Method for pouring and forming trailing edge beam of wind power blade along with shell
By injecting the UD cloth layer of the trailing edge of the wind power blade in advance, the problems of long forming time of the wind power blade and uneven appearance of the outer surface are solved, and the effect of simplifying operation and reducing costs is achieved.
Patent Information
- Application Number
- CN202410982750.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The wind power blade molding time is long and the infusion auxiliary materials are arranged in complex ways, resulting in steps on the outer surface, increasing manufacturing costs and affecting product quality.
The method of pre-filling and molding of the trailing edge UD cloth layer is used to cut out the trailing edge beam mold for mold release agent and lay continuous felt, cover the isolation film and release cloth, lay prefabricated VAP air extraction bags and composite diversion nets, and carry out Vacuum filling molding shortens molding time and reduces process requirements.
The blade forming time is shortened, the dark whitening of the trailing edge UD area and the outer surface shape steps are avoided, manufacturing costs are reduced, product quality and operation simplicity is improved.
Smart Images

Figure CN119078225A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind turbine blade infusion molding, and in particular to a method for infusion molding a wind turbine blade trailing edge beam together with a shell. Background Art
[0002] Most designs of wind turbine blades require the UD cloth layer on the trailing edge to be laid together with the shell structure layer. The overall blade molding time is relatively long, and the arrangement of the auxiliary materials for pouring is relatively complex. Prefabricated VAP vacuum bags need to be laid on both the inner and outer surfaces for vacuuming, which requires high manual skills. At the same time, the existing technology has the problem that the shell laying time is relatively long, which is time-consuming and labor-intensive; the prefabricated VAP vacuum bags are laid on the outer surface, resulting in steps on the outer surface profile, and the use of plastic putty for repairing the shape when rolling paint increases the manufacturing cost; the arrangement of the auxiliary materials for pouring is relatively high, and if there is a large error, the trailing edge UD area will be surrounded, affecting product quality.
[0003] Therefore, there is an urgent need for a wind turbine blade infusion molding method that can shorten the blade molding time, simplify the operation and reduce the process requirements. Summary of the invention
[0004] Based on this, it is necessary to provide a method for casting the trailing edge beam of a wind turbine blade together with the shell to address the above technical problems.
[0005] A method for casting a trailing edge beam of a wind turbine blade together with a shell, comprising the following steps:
[0006] S1. Cutting out the trailing edge profile from the shell mold as the trailing edge beam mold according to the axial and chordal positions of the trailing edge UD cloth layer in the shell;
[0007] S2, cleaning the trailing edge beam mold and applying a release agent thereto in a Z-shaped manner, laying a layer of continuous felt on the trailing edge beam mold to axially cover the trailing edge UD area;
[0008] S3. Lay a layer of isolation film on the continuous felt area and lay a release cloth as a whole;
[0009] S4. Laying the trailing edge UD cloth layer on the trailing edge beam mold in sequence according to the design positioning data;
[0010] S5. Cover the entire rear edge UD area with a release cloth, and lay a prefabricated VAP vacuum bag from the rear edge to the front edge of the rear edge UD cloth layer;
[0011] S6. Lay a composite guide net on the front edge of the prefabricated VAP vacuum bag, and overlap the rear edge with the prefabricated VAP vacuum bag;
[0012] S7. Place an ohm tube on the continuous felt at the leading edge side of the trailing edge UD cloth layer, and place a glue injection seat at an axial distance from the blade root;
[0013] S8, using a vacuum bag film to cover the trailing edge beam mold to seal the vacuum, turning on a vacuum pump to evacuate air, and performing injection molding;
[0014] S9, after the heating process of the rear edge beam mold is completed, the hardness of the rear edge beam cloth layer is tested, the mold is demoulded by cooling, and the rear edge beam is obtained and placed in the shell;
[0015] S10, laying all structural layers according to the shell design structure, and when laying to the trailing edge UD cloth layer structure, laying continuous felt in the trailing edge UD cloth layer area;
[0016] S11. Position the trailing edge beam according to the design data and place it in the shell cavity, lay the corresponding structural layers and auxiliary materials, lay prefabricated VAP vacuum bags in the trailing edge beam area to assist in vacuuming, lay vacuum bag film to maintain pressure and then perform injection molding to obtain a wind turbine blade.
