Energy consumption configuration method and device for new energy through power electronic transmission system
By configuring energy consumption according to the characteristics of the power electronic transmission system and new energy, the problem of large energy consumption and configuration in the new energy power electronic transmission system is solved, the equipment footprint and cost are reduced, and the economic benefits and reliability of the system are improved.
Patent Information
- Application Number
- CN202310637887.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2043-05-31
AI Technical Summary
The power electronic transmission system of new energy consumes a large amount of energy, resulting in large area and high cost of equipment. When new energy has time-travel or sufficient energy consumption, the power electronics will be re-configured to consume energy, affecting the safe operation of the equipment and engineering reliability. .
According to the emergency power regulation time of the power electronic transmission system access to the power grid system and the maximum time requirement for grid fault travel, combined with the fault travel characteristics and configuration energy consumption characteristics of new energy, the first and second time are determined, and the results and ratings are compared Power configuration consumes energy, reducing unnecessary energy consumption configurations.
It reduces the energy consumption configuration of the new energy power electronic transmission system, improves economic benefits, avoids waste of equipment land and cost, and ensures the safe and reliable operation of the system.
Smart Images

Figure CN119070323A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of new energy power transmission, and more specifically, to a method and device for configuring energy consumption of new energy through a power electronic transmission system, an electronic device, and a non-transitory computer-readable storage medium. Background Art
[0002] Countries around the world are accelerating energy transformation, especially by vigorously developing new energy technologies to solve the dilemma of economic development and climate warming. New energy mainly includes wind power, photovoltaics and supporting energy storage or reactive power compensation devices.
[0003] my country's new energy is mainly concentrated in deserts or offshore. Deserts and offshore are at the end of the power grid. Deserts and offshore new energy show a trend of large-scale development and centralized transmission, such as transmission through flexible direct current and transmission through low-frequency transmission. Due to the inertia of wind turbines in new energy, when the receiving end of the power electronic transmission system of new energy fails, the power cannot be transmitted, which may cause power accumulation and overvoltage tripping, affecting the safe operation of equipment and the reliable operation of the project.
[0004] The inventors of the present application have discovered that the energy consumption devices with the same capacity as the power of the new energy through the power electronic transmission system are currently used in engineering projects. The energy consumption time is directly determined according to the emergency power adjustment time of the power electronic transmission system connected to the power grid and the maximum time requirement for grid fault crossing, resulting in large energy consumption. Moreover, when the new energy has the ability to cross or is configured with sufficient energy consumption, the power electronics are repeatedly configured for energy consumption, resulting in problems such as large space and high cost. Summary of the invention
[0005] The present application proposes a method and device for configuring energy consumption of a new energy through a power electronic transmission system, an electronic device, and a non-transient computer-readable storage medium to solve the problem of large energy consumption configuration in a new energy power electronic transmission system.
[0006] According to one aspect of the present application, a method for configuring energy consumption of a new energy source through a power electronic transmission system is proposed, and the energy consumption configuration method includes: determining a first time according to an emergency power adjustment time of the power electronic transmission system connected to a power grid system and a maximum time requirement for grid fault ride-through; determining a second time according to a fault ride-through characteristic and a configured energy consumption characteristic of the new energy source; comparing the first time with the second time; and configuring the energy consumption according to the comparison result and the rated power of the power electronic transmission system.
[0007] According to some embodiments, configuring the energy consumption according to the comparison result and the difference between the first time and the second time includes: when the first time is greater than the second time, configuring the energy consumption according to the rated power of the power electronic transmission system multiplied by the difference between the first time and the second time.
[0008] According to some embodiments, the new energy includes photovoltaics, wind power, a combination of photovoltaics and wind power, a photovoltaic energy storage combination, a wind power energy storage combination, or a wind power photovoltaic energy storage combination system.
[0009] According to some embodiments, the power electronic transmission system includes: one or more of a flexible direct current transmission system, a low frequency transmission system, and a direct current transformer transmission system.
