Method and device for determining voltage quality of power distribution network and power distribution network detection system
Through statistical time limit duration and cluster analysis of distribution network voltage, combined with Pearson correlation coefficient and machine learning, the problem of inaccurate voltage quality assessment of distribution network is solved, and a more accurate voltage quality assessment and early warning mechanism is achieved, and the power grid is improved. stability and service quality.
Patent Information
- Application Number
- CN202411478883.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-10-22
AI Technical Summary
In the prior art, the voltage quality evaluation of the distribution network is inaccurate, which is difficult to fully reflect the voltage limit characteristics of the distribution network with high cable rate, which affects the accuracy of voltage management measures.
By obtaining the voltage data of the distribution network, counting the time limit of the voltage, calculating the voltage pass rate, using the K-means algorithm to cluster the voltage data, building a quality detection model, and using Pearson correlation coefficient and machine learning technology to predict the voltage pass rate , and set up warning thresholds to generate warning information.
It realizes a more objective assessment of the voltage quality of the distribution network, improves the accuracy of the assessment, provides a scientific basis for voltage governance and early warning mechanism, and improves the stability and service quality of the power grid.
Smart Images

Figure CN119064718A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power quality assessment of distribution networks, and in particular, to a method for determining voltage quality of distribution networks, an apparatus for determining voltage quality of distribution networks, a computer program product, and a distribution network detection system. Background Art
[0002] In modern urban power distribution networks, cable lines are widely used due to their highly reliable power supply performance and environmentally friendly characteristics. However, with the continuous increase in the cable rate and the increase in load volatility, the distribution network faces the challenge of declining power supply voltage quality.
[0003] Since the ground capacitance of cable lines is much larger than that of overhead lines, and the charging power is much higher than that of overhead lines, it may lead to excess capacitive reactive power when the load level is low, and then reactive power reverse transmission, causing the voltage at the end of the line to increase.
[0004] In the current power industry, there is a lack of evaluation methods for the voltage quality of distribution networks, resulting in inaccurate evaluation of the voltage quality of distribution networks. Summary of the invention
[0005] The main purpose of the present application is to provide a method for determining the voltage quality of a distribution network, an apparatus for determining the voltage quality of a distribution network, a computer program product and a distribution network detection system, so as to at least solve the problem of inaccurate voltage quality assessment of the distribution network in the prior art.
[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for determining the voltage quality of a distribution network is provided, comprising: acquiring voltage data of the distribution network; determining an over-limit duration of the distribution network within a target duration based on the voltage data, wherein the over-limit duration is the sum of a first duration that the voltage data exceeds a preset maximum value and a second duration that the voltage data exceeds a preset minimum value; determining a first qualified rate of the distribution network based on the over-limit duration, wherein the over-limit duration and the first qualified rate are negatively correlated.
[0007] Optionally, obtaining voltage data of the distribution network includes: obtaining an initial data set, wherein the initial data set includes at least the voltage amplitudes of all monitoring points in the distribution network; obtaining an electrical distance, wherein the electrical distance is the distance between the monitoring point and a main transformer; dividing the initial data set according to the electrical distance to obtain data groups; and clustering the data groups using a K-means algorithm to obtain the voltage data.
[0008] Optionally, after determining the over-limit duration of the distribution network within the target duration based on the voltage data, the method further includes: obtaining the total duration; calculating the quotient of the first duration and the total duration to obtain a first proportion, wherein the first proportion is the proportion of the first duration in the total duration; calculating the quotient of the second duration and the total duration to obtain a second proportion, wherein the second proportion is the proportion of the second duration in the total duration.
[0009] Optionally, after determining a first qualified rate of the distribution network according to the over-limit duration, the method further includes: generating a scatter plot according to the first qualified rate; and generating a target curve according to the first qualified rate.
[0010] Optionally, after determining the first pass rate of the distribution network according to the over-limit time, the method further includes: obtaining a first sub-pass rate, wherein the first sub-pass rate is the pass rate of the power supply voltage of the distribution network; obtaining a second sub-pass rate, wherein the second sub-pass rate is the pass rate of the voltage at the monitoring point of the switch station of the distribution network; and determining the relationship between the first sub-pass rate and the second sub-pass rate according to the Pearson correlation coefficient.
[0011] Optionally, after determining the over-limit duration of the distribution network within the target duration based on the voltage data, the method further includes: obtaining relevant information of the distribution network, wherein the relevant information includes at least one or more of line length, distribution location of transformers, load type and environmental information; constructing a quality detection model, wherein the quality detection model is trained using multiple sets of training data, and each set of training data in the multiple sets of training data includes historical over-limit durations, historical related information, and historical second qualified rates corresponding to the historical over-limit durations and the historical related information obtained within a historical time period; inputting the over-limit duration and the related information into the quality detection model to obtain the second qualified rate corresponding to the over-limit duration and the related information.
[0012] Optionally, after determining the first qualified rate of the distribution network according to the over-limit duration, the method further includes: obtaining a preset qualified rate threshold; and generating early warning information when the first qualified rate is less than or equal to the preset qualified rate threshold.
[0013] According to another aspect of the present application, a device for determining the voltage quality of a distribution network is provided, comprising: a first acquisition unit, for acquiring voltage data of the distribution network; a first determination unit, for determining an over-limit duration of the distribution network within a target duration based on the voltage data, wherein the over-limit duration is the sum of a first duration that the voltage data exceeds a preset maximum value and a second duration that the voltage data exceeds a preset minimum value; a second determination unit, for determining a first qualified rate of the distribution network based on the over-limit duration, wherein the over-limit duration and the first qualified rate are negatively correlated.
[0014] According to another aspect of the present application, a computer program product is provided, comprising a computer program, wherein when the computer program is executed by a processor, the computer program implements the steps of any one of the methods for determining the voltage quality of the power distribution network.
[0015] According to another aspect of the present application, a distribution network detection system is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for determining the voltage quality of the distribution network described in any one of the above.
