Cooler for transformer, on-line replacement method of cooler and railway vehicle
The cooler design with detachable connections and controlled vacuum process enables efficient and safe online replacement of EMU traction transformer coolers, addressing the inefficiencies of traditional methods.
Patent Information
- Application Number
- CN202411291616.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-12-03
AI Technical Summary
The existing method for replacing a failed cooler in an EMU traction transformer requires disassembling the entire transformer and cooler structure, leading to a long replacement cycle, high cost, and resource occupation, with complications in transportation and installation.
A cooler design with detachable connections, venting and liquid injection/discharge joints, and a controlled vacuum process allows for independent coolant management, enabling safe and efficient online replacement.
Facilitates quick and safe cooler replacement, reducing the replacement cycle, cost, and resource occupation, while ensuring safety and efficient coolant management.
Smart Images

Figure CN119069218A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a cooler for a transformer and an online replacement method thereof, and a rail vehicle, and belongs to the field of rail vehicle transformers. Background Art
[0002] The EMU traction transformer is installed on the train and converts the 25kV high voltage electricity of the contact network into various low voltage electricity required by the traction system and auxiliary systems. It is a power transformer with a special voltage level. It must meet the requirements of drastic changes in traction load. At the same time, it must suppress harmonic currents and limit short-circuit currents to ensure the safe, stable and reliable operation of the train's electric transmission system. It is the power source for important functions such as traction, braking, and communication of high-speed EMUs, and is the core and key component of high-speed EMUs.
[0003] The EMU traction transformer has a large line load and needs to meet the requirements of lightweight and miniaturized design, which requires high heat dissipation performance. Therefore, a special cooler is set up for heat dissipation. The existing EMU traction transformer is mainly an oil-immersed transformer. The high-temperature cooling medium in the transformer enters the cooler core through the oil pipe under the action of the oil pump, and exchanges heat with the cooling air in the cooler core (heat exchange core). The cooled cooling medium then flows back to the traction transformer oil tank and exchanges heat with the various components in the oil tank. This cycle is repeated to achieve cooling of the traction transformer.
[0004] In order to meet the requirements of miniaturization and lightness, the cooler 10 and the transformer box 20 of the EMU traction transformer are usually designed in an integrated manner, such as Figure 1 As shown. When the existing EMU traction transformer has a fault such as cooler oil leakage during line operation, the transformer as a whole (i.e., the overall structure of the cooler 10 and the transformer box 20) is usually removed from the vehicle and returned to the factory. After replacing the new cooler, the transformer as a whole is vacuum-filled with oil, and the factory inspection is completed. It is then transported to the vehicle depot for transformer installation and vehicle debugging before it can operate normally again. This type of cooler and replacement method has problems such as long replacement cycle, low efficiency, high cost, complicated process, and high resource occupation. Due to the large overall size and heavy weight of the transformer, the vehicle needs to be transferred to a dedicated workshop and the entire vehicle needs to be emptied before the transformer can be disassembled; the time and cost of transportation to and from the manufacturer are high; the overall vacuum oil filling time of the transformer is long, and the requirements for vacuum pumping equipment are high. Moreover, the overall disassembly and installation of the traction transformer require a long time and more resources for the entire vehicle and the dedicated workshop, which has a certain impact on normal production and operation. Summary of the invention
[0005] The problem to be solved by the present invention is that when a cooler for a transformer in an existing EMU fails, the entire structure including the transformer and the cooler needs to be removed from the vehicle and returned to the factory for repair, which results in a long replacement cycle, low efficiency, high cost, complicated process, and high resource occupation. A cooler for a transformer is provided.
[0006] In order to solve the above technical problem, the technical solution adopted by the present invention is: a cooler for a transformer, wherein the liquid inlet of the cooler (10) is detachably connected to one end of a first valve (30), and the liquid outlet of the cooler (10) is detachably connected to one end of a second valve (40); the other end of the first valve (30) and the other end of the second valve (40) are respectively used to communicate with the coolant outlet and the coolant inlet of the transformer box (20); The cooler (10) is provided with a first venting joint (1) for communicating with the outside atmosphere, a second venting joint (2) for connecting to a vacuum pump (50), and a liquid injection / discharge joint (3) for connecting to a liquid injection device (60) or discharging liquid in the cooler; The first air venting joint (1), the second air venting joint (2), and the liquid injection / drainage joint (3) are all in communication with the inner cavity of the cooler (10), and the opening of the first air venting joint (1), the opening of the second air venting joint (2), and the opening of the liquid injection / drainage joint (3) are all in a closed state; The first air venting joint (1) and the second air venting joint (2) are installed on the upper part of the cooler, and the liquid injection / liquid discharge joint (3) is installed on the lower part of the cooler (10).
[0007] In the present invention, by providing a first valve and a second valve, and the liquid inlet and the liquid outlet of the cooler (10) are detachably connected to one end of the first valve and one end of the second valve, respectively, when the cooler fails, the first valve and the second valve are turned off, and the coolant channel connecting the cooler and the transformer box can be cut off, that is, the coolant in the cooler and the coolant in the transformer box are independent of each other. By providing a liquid injection / liquid discharge joint, the coolant in the failed cooler can be discharged outward without affecting the coolant in the transformer box after the coolant channel is cut off. The failed cooler can be replaced by disassembling it. By providing a second venting joint and a liquid injection / liquid discharge joint, vacuum can be achieved when the cooler is injected with coolant, and the air in the cooler can be fully discharged when the oil is filled, ensuring the safety of the transformer after the cooler is connected to the transformer box again, and avoiding the safety hazards caused by insufficient gas discharge and the long oil filling cycle. By providing the first venting joint, when the cooler has been filled with coolant to a relatively high level and is not suitable for further vacuuming, the air in the cooler can be discharged into the outside atmosphere through the first venting joint. Considering that air tends to flow upwards and coolant tends to flow downwards, the first venting joint (1) and the second venting joint (2) are installed at the upper part of the cooler, and the liquid injection / drainage joint (3) is installed at the lower part of the cooler (10), thereby facilitating the discharge of air, the discharge of coolant and the injection of coolant.
[0008] Furthermore, the cooler (10) comprises a heat exchange core (4), and a cooling liquid containing chamber (5) arranged adjacent to the heat exchange core (4); the heat exchange core (4) has at least one cooling liquid channel, and each cooling liquid channel is in communication with the cooling liquid containing chamber (5); The liquid inlet and the liquid outlet of the cooler (10) are both located in the cooling liquid containing chamber (5); The first air venting joint (1) and the second air venting joint (2) are installed at the upper part of the coolant containing chamber (5), and the liquid injection / liquid discharge joint (3) is installed at the lower part of the coolant containing chamber (5); The first air venting connector (1), the second air venting connector (2), and the liquid injection / drainage connector (3) are all in communication with the inner cavity of the cooling liquid containing cavity (5).
[0009] Through the above arrangement, the coolant entering the cooler from the liquid inlet enters the coolant channel of the heat exchange core through the coolant receiving chamber, cools the coolant (for example, the coolant in the coolant channel is cooled by a fan or outside air), and then returns to the coolant receiving chamber through the coolant channel outlet. When there are multiple coolant channels (≥2), the coolant receiving chamber also plays a role in mixing the liquids flowing out of each coolant channel to avoid drastic changes in the temperature of the liquid flowing out of the coolant receiving chamber.
[0010] In a preferred technical solution, the first air venting joint (1) and the second air venting joint (2) are arranged on the top surface of the coolant containing chamber (5); and the liquid injection / drainage joint (3) is arranged on the bottom surface of the coolant containing chamber (5).
[0011] The above arrangement facilitates the discharge of air and the discharge and injection of coolant.
[0012] Furthermore, cooling liquid containing chambers (5) connected to the cooling liquid channels of the heat exchange core (4) are provided on both sides of the heat exchange core (4), and the cooling liquid containing chambers (5) on both sides of the heat exchange core (4) are respectively a first cooling liquid containing chamber (51) and a second cooling liquid containing chamber (52); the liquid inlet and the liquid outlet of the cooler (10) are both provided in the first cooling liquid containing chamber (51); Through the above arrangement, the cooling liquid enters one of the cooling liquid containing chambers (5), passes through the heat exchange core (4) to reach another cooling liquid containing chamber, and passes through the heat exchange core (4) again to return to one of the cooling liquid containing chambers, thereby achieving a better heat dissipation effect on the cooling liquid.
[0013] In a preferred technical solution, the second air release connector (2) and the liquid injection / drainage connector (3) are arranged in different coolant containing chambers (5).
[0014] Through the above arrangement, the liquid injection inlet (ie, the liquid injection / discharge joint) and the vacuum outlet (ie, the second air release joint) are located in different cavities, so that the vacuum effect is better.
[0015] In a preferred technical solution, each coolant containing chamber (5) is provided with a first venting connector (1).
[0016] Through the above arrangement, the air in each coolant containing cavity can be effectively discharged to the outside.
[0017] In a preferred technical solution, a partition (510) is arranged in the first cooling liquid containing chamber (51), and the partition (510) divides the inner cavity of the first cooling liquid containing chamber (51) into a first cavity (511) and a second cavity (512) which are independent of each other. The liquid inlet of the cooler (10) is arranged toward the first cavity (511), and the liquid outlet of the cooler (10) is arranged toward the second cavity (512). The liquid inlet of the cooler (10) is connected to the liquid outlet of the cooler (10) through the first cavity (511), the cooling liquid channel arranged in the heat exchange core (4) toward the first cavity (511), the second cooling liquid containing chamber (52), the cooling liquid channel arranged in the heat exchange core (4) toward the second cavity (512), and the second cavity (512) in sequence.
