Post-earthquake recoverability evaluation method, device and equipment of electric power facility and storage medium
By establishing power facility models and simulations, determining recovery paths and evaluating the post-seismic recovery of power facilities, the problem of difficult to evaluate the post-seismic recovery of power facilities is solved, rapid decision-making and reasonable allocation of resources are achieved, and recovery efficiency is improved. Assess reliability.
Patent Information
- Application Number
- CN202411038373.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-12-03
AI Technical Summary
After a major earthquake, it is difficult to effectively evaluate the post-seismic recovery of power facilities, resulting in a long recovery time and large resource investment, affecting earthquake relief and recovery and reconstruction work.
By establishing a power facility model, seismic simulation and recovery path determination are carried out, and a rose map is generated by combining PID controller and pseudo-spectral method, low-period static load disturbance test is performed to evaluate the post-seismic recovery of power facilities.
It has achieved effective evaluation of the post-seismic recovery ability assessment of power facilities, helping the power department to preset emergency plans, reduce recovery time, allocate resources reasonably, ensure the basic needs of social life and public services, improve recovery work efficiency, and enhance the assessment reliability.
Smart Images

Figure CN119067289A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of seismic resilience assessment, and in particular to a method, device, equipment and storage medium for assessing the post-earthquake recoverability of power facilities. Background Art
[0002] The power system is one of the important infrastructures in modern society. A stable power system can ensure the normal operation of infrastructure such as water supply, heating, lighting, and communications, thereby meeting the basic living needs of people in the earthquake-stricken areas.
[0003] Major earthquakes damage the power grid, causing power outages and huge losses to the national economy. The power supply in the earthquake zone directly affects earthquake relief work and production recovery, so the earthquake safety of the power system is particularly important. After an earthquake, whether the power facilities in the power system can quickly resume operation to ensure timely and stable power supply to the disaster area is an important indicator for evaluating the earthquake resistance of a region. Substations have suffered a lot of damage in major earthquakes at home and abroad, and since it is difficult to make an effective judgment on the recoverability of damaged power facilities after the earthquake, the required resources are large and the recovery is difficult, resulting in a long recovery time, which brings great inconvenience to earthquake relief and reconstruction work.
[0004] It can be seen that how to effectively evaluate the post-earthquake recoverability of power facilities has become a technical problem that technical personnel in this field need to solve urgently. Summary of the invention
[0005] The present invention provides a method, device, equipment and storage medium for evaluating the post-earthquake recoverability of electric power facilities, so as to effectively evaluate the post-earthquake recoverability of electric power facilities.
[0006] In order to solve the above technical problems, an embodiment of the present invention provides a method for evaluating the recoverability of power facilities after an earthquake, the method comprising:
[0007] The power facility model is established according to the structural information data and connection relationship data of each power facility in the power system.
[0008] A number of earthquake simulation events are created respectively, and each of the earthquake simulation events is input into the power facility model in turn to perform disaster simulation, and various status data of the power facility after the earthquake are obtained according to the output results of the power facility model.
[0009] A post-earthquake restoration path for the power system is determined based on each of the status data and a preset power restoration demand priority.
[0010] According to the post-earthquake recovery path, the power facility model is restored by simulating recovery to obtain corresponding power system recovery data, and the power facility model is restored by using the power system recovery data;
[0011] A low-cycle static load disturbance test is performed on the power facility model and the restored power facility model respectively, and a post-earthquake recoverability assessment result is obtained based on the first response data output by the power facility model and the second response data output by the restored power facility model.
[0012] Furthermore, the power facility model is established according to the structural information data and connection relationship data of each power facility in the power system, including:
[0013] Obtain the structure and connection relationship of the power facilities in the power system, use Abaqus to simulate the structure of the power facilities in the power system, and establish a power facility model.
[0014] A PID controller is added to the electric power facility model, and parameters are set for various components in the electric power facility model.
[0015] Furthermore, according to historical earthquake data, the process of seismic wave propagation is simulated based on the pseudo-spectral method to obtain rose diagrams of earthquakes of different levels and types, and a number of earthquake simulation events are generated according to the rose diagrams; wherein the historical earthquake data at least includes the time of earthquake occurrence, epicenter location, focal depth, and fault type.
[0016] Furthermore, determining the post-earthquake restoration path of the power system according to each of the state data and the preset power restoration demand priority includes:
[0017] Determine the first priority of power restoration needs based on post-earthquake power demand.
[0018] The power supply priority value is calculated based on the post-earthquake damage information and the first priority.
[0019] According to the power transfer priority value, a corresponding interconnection feeder is selected to determine a post-earthquake restoration path for the power system.
