Hoisting construction method for auxiliary hole of dual-fuel cabin
By installing a lifting ring before the construction of the dual fuel compartment and cutting to form a process hole segment after the construction is completed, and lifting it with a spreader, the problem of difficulty and workload of the process hole segment of the dual fuel compartment is solved, and a more efficient construction process is achieved and resource utilization.
Patent Information
- Application Number
- CN202411247976.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-06
AI Technical Summary
The construction of process hole segments of the dual fuel compartment is difficult and workload, especially because the four-layer bulkhead needs to be opened and closed, resulting in complex construction and waste of resources.
Before the construction of the double fuel tank, the lifting ring is pre-installed. After the construction is completed, the inner shell process hole segment is cut to form. It is lifted into the main group platform or cabin with a spreader, and reset and install after the construction of the enclosure system is completed.
It reduces construction difficulty and workload, avoids the back welding operation during subsequent cutting, and places the inner shell process hole segments in the outer cabin, reducing a large amount of lifting workload, reducing paint damage and resource waste.
Smart Images

Figure CN119079061A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shipbuilding, and in particular to a method for hoisting and constructing a process hole of a dual-fuel tank. Background Art
[0002] A four-layer bulkhead structure is arranged around the fuel tank of the dual-fuel container ship. When the fuel tank is constructed, the integrity of the fuel tank needs to be constructed first. After the fuel tank tightness test is completed, a process hole is opened on the bulkhead of the fuel tank for the construction of the containment system in the fuel tank. After the containment system construction is completed, the process hole is sealed. The prior art, such as the invention patent application with publication number CN116142409A, discloses a method for constructing a fuel tank in a single-hull state, which discloses that a complete cabin is formed after the fuel tank section assembly is completed, and the cabin is inflated for a tightness test. After the tightness test is completed, a bulkhead process hole is opened on the side, and internal sandblasting and coating operations and containment system construction are carried out. After the containment system construction is completed, the bulkhead process hole is sealed.
[0003] For a dual-fuel tank, there are four layers of bulkheads on the outside of the fuel tank. The outer compartment of the fuel tank is between the inner two layers of bulkheads and the outer two layers of bulkheads, usually the oil tank. Therefore, it is necessary to open process holes in the four layers of bulkheads to form two inner and outer process hole segments. After the opening, the opened process hole segments need to be removed and the process hole segments need to be reinstalled after the construction of the containment system is completed. Compared with a single process hole segment, the construction difficulty and workload are relatively large. Summary of the invention
[0004] In order to reduce the difficulty of constructing the process hole fragments of a dual fuel tank and reduce the workload, the present invention provides a dual fuel tank process hole hoisting construction method, in which the lifting ring is installed in advance, and after the integrity of the dual fuel tank is completed, the inner shell process hole fragment is hoisted into the outer fuel tank, and the outer shell process hole fragment is hoisted onto the general assembly platform, and reset and installed after the enclosure system construction is completed.
[0005] The technical objectives of the present invention are achieved through the following technical solutions:
[0006] A dual fuel tank process hole hoisting construction method, the method comprising:
[0007] Step 1, constructing a dual fuel tank, the dual fuel tank comprising an inner fuel tank and an outer fuel tank, the bulkhead between the inner fuel tank and the outer fuel tank comprising an inner fuel tank wall and a first outer fuel tank wall; the bulkhead between the outer fuel tank and the outer side of the hull comprising a second outer fuel tank wall and an outer plate; a rib plate is connected between the inner fuel tank wall and the first outer fuel tank wall, and a rib plate is connected between the second outer fuel tank wall and the outer plate;
[0008] During the construction process, lifting rings are pre-installed on the inner fuel tank wall, the first outer fuel tank wall, the second outer fuel tank wall, the outer plate and the rib plate according to the opening position of the process hole;
[0009] Step 2: After the integrity of the dual fuel tank is completed, conduct a tightness test on the inner fuel tank and a tightness test on the outer fuel tank;
[0010] Step 3: Cut the process hole according to the opening position of the process hole to form a shell process hole segment, the shell process hole segment includes the second outer fuel tank wall, the outer plate and the rib plate arranged between the second outer fuel tank wall and the outer plate; connect the shell process hole segment with the lifting ring of the lifting tool to lift the shell process hole segment to the general assembly platform;
[0011] Step 4: cutting the process hole according to the opening position of the process hole to form an inner shell process hole segment, the inner shell process hole segment including the inner fuel tank wall, the first outer fuel tank wall and a rib plate arranged between the inner fuel tank wall and the first outer fuel tank wall; using a lifting device to connect the lifting ring of the inner shell process hole segment to lift the inner shell process hole segment into the outer fuel tank;
[0012] Step 5: After the construction of the inner fuel tank and / or the outer fuel tank's internal containment system is completed, the inner shell process hole segment and the outer shell process hole segment are hoisted to their original positions in turn for reset and installation.
