Visual cooperation method and system capable of adjusting distributed load resources

By intelligently dividing load groups and building a distributed load digital twin model, combined with adaptive collaborative methods, the problem of geographical dispersion of distributed load resources and uncertainty of renewable energy is solved, the grid operation efficiency and energy utilization efficiency are improved, and the grid operation efficiency is ensured. Reasonable allocation of resources and stability of the system.

CN119070320APending Publication Date: 2024-12-03GAOYOU POWER SUPPLY OF JIANGSU ELECTRIC POWER +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411210721.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The geographical location of distributed load resources is scattered, and renewable energy generation is intermittent and uncertain, which leads to high pressure on the supply and demand balance of the power grid. It is difficult for traditional centralized management to grasp the operating status of each distributed load in real time and accurately, resulting in the operating efficiency of the power grid. Low and safety hazards.

Method used

By intelligently dividing the load group, using the total control end for precise control and coordinated scheduling, a distributed load digital twin model is built, and combined with K-Means clustering, adaptive collaboration methods and load transfer models, the collaborative work and resources within the load group are realized. Optimize scheduling.

Benefits of technology

It improves the operation efficiency of the power grid, optimizes the energy utilization efficiency, avoids excessive energy consumption or waste, ensures the rational use of resources, and promptly detects faults through real-time monitoring, reducing the impact of operation and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070320A_ABST
    Figure CN119070320A_ABST
Patent Text Reader

Abstract

The invention discloses a visual cooperation method and system capable of adjusting distributed load resources. The method comprises the specific steps that load characteristics and position information of distributed loads in a region are acquired, and load groups are divided; setting each load group as a shunt end, mapping the distributed loads in the load group at the same shunt end, and performing cooperative control on the distributed loads of the load group; and calling and mapping any shunt end by using the master control end, checking and acquiring load group operation data in any shunt end, and performing cooperative control on each shunt end load group by using a self-adaptive cooperative method based on the acquired load group operation data of each shunt end. According to the invention, through load cluster division and cooperative scheduling of the distributed loads of the load cluster, fine management of the distributed loads is realized, the mapping load group is called through the master control end, cooperative scheduling of the load group is carried out, excessive consumption or waste of energy is avoided, and thus the overall energy utilization efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of smart grid and energy management technology, and in particular to a visual coordination method and system capable of adjusting distributed load resources. Background Art

[0002] With the continuous development of renewable resources, not only has the dependence on petroleum fuels been reduced, but also greenhouse gas emissions have been reduced. This has led to an increasing proportion of distributed load resources (such as distributed photovoltaic power stations, small wind farms, home energy storage systems, electric vehicle charging stations, etc.) in the power grid. Distributed resources not only diversify and enrich the energy supply of the power grid, but also enhance the flexibility and resilience of the power grid, which helps to achieve distributed production and consumption of energy.

[0003] However, distributed load resources are geographically dispersed, and renewable energy generation is intermittent and uncertain. For example, solar power generation is greatly affected by weather, and wind power generation is restricted by natural factors such as wind speed and direction. This instability has brought tremendous pressure to the balance of supply and demand of the power grid. In addition, the charging demand of electric vehicles is also highly uncertain. The charging time and charging amount are difficult to accurately predict, which further increases the complexity of power grid scheduling.

[0004] Traditional management methods usually adopt centralized management, often relying on manual experience and historical data for decision-making, making it difficult to accurately grasp the operating status of each distributed load in real time, and even more difficult to achieve effective integration and coordinated optimization of resources. This may not only lead to inefficient grid operation, but also cause safety hazards such as supply and demand imbalance and voltage fluctuations. Summary of the invention

[0005] The purpose of the present invention is to provide a visual coordination method and system for adjustable distributed load resources, which can optimize power grid operation and improve energy utilization efficiency by intelligently dividing load groups and using a master control terminal to achieve precise control and coordinated scheduling of each load group.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0007] A visual coordination method for adjustable distributed load resources, comprising the following steps:

[0008] Obtain the load characteristics and location information of distributed loads in the area and divide them into load groups;

[0009] Each load group is set as a branch end, and the distributed loads in the load group are mapped on the same branch end, so as to coordinately control the distributed loads of the load group;

[0010] Use the master control end to call and map any branch end, view and obtain the operating data of the load group in any branch end, and use the adaptive collaborative method to collaboratively control the load groups at each branch end based on the acquired operating data of the load groups at each branch end;

[0011] Among them, the main control end maps the digital twin models of the load groups in one or more selected branch ends according to the location information of the load groups to construct a regional distributed load digital twin model, and obtains and visualizes the operating status and prediction results of the distributed loads in the distributed load digital twin model.

[0012] According to the above technical solution, the load characteristics include the seasonal fluctuation component of the load and the peak-to-valley difference of the load.

[0013] According to the above technical solution, the load group construction step includes:

[0014] Based on the location information of the distributed loads in the region, the K-Means method is used to cluster and determine the cluster center of each cluster;

[0015] Based on the load characteristics of each distributed load, a distance weighting factor between the corresponding distributed load and the cluster center of each location is calculated, and then the weighted distance between each distributed load and the cluster center of each location is calculated;

[0016] The distributed load is assigned to the corresponding cluster center according to the minimum weighted distance principle, and the cluster of each cluster center is regarded as a load group.

[0017] According to the above technical solution, the weighting factor is:

[0018] w ij =[ε j,c / (ε j,c -ε i,c )] γ [s j,c / (s j,c -s i,c )] γ ;

[0019] In the formula, w ij represents the weighting factor between distributed load i and cluster center j, ε j,c represents the load peak-to-valley difference of the cluster represented by cluster center j, ε i,c represents the peak-to-valley difference of distributed load i, s j,c represents the average seasonal fluctuation component of the cluster represented by cluster center j, s i,c represents the average seasonal fluctuation component of distributed load i, and γ represents the amplification coefficient of the weighting factor.

[0020] In some cases, the division of load group ranges should take into account seasonal changes in load, daily changes in load, and peak-to-valley difference rates of load. This is because these factors will affect the supply capacity of the load group. For example, in summer, the air conditioning load is high, requiring more electricity and cold water; while in winter, the heating load is high, requiring more thermal energy. Therefore, the peak-to-valley difference rate index, seasonal fluctuation component, and distance are integrated into a distance weighted factor to divide the load group.

[0021] According to the above technical solution, a load group digital twin model is constructed at the branch end based on the location information of the distributed loads in the load group, and the operating status and prediction results of the distributed loads in the load group are visually displayed;

[0022] Based on the operating status of the distributed loads in the load group, the internal coordination method is used to achieve the coordinated work of the distributed loads in the load group.

[0023] According to the above technical solution, the internal collaboration method comprises the following steps:

[0024] Determine the total load demand, total load supply, and seasonal and peak-valley characteristics of the total load demand and total load supply within the load group;

[0025] Determine whether the total load supply meets the seasonal and peak-valley period requirements of the total load demand. If so, there is no need for load dispatching;

[0026] When the total load supply meets the total load demand, if the total load supply does not meet the peak and valley period demand of the total load demand, the total load adjustment demand is the peak and valley demand. In the case of peak and valley demand, the load transfer model is used to coordinate the load scheduling;

[0027] When the total load supply meets the total load demand, if the total load supply does not meet the seasonal demand of the total load demand, or the total load supply does not meet the total load demand, the load group needs to purchase the required load demand from other groups; in this case, the cooperative game method can be used to coordinate the internal load operation.