[0020] Furthermore, the calculating of the power supply priority value according to the post-earthquake damage information and the first priority level includes:
[0021] The first priority level is modified according to the post-earthquake damage information to obtain a second priority level.
[0022] According to the second priority, a power transfer priority value of the power supply is calculated.
[0023] Further, selecting a corresponding interconnection feeder according to the power transfer priority value to determine a post-earthquake restoration path of the power system specifically includes:
[0024] The post-earthquake recovery path of the power system is determined according to the optimal path, the corresponding interconnecting feeder and the power transfer priority value, wherein the optimal path is designed to be obtained by a road-power supply point grid established based on the number of post-earthquake accessible roads and route information and a heuristic path search algorithm.
[0025] Further, obtaining a post-earthquake recoverability assessment result based on the first response data output by the power facility model and the second response data output by the restored power facility model includes:
[0026] According to the response difference between the first response data and the second response data, a radar comparison diagram reflecting the power parameters of the power facility before and after the earthquake under the static load disturbance is drawn.
[0027] According to the radar comparison chart, the post-earthquake recoverability assessment results of the power facilities in the power system are obtained.
[0028] Another embodiment of the present invention provides a post-earthquake recoverability assessment device for power facilities, comprising:
[0029] The model building module is used to build a power facility model based on the structural information data and connection relationship data of each power facility in the power system.
[0030] The earthquake disaster simulation module is used to create a number of earthquake simulation events respectively, input each earthquake simulation event into the power facility model in turn to perform disaster simulation, and obtain various status data of the power facility after the earthquake based on the output results of the power facility model.
[0031] The path determination module is used to determine the post-earthquake restoration path of the power system according to each of the state data and the preset power restoration demand priority.
[0032] The post-earthquake recovery module is used to perform recovery simulation on the power facility model according to the post-earthquake recovery path, obtain corresponding power system recovery data, and construct a restored power facility model with the power system recovery data.
[0033] The disturbance test module is used to perform low-cycle static load disturbance tests on the power facility model and the restored power facility model respectively, and obtain a post-earthquake recoverability assessment result based on the first response data output by the power facility model and the second response data output by the restored power facility model.
[0034] Yet another embodiment of the present invention provides a computer device, comprising a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor implements the post-earthquake recoverability assessment method for power facilities as described above when executing the computer program.
[0035] Yet another embodiment of the present invention provides a computer-readable storage medium storing a computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the post-earthquake recoverability assessment method of power facilities as described above is implemented.
[0036] Compared with the prior art, the embodiments of the present invention have the following advantages:
[0037] (1) By evaluating the post-earthquake recoverability of power facilities, an earthquake emergency plan can be preset based on the evaluation results before a disaster occurs, which helps the power sector make quick decisions after an earthquake and reduces recovery time;
[0038] (2) Restoring power facilities based on post-earthquake facility loss data and electricity demand priorities can help guide the rational allocation of post-earthquake power resources, ensure that the basic needs of social life and public services are met, and improve the efficiency of restoration work;
[0039] (3) By applying the same static load disturbance test to the initial power facility model and the restored power facility model, the post-earthquake recovery effect can be evaluated and the reliability of the post-earthquake recoverability assessment can be further improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 is a flowchart of the steps of a method for evaluating the recoverability of power facilities after an earthquake provided by an embodiment of the present invention;
[0041] Figure 2 A structural block diagram of a post-earthquake recoverability assessment device for power facilities provided by an embodiment of the present invention;
[0042] Figure 3 A structural diagram of a computer device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] In the description of this application, the terms "first", "second", "third", etc. are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", etc. may explicitly or implicitly include one or more of the feature. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0045] In the description of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two elements. The terms "vertical", "horizontal", "left", "right", "upper", "lower" and similar expressions used herein are only for illustrative purposes, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0046] In the description of this application, it should be noted that, unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by those skilled in the art. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood by specific circumstances.
[0047] An embodiment of the present invention provides a method for evaluating the recoverability of power facilities after an earthquake. Figure 1 , Figure 1 The flowchart is a method for evaluating the recoverability of power facilities after an earthquake in one embodiment of the present invention, including steps S11 to S15.
[0048] Step S11, establishing a power facility model according to the structural information data and connection relationship data of each power facility in the power system.
[0049] Obtain the structure and connection relationship of the power facilities in the power system, use Abaqus to simulate the structure of the power facilities in the power system by comprehensively considering factors such as structure, material, and topology, and establish a power facility model.
[0050] Add a PID controller to the power facility model, set parameters for each component in the power facility model, and use the PID controller to adjust the output power of the generator in the power facility to maintain the stability of the power system. By adjusting the parameters of the PID controller, we can observe changes in the response speed and stability of the system.
