Transformer overhaul and maintenance management method

By evaluating the failure probability of the transformer and combining the comprehensive analysis of multiple factors, a reasonable maintenance and maintenance strategy is formulated, which solves the problem of lack of intelligent early warning of maintenance methods in the existing technology, improves the operating reliability of the transformer and reduces the maintenance cost.

CN119067635APending Publication Date: 2024-12-03이너 몽골리아 일렉트릭 파워 그룹 컴퍼니 리미티드 이너 몽골리아 일렉트릭 파워 리서치 인스티튜트 브랜치
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411086256.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the prior art, the maintenance method of power equipment lacks a comprehensive analysis of operating parameters, which makes it difficult to conduct intelligent early warnings, and prone to excessive maintenance problems, affecting the maintenance and management of transformers.

Method used

By evaluating the failure probability of the transformer, a maintenance and maintenance strategy is formulated based on the failure probability. The calculation methods include life expectancy, initial aging rate, operation score, predicted aging rate and future operating condition score, combining position, duty cycle, observation conditions, measurement conditions and DGA testing and other factors, calculate the failure probability to determine the appropriate maintenance strategy.

Benefits of technology

It effectively avoids the problems of over-inspection and untimely maintenance, improves the operating reliability of the transformer, reduces the cost of equipment operation and maintenance, and brings economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067635A_ABST
    Figure CN119067635A_ABST
Patent Text Reader

Abstract

The invention discloses a transformer repair and maintenance management method, which evaluates the failure probability of a transformer and formulates a repair and maintenance strategy according to the failure probability of the transformer, and the transformer failure probability calculation method comprises the following steps: step 1, obtaining the expected life t of the transformer according to the normal expected life of the transformer; 2, calculating the initial aging rate beta 1 of the transformer; 3, calculating an initial operation score of the transformer according to the initial aging rate beta1 of the transformer; 4, calculating a current operation score according to the initial operation score; 5, calculating a predicted aging rate beta2 according to the current operation score; step 6, calculating a future operation condition score HF according to the predicted aging rate beta2; and step 7, calculating the failure probability of the transformer according to a formula based on the future operation condition score HF. The transformer maintenance management method provided by the invention can effectively improve the operation reliability of the transformer, reduce the equipment operation and maintenance cost, and bring great economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system analysis, and in particular to a transformer overhaul, maintenance and management method. Background Art

[0002] Power transformers are the core of energy conversion and transmission in the power grid, and are one of the most important and critical equipment in the power grid. It is a difficult problem that the power industry at home and abroad urgently needs to solve by adopting reasonable maintenance strategies to reduce maintenance costs, improve the operation and maintenance technology and management level of transformers, and prevent and reduce the probability of failure. In view of the fact that power transformers are affected by electromagnetic vibration, mechanical wear, chemical action, atmospheric corrosion, electrical corrosion and other internal and external influences during long-term operation, their health status gradually deteriorates, affecting the safety and accuracy of the equipment to varying degrees. The purpose of risk assessment of power transformers is to evaluate the abnormal impact of abnormal operation of transformers on power systems, to quantify the uncertainty in transformer operation, and to enable relevant personnel to better understand the health status of transformers and what countermeasures to take. Therefore, failure risk assessment of transformers is crucial for preventive maintenance and management of power systems.

[0003] In the prior art, the maintenance method for power equipment usually adopts the mode of planned maintenance and emergency repair. The planned maintenance lacks a comprehensive analysis of the operating parameters of the power equipment, and it is difficult to carry out intelligent early warning based on the hidden dangers of the power equipment. It is easy to cause problems such as "excessive maintenance", which is not conducive to the maintenance and management of the transformer. Summary of the invention

[0004] In order to solve the above technical problems, the present invention proposes a transformer inspection and maintenance management method, which accurately evaluates the future operating status of the transformer based on a more reliable transformer failure assessment calculation, so that a more appropriate maintenance strategy can be formulated according to the calculated failure assessment to avoid problems such as excessive inspection and maintenance.