[0028] According to the above technical solution, the load transfer model:

[0029]

[0030] Where P c (t) represents the load reduction at time t, that is, the load that can be directly reduced during the peak electricity period at time t, a c It represents the proportion of load shedding in the total load demand of the load group, P ini (t) represents the total load demand of the load group at time t, Δ c (t) represents the reduction coefficient at time t, P tr(t) represents the load that can be transferred at time t, that is, the load during the peak period is transferred to the load during the valley period. tr Indicates the proportion of transferable load in the total load demand of the load group, Δ tr (t) represents the transfer coefficient at time t.

[0031] According to the above technical solution, the specific execution steps of the adaptive collaboration method include:

[0032] Calculate external load demand data or external load supply data for each load group;

[0033] Calculate the weighted benefits from external load demand to external load supply load group for each load group;

[0034] Based on the revenue weighting, the revenue of each load group in the alliance cost minimization subproblem and revenue allocation subproblem of the Nash negotiation model is weighted;

[0035] The alternating direction multiplier method is used to solve the weighted alliance cost minimization subproblem and revenue allocation subproblem, and the solution is used as the optimal coordination method for the load group.

[0036] According to the above technical solution, the income is weighted:

[0037]

[0038] Where D mn represents the revenue weighting of the external load demand load group m and the external load supply load group l, d mn It represents the distance from external load demand load group m to external load supply load group n, d m,l represents the distance from the external load demand load group m to the external load supply load group l, N represents the number of external load supply load groups, and τ represents the magnification coefficient of the benefit weighting factor.

[0039] Since the distributed loads in a region may be relatively dispersed, only considering the benefits may increase energy loss. Therefore, the distance is integrated into the benefit weighting factor to make the coordination of load groups in the region more reasonable.

[0040] In another embodiment, a visual coordination system capable of adjusting distributed load resources includes:

[0041] The load group module is used to obtain the load characteristics and location information of the distributed loads in the area and divide the load groups;

[0042] A branch end module is used to set each load group as a branch end, map the distributed loads in the load group on the same branch end, and perform coordinated control on the distributed loads of the load group;

[0043] The main control end module is used to call and map any branch end, view and obtain the operating data of the load group in any branch end, and use the adaptive collaborative method to collaboratively control the load groups at each branch end based on the acquired operating data of the load groups at each branch end;

[0044] Among them, the main control end module maps the digital twin models of the load groups in one or more selected branch ends according to the location information of the load groups to construct a regional distributed load digital twin model, and obtains and visualizes the operating status and prediction results of the distributed loads in the distributed load digital twin model.

[0045] The present invention realizes the refined management of distributed loads and improves the optimization of power grid operation efficiency by dividing load clusters and coordinating the distributed loads of load clusters. By calling the mapped load group through the main control end and coordinating the load group, energy can be adjusted and allocated more accurately to avoid excessive consumption or waste of energy, thereby improving the overall energy utilization efficiency. The system can be controlled based on the real-time operation data of the load group at each branch end, using an adaptive collaborative method, which makes resource allocation more flexible and efficient. The load distribution can be dynamically adjusted according to actual needs to ensure that resources are used in the most reasonable way. Through remote monitoring and data calling functions, fault points in the system can be discovered and located in a timely manner, which is convenient for operation and maintenance personnel to respond quickly and carry out repairs, reducing the impact of faults on the normal operation of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0047] Figure 1 It is a flowchart of the steps of a visual coordination method for adjustable distributed load resources of the present invention;

[0048] Figure 2 It is a flow chart of the load group construction steps of the present invention. DETAILED DESCRIPTION

[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] Example 1

[0051] The present invention Figure 1-2As shown, a visual coordination method for adjustable distributed load resources includes the following steps:

[0052] S1. Obtain the load characteristics and location information of the distributed loads in the area and divide the load groups; the load characteristics include the seasonal fluctuation component of the load and the peak-to-valley difference of the load.