[0051] Step S12, respectively creating a number of earthquake simulation events, inputting each of the earthquake simulation events into the power facility model in turn to perform disaster simulation, and obtaining various status data of the power facility after the earthquake based on the output results of the power facility model.
[0052] According to historical earthquake data such as the time of earthquake occurrence, epicenter location, focal depth, fault type, etc., the process of seismic wave propagation is simulated based on the pseudo-spectral method to obtain data such as the amplitude, frequency, and propagation path of the seismic waves. Based on the above data, rose diagrams of earthquakes of different levels and types are generated, and several earthquake simulation events are generated.
[0053] Each earthquake simulation event is input into the power facility model, and a disaster simulation is performed on the power facility model. Based on the output results of the power facility model after the disaster simulation, various status data reflecting the damage status of the power facility after the earthquake disaster are obtained.
[0054] By simulating earthquake events in advance and generating earthquake simulation events, we can quantify earthquake risks and gain a deeper understanding of the causes and mechanisms of earthquakes. By using earthquake simulation events to simulate earthquake disasters for power facilities, we can evaluate their impact on the power system and accurately predict earthquake risks.
[0055] Step S13, determining a post-earthquake restoration path of the power system according to each of the state data and a preset power restoration demand priority.
[0056] The first priority of power restoration demand is determined according to the post-earthquake power demand. Specifically, the first priority of post-earthquake power restoration demand pre-set in this embodiment is: medical facilities > emergency command stations > communication facilities > residential electricity > public service facilities > industrial and commercial electricity.
[0057] Based on actual post-earthquake information such as the degree of damage to power facilities, the degree of damage to road traffic, and the difficulty of resource scheduling, human intervention is introduced at key decision points to repair and adjust the first priority and obtain the second priority.
[0058] According to the second priority, a power transfer priority value of the power supply is obtained.
[0059] The road-power supply point grid is established based on the number of accessible roads and route information after the earthquake, and the optimal path for post-earthquake repair is obtained through a heuristic path search algorithm.
[0060] The post-earthquake recovery path of the power system is determined based on the optimal path, corresponding interconnecting feeders and power supply priority values.
[0061] By correcting the preset priority of power restoration needs based on actual post-earthquake damage information, the order of power restoration can be reasonably adjusted according to actual conditions. By giving priority to restoring facilities that can be restored quickly, the power supply after the earthquake can be resolved more quickly, the risk of secondary disasters can be reduced, and the smooth progress of rescue and recovery work can be supported.
[0062] Step S14, performing a restoration simulation on the power facility model according to the post-earthquake restoration path to obtain corresponding power system restoration data, and constructing a restored power facility model with the power system restoration data.
[0063] According to the post-earthquake recovery path established in step S13, a recovery simulation is performed on the power facility model after the disaster simulation, and various parameters of the power facility model after the recovery simulation are statistically analyzed to obtain power system recovery data.
[0064] Based on the power system recovery data, a model of restored power facilities after recovery is constructed.
[0065] By simulating the power facilities obtained after post-earthquake recovery, the restored power facility model can be used to analyze and evaluate the post-earthquake recovery simulation results, which helps to improve the post-earthquake recovery simulation work.
[0066] Step S15, performing low-cycle static load disturbance tests on the power facility model and the restored power facility model respectively, and obtaining a post-earthquake recoverability assessment result based on the first response data output by the power facility model and the second response data output by the restored power facility model.
[0067] The same static load disturbance is applied to the power facility model and the restored power facility model respectively. Specifically, the method adopted in this embodiment is to apply the same high-frequency, low-period cyclic static force to the two, and record the response results of the two to the static force.
[0068] According to the response difference between the first response data of the power facility model to the static load disturbance and the second response data of the restored power facility model to the static load disturbance, a radar comparison diagram reflecting the power parameters of the power facility before and after the earthquake under the static load disturbance is drawn.
[0069] According to the comparison results of the radar comparison map, the anti-static load characteristics of the power facility model before and after the earthquake were compared and analyzed, and the post-earthquake recoverability assessment results of the power facilities in the power system were obtained.
[0070] Existing post-earthquake recoverability assessments often only obtain the reconstruction and restoration of facilities after the earthquake to statistically measure the recoverability, but do not analyze the effect of post-earthquake recovery. The embodiments of the present invention apply static loads to a power facility model in a normal state and a post-disaster recovery and reconstruction model, and compare and analyze the static strain, displacement, crack and other parameters of the two to obtain the differences in the working state and availability of the power facility under the static load, so as to evaluate the recoverability of the power facility after the earthquake.
