Method for controlling deformation of surrounding rock of mining roadway of deep mine
Through the joint effect of anchor-anchor cable and numerical simulation analysis, a reinforcement support plan for surrounding rock deformation in deep mine recovery tunnels was formulated, which solved the problems of high cost and poor stability of surrounding rock deformation in the existing technology, and realized the surrounding Effective support of rock and safe and efficient mining of tunnels.
Patent Information
- Application Number
- CN202411431348.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology for surrounding rock deformation control of deep mine recovery tunnels has limitations, including high preload anchoring and supporting costs for full-length anchoring, complex construction, reduced performance of pressure relief support materials, difficulty in large-scale application of bottom plate grouting reinforcement and High cost issue.
Using the joint function of anchor rod-anchored cable, the ore pressure display rules are analyzed through numerical simulation software, and the reinforcement and support schemes are formulated under primary mining and secondary mining. Combined with the suspension and reinforcement of anchor cables, the tunnel surrounding rock is realized. and secondary support is carried out when necessary to improve the support effect.
It effectively controls the deformation of surrounding rocks, improves the bearing capacity of surrounding rocks in the tunnel, reduces construction difficulty and cost, ensures the long-term stability and safety of the tunnels, and is suitable for engineering situations in large-scale and complex geological conditions in coal fields.
Smart Images

Figure CN119062400A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, in particular to a method for controlling deformation of surrounding rock in a deep mine mining tunnel. Background Art
[0002] With the continuous exploitation of coal resources, shallow coal resources are gradually exhausted, and mining activities are gradually extending to deeper areas. This trend has brought many challenges, the most notable of which is the deformation of surrounding rock in deep mine recovery tunnels. During deep mining, rock mass stress increases sharply, ground temperature rises, tunnel surrounding rock is severely broken, the plastic zone and broken zone are expanded, and creep phenomenon is intensified, which seriously threatens the safe production and economic benefits of the mine.
[0003] In response to the deformation of surrounding rock in deep mine tunnels, domestic and foreign scholars and engineering technicians have conducted extensive research and developed a series of effective control technologies. These technologies mainly include: (1) Full-length anchor support with high preload force anchor rods: By increasing the preload force of the anchor rods and adopting full-length anchoring, the support strength of the surrounding rock is enhanced and the deformation of the surrounding rock is reduced. Timely support of the upper part of the high wall: Timely support is carried out on the upper part of the high wall of the tunnel to control the lateral deformation of the surrounding rock and maintain the stability of the tunnel.
[0004] (2) Pressure relief support technology: Use pressure relief materials (such as wood materials, stone materials, metal materials and organic chemical materials, etc.) to support the surrounding rock. The stress in the surrounding rock is released through the compression deformation of the pressure relief materials, thereby improving the stress environment of the surrounding rock and reducing the support strength.
[0005] (3) Grouting reinforcement of bottom slab: For broken bottom slab rock layers, grouting reinforcement is used to improve their ability to resist bottom heave, thereby controlling the overall deformation of the tunnel.
[0006] (4) Application of new support materials: With the development of materials science, some new support materials (such as high-strength fiber materials, composite materials, etc.) have been introduced into mine support. These materials have excellent mechanical properties and durability, providing more options for tunnel support.
[0007] It is worth noting that the existing deep mine mining roadway surrounding rock deformation control technology has certain limitations: (1) Limitations of high preload anchor full-length anchor support: Adaptability to rock and soil. This method has high requirements for the adhesion and bonding strength of the rock and soil. If the rock and soil conditions are not good, additional treatment is required, which increases the difficulty and cost of construction. Site condition restrictions: In areas with limited space such as urban centers or adjacent buildings and basements, the setting of anchors may be limited, affecting the support effect. The construction technology requirements are high, and the construction technologies such as drilling and prestressing are complex, requiring professional equipment and operating techniques, otherwise the support quality may be affected. Economic cost: High preload anchor full-length anchor support is usually expensive and may not be economical for projects with limited budgets. Long-term stability and maintenance: Although the initial support effect is good, long-term stability requires regular inspection and maintenance, and repair and replacement in underground projects may be more difficult.
