Facility agriculture virtual power plant scheduling method and device, electronic equipment and storage medium

By optimizing the virtual power plant scheduling model of facility agriculture, combining the coupling relationship between the agricultural system and the energy system and the flexible characteristics of agricultural load, the rational allocation and optimization scheduling of energy resources in facility agriculture parks is achieved, and the potential of facility agriculture parks in energy management is solved. The problem of failure to fully utilize has improved energy utilization efficiency and environmental friendliness.

CN119067387APending Publication Date: 2024-12-03CHINA AGRI UNIV
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411155066.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The potential of facility agricultural parks in energy management has not been fully realized, mainly due to the inadequate consideration of the deep coupling between agricultural systems and energy systems and the lack of utilization of agricultural parks as virtual power plants to participate in large grid scheduling, resulting in poor flexibility and economical energy systems. and low environmental benefits.

Method used

By obtaining the control strategies, decision variables, objective functions, boundary conditions for safe operation of agricultural virtual power plants during facility agriculture, and energy system operation constraints, we optimize the scheduling model of facility agriculture virtual power plants to achieve the best state of agricultural parks and energy resources. Rational allocation, use the flexible characteristics of agricultural load for layered cluster control, and build an aggregation model to participate in external economic scheduling.

Benefits of technology

It improves energy utilization efficiency, reduces operating costs, enhances the economic and environmental friendliness of the system, and solves the problems of poor flexibility, economicality and low environmental benefits of the energy system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067387A_ABST
    Figure CN119067387A_ABST
Patent Text Reader

Abstract

The invention relates to a facility agriculture virtual power plant scheduling method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a control strategy during the scheduling of a facility agriculture virtual power plant; obtaining at least one piece of related information of a decision variable, a target function, an agricultural system safe operation boundary condition, an energy system operation constraint and a preset environmental benefit model during facility agriculture virtual power plant scheduling; and optimizing the facility agriculture virtual power plant scheduling model, so that the optimized facility agriculture virtual power plant scheduling model is utilized to enable the agricultural park to operate in an optimal state, and a final scheduling result of the facility agriculture virtual power plant is generated. According to the embodiment of the invention, through modeling the micro-grid load and the power supply in the facility agricultural park and analyzing the coupling relationship between the agricultural system and the energy system, reasonable allocation and optimal scheduling of various resources in the park are realized, so that the energy utilization efficiency is improved, the operation cost is reduced, and the energy utilization rate is improved. And the economical efficiency and environmental friendliness of the system are enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of agricultural energy management technology, and in particular to a method, device, electronic device and storage medium for scheduling a virtual power plant in facility agriculture. Background Art

[0002] With the rapid development of renewable energy technology and the increasing demand for environmental sustainability, the energy management and optimal scheduling of facility agriculture, as a high-energy-consuming industry, are receiving increasing attention.

[0003] Traditional facility agriculture parks usually rely on external power grids for electricity and heat supply, and lack effective energy management and scheduling strategies, resulting in inefficient energy utilization, high operating costs, and great pressure on the environment.

[0004] Among the related technologies, existing research has focused on load forecasting, power management, and energy storage in microgrids, but most of them have not fully considered the deep coupling between agricultural systems and energy systems, and the potential of agricultural parks to participate in large power grid dispatch as virtual power plants. In addition, when dealing with the optimal allocation of resources within facility agricultural parks, related technologies often ignore the boundary conditions for the safe operation of agricultural systems and the flexible characteristics of agricultural loads, which limits the potential of facility agricultural parks in energy management and needs to be improved urgently. Summary of the invention

[0005] The present application provides a method, device, electronic device and storage medium for scheduling a virtual power plant in facility agriculture to solve the problem that related technologies do not fully consider the deep coupling between the agricultural system and the energy system, and do not consider the potential of agricultural parks to participate in large power grid scheduling as virtual power plants, ignore the boundary conditions for the safe operation of the agricultural system and the flexible characteristics of agricultural loads, limit the potential of facility agriculture parks in energy management, and lead to poor flexibility of the energy system and low economic and environmental benefits.

[0006] The first aspect of the present application provides a method for scheduling a virtual power plant in facility agriculture, comprising the following steps: obtaining a control strategy for scheduling a virtual power plant in facility agriculture; based on the control strategy, obtaining at least one relevant information including decision variables, objective functions, agricultural system safe operation boundary conditions, energy system operation constraints, and a preset environmental benefit model for scheduling the virtual power plant in facility agriculture; optimizing a scheduling model for the virtual power plant in facility agriculture according to the at least one relevant information, so as to utilize the optimized scheduling model for the virtual power plant in facility agriculture so as to enable the agricultural park to operate in the best state, so as to generate the final scheduling result of the virtual power plant in facility agriculture.

[0007] Optionally, in one embodiment of the present application, the use of the optimized facility agriculture virtual power plant scheduling model to make the agricultural park operate in an optimal state includes: based on the optimized facility agriculture virtual power plant scheduling model, restricting the operating boundary conditions of the agricultural park to obtain a restriction result;

[0008] Whether the agricultural park meets the preset operating requirements is determined according to the restriction result; if the agricultural park meets the preset requirements, the agricultural park is controlled to operate in the optimal state.

[0009] Optionally, in one embodiment of the present application, the control strategy for obtaining the scheduling of the facility agriculture virtual power plant includes: utilizing the flexible characteristics of the facility agriculture load to perform hierarchical cluster control on the facility agriculture virtual power plant to obtain a hierarchical cluster control result; generating at least one resource cluster based on the hierarchical cluster control result, and constructing an aggregation model based on the at least one resource cluster; based on the aggregation model, controlling the virtual power plant layer to receive the power generation task of the dispatching center; and obtaining the control strategy based on the hierarchical cluster control result, the aggregation model and the power generation task.

[0010] Optionally, in one embodiment of the present application, the decision variables for obtaining the scheduling of the facility agriculture virtual power plant include: collecting the electrical output of batteries, biogas and hydrogen fuel cells when the power system meets the preset time conditions, and obtaining the hourly output of the power system; collecting the thermal output of the hydrogen fuel cell when the thermal system meets the preset time conditions, and obtaining the hourly output of the thermal system; and obtaining the decision variables for scheduling the facility agriculture virtual power plant based on the hourly output of the power system and the hourly output of the thermal system.

[0011] Optionally, in one embodiment of the present application, the calculation formula of the objective function is:

[0012]

[0013] in, is the purchase cost of hydrogen, F AVPP Subsidies for facility agriculture virtual power plants to participate in economic dispatch of distribution networks.

