Construction system and method for standard knowledge packet in capital construction feasibility investigation process of pilot equipment

By building a standard knowledge package and a knowledge calculation engine, and automatically comparing and verifying standards, the cumbersome and manual error problems of standard search and application in the feasibility study review of pilot equipment infrastructure have been solved, and an efficient and accurate review process has been achieved. .

CN119066147APending Publication Date: 2024-12-03ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +1

Patent Information

Application Number
CN202410987698.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-12-03

Smart Images

  • Figure CN119066147A_ABST
    Figure CN119066147A_ABST
Patent Text Reader

Abstract

The invention discloses a construction system and method for a standard knowledge packet in a trial equipment capital construction feasibility research process, and the system comprises a construction system body which comprises a standard specification access platform, a service capability calling platform and a business system embedding platform. Standard comparison of calculation reasoning and automation is carried out, indexes related to review are recognized, graded reminding is carried out according to the importance of terms, and reviews are helped to focus on key problems better; through automatic traceability based on a semantic knowledge base, application conditions of standard index terms in research reports and design documents are tracked, compliance traceability of projects is ensured, and reduction of potential violation risks is facilitated; by means of automatic standard traceability and application, the review process is simplified, the workload of an enterprise in the aspect of standard compliance review is reduced, the efficiency and accuracy of the review process are improved, and human errors are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of equipment review, and in particular to a system and method for constructing a standard knowledge package for a pilot equipment infrastructure feasibility study review process. Background Art

[0002] Infrastructure construction is referred to as: infrastructure refers to the basic construction of information digitization, mainly including seven major areas: 5G base station construction, ultra-high voltage, intercity high-speed railways and urban rail transit, new energy vehicle charging piles, big data centers, artificial intelligence, and industrial Internet. Infrastructure mainly refers to engineering facilities that provide public services for social production and residents’ lives. It is a public service system used to ensure the normal social and economic activities of the country or region. It is the material basis for the survival and development of the society. The pilot equipment infrastructure needs to be reviewed before operation.

[0003] However, traditional review has the following disadvantages: When conducting feasibility studies on pilot equipment infrastructure, power grid companies need to refer to numerous standards and index clauses to ensure that their infrastructure projects comply with relevant standards and specifications. These standards may be scattered in different documents and specifications. It is a tedious task for companies to find, understand and apply these standards. At the same time, the traditional feasibility study review process may involve a lot of manual participation and manual judgment, and there is a risk of subjectivity and error. Summary of the invention

[0004] The purpose of the present invention is to provide a system and method for constructing a standard knowledge package for the pilot equipment infrastructure feasibility study review process, so as to solve the problem proposed in the above background technology that power grid enterprises need to refer to numerous standards and indicator clauses when conducting pilot equipment infrastructure feasibility studies to ensure that their infrastructure projects comply with relevant standards and specifications. These standards may be scattered in different documents and specifications. It is a tedious task for enterprises to find, understand and apply these standards. At the same time, the traditional feasibility study review process may involve a large amount of manual participation and manual judgment, and there is a risk of subjectivity and error.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a construction system for a pilot equipment infrastructure feasibility study review process standard knowledge package, including a construction system body, characterized in that: the construction system body includes a standard specification access platform, a service capability calling platform and a business system embedding platform, the standard specification access platform establishes a two-way communication connection with the service capability calling platform, and the service capability calling platform is connected with the business system embedding platform; The standard specification access platform constructs a standard knowledge package for the pilot equipment infrastructure feasibility study review process, realizing scene adaptation, calculation reasoning, indicator identification, standard traceability, content comparison and hierarchical reminder functions; The service capability calling platform first analyzes the user needs and the characteristics of the scenario-based standard knowledge, then determines the functions and characteristics of the standard knowledge assistant, and designs the architecture and algorithm of the standard knowledge assistant; The business system embedded platform supports the integration of a standard knowledge assistant in the operation ticket filling interface, selects the operation ticket type and specific equipment, displays the associated technical standards, operation specifications, parameters, and indicator contents, standardizes the operation ticket filling requirements, and achieves accurate matching of scenes, equipment, and operations.

[0006] As a preferred technical solution of the present invention, the standard specification access platform includes a standard knowledge package construction module, a scenario adaptation solution module, a standard knowledge calculation and reasoning module, an indicator identification module, a standard indicator clause traceability module, an indicator clause comparison module, a standard compliance verification module and a standard clause hierarchical reminder module. The standard knowledge package construction module constructs a standard knowledge package for the pilot equipment infrastructure feasibility study review process. The scenario adaptation solution module is based on the scenario adaptation solution of the knowledge calculation and service engine, accurately identifies similar historical scenarios, quickly extracts relevant empirical knowledge, and efficiently carries out knowledge calculation. The standard knowledge calculation and reasoning module is based on the calculation and reasoning solution of the knowledge calculation and service engine, obtains relevant knowledge and information from the knowledge base, implements reasoning and verifies the results, collects feedback information and updates the knowledge base. The indicator identification module identifies the relevant indicators of the standard based on a human-machine combination method, extracts relevant indicator libraries and content libraries from the knowledge base, and combs or embeds point monitoring on the indicator libraries and content libraries to implement The human-machine combination is now used to verify and correct the indicator library and content library, collect feedback information and update the indicator library and content library. The standard indicator clause traceability module automatically traces the standard indicator clauses based on the semantic knowledge base, performs semantic analysis and query on the traceable indicators, obtains relevant standard indicator clauses from the knowledge base, and provides review suggestions for the feasibility study review of pilot equipment infrastructure based on the verified standard indicator clauses. The indicator clause comparison module realizes the comparison of standard indicator clauses, from collecting standard indicator clauses, clarifying the comparison objects, conducting comparison work, identifying differences, analyzing the causes of differences, giving comparison conclusions to optimizing standard indicator clauses. The standard compliance verification module realizes standard compliance verification, from obtaining standard indicator clauses, extracting relevant indicators, comparing indicators with standards, identifying causes to giving verification conclusions and optimizing the indicator library and content library. The standard clause hierarchical reminder module realizes hierarchical reminders of standard clauses, from determining the type of standard clauses, identifying standard clauses to giving hierarchical reminders and optimizing the indicator library and content library.