[0016] By applying the technical solution of the present application, the voltage fluctuation, that is, the voltage exceeding the limit, is taken into account. The voltage quality, that is, the first qualified rate, is determined by counting the duration of the voltage exceeding the limit. This can more objectively reflect the voltage quality status of the distribution network in a specific period, making the evaluation more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0018] Figure 1 A hardware structure block diagram of a mobile terminal for executing a method for determining voltage quality of a power distribution network provided in an embodiment of the present application is shown;
[0019] Figure 2 A schematic flow chart of a method for determining voltage quality of a distribution network provided according to an embodiment of the present application is shown;
[0020] Figure 3 A schematic diagram of the process of constructing the scoring criteria for voltage qualification rate is shown;
[0021] Figure 4 A scatter diagram of monthly voltage qualification rate is shown;
[0022] Figure 5 A schematic diagram showing a target curve for monthly voltage pass rate scores;
[0023] Figure 6 A structural block diagram of a device for determining voltage quality of a distribution network provided according to an embodiment of the present application is shown.
[0024] The above drawings include the following reference numerals:
[0025] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION
[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0027] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0028] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0029] The commonly used voltage qualification rate calculation method is usually "bidirectional". When evaluating the voltage deviation and voltage qualification rate of the distribution network, it is generally not distinguished between the voltage exceeding the upper limit and the voltage exceeding the lower limit, which makes it difficult to fully reflect the voltage exceeding the limit characteristics along the distribution network with high cable rate. In addition, since the voltage fluctuation of the distribution network is small during normal operation, the evaluation method of dividing the indicators into several levels may cause misjudgment of the voltage quality of some monitoring points, affecting the accuracy of voltage control measures.
[0030] As introduced in the background technology, the voltage quality assessment of the distribution network in the prior art is inaccurate. To solve the above problems, the embodiments of the present application provide a method for determining the voltage quality of a distribution network, an apparatus for determining the voltage quality of a distribution network, a computer program product and a distribution network detection system.
[0031] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0032] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a method for determining voltage quality of a distribution network according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is for illustration only and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.
[0033] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the display method of device information in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0034] In this embodiment, a method for determining the voltage quality of a distribution network running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0035] Figure 2 FIG. 1 is a flow chart of a method for determining voltage quality of a distribution network according to an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:
[0036] Step S201, obtaining voltage data of the distribution network;
[0037] Specifically, voltage data can be collected using the voltage measurement device in the distribution network switch cabinet and the DSCADA (Distribution Supervisory Control and Data Acquisition) system. These devices can monitor the voltage level in the distribution network in real time, including but not limited to steady-state power frequency voltage, instantaneous voltage fluctuations, etc. The data sampling period is set to once every 15 minutes to ensure that the details of the voltage fluctuation can be captured while keeping the data volume within a processable range.
[0038] Step S202, determining the over-limit duration of the distribution network within the target duration based on the voltage data, wherein the over-limit duration is the sum of a first duration that the voltage data exceeds a preset maximum value and a second duration that the voltage data exceeds a preset minimum value;
[0039] Specifically, based on the collected voltage data, the voltage over-limit duration of the high-cable distribution network within a specific target duration is determined. This duration is the cumulative time that the voltage data exceeds the preset maximum and minimum thresholds.
[0040] According to the voltage quality standard of the national power grid, the preset maximum and minimum values of the voltage are set. For a 220V low-voltage distribution network, the qualified voltage range is usually set to 220V±7%, that is, the qualified voltage range is 205.4V to 234.6V. Any voltage value outside this range will be considered as out of limit.
[0041] The voltage data obtained from the distribution network switchgear and DSCADA system are preprocessed, including data cleaning (removing invalid or abnormal data) and time synchronization to ensure the accuracy and consistency of the data. Then, each 15-minute voltage sampling data is checked to mark the time point when the voltage exceeds the preset maximum value or falls below the preset minimum value.
[0042] Based on the results of time stamping, statistics are collected for the first duration (first over-limit duration) that the voltage data of each monitoring point exceeds the preset maximum value and the second duration (second over-limit duration) that the voltage data is lower than the preset minimum value within a month. For example, if the voltage value of a monitoring point exceeds the maximum value for 10 hours and is lower than the minimum value for 5 hours within a month, then the over-limit duration of the monitoring point is 15 hours.
[0043] The over-limit duration of all monitoring points is summarized to obtain the total over-limit duration of the entire target area within the target duration.
[0044] Step S203: determining a first qualified rate of the distribution network according to the above-mentioned over-limit duration, wherein the above-mentioned over-limit duration and the above-mentioned first qualified rate are negatively correlated.
[0045] Specifically, the voltage qualification rate (first qualification rate) is an important indicator for measuring power quality, which reflects the proportion of the duration that the voltage value is within the specified range. The over-limit time refers to the sum of the time that the voltage exceeds the preset maximum or minimum value during the evaluation period. This relationship is particularly significant in distribution networks with high cable rates, because the characteristics of cable lines (such as high ground capacitance) can cause the voltage to exceed the limit under certain conditions, thereby affecting the voltage qualification rate. The longer the over-limit time, the lower the first qualification rate, and the shorter the over-limit time, the higher the first qualification rate.
[0046] Through this embodiment, the voltage fluctuation, that is, the voltage exceeding the limit, is taken into account. The voltage quality, that is, the first qualified rate, is determined by counting the duration of the voltage exceeding the limit. This can more objectively reflect the voltage quality status of the distribution network in a specific period, making the evaluation more accurate.
[0047] Specifically, this scheme considers the voltage over-limit characteristics of high-cable distribution lines, constructs a scientific calculation method for the voltage qualification rate of high-cable distribution networks, and compares the difference in voltage qualification rates between medium-voltage distribution networks and low-voltage distribution areas to clarify the characteristics of voltage over-limit in high-cable distribution networks. By implementing the voltage qualification rate evaluation method for high-cable distribution networks provided by this scheme, a "grid-load" two-way evaluation of the voltage qualification rate can be conducted for high-cable distribution areas, providing a basis for voltage quality management.
[0048] In the specific implementation process, the voltage data of the distribution network can be obtained through the following steps: obtaining an initial data set, wherein the initial data set at least includes the voltage amplitudes of all monitoring points in the distribution network; obtaining an electrical distance, wherein the electrical distance is the distance between the monitoring point and the main transformer; dividing the initial data set according to the electrical distance to obtain data groups; and clustering the data groups using the K-means algorithm to obtain the voltage data.