[0018] During the research, the applicant found that when cooling liquid cavities are respectively set on both sides of the heat exchange core, and the liquid inlet and liquid outlet of the cooler are both set in the first cooling liquid accommodating cavity, it is necessary to form a cooling liquid channel from the first cooling liquid accommodating cavity to the second cooling liquid accommodating cavity in the heat exchange core, and it is also necessary to form a cooling liquid channel from the second cooling liquid accommodating cavity to the first cooling liquid accommodating cavity, so that the cooling liquid can pass through the heat exchange core twice to achieve a better heat dissipation effect. However, in the prior art, after the liquid injection is completed, the liquid in the cooler does not form a circulation flow. When the first valve and the second valve are opened, the liquid entering from the liquid inlet tends to choose a path with lower pressure, that is, forming a flow path of liquid inlet→first cooling liquid accommodating cavity→liquid outlet, and cannot enter the second cooling liquid accommodating cavity through the heat exchange core, resulting in poor heat dissipation effect on the liquid, and the advantage of setting cooling liquid accommodating cavities on both sides of the heat exchange core cannot be effectively utilized.
[0019] Through the above preferred technical solution, when the transformer box and the cooler are in oil circulation as a whole, the liquid entering the first cooling liquid holding chamber from the liquid inlet can only flow through the first cavity to the cooling liquid channel of the heat exchange core, thereby forming a liquid flow path of the liquid inlet, the first cavity, the cooling liquid channel arranged in the heat exchange core toward the first cavity, the second cooling liquid holding chamber, the cooling liquid channel arranged in the heat exchange core toward the second cavity, the second cavity, and the liquid outlet, thereby achieving a better heat dissipation effect for the liquid. Moreover, through the above arrangement, when liquid is injected using the injection / drainage joint, the injection / drainage joint, the first cavity, the cooling liquid channel arranged in the heat exchange core toward the first cavity, the second cooling liquid holding chamber, the cooling liquid channel arranged in the heat exchange core toward the second cavity, and the liquid flow path of the second cavity are formed, and the injection of cooling liquid into the first cavity and the second cavity can be completed at one time.
[0020] In a more preferred technical solution, the cooling liquid channel comprises at least one first cooling liquid channel (43) arranged toward the first cavity (511) and at least one second cooling liquid channel (44) arranged toward the second cavity (512); each first cooling liquid channel (43) and each second cooling liquid channel (44) connect the first cooling liquid receiving cavity (51) and the second cooling liquid receiving cavity (52); the cooler further comprises a channel valve for opening / closing each second cooling liquid channel (44); the liquid injection / drainage joint (3) is arranged in the first cooling liquid receiving cavity (51), and the second air release joint (2) is arranged in the second cooling liquid receiving cavity (52).
[0021] In the present invention, by setting a channel valve in the second coolant channel, each second coolant channel can be closed during the process of starting the injection, that is, the liquid entering the first coolant receiving chamber only enters the second coolant receiving chamber through each first coolant channel. When the liquid in the second coolant receiving chamber reaches a certain height, each second coolant channel is opened again, and the injection continues. At this time, the liquid in the second coolant receiving chamber enters the second cavity of the first coolant receiving chamber through each second coolant channel, and the liquid level in the second coolant receiving chamber will also drop, so that the flow path of the first cavity → each first coolant channel → second coolant receiving chamber → each second coolant channel → second cavity can be realized. Through the above arrangement, when the first valve and the second valve are opened later, a certain flow cycle has been formed in the cooler, so that it is convenient to form an overall oil circuit cycle after the oil circuits of the transformer box and the cooler are connected.
[0022] Furthermore, the heights of the inner cavity top surface (4A) of the heat exchange core, the inner cavity top surface of the cooling liquid containing cavity provided with the first venting joint (1), and the inner cavity top surface (1A) of the first venting joint are successively increased; the heights of the inner cavity top surface (4A) of the heat exchange core, the inner cavity top surface of the cooling liquid containing cavity provided with the second venting joint (2), and the inner cavity top surface (2A) of the second venting joint are successively increased; The heights of the inner cavity bottom surface (4B) of the heat exchange core, the inner cavity bottom surface (5B) of the cooling liquid receiving cavity provided with the liquid injection / drainage joint (3), and the inner cavity bottom surface (3B) of the liquid injection / drainage joint are successively reduced.
[0023] Since air tends to flow to a higher position and liquid tends to flow to a lower position, the above arrangement facilitates the exhaustion of air in the inner cavity as fully as possible and helps to exhaust the coolant as fully as possible, thus avoiding the phenomenon of air collection and liquid residue at local high points affecting the normal operation of the transformer.
[0024] Furthermore, the cooler also includes a liquid level sensor for measuring the liquid level in the cooling liquid containing chamber (5), and the output end of the liquid level sensor and the control end of the vacuum pumping device (50) are both electrically connected to the controller.
[0025] The controller is used to shut down the vacuum device when the output end of the liquid level sensor outputs a first set height (i.e., when the liquid level in the cooler cavity reaches the first set height). Through the above arrangement, when the liquid level reaches a preset value, the vacuum device (50) can be shut down, thereby preventing the vacuum device (50) from pumping out the coolant.
[0026] Furthermore, the first venting joint (1) comprises a first screw sleeve (15) mounted on the cooler and a first connecting piece (13); the inner cavity of the first screw sleeve (15) is connected to the inner cavity of the cooler (10); the first connecting piece (13) cooperates with the inner thread of the first screw sleeve (15), thereby closing the opening of the first screw sleeve (15) or connecting the inner cavity of the first screw sleeve (15) to the external atmosphere. The first connecting piece (13) comprises a head (131) for closing the opening of the first screw sleeve, and an external threaded rod (132) for cooperating with the internal thread of the first screw sleeve, and a first air flow channel (133) is provided on the external threaded rod (132) for connecting the inner cavity of the first screw sleeve to the external atmosphere when the head (131) is not in contact with the first screw sleeve.
[0027] The second venting joint (2) comprises a second screw sleeve mounted on the cooler and a second connecting piece (23) for connecting to a vacuum extraction device (50); the inner cavity of the second screw sleeve is communicated with the inner cavity of the cooler (10); and the second connecting piece (23) is matched with the inner thread of the second screw sleeve.
[0028] The injection / drainage joint (3) comprises a third screw sleeve installed on the cooler, and a third connecting piece used to connect to a liquid injection device or to close an opening of the third screw sleeve; the inner cavity of the third screw sleeve is communicated with the inner cavity of the cooler (10); and the third connecting piece cooperates with the inner thread of the third screw sleeve.
[0029] Through the above arrangement, the first connecting member cooperates with the inner thread of the first screw sleeve, so that when tightened, the opening of the first screw sleeve is closed, and when the first connecting member is twisted so that there is a gap between the head and the first screw sleeve, the first air flow channel can connect the inner cavity of the first screw sleeve with the external atmosphere. When the first connecting member is twisted so that the head and the first screw sleeve are in close contact, the opening of the first screw sleeve can be closed, so that the inner cavity of the first screw sleeve is not connected with the external atmosphere.
[0030] In a preferred technical solution, at least one of the first screw sleeve, the second screw sleeve, and the third screw sleeve comprises an aluminum sleeve mounted on the cooler and a steel sleeve fixedly mounted on the inner side of the aluminum sleeve, wherein an internal thread matching with a corresponding connecting piece (the first connecting piece, the second connecting piece, or the third connecting piece) is formed on the inner side of the steel sleeve; the cooler (10) is made of aluminum, and the corresponding connecting piece is made of steel.
[0031] By providing an aluminum sleeve and a steel sleeve fixedly installed inside the aluminum sleeve, the aluminum sleeve can be made of the same material as the cooler for easy matching, and by using the steel sleeve and corresponding connecting parts, the bolts can be prevented from being easily bitten and broken when twisting traditional steel screws and aluminum screw seats.
[0032] In a preferred technical solution, the second connecting piece is a quick connector.
[0033] In a preferred technical solution, the third connecting member comprises a fastener (33) for closing the opening of the third screw sleeve and a quick connector for connecting to the injection device, and the inner thread of the third screw sleeve can be switchably connected to the quick connector and the fastener (33); more preferably, the fastener (33) comprises a fastener head (331) for closing the opening of the third screw sleeve and a fastener outer threaded rod (332) for matching with the inner thread of the third screw sleeve, and the fastener outer threaded rod (332) is provided with a second air flow channel for connecting the inner cavity of the third screw sleeve with the external atmosphere when the fastener head (331) is not in contact with the third screw sleeve.
[0034] Through the above arrangement, when the fastener is screwed so that there is a gap between the fastener head and the third screw sleeve, the second air flow channel can connect the inner cavity of the third screw sleeve with the external atmosphere, thereby discharging the coolant in the inner cavity of the cooler. When the fastener is screwed so that the fastener head is in close contact with the third screw sleeve, the opening of the third screw sleeve can be closed, so that the inner cavity of the third screw sleeve is not connected with the external atmosphere, so that the coolant cannot flow out.
[0035] According to the same inventive concept, the present invention also provides a rail vehicle, comprising the above-mentioned cooler, wherein the transformer is a traction transformer of the rail vehicle.