[0014] Optionally, in one embodiment of the present application, the expression of the energy system operation constraint is:

[0015]

[0016] in, and are the water flow rate, hydrogen flow rate and stack temperature at time t, and T HFC,maxare the maximum values ​​of the water flow rate, the hydrogen flow rate and the stack temperature, respectively, and T HFC,min are respectively the minimum values ​​of the water flow rate, the hydrogen flow rate and the stack temperature;

[0017] The constraints of the energy storage system are:

[0018]

[0019]

[0020] in, is the storage capacity of the battery pack during period t, η Eloss is the power storage loss rate, are respectively the charging and discharging power of the battery pack in the period t, are the charging and discharging efficiencies of the battery pack, S SOC,max , S SOC,min are the maximum and minimum states of charge, P Bat,total is the total system capacity of the battery, P ch,max , P dis,max are the maximum charging and discharging powers, respectively, are the charge and discharge states at time t, are the battery power states at the 1st hour and the 24th hour of the day, η Bat is the rated working condition coefficient of the battery;

[0021] The constraints of the biogas generator set in the facility agriculture virtual power plant are:

[0022]

[0023] Among them, P Biogas,min and P Biogas,max are the minimum output power and the maximum output power of the biogas unit respectively;

[0024] The constraints of light intensity and temperature of the greenhouse in the facility agriculture virtual power plant are:

[0025]

[0026] Among them, I Indoor,min and I Indoor,max are the minimum and maximum requirements for the light intensity in the greenhouse, T Indoor,min and T Indoor,max are respectively the minimum demand and the maximum demand of the greenhouse for the temperature;

[0027] The facility agriculture load constraint in the facility agriculture virtual power plant is:

[0028]

[0029] Among them, P Load,min and P Load,max are the controllable lower and upper limits of greenhouse electrical load, Q Lood,,min and Q Lood,max They are the controllable lower and upper bounds of greenhouse heat load respectively;

[0030] The power balance constraint in the facility agriculture virtual power plant is:

[0031]

[0032] in, is the load power of the facility agricultural power plant during the period t, is the charging power of the battery pack during the period t, is the electric power output of the biogas generator set during the period t, is the electrical power output of the photovoltaic system during the period t, is the discharge power of the battery pack during the period t, is the electric power output of the hydrogen fuel cell during the period t, is the actual controllable electric power load of the greenhouse electric load during the period t, is the heat load demand of the facility agriculture power plant during the period t, is the thermal power output of the hydrogen fuel cell during the period t, is the actual controllable thermal power load of the greenhouse heat load during the period t.

[0033] Optionally, in one embodiment of the present application, the expression for the amount of carbon emissions reduced by clean energy power generation in the preset environmental benefit model is:

[0034] E CCER =E B -E P ,

[0035] E B =EF grid ·P new,total ,

[0036] Among them, E B is the baseline carbon emissions, E P is the actual carbon emissions, EF grid is the benchmark carbon emission factor, P new,total is the total renewable energy generation;

[0037] The economic benefit expression of the carbon emissions reduced by hydrogen fuel cell power generation in the preset environmental benefit model is:

[0038] C G =E CCER ·P Deal ,

[0039] Among them, E CCER is the amount of carbon emissions reduced by clean energy generation, P Deal The carbon trading price.

[0040] The second aspect of the present application provides a facility agriculture virtual power plant scheduling device, including: a first acquisition module, used to obtain the control strategy during the scheduling of the facility agriculture virtual power plant; a second acquisition module, used to obtain at least one relevant information among the decision variables, objective functions, agricultural system safe operation boundary conditions, energy system operation constraints and preset environmental benefit models during the scheduling of the facility agriculture virtual power plant based on the control strategy; a scheduling module, used to optimize the facility agriculture virtual power plant scheduling model according to the at least one relevant information, so as to utilize the optimized facility agriculture virtual power plant scheduling model to make the agricultural park operate in the best state, so as to generate the final scheduling result of the facility agriculture virtual power plant.

[0041] Optionally, in one embodiment of the present application, the scheduling module includes: a restriction unit, used to restrict the operating boundary conditions of the agricultural park based on the optimized facility agriculture virtual power plant scheduling model to obtain a restriction result; a judgment unit, used to judge whether the agricultural park meets the preset operating demand conditions based on the restriction result; a first control unit, used to control the agricultural park to operate in the optimal state when the agricultural park meets the preset demand conditions.

[0042] Optionally, in one embodiment of the present application, the first acquisition module includes: a second control unit, used to utilize the flexible characteristics of the facility agriculture load to perform hierarchical cluster control on the facility agriculture virtual power plant to obtain a hierarchical cluster control result; a construction unit, used to generate at least one resource cluster according to the hierarchical cluster control result, and to construct an aggregation model based on the at least one resource cluster; a third control unit, used to control the virtual power plant layer to receive the power generation task of the dispatching center based on the aggregation model; and a first acquisition unit, used to obtain the control strategy based on the hierarchical cluster control result, the aggregation model and the power generation task.

[0043] Optionally, in one embodiment of the present application, the second acquisition module includes: a first acquisition unit, used to collect the electrical output of batteries, biogas and hydrogen fuel cells when the power system meets the preset time conditions, and obtain the hourly output of the power system; a second acquisition unit, used to collect the thermal output of the hydrogen fuel cell when the thermal system meets the preset time conditions, and obtain the hourly output of the thermal system; a second acquisition unit, used to obtain the decision variables for scheduling the facility agriculture virtual power plant based on the hourly output of the power system and the hourly output of the thermal system.

[0044] Optionally, in one embodiment of the present application, the calculation formula of the objective function is:

[0045]

[0046] in, is the purchase cost of hydrogen, F AVPP Subsidies for facility agriculture virtual power plants to participate in economic dispatch of distribution networks.

[0047] Optionally, in one embodiment of the present application, the expression of the energy system operation constraint is:

[0048]

[0049] in, and are the water flow rate, hydrogen flow rate and stack temperature at time t, and T HFC,max are the maximum values ​​of the water flow rate, the hydrogen flow rate and the stack temperature, respectively, and T HFC,min are respectively the minimum values ​​of the water flow rate, the hydrogen flow rate and the stack temperature;

[0050] The constraints of the energy storage system are:

[0051]

[0052] in, is the storage capacity of the battery pack during period t, η Eloss is the power storage loss rate, are respectively the charging and discharging power of the battery pack in the period t, are the charging and discharging efficiencies of the battery pack, S SOC,max , S SOC,min are the maximum and minimum states of charge, P Bat,total is the total system capacity of the battery, P ch,max , P dis,max are the maximum charging and discharging powers, respectively, are the charge and discharge states at time t, are the battery power states at the 1st hour and the 24th hour of the day, η Bat is the rated working condition coefficient of the battery;

[0053] The constraints of the biogas generator set in the facility agriculture virtual power plant are:

[0054]

[0055] Among them, P Biogas,min and P Biogas,max are the minimum output power and the maximum output power of the biogas unit respectively;

[0056] The constraints of light intensity and temperature of the greenhouse in the facility agriculture virtual power plant are:

[0057]

[0058] Among them, I Indoor,min and I Indoor,max are the minimum and maximum requirements for the light intensity in the greenhouse, T Indoor,min and T Indoor,max are respectively the minimum demand and the maximum demand of the greenhouse for the temperature;

[0059] The facility agriculture load constraint in the facility agriculture virtual power plant is:

[0060]

[0061] Among them, P Load,min and P Load,max are the controllable lower and upper limits of greenhouse electrical load, Q Lood,,min and Q Lood,max They are the controllable lower and upper bounds of greenhouse heat load respectively;

[0062] The power balance constraint in the facility agriculture virtual power plant is:

[0063]

[0064] in, is the load power of the facility agricultural power plant during the period t, is the charging power of the battery pack during the period t, is the electric power output of the biogas generator set during the period t, is the electrical power output of the photovoltaic system during the period t, is the discharge power of the battery pack during the period t, is the electric power output of the hydrogen fuel cell during the period t, is the actual controllable electric power load of the greenhouse electric load during the period t, is the heat load demand of the facility agriculture power plant during the period t, is the thermal power output of the hydrogen fuel cell during the period t, is the actual controllable thermal power load of the greenhouse heat load during the period t.