[0008] (2) Limitations of pressure relief support technology: Pressure relief support technology can often achieve significant support effects in the early stage, but with the passage of time and changes in geological conditions, the performance of the pressure relief material may gradually decrease, thus affecting the durability of the support effect. Therefore, the pressure relief support structure needs to be inspected and maintained regularly to ensure its long-term stability. Although pressure relief support technology can effectively release high stress in the surrounding rock, in some cases, the deformation of the surrounding rock may still exceed the expected range. This may be due to the complexity of geological conditions, improper selection of pressure relief materials, or problems during the construction process. Therefore, these factors need to be fully considered during the design and construction process, and corresponding measures need to be taken to strengthen the control of surrounding rock deformation.
[0009] (3) Limitations of base plate grouting reinforcement: Grouting reinforcement is generally applicable to structural reinforcement of a smaller area. For large-area or widely distributed cracks and voids, its reinforcement effect may not be obvious and other auxiliary measures need to be taken. Under certain complex geological conditions, such as high water pressure, high stress or broken strata, the construction difficulty of grouting reinforcement will increase or even be impossible. In addition, the application of grouting reinforcement will be limited when the construction space is small or there are obstacles. Although grouting reinforcement is relatively economical compared to other reinforcement methods, its cost may increase significantly when reinforcing a large area or at depth. At the same time, the selection and procurement of grouting materials also need to consider cost factors. Summary of the invention
[0010] In order to implement reliable deformation control of tunnel surrounding rock under weak and broken surrounding rock conditions without affecting structural safety, the present invention proposes a method for controlling deformation of surrounding rock in deep mine mining tunnels.
[0011] To achieve the above object, the present invention provides the following technical solutions: A method for controlling deformation of surrounding rock in a deep mine mining tunnel comprises the following steps: Arrange multiple mine pressure monitoring stations in the working face track lanes; Obtain monitoring data from the mine pressure monitoring station and derive the law of mine pressure manifestation based on the monitoring data; The numerical simulation software is used to establish a numerical calculation model, and the law of mine pressure manifestation is substituted into the numerical calculation model to obtain the deformation mechanism of the mining tunnel under primary and secondary mining. According to the deformation mechanism of the mining tunnel under primary and secondary mining and the principle of coordinated action of anchor cable and anchor rod, the reinforcement support scheme is obtained. The reinforcement effect of anchor rod is as follows: the anchor rod improves the integrity of the rock mass by bonding with the rock mass, and has the effects of suspension, span reduction, combined arch, reinforcement, etc., which can significantly improve the stress state of the surrounding rock. The suspension and reinforcement effect of anchor cable: the anchor cable not only has the advantages of large anchoring depth, large anchoring force, and can apply large preload, but also can maintain the stability of the loose rock below through its suspension effect when the surrounding rock deformation is large. According to the principle of coordinated action of anchor cable and anchor rod, when the anchor rod and prestressed anchor cable are installed at the same time, the anchor cable can also form an arching effect with the anchor rod group to control the deformation of the surrounding rock and improve the bearing capacity of the surrounding rock. The anchor rod and anchor cable play a common reinforcement role on the surrounding rock. Due to the small engineering extension of the anchor cable, the loose damage zone of the surrounding rock within this deformation range is small. Therefore, both anchor rods and anchor cables are mainly used to reinforce the surrounding rock, jointly improve the bearing capacity of the anchor body, maintain the stability of the surrounding rock, and realize the support of the surrounding rock of the mining tunnel. In the early stage of tunnel excavation support, the flexible support of anchor rods is mainly used, and in the later stage, the suspension function of anchor cables is mainly used. The two do not strengthen the support at the same time, but complement each other, thereby greatly improving the overall support performance of anchor rod support and achieving the purpose of controlling the deformation of the surrounding rock. Under the condition of weak and broken surrounding rock, the deformation of the tunnel surrounding rock is very large. In order to avoid the anchor cable extension exceeding the limit and breaking when using anchor rod-anchor cable combined support, the secondary support method and its working principle can be used to strengthen the support of the anchor cable, thereby realizing the support of the surrounding rock of the mining tunnel.
[0012] As a further solution of the present invention: the number of the mine pressure monitoring stations is at least three.
[0013] As a further solution of the present invention: the numerical simulation software is FLAC3D numerical simulation software, which has mature technology and good use effect.
[0014] As a further solution of the present invention: the deformation mechanism of the mining tunnel under primary mining and secondary mining includes the axial principal stress of the working face track tunnel and its ratio and the morphological characteristics of the plastic zone of the track tunnel surrounding rock in front of the working face.