[0017] In one of the embodiments, step S2 includes: cleaning the trailing edge beam mold, applying a release agent in a Z-shaped manner, laying a layer of continuous felt on the trailing edge beam mold, pouring resin diversion on the lower side, axially covering the trailing edge UD area, the chord-wise trailing edge side exceeds the trailing edge of the first layer UD by 0-30 mm, and the leading edge side exceeds the UD area by 80-100 mm.
[0018] In one embodiment, step S3 includes: laying a layer of isolation film on the continuous felt area, with an overlap width of 10-20 mm, the chord-wise trailing edge side extending beyond the trailing edge boundary line of the continuous felt by 0-30 mm, and the leading edge side extending beyond the UD area by 30-50 mm; laying a layer of release cloth as a whole, with the trailing edge of the release cloth extending beyond the trailing edge UD area positioning line mold by 0-50 mm, and the rest remaining on the leading edge side.
[0019] In one of the embodiments, step S5 includes: after the trailing edge UD cloth layer is laid, a layer of demoulding cloth is covered on the entire trailing edge UD area, the trailing edge side exceeds the parting line by 0-30 mm, the leading edge side exceeds the UD area by 0-50 mm, and a prefabricated VAP vacuum bag with a width of 200 mm is laid from 50-80 mm from the trailing edge of the trailing edge UD cloth layer to the leading edge.
[0020] In one embodiment, step S6 includes: laying a composite guide net on the leading edge of the prefabricated VAP vacuum bag, the trailing edge of the composite guide net overlaps the prefabricated VAP vacuum bag by 10-30 mm, and the leading edge of the composite guide net is 100 mm away from the leading edge of the trailing edge UD cloth layer.
[0021] In one of the embodiments, the injection seat is placed at a position 10m, 25m, 40m and 60m away from the blade root in the axial direction.
[0022] In one of the embodiments, step S9 includes: after the heating procedure of the trailing edge beam mold is completed, testing the hardness of the cloth layer of the trailing edge beam, and performing a hardness test every three meters on the surface; if the hardness of the cloth layer of the trailing edge beam meets the Shore hardness ≥55HD and the glass transition temperature ≥70°C, cooling to below 40°C for demolding, tearing off the demolding cloth on the upper and lower surfaces of the trailing edge beam to obtain the trailing edge beam, and using a hanging beam, a conformal guard plate and a hanging strap to place the trailing edge beam into the shell.
[0023] In one of the embodiments, step S10 includes: laying all structural layers according to the shell design, and when laying to the trailing edge UD cloth layer structure, laying a continuous felt in the trailing edge UD cloth layer area, the continuous felt exceeds the trailing edge side of the trailing edge beam by 0-50 mm, and the leading edge side exceeds the trailing edge beam by 50-70 mm. If the continuous felt exceeds the parting line on the trailing edge side of the trailing edge beam, the continuous felt is cut to align with the trailing edge of the trailing edge beam.
[0024] In one of the embodiments, in the step S11, the prefabricated VAP vacuum bag is laid toward the front edge with a distance of 50 mm between the rear edge of the rear edge beam and the rear edge of the rear edge.