[0036] According to the same inventive concept, the present invention also provides an online replacement method for a cooler, characterized in that: the cooler is the above-mentioned cooler; The online replacement method comprises: (S1) closing the first valve (30) and the second valve (40); (S2) disconnecting the replaced cooler from the first valve (30) and the second valve (40), and disassembling the replaced cooler; (S3) connecting the liquid inlet of the replaced cooler (10) to one end of the first valve (30), and connecting the liquid outlet of the replaced cooler (10) to one end of the second valve (40); (S4) connecting the second air release joint (2) to the vacuum pumping device (50), with the first air release joint (1) and the liquid injection / discharge joint (3) both in a closed state, and starting the vacuum pumping device (50); (S5) When the vacuum degree of the inner cavity of the cooler (10) reaches a set vacuum degree, the liquid injection device (60) is connected to the liquid injection / liquid discharge joint (3), and liquid is injected into the cooler (10) at a first liquid injection speed; (S6) When the liquid level in the inner cavity of the cooler (10) reaches a first set height, the vacuum pumping device (50) is turned off, and the second air release connector (2) is changed from an open state to a closed state; (S7) injecting liquid into the cooler (10) at a second injection speed, while changing the opening of the first venting joint (1) from a closed state to an open state, until the injection is completed, wherein the second injection speed is lower than the first injection speed; (S8) After the injection is completed, the first venting joint (1) is changed from an open state to a closed state; (S9) Open the first valve (30) and the second valve (40).
[0037] By means of the above technical solution, the connection between the inner cavity of the cooler and the inner cavity of the transformer box can be cut off by closing the first valve (30) and the second valve (40), and the first venting joint (1) and the injection / discharge joint (3) can be opened to discharge the liquid in the cooler, and then the cooler can be replaced. After replacing the cooler, vacuuming is first performed by a vacuuming device, and then oil is injected. When the liquid level in the inner cavity of the cooler (10) reaches a first set height, if vacuuming is continued, the coolant may be extracted. Therefore, the vacuuming device is closed, and then the first venting joint is opened to discharge the air in the inner cavity to the outside atmosphere through the first venting joint, and then the injection is continued until the injection is completed. For example, if coolant flows out of the first venting joint, it is determined that the injection is completed. When the liquid level is high, the liquid is injected at a lower second injection speed to avoid injecting too quickly. Preferably, between the operation of closing the first valve (30) and the second valve (40) and the operation of disassembling the replaced cooler, the first venting joint (1) and the injection / discharge joint (3) are opened to discharge the liquid in the cooler.
[0038] Furthermore, the cooler (10) comprises a heat exchange core (4), a cooling liquid containing chamber (5) arranged adjacent to the heat exchange core (4), the heat exchange core (4) having at least one cooling liquid channel, each cooling liquid channel being in communication with the cooling liquid containing chamber (5); the liquid inlet and the liquid outlet of the cooler (10) are both located on the cooling liquid containing chamber (5); the inner cavity top surface (4A) of the heat exchange core, the inner cavity top surface of the cooling liquid containing chamber provided with the first venting joint (1), and the inner cavity top surface (1A) of the first venting joint are located at heights increasing in sequence; The first venting joint (1) comprises a first screw sleeve (15) mounted on the cooler and a first connecting piece (13); the inner cavity of the first screw sleeve (15) is connected to the inner cavity of the cooler (10); the first connecting piece (13) cooperates with the inner thread of the first screw sleeve (15) to close the opening of the first screw sleeve (15) or connect the inner cavity of the first screw sleeve (15) to the external atmosphere; the first connecting piece (13) comprises a head (131) for closing the opening of the first screw sleeve (15), and an external threaded rod (132) cooperating with the internal thread of the first screw sleeve (15); the external threaded rod (132) is provided with a first air flow channel (133) for connecting the inner cavity of the first screw sleeve (15) to the external atmosphere when the head (131) is not in contact with the first screw sleeve (15); The first air flow channel (133) has a channel section opening (1333) formed on the outer wall of the external threaded rod (132); In the step (S7), the step of changing the opening of the first venting connector (1) from a closed state to an open state is specifically: (S71) twisting the first connecting member (13), and when the ratio of the length of the portion of the first projection that does not overlap with the second projection to the length of the first projection reaches a preset ratio p1, stopping twisting the first connecting member (13) until the stop time reaches a preset time t1; (S72) When the stop time reaches the preset time t1, continue to twist the first connecting member (13) until the ratio of the length of the portion of the first projection that does not overlap with the second projection to the length of the first projection is 1; Wherein, p1∈[1 / 4, 1 / 2]; the first projection is the projection of the channel section opening (1333) on the axis of the external threaded rod (132), and the second projection is the projection of the first screw sleeve (15) on the axis of the external threaded rod (132).
[0039] The applicant found during research that when exhausting air using the first venting joint, the air content in the cooler may not be high. If the opening of the first venting joint is directly set to the maximum, coolant may flow out of the first venting joint in a short time, causing certain pollution to the equipment. In addition, some air may still be mixed in the liquid. If the exhaust is too fast through the first venting joint, coolant may flow out of the first venting joint before the air mixed in the liquid flows out, so that the first venting joint can only be closed, and the air mixed in the liquid cannot be fully discharged. Through the above technical solution, the first connecting piece is turned, and when the ratio of the length of the part of the first projection that does not overlap with the second projection to the length of the first projection reaches a preset ratio p1 (the value range of p1 is [1 / 4, 1 / 2]), the first connecting piece (13) is stopped from being turned until the stop time reaches the preset time t1. Within this preset time t1, a certain amount of time can be reserved so that the air mixed in the oil can flow to the top surface of the inner cavity of the first venting joint at the highest height, thereby making the exhaust more sufficient.
[0040] In the preferred technical solution, when the ratio reaches a preset ratio p1 (i.e. when deflated), the channel section opening (1333) is located at the top of the first airflow channel (133). Through the above arrangement, the airflow of the first airflow channel (133) flows upward through the channel section opening located at the top, thereby facilitating the discharge of the airflow.
[0041] In a preferred technical solution, the cooler (10) comprises a heat exchange core (4), a cooling liquid receiving chamber (5) arranged adjacent to the heat exchange core (4), the heat exchange core (4) having at least one cooling liquid channel; a first venting joint (1) and a second venting joint (2) are mounted on the upper portion of the cooling liquid receiving chamber (5), and a liquid injection / draining joint (3) is mounted on the lower portion of the cooling liquid receiving chamber (5); the first venting joint (1), the second venting joint (2), and the liquid injection / draining joint (3) are all in communication with the inner cavity of the cooling liquid receiving chamber (5); cooling liquid receiving chambers (5) in communication with the cooling liquid channels of the heat exchange core (4) are arranged on both sides of the heat exchange core (4); the second venting joint (2) and the liquid injection / draining joint (3) are arranged in different cooling liquid receiving chambers (5); The cooling liquid containing chambers (5) on both sides of the heat exchange core (4) are respectively a first cooling liquid containing chamber (51) and a second cooling liquid containing chamber (52); the liquid injection / drainage joint (3) is installed at the lower part of the first cooling liquid containing chamber (51), and the second air release joint (2) is installed at the upper part of the second cooling liquid containing chamber (52); the liquid inlet and the liquid outlet of the cooler (10) are both arranged in the first cooling liquid containing chamber (51); A partition (510) is provided in the first cooling liquid containing chamber (51), and the partition (510) divides the inner cavity of the first cooling liquid containing chamber (51) into a first cavity (511) and a second cavity (512) which are independent of each other; The liquid inlet of the cooler (10) is arranged toward the first cavity (511), and the liquid outlet of the cooler (10) is arranged toward the second cavity (512), and the liquid inlet of the cooler (10) is connected to the liquid outlet of the cooler (10) in sequence through the first cavity (511), the cooling liquid channel arranged in the heat exchange core (4) toward the first cavity (511), the second cooling liquid containing cavity (52), the cooling liquid channel arranged in the heat exchange core (4) toward the second cavity (512), and the second cavity (512); The cooling liquid channel comprises at least one first cooling liquid channel (43) arranged toward the first cavity (511) and at least one second cooling liquid channel (44) arranged toward the second cavity (512), each first cooling liquid channel (43) and each second cooling liquid channel (44) connecting the first cooling liquid containing cavity (51) and the second cooling liquid containing cavity (52); In the process of starting the vacuum extraction device (50) until the vacuum degree of the inner cavity of the cooler (10) reaches a set vacuum degree, each of the first cooling liquid channels (43) and each of the second cooling liquid channels (44) are in an open state; Wherein, the step (S5) further comprises: before injecting liquid into the cooler (10) at a first injection speed, changing each second cooling liquid channel (44) from an open state to a closed state; when the liquid level in the second cooling liquid receiving chamber (52) reaches a second set height, changing each second cooling liquid channel (44) from a closed state to an open state; the second set height is higher than the height of each first cooling liquid channel (43) and higher than the height of each second cooling liquid channel (44); Wherein, in the step (S6), the liquid level in the inner cavity of the cooler (10) reaches the first set height, which means that the liquid level in the first cooling liquid containing cavity (51) and the liquid level in the second cooling liquid containing cavity (52) both reach the first set height; and the first set height is not lower than the second set height; Preferably, the first cavity (511) is located below the second cavity (512); Preferably, the partition (510) extends in the height direction of the first cooling liquid containing cavity (51), and the first cavity (511) and the second cavity (512) are located on both sides of the partition (510). The second set height may be the same as the first set height, and those skilled in the art may also set the size relationship between the two according to actual needs.
