avoids mechanical blockage, and ensures stable tool performance.

Benefits of technology

It realizes that there is no need for mechanical blocking again during the gas well production process, and realizes the controllable switching function in the pipe, reduces operation complexity and well control risks, and ensures the stable performance of the tool.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062271A_ABST
    Figure CN119062271A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of oil-gas field development downhole operation, and particularly discloses a gas well production tubular column preset type blocking device and an under-pressure operation method.In the under-pressure tubular column lowering process, the device is connected to the bottom of a tubular column, and at the moment, an upper shear pin penetrates through a body to fix an upper-stage sliding sleeve in an inner cavity of the body; a lower shear pin penetrates through the body to fix the lower-stage sliding sleeve in an inner cavity of the body, and a production channel is opened through pressing before production; in the production process, if well repair needs exist, only the steel ball needs to be put into the pipe column, and pipe interior plugging can be achieved through pressing again. In the whole gas well under-pressure operation process, mechanical plugging operation does not need to be carried out again; the preset blocking function of the gas well production pipe column is achieved, and the in-pipe mechanical plugging process is omitted; through the internal two-stage sliding sleeve design, the function of controllable opening and closing in the pipe is achieved; the bottom sliding sleeve limiting type structural design ensures the stable performance of the tool.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of downhole operation in oil and gas field development, and in particular relates to a pre-placed plugging device for a gas well production pipe column and a pressure operation method. Background Art

[0002] Gas well pressure operation is an advanced operation technology that controls the annular space and the internal pressure of the pipe string separately to realize the lifting and lowering of the gas well pipe string under pressure, which is a green and environmentally friendly operation technology that protects the reservoir. The well control equipment is used to control the wellhead pressure, and the dynamic sealing of the annular space of the casing and the blowout prevention of the pipe string during the construction operation are solved without killing the well. At present, in the field of gas well pressure operation, it is necessary to install a rupture disk or a pre-set plugging device at the bottom of the pipe string to control the internal pressure of the oil pipe through the plugging device, and then apply external force to the pipe string to overcome the upward force in the well, so as to complete the operation of lifting and lowering the pipe string under pressure. In addition, the well repair operation during the production process needs to plug the pipe string again. The operation process is relatively cumbersome, and the reliability of plugging is poor, which increases the risk of well control operation to a certain extent. For shale gas and tight gas, the wellhead pressure is often high in the early stage of development. According to relevant technical requirements, it is necessary to install a pipe plugging device at the bottom of the pipe string to prevent the oil and gas at the bottom of the pipe from spraying upward. At present, plugging devices and rupture disks are mostly imported, and the pre-set controllable switch plugging function cannot be realized. Summary of the invention

[0003] In order to overcome the shortcomings of the prior art, the purpose of the present invention is to provide a pre-set plugging device for a gas well production tubing and a pressurized operation method, so as to solve the problem that the tubing needs to be plugged again during the well repair operation in the production process, the gas well pressurized operation process is cumbersome, the plugging reliability is poor, and the preset controllable switch plugging function cannot be realized.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] In the first aspect, the present invention provides a pre-set plugging device for a gas well production pipe column, characterized in that it comprises: an upper joint, a steel ball, an upper shear pin, an upper sleeve, a lower shear pin, a lower sleeve, an outer tube and a lower joint; the upper joint, the outer tube and the lower joint are connected in sequence, and the top of the upper joint is used to connect the oil pipe; two third through holes are symmetrically provided on the outer tube, and the third through holes are connected to the annulus of the oil casing; the top of the inner cavity of the outer tube is connected to the upper sleeve and the lower sleeve in sequence; in the initial state, there is no steel ball in the device, and the plugging device is connected to the bottom end of the pipe column; in the production state, the lower sleeve is pressed to cut off the lower shear pin and move downward, so that the third through hole is connected to the annulus of the oil casing; when a complex situation occurs in the oil and gas well, a steel ball is put into the inner cavity of the outer tube, the upper shear pin is pressed to cut off, and the upper sleeve moves downward to close the third through hole;

[0006] The upper shear pin penetrates the body to fix the upper sliding sleeve in the inner cavity of the body; the lower shear pin penetrates the body to fix the lower sliding sleeve in the inner cavity of the body.