[0025] Compared with the prior art, the advantages and beneficial effects of the present invention are as follows: according to the axial and chordal positions of the trailing edge UD cloth layer in the shell, the trailing edge profile is cut out from the shell mold as the trailing edge beam mold, the trailing edge beam mold is cleaned and a release agent is applied to it in a Z-shaped manner, a layer of continuous felt is laid on the trailing edge beam mold to axially cover the trailing edge UD area; a layer of isolation film is laid on the continuous felt area, and the release cloth is laid as a whole, and the trailing edge UD cloth layer is laid on the trailing edge beam mold in sequence according to the design positioning data, the trailing edge UD area is covered as a whole with the release cloth, and a prefabricated VAP vacuum bag is laid from the trailing edge to the leading edge of the trailing edge UD cloth layer; a composite guide net is laid on the leading edge side of the prefabricated VAP vacuum bag, and the trailing edge side is overlapped with the prefabricated VAP vacuum bag, an ohm tube is placed on the continuous felt on the leading edge side of the trailing edge UD cloth layer, and a glue injection seat is placed at an axial distance from the blade root; the trailing edge beam mold is covered with a vacuum bag film to The vacuum is sealed, and the vacuum pump is turned on for exhaust, and injection molding is performed. After the heating program of the trailing edge beam mold is completed, the hardness of the cloth layer of the trailing edge beam is tested. When it meets the design requirements, the mold is demoulded by cooling to obtain the trailing edge beam and put it into the shell; all structural layers are laid according to the shell design structure, and when the trailing edge UD cloth layer structure is laid, a continuous felt is laid in the trailing edge UD cloth layer area, and the trailing edge beam is positioned and placed in the shell cavity according to the design data, and the corresponding structural layers and auxiliary materials are laid, and a prefabricated VAP vacuum bag is laid in the trailing edge beam area to assist in exhaust, and the vacuum bag film is laid for pressure maintenance and then injection molding is performed to obtain the wind turbine blade. By injecting and molding the trailing edge beam in advance, the blade molding time is shortened, the laying requirements are reduced, and the problems of dark package whitening in the trailing edge UD area and steps on the outer surface profile that increase the manufacturing cost can be avoided, thereby achieving the goals of simple operation, high process requirement error, and reduced manufacturing cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic flow chart of a method for casting a trailing edge beam of a wind turbine blade together with a shell in one embodiment;
[0027] Figure 2 This is a schematic diagram of the laying structure of the trailing edge UD cloth layer in one embodiment;
[0028] Figure 3 A schematic diagram of the layer laying structure during the pouring molding of the trailing edge beam in one embodiment;
[0029] Figure 4 A schematic diagram of the arrangement of the vacuum bag film when the rear edge beam mold is evacuated in one embodiment;
[0030] Figure 5 It is a schematic diagram of lifting the trailing edge beam in one embodiment. DETAILED DESCRIPTION
[0031] Before describing the specific embodiments of the present invention, the overall concept of the present invention is described as follows:
[0032] The present invention is mainly developed based on the process of wind turbine blade infusion molding. At present, the shell laying time is long, and the prefabricated VAP vacuum bag is laid on the outer surface, which easily leads to steps on the outer surface. When rolling paint, shaping putty is required to repair the shape, which increases the manufacturing cost, and the layout of the infusion auxiliary materials is relatively high. If there is a large error, it will directly affect the product quality.
[0033] Therefore, the present invention proposes a method for casting a trailing edge beam of a wind turbine blade together with a shell, by casting and preforming the trailing edge UD cloth layer in advance, and then placing the trailing edge beam in the shell for casting according to design requirements, thereby solving the problem of long blade molding time, greatly shortening the molding time, and avoiding the problems of dark packages and whitening in the trailing edge UD area after shell molding, steps on the outer profile surface and high cost. The operation is simple, the product quality is improved, and the manufacturing cost is reduced.
[0034] After introducing the overall concept of the present invention, in order to make the purpose, technical solution and advantages of the present invention more clear, the present invention is further described in detail by specific implementation methods in combination with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0035] In one embodiment, Figure 1 As shown, a method for casting a trailing edge beam of a wind turbine blade together with a shell is provided, comprising the following steps:
[0036] Step S101 , cutting out the trailing edge profile from the shell mold as a trailing edge beam mold according to the axial and chordal positions of the trailing edge UD cloth layer in the shell.
[0037] Specifically, in order to preform the trailing edge beam by pouring in advance, the trailing edge profile is cut out from the shell mold as the trailing edge beam mold according to the axial position and chordal position of the trailing edge UD (unidirectional fabric) cloth layer in the shell, so as to facilitate the pouring of the trailing edge beam.
[0038] Step S102, cleaning the rear edge beam mold and applying a release agent thereto in a Z-shaped manner, laying a layer of continuous felt on the rear edge beam mold to axially cover the rear edge UD area.
[0039] Specifically, after the intercepted trailing edge beam mold is cleaned, a release agent is applied to the trailing edge beam mold in a Z-shaped manner, which can achieve a more comprehensive release agent application to the trailing edge beam mold. A layer of continuous felt is laid on the trailing edge beam mold to improve the surface strength, and resin is poured on the lower side to guide the flow, axially covering the trailing edge UD area.