[0049] In this scheme, based on electrical distance and K-means algorithm, the voltage data of the high-cable distribution network is effectively clustered to identify the voltage characteristics of monitoring points in different areas or types, which provides strong support for more accurate evaluation of voltage qualification rate and formulation of corresponding voltage optimization strategies.
[0050] Specifically, the voltage measurement in the distribution network switch cabinet and the node voltage data collected by the DSCADA system are selected and data screening is performed. The multi-regional, high-density steady-state power frequency voltage electrical quantities that can be collected by the multi-source power quality monitoring system are selected as dynamic data for data analysis and voltage quality evaluation. The sampling period is once every 15 minutes to accurately reflect the voltage qualification rate level along the high-cable distribution line; the distribution transformer type of each monitoring point and the length of the cable line between each site are screened to analyze the relationship between the voltage qualification rate between the high-cable medium-voltage distribution network and the low-voltage substation.
[0051] As a further description of the above technical solution, the specific steps of the above data screening are as follows:
[0052] (1) Construct the data set of each monitoring point based on the system grid and operation data:
[0053]
[0054] Among them, T iis the type, name and capacity of the transformer; V i,t is the voltage amplitude of the monitored point; H i is the user load type; L i,j is the length of the cable line between two adjacent monitoring points;
[0055] (2) Calculate the electrical distance between each monitoring point and the main transformer, as shown in the following formula:
[0056]
[0057] L n represents the electrical distance, and n represents the number of main transformers;
[0058] (3) Based on the correlation between the cable line capacity rise effect and the line length, the length interval [nΔL, (n+1)ΔL] is set; the voltage collection data is divided into several groups according to the electrical distance between each monitoring point and the main transformer;
[0059] (4) Based on the statistical monitoring point substation type or user load type, the K-means clustering algorithm is used to obtain typical monitoring data, reduce the data volume and ensure the load characteristics.
[0060] Specifically, for each monitoring point, the electrical distance between it and the main transformer is calculated. The electrical distance is not only a reflection of the physical distance, but also takes into account factors such as line impedance and cable characteristics, which can more accurately represent the impact range of voltage changes. The distance is calculated using formulas in electrical engineering, which usually include parameters such as cable length, impedance, and line loss. For example, if a monitoring point is connected to the main transformer via a 2km cable, the impedance characteristics of the cable must also be considered to calculate the final electrical distance.
[0061] Specifically, the initial data set is divided into several data groups. The division of data groups is based on the similarity of electrical distance rather than the proximity of physical location. For example, all monitoring points with an electrical distance of 1-3 km from the main transformer form one group, and those with an electrical distance of 3-5 km form another group, and so on. The purpose of this division is to better identify the characteristics of the impact of the cable ratio on voltage in the subsequent cluster analysis.
[0062] Specifically, the data in each data group is clustered using the K-means algorithm. The K-means algorithm is a commonly used unsupervised learning method that can automatically divide data into K clusters based on the similarity between data points. In this embodiment, the selection of K should take into account factors such as the distribution of monitoring points, load characteristics, and length distribution of cable lines to ensure the effectiveness and representativeness of clustering.
[0063] Specifically, for example, K is set to 3, and then the voltage data of a group of monitoring points (electrical distance between 1-3km) are clustered. The clustering results may show three different voltage change patterns, each of which represents the impact of different types of loads or cable line characteristics on voltage.
[0064] Specifically, the results of K-means clustering were analyzed to identify the characteristics of voltage data at different monitoring points. For example, it was found that the voltage of monitoring points in one cluster was higher at night, while the voltage of monitoring points in another cluster was lower during peak hours. These characteristics were related to the electrical distance and load type of the monitoring points.
[0065] Specifically, before K-means clustering, the voltage data is standardized to eliminate the dimensional effects between different monitoring points. The calculation of electrical distance requires the combination of the physical length of the cable, the resistance and reactance values of the cable, and the topological structure of the distribution network. The K value (number of clusters) in the K-means algorithm needs to be determined based on the actual electrical network structure, the distribution of monitoring points, and the data characteristics. It can be optimized by methods such as the Elbow Method or the Silhouette Score.
[0066] During the specific implementation process, after determining the over-limit duration of the distribution network within the target duration based on the voltage data, the method further includes the following steps: obtaining the total duration; calculating the quotient of the first duration and the total duration to obtain a first proportion, wherein the first proportion is the proportion of the first duration in the total duration; calculating the quotient of the second duration and the total duration to obtain a second proportion, wherein the second proportion is the proportion of the second duration in the total duration.
[0067] In this solution, the proportion of the time when the voltage exceeds the limit, the proportion of the voltage exceeding the upper limit, and the proportion of the voltage exceeding the lower limit, that is, the first proportion and the second proportion, can be calculated. The voltage quality can be further determined by this proportion later.
[0068] Specifically, the duration of abnormal voltage values at each monitoring point is counted, and the indicator values of each monitoring point are obtained based on the voltage qualification rate evaluation method to clarify the voltage over-limit characteristics of the high-cable distribution network. Based on the characteristics of the distribution network monitoring data, the evaluation duration of the voltage qualification rate is selected, and the voltage qualification rate scoring standard of the high-cable distribution network is constructed.
[0069] As a further description of the above technical solution, the analysis method of the above voltage qualification rate is: calculate the proportion of the time when the voltage exceeds the upper limit at each monitoring point in the total evaluation period and the total voltage exceeding the limit time; weightedly calculate the power supply voltage qualification rate of each distribution transformer to measure the overall power supply voltage qualification rate of the local low-voltage substation.
[0070] The proportion of the voltage exceeding the upper limit duration in the total evaluation duration is as follows:
[0071]
[0072] In the formula, t max is the duration of the voltage exceeding the upper limit, t Z is the total assessment duration.
[0073] The proportion of the voltage exceeding the upper limit duration in the total evaluation duration is as follows:
[0074]
[0075] In the formula, t min The duration that the voltage exceeds the upper limit.