[0005] To achieve the above purpose, the technical solution adopted by the present invention is: a transformer inspection and maintenance management method, characterized in that the failure probability of the transformer is evaluated, and an inspection and maintenance strategy is formulated according to the failure probability of the transformer. The transformer failure probability calculation method comprises: step 1, obtaining the expected life t of the transformer according to the normal expected life of the transformer; step 2, calculating the initial aging rate β1 of the transformer; step 3, calculating the initial operation score of the transformer according to the initial aging rate β1 of the transformer; step 4, calculating the current operation score according to the initial operation score; step 5, calculating the predicted aging rate β2 according to the current operation score; step 6, calculating the future operation status score H according to the predicted aging rate β2 F ; Step 7: Score the future operation status H F Substitute into the formula: Calculate the failure probability of the transformer.

[0006] Furthermore, according to the formula: Calculate the expected lifetime t, where D is the duty cycle and L is the location factor.

[0007] Further, the location coefficient L includes a distance factor from the coast, an altitude factor, and a corrosion factor; wherein, the determination of the location coefficient L includes: if the maximum values ​​of the distance factor from the coast, the altitude factor, and the corrosion factor are greater than 1, the location coefficient is calculated using the following formula: L=MAX(d, a, c)+(((the sum of factors greater than 1)-1)×INC), INC is the incremental constant of the transformer, INC=0.05; d is the distance factor from the coast, a is the altitude factor, and c is the corrosion factor; if the maximum values ​​of the distance factor from the coast, the altitude factor, and the corrosion factor are not greater than 1, the location coefficient is calculated using the following formula: The position coefficient is calculated using the following formula: L=MIN(d, a, c), INC is the incremental constant of the transformer, INC=0.05; d is the distance factor from the coast, a is the altitude factor, and c is the corrosion factor; when the maximum utilization rate of the transformer is less than or equal to 50%, the duty cycle D is 1; when the maximum utilization rate of the transformer is greater than 50% and less than or equal to 70%, the duty cycle D is 1.05; when the maximum utilization rate of the transformer is greater than 70% and less than or equal to 100%, the duty cycle D is 1.1; when the maximum utilization rate of the transformer is greater than 100%, the duty cycle is 1.4.

[0008] Furthermore, the initial aging rate β1 of the transformer is determined according to the following formula, Among them, H new is the new operating condition score of the transformer, which is 0.5; H t Yes is the operating score when the asset reaches the end of its expected life, which is 5.5.

[0009] Further, the initial operation score H is calculated according to the following formula: i : H new is the new operating status score of the transformer, which is 0.5; the initial operating score H i The upper limit is 5.5; age is the age of the current transformer.

[0010] Furthermore, the initial operation score is modified according to the operation status score modifier and the reliability modifier to obtain the current operation score of the transformer; wherein the current operation status score is calculated as follows: H c =H i ×F h ×F r , where Fh is the running status score parameter, F r is the reliability scoring parameter, Fr The value ranges from 0.6 to 1.5, and the default value is 1. First, if the calculated health score is less than the maximum health score, the health score H c is the calculated value; if the calculated health score is greater than the maximum health score, the health score H c = maximum health score, the maximum health score is 10; then, compare the current health score H c and the minimum reliability score and the minimum health score. If the calculated health score is less than the minimum health score and the minimum reliability score, then the health score H c =0.5.