[0040] Step S102 includes: cleaning the rear edge beam mold, applying a release agent in a Z-shaped manner, laying a layer of continuous felt on the rear edge beam mold, pouring resin diversion on the lower side, axially covering the rear edge UD area, the chord-wise rear edge side exceeds the rear edge of the first layer UD by 0-30mm, and the leading edge side exceeds the UD area by 80-100mm.
[0041] Specifically, after cleaning the cut-out trailing edge beam mold, a release agent is applied to the trailing edge beam mold in a Z-shaped manner, so that the release agent can be applied more evenly to the trailing edge beam mold; a layer of continuous felt is laid on the trailing edge beam mold, and resin is poured on the lower side for diversion, covering the trailing edge UD area axially to improve the surface layer strength, with the chord-wise trailing edge side exceeding the trailing edge of the first layer of UD by 0-30 mm, and the leading edge side exceeding the UD area by 80-100 mm.
[0042] Step S103, laying a layer of isolation film on the continuous felt area, and laying a release cloth as a whole.
[0043] Specifically, a layer of isolation film is laid on the continuous felt area of the trailing edge beam mold to facilitate tearing off the continuous felt after solidification, and a layer of demoulding cloth is laid on the entire trailing edge beam mold to ensure that there is a rough surface after the trailing edge beam is prefabricated and solidified.
[0044] Among them, step S103 includes: laying a layer of isolation film on the continuous felt area, with an overlap width of 10-20mm, the chord-wise trailing edge side exceeding the continuous felt trailing edge boundary line by 0-30mm, and the leading edge side exceeding the trailing edge UD area by 30-50mm; laying a layer of demoulding cloth as a whole, with the trailing edge of the demoulding cloth exceeding the trailing edge UD area positioning line mold by 0-50mm, and the rest remaining on the leading edge side.
[0045] Specifically, a layer of isolation film is laid in the area where the continuous felt is laid on the trailing edge beam mold to facilitate tearing off after the continuous felt is cured. The overlap width is 10-20mm, and the chord-wise trailing edge side exceeds the trailing edge boundary line of the continuous felt by 0-30mm, and the leading edge side exceeds the UD area by 30-50mm. A layer of demoulding cloth is laid on the entire trailing edge beam mold, with the trailing edge exceeding the UD positioning line mold by 0-50mm, and the rest is left on the leading edge side to ensure that there is a rough surface after the trailing edge beam is prefabricated and cured.
[0046] Step S104 , laying the trailing edge UD fabric layer on the trailing edge beam mold in sequence according to the design positioning data.
[0047] Specifically, according to the design positioning data of the wind turbine blade, the trailing edge UD cloth layer is laid on the trailing edge beam mold in sequence, and the laying method is as follows: Figure 2 As shown, a continuous felt is laid on the trailing edge beam mold, an isolation film is laid on the continuous felt, a demoulding cloth covering the entire trailing edge beam mold is laid on the isolation film, and a trailing edge UD cloth layer is laid on the demoulding cloth.
[0048] Step S105, covering the entire rear edge UD area with a release cloth, and laying a prefabricated VAP vacuum bag from the rear edge to the front edge of the rear edge UD cloth layer.
[0049] Specifically, after the trailing edge UD cloth layer is laid, a layer of release cloth is covered on the entire trailing edge UD area, and a prefabricated VAP vacuum bag is laid from the trailing edge to the leading edge of the trailing edge UD cloth layer. Corresponding vacuum holes are provided on the trailing edge beam mold to facilitate vacuuming in combination with the prefabricated VAP vacuum bag.
[0050] Among them, step S105 includes: after the trailing edge UD cloth layer is laid, a layer of demoulding cloth is covered on the entire trailing edge UD area, the trailing edge side exceeds the parting line by 0-30mm, the leading edge side exceeds the UD area by 0-50mm, and a 200mm wide prefabricated VAP vacuum bag is laid 50-80mm from the trailing edge UD cloth layer to the leading edge side.