[0007] As a preferred technical solution of the present invention, the working process of the standard knowledge package construction module is as follows: S1, collect standard indicator clauses and establish a semantic knowledge base: collect and organize standard indicator clauses related to the feasibility study review of pilot equipment infrastructure, establish a semantic knowledge base, and provide basic data for standard knowledge calculation; S2, identify relevant indicators and establish an indicator library: identify relevant indicators in the feasibility study content of infrastructure through a human-machine combination method, establish an indicator library, and provide a reference for the comparison of standard indicator clauses; S3, establish a content library and perform content comparison: compare the infrastructure feasibility study content with the standard indicator clauses by category, establish a content library, and provide a reference for the automatic verification of standard compliance; S4, association identification: based on the review specification clauses of the feasibility study documents of infrastructure projects, The text needs to be understood and split on this basis, and the text is associated with the standard content information through the logical decomposition of the text, and the review rule base and relevant standard professional attribute data are summarized; S5. Realize automatic verification and establish a hierarchical reminder mechanism: Based on the semantic knowledge base, the standard indicator clauses are automatically traced, and the feasibility study content is compared with the standard indicator clauses to realize automatic verification of standard compliance, and graded reminders are given according to the clause type. The working process of the scenario adaptation solution module is as follows: S1. Identify scenario information: In the process of feasibility study review of pilot equipment infrastructure, scenario information is identified through various methods, such as: project type, construction location, and investment scale; S2. Match similar scenarios: The identified scenario information is compared with the historical information in the knowledge base. Compare data to match similar historical scenarios; S3. Extract experiential knowledge: extract relevant experiential knowledge from historical scenarios, including standard indicator clauses, indicator library, and content library; S4. Conduct knowledge calculation: use the extracted experiential knowledge to conduct knowledge calculation, including comparison of standard indicator clauses, reference to indicator library and content library; S5. Provide review suggestions: based on the results of knowledge calculation, provide review suggestions, including standard compliance verification, correction of indicator library and content library; S6. Optimize knowledge base: collect and organize feedback information during the review process, optimize the knowledge base, and improve adaptation accuracy and review efficiency. The working process of the standard knowledge calculation reasoning module is: S1. Determine the reasoning goal: clarify which knowledge needs to be calculated What knowledge should be obtained from the knowledge base, and what new knowledge should be inferred; S2. Acquire knowledge: obtain relevant knowledge and information from the knowledge base, including facts, rules, indicator library and content library; S3. Implement reasoning: use the acquired knowledge to implement reasoning, including rule-based reasoning, statistics-based reasoning and graph-based reasoning; S4. Verify the results: verify the reasoning results to ensure their accuracy and consistency; S5. Update the knowledge base: collect and organize feedback information during the reasoning process, update the knowledge base, and improve the accuracy and efficiency of reasoning. The workflow of the indicator identification module is as follows: S1. Information input: the user inputs information related to the feasibility study review of the pilot equipment infrastructure, such as project type, construction location, and investment scale;S2. Scenario matching: The system matches similar historical scenarios from the knowledge base based on the input scenario information, and extracts relevant indicator libraries and content libraries; S3. Map formation: The system combs or monitors the indicator library and content library to form a key touchpoint "map"; S4. Map correction: The user verifies and corrects the indicator library and content library based on the key touchpoint "map" to achieve human-machine integration; S5. Map update: The system updates the indicator library and content library based on the results of verification and correction. The specific workflow of the standard indicator clause traceability module is as follows: S1. Build a semantic knowledge base: collect and organize Pilot equipment infrastructure feasibility study review related standard indicator clauses, establish a semantic knowledge base, and provide basic data for automatic traceability of standard indicator clauses; S2, determine the indicators to be traced: clarify the indicators to be traced and their related information, such as indicator name, indicator definition; S3, query the knowledge base: perform semantic analysis on the indicators to be traced, convert them into nodes and edges in the knowledge graph, and use the semantic relationships in the knowledge graph to query; S4, locate standard indicator clauses: by querying the knowledge base, perform semantic matching on the indicators to be traced, and obtain relevant standard indicator clauses from the knowledge base; S5, verify standard indicator clauses: Verify the obtained standard indicator clauses to ensure their accuracy and consistency; S6. Provide review suggestions: Based on the verified standard indicator clauses, provide review suggestions for the pilot equipment infrastructure feasibility study review, including indicator definition, indicator source, and indicator calculation method. The workflow of the indicator clause comparison module is as follows: S1. Establish a standard indicator library: combine machine extraction with manual indexing to index standard indicator clauses and establish a standard indicator library; S2. Clarify the comparison object: Clarify the object to be compared, such as domestic standards and international standards, and standards between different countries; S3. Carry out comparison work: From the standard Select the indicator clauses related to the comparison object from the indicator library and carry out the comparison work; S4. Identify differences: During the comparison process, identify the differences between the indicator clauses, such as technical requirements, indicator definitions, and test methods; S5. Analyze the causes of differences: Analyze the causes of the differences found in the comparison, such as technical level, industrial process, and production habits; S6. Give comparison conclusions: Give comparison conclusions from a professional perspective to eliminate misunderstandings of the standards caused by differences in the standard system and production habits; S7. Optimize standard indicator clauses: According to the comparison conclusions, optimize the standard indicator clauses to improve the technical content and level of the standards. ;

[0008] As a preferred technical solution of the present invention, the workflow of the standard compliance verification module is specifically as follows: S1. Obtain standard indicator clauses: obtain standard indicator clauses related to the pilot equipment infrastructure feasibility study review from the knowledge base as a reference for verification; S2. Extract relevant indicators: extract relevant indicators from the pilot equipment infrastructure feasibility study review content library, including technical indicators and economic indicators; S3. Compare indicators with standards: compare the extracted indicators with the standard indicator clauses to identify the differences between the indicators and the standards; S4. Identify the reasons: analyze the identified reasons for the differences, including indicator calculation methods and indicator definitions; S5. Give verification results: based on the comparison results, give verification conclusions, including whether the standard compliance verification is passed or not; S6. Optimize the indicator library and content library: based on the verification conclusions , optimize the indicator library and content library to improve the review efficiency and accuracy. The specific workflow of the standard clause hierarchical reminder module is as follows: S1. Determine the type of standard clause: According to the degree of impact of the standard indicator clause on user interests, the standard clauses are divided into different types, such as basic indicators, important indicators and core indicators; S2. Identify standard clauses: Extract relevant standard indicator clauses from the pilot equipment infrastructure feasibility study review content library and identify which type of standard clauses they belong to; S3. Give hierarchical reminders: According to the type of standard clauses, give corresponding hierarchical reminders, such as "This indicator is a basic indicator, please pay attention to whether it meets the requirements", "This indicator is a core indicator, please ensure that it meets the requirements"; S4. Optimize the indicator library and content library: According to the hierarchical reminders, optimize the indicator library and content library.

[0009] As a preferred technical solution of the present invention, the service capability calling platform includes a standard application module, a data analysis module, a data storage module and an operation and maintenance data source module. The standard application module constructs an operation and maintenance database with the technical standards, operating specifications and parameters involved in operation and maintenance, and associates the technical standards, operating specifications and important parameters and performance index requirements corresponding to the equipment operation and maintenance and maintenance links with the operation ticket filling module of the maintenance plan system. The data analysis module develops an operation and maintenance scenario-based standard knowledge assistant, which is embedded in the maintenance plan or operation ticket writing scenario of the Southern Power Grid, to achieve data exchange and synchronization between the digital standard platform and the maintenance plan management system. The data storage module stores the service content in real time. The operation and maintenance data source module standardizes the operation ticket filling requirements, achieves accurate matching and knowledge push of scenarios, equipment and operations, and achieves accurate knowledge push during the operation and maintenance personnel's operation ticket filling process.