[0042] In the present invention, when performing the vacuuming and liquid injection operations in step (S5), each second coolant channel can be closed and only each first coolant channel can be opened. Since the second venting joint (2) and the liquid injection / drainage joint (3) are arranged in different coolant receiving chambers, the coolant in the first cavity of the first coolant receiving chamber that enters from the liquid injection / drainage joint enters the second coolant receiving chamber through the first coolant channel under the negative pressure of the vacuuming device. When the liquid level in the second coolant receiving chamber reaches the second set height, each first coolant channel can be opened, and at this time, the liquid in the second coolant receiving chamber enters the second cavity of the first coolant receiving chamber through each second coolant channel, and the liquid level in the second coolant receiving chamber also drops. The vacuuming and liquid injection operations are continued until the liquid level in the second coolant receiving chamber reaches the first set height, at which time the vacuuming device is closed to prevent the coolant from being drawn in. After the vacuum device is turned off, the operations in steps (S6) and (S7) need to be performed, that is, the second venting joint is closed and the first venting joint is opened, and the liquid injection is continued at the second injection speed. At this time, the flow path of the liquid is still the first cavity → each first coolant channel → second coolant receiving cavity → each second coolant channel → second cavity. Through the above settings, when the first valve and the second valve are opened later, a certain flow cycle has been formed in the cooler, so that after the oil circuits of the transformer box and the cooler are connected, an overall oil circuit cycle is formed.
[0043] The advantages and positive effects of the present invention are as follows: the present invention proposes an online replaceable cooler, which can realize online replacement of the cooler quickly and safely. Compared with the existing technology in which the transformer is taken off the vehicle and returned to the factory for repair due to cooler failure, the replacement cycle can be shortened, the replacement efficiency can be improved, the transportation, replacement, commissioning and other costs can be reduced, and the occupation of vehicle and depot resources can be reduced. Compared with the traditional normal pressure oil filling method, the present invention can fully discharge the air in the cooler to ensure the safety of the transformer, avoid the safety hazards and long cycle caused by insufficient gas discharge, and there is no need to lift the oil filling equipment to a very high height, which saves operating space, reduces the requirements for the operating environment, and increases the operability on site. It has the characteristics of short replacement cycle, high efficiency, low cost and high safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0045] Figure 1 It is a top view schematic diagram of the connection structure between the transformer box and the cooler in the prior art; Figure 2 is a top view schematic diagram of the connection structure between the cooler and the transformer box according to Embodiment 1 of the present invention; Figure 3 yes Figure 2 A front view of the connection between the intercooler and the first valve and the second valve; Figure 4 yes Figure 3 Front view of the connection between the middle cooler and the vacuum pumping device and the liquid injection equipment; Figure 5 yes Figure 2 A top view schematic diagram of the connection between the intercooler and the first valve and the second valve; Figure 6 is from Figure 3 A schematic diagram of the side view of the cooler seen from the direction A in the middle; Figure 7 is from Figure 3 A schematic diagram of the side view of the cooler seen from the direction B in the middle; Figure 8 yes Figure 2 A schematic cross-sectional view of a first venting connector connected to a cooler receiving chamber, wherein the section line of the fastener head is not shown; Figure 8 (a) Yes Figure 8 A schematic diagram of a first projection and a second projection on the axis of the external threaded rod when the first connecting member closes the opening of the first screw sleeve; Figure 8 (b) Yes Figure 8 A schematic diagram of the first projection and the second projection on the axis of the external threaded rod when the first connecting member is moved to a point where the ratio of the length of the portion of the first projection that does not overlap with the second projection to the length of the first projection is 1 / 3; Figure 8 (c) Yes Figure 8 A CC sectional view of the first connecting member; Fig. 9 yes Figure 2 A cross-sectional schematic diagram of a second venting connector connected to the cooler accommodating chamber; Fig.10 yes Figure 2 A cross-sectional schematic diagram of a liquid injection / drainage joint connected to a cooler receiving chamber; Fig.11 It is a front view of the cooler of Example 2 of the present invention connected with the first valve and the second valve, wherein the arrangement positions of the first venting joint, the second venting joint, and the liquid injection / drainage joint are shown; Fig.12 is a front view of the cooler connected to the first valve and the second valve according to Embodiment 3 of the present invention; Fig.13is a rear view of the cooler connected to the first valve and the second valve according to Embodiment 3 of the present invention; Fig.14 is a top view of the cooler connected to the first valve and the second valve according to Embodiment 3 of the present invention; Fig.15 yes Fig.14 DD cross-sectional diagram; Fig.16 is a front view of the cooler connected to the first valve and the second valve according to Embodiment 4 of the present invention; Fig.17 yes Fig.16 EE cross-sectional diagram.
[0046] In the above drawings: cooler 10, transformer box 20, first valve 30, second valve 40, vacuum device 50, liquid injection equipment 60, first venting joint 1, second venting joint 2, liquid injection / drainage joint 3, heat exchange core 4, first coolant channel 43, second coolant channel 44, partition 510, coolant accommodating chamber 5, first coolant accommodating chamber 51, second coolant accommodating chamber 52, first cavity 511, second cavity 512, inner cavity top surface 4A of heat exchange core, inner cavity bottom surface 4B of heat exchange core, inner cavity top surface 5A of coolant accommodating chamber, inner cavity bottom surface 5B of coolant accommodating chamber, inner cavity top surface 1A of first venting joint, inner cavity of second venting joint Top surface 2A, inner cavity bottom surface 3B of injection / drainage joint, first aluminum sleeve 11, first steel sleeve 12, first connecting piece 13, head 131, external threaded rod 132, first air flow channel 133, first sealing ring 14, first screw sleeve 15, second aluminum sleeve 21, second steel sleeve 22, second connecting piece 23, second sealing ring 24, protective sleeve 25, third aluminum sleeve 31, third steel sleeve 32, fastener 33, fastener head 331, fastener external threaded rod 332, third sealing ring 34, first pipeline 101, second pipeline 102, third pipeline 201, fourth pipeline 202, external threaded rod axis L1, first projection R-13, second projection R-15. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0048] Example 1 like Figure 2-Figure 10As shown, the present invention provides a cooler for a transformer, wherein the liquid inlet of the cooler 10 is detachably connected to one end of a first valve 30, and the liquid outlet of the cooler 10 is detachably connected to one end of a second valve 40; the other end of the first valve 30 and the other end of the second valve 40 are respectively used to communicate with the coolant outlet and the coolant inlet of the transformer box 20.
[0049] The cooler 10 is provided with a first venting joint 1 for communicating with the external atmosphere, a second venting joint 2 for connecting with a vacuum pump 50, and a liquid injection / draining joint 3 for connecting with a liquid injection device 60 or discharging liquid in the cooler.
[0050] The first vent connector 1, the second vent connector 2, and the injection / drainage connector 3 are all connected to the inner cavity of the cooler 10, and the opening of the first vent connector 1, the opening of the second vent connector 2, and the opening of the injection / drainage connector 3 are all in a closed state.
[0051] The first venting joint 1 and the second venting joint 2 are installed at the upper part of the cooler, and the liquid injection / draining joint 3 is installed at the lower part of the cooler 10 .
[0052] The cooling oil for transformers is mainly used for heat dissipation and insulation. If there is gas in the cooling oil channel of the transformer, the oil's pressure resistance will be reduced, and discharge may occur, which will bring great safety hazards to the operation of the transformer. Therefore, the present invention can better control the gas content in the transformer oil by adopting the method of vacuuming and oil filling at the same time.
[0053] The cooler 10 includes a heat exchange core 4 , which has at least one coolant channel, each of which is connected to a coolant receiving chamber 5 ; a liquid inlet and a liquid outlet of the cooler 10 are both located on the coolant receiving chamber 5 .
[0054] The first vent joint 1 and the second vent joint 2 are installed at the upper part of the coolant accommodating chamber 5 (i.e., the side of the coolant accommodating chamber 5 is higher than half of the height of the coolant accommodating chamber 5, or the top of the coolant accommodating chamber 5), and the filling / draining joint 3 is installed at the lower part of the coolant accommodating chamber 5 (i.e., the side of the coolant accommodating chamber 5 is lower than half of the height of the coolant accommodating chamber 5, or the bottom of the coolant accommodating chamber 5).
[0055] The first air venting connector 1 , the second air venting connector 2 , and the liquid injection / drainage connector 3 are all connected to the inner cavity of the coolant accommodating chamber 5 .
[0056] The cooler also includes a liquid level sensor (not shown) for measuring the liquid level in the cooling liquid receiving chamber 5. The output end of the liquid level sensor and the control end of the vacuum pump 50 are electrically connected to the controller. The controller can be a DSP, a single chip microcomputer or a PLC controller.
[0057] like Figure 8 As shown, the first venting joint 1 has a first screw sleeve installed on the cooler and a first connecting piece 13; the inner cavity of the first screw sleeve is connected to the inner cavity of the cooler 10; the first connecting piece 13 cooperates with the inner thread of the first screw sleeve, thereby closing the opening of the first screw sleeve or connecting the inner cavity of the first screw sleeve to the external atmosphere. When the first venting joint 1 is installed on the side of the coolant receiving chamber 5, the axis of the first screw sleeve is perpendicular to the height direction of the cooler; when the first venting joint 1 is installed on the top of the coolant receiving chamber 5, the axis of the first screw sleeve is parallel to the height direction of the cooler.