[0053] The load group construction steps include:

[0054] S101, clustering is performed using the K-Means method based on the location information of the distributed loads in the region to determine the cluster center of each cluster;

[0055] S102, based on the load characteristics of each distributed load, calculate the distance weighting factor between the corresponding distributed load and the cluster center of each location, and then calculate the weighted distance between each distributed load and the cluster center of each location; weighting factor:

[0056] w ij =[ε j,c / (ε j,c -ε i,c )] γ [s j,c / (s j,c -s i,c )] γ ;

[0057] In the formula, w ij represents the weighting factor between distributed load i and cluster center j, ε j,c represents the load peak-to-valley difference of the cluster represented by cluster center j, ε i,c represents the peak-to-valley difference of distributed load i, s j,c represents the average seasonal fluctuation component of the cluster represented by cluster center j, s i,c represents the average seasonal fluctuation component of distributed load i, γ represents the amplification factor of the weighting factor;

[0058] S103, allocating the distributed load to the corresponding cluster center according to the minimum weighted distance principle, and treating the cluster of each cluster center as a load group.

[0059] S2. Set each load group as a branch end, map the distributed loads in the load group on the same branch end, and coordinately control the distributed loads of the load group; the branch end builds a digital twin model of the load group based on the location information of the distributed loads in the load group, and visualizes the operating status and prediction results of the distributed loads in the load group; based on the operating status of the distributed loads in the load group, use the internal coordination method to achieve coordinated work of the distributed loads in the load group.

[0060] The steps to build a load group digital twin model include:

[0061] Obtain the geographical location information of each load within the load group and historical power data such as historical power consumption data, load peak and load valley values, power storage data, power production, etc. in different time periods on different dates;

[0062] Preprocess the collected historical power data, use neural network models, LSTM models, etc. to make predictions based on the preprocessed historical power data according to different prediction needs, and visualize the prediction results; and visualize the real-time load power data and operating status in real time;

[0063] For loads such as wind turbines, which are easy to construct ontology models, three-dimensional ontology models and PID control models can be constructed based on physical mechanisms. The real-time load power data and operating status can be synchronously changed to the digital twin model, and algorithms such as neural networks can be used to conduct behavioral prediction analysis on the twin model.

[0064] The internal collaborative method execution steps include:

[0065] Determine the total load demand, total load supply, and seasonal and peak-valley characteristics of the total load demand and total load supply within the load group;

[0066] Determine whether the total load supply meets the seasonal and peak-valley period requirements of the total load demand. If so, there is no need for load dispatching;

[0067] When the total load supply meets the total load demand, if the total load supply does not meet the peak and valley period demand of the total load demand, the total load adjustment demand is the peak and valley demand; in the case of peak and valley demand, the load transfer model is used to coordinate the load scheduling; load transfer model:

[0068]

[0069] Where P c (t) represents the load reduction at time t, that is, the load that can be directly reduced during the peak electricity period at time t, a c It represents the proportion of load shedding in the total load demand of the load group, P ini (t) represents the total load demand of the load group at time t, Δ c (t) represents the reduction coefficient at time t, P tr (t) represents the load that can be transferred at time t, that is, the load during the peak period is transferred to the load during the valley period. tr Indicates the proportion of transferable load in the total load demand of the load group, Δ tr (t) represents the transferability coefficient at time t;

[0070] When the total load supply meets the total load demand, if the total load supply does not meet the seasonal demand of the total load demand, or the total load supply does not meet the total load demand, the load group needs to purchase the required load demand from other groups, and the cooperative game method can be used within the load group for load coordinated scheduling.

[0071] S3, using the master control end to call and map any branch end, check and obtain the operating data of the load group in any branch end, and based on the obtained operating data of the load group at each branch end, use the adaptive collaborative method to collaboratively control the load groups at each branch end;

[0072] Among them, the main control end maps the digital twin models of the load groups in one or more selected branch ends according to the location information of the load groups to construct a regional distributed load digital twin model, and obtains and visualizes the operating status and prediction results of the distributed loads in the distributed load digital twin model.