[0065] Optionally, in one embodiment of the present application, the expression for the amount of carbon emissions reduced by clean energy power generation in the preset environmental benefit model is:

[0066] E CCER =E B -E P ,

[0067] E B =EF grid ·P new,total ,

[0068] Among them, E B is the baseline carbon emissions, E P is the actual carbon emissions, EF grid is the benchmark carbon emission factor, P new,total is the total renewable energy generation;

[0069] The economic benefit expression of the carbon emissions reduced by hydrogen fuel cell power generation in the preset environmental benefit model is:

[0070] C G =E CCER ·P Deal ,

[0071] Among them, E CCER is the amount of carbon emissions reduced by clean energy generation, P Deal The carbon trading price.

[0072] The third aspect of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the facility agriculture virtual power plant scheduling method as described in the above embodiment.

[0073] The fourth aspect of the present application provides a computer-readable storage medium, which stores a computer program that, when executed by a processor, implements the above-mentioned facility agriculture virtual power plant scheduling method.

[0074] The embodiment of the present application realizes the reasonable allocation and optimal scheduling of various resources in the park by modeling the microgrid load and power supply in the facility agriculture park and analyzing the coupling relationship between the agricultural system and the energy system, so as to improve energy utilization efficiency, reduce operating costs, and enhance the economy and environmental friendliness of the system. Thus, it solves the problem that the relevant technology does not fully consider the deep coupling between the agricultural system and the energy system, and does not consider the potential of the agricultural park to participate in the large power grid scheduling as a virtual power plant, ignores the boundary conditions for the safe operation of the agricultural system and the flexible characteristics of the agricultural load, limits the potential of the facility agriculture park in energy management, and leads to the problem of poor flexibility of the energy system, low economy and environmental benefits.

[0075] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0077] Figure 1 A flowchart of a method for scheduling a virtual power plant in facility agriculture provided according to an embodiment of the present application;

[0078] Figure 2 A schematic diagram of a control strategy of a facility agriculture virtual power plant scheduling method according to an embodiment of the present application;

[0079] Figure 3 A schematic diagram of the structure of a facility agriculture virtual power plant scheduling device provided according to an embodiment of the present application;

[0080] Figure 4 It is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION

[0081] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0082] The following describes the facility agriculture virtual power plant scheduling method, device, electronic device and storage medium of the embodiment of the present application with reference to the accompanying drawings. In view of the above-mentioned background technology, the related technology does not fully consider the deep coupling between the agricultural system and the energy system, and does not consider the potential of the agricultural park as a virtual power plant to participate in the large power grid scheduling, ignores the boundary conditions for the safe operation of the agricultural system and the flexible characteristics of the agricultural load, limits the potential of the facility agriculture park in energy management, and leads to the problem of poor flexibility, low economy and environmental benefits of the energy system. This application provides a facility agriculture virtual power plant scheduling method, in which the microgrid load and power supply in the facility agriculture park are modeled, and the coupling relationship between the agricultural system and the energy system is analyzed to achieve reasonable allocation and optimal scheduling of various resources in the park, so as to improve energy utilization efficiency, reduce operating costs, and enhance the economy and environmental friendliness of the system. This solves the problem that relevant technologies do not fully consider the deep coupling between agricultural systems and energy systems, and do not consider the potential of agricultural parks to participate in large power grid dispatching as virtual power plants. They ignore the boundary conditions for safe operation of agricultural systems and the flexible characteristics of agricultural loads, which limits the potential of facility agricultural parks in energy management, resulting in poor flexibility, low economic and environmental benefits of energy systems.

[0083] Specifically, Figure 1 A flow chart of a method for scheduling a virtual power plant in facility agriculture provided in an embodiment of the present application.

[0084] like Figure 1 As shown, the facility agriculture virtual power plant scheduling method includes the following steps:

[0085] In step S101, the control strategy for scheduling the facility agriculture virtual power plant is obtained.

[0086] In the actual implementation process, the embodiments of the present application can introduce control strategies for scheduling facility agriculture virtual power plants, thereby providing support for the rational allocation and optimal scheduling of various resources within the park, thereby improving energy utilization efficiency, reducing operating costs, and enhancing the economy and environmental friendliness of the system.

[0087] Optionally, in one embodiment of the present application, a control strategy for scheduling a facility agriculture virtual power plant is obtained, including: utilizing the flexible characteristics of the facility agriculture load to perform hierarchical cluster control on the facility agriculture virtual power plant to obtain a hierarchical cluster control result; generating at least one resource cluster based on the hierarchical cluster control result, and constructing an aggregation model based on at least one resource cluster; based on the aggregation model, controlling the virtual power plant layer to receive the power generation task of the dispatching center; and obtaining a control strategy based on the hierarchical cluster control result, the aggregation model and the power generation task.

[0088] During the actual implementation process, the embodiments of the present application can utilize the flexible characteristics of facility agriculture loads to perform hierarchical cluster control on facility agriculture virtual power plants, obtain hierarchical cluster control results, form multiple resource clusters based on the hierarchical cluster control results, and regard the clusters as units for information classification and aggregation model construction. Based on the aggregation model, the virtual power plant layer is controlled to receive the power generation tasks of the dispatching center to control the resource layer and participate in external economic dispatch. The embodiments of the present application can obtain control strategies based on the hierarchical cluster control results, aggregation models and power generation tasks.

[0089] The embodiments of the present application can obtain the local policy requirements on the capacity of virtual power plants, the control strategies and processes for constructing virtual power plants with internal resources in the park, and the interactive relationship between the agricultural park and the outside world when it serves as a virtual power plant, thereby enabling the facility agriculture park to optimize energy scheduling and improve energy utilization efficiency while ensuring the safety of agricultural production.

[0090] In step S102, based on the control strategy, at least one relevant information of the decision variables, objective function, agricultural system safe operation boundary conditions, energy system operation constraints and preset environmental benefit model during the scheduling of the facility agriculture virtual power plant is obtained.

[0091] In the actual implementation process, the embodiment of the present application can obtain relevant information such as decision variables, objective functions, safe operation boundary conditions of the agricultural system, operation constraints of the energy system, and preset environmental benefit models when scheduling the facility agriculture virtual power plant based on the control strategy. The embodiment of the present application can obtain decision variables and objective functions based on reference information, establish operating boundary conditions for the agricultural system and energy system of the agricultural park, and establish an environmental benefit model, so as to achieve reasonable allocation and optimal scheduling of various resources in the park, so as to improve energy utilization efficiency, reduce operating costs, and enhance the economy and environmental friendliness of the system.

[0092] Optionally, in one embodiment of the present application, decision variables for scheduling a virtual power plant for facility agriculture are obtained, including: collecting the electrical output of batteries, biogas and hydrogen fuel cells when the power system meets preset time conditions, to obtain the hourly output of the power system; collecting the thermal output of hydrogen fuel cells when the thermal system meets preset time conditions, to obtain the hourly output of the thermal system; and obtaining the decision variables for scheduling a virtual power plant for facility agriculture based on the hourly output of the power system and the hourly output of the thermal system.

