Soft start control method and device

The soft start control method for LLC power supplies addresses the issue of large impact currents by adaptively controlling startup parameters, ensuring safe and stable operation with real-time voltage detection and multiple platform frequency adjustments.

CN119070618APending Publication Date: 2024-12-03SHANDONG LONGERTEK TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310635909.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

LLC power supplies experience a large impact current during startup due to voltage loop control, which reduces system reliability and is not fully adaptable to various conditions.

Method used

A soft start control method involving system initialization, setting target voltage and switching frequency, real-time output voltage detection, and adaptive frequency reduction across multiple platforms with adjustable parameters to ensure the output voltage does not exceed the target.

Benefits of technology

Ensures a safe and stable startup process by accurately controlling the soft start, expanding applicability and ensuring the output voltage reaches the target within a certain time with alarm signals for operator intervention if necessary.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070618A_ABST
    Figure CN119070618A_ABST
Patent Text Reader

Abstract

The invention discloses a soft start control method and device, and the method comprises the following steps: initializing a control system, setting a target voltage, setting a platform switching frequency, setting the maximum duration of the platform, setting a soft start platform flag bit, detecting the output voltage of the system in real time, ending the soft start if the target voltage is reached within the maximum duration of the platform, and stopping the soft start if the target voltage is reached within the maximum duration of the platform. And if the maximum duration of the platform is reached and the target voltage is not reached, reducing the switching frequency of the platform, and continuing soft start. By initializing the system, setting the flag bit of the soft start platform and setting the target voltage, the switching frequency and the maximum duration time, the soft start process can be accurately controlled, the output voltage of the system can be detected in real time, soft start can be performed or the switching frequency of the platform can be reduced according to conditions, and the output voltage of the system is ensured not to exceed the target voltage. Therefore, the soft start process is safely and stably carried out, and the application range is enlarged by controlling parameters in the soft start platform.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of LLC power supply starting, and in particular relates to a soft starting control method, and also provides a soft starting device. Background Art

[0002] In power electronic devices, it is often necessary to soft-start high current and high voltage devices to avoid damage to the devices caused by surge current. Soft-start control is a commonly used control method for power electronic devices, which can effectively reduce the current surge of power electronic devices during the startup process and improve their startup success rate.

[0003] When the LLC power supply is powered on, the voltage of the output capacitor is much lower than the target voltage. At this time, the secondary winding of the LLC power supply's transformer is equivalent to a short circuit. Since the LLC power supply generally adopts a voltage loop control method, a large impact current will be generated, which will bring a large impact current to the system's power devices, reducing the reliability of the system.

[0004] At present, LLC power supply soft start generally adopts the method of gradually increasing the target voltage. During the startup process, the target voltage gradually increases according to a certain slope until it reaches the target value. This startup method still has a certain impact current under different input and output conditions and cannot be fully applicable to various startup conditions. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a soft start control method.

[0006] To achieve the above object, the technical solution of the present invention is:

[0007] A soft start control method comprises the following steps:

[0008] Control system initialization;

[0009] Set the target voltage, set the platform switching frequency, set the maximum platform duration, and set the soft start platform flag;

[0010] Real-time detection of system output voltage;

[0011] If the target voltage is reached within the maximum duration of the platform, the soft start ends;

[0012] If the maximum duration of the platform is reached and the target voltage is not reached, the platform switching frequency is reduced and the soft start continues.

[0013] Preferably, the platform switching frequency is provided with a platform minimum switching frequency;

[0014] If the platform switching frequency drops to the platform minimum switching frequency and the output voltage still does not reach the target voltage, the platform minimum switching frequency is maintained until the output voltage reaches the target voltage.

[0015] Preferably, a timeout alarm with a limit time is set corresponding to the minimum switching frequency of the platform. If the operating time at the minimum switching frequency of the platform reaches the limit time and still fails to meet the target voltage, an alarm signal is issued to remind the operator to check.

[0016] Preferably, the platform comprises a plurality of platforms, and the minimum switching frequency and the maximum duration of each platform can be set individually.

[0017] Preferably, the minimum switching frequencies of the plurality of platforms decrease step by step;

[0018] If the control system's operating time at the minimum switching frequency under the current platform has reached the platform's maximum duration, it will switch to operating under the secondary platform conditions.

[0019] Preferably, the number of the platforms is two or three.

[0020] The present invention also provides a soft start device, comprising: a power conversion circuit, a system output voltage sampling circuit and a control circuit;

[0021] Power conversion circuit, used to achieve isolated energy transfer;

[0022] System output voltage sampling circuit, real-time detection of output voltage status;

[0023] The control circuit is used to control system initialization, calculate the difference between the output voltage and the target voltage in real time, and adjust the parameters of the soft start platform and the control system during the startup process according to the difference.

[0024] After adopting the above technical solution, the soft start control method and device provided by the present invention have the following beneficial effects compared with the prior art.