[0076] By using the proportion of the voltage exceeding the upper limit time in the total exceeding limit time, the characteristics of voltage exceeding the limit of high-cable distribution lines are clarified:
[0077]
[0078] Specifically, to measure the overall power supply voltage qualification rate of the cable feeder, the steps are as follows:
[0079] If the collected data includes the actual value of the load supplied by each distribution station, the voltage qualification rate of the entire line can be calculated by weighted calculation based on the proportion of each distribution load and the total line load; otherwise, according to the type and number of distribution transformers of each cable line, the load importance is set in combination with the distribution transformer type, the voltage qualification rate benchmark limit of each power supply area is determined, and the overall power supply voltage qualification rate of the line is obtained by weighted calculation.
[0080] Specifically, the formula is as follows:
[0081]
[0082] Where N is the total number of distribution transformers; N i The number of special transformers, public transformers and main transformers; is the voltage qualification rate of each type of distribution transformer; ω i The load weights are set according to the importance of power supply of various distribution transformers. The determination method is as follows: First, an online evaluation system for the importance of power supply load of substations is constructed. For different types of substations in a certain cable power supply line or area, the five-scale method is used to compare the importance between any two, thereby obtaining a judgment matrix:
[0083] A k =(a ij ) n×n ,k=1,2,...,m,
[0084] Among them, m is the number of users participating in the evaluation. Secondly, a consistency test is performed. The consistency index is calculated by:
[0085]
[0086] Among them, λ max is the maximum eigenvalue of the judgment matrix; and then calculate the consistency ratio:
[0087]
[0088] Among them, RI is the consistency index; in the consistency test, if the CR value is less than 0.1, it means that the consistency of the judgment matrix is acceptable; then, the importance values are normalized by column, and the arithmetic mean method is used to calculate the weight:
[0089]
[0090] in,
[0091] represents the weight vector obtained by the arithmetic mean of the judgment matrix column vector; β is the number of weight vectors, a ij Represents the load weight corresponding to any two distribution transformer types.
[0092] As a further description of the above scheme, the scoring standard construction method based on the voltage monitoring data of the distribution network with a high cable rate is as follows: sort the indicator values of each monitoring point and list them in the form of a scatter plot, analyze the scatter plot distribution of each indicator value, and determine the grading interval based on the slope, "inflection point" and other characteristic quantities; set the scoring value corresponding to the grading boundary of the indicator calculation value, use the percentage evaluation method, set the scoring value corresponding to the grading boundary of the indicator value, calculate the scoring formula for each indicator, and draw the scoring curve for each voltage exceeding the upper limit indicator.
[0093] Specifically, the general scoring standard for grading indicators is as follows:
[0094]
[0095] In the formula, x represents the calculated value of the indicator, y represents the percentage score value, and a and b represent the coefficient matrix of the indicator scoring formula.
[0096] Specifically, a specific evaluation period, such as one month, is selected as the statistical time window for calculating the first pass rate and the limit crossing situation. In this period, the total amount of time data that can be collected is: 30 days × 24 hours / day × 4 samples / hour = 2880 sample points, which constitutes the above-mentioned total time length.
[0097] Specifically, the collected voltage data is preprocessed and analyzed to identify voltage over-limit situations. Assume that the national power quality standard stipulates that the qualified voltage range of the low-voltage distribution network is 220V±7%, that is, the voltage between 205.4V and 234.6V is considered qualified. The time when the voltage exceeds the preset maximum value is defined as the first duration, and the time when the voltage is lower than the preset minimum value is defined as the second duration.
[0098] Specifically, for each monitoring point, the proportion of the duration of the voltage exceeding the limit during the evaluation period is calculated. The first proportion and the second proportion are negatively correlated with the voltage quality. The voltage quality can be determined based on the first proportion and the second proportion respectively. Of course, the voltage quality can also be determined by taking a weighted average of the two proportions.
[0099] In the specific implementation process, after determining the first qualified rate of the distribution network according to the above-mentioned over-limit duration, the above-mentioned method also includes the following steps: generating a scatter plot according to the above-mentioned first qualified rate; generating a target curve according to the above-mentioned first qualified rate.
[0100] In this solution, by generating scatter plots and target curves, a visual method is provided for voltage quality assessment of high-cable distribution networks. This method helps power companies and grid operators better understand the distribution characteristics of voltage qualification rates through intuitive graphical displays.
[0101] Specifically, Figure 3 As shown in the figure, the relationship between the qualified rate of medium voltage distribution network and low voltage area voltage is calculated by using Pearson correlation coefficient. The qualified rate of power supply voltage in different areas is calculated by combining actual distribution transformer parameters and line topology.
[0102] As a further description of the above scheme, the Pearson correlation coefficient is used to analyze the relationship between the voltage qualification rate of the medium voltage distribution network and the low voltage area. The specific steps are as follows:
[0103] 1. Carry out correlation analysis on the qualified rate of power supply voltage of distribution transformer stations of the same distribution transformer type and the qualified rate of voltage calculated by collecting voltage of adjacent switch stations:
[0104] Calculate the correlation coefficients of the distribution transformer power supply voltage qualification rate and the load type and size of each site, the cable line length between the adjacent switch station and the distribution station, and the voltage qualification rate index value of the switch station monitoring point:
[0105]
[0106] Among them, r ab Indicates the degree of correlation; μ and σ are the mean and standard deviation respectively; N is the number of sites of the evaluation target after screening.
[0107] According to the above method, the actual data collected in multiple time periods are selected and the correlation calculation is performed again; the regression coefficient of the correlation coefficient between the above variables is determined by using the multivariate linear regression model, the correlation between the voltage qualification rate of the low-voltage substation and other influencing factors such as load type and cable length is reduced, and the independent correlation between the voltage qualification rate of the distribution transformer and the voltage qualification rate at the adjacent switch station is calculated:
[0108]
[0109] Where R represents the correlation coefficient between the voltage of the distribution transformer in the low-voltage area and the voltage qualified rate of the adjacent switch station; a1 is used to measure the independent correlation between the qualified rate of the distribution transformer voltage and the qualified rate of the voltage at the adjacent switch station, n represents the number of adjacent switch stations, and T N It represents the correlation index number that affects the voltage qualification rate at the distribution transformer, and b is a constant.