[0058] like Fig. 9 As shown, the second venting joint 2 has a second screw sleeve installed on the cooler and a second connecting piece 23 for connecting to the vacuum device 50; the inner cavity of the second screw sleeve is connected to the inner cavity of the cooler 10; the second connecting piece 23 is matched with the inner thread of the second screw sleeve. When the second venting joint 2 is installed on the side of the coolant receiving chamber 5, the axis of the second screw sleeve is perpendicular to the height direction of the cooler; when the second venting joint 2 is installed on the top of the coolant receiving chamber 5, the axis of the second screw sleeve is parallel to the height direction of the cooler.
[0059] like Fig.10 As shown, the injection / drainage joint 3 has a third screw sleeve installed on the cooler, a third connecting piece for connecting with the injection device or for closing the opening of the third screw sleeve; the inner cavity of the third screw sleeve is connected with the inner cavity of the cooler 10; the third connecting piece is matched with the inner thread of the third screw sleeve. When the third venting joint 3 is installed on the side of the coolant receiving chamber 5, the axis of the third screw sleeve is perpendicular to the height direction of the cooler; when the third venting joint 3 is installed at the bottom of the coolant receiving chamber 5, the axis of the third screw sleeve is parallel to the height direction of the cooler.
[0060] In the preferred technical solution, the first screw sleeve 15 includes a first aluminum sleeve 11 installed on the cooler and a first steel sleeve 12 fixedly installed on the inner side of the first aluminum sleeve 11, wherein the first steel sleeve 12 has an internal thread for cooperating with the external threaded rod 132; the cooler 10 is made of aluminum, and the first connecting member 13 is made of steel.
[0061] In the preferred technical solution, the second screw sleeve includes a second aluminum sleeve 21 installed on the cooler and a second steel sleeve 22 fixedly installed on the inner side of the second aluminum sleeve 21, and the second steel sleeve 22 has an internal thread for cooperating with the second connecting member 23; the cooler 10 is made of aluminum, and the second connecting member 23 is made of steel.
[0062] In the preferred technical solution, the third screw sleeve includes a third aluminum sleeve 31 installed on the cooler and a third steel sleeve 32 fixedly installed on the inner side of the third aluminum sleeve 31, wherein the third steel sleeve 32 has an internal thread for cooperating with a third connecting piece; the cooler 10 is made of aluminum, and the third connecting piece is made of steel.
[0063] Preferably, the first connecting member 13 has a head 131 for closing the opening of the first screw sleeve, an external threaded rod 132 matched with the internal thread of the first screw sleeve, and a first air flow channel 133 for connecting the inner cavity of the first screw sleeve with the external atmosphere when the head 131 is not in contact with the first screw sleeve is opened on the external threaded rod 132. The first connecting member 13 can be a screw or a bolt.
[0064] Preferably, the second connecting member can be a quick connector.
[0065] Preferably, the third connecting member includes a fastener 33 for closing the opening of the third screw sleeve and a quick connector for connecting to the injection device, and the inner thread of the third screw sleeve can be switchably connected to the quick connector and the fastener 33. When injection or drainage is required, the inner thread of the third screw sleeve can be connected to the quick connector; when the injection or drainage is completed and the opening needs to be closed, the inner thread of the third screw sleeve is connected to the fastener 33. More preferably, the fastener 33 has a fastener head 331 for closing the opening of the third screw sleeve, a fastener external thread rod 332 for matching with the inner thread of the third screw sleeve, and a second airflow channel for connecting the inner cavity of the third screw sleeve with the external atmosphere when the fastener head 331 is not in contact with the third screw sleeve is provided on the outer thread rod 332. The fastener 33 can be a screw or a bolt. The second airflow channel can adopt a structure similar to the first airflow channel. When the second airflow channel is set, when drainage is required, the fastener 33 can also be loosened to achieve drainage.
[0066] According to the same inventive concept, the present invention also provides a rail vehicle, characterized in that it includes the above-mentioned cooler, and the transformer is a traction transformer of the rail vehicle.
[0067] like Figure 2 As shown, the liquid inlet and the liquid outlet of the cooler are respectively connected to the first pipeline 101 and the second pipeline 102, and the first pipeline 101 and the second pipeline 102 are respectively detachably connected to one end of the first valve 30 and one end of the second valve 40. The other end of the first valve 30 is connected to the coolant outlet of the transformer box 20 through the third pipeline 201, and the other end of the second valve 40 is connected to the coolant inlet of the transformer box 20 through the fourth pipeline 202. Figure 2 The positions of the first pipeline 101, the second pipeline 102, the first valve 30, and the second valve 40 can be adjusted according to actual conditions.
[0068] The online replaceable cooler provided by the present invention is applicable to the field of rail transit traction transformers. The oil cooler can be replaced online without disassembling the traction transformer, which greatly shortens the replacement cycle, reduces the costs of transportation, replacement, and debugging, and reduces the occupation of vehicle and depot resources. At the same time, the cooler can be vacuum-filled with oil separately to avoid the presence of gas in the cooler and the risk of gas entering the transformer, which has the characteristics of short replacement cycle, high efficiency, low cost, and high safety.
[0069] The present invention is further described in detail below. Figure 2-Figure 5 As shown, the present invention provides an online replaceable cooler, which is applicable to the transformer field, including a first venting joint 1, a second venting joint 2, a liquid injection / draining joint 3, a heat exchange core 4, a coolant receiving chamber 5 (also called a coolant manifold), a first valve 30, a first pipeline 101, a second valve 40, and a second pipeline 102. The first venting joint 1 and the second venting joint 2 are located at the upper part of the coolant receiving chamber 5, and the liquid injection / draining joint 3 is located at the lower part of the coolant receiving chamber 5. The first valve 30 and the second valve 40 are connected to the coolant receiving chamber 5 through the first pipeline 101 and the second pipeline 102, respectively, and the cooler 10 is connected to the transformer box 20 through the first valve 30 and the second valve 40. Figure 2 , Figure 3 shown.
[0070] like Figure 6 , Figure 7 As shown, the height relationship between the inner cavity top surface 4A of the heat exchange core, the inner cavity top surface 5A of the coolant receiving chamber, the inner cavity top surface 1A of the first vent joint, and the inner cavity top surface 2A of the second vent joint is: the inner cavity top surface 1A and the inner cavity top surface 2A are both higher than the inner cavity top surface 5A, and the inner cavity top surface 5A is higher than the inner cavity top surface 4A, so that the vent joint is the high point inside the cooler. If there is gas in the cooler and it needs to be discharged, the gas will be discharged from the heat exchange core to the coolant receiving chamber to the first vent joint or the second vent joint in sequence, and finally discharged to the outside of the cooler. The above arrangement can prevent the phenomenon of local high point gas collection inside the cooler, which is conducive to fully discharging the gas inside the cooler.
[0071] like Figure 6 , Figure 7 As shown, the heights of the inner cavity bottom surface 4B of the heat exchange core, the inner cavity bottom surface 5B of the coolant receiving cavity, and the inner cavity bottom surface 3B of the liquid injection / drainage joint are successively reduced, that is, the inner cavity bottom surface 3B is lower than the inner cavity bottom surface 5B, and the inner cavity bottom surface 5B is lower than the inner cavity bottom surface 4B, so that the liquid injection / drainage joint is the lowest point inside the cooler. When the liquid in the cooler needs to be discharged, the liquid will be discharged from the heat exchange core to the liquid injection / drainage joint in sequence, and finally discharged to the outside of the cooler. The above arrangement can fully drain the liquid in the cooler.
[0072] like Figure 8 As shown, the first venting joint 1 includes a first aluminum sleeve 11, a first steel sleeve 12, a first sealing ring 14, and a screw (i.e., a first connecting member 13). The material of the vehicle-mounted transformer is generally aluminum. The first aluminum sleeve 11 is connected to the coolant containing chamber by welding. The first steel sleeve 12 is connected to the first aluminum sleeve 11 by threads. Before connection, fixing glue can be applied to the threads to seal and prevent loosening. The first steel sleeve 12 is provided with a groove, and the first sealing ring 14 is placed in the groove to prevent the first sealing ring 14 from sliding when the screw is tightened. The screw is connected to the first steel sleeve 12 by threads, and a through hole for venting is provided inside the screw, and the through hole can form a first air flow channel 133. When the screw of the first venting joint 1 is unscrewed, the through hole inside the screw connects the inside of the cooler with the atmosphere, and venting can be performed. When the screw is tightened, it can be better sealed. At the same time, the setting of the first steel sleeve 11 can well avoid the phenomenon of bolt biting and breaking that is easy to cause when the traditional steel screw and the aluminum screw seat are twisted in reverse.
[0073] like Fig. 9 As shown, the second venting joint 2 includes a second aluminum sleeve 21, a second steel sleeve 22, a second sealing ring 24, and a quick connector. The configuration of the second aluminum sleeve 21, the second steel sleeve 22, and the second sealing ring 24 is similar to the corresponding components in the first venting joint. The inner end of the quick connector is connected to the second steel sleeve 22 by a thread, and a protective sleeve 25 is provided on the outer end to prevent damage to the joint during operation, transportation, etc. The above-mentioned second venting joint is mated with the external matching quick connector female or male head to form a channel to connect the inside and outside of the cooler for venting or exhausting. When the external connector is disconnected, it can be automatically sealed.