[0007] Furthermore, the upper joint, outer tube and lower joint are all cylindrical structures, the bottom of the upper joint is provided with an external thread, the top of the outer tube is provided with an internal thread, the internal thread provided at the top of the outer tube is connected to the external thread provided at the bottom of the upper joint, and the bottom of the outer tube is provided with an internal thread; the top of the lower joint is provided with an external thread, and the external thread provided at the top of the lower joint is connected to the internal thread provided at the bottom of the outer tube.

[0008] Furthermore, a sealing groove is provided on the outer side of the bottom of the upper joint, and a sealing ring is provided in the sealing groove;

[0009] The upper sleeve is a cylindrical structure, and sealing grooves are provided on the top and bottom outer sides of the upper sleeve, and sealing rings are provided in the sealing grooves;

[0010] The lower-stage sliding sleeve is a cylindrical structure, a sealing groove is provided on the outer side of the top of the lower-stage sliding sleeve, and a sealing ring is provided in the sealing groove.

[0011] Furthermore, two first through holes are symmetrically opened on the top of the main body, and a first groove is opened on the top of the upper sliding sleeve. Before the pressure operation, one end of the upper shear pin is arranged in the first groove, and the other end is penetrated and arranged in the first through hole.

[0012] Furthermore, two second through holes are symmetrically opened in the middle of the body, and a second groove is opened on the top of the lower sleeve. Before pressure operation, one end of the lower shear pin is set in the second groove, and the other end is passed through the second through hole.

[0013] Furthermore, a third groove is provided on the lower-level sliding sleeve, and before pressure operation, the third groove and the third through hole are arranged correspondingly.

[0014] Furthermore, two fourth through holes are symmetrically provided on the main body. Before pressure operation, the locking pin is arranged in the fourth through hole, and the spring and the clamping screw are connected to the locking pin in sequence.

[0015] In a second aspect, the present invention provides a pressure operation method, based on a pre-placed plugging device for a gas well production string as described in any one of the above, comprising:

[0016] S1: Connect the plugging device to the bottom of the production pipe string, and seal the lower sleeve and the outer tube during the lowering process;

[0017] S2: After the production string is lowered to the predetermined position, the oil pipe is pressurized. When the pressure level reaches the critical value for the shearing of the lower shear pin, the lower shear pin breaks, and the lower sliding sleeve falls to the bottom of the body cavity. The third through hole is connected to the oil and casing annulus, and the gas well is produced;

[0018] S3: After the gas well has been produced for a period of time, during well repair under pressure, steel balls are put in and pressure is applied. When the pressure reaches the shearing critical value of the upper shear pin, the upper shear pin breaks, and the upper sleeve slides down to contact the top of the lower sleeve, and the pipe string is lifted under pressure.

[0019] Furthermore, in step S2, after the oil pipe is pressurized, the lower sleeve slides to the bottom position of the inner cavity of the body, and the third groove is connected to the locking pin.

[0020] Furthermore, in the step S3, during the well repair under pressure, a steel ball is put in and pressurized, the upper shear pin breaks, the upper sleeve slides to the top of the lower sleeve, the upper sleeve seals the third through hole, and the steel ball is set on the top of the upper sleeve.

[0021] The present invention has at least the following beneficial effects:

[0022] During the process of lowering the pipe string under pressure, the device is connected to the bottom of the pipe string. At this time, the upper shear pin penetrates the body to fix the upper sleeve in the inner cavity of the body; the lower shear pin penetrates the body to fix the lower sleeve in the inner cavity of the body, and the production channel is opened by pressurization before production; if there is a need for well repair during the production process, only steel balls need to be put into the pipe string, and the pipe can be sealed by pressurization again. During the entire gas well pressure operation process, there is no need to perform mechanical plugging operations again; the preset plugging function of the gas well production pipe string is realized, eliminating the mechanical plugging process in the pipe; the controllable switch function in the pipe is realized through the internal two-stage sleeve design; the bottom sleeve limit structure design ensures the stable performance of the tool. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0024] Figure 1 This is a schematic diagram of the structure of a pre-set plugging device for a gas well production string;

[0025] Figure 2 Schematic diagram of a pre-placed plugging device for the production string of a gas well after being pressurized;

[0026] Figure 3 Schematic diagram of the pre-set plugging device for the production string of a gas well after steel balls are dropped and pressurized.