[0011] Further, the transformer operation condition score modifier is composed of a plurality of sub-modifiers, and the sub-modifiers are: an observation condition sub-modifier, a measurement condition sub-modifier, an oil test modifier and a DGA test modifier;

[0012] The observation condition modifier includes an observation condition coefficient, a maximum score of the observation condition sub-modifier, and a minimum score of the observation condition sub-modifier; wherein the observation condition coefficient is obtained according to the input observation condition factor and through the MMI algorithm, and the observation condition factor includes: input transformer external condition, radiator condition, bushing condition, cable condition, input the input observation condition factor into the modifier, and use the MMI technology to combine multiple factors into a final observation condition coefficient, the maximum score of the observation condition sub-modifier is 10, and the minimum score of the observation condition sub-modifier is 0.5;

[0013] The measurement condition sub-modifier includes a measurement condition coefficient, a maximum score of the measurement condition sub-modifier, and a minimum score of the measurement condition sub-modifier; wherein the measurement condition coefficient is obtained according to the input observation condition factor and through the MMI algorithm, and the measurement condition factor includes a partial discharge test and a temperature detection, and these input observation condition factors are input into the modifier, and the MMI technology is used to combine multiple factors into a final observation condition coefficient, the maximum score of the measurement condition sub-modifier is 10, and the minimum score of the measurement condition sub-modifier is 0.5;

[0014] The oil test modifier includes an oil test coefficient, a maximum score of the oil test sub-modifier, and a minimum score of the oil test sub-modifier, wherein the oil test coefficient is obtained by calculation based on the input observation condition factors, and the measurement condition factors include: oil acidity, oil-water, and oil decomposition. The maximum score of the oil test sub-modifier is 10. The oil test coefficient and the minimum score of the oil test sub-modifier are obtained based on the final oil test score, and the oil test score = 80 × oil-water score + 125 × acidity score + 80 × decomposition score;

[0015] The DGA test modifier includes the DGA test coefficient, the maximum score of the DGA test sub-modifier and the minimum score of the DGA test sub-modifier. The DGA test coefficient is obtained by calculation based on the input observation condition factors. The measurement condition factors include: hydrogen content, methane content, acetylene content, ethylene content, and ethane content. These input measurement condition factors are input into the modifier to combine into a final DGA test coefficient. The maximum score of the DGA test sub-modifier is 10. The DGA test coefficient and the minimum score of the DGA test sub-modifier are obtained according to the following formula. The current DGA test score is calculated as 50×hydrogen score + 30×methane score + 30×ethylene score + 30×ethane score + 120×acetylene score. Get the DGA test coefficient according to the change of DGA test score, the minimum score of DGA test sub-modifier = current DGA test score ÷ 220;

[0016] Finally, the MMI algorithm is used to combine the above input observation condition coefficients, measurement condition sub-coefficients, oil test coefficients and DGA test coefficients to obtain a final operating condition score parameter F h .

[0017] Furthermore, the following formula is used to calculate the predicted aging rate β2: When the current running status score H c >0.5, the current operating status score is H c =0.5, then β2=β1, where age is the current life of the transformer, and β2≤2×β1.

[0018] Furthermore, the future operation status score is calculated using the following formula: Where T is the number of years in the future, r is the aging reduction coefficient, β2 is the predicted aging rate, and H F No more than 15.

[0019] Furthermore, H F Substitute into the formula: Calculate the failure probability of the transformer, and the health status of the transformer can be obtained based on the calculated PoF value. The smaller the value, the better the operating condition of the transformer.

[0020] The present invention proposes a transformer inspection and maintenance management method. When calculating the failure probability of the transformer, the position, duty cycle, observation conditions, measurement conditions, oil test and DGA test of the transformer are taken into consideration for transformer inspection and maintenance, so that the evaluation of the failure probability of the transformer is more comprehensive and accurate. Based on a more comprehensive and accurate transformer failure evaluation method, the failure probability of the transformer can be accurately obtained, so that an inspection and maintenance strategy can be accurately formulated according to the failure probability, effectively improving the operating reliability of the transformer, reducing the equipment operation and maintenance costs, and bringing greater economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION

[0022] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.

[0023] The present invention proposes a transformer overhaul and maintenance management method, which uses an evaluation unit to evaluate the failure probability of the transformer and formulates a transformer overhaul and maintenance strategy according to the evaluation result.