[0015] As a further solution of the present invention: the method for controlling deformation of surrounding rock in deep mine mining tunnels also includes the following steps: testing the effectiveness of the reinforcement support scheme.
[0016] As a further solution of the present invention: the reinforcement support solution includes driving anchor cables and driving single hydraulic props.
[0017] As a further solution of the present invention: the distance between two adjacent mine pressure monitoring stations is 20m.
[0018] Compared with the prior art, the beneficial effects of the present invention are as follows: based on the deformation mechanism of tunnel surrounding rock under primary mining and secondary mining, the present invention adopts the complementary principle of anchor-anchor cable joint support and the reinforced support design under the influence of primary mining and the reinforced support design under the influence of secondary mining, and proposes a method for controlling the deformation of tunnel surrounding rock in deep mines. The method is suitable for projects with large coal fields, soft coal seam bottom plates, weak and broken roof plates, serious deformation of tunnel surrounding rock, frequent repairs, and sometimes failure of support bodies after being affected by mining. Such projects have great risks of roof collapse, which seriously affect the rapid advancement of the comprehensive mining working face and restrict the safe and efficient mining of the mine. According to the specific geological conditions and production status of the coal mine, the law of mine pressure manifestation in the broken surrounding rock tunnel was analyzed through on-site monitoring, and the deformation mechanism of tunnel surrounding rock was revealed by numerical simulation research, which provided a basis for improving the scientific nature of the tunnel surrounding rock control scheme. The present invention provides specific reinforcement support schemes under the influence of primary and secondary mining, and also provides anchor rod and anchor cable support technology, construction operation and technical requirements to improve the on-site construction level and ensure that the construction quality meets the design requirements. After the research results were applied on-site, a better control effect of tunnel surrounding rock was achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The present invention is a flowchart of a method for controlling deformation of surrounding rock in a deep mine mining tunnel according to an embodiment of the present invention.
[0020] Figure 2 It is a cross-sectional view of the track tunnel support in an embodiment of the present invention.
[0021] Figure 3 It is an implementation diagram of the tunnel reinforcement support scheme under the influence of a single mining in an embodiment of the present invention.
[0022] Figure 4 It is an implementation diagram of the tunnel reinforcement support scheme under the influence of secondary mining in an embodiment of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] Reference Figure 1-Figure 4 A method for controlling deformation of surrounding rock in a deep mine mining tunnel comprises the following steps: (1) First, based on the domestic Changling No. 1 Coal Mine as the engineering background, 5 mine pressure monitoring stations were arranged in the track lane of the 152106 working face, with the distances from the working face being 85m, 105m and 125m respectively, and their serial numbers were 1, 2 and 3 respectively. According to the monitored data, the following analysis was conducted: before the working face was advanced to the monitoring station No. 1, the deep and shallow displacements of the roof did not change much. When the working face passed the monitoring station, that is, the monitoring station was located behind the working face, the shallow displacement gradually increased, and the displacement change rate at the depths of 3m and 4m increased significantly. When the working face was advanced by 110m, that is, the monitoring station was located 25m behind the working face, the displacements at the depths of 3m and 4m almost stopped changing, while the displacements at the depths of 1m and 2m continued to increase with the advancement of the working face. When the working face was advanced by 131m, that is, the monitoring station was located 46m behind the working face, the deep displacement suddenly increased, and as the working face advanced, the deep displacement of the roof gradually increased, and the rate of increase of the deep displacement was greater than that of the shallow displacement. Before the working face was advanced to the monitoring station No. 2, the displacement of the deep and shallow parts of the roof was almost unchanged. When the working face was about 20m away from the monitoring station, the displacement of the surrounding rock at different depths of the two sides increased slightly, and the displacement of the coal pillar side was greater than that of the coal wall side. The displacement of the coal pillar side at depths of 2m, 3m and 4m was slightly greater than that at 1m. When the working face passed the monitoring station, that is, the monitoring station was located behind the working face, the displacement at depths of 2m, 3m and 4m increased sharply. When the working face was advanced by 131m, that is, the monitoring station was located 26m behind the working face, the displacement at depths of 2m, 3m and 4m almost stopped changing, while the displacement at 1m increased slightly with the advancement of the working face. As the working face advanced, the deep displacement increased sharply, while the shallow displacement did not change much, that is, when the monitoring station was located behind the working face, the displacement at depths of 2m, 3m and 4m