[0025] (1) By initializing the system, setting the soft start platform flag, and setting the target voltage, switching frequency, and maximum duration, the soft start process can be accurately controlled, the system output voltage can be detected in real time, and soft start or platform switching frequency can be reduced according to the situation to ensure that the system output voltage does not exceed the target voltage, thereby achieving a safe and stable soft start process. By controlling the parameters in the soft start platform, the scope of application is expanded.

[0026] (2) By setting the platform minimum switching frequency, it can be ensured that the system output voltage will not exceed the target voltage under any circumstances. When the platform switching frequency drops to the platform minimum switching frequency, the target voltage is still not reached. The platform minimum switching frequency is maintained until the output voltage reaches the target voltage, realizing adaptive control of the soft start process.

[0027] (3) By setting the limit time corresponding to the platform's minimum switching frequency, it is possible to ensure that the system reaches the target voltage within a certain period of time. When the operating time at the platform's minimum switching frequency reaches the limit time and still fails to meet the target voltage, an alarm signal is issued to remind the operator to check in time to ensure the safe operation of the system.

[0028] (4) Flexible control can be achieved by individually setting the minimum switching frequency and maximum duration of multiple platforms. When the control system's operation time at the minimum switching frequency under the current platform has reached the maximum duration of the platform, it can switch to the secondary platform to better ensure the safe and stable startup of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The accompanying drawings are part of the present invention and are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but do not constitute an improper limitation of the present invention. Obviously, the drawings described below are only some embodiments. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the accompanying drawings:

[0030] Figure 1 It is a schematic diagram of the process of the present invention.

[0031] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but are intended to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention but are not used to limit the scope of the present invention.

[0033] In the description of the present invention, it should be noted that the directions or positional relationships indicated by terms such as “upper”, “lower”, “front”, “back”, “left”, “right”, “vertical”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0034] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0036] As shown in the figure, this embodiment provides a soft start control method, which is characterized in that it includes the following steps: first, the system is initialized, the target voltage is set, the platform switching frequency is set, the maximum duration of the platform is set, and then the soft start platform flag is set to start calculating the start time.

[0037] The output voltage in the system is detected in real time. During the system soft start process, if the target voltage is reached within the maximum duration of the platform, the soft start ends.

[0038] Furthermore, if the maximum duration of the platform is reached and the target voltage is not reached, the platform switching frequency is reduced and the soft start is continued.

[0039] By initializing the system, setting the soft start platform flag, and setting the target voltage, switching frequency, and maximum duration, the soft start process can be accurately controlled, the system output voltage can be detected in real time, and soft start or platform switching frequency can be reduced according to the situation to ensure that the system output voltage does not exceed the target voltage, thereby achieving a safe and stable soft start process. By controlling the parameters in the soft start platform, the scope of application is increased. Furthermore, the control system initialization includes data initialization and PWM module initialization.

[0040] Furthermore, the platform switching frequency is provided with a platform minimum switching frequency. If the platform switching frequency drops to the platform minimum switching frequency and the output voltage still does not reach the target voltage, the platform minimum switching frequency is maintained until the output voltage reaches the target voltage.

[0041] By setting the platform minimum switching frequency, it can be ensured that the system output voltage will not exceed the target voltage under any circumstances. When the platform switching frequency drops to the platform minimum switching frequency, the target voltage is still not reached. The platform minimum switching frequency is maintained until the output voltage reaches the target voltage, realizing adaptive control of the soft start process.

[0042] Furthermore, a timeout alarm with a limit time is set corresponding to the minimum switching frequency of the platform. If the operating time at the minimum switching frequency of the platform reaches the limit time and still fails to meet the target voltage, an alarm signal is issued to remind the operator to check.

[0043] By setting the limit time corresponding to the platform's minimum switching frequency, you can ensure that the system reaches the target voltage within a certain period of time. When the operating time at the platform's minimum switching frequency reaches the limit time and still does not meet the target voltage, an alarm signal is issued to remind operators to check in time to ensure the safe operation of the system.

[0044] The platform includes a plurality of platforms, the minimum switching frequency and the maximum duration of each platform can be set separately, and the minimum switching frequencies of the plurality of platforms decrease step by step;

[0045] If the control system's operating time at the minimum switching frequency under the current platform has reached the platform's maximum duration, it will switch to operating under the secondary platform conditions.

[0046] Flexible control can be achieved by individually setting the minimum switching frequency and maximum duration of multiple platforms. When the control system's minimum switching frequency operation time under the current platform has reached the maximum duration of the platform, it can be switched to the secondary platform to better ensure the safe and stable startup of the system.

[0047] Furthermore, after starting the soft start process and setting parameters such as the target voltage, limit time, and platform minimum switching frequency, the system frequency is slowly reduced from the maximum switching frequency while the output voltage is detected in real time.

[0048] The state of the soft start plateau is determined based on the output voltage.

[0049] Determine whether the output voltage reaches the target voltage;

[0050] If the output voltage reaches the target voltage, the soft start ends.