[0024] Furthermore, the failure probability evaluation method is as follows:

[0025] It mainly includes the calculation steps of the failure probability (POF) of the transformer:

[0026] According to the formula: Calculate the failure probability of the transformer, where: H is the operation score variable, H≤4; K and C are constants, K is 0.0078%, and C is 1.087.

[0027] Step 1: Obtain life expectancy based on normal life expectancy

[0028]

[0029] Wherein, D represents the duty cycle and L represents the position coefficient; the normal expected life span can be found by querying.

[0030] The location factor L indicates that the expected life of the transformer is affected by the installation environment. For example, a transformer exposed to higher humidity or pollution may have a shorter service life than a similar transformer exposed to lower humidity or pollution. Therefore, this influence can be determined by the specific location factors of the transformer. The location factors include: distance factor from the coast, altitude factor, corrosion factor, etc. The distance factor from the coast, altitude factor, and corrosion factor can be found according to Table 1.

[0031] Table 1. Position coefficient lookup table

[0032] distance Distance Factor altitude Altitude Factor Corrosion level Corrosion Factor ≤1km 1.35 ≤100m 0.9 1 0.9 >1kmand≤5km 1.1 >100mand≤200m 1 2 0.95 >5kmand≤10km 1.05 >200mand≤300m 1.05 3 1 >10km and ≤20km 1 >300m 1.1 4 1.1 >20km 0.9 \ 1 5 1.25

[0033] Among them, the corrosion levels are as follows: Corrosion Level 1: Usually indicates very slight corrosion, which may be just slight changes on the surface or subtle corrosion marks, and has little effect on material properties; Corrosion Level 2: Indicates mild corrosion, obvious corrosion marks or small pits on the surface can be seen, but the overall structure is not seriously damaged; Corrosion Level 3: Moderate corrosion, there may be obvious corrosion pits or depressions on the surface, which begin to affect the function and performance of the material; Corrosion Level 4: Severe corrosion, serious surface corrosion, there may be a large number of pits and depressions, which have significantly affected the structure and performance of the material; Corrosion Level 5: Extreme corrosion, the surface has been severely damaged and may have lost its original function and strength.

[0034] The final position coefficient L can be determined according to the following formula:

[0035] If the maximum value of the distance factor from the coast, the altitude factor, and the corrosion factor is greater than 1, the location coefficient is calculated using the following formula:

[0036] L = MAX(d, a, c) + (((sum of factors greater than 1) - 1) × INC)

[0037] Among them, INC is the incremental constant of the transformer, INC = 0.05; d is the distance factor from the coast, a is the altitude factor, and c is the corrosion factor.

[0038] If the maximum values ​​of the distance factor from the coast, the altitude factor, and the corrosion factor are not greater than 1, the location coefficient is calculated using the following formula:

[0039] L = MIN(d, a, c)

[0040] Among them, INC is the incremental constant of the transformer, INC = 0.05; d is the distance factor from the coast, a is the altitude factor, and c is the corrosion factor.

[0041] The duty cycle D is found according to the maximum utilization rate of the transformer under normal conditions. When the maximum utilization rate of the transformer is less than or equal to 50%, the duty cycle D is 1; when the maximum utilization rate of the transformer is greater than 50% and less than or equal to 70%, the duty cycle D is 1.05; when the maximum utilization rate of the transformer is greater than 70% and less than or equal to 100%, the duty cycle D is 1.1; when the maximum utilization rate of the transformer is greater than 100%, the duty cycle is 1.4.

[0042] Step 2: Calculate the initial aging rate β1

[0043] Determine β1 according to the following formula,

[0044]

[0045] Among them, H new is the new operating condition score of the transformer, which is 0.5; H t Yes is the operating score when the asset reaches the end of its expected life, which is 5.5.

[0046] Step 3: Calculate the initial run score

[0047] The initial service rating is obtained by defining the relationship between the transformer's service condition and age through the transformer's expected life, using the following formula:

[0048]

[0049] Among them, H new is the new operating status score of the transformer, which is 0.5; the initial operating score H i The upper limit is 5.5; age is the current age of the transformer; in this step, a preliminary assessment of the transformer is calculated, but the actual operating condition measurement is not taken into account and needs to be corrected according to the operating speed of the transformer.