[0074] like Fig.10 As shown, the liquid injection / drainage joint 3 includes a third aluminum sleeve 31, a third steel sleeve 32, a third sealing ring 34, and a screw. The arrangement of the aluminum sleeve 31, the steel sleeve 32, and the third sealing ring 34 is similar to the corresponding components of the first venting joint. The screw is connected to the third steel sleeve 32 through a thread. When the screw of the liquid injection / drainage joint 3 is removed, the liquid in the cooler can be discharged through the threaded hole in the third steel sleeve 32. When the screw is tightened, it can be better sealed.
[0075] Preferably, the second steel sleeve 22 in the second venting joint and the third steel sleeve 32 in the injection / drainage joint can be configured to have the same threaded interface, so as to facilitate the unification of models of quick connectors and improve versatility. The first connector / second connector (such as a screw) in the first venting joint / second venting joint can also be replaced with a quick connector as needed.
[0076] The first steel sleeve 12, the second steel sleeve 22, and the third steel sleeve 32 can also be replaced by a wire screw sleeve. The corresponding aluminum sleeves, steel sleeves, sealing rings, screws, and quick connectors in the first venting joint 1, the second venting joint 2, and the injection / discharge joint 3 can have unified interfaces or models to increase versatility and reduce spare parts.
[0077] The present invention also relates to a method for online replacement of an oil cooler. The above-mentioned cooler 10 is provided with an oil injection device and a vacuum pump. When the cooler fails, it needs to be replaced online. The online replacement method comprises the following steps: (S1) The first valve 30 and the second valve 40 are closed so that the cooler is completely isolated from the transformer tank.
[0078] (S2) Open the first vent joint and the liquid filling / draining joint to drain the liquid in the cooler into an external container. After draining, remove the faulty cooler.
[0079] (S3) After installing the new cooler, replace screw 2 of the filling / draining joint with a quick connector and tighten it.
[0080] (S4) Connect the vacuum device to the second venting connector via an external quick connector male or female. The first venting connector, the liquid injection / discharge connector, the first valve 30, and the second valve 40 are all in a closed or tightened state. Start the vacuum device to perform vacuuming.
[0081] (S5) When the vacuum degree reaches the set value, the oil injection device is connected to the injection / drainage joint through the external quick connector male or female, and the cooler is filled with oil at the first injection speed. As the oil injection height increases, the vacuum degree will decrease. Therefore, while the oil is injected, the vacuum device is operated at the same time.
[0082] (S6) When the oil level reaches a relatively high level, vacuuming may draw in oil, which may damage the vacuuming device. At this time, the quick connector and the vacuuming device connected to the second air bleed connector may be removed according to the situation to restore the sealing of the second air bleed connector.
[0083] (S7) reducing the oil injection speed of the oil injection device, injecting oil at a second injection speed, and while slowly injecting oil, slowly opening the screw with a hole of the first venting joint (i.e., the first connecting member provided with the first air flow channel) until no gas is discharged from the first venting joint; (S8) Tighten the screw with holes to restore the sealing of the first bleed joint.
[0084] ( S9 ) Finally, the first valve 30 and the second valve 40 are opened to allow the cooler to communicate with the transformer tank.
[0085] like Figure 8 , Figure 8As shown in (c), the first vent joint 1 has a first screw sleeve 15 and a first connecting piece 13 installed on the cooler; the inner cavity of the first screw sleeve 15 is connected to the inner cavity of the cooler 10; the first connecting piece 13 cooperates with the inner thread of the first screw sleeve 15, so as to close the opening of the first screw sleeve 15 or connect the inner cavity of the first screw sleeve 15 with the external atmosphere; the first connecting piece 13 has a head 131 for closing the opening of the first screw sleeve 15, and an external threaded rod 132 cooperates with the internal thread of the first screw sleeve 15, and a first air flow channel 133 is opened on the external threaded rod 132 for connecting the inner cavity of the first screw sleeve 15 with the external atmosphere when the head 131 is not in contact with the first screw sleeve 15.
[0086] The first airflow channel 133 has a channel section opening 1333 formed on the outer wall of the external threaded rod 132. The first airflow channel 133 includes a first channel section 1331 extending in the axial direction of the external threaded rod 132, and a second channel section 1332 communicating with the first channel section 1331, wherein the extension direction of the second channel section 1332 is perpendicular to the axial direction of the external threaded rod 132, and the second channel section 1332 has a channel section opening 1333 formed on the outer wall of the external threaded rod 132; the inner cavity of the first screw sleeve 15 is communicated with the outer space of the external threaded rod 132 through the first channel section 1331 and the second channel section 1332 in sequence.
[0087] In a preferred embodiment, in step S7, the step of changing the opening of the first venting connector 1 from a closed state to an open state is specifically: (S71) twisting the first connecting member 13, and when the ratio of the length of the portion of the first projection that does not overlap with the second projection to the length of the first projection reaches a preset ratio p1, stopping twisting the first connecting member 13; (S72) When the stop time reaches the preset time t1, the first connecting member 13 is continuously twisted until the ratio of the length of the portion of the first projection that does not overlap with the second projection to the length of the first projection is 1; Wherein, p1∈[1 / 4, 1 / 2]; the first projection is the projection of the channel section opening 1333 on the axis of the external threaded rod 132, and the second projection is the projection of the first screw sleeve 15 on the axis of the external threaded rod 132. The first channel section 1331 may extend in the radial direction of the external threaded rod 132. In this embodiment, p1 may be 1 / 3.
[0088] like Figure 8As shown in (a), when the first connecting member closes the opening of the first screw sleeve, the first projection and the second projection on the axis of the external threaded rod, the ratio of the length of the portion of the first projection R-13 that does not overlap with the second projection R-15 (i.e., the length of R-13 not covered by R-15) to the length of the first projection R-13 does not reach the value of p1=1 / 3. In step (S71), the first connecting member 13 is screwed, that is, the first connecting member moves in a direction away from the first screw sleeve.
[0089] like Figure 8 As shown in (b), when the first connecting member moves to the point where the ratio of the length of the portion of the first projection R-13 that does not overlap with the second projection R-15 to the length of the first projection R-13 is 1 / 3, the first connecting member 13 is stopped from being twisted in step (S71) until the stop time reaches the preset time t1. The value range of t1 is, for example, 3-8 minutes. The first connecting member 13 is continued to be twisted until the ratio of the length of the portion of the first projection R-13 that does not overlap with the second projection R-15 to the length of the first projection is 1, that is, the first projection R-13 and the second projection R-15 are completely staggered.
[0090] The online replaceable cooler and replacement method of the above invention can realize online replacement of the cooler quickly and safely, and can fully exhaust the air in the cooler to ensure the safety of the transformer. It greatly saves the cycle and cost of the traditional method of returning the transformer to the factory for repair due to cooler failure, and also avoids the safety hazards and long cycle caused by insufficient gas exhaust in the ordinary normal pressure oil filling method. At the same time, there is no need to lift the oil filling equipment to a very high height, which saves operating space, reduces the requirements for the operating environment, and increases on-site operability.
[0091] The above cooler can be used for coolers of different structural forms such as tube type, plate type, plate fin type, tube fin type, etc., and can also be used for coolers with coolant headers on both sides. The above online replaceable cooler and replacement method are applicable to both EMU traction transformers and locomotive traction transformers and other types of equipment.
[0092] Example 2 like Fig.11 As shown, the difference between this embodiment 2 and embodiment 1 is that the first venting joint 1 and the second venting joint 2 are located on the top surface (upper surface) of the coolant receiving chamber 5, and the liquid injection / draining joint 3 is located on the bottom surface (lower surface) of the coolant receiving chamber 5. If the upper and bottom space of the cooler under the vehicle allows, it can be as follows Fig.11 As shown, the venting joint and the liquid injection / draining joint are respectively arranged on the top surface and the bottom surface of the cooler.
[0093] Example 3 like Figure 12-14As shown, the difference between this embodiment 3 and embodiment 2 is that both sides of the heat exchange core 4 are provided with a coolant receiving chamber 5 connected to the coolant channel of the heat exchange core 4; the liquid inlet and the liquid outlet of the cooler 10 are both located in one of the coolant receiving chambers 5. The second venting connector 2 and the liquid injection / drainage connector 3 are arranged in different coolant receiving chambers 5.
[0094] In this embodiment 3, the second venting joint 2 and the liquid injection / drainage joint 3 may be arranged in different cooling liquid containing chambers 5. When the cooler is connected to the transformer box, the cooling liquid enters the cooling liquid containing chamber 5 on one side through the first pipeline 101 from the first valve 30, enters the cooling liquid containing chamber 5 on the other side after passing through the heat exchange core 4, then returns through the heat exchange core 4 to enter the cooling liquid containing chamber 5 on the one side, and then flows out from the second valve 40 through the second pipeline 102. Fig.12 The coolant flow direction is shown by dashed arrows.
[0095] Preferably, each coolant containing chamber 5 is provided with a first venting connector 1 .