[0013] Furthermore, within the process hole opening range of the inner fuel tank wall on the side close to the first outer fuel tank wall, the first inner shell process hole lifting rings are respectively installed on both sides of the upper end of the process hole opening range, and the second inner shell process hole lifting rings are respectively installed on both sides of the lower end of the process hole opening range.
[0014] Furthermore, within the process hole opening range of the first outer fuel tank wall on the side close to the inner fuel tank wall, third inner shell process hole lifting rings are respectively installed on both sides of the upper end close to the process hole opening range; outside the process hole opening range of the first outer fuel tank wall on the side close to the second outer fuel tank wall, fourth inner shell process hole lifting rings are respectively installed on both sides of the lower end close to the process hole opening range; the inner shell process hole reinforcement is connected between the inner fuel tank wall and the first outer fuel tank wall, and the inner shell process hole reinforcement is located within the process hole opening range close to the lower end of the process hole opening range.
[0015] Furthermore, a fifth inner shell process hole lifting ring is installed on the rib between the inner fuel tank wall and the first outer fuel tank wall. The fifth inner shell process hole lifting ring is installed on the ribs closest to the edge of the process hole opening range on both sides outside the process hole opening range and is located above the process hole opening range.
[0016] Furthermore, within the range of the process hole opening on the side of the second outer fuel tank wall close to the outer plate, the first shell process hole lifting rings are respectively installed on both sides close to the middle of the height of the process hole, and the second shell process hole lifting rings are respectively installed on both sides close to the lower end of the process hole; the fifth shell process hole lifting ring is installed above the range of the process hole opening on the side of the second outer fuel tank wall close to the first outer fuel tank wall.
[0017] Furthermore, fourth shell process hole lifting rings are respectively installed on both sides outside the process hole opening range of the side of the outer plate close to the second outer fuel tank wall, and the fourth shell process hole lifting ring is arranged close to the lower end of the process hole opening range; third shell process hole lifting rings are installed on both sides of the upper end of the process hole opening range within the process hole opening range on the other side of the outer plate; the shell process hole reinforcement is connected between the outer plate and the second outer fuel tank wall, and the shell process hole reinforcement is located within the process hole opening range; the fourth shell process hole lifting ring is higher than the shell process hole reinforcement.
[0018] Furthermore, a sixth shell process hole lifting ring is installed on the rib between the second outer fuel tank wall and the outer plate. The sixth shell process hole lifting ring is installed on the ribs closest to the edge of the process hole opening range on both sides outside the process hole opening range and is located above the process hole opening range.
[0019] Further, the lifting equipment includes a hand chain hoist and a crane;
[0020] When the shell process hole segment is hoisted to the general assembly platform by means of the hoisting device connected to the hoisting ring of the shell process hole segment:
[0021] Hang the hand chain hoist at the sixth outer shell process hole lifting ring, connect the hook of the hand chain hoist to the first outer shell process hole lifting ring, then cut the outer shell process hole fragments, and dump the outer shell process hole fragments into the outer fuel tank. During the dumping process, a person pulls the chain of the hand chain hoist so that the outer shell process hole fragments are gradually dumped into the outer fuel tank;
[0022] After the shell process hole segment is completely dumped, the hand chain hoist is hung on the fourth shell process hole lifting ring, the hook of the hand chain hoist is connected to the second shell process hole lifting ring, and the chain of the hand chain hoist is pulled to move the shell process hole segment to the outside of the outer plate;
[0023] Connect the hook of the crane to the lifting ring of the third shell process hole and lift the shell process hole segment to the general assembly platform;
[0024] When performing the ceiling mount resetting installation in step 5:
[0025] First, lift the outer shell process hole segment to the outer plate through the third outer shell process hole lifting ring of the crane hook;
[0026] Then, the hand chain hoist is hung on the fourth outer shell process hole lifting ring, the hook of the hand chain hoist is connected to the second outer shell process hole lifting ring, and the chain of the hand chain hoist is pulled to move the outer shell process hole segment into the outer fuel tank;
[0027] Hang the hand chain hoist on the sixth shell process hole ring, connect the hook of the hand chain hoist to the first shell process hole ring, pull the chain of the hand chain hoist to make the shell segment fragment flip 90 degrees to reset.