[0050] Step 4: Calculate the current running score

[0051] The initial operation score is modified according to the operation status score modifier and the reliability modifier to obtain the current operation score of the transformer;

[0052] The current health score is calculated as follows:

[0053] H c =H i ×F h ×F r

[0054] F h is the health scoring parameter, F r is the reliability scoring parameter, F r The value is usually between 0.6 and 1.5, and the default value is 1;

[0055] First, if the calculated health score is less than the maximum health score, the health score H c is the calculated value; if the calculated health score is greater than the maximum health score, the health score H c = Maximum health score, which is the maximum value of the current health score (used for situations where a good result of a health check or measurement means that the health score does not exceed the specified value, and the maximum health score is 10;

[0056] Then, compare the current health score H c and the minimum reliability score and the minimum health score. If the calculated health score is less than the minimum health score and the minimum reliability score, then the health score H c =The maximum value of the minimum health score and the minimum reliability score, the minimum reliability score is 0.5 and the minimum health score is 0.5.

[0057] It should be noted that the transformer operating condition score modifier is composed of multiple sub-modifiers, which are: observation condition sub-modifier, measurement condition sub-modifier, oil test modifier and DGA test modifier.

[0058] The observation condition modifier includes the observation condition coefficient, the maximum score of the observation condition sub-modifier and the minimum score of the observation condition sub-modifier; the observation condition coefficient is obtained according to the input observation condition factors and the MMI algorithm. The observation condition factors are, for example, the external condition of the input transformer, the condition of the radiator, the condition of the bushing, the condition of the cable, etc. These input observation condition factors are input into the modifier and combined into a final observation condition coefficient. The maximum score of the observation condition sub-modifier is 10, and the minimum score of the observation condition sub-modifier is 0.5.

[0059] The method of combining multiple factors into a single factor using the MMI technique is described as follows:

[0060] When there is a factor greater than 1, then: Var1 = maximum factor, Var2 = sum of values ​​of all factors - 1 > 0, Var3 = Var2 / division factor 1; thus, the observation condition coefficient = Var1 + Var3 is calculated;

[0061] When all factors are less than or equal to 1, then: Var1 = the smallest factor, Var2 = the second smallest factor, Var3 = (Var2-1) / division factor 2; thus, the observation condition coefficient = Var1 + Var3 is calculated. Wherein, division factor 1 and division factor 2 are both constants 2.

[0062] Example 1: The factor set includes: 1.2, 1.1, 1.02, 0.9, Var1=1.2, Var2=(1.1-1)+(1.02-1)=0.12, Var3=0.12 / 2=0.06; thus, it is calculated that the observation condition coefficient=1.2+0.06=1.26.

[0063] Example 2: The factor set includes: 1, 1, 0.8, 0.9, Var1=0.8, Var2=0.9, Var3=(0.9-1) / 2=-0.05; thus, it is calculated that the observation condition coefficient=0.8-0.05=0.75.

[0064] In summary, the present application utilizes the MMI algorithm to combine multiple observation condition factors into a single observation condition coefficient for calculation.

[0065] The measurement condition sub-modifier includes the measurement condition coefficient, the maximum score of the measurement condition sub-modifier and the minimum score of the measurement condition sub-modifier; the observation condition coefficient is obtained according to the input observation condition factor and the MMI algorithm. The measurement condition factor is such as partial discharge test, temperature detection, etc. These input observation condition factors are input into the modifier and combined into a final observation condition coefficient. The maximum score of the measurement condition sub-modifier is 10, and the minimum score of the measurement condition sub-modifier is 0.5. For the method of combining multiple factors into a single factor using MMI technology, please refer to the observation condition modifier section, which will not be repeated here.