[0051] Specifically, after the trailing edge UD cloth layer is laid, a layer of demoulding cloth is covered on the entire trailing edge UD area, the trailing edge side exceeds the parting line by 0-30mm, the leading edge side exceeds the UD area by 0-50mm, and a prefabricated VAP vacuum bag with a width of 200mm is laid toward the leading edge at a distance of 50-80mm from the trailing edge of the trailing edge UD cloth layer. Of course, other vacuum systems can also be used to perform vacuum operations in combination with the vacuum holes.
[0052] Step S106, laying a composite guide net on the leading edge of the prefabricated VAP air extraction bag, and overlapping the trailing edge side with the prefabricated VAP air extraction bag.
[0053] Specifically, a composite guide net is laid on the leading edge side of the prefabricated VAP vacuum bag, and the trailing edge side of the composite guide net is overlapped with the prefabricated VAP vacuum bag. The composite guide net can effectively improve the resin fluidity, reduce the generation of dry spot defects, and improve the molding quality of the trailing edge beam.
[0054] Among them, step S106 includes: laying a composite guide net on the leading edge side of the prefabricated VAP vacuum bag, the trailing edge side of the composite guide net overlaps the prefabricated VAP vacuum bag by 10-30mm, and the leading edge side of the composite guide net is 100mm away from the leading edge of the trailing edge UD cloth layer.
[0055] Specifically, after the prefabricated VAP vacuum bag is laid, a composite guide net is laid on the leading edge of the prefabricated VAP vacuum bag. The trailing edge of the composite guide net overlaps the prefabricated VAP vacuum bag by 10-30 mm, and the leading edge of the composite guide net is 100 mm away from the leading edge of the trailing edge UD cloth layer to facilitate resin diversion.
[0056] Step S107, placing an ohm tube on the continuous felt at the leading edge side of the trailing edge UD cloth layer, and placing a glue injection seat at a position axially away from the blade root.
[0057] Specifically, an Ω19 ohm tube is placed on the continuous felt on the leading edge side of the trailing edge UD cloth layer, and a glue injection seat is placed at an axial distance from the blade root. Of course, a glue injection system can also be placed to achieve glue injection.
[0058] The injection seat can be placed at an axial distance of 10m, 25m, 40m and 60m from the blade root.
[0059] Step S108, using a vacuum bag film to cover the rear edge beam mold to seal the vacuum, turning on the vacuum pump to evacuate air, and performing injection molding to obtain the rear edge beam.
[0060] Specifically, a vacuum bag film is used to cover the rear edge beam mold as a whole to seal the vacuum (vacuum system), and a vacuum pump is turned on to evacuate air. When the vacuum gauge reading is less than 20 mbar, the vacuum pump is turned on again to perform injection molding to obtain a pre-injected rear edge beam, such as Figure 3 and Figure 4 shown.
[0061] In combination with the above steps, before the wind turbine blade shell molding operation is performed, the trailing edge UD cloth layer under the core material in the shell structure is poured in advance to preform it into a trailing edge beam. Compared with the prior art in which the trailing edge UD cloth layer and the shell structure layer are laid together, the pouring molding of the trailing edge UD cloth layer is performed in advance, which shortens the blade molding time, avoids auxiliary material laying errors, and improves product quality.
[0062] Step S109, after the heating process of the rear edge beam mold is completed, the hardness of the rear edge beam cloth layer is tested, the mold is demoulded by cooling, and the rear edge beam is obtained and placed in the shell.
[0063] Specifically, after the trailing edge beam is poured and formed, the trailing edge beam mold is heated. After the heating process is completed, the hardness of the trailing edge beam cloth layer is tested to see if it meets the design requirements. If the test result is that it meets the design requirements, the trailing edge beam mold is cooled and demolded, the trailing edge beam is taken out, and the prepared trailing edge beam is placed in the shell to achieve early pouring and forming of the trailing edge beam, thereby shortening the blade forming time.
[0064] Among them, step S109 includes: after the heating program of the rear edge beam mold is completed, testing the hardness of the rear edge beam cloth layer, and performing a hardness test every three meters on the surface; if the hardness of the rear edge beam cloth layer meets the Shore ≥55HD, and the glass transition temperature ≥70°C, cooling to below 40°C for demoulding, tearing off the demoulding cloth on the upper and lower surfaces of the rear edge beam, obtaining the rear edge beam, and using a hanging beam, a casual guard plate and a sling to place the rear edge beam into the shell.