[0028] Further, the lifting device includes a hand chain hoist;
[0029] When the inner shell process hole segment is hoisted into the outer fuel tank by means of the hoisting device connected to the hoisting ring of the inner shell process hole segment:
[0030] Hang a hand chain hoist at the fifth inner shell process hole lifting ring, connect the hook of the hand chain hoist to the first inner shell process hole lifting ring, then cut the inner shell process hole segment, and dump the inner shell process hole segment into the inner fuel tank, and pull the chain of the hand chain hoist during the dumping process so that the inner shell process hole segment is gradually dumped into the inner fuel tank;
[0031] After the inner shell process hole segment is completely dumped, hang the hand chain hoist at the fourth inner shell process hole lifting ring, connect the hook of the hand chain hoist to the second inner shell process hole lifting ring, pull the chain of the hand chain hoist to lift the inner shell process hole segment into the outer fuel tank;
[0032] Hang a hand chain hoist on the top of the outer fuel tank, connect the hook of the hand chain hoist to the lifting ring of the third inner shell process hole to completely lift the inner shell process hole segment into the outer fuel tank;
[0033] When performing the ceiling mount resetting installation in step 5:
[0034] Hang a hand chain hoist on the top of the outer fuel tank, connect the hook of the hand chain hoist to the lifting ring of the third inner shell process hole, and completely lift the inner shell process hole segment close to the first outer fuel tank wall;
[0035] Hang the hand chain hoist at the fourth inner shell process hole lifting ring, connect the hook of the hand chain hoist to the second inner shell process hole lifting ring, pull the chain of the hand chain hoist to lift the inner shell process hole segment into the inner fuel tank;
[0036] After the inner shell process hole piece is moved to the inner fuel tank, the hand chain hoist is hung at the fifth inner shell process hole lifting ring, the hook of the hand chain hoist is connected to the first inner shell process hole lifting ring, and the chain of the hand chain hoist is pulled to make the inner shell process hole piece flip 90 degrees and reset.
[0037] Compared with the prior art, the beneficial effect of the present invention is that the lifting ring is installed before the integrity construction, which reduces the workload of the subsequent process and the damage to the paint. At the same time, because the lifting ring is installed before the integrity construction is completed, the overhead welding operation of subsequent cutting of the process hole is avoided; the inner shell process hole fragment is placed in the outer fuel tank to avoid it being completely moved out of the hull outer plate, thereby reducing a large amount of lifting workload. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a schematic diagram of the structure of the side area of the dual fuel tank in the present invention.
[0039] Figure 2 yes Figure 1 AA view in.
[0040] Figure 3 yes Figure 1 BB view in.
[0041] Figure 4 It is a schematic diagram of the rib arrangement between the inner fuel tank wall and the first outer fuel tank wall.
[0042] Figure 5 yes Figure 1 The CC view in .
[0043] Figure 6 yes Figure 1 DD view in .
[0044] Figure 7 It is a schematic diagram of the rib arrangement between the second outer fuel tank wall and the outer plate.
[0045] Figure 8 It is a schematic diagram of the inner shell process hole reinforcement setting in the present invention.
[0046] Fig. 9 It is a schematic diagram of the reinforced setting of the shell process holes in the present invention.
[0047] Fig.10 It is a schematic diagram of the installation of the hanger at the sixth shell process hole lifting ring in the present invention.
[0048] Fig.11 It is a schematic diagram of the installation of the hanger at the fourth shell process hole lifting ring in the present invention.
[0049] Fig.12 It is a schematic diagram of the connection between the third shell process hole lifting ring and the lifting fixture in the present invention.