[0010] According to some embodiments, the first time is a larger value of an emergency power regulation time of the power electronic transmission system connected to a power grid system and a maximum time required for a power grid fault ride-through, as shown in the following formula:
[0011] T1=max{T3|T4}
[0012] Among them, T1 is the first time, T3 is the third time, which is the maximum required time for emergency power regulation of the grid access system, and T4 is the fourth time, which is the maximum required time for fault ride-through of the grid access system. The maximum required time for emergency power regulation and the maximum required time for fault ride-through are both determined by the demand of the grid access system.
[0013] According to some embodiments, according to the fault ride-through characteristics and configured energy consumption characteristics of the new energy, determining the second time includes: configuring the power generation power of the photovoltaic storage in the new energy to the first power generation power, and the fault ride-through characteristic of the photovoltaic storage is that the active current can be quickly adjusted and output without configuring energy consumption during ride-through; configuring the power generation power of the wind power in the new energy to the second power generation power, and configuring the wind turbine energy consumption tolerance full power time to the fifth time, and the fifth time is determined by the wind turbine configuration energy consumption. The wind power fault ride-through characteristic is the current characteristic output by the wind turbine during the fault period after the wind turbine is configured with energy consumption according to the access standard of the power grid or wind farm.
[0014] According to some embodiments, the energy consumption configuration method according to claim 6 is characterized in that determining the second time according to the fault ride-through characteristics and the configured energy consumption characteristics of the new energy source further comprises: calculating the second time according to the first generated power, the first time, the second generated power, the fifth time and the rated power of the power electronic transmission system, as shown in the following formula:
[0015] T2=(P1*T1+P2*T5) / Ps
[0016] Among them, P1 is the first generated power, T1 is the first time, P2 is the second generated power, T5 is the fifth time, and Ps is the rated power of the power electronic transmission system.
[0017] According to some embodiments, when the first time is greater than the second time, configuring the energy consumption according to the difference between the rated power of the power electronic transmission system multiplied by the first time and the second time includes determining the energy consumption according to the following formula:
[0018] E chmin =Ps*(T1-T2)
[0019] Where: T1 is the first time, T2 is the second time, Ps is the rated power of the power electronic transmission system, E chmin is the minimum energy value of the energy consumption.
[0020] According to some embodiments, the energy consumption configuration method further includes: determining a minimum energy consumption power according to a minimum energy value of the energy consumption when the first time is greater than the second time.
[0021] According to some embodiments, when the first time is greater than the second time, determining the minimum power of energy consumption according to the minimum energy value of the energy consumption includes:
[0022] The minimum power consumption is determined according to the following formula:
[0023] P chmin =E chmin / T1
[0024] Among them, P chmin is the minimum power consumption, E chmin is the minimum energy value of the energy consumption, and T1 is the first time.
[0025] According to some embodiments, the energy consumption is AC energy consumption configured on the AC side, or the energy consumption is DC energy consumption configured on the DC side.
[0026] According to some embodiments, the energy consumption configuration method further includes: if the first time is not greater than the second time, not configuring the energy consumption.
[0027] According to one aspect of the present application, a device for configuring energy consumption of a new energy source through a power electronic transmission system is proposed, and the energy consumption configuration device includes: a first time determination unit, used to determine a first time according to an emergency power adjustment time of the power electronic transmission system connected to a power grid system and a maximum time requirement for grid fault ride-through; a second time determination unit, used to determine a second time according to a fault ride-through characteristic and a configured energy consumption characteristic of the new energy source; a comparison unit, used to compare the first time with the second time; and an energy consumption configuration unit, used to configure the energy consumption according to a comparison result and the rated power of the power electronic transmission system.
[0028] According to one aspect of the present application, an electronic device is provided, comprising: a processing unit; and
[0029] A storage unit stores a computer program, and when the computer program is executed by the processing unit, the processing unit executes the energy consumption configuration method as described in any of the previous embodiments.
[0030] According to one aspect of the present application, a non-transitory computer-readable storage medium is provided, on which computer-readable instructions are stored. When the instructions are executed by a processor, the processor executes the energy consumption configuration method as described in any of the previous embodiments.