[0065] Specifically, after the heating procedure of the trailing edge beam mold is completed, the hardness of the trailing edge beam cloth layer is tested, and the hardness test is performed every three meters on the surface of the trailing edge beam cloth layer; during the test, differential scanning calorimetry (DSC) can be used to perform thermal analysis of the trailing edge beam cloth layer, and the changes in its corresponding physical and chemical properties can be analyzed by controlling the change in sample temperature. In DSC analysis, the Tg value represents the transition temperature of the material from the glassy state to the highly elastic state, that is, the glass transition temperature of the material. The Tg value can be determined by observing the heat change, which reflects the change in the physical state of the material during the heating process.
[0066] If the hardness of the rear edge beam cloth layer meets the Shore ≥ 55HD, and the glass transition temperature Tg (DSC median) ≥ 70℃, it means that the hardness of the rear edge beam cloth layer meets the conditions. The surface temperature of the product is reduced to below 40℃ for demoulding, and the demoulding cloth on the upper and lower surfaces of the rear edge beam is torn off. The rear edge beam is fixed and lifted by a hanging beam, a profiled guard plate and a sling. The profiled guard plate is arranged at both ends of the rear edge beam, and the sling is used to fix the rear edge beam on the hanging beam. Figure 5 As shown, it is convenient to place the prepared trailing edge beam into the shell through the hanging beam.
[0067] Step S110 , laying all structural layers according to the shell design structure, and when laying to the trailing edge UD cloth layer structure, laying a continuous felt in the trailing edge UD cloth layer area.
[0068] Specifically, according to the design structure of the wind turbine blade shell, all structural layers are laid. When laying to the trailing edge UD cloth layer structure, continuous felt is laid in the trailing edge UD cloth layer area to optimize the distribution and penetration of the resin, which helps to improve the overall quality and performance of the wind turbine blade.
[0069] Among them, step S110 includes: laying all structural layers according to the shell design, and when laying to the trailing edge UD cloth layer structure, laying a continuous felt in the trailing edge UD cloth layer area, the continuous felt exceeds the trailing edge side of the trailing edge beam by 0-50mm, and the leading edge side exceeds the trailing edge beam by 50-70mm. If the continuous felt exceeds the parting line on the trailing edge side of the trailing edge beam, the continuous felt is cut to align with the trailing edge of the trailing edge beam.
[0070] Specifically, according to the shell design of the wind turbine blade, all the structural layers of the wind turbine blade are laid. When the UD cloth layer structure of the trailing edge is laid, a continuous mat is laid in the trailing edge UD cloth layer area to facilitate the impregnation of the glass fiber cloth. In order to ensure the accuracy of the laying position, the laying method can be overlapped or butted. When laying the continuous mat, the continuous mat exceeds the trailing edge side of the trailing edge beam by 0-50mm, and the leading edge side exceeds the trailing edge beam by 50-70mm. If the continuous mat exceeds the parting line on the trailing edge side of the trailing edge beam, the continuous mat is cut to align with the trailing edge of the trailing edge beam, and the excess continuous mat is cut and removed, thereby enhancing the bonding strength between the glass fiber cloth and the matrix resin and improving the overall performance and durability of the composite material.
[0071] Step S111, positioning the trailing edge beam according to the design data and placing it in the shell cavity, laying the corresponding structural layers and auxiliary materials, laying prefabricated VAP vacuum bags in the trailing edge beam area to assist in vacuuming, laying vacuum bag film to maintain pressure and then pouring and molding to obtain a wind turbine blade.
[0072] Specifically, the trailing edge beam is positioned according to the design data and placed in the shell cavity, and the corresponding structural layers, such as fiberglass cloth, PVC, webs, etc., are laid on the wind turbine blade shell. Auxiliary materials, such as resin, are laid according to the process requirements, and prefabricated VAP vacuum bags are laid in the trailing edge beam area to assist in vacuuming. After laying the vacuum bag film for pressure maintenance, infusion molding is performed to obtain the wind turbine blade, which reduces the requirements for the arrangement of infusion auxiliary materials, avoids the appearance of steps on the outer surface, improves product quality, and reduces manufacturing costs.