[0050] Fig.13 It is a schematic diagram of the installation of the hanger at the lifting ring of the fifth inner shell process hole in the present invention.
[0051] Fig.14It is a schematic diagram of the installation of the hanger at the lifting ring of the fourth inner shell process hole in the present invention.
[0052] Fig.15 It is a schematic diagram of the connection between the third inner shell process hole lifting ring and the lifting fixture in the present invention.
[0053] In the figure, 1. inner fuel tank; 2. inner fuel tank wall; 3. first outer fuel tank wall; 4. second outer fuel tank wall; 5. outer fuel tank; 6. outer plate; 7. inner shell process hole fragment; 8. outer shell process hole fragment; 9. first inner shell process hole lifting ring; 10. second inner shell process hole lifting ring; 11. third inner shell process hole lifting ring; 12. fourth inner shell process hole lifting ring; 13. fifth inner shell process hole lifting ring; 14. inner shell process hole reinforcement; 15. first outer shell process hole lifting ring; 16. second outer shell process hole lifting ring; 17. third outer shell process hole lifting ring; 18. fourth outer shell process hole lifting ring; 19. rib plate; 20. outer shell process hole reinforcement; 21. fifth outer shell process hole lifting ring; 22. sixth outer shell process hole lifting ring. DETAILED DESCRIPTION
[0054] The technical solution of the present invention is further described below in conjunction with specific embodiments:
[0055] A dual fuel tank process hole hoisting construction method, the method comprising:
[0056] Step 1: Build a dual fuel tank, such as Figure 1 As shown, the dual fuel tank includes an inner fuel tank 1 and an outer fuel tank 5. In this embodiment, the inner fuel tank is used to store natural gas, and the outer fuel tank is used to store fuel oil. The bulkhead between the inner fuel tank 1 and the outer fuel tank 5 includes an inner fuel tank wall 2 and a first outer fuel tank wall 3; the bulkhead between the outer fuel tank 5 and the outer side of the hull includes a second outer fuel tank wall 4 and an outer plate 6; a rib 19 is connected between the inner fuel tank wall 2 and the first outer fuel tank wall 3, and a rib 19 is connected between the second outer fuel tank wall 4 and the outer plate 6.
[0057] During the construction process, lifting rings are pre-installed on the inner fuel tank wall 2, the first outer fuel tank wall 3, the second outer fuel tank wall 4, the outer plate 6 and the rib 19 according to the opening positions of the process holes; in this embodiment, the five special meanings of "first", "second", "third", "fourth", "fifth" and "sixth" are involved and are only used to distinguish the structure.
[0058] The location of the process workers is determined according to the height of the scaffolding platform built by the enclosure system, which is convenient for the transportation of personnel and materials.
[0059] Specifically, on the inner fuel tank wall, such as Figure 2As shown, the side of the inner fuel tank wall 2 located inside the inner fuel tank is a smooth surface, and the side of the inner fuel tank close to the first outer fuel tank wall is a frame surface; within the process hole opening range, the lifting ring is installed on the frame surface of the inner fuel tank wall 2, specifically, a first inner shell process hole lifting ring 9 is installed on the left and right sides near the upper end of the process hole opening range, and a second inner shell process hole lifting ring 10 is installed on the left and right sides near the lower end of the process hole opening range.
[0060] Specifically, on the first outer fuel tank wall 3, as shown in FIG. Figure 3 As shown, the side of the first outer fuel tank wall 3 close to the inner fuel tank wall 2 is a frame surface, and the other side of the first outer fuel tank wall 3 is a smooth surface. Within the process hole opening range of the frame surface of the first outer fuel tank wall 3, a third inner shell process hole lifting ring 11 is respectively installed on the left and right sides close to the upper end of the process hole opening range; on the smooth surface of the first outer fuel tank wall 3, a fourth inner shell process hole lifting ring 12 is installed outside the process hole opening range, specifically, the fourth inner shell process hole lifting ring 12 is arranged on the left and right sides close to the lower end of the process hole opening range.