[0031] According to the embodiments of the present application, the energy consumption configuration of the new energy power electronic transmission system is reduced and the economic benefits are improved.
[0032] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for describing the embodiments. By describing the exemplary embodiments in detail with reference to the drawings, the above and other objectives, features and advantages of the present application will become more apparent.
[0034] Figure 1 A system schematic diagram of a new energy transmission system via power electronics according to an exemplary embodiment of the present application is shown.
[0035] Figure 2 A system schematic diagram of a new energy flexible direct current transmission system according to an exemplary embodiment of the present application is shown.
[0036] Figure 3 A system schematic diagram of a new energy transmission system via a low frequency / divided frequency according to an exemplary embodiment of the present application is shown.
[0037] Figure 4 A flow chart of a method for configuring energy consumption of a new energy source via a power electronic transmission system according to an exemplary embodiment of the present application is shown.
[0038] Figure 5 A block diagram of an energy consumption configuration device for a new energy source via a power electronic transmission system according to an exemplary embodiment of the present application is shown.
[0039] Figure 6 An electronic device according to an exemplary embodiment of the present application is shown. DETAILED DESCRIPTION
[0040] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in many forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this application will be comprehensive and complete and will fully convey the concepts of the example embodiments to those skilled in the art. In the figures, the same figures show the same or similar parts, and thus their repeated description will be omitted.
[0041] The user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of relevant countries and regions, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0042] The described features, structures or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced without one or more of these specific details, or other modes, components, materials, devices or operations may be adopted. In these cases, known structures, methods, devices, implementations, materials or operations will not be shown or described in detail.
[0043] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.
[0044] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.
[0045] The specific implementation modes of the present invention are described in detail below with reference to the accompanying drawings.
[0046] Figure 1 A system schematic diagram of a new energy transmission system via power electronics according to an exemplary embodiment of the present application is shown.
[0047] like Figure 1 As shown, the new energy through the power electronic transmission system includes an external new energy system 101, a power electronic transmission system 201 and an access grid system 301. The new energy system 101 can be a photovoltaic, wind power, photovoltaic-wind power combination, photovoltaic energy storage combination, wind power energy storage combination, wind power photovoltaic storage combination system. The power electronic transmission system 201 includes a transmission system and an energy consumption device, wherein the transmission system includes one or more of a flexible direct current transmission system, a low-frequency transmission system, and a direct current transformer transmission system. The power electronic transmission system receives the alternating current or direct current input by the new energy system 101, and after being transmitted by the power electronic transmission system, it is delivered to the access grid system 301.
[0048] Figure 2 A system schematic diagram of a new energy flexible direct current transmission system according to an exemplary embodiment of the present application is shown;
[0049] like Figure 2 As shown, the new energy system 101 is connected to the sending end 2011 of the flexible DC transmission system 201, converted into DC and sent to the receiving end 2012, and converted into an AC system through the receiving end 2012 to access the power grid system 301, wherein the flexible DC transmission system 201 determines the first time according to the emergency power adjustment time of the power electronic transmission system connected to the power grid system 301 and the maximum time requirement for grid fault crossing, determines the second time according to the fault crossing characteristics and configured energy consumption characteristics of the new energy system 101, and compares the first time and the second time. According to an embodiment of the present application, when the first time is greater than the second time, the minimum energy value of the energy consumption 2013 is determined according to the difference between the rated power of the electronic transmission system multiplied by the first time minus the second time. According to other embodiments of the present application, when the first time is not greater than the second time, energy consumption is not configured.
[0050] Figure 3 According to an exemplary embodiment of the present application, a system schematic diagram showing an exemplary embodiment of a new energy transmission system via a low frequency / divided frequency transmission system is shown. Figure 3 As shown, the new energy transmission system through low-frequency transmission includes a new energy system 101, a low-frequency / divided-frequency transmission system 201 and an access grid system 301, wherein: the low-frequency transmission system 201 includes a low-frequency transmission converter 2014 and an energy consumption 2013. The low-frequency transmission converter 2014 receives the low-frequency AC power input from the new energy system 101 into industrial frequency AC power, and then sends it to the access grid system 301.