[0010] As a preferred technical solution of the present invention, the business system embedded platform includes a data exchange and synchronization solution module, a standard knowledge and operation ticket filling module, a knowledge push module and a risk response measures module. The data exchange and synchronization solution module exchanges and synchronizes data with the integrated system through a data interface. The standard knowledge and operation ticket filling module associates the standard knowledge with the operation ticket filling module of the maintenance plan system, standardizes the operation ticket filling requirements, and achieves accurate matching of scenarios, equipment, and operations. The knowledge push module formulates intelligent and precise push strategies according to application scenarios, and dynamically pushes corresponding standard knowledge, operation specifications, and parameter performance requirements. The risk response measures module uses traditional machine learning, heuristic intelligent algorithms, knowledge reasoning, computer vision, natural language processing and other artificial intelligence technologies for analysis based on data characteristics and business needs.

[0011] As a preferred technical solution of the present invention, the workflow of the data exchange synchronization solution module is specifically as follows: S1. Determine the content of data exchange: determine the type and amount of data that need to be exchanged between the digital standard platform and the maintenance plan management system, including data format, data structure, and data field; S2. Determine the method of data exchange: select a suitable data exchange method according to the content of data exchange and system architecture, such as file transfer, interface call, and database synchronization; S3. Design data interface: design data interface according to the content and format of data exchange, including data transmission protocol, data encoding method, and data transmission method; S4. Develop data interface program: develop data interface program according to the design of data interface to realize data Transmission and conversion to ensure that data is correctly transmitted and synchronized; S5. Test data exchange interface: Test the data exchange interface to ensure accurate data transmission and synchronization, and eliminate potential problems and errors; S6. Deploy data exchange interface: Deploy the data exchange interface to the digital standard platform and the Southern Power Grid maintenance plan management system to ensure real-time data exchange and synchronization; S7. Monitor data exchange status: Monitor the data exchange interface to promptly detect and handle data exchange anomalies to ensure stability and reliability of data exchange; S8. Regularly maintain and update the data interface: With the upgrade and update of the digital standard platform and the Southern Power Grid maintenance plan management system, the data interface needs to be maintained and updated to ensure data exchange and synchronization The normal operation of the standard knowledge and operation ticket filling module is specifically as follows: S1. Collect and organize relevant standard knowledge and technical specifications according to the requirements of the operation ticket filling module: first, through communication with experts in the field, read the corresponding standards and operation manuals to analyze and collect the technical standards, operation specifications and important parameters, performance indicators required by the operation ticket filling related equipment operation and maintenance, standard knowledge and technical specifications, form a standard knowledge base and technology base, and establish a data model and knowledge graph data structure to save and manage this knowledge; S2. Define the association method between standard knowledge and operation tickets: Determine how to associate standard knowledge with operation tickets, by connecting the knowledge points of the standard knowledge base with the filling points of the operation ticket filling function module Write items to associate, for example, set a standard knowledge point for each fill-in item, or mark the corresponding fill-in item on the knowledge point, and create an index for quick matching. The following methods are used: ① Realize association through hyperlinks: In the operation ticket filling interface, add a hyperlink to the relevant standard knowledge page. The user clicks the link to view the relevant standard knowledge. In the standard knowledge interface, add a hyperlink to the relevant operation ticket filling page. The user clicks the link to jump directly to the operation ticket filling interface; ② Realize association through the API interface. When designing the system, the two functional modules of standard knowledge and operation ticket filling are designed as independent services, and then the data interaction between the two functional modules is realized through the API interface;③Realize association through database. When designing the system, store the data of the two functional modules of standard knowledge and operation ticket filling in the same database, and then realize the data interaction between the two functional modules through database query and association; S3. Establish indexes of standard knowledge base and operation ticket filling function module: For standard knowledge base and operation ticket filling function module, design keyword index through manual classification or natural language processing to help users quickly search and match corresponding knowledge and filling items; S4. Integrate with operation ticket filling function module: After realizing the association between standard knowledge base and operation ticket filling function module, integrate standard knowledge base into operation ticket filling function module. For each filling item, add a button or input box that references standard knowledge on the filling interface to associate the relevant standards with it. When the user selects the corresponding standard, the corresponding content of the relevant standard will pop up automatically; S5. Automatically generate and fill in the operation ticket based on standard knowledge: In the maintenance plan system, based on standard knowledge and technical specifications, combined with the operation ticket operation scenario, realize the pre-filling of standard content of the operation ticket; S6. Test and optimize and upgrade: After the implementation of the solution, it is necessary to test and optimize to ensure the normal operation of the associated function and user experience. ;

[0012] The method for using the system for constructing the standard knowledge package of the pilot equipment infrastructure feasibility study review process of the present invention comprises the following steps: Step 1: Establish a standard specification access platform: Establish a general knowledge package for infrastructure feasibility review, which contains standard indicator clauses and parameters related to the pilot equipment infrastructure feasibility review. These clauses cover requirements and regulations in various aspects, such as engineering design, environmental assessment, and cost-benefit analysis. The knowledge package will be stored in a computer-understandable form and contain standard definitions, dependencies, and scope of application information; Step 2: Establish a service capability call platform: When conducting a feasibility study review, knowledge computing and service engines will be used to automatically trace the standard indicator clauses. The digital standard service will identify and extract the relevant standard indicator clauses according to the specific scenario of the review, and automatically analyze their meanings and requirements. The service engine will compare the feasibility study content with the standard indicator clauses to automatically verify the compliance with the standards. Step 3. Establish a business system embedded platform: By analyzing the feasibility study report, design documents and related data, automatically check whether the requirements specified in the relevant standards are met, and perform calculation reasoning and logical inference to verify the compliance of the feasibility study content, and generate a corresponding evaluation report, and provide graded reminders according to the type of clauses. For key indicator clauses, pay special attention and provide detailed explanations and suggestions to reviewers, and for general indicator clauses, give brief reminders.

[0013] Compared with the prior art, the present invention has the following beneficial effects: 1. By building standard knowledge packages and knowledge computing and service engines, calculating reasoning and automated standard comparison, we can realize automatic verification and evaluation of feasibility study contents. By identifying indicators related to the review and providing graded reminders based on the importance of the clauses, we can help reviewers better focus on key issues. 2. Through automatic traceability based on the semantic knowledge base, the application of standard indicator clauses in feasibility studies and design documents is tracked to ensure the traceability of project compliance, which is crucial for corporate compliance management and standardized operations and helps reduce potential risks of violations; 3. By automating the traceability and application of standards, the review process can be simplified, the workload of enterprises in standard compliance review can be reduced, the efficiency and accuracy of the review process can be improved, and human errors can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A schematic diagram of the architecture of the system ontology constructed for the present invention; Figure 2 This is a schematic diagram of the architecture of the standard access platform of the present invention; Figure 3 A workflow diagram for constructing modules of the standard knowledge package of the present invention; Figure 4 This is a workflow diagram of the scenario adaptation solution module of the present invention; Figure 5 The following is a workflow diagram of the standard knowledge calculation and reasoning module of the present invention; Figure 6 It is a work flow chart of the indicator identification module of the present invention; Figure 7 This is a workflow diagram of the standard indicator clause tracing module of the present invention; Figure 8 This is a workflow diagram of the indicator clause comparison module of the present invention; Fig. 9 is a workflow diagram of the standard compliance verification module of the present invention; Fig.10 This is a workflow diagram of the standard clause classification reminder module of the present invention; Fig.11 A schematic diagram of the architecture of the service capability calling platform of the present invention; Fig.12 This is a schematic diagram of the architecture of the business system embedded in the platform of the present invention; Fig.13 The following is a workflow diagram of the data exchange synchronization solution module of the present invention; Fig.14 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0015] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0016] See also Figure 1-14 The present invention provides a system for constructing a standard knowledge package of a pilot equipment infrastructure feasibility study review process, including constructing a system ontology, the system ontology including a standard specification access platform, a service capability calling platform and a business system embedding platform, the standard specification access platform establishes a two-way communication connection with the service capability calling platform, and the service capability calling platform is connected with the business system embedding platform; The standard specification access platform builds a standard knowledge package for the pilot equipment infrastructure feasibility study review process, realizing scene adaptation, calculation reasoning, indicator identification, standard traceability, content comparison and graded reminder functions; The service capability invocation platform first analyzes user needs and the characteristics of scenario-based standard knowledge, then determines the functions and characteristics of the standard knowledge assistant, and designs the architecture and algorithm of the standard knowledge assistant; The business system embedding platform supports the integration of a standard knowledge assistant in the operation ticket filling interface, selecting the operation ticket type and specific equipment, displaying the associated technical standards, operating specifications, parameters, and indicator content, standardizing the operation ticket filling requirements, and achieving accurate matching of scenarios, equipment, and operations.