[0093] It is understandable that, from the perspective of the energy system, the decision variables of the model in the embodiment of the present application mainly consider the hourly output of the power and thermal systems. represents the electrical output of batteries, biogas, and hydrogen fuel cells at time t, represents the thermal output of the hydrogen fuel cell at time t. In addition, the decision-making effect of the hourly changes in relevant parameters within the energy system should also be considered comprehensively.

[0094] During the actual implementation process, the embodiments of the present application can collect the electrical output of batteries, biogas and hydrogen fuel cells in the power system at time t to obtain the hourly output of the power system. The embodiments of the present application can collect the thermal output of hydrogen fuel cells in the thermal system at time t to obtain the hourly output of the thermal system. The decision variables for scheduling the facility agriculture virtual power plant are obtained based on the hourly output of the power system and the hourly output of the thermal system.

[0095] It should be noted that the preset time condition can be set by those skilled in the art according to actual conditions and is not specifically limited here.

[0096] In one embodiment of the present application, the calculation formula of the objective function is:

[0097]

[0098] in, is the purchase cost of hydrogen, F AVPP Subsidies for facility agriculture virtual power plants to participate in economic dispatch of distribution networks.

[0099] It is understandable that the main purpose of the energy management model of the facility agriculture virtual power plant in the embodiment of the present application is to analyze the role of distributed resources such as hydrogen energy cogeneration, photovoltaic power generation, energy storage, biogas power generation, and controllable electric and thermal loads to support the distribution network, thereby minimizing the operating costs of the facility agriculture virtual power plant. Agricultural waste and winery waste are recycled as biomass resources in the park to produce biogas, and a small amount of free electricity can be provided to the park via biogas generators. Therefore, the energy cost of the agricultural park mainly comes from the hydrogen fuel cell cogeneration system, and the source of income for the facility agriculture virtual power plant is the subsidies obtained as a virtual power plant to the outside world.

[0100] Specifically, the objective function for optimizing the operation of the facility agriculture virtual power plant in the embodiment of the present application is as follows:

[0101]

[0102] in, The cost of purchasing hydrogen can be calculated as follows:

[0103]

[0104] in, is the hydrogen consumed at time t, The unit price of purchased hydrogen.

[0105] F AVPPSubsidies for facility agriculture virtual power plants to participate in economic dispatch of distribution networks;

[0106]

[0107] c Peak =c Peak,pri +c Peak,ca ,

[0108] in, is the peak load task at time t, c Peak The compensation price for the facility agriculture virtual power plant to participate in external peak load regulation, c Peak,pri The basic compensation price for peak load regulation; c Peak,ca Compensate for capacity electricity prices.

[0109] It should be noted that the crops planted in the greenhouses proposed in this application are tomatoes. Studies have shown that the temperature requirement for tomatoes is 10-35°C. Tomatoes are light-loving crops. When the indoor light is too low, tomatoes will consume their own nutrients, which is not conducive to their economic growth. The light intensity is 300-800μmol / m 2 / s can grow normally, and the light intensity is 500-800μmol / m 2 / s, the photosynthetic rate increases slowly. The light intensity is greater than 800μmol / m 2 / s, the photosynthetic rate remains basically unchanged. Therefore, in order to ensure the high-quality growth of tomatoes, this study used agricultural HPS lamps: Philips Master Greenpower, and adopted a supplementary lighting strategy of all-night lighting. For detailed parameters, please refer to Appendix 1-5. At night, the light intensity was maintained at 300-500μmol / m 2 / s, maintained at 300-800 μmol / m 2 / s. The unit of light intensity is unified as lux.

[0110] In one embodiment of the present application, the expression of the energy system operation constraint is:

[0111]

[0112] in, and are the water flow rate, hydrogen flow rate and stack temperature at time t, and T HFC,max are the maximum values ​​of water flow rate, hydrogen flow rate and stack temperature, respectively. and T HFC,min are the minimum values ​​of water flow rate, hydrogen flow rate and stack temperature respectively;

[0113] The constraints of the energy storage system are:

[0114]

[0115] in, is the storage capacity of the battery pack during period t, η Eloss is the power storage loss rate, are the charging and discharging power of the battery pack in period t, are the charging and discharging efficiency of the battery pack, S SOC,max , S SOC,min are the maximum and minimum states of charge, P Bat,total is the total system capacity of the battery, P ch,max , P dis,max are the maximum charging and discharging powers, respectively, are the charge and discharge states at time t, are the battery power states at the 1st hour and the 24th hour of the day, η Bat is the rated working condition coefficient of the battery;

[0116] The constraints of the biogas generator set in the facility agriculture virtual power plant are:

[0117]

[0118] Among them, P Biogas,min and P Biogas,max are the minimum output power and maximum output power of the biogas unit respectively;

[0119] The constraints on the light intensity and temperature of the greenhouse in the facility agriculture virtual power plant are:

[0120]

[0121] Among them, I Indoor,min and I Indoor,max are the minimum and maximum requirements for light intensity in the greenhouse, T Indoor,min and T Indoor,max are the minimum and maximum temperature requirements of the greenhouse respectively;

[0122] The load constraints of facility agriculture in the facility agriculture virtual power plant are:

[0123]

[0124] Among them, P Load,min and P Load,max are the controllable lower and upper limits of greenhouse electrical load, Q Lood,,min and Q Lood,max They are the controllable lower and upper bounds of greenhouse heat load respectively;

[0125] The power balance constraint in the facility agriculture virtual power plant is:

[0126]

[0127] in, is the load power of the facility agriculture power plant in period t, is the charging power of the battery pack during period t, is the electric power output of the biogas generator set in period t, is the power output of the photovoltaic system in period t, is the discharge power of the battery pack during period t, is the electrical power output of the hydrogen fuel cell during period t, is the actual controllable electric power load of the greenhouse in period t, is the heat load demand of the facility agriculture power plant in period t, is the thermal power output of the hydrogen fuel cell during period t, is the actual controllable thermal power load of the greenhouse heat load during period t.

[0128] It can be understood that this formula describes the relationship between power balance and thermal energy balance at a certain moment t. In the embodiment of the present application, in the greenhouse of facility agriculture, the load can be divided into rigid load (uncontrollable load) and flexible load (controllable load). Rigid loads are mainly loads with fixed time and fixed demand in the greenhouse, such as electric functional water generators, self-priming pumps, ultra-high pressure cleaning machines, cold and warm pool water thermostats, etc. Flexible loads are allowed to be interrupted or time-shifted, provided that the lack of load in the short term will not overly affect the growth of crops. In the research of this application, both the lighting demand and the heating demand can fluctuate within a certain range, and they can be identified as interruptible electrical and thermal loads. In addition, the electric and thermal loads of the facility agriculture virtual power plant come from production and living scenes such as greenhouses, wineries, and residential buildings.