[0027] Figure numerals: 1. upper joint; 2. steel ball; 3. sealing ring; 4. upper shear pin; 5. upper sleeve; 6. lower shear pin; 7. lower sleeve; 8. outer cylinder; 9. locking pin; 10. clamping screw; 11. spring; 12. lower joint; 13. first through hole; 14. second through hole; 15. third through hole; 16. fourth through hole; 17. first groove; 18. second groove; 19. third groove. DETAILED DESCRIPTION

[0028] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0029] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present invention belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present invention.

[0030] Example 1

[0031] like Figure 1-Figure 3 As shown, a gas well production pipe column pre-set plugging device comprises: an upper joint 1, a steel ball 2, an upper sliding sleeve 5, a lower sliding sleeve 7, an outer tube 8 and a lower joint 12; the upper joint 1, the outer tube 8 and the lower joint 12 are connected in sequence, the upper joint 1, the outer tube 8 and the lower joint 12 are all cylindrical structures, the top of the upper joint 1 is provided with an external thread for connecting the oil pipe, the bottom of the upper joint 1 is provided with an external thread, the top of the outer tube 8 is provided with an internal thread, the internal thread provided at the top of the outer tube 8 is connected with the external thread provided at the bottom of the upper joint 1, and the bottom of the outer tube 8 is provided with an internal thread; the top of the lower joint 12 is provided with an external thread, and the lower joint 12 is provided with an internal thread. The external thread arranged at the top of 12 is connected with the internal thread arranged at the bottom of the outer tube 8; two third through holes 15 are symmetrically opened on the outer tube 8, and the third through holes 15 are connected with the oil casing annulus; the top of the inner cavity of the outer tube 8 is connected with the upper sliding sleeve 5 and the lower sliding sleeve 7 in sequence; in the initial state, there is no steel ball in the device, and the plugging device is connected to the bottom end of the pipe string; in the production state, the lower sliding sleeve 7 is pressurized to cut off the lower shear pin 6 and move downward, so that the third through hole 15 is connected with the oil casing annulus; when a complex situation occurs in the oil and gas well, the steel ball 2 is put into the inner cavity of the outer tube 8, the upper shear pin 4 is pressurized to cut off, and the upper sliding sleeve 5 moves downward to close the third through hole 15.

[0032] An annular sealing groove is provided on the outer side of the bottom of the upper joint 1 , and a sealing ring 3 is arranged in the sealing groove to ensure that the upper joint 1 is in a sealed state when connected to the body 8 .

[0033] The upper sleeve 5 is a cylindrical structure. The outer sides of the top and bottom of the upper sleeve 5 are provided with annular sealing grooves. The sealing grooves are provided with sealing rings 3 for sealing the third through hole 15 after the ball is thrown and pressed.

[0034] Two first through holes 13 are symmetrically opened on the top of the main body 8, and an annular first groove 17 is opened on the top of the upper sleeve 5. Before the pressure operation, one end of the upper shear pin 4 is set in the first groove 17, and the other end is penetrated in the first through hole 13. The upper shear pin 4 penetrates the main body 8 to fix the upper sleeve 5 in the inner cavity of the main body 8.

[0035] The lower sleeve 7 is a cylindrical structure. An annular sealing groove is provided on the outer side of the top of the lower sleeve 7. A sealing ring 3 is provided in the sealing groove to seal the lower sleeve 7 and the body 8.

[0036] Two second through holes 14 are symmetrically opened in the middle of the main body 8, and a second annular groove 18 is opened on the top of the lower sleeve 7. Before the pressure operation, one end of the lower shear pin 6 is set in the second groove 18, and the other end is penetrated in the second through hole 14. The lower shear pin 6 penetrates the main body 8 to fix the lower sleeve 7 in the inner cavity of the main body 8.