increased sharply. When the working face was advanced by 156m, that is, the monitoring station was located 51m behind the working face, the deep displacement reached the maximum value and no longer increased; When the No. 3 monitoring station is about 40m away from the working face, the deep displacement of the two sides shows an increasing trend, and the displacement of the coal pillar side is greater than that of the coal wall side. The displacement of the coal pillar side at a depth of 1m has almost no change, and the displacements at depths of 2m, 3m and 4m gradually increase with the advancement of the working face. When the working face is less than 15m away from the monitoring station, the displacement of the deep and shallow parts of the roof gradually increases. When the working face pushes past the monitoring station, that is, the monitoring station is located behind the working face, the displacement change rate at depths of 2m, 3m and 4m increases significantly, and the displacement continues to increase, while the displacement at 1m increases slightly with the advancement of the working face. With the advancement of the working face, both the deep and shallow parts continue to increase. It can be concluded that compared with the advance support pressure, the influence of the support pressure behind the working face on the deformation of the surrounding rock of the track tunnel is more significant. The displacement of the roof behind the working face is greater than the shallow displacement, indicating that the roof has delamination and its position is between 2m and 6m. Under the influence of the supporting pressure behind the working face, the displacement of the two sides increases significantly, and the displacement of the coal pillar side is greater than that of the coal wall side.
[0025] (2) Based on the law of mine pressure manifestation, the damage characteristics of the track tunnel of the 152106 working face of Changling No. 1 Coal Mine were obtained: the deformation of the track tunnel behind the working face was more serious, the convergence of the coal pillar side was greater than that of the coal wall side, the bottom heave was greater near the coal pillar side, the roof sank as a whole, and the anchor rods and cables were broken, which proved that the original support scheme needed to be strengthened.
[0026] (3) Taking Changling No. 1 Coal Mine as the engineering background, a numerical calculation model with the dimensions of 400m×400m×150m in length×width×height was established using FLAC3D numerical simulation software. The coal seam burial depth was 375m, the vertical load was 5MPa, the lateral pressure coefficient was 1.3, and a stress gradient of 0.025MPa was applied. The Mohr-Coulomb strength criterion was adopted, and the tunnel excavation part was simulated by zero unit. When simulating the excavation of the working face, a coal pillar with a width of 100m was left on both sides of the front and rear in the y direction, and a coal pillar with a width of 100m was left on the right side in the x direction. After the excavation was completed, the stress and principal stress were extracted along the axial direction of the tunnel. In order to study the morphological characteristics of the plastic zone of the tunnel surrounding rock under the influence of mining, a numerical calculation model with the dimensions of 60m×60m in length×width was established using FLAC3D numerical simulation software. The bottom of the numerical calculation model was a fixed boundary, and the working face was applied on the top and around. After the excavation was completed, the stress was extracted along the axial direction of the tunnel. The numerical calculation adopts the Mohr-Coulomb strength criterion, and the tunnel excavation part adopts zero unit simulation. The axial principal stress and its ratio of the working face track tunnel and the morphological characteristics of the plastic zone of the track tunnel in front of the working face under the influence of primary and secondary mining are obtained. The analysis shows that the displacement of the tunnel surrounding rock under primary mining is consistent with the range of the tunnel surrounding rock plastic zone, and the displacement of the surrounding rock and the range of the plastic zone in front of the working face are smaller than the displacement of the surrounding rock and the range of the plastic zone behind the working face. The maximum principal stress and the principal stress ratio in front of the working face are smaller than the maximum principal stress and the principal stress ratio behind the working face. The range of the plastic zone of the tunnel surrounding rock in front of the working face is also smaller than that behind the working face, and behind the working face, with the increase of the distance to the working face, the range of the plastic zone gradually increases. After the influence of secondary mining, the maximum principal stress ratio of the track tunnel within 100m in front of the working face is greater than 2.50, the plastic zone is butterfly-shaped, and the size of the butterfly leaf gradually decreases with the increase of the distance to the working face. It is also found that the plastic zone has leap permeability. This reveals the deformation mechanism of the surrounding rock of the mining tunnel under the influence of mining: under the superposition of the original rock stress field and the mining stress field, the tunnel is in a high deviatoric stress environment, and a high deviatoric stress difference appears in the surrounding rock. This non-uniform stress field causes the plastic zone of the tunnel surrounding rock to evolve into a butterfly distribution, resulting in deformation characteristics such as the two walls moving closer together, the roof sinking and the bottom bulging in the tunnel.