[0129] Specifically, the detailed constraints of the hydrogen fuel cell in the embodiment of the present application are as follows:

[0130]

[0131] The working state of the battery pack includes charging and discharging, and each charge and discharge has capacity constraints, which are determined by product parameters. The battery pack needs to be maintained within a certain SOC range during operation to protect the battery life. The constraints for the energy storage system are as follows:

[0132]

[0133] The constraints of the biogas generator set are:

[0134]

[0135] According to the constraints of light intensity and temperature in the agricultural system introduced above, we can get:

[0136]

[0137] Then the controllable facility agriculture load constraints are obtained as follows:

[0138]

[0139] Combining the above model, it can be seen that for the entire energy system, the power balance constraints are as follows:

[0140]

[0141] The facility agriculture virtual power plant mainly uses clean energy for power supply, among which hydrogen cogeneration and photovoltaic power generation are both zero-carbon emission power generation methods.

[0142] In one embodiment of the present application, the expression of the carbon emissions reduced by clean energy power generation in the preset environmental benefit model is:

[0143] E CCER =E B -E P ,

[0144] E B =EF grid ·P new,total ,

[0145] Among them, E B is the baseline carbon emissions, E P is the actual carbon emissions, EF grid is the benchmark carbon emission factor, P new,total is the total renewable energy generation;

[0146] The economic benefit of reducing carbon emissions by generating electricity with hydrogen fuel cells in the preset environmental benefit model is expressed as:

[0147] C G =E CCER ·P Deal ,

[0148] Among them, E CCER is the amount of carbon emissions reduced by clean energy generation, P Deal The carbon trading price.

[0149] It is understandable that in order to understand the calculation process of environmental benefits in more detail, the research of this application refers to the calculation method of clean energy equivalent carbon emissions, and quantifies the carbon dioxide emissions of the facility agriculture virtual power plant as a whole to the outside world when the system is running. In addition, the relevant carbon emission reduction can also be equivalent to economic benefits, which can provide a reference for the future clean energy power generation to enter the carbon trading market. The amount of carbon emissions reduced by clean energy power generation can be calculated as follows:

[0150] E CCER =E B -E P ,

[0151] E B =EF grid ·P new,total ,

[0152] Among them, E B is the benchmark carbon emission, which is determined by the benchmark carbon emission factor and the total renewable energy power generation; E P is the actual carbon emissions, P new,total is the total renewable energy power generation.

[0153] The calculation of the baseline carbon emission factor can refer to the method in the United Nations carbon emission calculation standard UNFCCC:

[0154] EF grid =EF grid,OM ·W OM +EF grid,BM ·W BM ,

[0155] Among them, EF grid,OM and EF grid,BM are the marginal emission factors of electricity and capacity, W OM and W BM According to the data released by my country's Ministry of Ecology and Environment, the weight of hydrogen fuel cell power generation is 0.5, and the weights of photovoltaic power generation are 0.75 and 0.25 respectively.

[0156] Therefore, the economic benefits of reducing carbon emissions through hydrogen fuel cell power generation are calculated as follows:

[0157] C G =E CCER ·P Deal ,

[0158] Among them, P Deal The carbon trading price in Shandong Province in 2021 is 44.91 yuan / ton CO2.

[0159] In step S103, the facility agriculture virtual power plant scheduling model is optimized according to at least one relevant information, so as to utilize the optimized facility agriculture virtual power plant scheduling model to make the agricultural park operate in the best state, so as to generate the final scheduling result of the facility agriculture virtual power plant.

[0160] As a possible implementation method, the embodiment of the present application can optimize the facility agriculture virtual power plant scheduling model based on at least one relevant information, so as to utilize the optimized facility agriculture virtual power plant scheduling model to make the agricultural park operate in the best state, so as to generate the final scheduling result of the facility agriculture virtual power plant.

[0161] The embodiment of the present application not only takes into account the coupling relationship between the agricultural system and the energy system, but also integrates the interaction between the agricultural park and the outside world when it acts as a virtual power plant. By constructing optimization models and control strategies, it enables the facility agriculture park to optimize energy scheduling, improve energy utilization efficiency, reduce operating costs, and reduce environmental impact while ensuring agricultural production safety.

[0162] Optionally, in one embodiment of the present application, an optimized facility agriculture virtual power plant scheduling model is used to make the agricultural park operate in the optimal state, including: based on the optimized facility agriculture virtual power plant scheduling model, restricting the operating boundary conditions of the agricultural park to obtain restriction results; judging whether the agricultural park meets the preset operating demand conditions according to the restriction results; if the agricultural park meets the preset demand conditions, controlling the agricultural park to operate in the optimal state.

[0163] It can be understood that the preset operating requirement condition in the embodiment of the present application can be a condition where the light intensity in the greenhouse operates at the lowest light intensity requirement.

[0164] In the actual implementation process, when the energy system of the agricultural park meets the operating output requirements of the virtual power plant, the embodiment of the present application can observe whether the operating state of the agricultural system is reasonable, and based on the optimized facility agriculture virtual power plant scheduling model, restrict the operating boundary conditions of the agricultural park to obtain the restriction result. The embodiment of the present application can judge whether the agricultural park meets the condition that the light intensity in the greenhouse operates at the lowest light intensity requirement based on the restriction result, and when the agricultural park meets the demand conditions, control the agricultural park to operate in the best state, thereby further optimizing energy scheduling, improving energy utilization efficiency, reducing operating costs, and reducing environmental impact.

[0165] It should be noted that the preset requirement conditions can be set by those skilled in the art according to actual conditions and are not specifically limited here.

[0166] Specifically, it can be combined Figure 2As shown, the working principle of the facility agriculture virtual power plant scheduling method in the embodiment of the present application is explained in detail with a specific embodiment.

[0167] Figure 2 This is the control strategy for the facility agriculture virtual power plant, which mainly takes the flexible characteristics of the facility agriculture load (interruptible and time-shiftable characteristics) as the entry point, and adopts a hierarchical cluster control method to model the controllable resource aggregation of the facility agriculture virtual power plant.

[0168] The object of this application is located in an agricultural park in Langyatai, Qingdao City, Shandong Province, China (119.91°E, 35.69°N), covering an area of ​​26.68 hectares. The agricultural park consists of greenhouses with facilities for agriculture, biogas fermentation tanks, wineries, office buildings, residential areas and other infrastructure. The park's energy system consists of electric heating loads, photovoltaic power generation systems, biogas power generation systems and electric heating lines that are transported into the park via thermal pipelines and 35 / 0.38kV transformers. Among them, the electric heating load is generated by daily production and life such as greenhouses with facilities for agriculture, wineries, and office buildings. The photovoltaic power generation system is installed on the greenhouses with facilities for agriculture, covering an area of ​​75%, making full use of the top space of the greenhouse. The biogas power generation system recycles the biomass resources generated by the winery and greenhouses with facilities for agriculture in the agricultural park for biogas fermentation, and then supplies power to the park through the biogas generator set, realizing the rational use of resources.

[0169] On a typical day in winter, the energy of the agricultural park is mainly electricity and heat purchased from the outside world, and imported through the power and heat network. The electricity price implements the two-part billing principle of industrial electricity price: electricity price + capacity price. The electricity price adopts the time-of-use electricity price principle. During the peak period: 8:30-11:00, 14:30-21:00, the electricity price is 0.8663 yuan / kWh; during the off-peak period 12:00-13:00, 23:00-7:00, the electricity price is 0.3082 yuan / kWh; the rest of the period is the normal period, and the electricity price is 0.5872 yuan / kWh. The capacity electricity price is 38 yuan / kW per month. In addition, the park adopts steam heating, and the heat price is 0.4451 yuan / kWh. Since both economy and environmental protection need to be considered at the same time, the biogas generator set needs to be flexibly powered. In addition, the photovoltaic power generation in the park is directly connected to the grid.