[0110] 2. The voltage qualification rate of the entire line is calculated by weighting the voltage qualification rate of the switch stations along the line, and a correlation analysis is performed with the power supply voltage qualification rate of the entire line.
[0111] In the actual application scheme, the monthly low-voltage substation voltage data collected by the DSCADA system in the high-cable distribution area of a certain city's power supply company was selected, and the duration of the abnormal voltage value at each monitoring point was counted. A voltage qualification rate evaluation method for a high-cable distribution network using a monitoring device provided in this scheme was adopted to obtain the monthly voltage qualification rate evaluation results and evaluation standards.
[0112] The monthly voltage qualification rate scatter plot is as follows Figure 4 As shown. According to the slope change characteristics, the voltage over-upper limit curve of the monitoring point is divided into 5 sections. Assuming that the voltage pass rate is 96%, 80.95%, 65% and 31.62%, the corresponding scores are 100 points, 80 points, 60 points and 30 points respectively. Based on this, the scoring standard of the voltage over-upper limit indicator is: The monthly voltage pass rate evaluation curve is as follows Figure 5 shown.
[0113]
[0114] Specifically, the electrical distance (or cable length) and the first qualified rate of each monitoring point are used as variables on the X-axis and Y-axis to generate a scatter plot. This helps to observe the relationship between the electrical distance and the voltage qualified rate, and whether there is an obvious distribution pattern or trend. For example, it can be expected that as the electrical distance increases, the voltage qualified rate may decrease, especially in areas with a high cabling rate.
[0115] Specifically, based on the data points on the scatter plot, a target curve is generated using curve fitting technology. The target curve can be a straight line, a polynomial curve, or a function in other forms. The specific form should be determined according to the characteristics of the data distribution. This curve will help quantify the relationship between the electrical distance and the first qualified rate, providing a reference for subsequent analysis and decision-making.
[0116] Specifically, by comparing the scatter plot and the target curve, the fluctuation pattern of the voltage qualification rate and the specific impact of the cable rate on the voltage quality can be identified. For example, the slope of the curve can reveal the intensity of the impact of the electrical distance on the voltage qualification rate; the shape of the curve (such as linear, convex or concave) can reflect the nature of the impact. In addition, abnormal points or dense areas in the scatter plot may also point to specific voltage problems or potential optimization opportunities.
[0117] Specifically, before generating a scatter plot, data cleaning should be performed to remove invalid values or extreme values to ensure the accuracy of the analysis results. Select an appropriate fitting method (such as linear regression, polynomial regression) to generate the target curve, and consider the nonlinear relationship and fitting error of the data. Use professional data visualization software (such as Python's Matplotlib library, Excel, SPSS, etc.) to generate scatter plots and target curves for subsequent analysis and display. The characteristic parameters of the target curve, such as the slope and inflection point, as well as the patterns in the scatter plot, can be used to interpret the impact mechanism of the cable rate on the voltage qualification rate, and provide strategic guidance for improving voltage quality.
[0118] In some embodiments, after determining the first pass rate of the distribution network based on the above-mentioned over-limit time, the method further includes the following steps: obtaining a first sub-pass rate, wherein the first sub-pass rate is the pass rate of the power supply voltage of the distribution network; obtaining a second sub-pass rate, wherein the second sub-pass rate is the pass rate of the voltage of the monitoring point of the switch station of the distribution network; and determining the relationship between the first sub-pass rate and the second sub-pass rate based on the Pearson correlation coefficient.
[0119] In this scheme, by calculating the Pearson correlation coefficient, the correlation between the qualified rate of power supply voltage and the qualified rate of voltage at the switch station monitoring point can be analyzed, which provides data support and decision-making basis for the voltage quality management and optimization of distribution networks with high cable rates.
[0120] Specifically, the power supply voltage data is analyzed, the duration of the voltage exceeding the upper limit and the lower limit is counted, and the qualified rate of the power supply voltage is calculated, that is, the proportion of the time when the voltage is within the specified range to the total monitoring time. This will be used as the first sub-qualified rate to reflect the overall voltage quality of the distribution network.
[0121] Specifically, the voltage data of the monitoring points of each switch station are processed in the same way to calculate their respective voltage qualification rates. The voltage qualification rates of the monitoring points of these switch stations will be used as the second sub-qualification rate to evaluate the voltage quality of a specific area or node.
[0122] Specifically, the Pearson correlation coefficient is used to measure the linear relationship between the first sub-qualification rate (power supply voltage qualification rate) and the second sub-qualification rate (switch station monitoring point voltage qualification rate). The value range of the Pearson correlation coefficient is between -1 and 1, and a value close to 1 indicates a positive correlation, close to -1 indicates a negative correlation, and close to 0 indicates no linear relationship.
[0123] Specifically, assuming that the calculated Pearson correlation coefficient is 0.85, this indicates that there is a significant positive correlation between the qualified rate of power supply voltage and the qualified rate of voltage at the switch station monitoring point. This means that when the overall power supply voltage of the distribution network is at a qualified level, the voltage quality at the switch station monitoring point also tends to be qualified; conversely, if the qualified rate of power supply voltage is low, the voltage quality at the switch station monitoring point may also be affected.
[0124] Specifically, before calculating the qualified rate, data cleaning is required to remove outliers and missing data to ensure the accuracy and reliability of the analysis. In addition to calculating the Pearson correlation coefficient, the relationship between the first sub-qualified rate and the second sub-qualified rate can also be visually observed by drawing a scatter plot. The analysis results should be combined with the specific conditions and load characteristics of the distribution network to formulate a reasonable voltage quality improvement strategy. For example, for those areas with low first and second sub-qualified rates, more thorough grid transformation or optimization may be required.
[0125] In some embodiments, after determining the over-limit duration of the distribution network within the target duration based on the voltage data, the method further includes the following steps: obtaining relevant information of the distribution network, wherein the relevant information includes at least one or more of the line length, the distribution location of the transformer, the load type and the environmental information; constructing a quality detection model, wherein the quality detection model is trained using multiple sets of training data, and each set of training data in the multiple sets of training data includes historical over-limit durations, historical related information, and historical second qualified rates corresponding to the historical over-limit durations and the historical related information obtained within a historical time period; inputting the over-limit durations and the related information into the quality detection model to obtain the second qualified rates corresponding to the over-limit durations and the related information.