[0061] As a preference, Figure 3 and Figure 8 As shown, the inner shell process hole reinforcement 14 is connected between the inner fuel tank wall 2 and the first outer fuel tank wall 3, and the inner shell process hole reinforcement 14 is located within the process hole opening range and is arranged near the lower end of the process hole opening range. In this embodiment, the inner shell process hole reinforcement 14 is two parallel channel steels, and the installation height of the inner shell process hole reinforcement 14 is lower than the height of the fourth inner shell process hole lifting ring 12. The inner shell process hole reinforcement 14 is arranged to prevent the inner shell process hole segment 7 from being deformed during the cutting process.
[0062] Specifically, the fifth inner shell process hole lifting ring 13 is installed on the rib 19 between the inner fuel tank wall 2 and the first outer fuel tank wall 3, such as Figure 4 As shown, the fifth inner shell process hole lifting ring 13 is installed on the ribs 19 closest to the edge of the process hole opening range on both sides outside the process hole opening range and is located above the process hole opening range.
[0063] Specifically, on the second outer fuel tank wall, such as Figure 5As shown, one side of the second outer fuel tank wall 4 close to the outer plate 6 is a frame surface, and the other side of the second outer fuel tank wall 4 is a smooth surface; within the process hole opening range of the frame surface of the second outer fuel tank wall 4, a first shell process hole lifting ring 15 is installed on both sides close to the middle of the height of the process hole opening range, and a second shell process hole lifting ring 16 is installed on both sides close to the lower end of the process hole opening range; a fifth shell process hole lifting ring 21 is installed outside the smooth process hole opening range of the second outer fuel tank wall 4, and specifically, the fifth shell process hole lifting ring 21 is installed above the process hole opening range.
[0064] Specifically, on the outer plate 6, as shown in FIG. Figure 6 As shown, the side of the outer plate 6 close to the second outer fuel tank wall 4 is a frame surface, and the other side of the outer plate 6 is located outside the ship and is a smooth surface; a fourth shell process hole lifting ring 18 is installed outside the process hole opening range of the frame surface of the outer plate 6, and the fourth shell process hole lifting ring 18 is arranged near the left and right sides of the lower end of the process hole opening range. A third shell process hole lifting ring 17 is installed on the smooth surface of the outer plate 6, and the third shell process hole lifting ring 17 is arranged within the process hole opening range and near the left and right sides of the upper end of the process hole opening range.
[0065] As a preference, Figure 6 and Fig. 9 As shown, the shell process hole reinforcement 20 is connected between the outer plate 6 and the second outer fuel tank wall 4, and the shell process hole reinforcement 20 is located within the process hole opening range; the fourth shell process hole lifting ring 18 is higher than the shell process hole reinforcement 20. In this embodiment, the shell process hole reinforcement 20 is two parallel channel steels. The shell process hole reinforcement 20 is arranged to avoid deformation when the shell process hole fragment is cut.
[0066] Specifically, the sixth shell process hole lifting ring 22 is installed on the rib 19 between the second outer fuel tank wall 4 and the outer plate 6. Figure 7 As shown, the sixth shell process hole hanging ring 22 is installed on the ribs 19 closest to the edge of the process hole opening range on both sides outside the process hole opening range and is located above the process hole opening range.
[0067] Step 2: After the integrity of the dual fuel tank is completed, conduct a tightness test on the inner fuel tank and the outer fuel tank; the tightness test is carried out by inflation, and after inflation, the fluctuation of air pressure is checked to determine whether the tightness meets the requirements.
[0068] Step 3, cutting the process hole according to the opening position of the process hole to form a shell process hole segment 8, the shell process hole segment 8 includes the second outer fuel tank wall 4, the outer plate 6 and the rib plate 19 arranged between the second outer fuel tank wall 4 and the outer plate 6; using the lifting device to connect the lifting ring of the shell process hole segment to lift the shell process hole segment to the general assembly platform;
[0069] Specifically, Fig.10 As shown, a hand chain hoist is hung at the sixth shell process hole lifting ring 22, and the hook of the hand chain hoist is connected to the first shell process hole lifting ring 15, and then the shell process hole segment is cut, and the shell process hole segment is dumped into the outer fuel tank. During the dumping process, a person pulls the chain of the hand chain hoist so that the shell process hole segment 8 is gradually dumped into the outer fuel tank; a hand chain hoist is hung at the sixth shell process hole lifting ring 22 at the ribs on both sides respectively;
[0070] like Fig.11 As shown, after the shell process hole segment is completely dumped, the hand chain hoist is hung on the fourth shell process hole lifting ring 18, the hook of the hand chain hoist is connected to the second shell process hole lifting ring 16, and the chain of the hand chain hoist is pulled to move the shell process hole segment 8 to the outside of the outer plate;
[0071] like Fig.12 As shown, the hook of the crane is connected to the third shell process hole lifting ring 17 to lift the shell process hole segment 8 to the overall assembly platform.