[0170] In response to the problems existing in the existing operating mode, three operating scenarios are proposed, and the economic and environmental benefits under the three different operating scenarios are analyzed, as shown in Table 1. In Strategy 1, the park purchases electricity and heat energy from the outside world, combines biogas power generation for energy supply, and photovoltaic power generation is directly connected to the grid, and the flexibility of the energy system is poor. Strategy 2 uses hydrogen fuel cell cogeneration, and combines photovoltaic power generation and biogas power generation to supply heat and electricity to the park. In addition, energy storage batteries are added to improve the flexibility of the energy system. Strategy 3 is based on Strategy 2. During peak electricity consumption, the energy system is used to form a facility agriculture virtual power plant, and the flexible load in the park is appropriately interrupted to supply power to the outside world:

[0171] Table 1 is the operation strategy table of the agricultural park energy system, as shown in Table 1:

[0172] Table 1

[0173]

[0174]

[0175] With a 75% photovoltaic coverage rate, the electricity generated by the photovoltaic power generation system can be used for indoor lighting in the greenhouse, thereby converting uncontrollable natural light into more controllable artificial lighting, improving the flexibility of the agricultural system and the energy system, and ensuring that it has minimal impact on the agricultural system while bringing power generation benefits.

[0176] Strategy 1 has low economic and environmental benefits and poor flexibility. In Strategy 2, the electricity generated by the hydrogen fuel cell cogeneration system is the main energy source of the park, with the highest electric and thermal energy utilization efficiency reaching 96.2%. Photovoltaic power generation is concentrated in the 8-16 hours, reducing biogas power generation and CO2 emissions. The energy storage battery is charged when the light intensity is high and discharged during the peak power consumption period at night, realizing "daytime generation and nighttime use" and preventing the occurrence of light abandonment.

[0177] In Strategy 3, the park transmits electricity to the outside world during peak electricity consumption to form a virtual power plant. The greenhouse load of the facility agriculture is interrupted under the condition of ensuring the safe operation of the agricultural system. When the park energy system cannot meet the peak demand, the greenhouse load is interrupted, and the hydrogen fuel cell supplies energy to the outside world to complete the virtual power plant output task.

[0178] When the agricultural park energy system operates in virtual power plant mode, the energy storage battery stores energy when electricity prices are low and photovoltaic power generation is high, and concentrates the stored electricity when peak-shaving tasks arrive, in order to maximize economic benefits.

[0179] When the energy system of the agricultural park meets the operating output requirements of the virtual power plant, this application needs to observe whether the operating status of the agricultural system is reasonable. After the load of the facility agriculture greenhouse is interrupted, the total light intensity in the greenhouse decreases as the supplementary light load decreases. Due to the limitations of the operating boundary conditions of the agricultural system, when the light intensity in the greenhouse operates at the lowest light intensity requirement, the tomatoes in the greenhouse can still maintain normal growth;

[0180] In order to analyze the economic benefits of agricultural parks that use hydrogen as the main energy source, the four different electricity price costs and hydrogen fuel cell operating costs of virtual power plant subsidies, peak electricity prices, normal electricity prices and valley electricity prices in Qingdao, Shandong Province were compared under the same energy demand. Although Qingdao, Shandong Province has a certain degree of subsidy for the hydrogen cost of hydrogen refueling stations and can support the development of hydrogen fuel cell vehicles, the hydrogen cost of hydrogen fuel cell cogeneration systems after current policy subsidies is still relatively high. Therefore, compared with directly purchasing energy from the external electric heating network, the economic competitiveness of using hydrogen fuel cells for cogeneration of heat and power in agricultural parks is not strong.

[0181] In addition, the economic and environmental benefits of the agricultural park energy system under the above three different operation strategies are shown in Table 2. In Strategy 1, the operating cost of the system comes from purchasing electricity and heat from the outside, and CO2 is mainly generated by the external power grid and heat network, with high carbon emissions. It can be found that the operating cost of Strategy 2 is 2.08 times that of Strategy 1, but the total CO2 emissions of Strategy 1 are 19.49 times that of Strategy 2 (the CO2 of Strategy 2 mainly comes from biogas power generation). In addition, since the photosynthesis of tomatoes requires the absorption of CO2, according to the photosynthetic rate model, the CO2 demand of the greenhouse in one day can be calculated to be 2483.63kg, and the daily system CO2 emissions of the agricultural park under Strategy 2 are only 56.95kg. Referring to Strategy 2, the use of hydrogen energy can enable the system to operate in a nearly zero-carbon emission mode, with high environmental benefits. In practical applications, when the subsidized hydrogen price in Qingdao is around 17.4 yuan / kg, the hydrogen fuel cell cogeneration system can compete with purchased energy.

[0182] For the entire energy network, although the total operating cost of Strategy 1 is lower, the system needs to emit a large amount of CO2, and the environmental benefits are low.

[0183] Table 2 is an analysis table of the economic and environmental benefits of the agricultural park, as shown in Table 2:

[0184] Table 2

[0185] Operation plan Total operating cost (yuan) <![CDATA[CO2 emissions (kg)]]> <![CDATA[Greenhouse CO2 demand (kg)]]> Strategy 1 38085.29 45671.82 2483.63 Strategy 2 79215.87 2540.58 2483.63 Strategy 3 78398.32 2757.49 2395.92

[0186] According to the facility agriculture virtual power plant scheduling method proposed in the embodiment of the present application, by modeling the microgrid load and power supply in the facility agriculture park, and analyzing the coupling relationship between the agricultural system and the energy system, the reasonable allocation and optimal scheduling of various resources in the park are realized to improve energy utilization efficiency, reduce operating costs, and enhance the economy and environmental friendliness of the system. Thus, the problem that the relevant technology does not fully consider the deep coupling between the agricultural system and the energy system, and does not consider the potential of the agricultural park as a virtual power plant to participate in the large power grid scheduling, ignores the boundary conditions for the safe operation of the agricultural system and the flexible characteristics of the agricultural load, limits the potential of the facility agriculture park in energy management, and leads to the problem of poor flexibility of the energy system, low economy and environmental benefits.

[0187] Next, the facility agriculture virtual power plant scheduling device proposed according to the embodiment of the present application is described with reference to the accompanying drawings.

[0188] Figure 3 It is a structural schematic diagram of the facility agriculture virtual power plant scheduling device in an embodiment of the present application.

[0189] like Figure 3 As shown, the facility agriculture virtual power plant scheduling device 10 includes: a first acquisition module 100, a second acquisition module 200 and a scheduling module 300.

[0190] Specifically, the first acquisition module 100 is used to obtain the control strategy for scheduling the facility agriculture virtual power plant.

[0191] The second acquisition module 200 is used to obtain at least one relevant information of the decision variables, objective functions, safe operation boundary conditions of the agricultural system, energy system operation constraints and preset environmental benefit models during the scheduling of the facility agriculture virtual power plant based on the control strategy.