[0066] The oil test modifier also includes an oil test coefficient, a maximum score of the oil test sub-modifier, and a minimum score of the oil test sub-modifier. The oil test coefficient is obtained by calculation based on the input observation condition factors. The measurement condition factors are such as oil acidity, oil-water, and oil decomposition. These input oil test factors are input into the modifier and combined into a final oil test coefficient. The maximum score of the oil test sub-modifier is 10. The oil test coefficient is calculated based on the input observation condition factors using the following formula: Oil test score = 80 × oil-water score + 125 × acidity score + 80 × decomposition score. The oil-water score, acidity score, and decomposition score can be obtained by referring to Table 2. According to the final oil test score, the oil test coefficient and the minimum score of the oil test sub-modifier can be obtained by combining Table 3.

[0067] Table 2. Oil test score table

[0068] Moisture content (ppm) Acidity (mgKOH / g) Decomposition strength (KV) score -0.01-15 / 50-10000 0 15-30 -0.01-0.15 40-50 2 30-40 0.15-0.30 30-40 4 40-50 0.30-0.50 / / 50-10000 0.50-10000 -0.01-30 10

[0069] Table 3, Oil test coefficient query table

[0070]

[0071] The DGA test modifier mainly detects the content of dissolved gas in oil. It also includes DGA test coefficient, DGA test sub-modifier maximum score and DGA test sub-modifier minimum score. The DGA test coefficient is calculated based on the input observation condition factors. The measurement condition factors are such as hydrogen content, methane content, acetylene content, ethylene content, ethane content, etc. These input measurement condition factors are input into the modifier to combine into a final DGA test coefficient. The maximum score of the DGA test sub-modifier is 10.

[0072] The DGA test coefficient and the minimum score of the DGA test sub-modifier are obtained according to the following formula:

[0073] Calculate the current DGA test score = 50 × hydrogen score + 30 × methane score + 30 × ethylene score + 30 × ethane score + 120 × acetylene score;

[0074]

[0075] The DGA test coefficient can be obtained by referring to Table 3 according to the changes in DGA test scores;

[0076] DGA test sub-modifier minimum score = current DGA test score ÷ 220.

[0077] Table 4. DGA test coefficient query table

[0078]

[0079]

[0080] The MMI algorithm is used to combine the above input observation condition coefficients, measurement condition sub-coefficients, oil test coefficients and DGA test coefficients to obtain a final operating condition score parameter F h For example, when there is a factor greater than 1, Var1 = the largest factor, Var2 = the sum of the values ​​of all factors - 1 > 0, Var3 = Var2 / division factor 1; thus, the operation status score parameter = Var1 + Var3 is calculated; when all factors are less than or equal to 1, Var1 = the smallest factor, Var2 = the second smallest factor, Var3 = (Var2-1) / division factor 2; thus, the operation status score parameter = Var1 + Var3 is calculated. Where, division factor 1 and division factor 2 are both constants 2.

[0081] Step 5: Calculate the predicted aging rate β2

[0082] The predicted aging rate β2 is obtained from the current operating score and the age of the transformer using the following formula:

[0083]

[0084] When the current running status score H c >0.5, the current operating status score is H c =0.5, then β2=β1, where age is the current life of the transformer, and β2≤2×β1.

[0085] Step 6: Calculate the future health score

[0086] The calculation is done using the following formula:

[0087]

[0088] Where T is the number of years in the future, r is the aging reduction coefficient, β2 is the predicted aging rate, and H F No more than 15.

[0089] Step 7: H F Substitute into the formula: Calculate the failure probability of the transformer. The health status of the transformer can be obtained based on the calculated PoF value. The smaller the value, the better the transformer operation status.

[0090] Step 8. Classify the corresponding transformers according to the final PoF values. For example, the operating conditions of the transformers are classified from low to high into five categories: H1 (0.5 to 3), H2 (3 to 5.5), H3 (5.5 to 6.5), H4 (6.5 to 8), and H5 (8 to 15). The maintenance strategy of H1 may be that no maintenance is required within 5 years, the maintenance strategy of H2 may be regular maintenance within 5 years, the maintenance strategy of H3 may be regular replacement within 5 years, H4 may require comprehensive maintenance of the transformer, and H5 may require replacement of a new transformer.