[0073] Among them, in step S111, the prefabricated VAP vacuum bag is laid toward the front edge with a distance of 50 mm between the rear edge of the rear edge beam and the rear edge of the rear edge bag to facilitate overall vacuuming.
[0074] In this embodiment, the trailing edge profile is cut out from the shell mold as the trailing edge beam mold according to the axial and chordal positions of the trailing edge UD cloth layer in the shell, the trailing edge beam mold is cleaned and a release agent is applied to it in a Z-shaped manner, a layer of continuous felt is laid on the trailing edge beam mold to axially cover the trailing edge UD area; a layer of isolation film is laid on the continuous felt area, and the release cloth is laid as a whole, and the trailing edge UD cloth layer is laid on the trailing edge beam mold in sequence according to the design positioning data, the trailing edge UD area is covered as a whole with the release cloth, and a prefabricated VAP vacuum bag is laid from the trailing edge to the leading edge of the trailing edge UD cloth layer; a composite guide net is laid on the leading edge side of the prefabricated VAP vacuum bag, and the trailing edge side is overlapped with the prefabricated VAP vacuum bag, an ohm tube is placed on the continuous felt on the leading edge side of the trailing edge UD cloth layer, and a glue injection seat is placed at an axial distance from the blade root; the trailing edge beam mold is covered with a vacuum bag film to seal the vacuum, and the vacuum bag is opened. The vacuum pump is used for evacuation and injection molding. After the heating program of the trailing edge beam mold is completed, the hardness of the cloth layer of the trailing edge beam is tested. When it meets the design requirements, it is cooled and demoulded to obtain the trailing edge beam and put it into the shell; all structural layers are laid according to the shell design structure. When the trailing edge UD cloth layer structure is laid, a continuous felt is laid in the trailing edge UD cloth layer area, the trailing edge beam is positioned and placed in the shell cavity according to the design data, the corresponding structural layers and auxiliary materials are laid, and a prefabricated VAP vacuum bag is laid in the trailing edge beam area to assist in evacuation. After laying the vacuum bag film for pressure maintenance, injection molding is performed to obtain the wind turbine blade. By injecting and molding the trailing edge beam in advance, the blade molding time is shortened, the laying requirements are reduced, and the problems of dark package whitening in the trailing edge UD area and steps on the outer surface profile that increase the manufacturing cost can be avoided, thereby achieving the goals of simple operation, high process requirement error and reduced manufacturing cost.
[0075] The above contents are further detailed descriptions of the present invention in combination with specific implementation methods, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the scope of protection of the present invention.
Claims
1. A method for casting a trailing edge beam of a wind turbine blade together with a shell, characterized in that: The following steps are involved: S1. Cutting out the trailing edge profile from the shell mold as the trailing edge beam mold according to the axial and chordal positions of the trailing edge UD cloth layer in the shell; S2, cleaning the trailing edge beam mold and applying a release agent thereto in a Z-shaped manner, laying a layer of continuous felt on the trailing edge beam mold to axially cover the trailing edge UD area; S3. Lay a layer of isolation film on the continuous felt area and lay a release cloth as a whole; S4. Laying the trailing edge UD cloth layer on the trailing edge beam mold in sequence according to the design positioning data; S5. Cover the entire rear edge UD area with a release cloth, and lay a prefabricated VAP vacuum bag from the rear edge to the front edge of the rear edge UD cloth layer; S6. Lay a composite guide net on the leading edge of the prefabricated VAP vacuum bag, and overlap the trailing edge with the prefabricated VAP vacuum bag; S7. Place an ohm tube on the continuous felt at the leading edge side of the trailing edge UD cloth layer, and place a glue injection seat at an axial distance from the blade root; S8, using a vacuum bag film to cover the trailing edge beam mold to seal the vacuum, turning on a vacuum pump to evacuate air, and performing injection molding; S9, after the heating process of the rear edge beam mold is completed, the hardness of the rear edge beam cloth layer is tested, the mold is demoulded by cooling, and the rear edge beam is obtained and placed in the shell; S10, laying all structural layers according to the shell design structure, and when laying to the trailing edge UD cloth layer structure, laying continuous felt in the trailing edge UD cloth layer area; S11. Position the trailing edge beam according to the design data and place it in the shell cavity, lay the corresponding structural layers and auxiliary materials, lay prefabricated VAP vacuum bags in the trailing edge beam area to assist in vacuuming, lay vacuum bag film to maintain pressure and then perform injection molding to obtain a wind turbine blade.