[0126] In this solution, a quality detection model is built using machine learning technology to predict the changing trend of voltage quality in high-cable distribution networks based on historical data. This approach can not only help power companies to warn and respond to voltage problems in advance, but also provide data support for optimizing power quality and grid operation strategies, thereby improving grid stability and service quality.
[0127] Specifically, a large amount of historical data is collected from the DSCADA system, including but not limited to: the duration of voltage exceeding the limit in different time periods (historical duration of voltage exceeding the limit), the cable length of the line, the distribution location of the transformer (for example, transformer type, name and capacity), user load type, and environmental information (such as temperature, humidity, etc.). For these data, necessary cleaning and preprocessing are performed, such as removing outliers, filling missing values, and performing data standardization, etc., to improve the accuracy of subsequent model training.
[0128] Specifically, the collected historical data are organized into training data sets, and each set of training data includes the duration of voltage exceeding the limit in the historical time period, relevant line information (cable length, transformer distribution location, load type, environmental information, etc.), and the corresponding voltage qualification rate (historical second qualification rate). For example, a set of training data may show that under a certain cable length and load type, when the voltage exceeds the limit for 10 hours, the historical second qualification rate is 90%.
[0129] Specifically, a machine learning algorithm, such as support vector machine (SVM), random forest (RF), neural network (NN), etc., is selected as the basis of the quality detection model. The model is trained using multiple sets of training data to learn the mapping relationship between the over-limit duration and related information and the voltage qualified rate. The training goal is to enable the model to predict the corresponding voltage qualified rate based on the input over-limit duration and related information.
[0130] Specifically, after the model is trained, an independent test data set is used to verify the model's prediction performance. Cross-validation can be used to ensure the generalization ability of the model. If the error between the model prediction result and the actual voltage qualification rate is large, it is necessary to adjust the model parameters or try other algorithms to optimize the model to improve the prediction accuracy.
[0131] Specifically, the latest over-limit duration and distribution network related information are input into the trained quality detection model to obtain the predicted voltage qualification rate (second qualification rate). This prediction result can be used to warn of voltage quality problems in advance and guide power system operation and maintenance personnel to take preventive measures, such as adjusting reactive power compensation and optimizing load scheduling, to ensure that voltage quality meets the standards.
[0132] Specifically, before model training, feature selection is required to ensure that the information input into the model has a direct or indirect correlation with the voltage quality. For example, the temperature in the environmental information may affect the conductivity of the cable, thereby indirectly affecting the voltage quality. The appropriate machine learning model should be selected according to the characteristics of the training data. For example, if there is a complex nonlinear relationship between the data, a neural network may be a better choice. The second qualified rate predicted by the model needs to be interpreted in conjunction with the actual working conditions. For example, a reduction in the predicted qualified rate may mean that immediate measures need to be taken to prevent potential voltage problems from escalating.
[0133] In some embodiments, after determining the first pass rate of the distribution network based on the above-mentioned over-limit duration, the above-mentioned method also includes the following steps: obtaining a preset pass rate threshold; and generating early warning information when the above-mentioned first pass rate is less than or equal to the above-mentioned preset pass rate threshold.
[0134] In this solution, by setting a preset pass rate threshold and combining it with real-time monitoring data, an effective voltage quality early warning mechanism is provided, which can help power companies to promptly detect and handle voltage quality problems, avoid power loss and equipment damage caused by voltage fluctuations, and thus improve the overall operation efficiency and service quality of the power grid.
[0135] Specifically, the power company or distribution network operator needs to set a reasonable voltage qualification rate threshold based on national power quality standards, grid operation experience and historical data. For example, assuming that the preset qualification rate threshold is 98%, when the voltage qualification rate is lower than 98%, the system will generate an early warning message.
[0136] Specifically, the DSCADA system and the voltage monitoring devices in the distribution network are used to collect and analyze the voltage data of each monitoring point in real time, and calculate the voltage limit duration (first duration), total evaluation duration (total duration) and voltage qualification rate (first qualification rate). This process is continuous, ensuring that the system can respond to changes in voltage quality in real time.
[0137] Specifically, the first qualified rate calculated in real time is compared with the preset qualified rate threshold. If the first qualified rate is lower than or equal to the preset qualified rate threshold (i.e. 98%), the system immediately generates an early warning message. The early warning message should include the following key contents: the monitoring point information that triggers the early warning, the current voltage qualified rate, the specific situation of the voltage exceeding the limit (such as the frequency and duration of the limit exceeding), and the recommended preliminary response measures.
[0138] Specifically, after receiving the early warning information, the power system operation and maintenance personnel should immediately conduct a detailed inspection and analysis of the affected areas. This may include reviewing the load pattern, checking the status of reactive power compensation equipment, analyzing the operating parameters of the cable line, etc. Based on the early warning information and on-site inspection results, the operation and maintenance personnel can formulate and implement specific voltage quality improvement measures.
[0139] In summary, this scheme constructs a voltage qualification rate evaluation method based on the characteristics of voltage over-limit in high-cable distribution networks; the present invention constructs a scoring standard construction method based on the voltage measurement data of high-cable medium-voltage distribution networks and low-voltage substations, analyzes the correlation between the voltage qualification rates of monitoring points of medium-voltage distribution networks and low-voltage substations in different ranges of high-cable distribution areas, and realizes the "grid-load" two-way evaluation of the voltage qualification rate of high-cable distribution networks.
[0140] The embodiment of the present application also provides a device for determining the voltage quality of a distribution network. It should be noted that the device for determining the voltage quality of a distribution network in the embodiment of the present application can be used to execute the method for determining the voltage quality of a distribution network provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been described will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.
[0141] The following is an introduction to the device for determining the voltage quality of the distribution network provided in an embodiment of the present application.
[0142] Figure 6 1 is a structural block diagram of a device for determining voltage quality of a distribution network according to an embodiment of the present application. Figure 6 As shown, the device comprises:
[0143] A first acquisition unit 10 is used to acquire voltage data of a distribution network;
[0144] A first determining unit 20 is used to determine, based on the voltage data, an over-limit duration of the distribution network within a target duration, wherein the over-limit duration is the sum of a first duration during which the voltage data exceeds a preset maximum value and a second duration during which the voltage data exceeds a preset minimum value;
[0145] The second determining unit 30 is used to determine a first qualified rate of the distribution network according to the above-mentioned over-limit time, wherein the above-mentioned over-limit time and the above-mentioned first qualified rate are negatively correlated.