[0091] The present invention proposes a transformer inspection and maintenance management method. When calculating the failure probability of the transformer, the position, duty cycle, observation conditions, measurement conditions, oil test and DGA test of the transformer are taken into consideration for transformer inspection and maintenance, so that the evaluation of the failure probability of the transformer is more comprehensive and accurate. Based on a more comprehensive and accurate transformer failure evaluation method, the failure probability of the transformer can be accurately obtained, so that an inspection and maintenance strategy can be accurately formulated according to the failure probability, effectively improving the operating reliability of the transformer, reducing the equipment operation and maintenance costs, and bringing greater economic benefits.

[0092] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A transformer maintenance management method, It is characterized in that The failure probability of the transformer is evaluated, and a maintenance strategy is formulated according to the failure probability of the transformer. The failure probability calculation method of the transformer includes: Step 1: Obtain the expected life t of the transformer according to the normal expected life of the transformer; Step 2: Calculate the initial aging rate β of the transformer 1 ; Step 3: According to the initial aging rate β of the transformer 1 Calculate the initial operating rating of the transformer; Step 4: Calculate the current running score based on the initial running score; Step 5: Calculate the predicted aging rate β based on the current running score 2 ; Step 6: According to the predicted aging rate β 2 Calculate the future health score H F ; Step 7: Score the future operation status H F Substitute into the formula: Calculate the failure probability of the transformer.

2. The transformer maintenance management method according to claim 1, It is characterized in that According to the formula: Calculate the expected lifetime t, where D is the duty cycle and L is the location factor.

3. The transformer maintenance management method according to claim 2, It is characterized in that The location coefficient L includes a distance factor from the coast, an altitude factor, and a corrosion factor; wherein the determination of the location coefficient L includes: If the maximum value of the distance factor from the coast, the altitude factor, and the corrosion factor is greater than 1, the location coefficient is calculated using the following formula: INC is the incremental constant of the transformer, INC = 0.05; d is the distance factor from the coast, a is the altitude factor, and c is the corrosion factor; If the maximum values ​​of the distance factor from the coast, the altitude factor, and the corrosion factor are not greater than 1, the location coefficient is calculated using the following formula: L = MIN (d, a, c), INC is the incremental constant of the transformer, INC = 0.05; d is the distance factor from the coast, a is the altitude factor, and c is the corrosion factor; When the maximum utilization rate of the transformer is less than or equal to 50%, the duty cycle D is 1; when the maximum utilization rate of the transformer is greater than 50% and less than or equal to 70%, the duty cycle D is 1.05; when the maximum utilization rate of the transformer is greater than 70% and less than or equal to 100%, the duty cycle D is 1.1; when the maximum utilization rate of the transformer is greater than 100%, the duty cycle is 1.

4.

4. The transformer inspection, maintenance and management method according to claim 3, It is characterized in that Determine the initial aging rate β of the transformer according to the following formula 1 , Among them, H new is the new operating condition score of the transformer, which is 0.5; H t Yes is the operating score when the asset reaches the end of its expected life, which is 5.

5.

5. The transformer inspection, maintenance and management method according to claim 4, It is characterized in that The initial run score is calculated according to the following formula H new is the new operating status score of the transformer, which is 0.5; the initial operating score H i The upper limit is 5.5; age is the age of the current transformer.

6. The transformer inspection, maintenance and management method according to claim 5, It is characterized in that The initial operation score is modified according to the operation status score modifier and the reliability modifier to obtain the current operation score of the transformer; The current operation status score is calculated as follows: c =H i ×F h ×F r , where Fh is the running status score parameter, F r is the reliability scoring parameter, F r The value ranges from 0.6 to 1.5, and the default value is 1; First, if the calculated health score is less than the maximum health score, the health score H c is the calculated value; if the calculated health score is greater than the maximum health score, the health score H c = Maximum health score, the maximum health score is 10; Then, compare the current health score H c and the minimum reliability score and the minimum health score. If the calculated health score is less than the minimum health score and the minimum reliability score, then the health score H c =0.