2. The method for casting a wind turbine blade trailing edge beam together with a shell according to claim 1, characterized in that: The step S2 comprises: Clean the trailing edge beam mold and apply a release agent in a Z-shaped manner, lay a layer of continuous felt on the trailing edge beam mold, pour resin diversion on the lower side, axially cover the trailing edge UD area, the chord-wise trailing edge side exceeds the trailing edge of the first layer UD by 0-30mm, and the leading edge side exceeds the UD area by 80-100mm.
3. The method for casting a wind turbine blade trailing edge beam together with a shell according to claim 1, characterized in that: The step S3 comprises: Lay a layer of isolation film on the continuous felt area with an overlap width of 10-20mm, with the chord-wise trailing edge side extending 0-30mm beyond the boundary line of the continuous felt trailing edge, and the leading edge side extending 30-50mm beyond the UD area; Lay a layer of release cloth on the whole, with the rear edge of the release cloth extending 0-50mm beyond the rear edge UD area positioning line mold, and the rest remaining on the front edge side.
4. The method for casting a wind turbine blade trailing edge beam together with a shell according to claim 1, characterized in that: The step S5 comprises: After the trailing edge UD cloth layer is laid, a layer of release cloth is covered on the entire trailing edge UD area, with the trailing edge side extending 0-30mm beyond the parting line and the leading edge side extending 0-50mm beyond the UD area. A 200mm wide prefabricated VAP vacuum bag is laid 50-80mm from the trailing edge of the trailing edge UD cloth layer to the leading edge.
5. The method for casting a wind turbine blade trailing edge beam together with a shell according to claim 1, characterized in that: The step S6 comprises: A composite guide net is laid on the leading edge of the prefabricated VAP vacuum bag, the trailing edge of the composite guide net overlaps the prefabricated VAP vacuum bag by 10-30 mm, and the leading edge of the composite guide net is 100 mm away from the leading edge of the trailing edge UD cloth layer.
6. The method for casting a wind turbine blade trailing edge beam together with a shell according to claim 1, characterized in that: The glue injection seat is placed at positions 10m, 25m, 40m and 60m away from the blade root in the axial direction.
7. The method for casting a wind turbine blade trailing edge beam together with a shell according to claim 1, characterized in that: The step S9 comprises: After the heating process of the trailing edge beam mold is completed, the hardness of the trailing edge beam cloth layer is tested, and the hardness test is performed every three meters on the surface; If the hardness of the cloth layer of the trailing edge beam meets the Shore hardness ≥55HD and the glass transition temperature ≥70°C, cool it to below 40°C for demoulding, tear off the demoulding cloth on the upper and lower surfaces of the trailing edge beam, obtain the trailing edge beam, and use a hanging beam, a conformal guard plate and a hanging belt to place the trailing edge beam into the shell.
8. The method for casting a trailing edge beam of a wind turbine blade together with a shell according to claim 1, characterized in that: The step S10 comprises: Lay all structural layers according to the shell design. When laying to the trailing edge UD cloth layer structure, lay continuous felt in the trailing edge UD cloth layer area. The continuous felt exceeds the trailing edge side of the trailing edge beam by 0-50mm and the leading edge side exceeds the trailing edge beam by 50-70mm. If the continuous felt exceeds the parting line on the trailing edge side of the trailing edge beam, cut the continuous felt to align with the trailing edge of the trailing edge beam.
9. The method for casting a wind turbine blade trailing edge beam together with a shell according to claim 1, characterized in that: In the step S11, the prefabricated VAP vacuum bag is laid toward the front edge with a distance of 50 mm between the rear edge of the rear edge beam and the rear edge of the rear edge.
Citation Information
Patent Citations
Molding process of trailing edge UD and core material of wind power blade
CN117549576A
Vacuum infusion system for wind power blade trailing edge UD prefabricated part
CN219727263U