[0192] The scheduling module 300 is used to optimize the facility agriculture virtual power plant scheduling model according to at least one relevant information, so as to utilize the optimized facility agriculture virtual power plant scheduling model to make the agricultural park operate in the best state, so as to generate the final scheduling result of the facility agriculture virtual power plant.

[0193] Optionally, in one embodiment of the present application, the scheduling module 300 includes: a restriction unit, a judgment unit and a first control unit.

[0194] Among them, the restriction unit is used to restrict the operating boundary conditions of the agricultural park based on the optimized facility agriculture virtual power plant scheduling model to obtain the restriction results.

[0195] The judgment unit is used to judge whether the agricultural park meets the preset operation requirements according to the restriction results.

[0196] The first control unit is used to control the agricultural park to operate in an optimal state when the agricultural park meets preset demand conditions.

[0197] Optionally, in one embodiment of the present application, the first acquisition module 100 includes: a second control unit, a construction unit, a third control unit and a first acquisition unit.

[0198] Among them, the second control unit is used to utilize the flexible characteristics of the facility agriculture load to perform hierarchical cluster control on the facility agriculture virtual power plant to obtain the hierarchical cluster control results.

[0199] The construction unit is used to generate at least one resource cluster according to the hierarchical cluster control result, and to construct an aggregation model according to the at least one resource cluster.

[0200] The third control unit is used to control the virtual power plant layer to receive the power generation task of the dispatching center based on the aggregation model.

[0201] The first acquisition unit is used to obtain a control strategy according to the hierarchical cluster control result, the aggregation model and the power generation task.

[0202] Optionally, in one embodiment of the present application, the second acquisition module 200 includes: a first acquisition unit, a second acquisition unit and a second acquisition unit.

[0203] Among them, the first collection unit is used to collect the power output of batteries, biogas and hydrogen fuel cells when the power system meets the preset time conditions to obtain the hourly output of the power system.

[0204] The second collection unit is used to collect the thermal output of the hydrogen fuel cell when the thermal system meets the preset time conditions to obtain the hourly output of the thermal system.

[0205] The second acquisition unit is used to obtain the decision variables for scheduling the facility agriculture virtual power plant according to the hourly output of the power system and the hourly output of the thermal system.

[0206] Optionally, in one embodiment of the present application, the calculation formula of the objective function is:

[0207]

[0208] in, is the purchase cost of hydrogen, F AVPP Subsidies for facility agriculture virtual power plants to participate in economic dispatch of distribution networks.

[0209] Optionally, in one embodiment of the present application, the expression of the energy system operation constraint is:

[0210]

[0211] in, and are the water flow rate, hydrogen flow rate and stack temperature at time t, and T HFC,max are the maximum values ​​of water flow rate, hydrogen flow rate and stack temperature, respectively. and T HFC,min are the minimum values ​​of water flow rate, hydrogen flow rate and stack temperature respectively;

[0212] The constraints of the energy storage system are:

[0213]

[0214] in, is the storage capacity of the battery pack during period t, η Eloss is the power storage loss rate, are the charging and discharging power of the battery pack in period t, are the charging and discharging efficiency of the battery pack, S SOC,max , S SOC,min are the maximum and minimum states of charge, P Bat,total is the total system capacity of the battery, P ch,max , P dis,max are the maximum charging and discharging powers, respectively, are the charge and discharge states at time t, are the battery power states at the 1st hour and the 24th hour of the day, η Bat is the rated working condition coefficient of the battery;

[0215] The constraints of the biogas generator set in the energy system are:

[0216]

[0217] Among them, P Biogas,min and P Biogas,max are the minimum output power and maximum output power of the biogas unit respectively;

[0218] The constraints on the light intensity and temperature of the greenhouse in the energy system are:

[0219]

[0220] Among them, I Indoor,min and I Indoor,max are the minimum and maximum requirements for light intensity in the greenhouse, T Indoor,min and T Indoor,max are the minimum and maximum temperature requirements of the greenhouse respectively;

[0221] The load constraint of facility agriculture in the energy system is:

[0222]

[0223] Among them, P Load,min and P Load,max are the controllable lower and upper limits of greenhouse electrical load, Q Lood,,min and Q Lood,max They are the controllable lower and upper bounds of greenhouse heat load respectively;

[0224] The power balance constraint in the energy system is:

[0225]

[0226] in, is the load power of the facility agriculture power plant in period t, is the charging power of the battery pack during period t, is the electric power output of the biogas generator set in period t, is the power output of the photovoltaic system in period t, is the discharge power of the battery pack during period t, is the electrical power output of the hydrogen fuel cell during period t, is the actual controllable electric power load of the greenhouse in period t, is the heat load demand of the facility agriculture power plant in period t, is the thermal power output of the hydrogen fuel cell during period t, is the actual controllable thermal power load of the greenhouse heat load during period t.

[0227] Optionally, in one embodiment of the present application, the expression for the amount of carbon emissions reduced by clean energy power generation in the preset environmental benefit model is:

[0228] E CCER =E B -E P ,

[0229] E B =EF grid ·P new,total ,

[0230] Among them, E B is the baseline carbon emissions, E P is the actual carbon emissions, EF grid is the benchmark carbon emission factor, P new,total is the total renewable energy generation;

[0231] The economic benefit of reducing carbon emissions by generating electricity with hydrogen fuel cells in the preset environmental benefit model is expressed as:

[0232] CG =E CCER ·P Deal ,

[0233] Among them, E CCER is the amount of carbon emissions reduced by clean energy generation, P Deal The carbon trading price.

[0234] It should be noted that the aforementioned explanation of the embodiment of the facility agriculture virtual power plant scheduling method is also applicable to the facility agriculture virtual power plant scheduling device of this embodiment, and will not be repeated here.

[0235] According to the facility agriculture virtual power plant dispatching device proposed in the embodiment of the present application, the near-zero carbon emissions of the entire energy system can be achieved, which is in line with the development concept of the new power system, and is of great help to my country's development of hydrogen energy, construction of facility agriculture virtual power plants, analysis of the utilization potential of hydrogen energy, etc., and is of great significance to promoting the realization of clean and low-carbon development of my country's agricultural and rural energy systems. Thus, it solves the problem that the relevant technology does not fully consider the deep coupling between the agricultural system and the energy system, and does not consider the potential of agricultural parks to participate in large power grid dispatching as virtual power plants, ignores the boundary conditions for the safe operation of the agricultural system and the flexible characteristics of agricultural loads, limits the potential of facility agriculture parks in energy management, and leads to the problem of poor flexibility, low economic and environmental benefits of the energy system.

[0236] Figure 4 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device may include:

[0237] Memory 401 , processor 402 , and a computer program stored in the memory 401 and executable on the processor 402 .

[0238] When the processor 402 executes the program, the facility agriculture virtual power plant scheduling method provided in the above embodiment is implemented.

[0239] Furthermore, the electronic device further comprises:

[0240] The communication interface 403 is used for communication between the memory 401 and the processor 402 .

[0241] The memory 401 is used to store computer programs that can be executed on the processor 402 .

[0242] The memory 401 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.