[0073] The specific execution steps of the adaptive collaboration method include:

[0074] S301, calculating external load demand data or external load supply data of each load group;

[0075] S302, calculating the weighted benefit from the external load demand of each load group to the external load supply load group;

[0076] S303, weighting the revenue of each load group in the alliance cost minimization subproblem and the revenue allocation subproblem of the Nash negotiation model based on revenue weighting;

[0077] S304. Use the alternating direction multiplier method to solve the weighted alliance cost minimization subproblem and the revenue distribution subproblem, and use the solution as the optimal coordination method for the load group.

[0078] Return weighting:

[0079]

[0080] Where D mn represents the revenue weighting of the external load demand load group m and the external load supply load group l, d mn It represents the distance from external load demand load group m to external load supply load group n, d m,l represents the distance from the external load demand load group m to the external load supply load group l, N represents the number of external load supply load groups, and τ represents the magnification coefficient of the benefit weighting factor.

[0081] Example 2

[0082] A visual coordination system capable of adjusting distributed load resources, comprising:

[0083] The load group module is used to obtain the load characteristics and location information of the distributed loads in the area and divide the load groups;

[0084] A branch end module is used to set each load group as a branch end, map the distributed loads in the load group on the same branch end, and perform coordinated control on the distributed loads of the load group;

[0085] The main control end module is used to call and map any branch end, view and obtain the operating data of the load group in any branch end, and use the adaptive collaborative method to collaboratively control the load groups at each branch end based on the acquired operating data of the load groups at each branch end;

[0086] Among them, the main control end module maps the digital twin models of the load groups in one or more selected branch ends according to the location information of the load groups to construct a regional distributed load digital twin model, and obtains and visualizes the operating status and prediction results of the distributed loads in the distributed load digital twin model.

[0087] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0088] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A visual coordination method for adjustable distributed load resources, characterized in that: The steps of the visualization collaboration method include: Obtain the load characteristics and location information of distributed loads in the area and divide them into load groups; Each load group is set as a branch end, and the distributed loads in the load group are mapped on the same branch end, so as to coordinately control the distributed loads of the load group; Use the master control end to call and map any branch end, view and obtain the operating data of the load group in any branch end, and use the adaptive collaborative method to collaboratively control the load groups at each branch end based on the acquired operating data of the load groups at each branch end; Among them, the main control end maps the digital twin models of the load groups in one or more selected branch ends according to the location information of the load groups to construct a regional distributed load digital twin model, and obtains and visualizes the operating status and prediction results of the distributed loads in the distributed load digital twin model.

2. The method for visual coordination of adjustable distributed load resources according to claim 1, characterized in that: The load characteristics include load seasonal fluctuation components and load peak-to-valley differences.

3. The method for visual coordination of adjustable distributed load resources according to claim 1, characterized in that: The load group construction step comprises: Based on the location information of the distributed loads in the region, the K-Means method is used to cluster and determine the cluster center of each cluster; Based on the load characteristics of each distributed load, a distance weighting factor between the corresponding distributed load and the cluster center of each location is calculated, and then the weighted distance between each distributed load and the cluster center of each location is calculated; The distributed load is assigned to the corresponding cluster center according to the minimum weighted distance principle, and the cluster of each cluster center is regarded as a load group.

4. The method for visual coordination of adjustable distributed load resources according to claim 3, characterized in that: The weighting factors are: w ij =[e j,c / (e j,c -e i,c )] γ [s j,c / (s j,c -s i,c )] γ ; In the formula, w ij represents the weighting factor between distributed load i and cluster center j, ε j,c represents the load peak-to-valley difference of the cluster represented by cluster center j, ε i,c represents the peak-to-valley difference of distributed load i, s j,c represents the average seasonal fluctuation component of the cluster represented by cluster center j, s i,c represents the average seasonal fluctuation component of distributed load i, and γ represents the amplification coefficient of the weighting factor.