[0051] The low-frequency transmission system 201 determines the first time according to the emergency power adjustment time of the power electronic transmission system connected to the power grid and the maximum time requirement for the power grid fault crossing, determines the second time according to the fault crossing characteristics of the new energy system 101 and the configured energy consumption characteristics, and compares the first time and the second time. According to an embodiment of the present application, when the first time is greater than the second time, the minimum energy value of the energy consumption 2013 is determined according to the rated power of the electronic transmission system multiplied by the difference between the first time and the second time. According to other embodiments of the present application, when the first time is not greater than the second time, energy consumption is not configured.
[0052] Figure 4 A flow chart of a method for configuring energy consumption of a new energy source through a power electronic transmission system according to an exemplary embodiment of the present application is shown. According to an embodiment of the present application, the new energy source includes photovoltaic, wind power, photovoltaic-wind power combination, photovoltaic energy storage combination, wind power energy storage combination or wind power photovoltaic energy storage combination system. The power electronic transmission system includes: one or more of a flexible direct current transmission system, a low-frequency transmission system, and a direct current transformer transmission system.
[0053] like Figure 4 As shown, in step S401, a first time is determined according to the emergency power adjustment time of the power electronic transmission system connected to the power grid system and the maximum time requirement for grid fault ride-through.
[0054] In a specific embodiment, the first time is a larger value of the emergency power regulation time of the power electronic transmission system connected to the power grid system and the maximum time required for grid fault ride-through, as shown in formula (1).
[0055] T1=max{T3|T4} (1)
[0056] Among them, T1 is the first time, T3 is the third time, which is the maximum demand time for emergency power regulation of the access grid system 301, and T4 is the fourth time, which is the maximum demand time for fault ride-through of the access grid system 301. The maximum demand time for emergency power regulation and the maximum demand time for fault ride-through are both determined by the demand of the access grid system 301, for example, according to the need for the wind farm to have emergency power regulation capabilities. In a specific implementation, the sudden drop time of emergency power regulation needs to be between 1 second and 2 seconds. In other embodiments, the wind farm is required to have a low voltage ride-through tolerance time of 625 milliseconds or 1.5 seconds.
[0057] In step S403, a second time is determined according to the fault ride-through characteristics and the configured energy consumption characteristics of the new energy source.
[0058] In a specific embodiment, when the new energy is a combination of photovoltaic and wind power, the power generation of the photovoltaic storage in the new energy is configured as the first power generation, and the fault ride-through characteristic of the photovoltaic storage is that the active current can be quickly adjusted and output without configuring energy consumption during the ride-through; the power generation of the wind power in the new energy is configured as the second power generation, and the wind turbine energy consumption tolerance full power time is configured as the fifth time, and the fifth time is determined by the wind turbine configuration energy consumption. The fault ride-through characteristic of the wind power is the current characteristic output by the wind turbine during the fault period after the wind turbine is configured with energy consumption according to the access standard of the power grid or wind farm. Taking Part 1-Onshore Wind Power in the national standard GB T 19963.1-2021 Technical Regulations for Wind Farm Access to Power System as an example, the wind turbine fault ride-through characteristic has a clear reactive current Iq requirement, and its active current Id can be calculated by the total current limit Imax of the converter and the reactive current, as shown in formula (2).
[0059]
[0060] In another embodiment, when the new energy source is photovoltaic, the second power generation is configured to be zero. The power generation of the photovoltaic storage in the new energy source is configured to be the first power generation, and the fault ride-through characteristic of the photovoltaic storage is that the active current can be quickly adjusted and output without configuring energy consumption during ride-through.
[0061] According to an embodiment of the present application, the second time is calculated based on the first generated power, the first time, the second generated power, the fifth time and the rated power of the power electronic transmission system, as shown in formula (3).