[0072] Step 4: cutting the process hole according to the opening position of the process hole to form the inner shell process hole segment 7, the inner shell process hole segment 7 includes the inner fuel tank wall 2, the first outer fuel tank wall 3 and the rib plate 19 arranged between the inner fuel tank wall 2 and the first outer fuel tank wall 3; using the lifting device to connect the lifting ring of the inner shell process hole segment to lift the inner shell process hole segment into the outer fuel tank;
[0073] Specifically, Fig.13 As shown, a hand chain hoist is hung at the fifth inner shell process hole lifting ring 13, and the hook of the hand chain hoist is connected to the first inner shell process hole lifting ring 9, and then the inner shell process hole segment 7 is cut, and the inner shell process hole segment is dumped into the inner fuel tank. During the dumping process, the chain of the hand chain hoist is pulled so that the inner shell process hole segment 7 is gradually dumped into the inner fuel tank;
[0074] like Fig.14 As shown, after the inner shell process hole segment 7 is completely dumped, the hand chain hoist is hung at the fourth inner shell process hole lifting ring 12, the hook of the hand chain hoist is connected to the second inner shell process hole lifting ring 10, and the chain of the hand chain hoist is pulled to lift the inner shell process hole segment 7 into the outer fuel tank;
[0075] like Fig.15 As shown, a hand chain hoist is hung on the top of the outer fuel tank, and the hook of the hand chain hoist is connected to the third inner shell process hole lifting ring 11 to completely lift the inner shell process hole segment 7 into the outer fuel tank.
[0076] Step 5: After the construction of the inner fuel tank and / or the outer fuel tank inner containment system is completed, the inner shell process hole segment and the outer shell process hole segment are hoisted to the original position and reset and installed in turn. The inner shell process hole segment is hoisted and reset first, and then the outer shell process hole segment is hoisted and reset.
[0077] When lifting and resetting the process hole fragment of the inner shell fragment:
[0078] Hang a hand chain hoist on the top of the outer fuel tank, connect the hook of the hand chain hoist to the third inner shell process hole lifting ring 11 to completely lift the inner shell process hole segment close to the first outer fuel tank wall 3;
[0079] Hang the hand chain hoist at the fourth inner shell process hole lifting ring 12, connect the hook of the hand chain hoist to the second inner shell process hole lifting ring 10, and pull the chain of the hand chain hoist to lift and move the inner shell process hole segment 7 into the inner fuel tank;
[0080] After the inner shell process hole sheet body is moved to the inner fuel tank, the hand chain hoist is hung on the fifth inner shell process hole lifting ring 13, the hook of the hand chain hoist is connected to the first inner shell process hole lifting ring 9, and the chain of the hand chain hoist is pulled to make the inner shell process hole sheet body flip 90 degrees and reset.
[0081] When lifting and resetting the process hole fragment of the shell fragment:
[0082] First, the shell process hole segment 8 is lifted to the outer plate 6 by the third shell process hole lifting ring 17 of the crane hook;
[0083] Then, the hand chain hoist is hung on the fourth shell process hole lifting ring 18, the hook of the hand chain hoist is connected to the second shell process hole lifting ring 16, and the chain of the hand chain hoist is pulled to move the shell process hole segment into the outer fuel tank;
[0084] Hang the hand chain hoist on the sixth shell process hole ring 22, the hook of the hand chain hoist is connected to the first shell process hole ring 15, and pull the chain of the hand chain hoist to turn the shell segment segment 8 90 degrees to reset.
[0085] This embodiment is only a further explanation of the present invention, not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed, but as long as it is within the scope of the claims of the present invention, it will be protected by the patent law.