[0146] Through this embodiment, the voltage fluctuation, that is, the voltage exceeding the limit, is taken into account. The voltage quality, that is, the first qualified rate, is determined by counting the duration of the voltage exceeding the limit. This can more objectively reflect the voltage quality status of the distribution network in a specific period, making the evaluation more accurate.
[0147] In the specific implementation process, the first acquisition unit includes a first acquisition module, a second acquisition module, a division module and a clustering module. The first acquisition module is used to acquire an initial data set, wherein the initial data set at least includes the voltage amplitudes of all monitoring points in the distribution network; the second acquisition module is used to acquire an electrical distance, wherein the electrical distance is the distance between the monitoring point and the main transformer; the division module is used to divide the initial data set according to the electrical distance to obtain a data group; the clustering module is used to perform clustering processing on the data group using a K-means algorithm to obtain the voltage data.
[0148] In this scheme, based on electrical distance and K-means algorithm, the voltage data of the high-cable distribution network is effectively clustered to identify the voltage characteristics of monitoring points in different areas or types, which provides strong support for more accurate evaluation of voltage qualification rate and formulation of corresponding voltage optimization strategies.
[0149] During the specific implementation process, the above-mentioned device also includes a second acquisition unit, a first calculation unit and a second calculation unit. The second acquisition unit is used to obtain the total duration after determining the over-limit duration of the above-mentioned distribution network within the target duration based on the above-mentioned voltage data; the first calculation unit is used to calculate the quotient of the above-mentioned first duration and the above-mentioned total duration to obtain a first proportion, wherein the above-mentioned first proportion is the proportion of the above-mentioned first duration in the above-mentioned total duration; the second calculation unit is used to calculate the quotient of the above-mentioned second duration and the above-mentioned total duration to obtain a second proportion, wherein the above-mentioned second proportion is the proportion of the above-mentioned second duration in the above-mentioned total duration.
[0150] In this solution, the proportion of the time when the voltage exceeds the limit, the proportion of the voltage exceeding the upper limit, and the proportion of the voltage exceeding the lower limit, that is, the first proportion and the second proportion, can be calculated. The voltage quality can be further determined by this proportion later.
[0151] During the specific implementation process, the above-mentioned device also includes a first generation unit and a second generation unit. The first generation unit is used to generate a scatter plot based on the first pass rate of the above-mentioned distribution network after determining the first pass rate of the above-mentioned distribution network based on the above-mentioned over-limit time; the second generation unit is used to generate a target curve based on the above-mentioned first pass rate.
[0152] In this solution, by generating scatter plots and target curves, a visual method is provided for voltage quality assessment of high-cable distribution networks. This method helps power companies and grid operators better understand the distribution characteristics of voltage qualification rates through intuitive graphical displays.
[0153] In some embodiments, the above-mentioned device also includes a third acquisition unit, a fourth acquisition unit and a third determination unit, the third acquisition unit is used to obtain the first sub-qualification rate after determining the first qualification rate of the above-mentioned distribution network according to the above-mentioned over-limit time, wherein the above-mentioned first sub-qualification rate is the qualification rate of the power supply voltage of the above-mentioned distribution network; the fourth acquisition unit is used to obtain the second sub-qualification rate, wherein the above-mentioned second sub-qualification rate is the qualification rate of the voltage of the monitoring point of the switch station of the above-mentioned distribution network; the third determination unit is used to determine the relationship between the above-mentioned first sub-qualification rate and the above-mentioned second sub-qualification rate according to the Pearson correlation coefficient.
[0154] In this scheme, by calculating the Pearson correlation coefficient, the correlation between the qualified rate of power supply voltage and the qualified rate of voltage at the switch station monitoring point can be analyzed, which provides data support and decision-making basis for the voltage quality management and optimization of distribution networks with high cable rates.
[0155] In some embodiments, the above-mentioned device also includes a fourth acquisition unit, a construction unit and a processing unit, the fourth acquisition unit is used to obtain relevant information of the above-mentioned distribution network after determining the over-limit time of the above-mentioned distribution network within the target time according to the above-mentioned voltage data, wherein the above-mentioned relevant information at least includes one or more of the line length, the distribution location of the transformer, the load type and the environmental information; the construction unit is used to construct a quality detection model, wherein the above-mentioned quality detection model is trained using multiple groups of training data, and each group of training data in the above-mentioned multiple groups of training data includes historical over-limit time obtained within a historical time period, historical related information, and the historical second qualified rate corresponding to the above-mentioned historical over-limit time and the above-mentioned historical related information; the processing unit is used to input the above-mentioned over-limit time and the above-mentioned related information into the above-mentioned quality detection model to obtain the second qualified rate corresponding to the above-mentioned over-limit time and the above-mentioned related information.
[0156] In this solution, a quality detection model is built using machine learning technology to predict the changing trend of voltage quality in high-cable distribution networks based on historical data. This approach can not only help power companies to warn and respond to voltage problems in advance, but also provide data support for optimizing power quality and grid operation strategies, thereby improving grid stability and service quality.
[0157] In some embodiments, the above-mentioned device also includes a fifth acquisition unit and a third generation unit. The fifth acquisition unit is used to obtain a preset pass rate threshold after determining the first pass rate of the above-mentioned distribution network based on the above-mentioned over-limit duration; the third generation unit is used to generate early warning information when the above-mentioned first pass rate is less than or equal to the above-mentioned preset pass rate threshold.
[0158] In this solution, by setting a preset pass rate threshold and combining it with real-time monitoring data, an effective voltage quality early warning mechanism is provided, which can help power companies to promptly detect and handle voltage quality problems, avoid power loss and equipment damage caused by voltage fluctuations, and thus improve the overall operation efficiency and service quality of the power grid.