[0017] The standard specification access platform includes a standard knowledge package construction module, a scenario adaptation solution module, a standard knowledge calculation and reasoning module, an indicator identification module, a standard indicator clause traceability module, an indicator clause comparison module, a standard compliance verification module and a standard clause classification reminder module. The standard knowledge package construction module constructs a standard knowledge package for the feasibility study review process of the pilot equipment infrastructure. The scenario adaptation solution module is based on the scenario adaptation solution of the knowledge computing and service engine, accurately identifies similar historical scenarios, quickly extracts relevant experience knowledge, and efficiently carries out knowledge computing. The standard knowledge calculation and reasoning module is based on the calculation and reasoning solution of the knowledge computing and service engine, obtains relevant knowledge and information from the knowledge base, implements reasoning and verifies the results, collects feedback information and updates the knowledge base. The indicator identification module identifies the relevant indicators of the standard based on the human-machine combination method, extracts the relevant indicator library and content library from the knowledge base, sorts out the indicator library and content library or performs point monitoring to achieve human-machine combination and indicators. The standard indicator clause traceability module automatically traces the standard indicator clauses based on the semantic knowledge base, performs semantic analysis and query on the traceable indicators, obtains relevant standard indicator clauses from the knowledge base, and provides review suggestions for the feasibility study review of pilot equipment infrastructure based on the verified standard indicator clauses. The indicator clause comparison module realizes the comparison of standard indicator clauses, from collecting standard indicator clauses, clarifying the comparison objects, conducting the comparison work, identifying the differences, analyzing the reasons for the differences, giving the comparison conclusions to optimizing the standard indicator clauses. The standard compliance verification module realizes the standard compliance verification, from obtaining the standard indicator clauses, extracting the relevant indicators, comparing the indicators with the standards, identifying the reasons to giving the verification conclusions and optimizing the indicator library and content library. The standard clause hierarchical reminder module realizes the hierarchical reminder of standard clauses, from determining the type of standard clauses, identifying the standard clauses to giving hierarchical reminders and optimizing the indicator library and content library.

[0018] The working process of the standard knowledge package construction module is as follows: S1. Collect standard indicator clauses and establish a semantic knowledge base: collect and organize standard indicator clauses related to the feasibility study review of pilot equipment infrastructure, establish a semantic knowledge base, and provide basic data for standard knowledge calculation; S2. Identify relevant indicators and establish an indicator library: identify relevant indicators in the feasibility study content of infrastructure through human-computer combination, establish an indicator library, and provide a reference for the comparison of standard indicator clauses; S3. Establish a content library and perform content comparison: compare the infrastructure feasibility study content with standard indicator clauses by category, establish a content library, and provide a reference for automatic verification of standard compliance; S4. Association identification: based on the review specification clauses of the feasibility study documents of infrastructure projects, it is necessary to check the layout on this basis. Understand and split, and associate the clauses with standard content information through logical decomposition of the clauses, summarize the review rule base and relevant standard professional attribute data; S5. Realize automatic verification and establish a hierarchical reminder mechanism: Based on the semantic knowledge base, the standard indicator clauses are automatically traced, and the feasibility study content is compared with the standard indicator clauses to realize automatic verification of standard compliance, and graded reminders are given according to the clause type. The working process of the scenario adaptation solution module is as follows: S1. Identify scenario information: In the feasibility study review process of pilot equipment infrastructure, scenario information is identified through various methods, such as project type, construction location, and investment scale; S2. Match similar scenarios: Compare the identified scenario information with the historical data in the knowledge base, and match S3. Extract experiential knowledge: extract relevant experiential knowledge from historical scenarios, including standard indicator clauses, indicator library, and content library; S4. Conduct knowledge calculation: use the extracted experiential knowledge to conduct knowledge calculation, including comparison of standard indicator clauses, reference to indicator library and content library; S5. Provide review suggestions: based on the results of knowledge calculation, provide review suggestions, including standard compliance verification, correction of indicator library and content library; S6. Optimize knowledge base: collect and organize feedback information during the review process, optimize the knowledge base, improve adaptation accuracy and review efficiency. The working process of the standard knowledge calculation reasoning module is as follows: S1. Determine the reasoning goal: clarify which knowledge bases need to be obtained What knowledge to obtain, and what new knowledge needs to be inferred; S2. Acquire knowledge: obtain relevant knowledge and information from the knowledge base, including facts, rules, indicator library and content library; S3. Implement reasoning: use the acquired knowledge to implement reasoning, including rule-based reasoning, statistics-based reasoning and graph-based reasoning; S4. Verify the results: verify the reasoning results to ensure their accuracy and consistency; S5. Update the knowledge base: collect and organize feedback information during the reasoning process, update the knowledge base, and improve the accuracy and efficiency of reasoning. The workflow of the indicator identification module is: S1. Information input: The user inputs information related to the feasibility study review of the pilot equipment infrastructure, such as project type, construction location, and investment scale;S2. Scenario matching: The system matches similar historical scenarios from the knowledge base based on the input scenario information, and extracts relevant indicator libraries and content libraries; S3. Map formation: The system sorts out or monitors the indicator library and content library to form a key touchpoint "map"; S4. Map correction: The user verifies and corrects the indicator library and content library based on the key touchpoint "map" to achieve human-machine integration; S5. Map update: The system updates the indicator library and content library based on the results of verification and correction. The specific workflow of the standard indicator clause traceability module is as follows: S1. Build a semantic knowledge base: Collect and organize test results; S2. Determine the standard indicator clauses related to the feasibility study of point equipment infrastructure, establish a semantic knowledge base, and provide basic data for the automatic traceability of standard indicator clauses; S2. Determine the indicators to be traced: clarify the indicators to be traced and their related information, such as indicator name and indicator definition; S3. Query the knowledge base: perform semantic analysis on the indicators to be traced, convert them into nodes and edges in the knowledge graph, and use the semantic relationships in the knowledge graph to query; S4. Locate the standard indicator clauses: By querying the knowledge base, perform semantic matching on the indicators to be traced, and obtain relevant standard indicator clauses from the knowledge base; S5. Verify the standard indicator clauses: Verify the obtained standard indicator clauses to ensure their accuracy and consistency; S6. Provide review suggestions: Based on the verified standard indicator clauses, provide review suggestions for the pilot equipment infrastructure feasibility study review, including indicator definition, indicator source, indicator calculation method, and the specific workflow of the indicator clause comparison module is as follows: S1. Establish a standard indicator library: combine machine extraction with manual indexing, index standard indicator clauses, and establish a standard indicator library; S2. Clarify the comparison object: Clarify the object to be compared, such as domestic standards and international standards, and standards between different countries; S3. Carry out comparison work: From standard indicators Select the index clauses related to the comparison object from the standard library and carry out the comparison work; S4. Identify differences: During the comparison process, identify the differences between the index clauses, such as technical requirements, index definitions, and test methods; S5. Analyze the causes of differences: Analyze the causes of the differences found in the comparison, such as technical level, industrial process, and production habits; S6. Give comparison conclusions: Give comparison conclusions from a professional perspective to eliminate misunderstandings of the standards caused by differences in the standard system and production habits; S7. Optimize standard index clauses: According to the comparison conclusions, optimize the standard index clauses to improve the technical content and level of the standards. ;