[0096] The cooling liquid containing chambers 5 on both sides of the heat exchange core 4 are respectively the first cooling liquid containing chamber 51 and the second cooling liquid containing chamber 52; the cooling liquid channel includes at least one first cooling liquid channel 43 and at least one second cooling liquid channel 44, each first cooling liquid channel 43 and each second cooling liquid channel 44 connect the first cooling liquid containing chamber 51 and the second cooling liquid containing chamber 52; the channel valve is used to open or close each second cooling liquid channel 44; the liquid injection / drainage joint 3 is arranged in the first cooling liquid containing chamber 51, and the second venting joint 2 is arranged in the second cooling liquid containing chamber 52. The liquid inlet and liquid outlet of the cooler 10 are both arranged in the first cooling liquid containing chamber 51.
[0097] like Figure 12-Figure 15 As shown, in this embodiment 3, a partition 510 is provided in the first cooling liquid containing chamber 51, and the partition 510 divides the inner cavity of the first cooling liquid containing chamber 51 into a first cavity 511 and a second cavity 512 which are independent of each other. The liquid inlet of the cooler 10 is arranged toward the first cavity 511, and the liquid outlet of the cooler 10 is arranged toward the second cavity 512. The liquid inlet of the cooler 10 is connected to the liquid outlet of the cooler 10 through the first cavity 511, the cooling liquid channel (i.e., each first cooling liquid channel 43) arranged in the heat exchange core 4 toward the first cavity 511, the second cooling liquid containing chamber 52, the cooling liquid channel (i.e., each second cooling liquid channel 44) arranged in the heat exchange core 4 toward the second cavity 512, and the second cavity 512 in sequence.
[0098] The coolant channel includes at least one first coolant channel 43 arranged toward the first cavity 511 and at least one second coolant channel 44 arranged toward the second cavity 512. Each first coolant channel 43 and each second coolant channel 44 connect the first coolant accommodating cavity 51 and the second coolant accommodating cavity 52. The cooler also includes a channel valve (not shown in the figure) for opening / closing each second coolant channel 44. The filling / draining joint 3 is arranged in the first coolant accommodating cavity 51, and the second venting joint 2 is arranged in the second coolant accommodating cavity 52.
[0099] During the process of starting the vacuum pumping device 50 and until the vacuum degree of the inner cavity of the cooler 10 reaches the set vacuum degree, each of the first coolant channels 43 and each of the second coolant channels 44 are in an open state.
[0100] The step (S5) further comprises: before injecting liquid into the cooler (10) at a first injection speed, changing each second cooling liquid channel (44) from an open state to a closed state; when the liquid level in the second cooling liquid receiving chamber (52) reaches a second set height, changing each second cooling liquid channel (44) from a closed state to an open state. The second set height is higher than the height of each first cooling liquid channel (43) and higher than the height of each second cooling liquid channel (44).
[0101] In step (S6), the liquid level in the inner cavity of the cooler (10) reaches a first set height, which means that the liquid level in the first cooling liquid containing cavity (51) and the liquid level in the second cooling liquid containing cavity (52) both reach the first set height; and the first set height is not lower than the second set height; In this embodiment, the partition 510 is arranged horizontally, that is, the inner cavity of the heat exchange core 4 is divided into a first cavity 511 located at the top and a second cavity 512 located at the bottom, and the liquid inlet of the cooler 10 is higher than the height position of the partition 510, and the liquid outlet of the cooler 10 is lower than the height position of the partition 510, so that the liquid flowing into the first cooling liquid holding cavity 51 from the liquid inlet can more easily enter the cooling liquid channel of the first cavity 511, and the liquid flowing out of the cooling liquid channel of the second cavity 512 can more easily flow out from the liquid outlet, thereby forming a flow path for the cooling liquid.
[0102] Example 4 like Figure 16-Figure 17 As shown, the difference between this embodiment 4 and embodiment 3 is that the partition 510 is arranged vertically, that is, the first cavity 511 and the second cavity 512 are respectively located on the left and right sides of the partition, and the liquid inlet of the cooler 10 is located on the same side as the first cavity 511, and the liquid outlet of the cooler 10 is located on the same side as the second cavity 512.
[0103] It should be noted that the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0104] The embodiments of the present invention are described in detail above, but the contents are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made according to the scope of the present invention should still be included in the scope of the present invention. After reading the present invention, the modifications of various equivalent forms of the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application. In the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
Claims
1. A cooler for a transformer, characterized in that: The liquid inlet of the cooler (10) is detachably connected to one end of the first valve (30), and the liquid outlet of the cooler (10) is detachably connected to one end of the second valve (40); the other end of the first valve (30) and the other end of the second valve (40) are respectively used to communicate with the coolant outlet and the coolant inlet of the transformer box (20); The cooler (10) is provided with a first venting joint (1) for communicating with the outside atmosphere, a second venting joint (2) for connecting to a vacuum pump (50), and a liquid injection / discharge joint (3) for connecting to a liquid injection device (60) or discharging liquid in the cooler; The first air venting connector (1), the second air venting connector (2), and the liquid injection / drainage connector (3) are all in communication with the inner cavity of the cooler (10); The first air venting joint (1) and the second air venting joint (2) are installed on the upper part of the cooler, and the liquid injection / liquid discharge joint (3) is installed on the lower part of the cooler (10).
2. The cooler according to claim 1, characterized in that: The cooler (10) comprises a heat exchange core (4) and a cooling liquid containing chamber (5) arranged adjacent to the heat exchange core (4); the heat exchange core (4) has at least one cooling liquid channel, and each cooling liquid channel is in communication with the cooling liquid containing chamber (5); a liquid inlet and a liquid outlet of the cooler (10) are both located on the cooling liquid containing chamber (5); The first air venting joint (1) and the second air venting joint (2) are installed at the upper part of the coolant containing chamber (5), and the liquid injection / liquid discharge joint (3) is installed at the lower part of the coolant containing chamber (5); The first air venting connector (1), the second air venting connector (2), and the liquid injection / drainage connector (3) are all in communication with the inner cavity of the cooling liquid containing cavity (5); Preferably, the first air venting connector (1) and the second air venting connector (2) are arranged on the top surface of the coolant containing chamber (5); The liquid injection / liquid discharge joint (3) is arranged on the bottom surface of the cooling liquid containing cavity (5).
3. The cooler according to claim 2, characterized in that: Both sides of the heat exchange core (4) are provided with cooling liquid containing chambers (5) which are in communication with the cooling liquid channels of the heat exchange core (4), and the cooling liquid containing chambers (5) on both sides of the heat exchange core (4) are respectively a first cooling liquid containing chamber (51) and a second cooling liquid containing chamber (52); the liquid inlet and the liquid outlet of the cooler (10) are both provided in the first cooling liquid containing chamber (51); Preferably, the second air release connector (2) and the liquid injection / drainage connector (3) are arranged in different coolant receiving chambers (5); Preferably, each coolant containing cavity (5) is provided with a first venting connector (1); Preferably, a partition (510) is arranged in the first cooling liquid containing chamber (51), and the partition (510) divides the inner cavity of the first cooling liquid containing chamber (51) into a first cavity (511) and a second cavity (512) which are independent of each other; the liquid inlet of the cooler (10) is arranged toward the first cavity (511), and the liquid outlet of the cooler (10) is arranged toward the second cavity (512); the liquid inlet of the cooler (10) is connected to the liquid outlet of the cooler (10) through the first cavity (511), the cooling liquid channel arranged in the heat exchange core (4) toward the first cavity (511), the second cooling liquid containing chamber (52), the cooling liquid channel arranged in the heat exchange core (4) toward the second cavity (512), and the second cavity (512) in sequence; More preferably, the cooling liquid channel comprises at least one first cooling liquid channel (43) arranged toward the first cavity (511) and at least one second cooling liquid channel (44) arranged toward the second cavity (512), and each first cooling liquid channel (43) and each second cooling liquid channel (44) connect the first cooling liquid receiving cavity (51) and the second cooling liquid receiving cavity (52); the cooler further comprises a channel valve for opening / closing each second cooling liquid channel (44); the injection / drainage joint (3) is arranged in the first cooling liquid receiving cavity (51), and the second venting joint (2) is arranged in the second cooling liquid receiving cavity (52).
4. The cooler according to claim 2, characterized in that: The heights of the inner cavity top surface (4A) of the heat exchange core, the inner cavity top surface of the cooling liquid containing cavity provided with the first venting joint (1), and the inner cavity top surface (1A) of the first venting joint are successively increased; the heights of the inner cavity top surface (4A) of the heat exchange core, the inner cavity top surface of the cooling liquid containing cavity provided with the second venting joint (2), and the inner cavity top surface (2A) of the second venting joint are successively increased; The heights of the inner cavity bottom surface (4B) of the heat exchange core, the inner cavity bottom surface (5B) of the cooling liquid receiving cavity provided with the liquid injection / drainage joint (3), and the inner cavity bottom surface (3B) of the liquid injection / drainage joint are successively reduced.
5. The cooler according to any one of claims 1 to 4, characterized in that: It also includes a liquid level sensor for measuring the liquid level in the cooling liquid containing chamber (5), and the output end of the liquid level sensor and the control end of the vacuum pumping device (50) are both electrically connected to the controller.