Claims
1. A method for hoisting and installing the process hole of a dual fuel tank. It is characterized in that The method includes: Step 1, constructing a dual fuel tank, the dual fuel tank comprising an inner fuel tank and an outer fuel tank, the bulkhead between the inner fuel tank and the outer fuel tank comprising an inner fuel tank wall and a first outer fuel tank wall; the bulkhead between the outer fuel tank and the outer side of the hull comprising a second outer fuel tank wall and an outer plate; a rib plate is connected between the inner fuel tank wall and the first outer fuel tank wall, and a rib plate is connected between the second outer fuel tank wall and the outer plate; During the construction process, lifting rings are pre-installed on the inner fuel tank wall, the first outer fuel tank wall, the second outer fuel tank wall, the outer plate and the rib plate according to the opening position of the process hole; Step 2: After the integrity of the dual fuel tank is completed, conduct a tightness test on the inner fuel tank and a tightness test on the outer fuel tank; Step 3: Cut the process hole according to the opening position of the process hole to form a shell process hole segment, the shell process hole segment includes the second outer fuel tank wall, the outer plate and the rib plate arranged between the second outer fuel tank wall and the outer plate; connect the shell process hole segment with the lifting ring of the lifting tool to lift the shell process hole segment to the general assembly platform; Step 4: cutting the process hole according to the opening position of the process hole to form an inner shell process hole segment, the inner shell process hole segment including the inner fuel tank wall, the first outer fuel tank wall and a rib plate arranged between the inner fuel tank wall and the first outer fuel tank wall; using a lifting device to connect the lifting ring of the inner shell process hole segment to lift the inner shell process hole segment into the outer fuel tank; Step 5: After the construction of the inner fuel tank and / or the outer fuel tank's internal containment system is completed, the inner shell process hole segment and the outer shell process hole segment are hoisted to their original positions in turn for reset and installation.
2. A dual fuel tank process hole hoisting construction method according to claim 1, It is characterized in that Within the process hole opening range on the side of the inner fuel tank wall close to the first outer fuel tank wall, the first inner shell process hole lifting rings are respectively installed on both sides of the upper end of the process hole opening range, and the second inner shell process hole lifting rings are respectively installed on both sides of the lower end of the process hole opening range.
3. A dual fuel tank process hole hoisting construction method according to claim 2, It is characterized in that Within the process hole opening range on the side of the first outer fuel tank wall close to the inner fuel tank wall, third inner shell process hole lifting rings are respectively installed on both sides of the upper end of the process hole opening range; outside the process hole opening range on the side of the first outer fuel tank wall close to the second outer fuel tank wall, fourth inner shell process hole lifting rings are respectively installed on both sides of the lower end of the process hole opening range; the inner shell process hole reinforcement is connected between the inner fuel tank wall and the first outer fuel tank wall, and the inner shell process hole reinforcement is located within the process hole opening range and is arranged close to the lower end of the process hole opening range.
4. A dual fuel tank process hole hoisting construction method according to claim 3, It is characterized in that A fifth inner shell process hole lifting ring is installed on the rib between the inner fuel tank wall and the first outer fuel tank wall. The fifth inner shell process hole lifting ring is installed on the ribs on both sides outside the process hole opening range that are closest to the edge of the process hole opening range and is located above the process hole opening range.
5. A dual fuel tank process hole hoisting construction method according to claim 1, It is characterized in that Within the range of the process hole on the side of the second outer fuel tank wall close to the outer plate, the first shell process hole lifting rings are respectively installed on both sides close to the middle of the height of the process hole, and the second shell process hole lifting rings are respectively installed on both sides close to the lower end of the process hole; the fifth shell process hole lifting ring is installed above the range of the process hole on the side of the second outer fuel tank wall close to the first outer fuel tank wall.
6. A dual fuel tank process hole hoisting construction method according to claim 5, It is characterized in that Fourth shell process hole lifting rings are respectively installed on both sides outside the process hole opening range of the side of the outer plate close to the second outer fuel tank wall, and the fourth shell process hole lifting ring is arranged close to the lower end of the process hole opening range; third shell process hole lifting rings are installed on both sides of the upper end of the process hole opening range close to the process hole opening range on the other side of the outer plate; the shell process hole reinforcement is connected between the outer plate and the second outer fuel tank wall, and the shell process hole reinforcement is located within the process hole opening range; the fourth shell process hole lifting ring is higher than the shell process hole reinforcement.