[0037] The lower sliding sleeve 7 is also provided with an annular third groove 19 . Before the pressure operation, the third groove 19 is arranged corresponding to the third through hole 15 .

[0038] Two fourth through holes 16 are symmetrically provided on the body 8. Before pressure operation, the locking pin 9 is arranged in the fourth through hole 16, and the spring 11 and the clamping screw 10 are connected with the locking pin 9 in sequence.

[0039] like Figure 2 As shown, after the oil pipe is pressurized, the lower shear pin 6 breaks, the lower sleeve 7 slides to the bottom position of the inner cavity of the body 8, and the third groove 19 is connected to the locking pin 9.

[0040] like Figure 3 As shown, during well repair under pressure, the steel ball 2 is put in and pressurized, the upper shear pin 4 breaks, the upper sleeve 5 slides to the top of the lower sleeve 7, the upper sleeve 5 seals the third through hole 15, and the steel ball 2 is set on the top of the upper sleeve 5.

[0041] Example 2

[0042] A pressure operation method, comprising:

[0043] S1: During the process of lowering the production string under pressure in the gas well, the plugging device is connected to the bottom of the production string. During the lowering process, the lower sleeve 7 and the outer tube 8 are sealed to achieve pressure control in the pipe;

[0044] S2: After the production string is lowered to the predetermined position, the oil pipe is pressurized. When the pressure level reaches the critical value for shearing of the lower shear pin 6, the lower shear pin 6 breaks, and the lower sliding sleeve 7 falls into the bottom position of the inner cavity of the body 8. The spring 11 is compressed, and the locking pin 9 is connected to the third groove 19. At this time, the third through hole 15 on the outer tube 8 body is connected to the oil casing annulus, and the gas well can be produced;

[0045] S3: If there is a need for well repair under pressure after the gas well has been produced for a period of time, there is no need for mechanical plugging at this time. Just put in the steel ball 2 and then pressurize it. When the pressure reaches the shearing critical value of the upper shear pin 4, the upper shear pin 4 breaks, and the upper sleeve 5 slides down to contact the top of the lower sleeve 7. At this time, the two sets of sealing rings 3 on the upper sleeve 5 close the third through hole 15 on the outer tube 8 to realize the pressure control in the pipe, and then the operation of lifting the pipe string under pressure can be carried out directly.

[0046] It is known from common technical knowledge that the present invention can be implemented by other embodiments that do not deviate from its spirit or essential features. Therefore, the above disclosed embodiments are only illustrative in all respects and are not exclusive. All changes within the scope of the present invention or within the scope equivalent to the present invention are included in the present invention.

[0047] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A pre-set plugging device for a gas well production string, characterized in that: include: An upper joint (1), a steel ball (2), an upper shear pin (4), an upper sleeve (5), a lower shear pin (6), a lower sleeve (7), an outer tube (8) and a lower joint (12); the upper joint (1), the outer tube (8) and the lower joint (12) are connected in sequence, and the top of the upper joint (1) is used to connect the oil pipe; two third through holes (15) are symmetrically provided on the outer tube (8), and the third through holes (15) are connected to the annulus of the oil casing; the top of the inner cavity of the outer tube (8) is connected in sequence An upper sliding sleeve (5) and a lower sliding sleeve (7) are connected; in the initial state, there is no steel ball in the device, and the plugging device is connected to the bottom end of the pipe string; in the production state, the lower sliding sleeve (7) is pressed to cut off the lower shear pin (6) and move downward, so that the third through hole (15) is connected to the oil casing annulus; when a complex situation occurs in the oil and gas well, a steel ball (2) is put into the inner cavity of the outer cylinder (8), and the upper shear pin (4) is pressed to cut off, and the upper sliding sleeve (5) moves downward to close the third through hole (15); The upper shear pin (4) penetrates the body (8) to fix the upper sliding sleeve (5) in the inner cavity of the body (8); the lower shear pin (6) penetrates the body (8) to fix the lower sliding sleeve (7) in the inner cavity of the body (8).