5. The method for visual coordination of adjustable distributed load resources according to claim 1, characterized in that: At the branch end, a load group digital twin model is constructed based on the location information of the distributed loads in the load group, and the operation status and prediction results of the distributed loads in the load group are visually displayed; Based on the operating status of the distributed loads in the load group, the internal coordination method is used to achieve the coordinated work of the distributed loads in the load group.

6. The method for visual coordination of adjustable distributed load resources according to claim 1, characterized in that: The internal collaboration method steps include: Determine the total load demand, total load supply, and seasonal and peak-valley characteristics of the total load demand and total load supply within the load group; Determine whether the total load supply meets the seasonal and peak-valley period requirements of the total load demand. If so, there is no need for load dispatching; When the total load supply meets the total load demand, if the total load supply does not meet the peak and valley period demand of the total load demand, the total load adjustment demand is the peak and valley demand. In the case of peak and valley demand, the load transfer model is used to coordinate the load scheduling; When the total load supply meets the total load demand, if the total load supply does not meet the seasonal demand of the total load demand, or the total load supply does not meet the total load demand, the load group needs to purchase the required load demand from other groups.

7. A visual coordination method for adjustable distributed load resources according to claim 6, characterized in that: The load transfer model: Where P c (t) represents the load reduction at time t, that is, the load that can be directly reduced during the peak electricity period at time t, a c It represents the proportion of load shedding in the total load demand of the load group, P ini (t) represents the total load demand of the load group at time t, Δ c (t) represents the reduction coefficient at time t, P tr (t) represents the load that can be transferred at time t, that is, the load during the peak period is transferred to the load during the valley period. tr Indicates the proportion of transferable load in the total load demand of the load group, Δ tr (t) represents the transfer coefficient at time t.

8. The visual coordination method of adjustable distributed load resources according to claim 1, characterized in that: The specific execution steps of the adaptive collaboration method include: Calculate external load demand data or external load supply data for each load group; Calculate the weighted benefits from external load demand to external load supply load group for each load group; Based on the revenue weighting, the revenue of each load group in the alliance cost minimization subproblem and revenue allocation subproblem of the Nash negotiation model is weighted; The alternating direction multiplier method is used to solve the weighted alliance cost minimization subproblem and revenue allocation subproblem, and the solution is used as the optimal coordination method for the load group.

9. The visual coordination method of adjustable distributed load resources according to claim 8, characterized in that: The returns are weighted as follows: Where D mn represents the revenue weighting of the external load demand load group m and the external load supply load group l, d mn It represents the distance from external load demand load group m to external load supply load group n, d m,l It represents the distance from the external load demand load group m to the external load supply load group l, N represents the number of external load supply load groups, and τ represents the magnification coefficient of the benefit weighting factor.

10. A visual collaborative system capable of adjusting distributed load resources, characterized in that: include: The load group module is used to obtain the load characteristics and location information of the distributed loads in the area and divide the load groups; A branch end module is used to set each load group as a branch end, map the distributed loads in the load group on the same branch end, and perform coordinated control on the distributed loads of the load group; The main control end module is used to call and map any branch end, view and obtain the operating data of the load group in any branch end, and use the adaptive collaborative method to collaboratively control the load groups at each branch end based on the acquired operating data of the load groups at each branch end; Among them, the main control end module maps the digital twin models of the load groups in one or more selected branch ends according to the location information of the load groups to construct a regional distributed load digital twin model, and obtains and visualizes the operating status and prediction results of the distributed loads in the distributed load digital twin model.

Citation Information

Patent Citations

  • ADMM-based power distribution network-microgrid group collaborative distributed optimal scheduling method and system

    CN115333110A

  • Power load flexible adjusting system of multiple power generation systems

    CN117411011A

  • Virtual aggregation system and method for regional energy source complex

    WO2021244000A1