6. The cooler according to any one of claims 1 to 4, characterized in that: The first venting joint (1) comprises a first screw sleeve (15) mounted on the cooler and a first connecting piece (13); the inner cavity of the first screw sleeve (15) is connected to the inner cavity of the cooler (10); the first connecting piece (13) cooperates with the inner thread of the first screw sleeve (15) to close the opening of the first screw sleeve (15) or connect the inner cavity of the first screw sleeve (15) to the external atmosphere; the first connecting piece (13) comprises a head (131) for closing the opening of the first screw sleeve (15), and an external threaded rod (132) cooperating with the internal thread of the first screw sleeve (15); the external threaded rod (132) is provided with a first air flow channel (133) for connecting the inner cavity of the first screw sleeve (15) to the external atmosphere when the head (131) is not in contact with the first screw sleeve (15); The second venting joint (2) comprises a second screw sleeve mounted on the cooler and a second connecting piece (23) for connecting to a vacuum extraction device (50); the inner cavity of the second screw sleeve is in communication with the inner cavity of the cooler (10); the second connecting piece (23) is matched with the inner thread of the second screw sleeve; The liquid injection / liquid discharge joint (3) comprises a third screw sleeve installed in the cooler, and a third connecting piece used to connect to a liquid injection device or to close an opening of the third screw sleeve; the inner cavity of the third screw sleeve is communicated with the inner cavity of the cooler (10); and the third connecting piece is matched with the inner thread of the third screw sleeve; Preferably, at least one of the first screw sleeve, the second screw sleeve, and the third screw sleeve comprises an aluminum sleeve installed on the cooler and a steel sleeve fixedly installed inside the aluminum sleeve, wherein an internal thread matching with a corresponding connecting piece is formed inside the steel sleeve; and the corresponding connecting piece is made of steel; Preferably, the second connecting member is a quick connector; Preferably, the third connecting member comprises a fastener (33) for closing the opening of the third screw sleeve and a quick connector for connecting to the injection device, and the inner thread of the third screw sleeve can be switchably connected to the quick connector and the fastener (33); more preferably, the fastener (33) comprises a fastener head (331) for closing the opening of the third screw sleeve and a fastener outer threaded rod (332) for cooperating with the inner thread of the third screw sleeve, and the fastener outer threaded rod (332) is provided with a second air flow channel for connecting the inner cavity of the third screw sleeve with the external atmosphere when the fastener head (331) is not in contact with the third screw sleeve.
7. A rail vehicle, characterized in that: The cooler comprises the cooler according to any one of claims 1 to 6, wherein the transformer is a traction transformer of a rail vehicle.
8. A method for online replacement of a cooler, characterized in that: The cooler is the cooler according to any one of claims 1 to 6; The online replacement method comprises: (S1) closing the first valve (30) and the second valve (40); (S2) disconnecting the replaced cooler from the first valve (30) and the second valve (40), and disassembling the replaced cooler; (S3) connecting the liquid inlet of the replaced cooler (10) to one end of the first valve (30), and connecting the liquid outlet of the replaced cooler (10) to one end of the second valve (40); (S4) connecting the second air release joint (2) to the vacuum pumping device (50), with the first air release joint (1) and the liquid injection / discharge joint (3) both in a closed state, and starting the vacuum pumping device (50); (S5) When the vacuum degree of the inner cavity of the cooler (10) reaches a set vacuum degree, the liquid injection device (60) is connected to the liquid injection / liquid discharge joint (3), and liquid is injected into the cooler (10) at a first liquid injection speed; (S6) When the liquid level in the inner cavity of the cooler (10) reaches a first set height, the vacuum pumping device (50) is turned off, and the second air release connector (2) is changed from an open state to a closed state; (S7) injecting liquid into the cooler (10) at a second injection speed, while changing the opening of the first venting joint (1) from a closed state to an open state, until the injection is completed, wherein the second injection speed is lower than the first injection speed; (S8) After the injection is completed, the first venting joint (1) is changed from an open state to a closed state; (S9) Open the first valve (30) and the second valve (40).
9. The online replacement method according to claim 8, characterized in that: The cooler (10) comprises a heat exchange core (4), and a cooling liquid containing cavity (5) arranged adjacent to the heat exchange core (4); the heat exchange core (4) has at least one cooling liquid channel, and each cooling liquid channel is in communication with the cooling liquid containing cavity (5); the liquid inlet and the liquid outlet of the cooler (10) are both located in the cooling liquid containing cavity (5); the inner cavity top surface (4A) of the heat exchange core, the inner cavity top surface of the cooling liquid containing cavity provided with the first venting joint (1), and the inner cavity top surface (1A) of the first venting joint are located at heights increasing in sequence; The first venting joint (1) comprises a first screw sleeve (15) mounted on the cooler and a first connecting piece (13); the inner cavity of the first screw sleeve (15) is connected to the inner cavity of the cooler (10); the first connecting piece (13) cooperates with the inner thread of the first screw sleeve (15) to close the opening of the first screw sleeve (15) or connect the inner cavity of the first screw sleeve (15) to the external atmosphere; the first connecting piece (13) comprises a head (131) for closing the opening of the first screw sleeve (15), and an external threaded rod (132) cooperating with the internal thread of the first screw sleeve (15); the external threaded rod (132) is provided with a first air flow channel (133) for connecting the inner cavity of the first screw sleeve (15) to the external atmosphere when the head (131) is not in contact with the first screw sleeve (15); The first air flow channel (133) has a channel section opening (1333) formed on the outer wall of the external threaded rod (132); In the step (S7), the step of changing the opening of the first venting connector (1) from a closed state to an open state is specifically: (S71) twisting the first connecting member (13), and when the ratio of the length of the portion of the first projection that does not overlap with the second projection to the length of the first projection reaches a preset ratio p1, stopping twisting the first connecting member (13); (S72) When the stop time reaches a preset time t1, continue to twist the first connecting member (13) until the ratio of the length of the portion of the first projection that does not overlap with the second projection to the length of the first projection is 1; Wherein, p1∈[1 / 4, 1 / 2]; the first projection is the projection of the channel section opening (1333) on the axis of the external threaded rod (132), and the second projection is the projection of the first screw sleeve (15) on the axis of the external threaded rod (132); Preferably, when the ratio reaches a preset ratio p1, the channel section opening (1333) is located at the top end of the first airflow channel (133).
10. The online replacement method according to claim 8, characterized in that: The cooler (10) comprises a heat exchange core (4), and a cooling liquid containing cavity (5) arranged adjacent to the heat exchange core (4), wherein the heat exchange core (4) has at least one cooling liquid channel; the first air venting joint (1), the second air venting joint (2), and the liquid injection / draining joint (3) are all in communication with the inner cavity of the cooling liquid containing cavity (5); the second air venting joint (2) and the liquid injection / draining joint (3) are arranged in different cooling liquid containing cavities (5); Both sides of the heat exchange core (4) are provided with cooling liquid containing chambers (5) which are in communication with the cooling liquid channels of the heat exchange core (4); the cooling liquid containing chambers (5) on both sides of the heat exchange core (4) are respectively a first cooling liquid containing chamber (51) and a second cooling liquid containing chamber (52); the liquid injection / drainage joint (3) is installed at the lower part of the first cooling liquid containing chamber (51), and the second air release joint (2) is installed at the upper part of the second cooling liquid containing chamber (52); the liquid inlet and the liquid outlet of the cooler (10) are both arranged in the first cooling liquid containing chamber (51); A partition (510) is provided in the first cooling liquid containing chamber (51), and the partition (510) divides the inner cavity of the first cooling liquid containing chamber (51) into a first cavity (511) and a second cavity (512) which are independent of each other; The liquid inlet of the cooler (10) is arranged toward the first cavity (511), and the liquid outlet of the cooler (10) is arranged toward the second cavity (512), and the liquid inlet of the cooler (10) is connected to the liquid outlet of the cooler (10) in sequence through the first cavity (511), the cooling liquid channel arranged in the heat exchange core (4) toward the first cavity (511), the second cooling liquid containing cavity (52), the cooling liquid channel arranged in the heat exchange core (4) toward the second cavity (512), and the second cavity (512); The cooling liquid channel comprises at least one first cooling liquid channel (43) arranged toward the first cavity (511) and at least one second cooling liquid channel (44) arranged toward the second cavity (512), each first cooling liquid channel (43) and each second cooling liquid channel (44) connecting the first cooling liquid containing cavity (51) and the second cooling liquid containing cavity (52); In the process of starting the vacuum extraction device (50) until the vacuum degree of the inner cavity of the cooler (10) reaches a set vacuum degree, each of the first cooling liquid channels (43) and each of the second cooling liquid channels (44) are in an open state; Wherein, the step (S5) further comprises: before injecting liquid into the cooler (10) at a first injection speed, changing each second cooling liquid channel (44) from an open state to a closed state; when the liquid level in the second cooling liquid receiving chamber (52) reaches a second set height, changing each second cooling liquid channel (44) from a closed state to an open state; the second set height is higher than the height of each first cooling liquid channel (43) and higher than the height of each second cooling liquid channel (44); Wherein, in the step (S6), the liquid level in the inner cavity of the cooler (10) reaches the first set height, which means that the liquid level in the first cooling liquid containing cavity (51) and the liquid level in the second cooling liquid containing cavity (52) both reach the first set height; and the first set height is not lower than the second set height; Preferably, the first cavity (511) is located below the second cavity (512); Preferably, the partition (510) extends in the height direction of the first cooling liquid containing cavity (51), and the first cavity (511) and the second cavity (512) are located on both sides of the partition (510).
Citation Information
Cited By
Transformer cooler and online replacement method therefor, and rail vehicle
WO2026056164A1