[0243] If the memory 401, the processor 402 and the communication interface 403 are implemented independently, the communication interface 403, the memory 401 and the processor 402 can be connected to each other through a bus and communicate with each other. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component (PCI) bus or an Extended Industry Standard Architecture (EISA) bus. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 4 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0244] Optionally, in a specific implementation, if the memory 401, the processor 402 and the communication interface 403 are integrated on a chip, the memory 401, the processor 402 and the communication interface 403 can communicate with each other through an internal interface.

[0245] The processor 402 may be a central processing unit (CPU), or an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present application.

[0246] This embodiment also provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the above-mentioned facility agriculture virtual power plant scheduling method is implemented.

[0247] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0248] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, "N" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0249] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or N executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0250] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or N wirings (electronic devices), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways as necessary and then storing it in a computer memory.

[0251] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiment, the N steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0252] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0253] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0254] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A method for scheduling a virtual power plant in facility agriculture, characterized in that: The following steps are involved: Obtain control strategies for the scheduling of facility agriculture virtual power plants; Based on the control strategy, obtaining at least one relevant information of the decision variables, objective function, agricultural system safe operation boundary conditions, energy system operation constraints and preset environmental benefit model during the scheduling of the facility agriculture virtual power plant; The facility agriculture virtual power plant scheduling model is optimized according to the at least one relevant information, so as to utilize the optimized facility agriculture virtual power plant scheduling model to make the agricultural park operate in the best state, so as to generate the final scheduling result of the facility agriculture virtual power plant.

2. The method according to claim 1, characterized in that The optimized facility agriculture virtual power plant scheduling model is used to make the agricultural park operate in the best state, including: Based on the optimized facility agriculture virtual power plant scheduling model, the operating boundary conditions of the agricultural park are restricted to obtain restriction results; Determining whether the agricultural park meets preset operation requirements according to the restriction result; If the agricultural park meets the preset demand conditions, the agricultural park is controlled to operate in the optimal state.

3. The method according to claim 1, characterized in that The control strategy for obtaining the scheduling of the facility agriculture virtual power plant includes: Using the flexible characteristics of the facility agriculture load, the facility agriculture virtual power plant is subjected to hierarchical cluster control to obtain a hierarchical cluster control result; generating at least one resource cluster according to the hierarchical cluster control result, and constructing an aggregation model according to the at least one resource cluster; Based on the aggregation model, the virtual power plant layer is controlled to receive power generation tasks from the dispatching center; The control strategy is obtained according to the hierarchical cluster control result, the aggregation model and the power generation task.

4. The method according to claim 1, characterized in that: The decision variables for obtaining the scheduling of the facility agriculture virtual power plant include: Collecting the power output of batteries, biogas and hydrogen fuel cells when the power system meets the preset time conditions to obtain the hourly output of the power system; Collecting the thermal output of the hydrogen fuel cell when the thermal system meets the preset time condition to obtain the hourly output of the thermal system; The decision variables for scheduling the facility agriculture virtual power plant are obtained according to the hourly output of the power system and the hourly output of the thermal system.

5. The method according to claim 1, characterized in that The calculation formula of the objective function is: in, is the purchase cost of hydrogen, F AVPP Subsidies for facility agriculture virtual power plants to participate in economic dispatch of distribution networks.

6. The method according to claim 1, characterized in that The expression of the energy system operation constraint is: in, and are the water flow rate, hydrogen flow rate and stack temperature at time t, and T HFC,max are the maximum values ​​of the water flow rate, the hydrogen flow rate and the stack temperature, respectively, and T HFC,min are respectively the minimum values ​​of the water flow rate, the hydrogen flow rate and the stack temperature; The constraints of the energy storage system in the facility agriculture virtual power plant are: in, is the storage capacity of the battery pack during period t, η Eloss is the power storage loss rate, are respectively the charging and discharging power of the battery pack in the period t, are the charging and discharging efficiencies of the battery pack, S SOC,max , S SOC, are the maximum and minimum states of charge, P Bat,total is the total system capacity of the battery, P ch, , P dis,max are the maximum charging and discharging powers, respectively, are the charge and discharge states at time t, are the battery power states at the 1st hour and the 24th hour of the day, η Bat is the rated working condition coefficient of the battery; The constraints of the biogas generator set in the facility agriculture virtual power plant are: Among them, P Biogas,min and P Biogas,max are the minimum output power and the maximum output power of the biogas unit respectively; The constraints of light intensity and temperature of the greenhouse in the facility agriculture virtual power plant are: Among them, I Indoor, and I Indoor,x are the minimum and maximum requirements for the light intensity in the greenhouse, T Indoor, and T Indoor, are respectively the minimum demand and the maximum demand of the greenhouse for the temperature; The facility agriculture load constraint in the facility agriculture virtual power plant is: Among them, P Load, and P Load, are the controllable lower and upper limits of greenhouse electrical load, Q Lood,, and Q Lood, They are the controllable lower and upper bounds of greenhouse heat load respectively; The power balance constraint in the facility agriculture virtual power plant is: in, is the load power of the facility agricultural power plant during the period t, is the charging power of the battery pack during the period t, is the electric power output of the biogas generator set during the period t, is the electrical power output of the photovoltaic system during the period t, is the discharge power of the battery pack during the period t, is the electrical power output of the hydrogen fuel cell during the period t, is the actual controllable electric power load of the greenhouse electric load during the period t, is the heat load demand of the facility agriculture power plant during the period t, is the thermal power output of the hydrogen fuel cell during the period t, is the actual controllable thermal power load of the greenhouse heat load during the period t.

7. The method according to claim 1, characterized in that The expression for the amount of carbon emissions reduced by clean energy power generation in the preset environmental benefit model is: AND ccER = B -P, E B =F grid · new,total , Among them, E B is the baseline carbon emissions, E P is the actual carbon emissions, EF grid is the benchmark carbon emission factor, P new,total is the total renewable energy generation; The economic benefit expression of the carbon emissions reduced by hydrogen fuel cell power generation in the preset environmental benefit model is: C G = CCER · Deal , Among them, E CCER is the amount of carbon emissions reduced by clean energy generation, P Deal The carbon trading price.

8. A facility agriculture virtual power plant dispatching device, characterized in that: include: The first acquisition module is used to obtain the control strategy for the scheduling of the facility agriculture virtual power plant; A second acquisition module is used to acquire at least one relevant information of the decision variables, objective functions, safe operation boundary conditions of the agricultural system, energy system operation constraints and preset environmental benefit models during the scheduling of the facility agriculture virtual power plant based on the control strategy; The scheduling module is used to optimize the facility agriculture virtual power plant scheduling model according to the at least one relevant information, so as to utilize the optimized facility agriculture virtual power plant scheduling model to make the agricultural park operate in the best state, so as to generate the final scheduling result of the facility agriculture virtual power plant.

9. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the facility agriculture virtual power plant scheduling method as described in any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: The program is executed by a processor to implement the facility agriculture virtual power plant scheduling method as described in any one of claims 1-7.

Citation Information

Cited By

  • Intelligent farm virtual power plant model containing agricultural irrigation load and optimal scheduling method

    CN119693030A

  • Agricultural park power distribution network comprehensive energy storage planning method considering crop growth factors

    CN121172834A

  • Digital twin biogas factory global electric energy monitoring and energy saving optimization system and method

    CN121277113A

  • Greenhouse micro-grid dynamic scheduling and photosynthetic efficiency collaborative optimization control method and system

    CN121965813A