5.

7. The transformer inspection, maintenance and management method according to claim 6, It is characterized in that The transformer operation condition score modifier is composed of a plurality of sub-modifiers, which are: an observation condition sub-modifier, a measurement condition sub-modifier, an oil test modifier and a DGA test modifier; The observation condition modifier includes an observation condition coefficient, an observation condition sub-modifier maximum score, and an observation condition sub-modifier minimum score; The observation condition coefficient is obtained according to the input observation condition factor and the MMI algorithm. The observation condition factor includes: input transformer external condition, radiator condition, bushing condition, cable condition, input the input observation condition factor into the modifier, and use the MMI technology to combine multiple factors into a final observation condition coefficient. The maximum score of the observation condition sub-modifier is 10, and the minimum score of the observation condition sub-modifier is 0.5; The measurement condition sub-modifier includes a measurement condition coefficient, a maximum score of the measurement condition sub-modifier, and a minimum score of the measurement condition sub-modifier; wherein the measurement condition coefficient is obtained according to the input observation condition factor and through the MMI algorithm, and the measurement condition factor includes a partial discharge test and a temperature detection, and these input observation condition factors are input into the modifier, and the MMI technology is used to combine multiple factors into a final observation condition coefficient, the maximum score of the measurement condition sub-modifier is 10, and the minimum score of the measurement condition sub-modifier is 0.5; The oil test modifier includes an oil test coefficient, a maximum score of the oil test sub-modifier, and a minimum score of the oil test sub-modifier, wherein the oil test coefficient is obtained by calculation based on the input observation condition factors, and the measurement condition factors include: oil acidity, oil-water, and oil decomposition. The maximum score of the oil test sub-modifier is 10. The oil test coefficient and the minimum score of the oil test sub-modifier are obtained based on the final oil test score, and the oil test score = 80 × oil-water score + 125 × acidity score + 80 × decomposition score; The DGA test modifier includes the DGA test coefficient, the maximum score of the DGA test sub-modifier and the minimum score of the DGA test sub-modifier. The DGA test coefficient is obtained by calculation based on the input observation condition factors. The measurement condition factors include: hydrogen content, methane content, acetylene content, ethylene content, and ethane content. These input measurement condition factors are input into the modifier to combine into a final DGA test coefficient. The maximum score of the DGA test sub-modifier is 10. The DGA test coefficient and the minimum score of the DGA test sub-modifier are obtained according to the following formula. The current DGA test score is calculated as 50×hydrogen score + 30×methane score + 30×ethylene score + 30×ethane score + 120×acetylene score. Get the DGA test coefficient according to the change of DGA test score, the minimum score of DGA test sub-modifier = current DGA test score ÷ 220; Finally, the MMI algorithm is used to combine the above input observation condition coefficients, measurement condition sub-coefficients, oil test coefficients and DGA test coefficients to obtain a final operating condition score parameter F h .

8. The transformer inspection, maintenance and management method according to claim 7, It is characterized in that The following formula is used to calculate the predicted aging rate β 2 : When the current running status score H c >0.5, the current operating status score is H c =0.5, at this time β 2 =β 1 , where age is the current life of the transformer, and β 2 ≤2×β 1 .

9. The transformer inspection, maintenance and management method according to claim 8, It is characterized in that The future health score is calculated using the following formula: Among them, T is the number of years in the future, r is the aging reduction coefficient, β 2 To predict the aging rate, and HF does not exceed 15.

10. The transformer inspection, maintenance and management method according to claim 9, It is characterized in that H F Substitute into the formula: Calculate the failure probability of the transformer, and the health status of the transformer can be obtained based on the calculated PoF value. The smaller the value, the better the operating condition of the transformer.