[0051] Furthermore, if the output voltage does not reach the target voltage, the switching frequency of the system will continue to decrease.

[0052] When the system switching frequency has been reduced to the platform minimum switching frequency, the output voltage still does not reach the target voltage.

[0053] The system frequency will maintain the current platform minimum frequency until the output voltage reaches the target voltage and the soft start ends.

[0054] Furthermore, compared with the soft start of a single platform, the difference of the multi-platform soft start is that the maximum duration and minimum switching frequency are set for each platform. If the output voltage does not reach the target voltage and the switching frequency has dropped to the minimum switching frequency, the current switching frequency is maintained until the maximum duration of the platform. The first platform to be run is defined as the first platform, followed by the second platform, the third platform, and so on.

[0055] If the output voltage still does not reach the target voltage after the maximum duration of the platform ends, the system will enter the next platform, that is, the second platform, repeat the steps of the first platform, set the soft start second platform flag, and reduce the switching frequency. If the switching frequency has dropped to the minimum switching frequency and maintains the current switching frequency until the target voltage is still not reached after the maximum duration of the platform, it will enter the third platform and repeat the steps of the previous platform until the target voltage is reached.

[0056] Further, the platform minimum switching frequency of each platform is different, and the platform minimum switching frequency of the first platform is greater than the platform minimum switching frequency of the second platform;

[0057] The minimum switching frequency of the second platform is greater than the minimum switching frequency of the third platform, and so on. The minimum switching frequency of the platform is determined according to the resonant frequency of the control system. The number of platforms is preferably two or three, and the platform is not necessarily set to two or three, and more platforms can be set as needed.

[0058] Furthermore, the number of soft-start platforms is determined based on the resonant current overshoot inside the control system. For example, if the current is 10A in the normal state and reaches 20A during the test, the platform is increased to avoid overshoot. The purpose is to adjust the parameters to achieve a state where the output voltage has no overshoot and the internal current has no overshoot.

[0059] Furthermore, the maximum duration of each platform is also different, and the specific maximum duration of each platform is determined according to the required time for output voltage startup.

[0060] This embodiment also provides a soft start device, including: a power conversion circuit, a system output voltage sampling circuit and a control circuit.

[0061] Power conversion circuit is used to realize isolated energy transfer.

[0062] The system output voltage sampling circuit detects the state of the output voltage in real time.

[0063] The control circuit is used to control system initialization, calculate the difference between the output voltage and the target voltage in real time, and adjust the parameters of the soft start platform and the control system during the startup process according to the difference.

[0064] Preferably, the soft start control method and soft start device mentioned in this embodiment are applied to LLC power supply technology to solve the problem in the prior art that LLC will bring a large impact current to the power devices of the system when powered on, thereby improving the reliability of the system. Compared with the commonly used soft start method, it does not increase the circuit elements and cost, and has higher reliability.

[0065] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0066] The above description is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this patent can make some changes or modifications to equivalent embodiments of equivalent changes by using the technical content suggested above without departing from the scope of the technical solution of the present invention. The implementation scheme in the above embodiment can also be further combined or replaced. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of the solution of the present invention.

Claims

1. A soft start control method, characterized in that: The steps include: Control system initialization; Set the target voltage, set the platform switching frequency, set the maximum platform duration, and set the soft start platform flag; Real-time detection of system output voltage; If the target voltage is reached within the maximum duration of the platform, the soft start ends; If the maximum duration of the platform is reached and the target voltage is not reached, the platform switching frequency is reduced and the soft start continues.

2. A soft start control method according to claim 1, characterized in that: The platform switching frequency is provided with a platform minimum switching frequency; If the platform switching frequency drops to the platform minimum switching frequency and the output voltage still does not reach the target voltage, the platform minimum switching frequency is maintained until the output voltage reaches the target voltage.

3. A soft start control method according to claim 2, characterized in that: A timeout alarm with a limit time is set corresponding to the minimum switching frequency of the platform. If the operating time at the minimum switching frequency of the platform reaches the limit time and still fails to meet the target voltage, an alarm signal is issued to remind the operator to check.

4. A soft start control method according to claim 2, characterized in that: The platform includes a plurality of platforms, and the minimum switching frequency and the maximum duration of each platform can be set individually.

5. A soft start control method according to claim 4, characterized in that: The minimum switching frequencies of the plurality of platforms are gradually reduced; If the control system's operating time at the minimum switching frequency under the current platform has reached the platform's maximum duration, it will switch to operating under the secondary platform conditions.

6. A soft start control method according to claim 4, characterized in that: The number of the platforms is two or three.

7. A soft start device, characterized in that: include: Power conversion circuit, system output voltage sampling circuit and control circuit; Power conversion circuit, used to achieve isolated energy transfer; System output voltage sampling circuit, real-time detection of output voltage status; The control circuit is used to control system initialization, calculate the difference between the output voltage and the target voltage in real time, and adjust the parameters of the soft start platform and the control system during the startup process according to the difference.