[0027] (4) Based on the deformation mechanism of the surrounding rock of the mining tunnel under the influence of mining. According to the complementary principle of the joint support of anchor rods and anchor cables: the role of anchor cables is the same as that of single anchor rods, which can not only strengthen the surrounding rock but also suspend the loose surrounding rock below. The difference between the two is that anchor cables can be anchored in deep stable rock formations, while anchor rods are shorter in length. Under poor surrounding rock conditions, especially under broken surrounding rock conditions, anchor rods cannot be anchored in stable rock formations. At this time, the suspension effect of anchor rods is very small, and the surrounding rock deformation is mainly controlled by its reinforcement effect and the arching effect of the anchor rod group to improve the bearing capacity of the surrounding rock. When anchor rods and prestressed anchor cables are installed at the same time, the anchor rods and anchor cables play a common reinforcement role on the surrounding rock. Due to the small engineering extension of the anchor cable, the loose damage zone of the surrounding rock within this deformation range is small. Therefore, both anchor rods and anchor cables mainly play the role of strengthening the surrounding rock, and jointly improve the bearing capacity of the anchor body and maintain the stability of the surrounding rock. Then, the reinforcement support design under the influence of primary mining and the reinforcement support design under the influence of secondary mining are carried out on the original support: the specific support methods are as follows: The 152106 working face of Changling No. 1 Coal Mine is used as the engineering background: the 152106 working face has three parallel tunnels, namely the working face track tunnel, machine tunnel and return air tunnel. The distance between the working face track tunnel and the machine tunnel is 8m, and the distance between the machine tunnel and the return air tunnel is 200m. The cut eye is arranged vertically with the three tunnels. The cross-sections of the three tunnels of the working face are all rectangular, with a cross-sectional area of 8.58~10.55m 2 , anchor nets, anchor cables and wire mesh are used in combination with belt support, and 11# miner steel is used for support when the roof is broken. During the mining process, the working face track lane is mainly used for air intake, material transportation, pipeline equipment laying, drainage and pedestrians, and serves as the return air lane of the 152107 working face; the machine lane is mainly used for coal transportation and gas extraction; the return air lane is mainly used for return air, pedestrians, gas extraction and drainage.
[0028] Between the working face track tunnel and the machine tunnel, a connecting tunnel is arranged every 100m or so, with a total of 14 connecting tunnels, with a cross section of 8.25 m 2 The support method is anchor net and anchor cable support, which is mainly used for ventilation, refuge chambers and pedestrians.
[0029] Track lane is arranged in C5 b In the coal seam, the roof elevation is +1595m, the tunnel section has a net width of 3.6m, a net height of 2.8m, and a designed length of 1533m. The roof is supported by reinforced resin anchors, anchor cables, anchor beams, belts (steel ropes) and wire mesh, and the tunnel sides are supported by pipe seam anchors, glass anchors and wire mesh.
[0030] Specific support parameters: The top plate is supported by belts, steel ropes, reinforced resin anchors, anchor cables, and diamond wire mesh. The specifications of the resin anchors are: (Φ20mm, 2.2m long), the row spacing is 800mm×1100mm, and 4 sets of anchors are arranged in each row; the belt specifications are: (1.3m long, 0.4m wide), 4 belts are arranged in each row, and the special steel ropes (Φ18.5mm, 2.8m long) made by the electromechanical team are used for longitudinal support, and 4 are arranged in each row. ; Anchor cable specifications: Φ17.8mm, 6.3m long, the support beams are 2.5m long and 1m long No. 11 mining steel, 6 rolls of resin medicine rolls / root, when using 2.5m anchor beam, the anchor cable spacing is 1.8m, the row spacing is 1.5m, and there are 2 anchor cables in each row; when using 1m anchor beam, the anchor cables are arranged along the center line of the tunnel with a row spacing of 2.2m, wire mesh specifications: (4m×1.2m, mesh size is 50×50mm, wire mesh Φ3.6mm).
[0031] Glass anchor rods and wire mesh support are used on the coal wall side of the roadway (glass anchor rod specification Φ16mm, length 1.8m), and pipe seam anchor rods and wire mesh support are used on the coal pillar side (pipe seam anchor rod specification Φ37mm, length 1.8m). Figure 2 .