[0019] The specific workflow of the standard compliance verification module is as follows: S1. Obtain standard indicator clauses: Obtain standard indicator clauses related to the pilot equipment infrastructure feasibility study review from the knowledge base as a reference for verification; S2. Extract relevant indicators: Extract relevant indicators from the pilot equipment infrastructure feasibility study review content library, including technical indicators and economic indicators; S3. Compare indicators and standards: Compare the extracted indicators with the standard indicator clauses to identify the differences between the indicators and the standards; S4. Identify the causes: Analyze the identified causes of the differences, including indicator calculation methods and indicator definitions; S5. Give verification results: Based on the comparison results, give verification conclusions, including whether the standard compliance verification has passed or failed; S6. Optimize the indicator library and content library: According to the verification conclusions, optimize the indicator library and content library. The content library is optimized to improve the review efficiency and accuracy. The specific workflow of the standard clause grading reminder module is as follows: S1. Determine the type of standard clause: According to the degree of impact of the standard indicator clause on user interests, the standard clauses are divided into different types, such as basic indicators, important indicators and core indicators; S2. Identify standard clauses: Extract relevant standard indicator clauses from the pilot equipment infrastructure feasibility study review content library and identify which type of standard clauses they belong to; S3. Give graded reminders: According to the type of standard clauses, give corresponding graded reminders, such as "This indicator is a basic indicator, please pay attention to whether it meets the requirements", "This indicator is a core indicator, please ensure that it meets the requirements"; S4. Optimize the indicator library and content library: According to the graded reminders, optimize the indicator library and content library.

[0020] The service capability call platform includes a standard application module, a data analysis module, a data storage module and an operation and maintenance data source module. The standard application module constructs an operation and maintenance database with the technical standards, operating specifications and parameters involved in operation and maintenance, and associates the technical standards, operating specifications and important parameters and performance index requirements corresponding to the equipment operation and maintenance and maintenance links with the operation ticket filling module of the maintenance plan system. The data analysis module develops a scenario-based standard knowledge assistant for operation and maintenance, which is embedded in the maintenance plan or operation ticket writing scenario of the Southern Power Grid to realize data exchange and synchronization between the digital standard platform and the maintenance plan management system. The data storage module stores service content in real time. The operation and maintenance data source module standardizes the requirements for filling out operation tickets, realizes accurate matching and knowledge push of scenarios, equipment and operations, and realizes accurate knowledge push during the operation and maintenance personnel's operation ticket filling process.

[0021] The business system embedding platform includes a data exchange and synchronization solution module, a standard knowledge and operation ticket filling module, a knowledge push module and a risk response measure module. The data exchange and synchronization solution module exchanges and synchronizes data with the integrated system through a data interface. The standard knowledge and operation ticket filling module associates the standard knowledge with the operation ticket filling module of the maintenance plan system, standardizes the operation ticket filling requirements, and achieves accurate matching of scenarios, equipment, and operations. The knowledge push module formulates intelligent and precise push strategies based on application scenarios, and dynamically pushes corresponding standard knowledge, operation specifications, and parameter performance requirements. The risk response measure module uses traditional machine learning, heuristic intelligent algorithms, knowledge reasoning, computer vision, natural language processing and other artificial intelligence technologies for analysis based on data characteristics and business needs.

[0022] The specific workflow of the data exchange synchronization solution module is as follows: S1. Determine the content of data exchange: determine the type and amount of data that need to be exchanged between the digital standard platform and the maintenance plan management system, including data format, data structure, and data field; S2. Determine the method of data exchange: select an appropriate data exchange method based on the content of data exchange and system architecture, such as file transfer, interface call, and database synchronization; S3. Design data interface: design data interface based on the content and format of data exchange, including data transmission protocol, data encoding method, and data transmission method; S4. Develop data interface program: develop data interface program based on the design of data interface to realize data transmission and conversion and ensure data correctness S5. Test data exchange interface: Test the data exchange interface to ensure accurate data transmission and synchronization, and eliminate potential problems and errors; S6. Deploy data exchange interface: Deploy the data exchange interface to the digital standard platform and the Southern Power Grid maintenance plan management system to ensure real-time data exchange and synchronization; S7. Monitor data exchange status: Monitor the data exchange interface to promptly detect and handle data exchange anomalies to ensure stability and reliability of data exchange; S8. Regularly maintain and update the data interface: With the upgrade and update of the digital standard platform and the Southern Power Grid maintenance plan management system, the data interface needs to be maintained and updated to ensure the normal data exchange and synchronization. The specific workflow of the standard knowledge and operation ticket filling module is as follows: S1. Collect and organize relevant standard knowledge and technical specifications according to the requirements of the operation ticket filling module: First, through communication with field experts, read the corresponding standards and operation manuals to analyze and collect the technical standards, operation specifications and important parameters, performance indicators required for the operation and maintenance of the relevant equipment required for the operation ticket filling, standard knowledge and technical specifications, form a standard knowledge base and technology base, and establish a data model and knowledge graph data structure to save and manage this knowledge; S2. Define the association between standard knowledge and operation tickets: Determine how to associate standard knowledge with operation tickets, by linking the knowledge points of the standard knowledge base with the filling items of the operation ticket filling function module. Association, for example, setting a standard knowledge point for each filling item, or marking the corresponding filling item on the knowledge point, and establishing an index for quick matching. The following methods are adopted: ① Association through hyperlinks: In the operation ticket filling interface, add a hyperlink to link to the relevant standard knowledge page. The user clicks the link to view the relevant standard knowledge. In the standard knowledge interface, add a hyperlink to link to the relevant operation ticket filling page. The user clicks the link to jump directly to the operation ticket filling interface; ② Association is realized through the API interface. When designing the system, the two functional modules of standard knowledge and operation ticket filling are designed as independent services respectively, and then the data interaction between the two functional modules is realized through the API interface;③Realize association through database. When designing the system, store the data of the two functional modules of standard knowledge and operation ticket filling in the same database, and then realize the data interaction between the two functional modules through database query and association; S3. Establish indexes of standard knowledge base and operation ticket filling function module: For standard knowledge base and operation ticket filling function module, design keyword index through manual classification or natural language processing to help users quickly search and match corresponding knowledge and filling items; S4. Integrate with operation ticket filling function module: After realizing the association between standard knowledge base and operation ticket filling function module, integrate standard knowledge base into operation ticket filling function module. For each filling item, add a button or input box that references standard knowledge on the filling interface to associate the relevant standards with it. When the user selects the corresponding standard, the corresponding content of the relevant standard will pop up automatically; S5. Automatically generate and fill in the operation ticket based on standard knowledge: In the maintenance plan system, based on standard knowledge and technical specifications, combined with the operation ticket operation scenario, realize the pre-filling of standard content of the operation ticket; S6. Test and optimize and upgrade: After the implementation of the solution, it is necessary to test and optimize to ensure the normal operation of the associated function and user experience. ;