[0159] The above-mentioned device for determining the voltage quality of the distribution network includes a processor and a memory, and the above-mentioned first acquisition unit, the first determination unit, the second determination unit, etc. are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to implement corresponding functions. The above-mentioned modules are all located in the same processor; or, the above-mentioned modules are located in different processors in any combination.
[0160] The processor includes a kernel, and the kernel calls the corresponding program unit from the memory. One or more kernels can be set, and the problem of inaccurate voltage quality evaluation of the distribution network in the prior art is solved by adjusting kernel parameters.
[0161] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0162] An embodiment of the present invention provides a computer-readable storage medium, which includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method for determining the voltage quality of the distribution network.
[0163] An embodiment of the present invention provides a processor, and the processor is used to run a program, wherein the method for determining the voltage quality of the distribution network is executed when the program is run.
[0164] An embodiment of the present invention provides a device, the device includes a processor, a memory, and a program stored in the memory and executable on the processor, and when the processor executes the program, at least the steps of the method for determining the voltage quality of the distribution network are implemented. The device in this article can be a server, a PC, a PAD, a mobile phone, etc.
[0165] A computer program product includes a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for determining the voltage quality of the distribution network in each embodiment of the present application are implemented.
[0166] The present application also includes a distribution network detection system, including one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the one or more memories and are configured to be executed by the one or more processors, and the one or more programs include a method for determining the voltage quality of the distribution network.
[0167] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0168] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0169] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0170] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0171] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0172] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0173] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0174] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0175] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0176] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0177] 1) The method for determining the voltage quality of the distribution network of the present application takes into account the voltage fluctuation, that is, the voltage exceeding the limit, and determines the voltage quality, that is, the first qualified rate, by counting the duration of the voltage exceeding the limit. This can more objectively reflect the voltage quality status of the distribution network within a specific period, so that the evaluation accuracy is better.
[0178] 2) The device for determining the voltage quality of the distribution network of the present application takes into account the voltage fluctuation, that is, the voltage exceeding the limit, and determines the voltage quality, that is, the first qualified rate, by counting the duration of the voltage exceeding the limit. This can more objectively reflect the voltage quality status of the distribution network within a specific period, so that the evaluation accuracy is better.
[0179] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for determining the voltage quality of a distribution network, characterized in that: include: Obtain voltage data of the distribution network; Determine, according to the voltage data, an over-limit duration of the distribution network within a target duration, wherein the over-limit duration is the sum of a first duration during which the voltage data exceeds a preset maximum value and a second duration during which the voltage data exceeds a preset minimum value; A first qualified rate of the distribution network is determined according to the over-limit duration, wherein the over-limit duration and the first qualified rate are negatively correlated.
2. The method according to claim 1, characterized in that Obtain voltage data of the distribution network, including: Acquire an initial data set, wherein the initial data set at least includes voltage amplitudes of all monitoring points in the distribution network; Acquire an electrical distance, wherein the electrical distance is a distance between the monitoring point and a main transformer; Dividing the initial data set according to the electrical distance to obtain data groups; The data group is clustered using a K-means algorithm to obtain the voltage data.
3. The method according to claim 1, characterized in that After determining the over-limit duration of the distribution network within the target duration according to the voltage data, the method further includes: Get the total duration; Calculate the quotient of the first duration and the total duration to obtain a first proportion, wherein the first proportion is the proportion of the first duration in the total duration; A quotient of the second duration and the total duration is calculated to obtain a second proportion, wherein the second proportion is the proportion of the second duration in the total duration.
4. The method according to claim 1, characterized in that: After determining the first qualified rate of the distribution network according to the over-limit duration, the method further includes: Generate a scatter plot according to the first qualified rate; A target curve is generated according to the first qualified rate.
5. The method according to claim 1, characterized in that: After determining the first qualified rate of the distribution network according to the over-limit duration, the method further includes: Obtaining a first sub-qualified rate, wherein the first sub-qualified rate is a qualified rate of the power supply voltage of the power distribution network; Obtaining a second sub-qualified rate, wherein the second sub-qualified rate is a qualified rate of a voltage at a monitoring point of a switch station of the distribution network; The relationship between the first sub-qualification rate and the second sub-qualification rate is determined according to the Pearson correlation coefficient.
6. The method according to claim 1, characterized in that After determining the over-limit duration of the distribution network within the target duration according to the voltage data, the method further includes: Acquire relevant information of the distribution network, wherein the relevant information includes at least one or more of line length, distribution location of transformers, load type and environmental information; Constructing a quality detection model, wherein the quality detection model is trained using multiple sets of training data, each set of training data in the multiple sets of training data includes a historical limit-crossing duration, historical related information, and a historical second qualified rate corresponding to the historical limit-crossing duration and the historical related information obtained within a historical time period; The limit-exceeding time length and the related information are input into the quality detection model to obtain a second qualified rate corresponding to the limit-exceeding time length and the related information.
7. The method according to claim 1, characterized in that After determining the first qualified rate of the distribution network according to the over-limit duration, the method further includes: Obtaining a preset pass rate threshold; When the first qualified rate is less than or equal to the preset qualified rate threshold, early warning information is generated.
8. A device for determining voltage quality of a distribution network, characterized in that: include: A first acquisition unit, used to acquire voltage data of the distribution network; A first determining unit, configured to determine, based on the voltage data, an over-limit duration of the distribution network within a target duration, wherein the over-limit duration is the sum of a first duration during which the voltage data exceeds a preset maximum value and a second duration during which the voltage data exceeds a preset minimum value; The second determining unit is used to determine a first qualified rate of the distribution network according to the over-limit duration, wherein the over-limit duration and the first qualified rate are negatively correlated.
9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method for determining the voltage quality of the power distribution network as claimed in any one of claims 1 to 7 are implemented.
10. A distribution network detection system, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for determining the voltage quality of the distribution network as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Distribution network voltage disqualification period identification method based on time-space characteristics
CN111191966A
Voltage qualification rate recording method and device of dual-core intelligent electric meter
CN112782642A
Distribution network voltage out-of-limit reason analysis method based on clustering and analytic hierarchy process algorithms
CN112785119A
Systems and methods for managing voltage event alarms in an electrical system
EP3968481A1
Cited By
Power distribution network monitoring method and device and power distribution network monitoring system
CN119831162A