[0032] Reinforcement support design under the influence of primary mining: The original support plan is: (1) The roof is supported by anchor wire ropes. The specific materials and parameters are as follows: the specifications of the resin anchor rods are Φ20mm×2200mm, the spacing between rows is 800mm×1100mm, and 4 anchor rods are arranged in each row. In addition, belts, steel ropes, and diamond wire mesh are used as surface protection components. The specifications of the belts are 1300mm×400mm in length and width, and 4 are arranged in each row. The specifications of the steel ropes are Φ18.5mm×2800mm, and 4 are arranged in each row. The specifications of the anchor cables are Φ17.8mm×6300mm, the joists are 2500mm long No. 11 mining steel, the spacing between rows is 1800mm×1500mm, and 2 anchor cables are arranged in each row. When the joists are 1000mm long No. 11 mining steel, the anchor cables are arranged along the center line of the tunnel, with a spacing of 2200mm and 1 anchor cable in each row.
[0033] The wire mesh is made of Φ3.6mm steel bars, with a mesh width of 4000mm×1200mm, a mesh opening of 50mm×50mm, a mesh overlap of 100mm, and each grid is tied with 14# lead wire. Each anchor rod and anchor cable uses 2 and 6 rolls of resin rolls respectively.
[0034] (2) Glass anchors and wire mesh are used for support on the side of the coal wall. The specifications of the glass anchors are Φ16mm×1800mm, and each anchor uses two rolls of resin medicine rolls. Pipe seam anchors and wire mesh are used for support on the side of the coal pillar. The specifications of the pipe seam anchors are Φ37mm×1800mm, and the spacing between rows is 1000mm×1100mm.
[0035] The reinforcement support scheme under the influence of primary mining is: (1) Anchor cables are added to the roof. The specifications of the anchor cables are Φ17.8mm×6300mm, the joist is 2500mm long No. 11 mining steel, the spacing between rows is 1800mm×1500mm, there are 2 anchor cables in each row, and each anchor cable uses 6 rolls of resin medicine rolls.
[0036] (2) The coal pillar is reinforced with through-anchor cables. The diameter of the anchor cable is 17.8 mm, and the length is adjusted according to the deformation. The support beam is 2500 mm long No. 11 mining steel, which can also be used in conjunction with δ12 mm × 400 mm × 400 mm steel plates. Glass anchor rods are reinforced with glass anchor rods, with a specification of Φ16 mm × 1800 mm, and each anchor rod uses 2 rolls of resin medicine rolls.
[0037] (3) Install single hydraulic pillars. On the premise of ensuring that the track can be used normally, install a row of single hydraulic pillars along the direction of the tunnel with a spacing of 1000mm. The top beam uses a 4000mm long π-shaped steel beam, and the bottom beam specifications are: No. 11 miner steel × 2 pieces × 3300mm. The two ends of the bottom beam are fixed with U-shaped clips. The π-shaped steel beam and the miner steel bottom beam are arranged along the direction of the tunnel; each single hydraulic pillar is equipped with a large iron shoe at the bottom, and each single hydraulic pillar is equipped with an anti-fall chain at the top. The telescopic amount of the live column of the single hydraulic pillar shall not be less than 400mm, and the initial support force shall not be less than 90kN. Before installing the single hydraulic pillar, the bottom loose coal should be cleaned up, and it shall not be installed on the loose coal. The single hydraulic pillars must be installed in rows with the column valves in the same direction. Check regularly and replace the single hydraulic pillars immediately if they are crushed, leaking or severely deformed under pressure. The reinforcement support scheme for the track tunnel under the influence of a mining operation is as follows Figure 3 shown.