[0023] The method for using the system for constructing the standard knowledge package of the pilot equipment infrastructure feasibility study review process of the present invention comprises the following steps: Step 1: Establish a standard specification access platform: Establish a general knowledge package for infrastructure feasibility review, which contains standard indicator clauses and parameters related to the pilot equipment infrastructure feasibility review. These clauses cover requirements and regulations in various aspects, such as engineering design, environmental assessment, and cost-benefit analysis. The knowledge package will be stored in a computer-understandable form and contain standard definitions, dependencies, and scope of application information; Step 2: Establish a service capability call platform: When conducting a feasibility study review, knowledge computing and service engines will be used to automatically trace the standard indicator clauses. The digital standard service will identify and extract the relevant standard indicator clauses according to the specific scenario of the review, and automatically analyze their meanings and requirements. The service engine will compare the feasibility study content with the standard indicator clauses to automatically verify the compliance with the standards. Step 3. Establish a business system embedded platform: By analyzing the feasibility study report, design documents and related data, automatically check whether the requirements specified in the relevant standards are met, and perform calculation reasoning and logical inference to verify the compliance of the feasibility study content, and generate a corresponding evaluation report, and provide graded reminders according to the type of clauses. For key indicator clauses, pay special attention and provide detailed explanations and suggestions to reviewers, and for general indicator clauses, give brief reminders.

[0024] In the present invention, a general knowledge package for infrastructure feasibility study review is established, which contains standard indicator clauses and parameters related to the pilot equipment infrastructure feasibility study review. These clauses cover requirements and regulations in various aspects, such as engineering design, environmental assessment, and cost-benefit analysis. The knowledge package will be stored in a computer-understandable form and contain standard definitions, dependencies, and scope of application information. When conducting a feasibility study review, a knowledge calculation and service engine will be used to automatically trace the standard indicator clauses. The digital standard service will identify and extract the standard indicator clauses related to the specific scenario of the review, and automatically parse their meanings and requirements. The service engine will compare the feasibility study content with the standard indicator clauses, automatically verify the compliance with the standards, and automatically check whether the requirements specified in the relevant standards are met by analyzing the feasibility study report, design documents, and related data. Calculation reasoning and logical inference are performed to verify the compliance of the feasibility study content, and a corresponding evaluation report is generated. Graded reminders are given according to the type of clause, and key indicator clauses are given special attention, and detailed explanations and suggestions are provided to the reviewers, while general indicator clauses are briefly reminded.

[0025] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. The construction system of the pilot equipment infrastructure feasibility study review process standard knowledge package includes the construction system ontology, which is characterized by: The construction system body includes a standard specification access platform, a service capability calling platform and a business system embedding platform, wherein the standard specification access platform establishes a two-way communication connection with the service capability calling platform, and the service capability calling platform is connected with the business system embedding platform; The standard specification access platform constructs a standard knowledge package for the pilot equipment infrastructure feasibility study review process, realizing scene adaptation, calculation reasoning, indicator identification, standard traceability, content comparison and hierarchical reminder functions; The service capability calling platform first analyzes the user needs and the characteristics of the scenario-based standard knowledge, then determines the functions and characteristics of the standard knowledge assistant, and designs the architecture and algorithm of the standard knowledge assistant; The business system embedded platform supports the integration of a standard knowledge assistant in the operation ticket filling interface, selects the operation ticket type and specific equipment, displays the associated technical standards, operation specifications, parameters, and indicator contents, standardizes the operation ticket filling requirements, and achieves accurate matching of scenes, equipment, and operations.

2. The system for constructing a standard knowledge package for the pilot equipment infrastructure feasibility study review process according to claim 1 is characterized by: The standard specification access platform includes a standard knowledge package construction module, a scenario adaptation solution module, a standard knowledge calculation and reasoning module, an indicator identification module, a standard indicator clause traceability module, an indicator clause comparison module, a standard compliance verification module and a standard clause classification reminder module. The standard knowledge package construction module constructs a standard knowledge package for the pilot equipment infrastructure feasibility study review process. The scenario adaptation solution module is based on the scenario adaptation solution of the knowledge calculation and service engine, accurately identifies similar historical scenarios, quickly extracts relevant experience knowledge, and efficiently carries out knowledge calculation. The standard knowledge calculation and reasoning module is based on the calculation and reasoning solution of the knowledge calculation and service engine, obtains relevant knowledge and information from the knowledge base, implements reasoning and verifies the results, collects feedback information and updates the knowledge base. The indicator identification module identifies the relevant indicators of the standard based on the human-machine combination method, extracts the relevant indicator library and content library from the knowledge base, combs the indicator library and content library or performs point monitoring to achieve human-machine combination and The standard index clause traceability module automatically traces the standard index clauses based on the semantic knowledge base, performs semantic analysis and query on the traceable indicators, obtains relevant standard index clauses from the knowledge base, and provides review suggestions for the feasibility study review of pilot equipment infrastructure based on the verified standard index clauses. The index clause comparison module realizes the comparison of standard index clauses, from collecting standard index clauses, clarifying the comparison objects, conducting comparison work, identifying differences, analyzing the reasons for differences, giving comparison conclusions to optimizing standard index clauses. The standard compliance verification module realizes standard compliance verification, from obtaining standard index clauses, extracting relevant indicators, comparing indicators with standards, identifying reasons to giving verification conclusions and optimizing the index library and content library. The standard clause hierarchical reminder module realizes hierarchical reminder of standard clauses, from determining the type of standard clauses, identifying standard clauses to giving hierarchical reminders and optimizing the index library and content library.