[0062] T2=(P1*T1+P2*T5) / Ps (3)
[0063] Among them, P1 is the first generated power, T1 is the first time, P2 is the second generated power, T5 is the fifth time, and Ps is the rated power of the power electronic transmission system.
[0064] In step S405, the first time is compared with the second time.
[0065] In step S407, the energy consumption is configured according to the comparison result and the rated power of the power electronic transmission system.
[0066] When the first time is greater than the second time, the energy consumption is configured according to the difference between the rated power of the power electronic transmission system multiplied by the first time and the second time, as shown in formula (4).
[0067] E chmin =Ps*(T1-T2) (4)
[0068] Where: T1 is the first time, T2 is the second time, Ps is the rated power of the power electronic transmission system, E chmin is the minimum energy value of the energy consumption.
[0069] According to an embodiment of the present application, Figure 4 The energy consumption configuration method shown also includes determining the minimum energy consumption power according to the minimum energy value of the energy consumption, as shown in formula (5).
[0070] P chmin =E chmin / T1 (5)
[0071] Among them, P chmin is the minimum power consumption, E chmin is the minimum energy value of the energy consumption, and T1 is the first time.
[0072] It should be noted here that Figure 4 The energy consumption includes AC energy consumption configured on the AC side, or DC energy consumption configured on the DC side.
[0073] According to some other embodiments of the present application, when the first time is not greater than the second time, the energy consumption is not configured.
[0074] according to Figure 4 The illustrated embodiment reduces or eliminates the energy consumption configuration required for the power electronic transmission system by optimizing the fault ride-through characteristics of new energy sources and the whole system of power electronic control, thereby improving economic benefits.
[0075] The above mainly introduces the embodiments of the present application from the perspective of the method. Those skilled in the art should easily appreciate that, in combination with the operations or steps of each example described in the embodiments disclosed herein, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Those skilled in the art can use different ways to implement the described functions for each specific operation or method, and such implementation should not be considered to be beyond the scope of the present application.
[0076] The following describes the device embodiments of the present application. For details not described in the device embodiments of the present application, reference can be made to the method embodiments of the present application.
[0077] Figure 5 A block diagram of an energy consumption configuration device for a new energy source via a power electronic transmission system according to an exemplary embodiment of the present application is shown. Figure 5The energy consumption configuration device shown includes a first time determination unit 501, a second time determination unit 503, a comparison unit 505 and an energy consumption configuration unit 507. The first time determination unit 501 is used to determine the first time according to the emergency power adjustment time of the power electronic transmission system connected to the power grid system and the maximum time requirement of the power grid fault ride-through, the second time determination unit 503 is used to determine the second time according to the fault ride-through characteristics and configuration energy consumption characteristics of the new energy, the comparison unit 505 is used to compare the first time with the second time, and the energy consumption configuration unit 507 is used to configure the energy consumption according to the comparison result and the rated power of the power electronic transmission system.
[0078] Figure 6 An electronic device according to an exemplary embodiment of the present application is shown. Figure 6 The electronic device 200 according to this embodiment of the present application is described. Figure 6 The electronic device 200 shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0079] like Figure 6 As shown, the electronic device 200 is in the form of a general computing device. The components of the electronic device 200 may include, but are not limited to: at least one processing unit 210, at least one storage unit 220, a bus 230 connecting different system components (including the storage unit 220 and the processing unit 210), a display unit 240, etc.
[0080] The storage unit stores program codes, which can be executed by the processing unit 210, so that the processing unit 210 executes the methods described in this specification according to various exemplary embodiments of the present application. For example, the processing unit 210 can execute the following: Figure 1 The method shown in .
[0081] The storage unit 220 may include a readable medium in the form of a volatile storage unit, such as a random access memory unit (RAM) 2201 and / or a cache memory unit 2202 , and may further include a read-only memory unit (ROM) 2203 .
[0082] The storage unit 220 may also include a program / utility 2204 having a set (at least one) of program modules 2205, such program modules 2205 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.
[0083] Bus 230 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.