2. A gas well production string pre-set plugging device according to claim 1, characterized in that: The upper joint (1), the outer tube (8) and the lower joint (12) are all cylindrical structures. The bottom of the upper joint (1) is provided with an external thread, the top of the outer tube (8) is provided with an internal thread, the internal thread provided at the top of the outer tube (8) is connected to the external thread provided at the bottom of the upper joint (1), and the bottom of the outer tube (8) is provided with an internal thread; the top of the lower joint (12) is provided with an external thread, and the external thread provided at the top of the lower joint (12) is connected to the internal thread provided at the bottom of the outer tube (8).

3. A gas well production string pre-set plugging device according to claim 1, characterized in that: The bottom of the upper joint (1) is provided with a sealing groove, and a sealing ring (3) is arranged in the sealing groove; The upper sleeve (5) is a cylindrical structure, and the top and bottom of the upper sleeve (5) are both provided with sealing grooves on the outside, and a sealing ring (3) is provided in the sealing groove; The lower-level sliding sleeve (7) is a cylindrical structure. A sealing groove is provided on the outer side of the top of the lower-level sliding sleeve (7), and a sealing ring (3) is provided in the sealing groove.

4. A gas well production string pre-set plugging device according to claim 1, characterized in that: Two first through holes (13) are symmetrically provided on the top of the main body (8), and a first groove (17) is provided on the top of the upper sleeve (5). Before pressure operation, one end of the upper shear pin (4) is arranged in the first groove (17), and the other end is arranged through the first through hole (13).

5. A gas well production string pre-set plugging device according to claim 1, characterized in that: Two second through holes (14) are symmetrically provided on the middle of the body (8), and a second groove (18) is provided on the top of the lower sliding sleeve (7). Before pressure operation, one end of the lower shear pin (6) is arranged in the second groove (18), and the other end is arranged through the second through hole (14).

6. A gas well production string pre-set plugging device according to claim 1, characterized in that: The lower-level sliding sleeve (7) is also provided with a third groove (19). Before the pressure operation, the third groove (19) and the third through hole (15) are arranged correspondingly.

7. A gas well production string pre-set plugging device according to claim 1, characterized in that: The body (8) is also symmetrically provided with two fourth through holes (16). Before pressure operation, the locking pin (9) is arranged in the fourth through hole (16), and the spring (11) and the clamping screw (10) are connected to the locking pin (9) in sequence.

8. A pressure operation method, characterized in that: A gas well production pipe pre-set plugging device according to any one of claims 1 to 7, comprising: S1: Connect the plugging device to the bottom of the production pipe column, and seal the lower sliding sleeve (7) and the outer cylinder (8) during the lowering process; S2: After the production string is lowered to the predetermined position, the oil pipe is pressurized. When the pressure level reaches the critical value for shearing the lower shear pin (6), the lower shear pin (6) breaks, and the lower sliding sleeve (7) falls into the bottom position of the inner cavity of the body (8). The third through hole (15) is connected to the oil casing annulus, and the gas well is produced; S3: After the gas well has been produced for a period of time, during well repair under pressure, a steel ball (2) is put in and pressure is applied. When the pressure reaches the shearing critical value of the upper shear pin (4), the upper shear pin (4) breaks, and the upper sleeve (5) slides down to contact the top of the lower sleeve (7), and the operation of lifting the pipe string under pressure is carried out.

9. A pressure operation method according to claim 8, characterized in that: In step S2, after the oil pipe is pressurized, the lower sleeve (7) slides to the bottom position of the inner cavity of the body (8), and the third groove (19) is connected to the locking pin (9).

10. A pressure operation method according to claim 8, characterized in that: In the step S3, when the well is repaired under pressure, the steel ball (2) is put in and pressurized, the upper shear pin (4) is broken, the upper sleeve (5) slides to the top of the lower sleeve (7), the upper sleeve (5) seals the third through hole (15), and the steel ball (2) is set on the top of the upper sleeve (5).