3. The system for constructing a standard knowledge package for the pilot equipment infrastructure feasibility study review process according to claim 2 is characterized by: The working process of the standard knowledge package construction module is as follows: S1. Collect standard indicator clauses and establish a semantic knowledge base: collect and organize standard indicator clauses related to the feasibility study review of pilot equipment infrastructure, establish a semantic knowledge base, and provide basic data for standard knowledge calculation; S2. Identify relevant indicators and establish an indicator library: identify relevant indicators in the feasibility study content of infrastructure through human-computer combination, establish an indicator library, and provide a reference for the comparison of standard indicator clauses; S3. Establish a content library and perform content comparison: compare the infrastructure feasibility study content with the standard indicator clauses by category, establish a content library, and provide a reference for automatic verification of standard compliance; S4. Association identification: Based on the review specification clauses of the feasibility study documents of infrastructure projects, it is necessary to understand and split the layout on this basis, and associate the clauses with the standard content information through the logical decomposition of the clauses, summarize the review rule library and the relevant standard professional attribute data; S5. Realize automatic verification and establish a hierarchical reminder mechanism: Based on the semantic knowledge base, the standard indicator clauses are automatically traced, and the feasibility study content is compared with the standard indicator clauses to realize automatic verification of standard compliance, and hierarchical reminders are given according to the clause type. The working process of the scenario adaptation solution module is as follows: S1. Identify scenario information: In the feasibility study review process of pilot equipment infrastructure, scenario information is identified in a variety of ways, such as project type, construction location, and investment scale; S2. Match similar scenarios: Compare the identified scenario information with the historical data in the knowledge base to match similar historical scenarios; S3. Extract experiential knowledge: Extract relevant experiential knowledge from historical scenarios, including standard indicator clauses, indicator library, and content library; S4. Conduct knowledge calculation: Use the extracted empirical knowledge to conduct knowledge calculation, including comparison of standard indicator clauses, reference to indicator library and content library; S5. Provide review suggestions: Based on the results of knowledge calculation, provide review suggestions, including standard compliance verification, correction of indicator library and content library; S6. Optimize knowledge base: Collect and organize feedback information during the review process, optimize the knowledge base, and improve adaptation accuracy and review efficiency. The working process of the standard knowledge calculation reasoning module is as follows: S1. Determine the reasoning goal: clarify which knowledge needs to be obtained from which knowledge base, and which new knowledge needs to be inferred; S2 Obtain knowledge: Obtain relevant knowledge and information from the knowledge base, including facts, rules, indicator library and content library; S3, implement reasoning: use the acquired knowledge to implement reasoning, including rule-based reasoning, statistics-based reasoning, and graph-based reasoning; S4. Verify the results: verify the inference results to ensure their accuracy and consistency; S5. Update the knowledge base: collect and organize the feedback information in the inference process, update the knowledge base, and improve the accuracy and efficiency of the inference. The workflow of the indicator identification module is as follows: S1. Information input: the user inputs the information related to the feasibility study review of the pilot equipment infrastructure, such as project type, construction location, and investment scale; S2. Scenario matching: the system matches similar historical scenarios from the knowledge base based on the input scenario information, and extracts relevant indicator libraries and content libraries; S3. Map formation: the system sorts out or monitors the indicator library and content library to form a key touchpoint "map"; S4. Map correction: users check and correct the indicator library and content library according to the key touchpoint "map" to achieve human-machine integration; S5. Map update: the system updates the indicator library and content library according to the results of verification and correction. The workflow of the standard indicator clause traceability module is as follows: S1. Construct semantic knowledge base: collect and organize standard indicator clauses related to the feasibility study review of pilot equipment infrastructure, establish a semantic knowledge base, and provide basic data for the automatic traceability of standard indicator clauses; S2. Determine the indicators to be traced: clarify the indicators to be traced and their related information, such as indicator name and indicator definition; S3. Query the knowledge base: perform semantic analysis on the indicators to be traced, convert them into nodes and edges in the knowledge graph, and use the semantic relationships in the knowledge graph for query; S4. Locate standard indicator clauses: perform semantic matching on the indicators to be traced by querying the knowledge base, and obtain relevant standard indicator clauses from the knowledge base; S5. Verify standard indicator clauses: verify the obtained standard indicator clauses to ensure their accuracy and consistency; S6. Provide review suggestions: based on the standards that have passed the verification The indicator clauses provide review suggestions for the feasibility study review of pilot equipment infrastructure, including indicator definition, indicator source, and indicator calculation method. The workflow of the indicator clause comparison module is as follows: S1. Establish a standard indicator library: combine machine extraction with manual indexing to index standard indicator clauses and establish a standard indicator library; S2. Clarify the comparison object: clarify the objects that need to be compared, such as domestic standards and international standards, and standards between different countries; S3. Carry out comparison work: select indicator clauses related to the comparison object from the standard indicator library and carry out comparison work; S4. Identify differences: During the comparison process, identify the differences between indicator clauses, such as technical requirements, indicator definitions, and test methods; S5. Analyze the causes of differences: Analyze the causes of the differences compared, such as technical level, industrial process, and production habits; S6. Give comparison conclusions: Give comparison conclusions from a professional perspective to eliminate misunderstandings of standards caused by differences in standard systems and production habits; S7. Optimize standard indicator clauses: According to the comparison conclusions, optimize the standard indicator clauses to improve the technical content and level of the standards.

4. The system for constructing a standard knowledge package for the pilot equipment infrastructure feasibility study review process according to claim 2 is characterized by: The workflow of the standard compliance verification module is as follows: S1. Obtain standard indicator clauses: obtain standard indicator clauses related to the pilot equipment infrastructure feasibility study review from the knowledge base as a reference for verification; S2. Extract relevant indicators: extract relevant indicators from the pilot equipment infrastructure feasibility study review content library, including technical indicators and economic indicators; S3. Compare indicators with standards: compare the extracted indicators with the standard indicator clauses to identify the differences between the indicators and the standards; S4. Identify the causes: analyze the identified causes of the differences, including indicator calculation methods and indicator definitions; S5. Give verification results: give verification conclusions based on the comparison results, including whether the standard compliance verification is passed or not; S6. Optimize the indicator library and content library: optimize the indicator library and content library based on the verification conclusions. The content library is optimized to improve the review efficiency and accuracy. The specific workflow of the standard clause hierarchical reminder module is as follows: S1. Determine the type of standard clause: According to the degree of influence of the standard indicator clause on the user's interests, the standard clauses are divided into different types, such as basic indicators, important indicators and core indicators; S2. Identify standard clauses: Extract relevant standard indicator clauses from the pilot equipment infrastructure feasibility study review content library and identify which type of standard clauses they belong to; S3. Give hierarchical reminders: According to the type of standard clauses, give corresponding hierarchical reminders, such as "This indicator is a basic indicator, please pay attention to whether it meets the requirements", "This indicator is a core indicator, please ensure that it meets the requirements"; S4. Optimize the indicator library and content library: According to the hierarchical reminders, optimize the indicator library and content library.