[0084] The electronic device 200 may also communicate with one or more external devices 300 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 200, and / or communicate with any device that enables the electronic device 200 to communicate with one or more other computing devices (e.g., routers, modems, etc.). Such communication may be performed via an input / output (I / O) interface 250. Furthermore, the electronic device 200 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 260. The network adapter 260 may communicate with other modules of the electronic device 200 via the bus 230. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 200, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0085] Through the description of the above implementation methods, it is easy for those skilled in the art to understand that the example implementation methods described here can be implemented by software or by combining software with necessary hardware. The technical solution according to the implementation method of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, including several instructions to enable a computing device (which can be a personal computer, a server, or a network device, etc.) to execute the above method according to the implementation method of the present application.
[0086] The software product may use any combination of one or more readable media. The readable medium may be a readable signal medium or a readable storage medium. The readable storage medium may be, for example, but not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination thereof. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof.
[0087] Computer readable storage media may include data signals propagated in baseband or as part of a carrier wave, wherein readable program codes are carried. Such propagated data signals may take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. The readable storage medium may also be any readable medium other than a readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, device, or device. The program codes contained on the readable storage medium may be transmitted using any suitable medium, including but not limited to wireless, wired, optical cable, RF, etc., or any suitable combination thereof.
[0088] Program code for performing the operations of the present application may be written in any combination of one or more programming languages, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In the case of a remote computing device, the remote computing device may be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computing device (e.g., via the Internet using an Internet service provider).
[0089] The computer-readable medium carries one or more programs. When the one or more programs are executed by a device, the computer-readable medium implements the aforementioned functions.
[0090] Those skilled in the art will appreciate that the above modules can be distributed in the device according to the description of the embodiment, or can be changed accordingly and only used in one or more devices different from the embodiment. The modules of the above embodiments can be combined into one module, or further divided into multiple sub-modules.
[0091] According to an embodiment of the present application, a computer program is provided, including a computer program or an instruction. When the computer program or the instruction is executed by a processor, the method described above can be executed.
[0092] The embodiments of the present application are described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and its core idea of the present application. At the same time, changes or deformations made by those skilled in the art based on the ideas of the present application, the specific implementation methods and the scope of application of the present application, all belong to the scope of protection of the present application. In summary, the content of this specification should not be construed as a limitation on the present application.
Claims
1. A method for configuring energy consumption of new energy through a power electronic transmission system, characterized in that: The energy consumption configuration method comprises: Determine the first time according to the emergency power regulation time of the power electronic transmission system connected to the power grid system and the maximum time requirement for grid fault ride-through; determining a second time according to the fault ride-through characteristics and configuration energy consumption characteristics of the new energy source; comparing the first time with the second time; The energy consumption is configured according to the comparison result and the rated power of the power electronic transmission system.
2. The energy consumption configuration method according to claim 1, characterized in that: Configuring the energy consumption according to the comparison result and the difference between the first time and the second time includes: When the first time is greater than the second time, the energy consumption is configured according to the difference between the rated power of the power electronic transmission system multiplied by the first time and the second time.
3. The energy consumption configuration method according to claim 1, characterized in that: The new energy sources include photovoltaics, wind power, a combination of photovoltaics and wind power, a photovoltaic energy storage combination, a wind power energy storage combination or a wind power photovoltaic energy storage combination system.
4. The energy consumption configuration method according to claim 1, characterized in that: The power electronic transmission system comprises: One or more of flexible DC transmission system, low frequency transmission system, DC transformer transmission system.
5. The energy consumption configuration method according to claim 1, characterized in that: The first time is the larger value of the emergency power adjustment time of the power electronic transmission system connected to the power grid system and the maximum time required for grid fault ride-through, as shown in the following formula: T1=max{T3|T4} Among them, T1 is the first time, T3 is the third time, which is the maximum required time for emergency power regulation of the grid access system, and T4 is the fourth time, which is the maximum required time for fault ride-through of the grid access system. The maximum required time for emergency power regulation and the maximum required time for fault ride-through are both determined by the demand of the grid access system.