[0038] The reinforcement support scheme under the influence of secondary mining is: (4) Under the influence of secondary mining, the plastic zone of the tunnel surrounding rock is large, and the depth of roof damage exceeds the anchoring range of the anchor cable. At this time, the anchor cable can no longer play a suspending role. Therefore, after the working face is advanced, the track is removed in time, and on the basis of the reinforcement support plan under the influence of the first mining, another row of single hydraulic pillars is added in the tunnel along the tunnel direction, that is, a total of 2 rows of single hydraulic pillars are set in the tunnel direction, with a spacing of 1000mm. The top beam adopts a 4000mm long π-shaped steel beam, and the bottom beam specifications are: No. 11 miner steel × 2 pieces × 3300mm. The two ends of the bottom beam are fixed with U-shaped clips. The π-shaped steel beam and the miner steel bottom beam are arranged along the tunnel direction; each single hydraulic pillar is equipped with a large iron shoe at the bottom, and each single hydraulic pillar is equipped with an anti-fall chain at the top. The telescopic amount of the live column of the single hydraulic pillar shall not be less than 400mm, and the initial support force shall not be less than 90kN. Before setting up the single hydraulic pillar, the bottom false coal should be cleaned up, and it shall not be set on false coal. Single hydraulic props must be installed in rows and columns, with the valves facing the same direction. Check regularly and replace any single hydraulic props that are crushed, leaking, or severely deformed by pressure immediately. Figure 4 shown.
[0039] (5) The reinforcement support scheme under the influence of the above-mentioned primary and secondary mining was constructed on the above-mentioned 152106 working face, and the above-mentioned construction operation and technical requirements were met to ensure the quality of the reinforcement support construction. In order to monitor the deformation law of the surrounding rock of the track tunnel under the influence of mining, four mine pressure monitoring stations were arranged in the track tunnel in front of the 152106 working face, with the distances to the working face being 60m, 80m, 100m and 120m respectively. The impact of the primary mining caused by the mining of the 152106 working face was observed, and the sinking of the two sides and the roof of the track tunnel was observed: after the reinforcement support of the track tunnel, during the observation period, after being affected by the primary mining, the sinking amount of the roof of the track tunnel in front of the working face and the movement of the two sides were less than those behind the working face, the deformation of the coal pillar side was reduced by 65%, and there was no obvious sinking and separation of the roof. At the same time, the number of repairs of the track tunnel was significantly reduced, which shows that the deformation of the surrounding rock was effectively controlled and the reinforcement support effect was good. During the mining of the 152107 working face, the track tunnel will be affected by secondary mining. On the basis of the primary reinforcement support, a single hydraulic support is added. According to the mine pressure detection results, it can be concluded that after the secondary reinforcement support of the track tunnel, when the distance from the monitoring station to the working face is less than 100m, the tunnel surrounding rock convergence rate gradually increases. Under the influence of secondary mining, the maximum values of the two sides of the track tunnel and the roof sinking are 538mm and 416mm respectively. The coal pillars bulge outward locally, but do not squeeze the single hydraulic support. The tunnel ventilation section and safety passage meet the design requirements, and the tunnel surrounding rock control effect is good.
[0040] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A method for controlling deformation of surrounding rock in a deep mine mining tunnel, characterized in that: The following steps are involved: Arrange multiple mine pressure monitoring stations in the working face track lanes; Obtain monitoring data from the mine pressure monitoring station and derive the law of mine pressure manifestation based on the monitoring data; The numerical simulation software is used to establish a numerical calculation model, and the law of mine pressure manifestation is substituted into the numerical calculation model to obtain the deformation mechanism of the mining tunnel under primary and secondary mining. According to the deformation mechanism of mining tunnel under primary and secondary mining and the coordination principle of anchor cable and anchor rod, a reinforcement support scheme is obtained.
2. The method for controlling deformation of surrounding rock in deep mine mining tunnel according to claim 1, characterized in that: The number of mine pressure monitoring stations shall be at least three.
3. The method for controlling deformation of surrounding rock in deep mine mining tunnel according to claim 1 or 2, characterized in that: The distance between two adjacent mine pressure monitoring stations is 20m.
4. The method for controlling deformation of surrounding rock in deep mine mining tunnel according to claim 1, characterized in that: The numerical simulation software is FLAC3D numerical simulation software.
5. The method for controlling deformation of surrounding rock in deep mine mining tunnel according to claim 1, characterized in that: The deformation mechanism of the mining tunnel under the primary mining and secondary mining includes the axial principal stress and its ratio of the working face track tunnel and the morphological characteristics of the plastic zone of the track tunnel surrounding rock in front of the working face.
6. The method for controlling deformation of surrounding rock in deep mine mining tunnel according to claim 1, characterized in that: The following steps are also included: Test the effectiveness of the reinforcement support scheme.
7. The method for controlling deformation of surrounding rock in deep mine mining tunnel according to claim 1 or 5, characterized in that: The reinforcement support plan includes installing anchor cables and single hydraulic props.