5. The system for constructing a standard knowledge package for the pilot equipment infrastructure feasibility study review process according to claim 1 is characterized by: The service capability calling platform includes a standard application module, a data analysis module, a data storage module and an operation and maintenance data source module. The standard application module constructs an operation and maintenance database with the technical standards, operating specifications and parameters involved in operation and maintenance, and associates the technical standards, operating specifications and important parameters and performance index requirements corresponding to the equipment operation and maintenance and maintenance links with the operation ticket filling module of the maintenance plan system. The data analysis module develops a scenario-based standard knowledge assistant for operation and maintenance, which is embedded in the maintenance plan or operation ticket writing scenario of the Southern Power Grid to realize data exchange and synchronization between the digital standard platform and the maintenance plan management system. The data storage module stores service content in real time. The operation and maintenance data source module standardizes the operation ticket filling requirements to achieve accurate matching and knowledge push of scenarios, equipment and operations, and realize accurate knowledge push during the operation and maintenance personnel's operation ticket filling process.

6. The system for constructing a standard knowledge package for the pilot equipment infrastructure feasibility study review process according to claim 1 is characterized by: The business system embedding platform includes a data exchange and synchronization solution module, a standard knowledge and operation ticket filling module, a knowledge push module and a risk response measure module. The data exchange and synchronization solution module exchanges and synchronizes data with the integrated system through a data interface. The standard knowledge and operation ticket filling module associates the standard knowledge with the operation ticket filling module of the maintenance plan system, standardizes the operation ticket filling requirements, and achieves accurate matching of scenarios, equipment, and operations. The knowledge push module formulates intelligent and precise push strategies based on application scenarios, and dynamically pushes corresponding standard knowledge, operation specifications, and parameter performance requirements. The risk response measure module uses traditional machine learning, heuristic intelligent algorithms, knowledge reasoning, computer vision, natural language processing and other artificial intelligence technologies for analysis based on data characteristics and business needs.

7. The system for constructing a standard knowledge package for the pilot equipment infrastructure feasibility study review process according to claim 6 is characterized by: The workflow of the data exchange synchronization solution module is as follows: S1. Determine the content of data exchange: determine the type and amount of data that need to be exchanged between the digital standard platform and the maintenance plan management system, including data format, data structure, and data field; S2. Determine the method of data exchange: select a suitable data exchange method according to the content of data exchange and system architecture, such as file transfer, interface call, and database synchronization; S3. Design data interface: design data interface according to the content and format of data exchange, including data transmission protocol, data encoding method, and data transmission method; S4. Develop data interface program: According to the design of data interface, develop data interface program to realize data transmission and conversion, and ensure data is correctly transmitted and synchronized; S5. Test data exchange interface: Test the data exchange interface to ensure data is accurately transmitted and synchronized, and eliminate potential problems and errors; S6. Deploy data exchange interface: Deploy the data exchange interface to the digital standard platform and the maintenance plan management system of the Southern Power Grid to ensure real-time data exchange and synchronization; S7. Monitor data exchange status: monitor data exchange interface, timely discover and handle data exchange anomalies, and ensure the stability and reliability of data exchange; S8. Regularly maintain and update data interface: with the upgrade and update of digital standard platform and China Southern Power Grid maintenance plan management system, it is necessary to maintain and update data interface to ensure the normal data exchange and synchronization. The workflow of the standard knowledge and operation ticket filling module is as follows: S1. According to the requirements of the operation ticket filling module, collect and organize relevant standard knowledge and technical specifications: first, through communication with experts in the field, read the corresponding standards and operation manuals to analyze and collect the technical standards, operation specifications and important parameters, performance indicators required for the operation and maintenance of relevant equipment, and the corresponding technical standards, operation specifications, and performance indicators required for the operation ticket filling. Standard knowledge and technical specifications, form S2. Define the association between standard knowledge and operation tickets: Determine how to associate standard knowledge with operation tickets by associating the knowledge points of the standard knowledge base with the filling items of the operation ticket filling function module, such as setting a standard knowledge point for each filling item, or marking the corresponding filling items on the knowledge point, and establishing an index for fast matching. The following methods are used: ① Association through hyperlinks: In the operation ticket filling interface, add a hyperlink to the relevant standard knowledge page. The user clicks the link to view the relevant standard knowledge. In the standard knowledge interface, add a hyperlink to the relevant operation ticket filling page. The user clicks the link to jump directly to the operation ticket filling interface; ②Realize association through API interface. When designing the system, the two functional modules of standard knowledge and operation ticket filling are designed as independent services respectively, and then the data interaction between the two functional modules is realized through API interface. ③Realize association through database. When designing the system, the data of the two functional modules of standard knowledge and operation ticket filling are stored in the same database, and then the data interaction between the two functional modules is realized through database query and association. S3. Establish indexes for standard knowledge base and operation ticket filling functional modules: For standard knowledge base and operation ticket filling functional modules, keyword indexes are designed through manual classification or natural language processing to help users quickly search and match corresponding knowledge and filling items. S4. Integrate with operation ticket filling functional module: After realizing the association between standard knowledge base and operation ticket filling functional module, integrate standard knowledge base into operation ticket filling functional module. For each filling item, associate relevant standards with it by adding a button or input box that references standard knowledge on the filling interface. When the user selects the corresponding standard, the corresponding content of the relevant standard will pop up automatically. S5. Automatic generation and filling of operation tickets based on standard knowledge: In the maintenance plan system, based on standard knowledge and technical specifications, combined with the operation ticket operation scenario, the standard content of the operation ticket is pre-filled; S6. Testing and optimization upgrade: After the solution is implemented, testing and optimization are required to ensure the normal operation of related functions and user experience.

8. The method for using the system for constructing the pilot equipment infrastructure feasibility study review process standard knowledge package according to any one of claims 1 to 7, characterized in that: The following steps are involved: Step 1: Establish a standard specification access platform: Establish a general knowledge package for infrastructure feasibility review, which contains standard indicator clauses and parameters related to the pilot equipment infrastructure feasibility review. These clauses cover requirements and regulations in various aspects, such as engineering design, environmental assessment, and cost-benefit analysis. The knowledge package will be stored in a computer-understandable form and contain standard definitions, dependencies, and scope of application information; Step 2: Establish a service capability call platform: When conducting a feasibility study review, knowledge computing and service engines will be used to automatically trace the standard indicator clauses. The digital standard service will identify and extract the relevant standard indicator clauses according to the specific scenario of the review, and automatically analyze their meanings and requirements. The service engine will compare the feasibility study content with the standard indicator clauses to automatically verify the compliance with the standards. Step 3. Establish a business system embedded platform: By analyzing the feasibility study report, design documents and related data, automatically check whether the requirements specified in the relevant standards are met, and perform calculation reasoning and logical inference to verify the compliance of the feasibility study content, and generate a corresponding evaluation report, and provide graded reminders according to the type of clauses. For key indicator clauses, pay special attention and provide detailed explanations and suggestions to reviewers, and for general indicator clauses, give brief reminders.

Citation Information

Patent Citations

  • Knowledge graph construction standard table content automatic identification method

    CN115937881A

  • Method and system for automatically comparing and discovering power standard difference information

    CN116739080A

  • Establishing and querying methods of knowledge library engine based on emergency management

    US20150095331A1

Cited By

  • Knowledge-driven underground building design scheme intelligent examination method, system and equipment

    CN120216671A