[0071] The post-earthquake recoverability assessment method of power facilities of the present invention can preset earthquake emergency plans based on the assessment results before the disaster occurs by assessing the post-earthquake recoverability of power facilities, which is helpful for the power department to make decisions quickly after the earthquake and reduce the recovery time; the power facilities can be restored according to the post-earthquake facility loss data and electricity demand priority, which can help guide the rational allocation of post-earthquake power resources, ensure that the basic needs of social life and public services are met, and improve the efficiency of recovery work; by applying the same static load disturbance test to the initial power facility model and the restored power facility model, the post-earthquake recovery effect is evaluated, and the reliability of the post-earthquake recoverability assessment is further improved.
[0072] The embodiment of the present invention further provides a post-earthquake recoverability assessment device for power facilities, which is used to execute the post-earthquake recoverability assessment method for power facilities as described above. Figure 2 As shown, Figure 2 The structure block diagram of a post-earthquake recoverability assessment device for power facilities according to an embodiment of the present invention is shown, and the device comprises:
[0073] The model building module 21 is used to build a power facility model according to the structural information data and connection relationship data of each power facility in the power system.
[0074] The earthquake disaster simulation module 22 is used to create a number of earthquake simulation events respectively, input each earthquake simulation event into the power facility model in turn to perform disaster simulation, and obtain various status data of the power facility after the earthquake based on the output results of the power facility model.
[0075] The path determination module 23 is used to determine the post-earthquake restoration path of the power system according to each of the state data and the preset power restoration demand priority.
[0076] The post-earthquake recovery module 24 is used to perform a recovery simulation on the power facility model according to the post-earthquake recovery path, obtain corresponding power system recovery data, and construct a restored power facility model with the power system recovery data.
[0077] The disturbance test module 25 is used to perform low-cycle static load disturbance tests on the power facility model and the restored power facility model respectively, and obtain a post-earthquake recoverability assessment result based on the first response data output by the power facility model and the second response data output by the restored power facility model.
[0078] The technical features and technical effects of the device proposed in the embodiment of the present invention are the same as those of the method proposed in the embodiment of the present invention, and are not described in detail here. Each module in the above device can be implemented in whole or in part by software, hardware, and a combination thereof. Each of the above modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each of the above modules.
[0079] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program; wherein, when the computer program is run, it controls the device where the computer-readable storage medium is located to execute the post-earthquake recoverability assessment method for power facilities as described above.
[0080] The embodiment of the present invention further provides a computer device, Figure 3 A structural block diagram of a preferred embodiment of a computer device provided by the present invention, the computer device includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and the processor implements the post-earthquake recoverability assessment method of power facilities as described above when executing the computer program.
[0081] Preferably, the computer program can be divided into one or more modules / units (such as computer program 1, computer program 2, ...), and the one or more modules / units are stored in the memory and executed by the processor to complete the present invention. The one or more modules / units can be a series of computer program instruction segments that can complete specific functions, and the instruction segments are used to describe the execution process of the computer program in the computer device.
[0082] The processor may be a central processing unit (CPU), or other general-purpose processors, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor, or the processor may be any conventional processor. The processor is the control center of the computer device, and various parts of the computer device are connected using various interfaces and lines.
[0083] The memory mainly includes a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function, etc., and the data storage area can store related data, etc. In addition, the memory can be a high-speed random access memory, or a non-volatile memory, such as a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, SD) card, and a flash card (Flash Card), etc., or the memory can also be other volatile solid-state storage devices.
[0084] It should be noted that the above-mentioned computer device may include, but is not limited to, a processor and a memory. Those skilled in the art will understand that Figure 3 The structural block diagram is merely an example of a computer device and does not constitute a limitation of the computer device, and may include more or less components than shown in the figure, or combine certain components, or different components.
[0085] In summary, the post-earthquake recoverability assessment method, device, equipment and storage medium of a power facility provided by the embodiments of the present invention have the following beneficial effects:
[0086] (1) By evaluating the post-earthquake recoverability of power facilities, an earthquake emergency plan can be preset based on the evaluation results before a disaster occurs, which helps the power sector make quick decisions after an earthquake and reduces recovery time;
[0087] (2) Restoring power facilities based on post-earthquake facility loss data and electricity demand priorities can help guide the rational allocation of post-earthquake power resources, ensure that the basic needs of social life and public services are met, and improve the efficiency of restoration work;
[0088] (3) By applying the same static load disturbance test to the initial power facility model and the restored power facility model, the post-earthquake recovery effect can be evaluated and the reliability of the post-earthquake recoverability assessment can be further improved.