6. The energy consumption configuration method according to claim 2, characterized in that: According to the fault ride-through characteristics and configuration energy consumption characteristics of new energy sources, the second time is determined to include: The power generation power of the photovoltaic storage in the new energy is configured as the first power generation power, and the fault ride-through characteristic of the photovoltaic storage is that the active current can be quickly adjusted and outputted without configuring energy consumption during the ride-through; The power generation power of wind power in the new energy is configured as the second power generation power, and the wind turbine energy consumption tolerance full power time is configured as the fifth time. The fifth time is determined by the wind turbine configuration energy consumption. The fault ride-through characteristic of the wind power is the current characteristic output by the wind turbine during the fault period after the wind turbine is configured with energy consumption according to the access standard of the power grid or wind farm.
7. The energy consumption configuration method according to claim 6, characterized in that: Determine the second time based on the fault ride-through characteristics and configuration energy consumption characteristics of the new energy, and also include: The second time is calculated according to the first generated power, the first time, the second generated power, the fifth time and the rated power of the power electronic transmission system, as shown in the following formula: T2=(P1*T1+P2*T5) / Ps Among them, P1 is the first generated power, T1 is the first time, P2 is the second generated power, T5 is the fifth time, and Ps is the rated power of the power electronic transmission system.
8. The energy consumption configuration method according to claim 7, characterized in that: When the first time is greater than the second time, configuring the energy consumption according to the difference between the rated power of the power electronic transmission system multiplied by the first time and the second time includes determining the energy consumption according to the following formula: AND chmin =Ps*(T1-T2) Where: T1 is the first time, T2 is the second time, Ps is the rated power of the power electronic transmission system, E chmin is the minimum energy value of the energy consumption.
9. The energy consumption configuration method according to claim 8, characterized in that: The energy consumption configuration method also includes: When the first time is greater than the second time, the minimum power of energy consumption is determined according to the minimum energy value of the energy consumption.
10. The energy consumption configuration method according to claim 9, characterized in that: In a case where the first time is greater than the second time, determining the minimum power of energy consumption according to the minimum energy value of the energy consumption includes: The minimum power consumption is determined according to the following formula: P chmin =E chmin / T1 Among them, P chmin is the minimum power consumption, E chmin is the minimum energy value of the energy consumption, and T1 is the first time.
11. The energy consumption configuration method according to claim 1, characterized in that: The energy consumption is AC energy consumption configured on the AC side, or the energy consumption is DC energy consumption configured on the DC side.
12. The energy consumption configuration method according to claim 1, characterized in that: The energy consumption configuration method also includes: When the first time is not greater than the second time, the energy consumption is not configured.
13. An energy consumption configuration device for a new energy source via a power electronic transmission system, characterized in that: The energy consumption configuration device comprises: A first time determination unit, configured to determine a first time according to an emergency power adjustment time of the power electronic transmission system connected to a power grid system and a maximum time requirement for a power grid fault ride-through; A second time determination unit, configured to determine a second time according to a fault ride-through characteristic and a configuration energy consumption characteristic of the new energy; a comparing unit, configured to compare the first time with the second time; An energy consumption configuration unit is used to configure the energy consumption according to the comparison result and the rated power of the power electronic transmission system.
14. An electronic device comprising: Processing unit; as well as A storage unit stores a computer program, and when the computer program is executed by the processing unit, the processing unit executes the energy consumption configuration method according to any one of claims 1 to 12.
15. A non-transitory computer-readable storage medium having computer-readable instructions stored thereon, which, when executed by a processor, causes the processor to execute the energy consumption configuration method according to any one of claims 1 to 12.
Citation Information
Patent Citations
New energy power generation unit power control method and system based on DC fault
CN110571870A
AC energy consumption resistance optimal configuration method and system suitable for flexible DC power grid
CN111404194A
Energy management system (EMS) of microgrid
CN112600241A
Multi-level data center consolidated power control
US20150115711A1
Boosting reactive current injection from wind turbine generators
WO2020125882A1