[0089] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A method for assessing the recoverability of power facilities after an earthquake, characterized in that: include: Establishing a power facility model according to the structural information data and connection relationship data of each power facility in the power system; Creating a number of earthquake simulation events respectively, inputting each earthquake simulation event into the power facility model in turn to perform disaster simulation, and obtaining various status data of the power facility after the earthquake according to the output results of the power facility model; Determining a post-earthquake restoration path for the power system according to each of the status data and a preset power restoration demand priority; According to the post-earthquake recovery path, the power facility model is restored by simulating recovery to obtain corresponding power system recovery data, and the power facility model is restored by using the power system recovery data; A low-cycle static load disturbance test is performed on the power facility model and the restored power facility model respectively, and a post-earthquake recoverability assessment result is obtained based on the first response data output by the power facility model and the second response data output by the restored power facility model.
2. The post-earthquake recoverability assessment method for power facilities according to claim 1, characterized in that: The step of establishing a power facility model according to the structural information data and connection relationship data of each power facility in the power system comprises: Obtain the structure and connection relationship of the power facilities in the power system, use Abaqus to simulate the structure of the power facilities in the power system, and establish a power facility model; A PID controller is added to the electric power facility model, and parameters are set for various components in the electric power facility model.
3. The post-earthquake recoverability assessment method for power facilities according to claim 1, characterized in that: According to historical earthquake data, the process of seismic wave propagation is simulated based on the pseudo-spectral method to obtain rose diagrams of earthquakes of different levels and types, and a number of earthquake simulation events are generated according to the rose diagrams; wherein the historical earthquake data at least includes the time of earthquake occurrence, epicenter location, focal depth, and fault type.
4. The method for assessing the recoverability of power facilities after an earthquake as claimed in claim 1, characterized in that: The determining of the post-earthquake restoration path of the power system according to each of the state data and the preset power restoration demand priority includes: Determine the first priority of power restoration needs based on post-earthquake power demand; Calculating a power supply priority value for power supply according to the post-earthquake damage information and the first priority; According to the power transfer priority value, a corresponding interconnection feeder is selected to determine a post-earthquake restoration path for the power system.
5. The method for assessing the recoverability of power facilities after an earthquake as claimed in claim 4, characterized in that: The calculating the power supply priority value of the power supply according to the post-earthquake damage information and the first priority includes: Modifying the first priority level according to the post-earthquake damage information to obtain a second priority level; According to the second priority, a power transfer priority value of the power supply is calculated.
6. The method for assessing the recoverability of power facilities after an earthquake as claimed in claim 4, characterized in that: The selecting a corresponding interconnection feeder according to the power transfer priority value to determine a post-earthquake restoration path of the power system specifically includes: The post-earthquake recovery path of the power system is determined according to the optimal path, the corresponding interconnecting feeder and the power transfer priority value, wherein the optimal path is designed to be obtained by a road-power supply point grid established based on the number of post-earthquake accessible roads and route information and a heuristic path search algorithm.
7. The method for assessing the recoverability of power facilities after an earthquake as claimed in claim 6, characterized in that: The method of obtaining a post-earthquake recoverability assessment result according to the first response data output by the electric power facility model and the second response data output by the restored electric power facility model comprises: Drawing a radar comparison diagram reflecting the power parameters of the power facility before and after the earthquake under static load disturbance according to the response difference between the first response data and the second response data; According to the radar comparison chart, the post-earthquake recoverability assessment results of the power facilities in the power system are obtained.
8. A post-earthquake recoverability assessment device for power facilities, characterized in that: include: A model building module, used to build a power facility model according to the structural information data and connection relationship data of each power facility in the power system; An earthquake disaster simulation module is used to create a number of earthquake simulation events respectively, input each earthquake simulation event into the power facility model in turn to perform disaster simulation, and obtain various status data of the power facility after the earthquake according to the output results of the power facility model; A path determination module, used to determine a post-earthquake restoration path of the power system according to each of the state data and a preset power restoration demand priority; A post-earthquake recovery module, used to perform a recovery simulation on the power facility model according to the post-earthquake recovery path, obtain corresponding power system recovery data, and construct a restored power facility model with the power system recovery data; The disturbance test module is used to perform low-cycle static load disturbance tests on the power facility model and the restored power facility model respectively, and obtain a post-earthquake recoverability assessment result based on the first response data output by the power facility model and the second response data output by the restored power facility model.
9. A computer device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the method for assessing the post-earthquake recoverability of electric power facilities as described in any one of claims 1 to 7 is implemented.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the post-earthquake recoverability assessment method for power facilities as described in any one of claims 1 to 7 is implemented.