7. A dual fuel tank process hole hoisting construction method according to claim 6, It is characterized in that The sixth shell process hole lifting ring is installed on the rib between the second outer fuel tank wall and the outer plate. The sixth shell process hole lifting ring is installed on the ribs closest to the edge of the process hole opening range on both sides outside the process hole opening range and is located above the process hole opening range.
8. A dual fuel tank process hole hoisting construction method according to claim 7, It is characterized in that Lifting equipment includes hand chain hoists and cranes; When the shell process hole segment is hoisted to the general assembly platform by means of the hoisting device connected to the hoisting ring of the shell process hole segment: Hang the hand chain hoist at the sixth outer shell process hole lifting ring, connect the hook of the hand chain hoist to the first outer shell process hole lifting ring, then cut the outer shell process hole fragments, and dump the outer shell process hole fragments into the outer fuel tank. During the dumping process, a person pulls the chain of the hand chain hoist so that the outer shell process hole fragments are gradually dumped into the outer fuel tank; After the shell process hole segment is completely dumped, the hand chain hoist is hung on the fourth shell process hole lifting ring, the hook of the hand chain hoist is connected to the second shell process hole lifting ring, and the chain of the hand chain hoist is pulled to move the shell process hole segment to the outside of the outer plate; Connect the hook of the crane to the lifting ring of the third shell process hole and lift the shell process hole segment to the general assembly platform; When performing the ceiling mount resetting installation in step 5: First, lift the outer shell process hole segment to the outer plate through the third outer shell process hole lifting ring of the crane hook; Then, the hand chain hoist is hung on the fourth outer shell process hole lifting ring, the hook of the hand chain hoist is connected to the second outer shell process hole lifting ring, and the chain of the hand chain hoist is pulled to move the outer shell process hole segment into the outer fuel tank; Hang the hand chain hoist on the sixth shell process hole ring, connect the hook of the hand chain hoist to the first shell process hole ring, pull the chain of the hand chain hoist to make the shell segment fragment flip 90 degrees to reset.
9. A dual fuel tank process hole hoisting construction method according to claim 4, It is characterized in that The lifting equipment includes a hand chain hoist; When the inner shell process hole segment is hoisted into the outer fuel tank by means of the hoisting device connected to the hoisting ring of the inner shell process hole segment: Hang a hand chain hoist at the fifth inner shell process hole lifting ring, connect the hook of the hand chain hoist to the first inner shell process hole lifting ring, then cut the inner shell process hole segment, and dump the inner shell process hole segment into the inner fuel tank, and pull the chain of the hand chain hoist during the dumping process so that the inner shell process hole segment is gradually dumped into the inner fuel tank; After the inner shell process hole segment is completely dumped, hang the hand chain hoist at the fourth inner shell process hole lifting ring, connect the hook of the hand chain hoist to the second inner shell process hole lifting ring, pull the chain of the hand chain hoist to lift the inner shell process hole segment into the outer fuel tank; Hang a hand chain hoist on the top of the outer fuel tank, connect the hook of the hand chain hoist to the lifting ring of the third inner shell process hole to completely lift the inner shell process hole segment into the outer fuel tank; When performing the hoisting and resetting installation in step 5: Hang a hand chain hoist on the top of the outer fuel tank, connect the hook of the hand chain hoist to the lifting ring of the third inner shell process hole, and completely lift the inner shell process hole segment close to the first outer fuel tank wall; Hang the hand chain hoist at the fourth inner shell process hole lifting ring, connect the hook of the hand chain hoist to the second inner shell process hole lifting ring, pull the chain of the hand chain hoist to lift the inner shell process hole segment into the inner fuel tank; After the inner shell process hole piece is moved to the inner fuel tank, the hand chain hoist is hung at the fifth inner shell process hole lifting ring, the hook of the hand chain hoist is connected to the first inner shell process hole lifting ring, and the chain of the hand chain hoist is pulled to make the inner shell process hole piece flip 90 degrees and reset.
Citation Information
Patent Citations
Hoisting method for combined pump tower base of large dual-fuel container ship
CN111056430A
Construction method of fuel cabin in single-shell state
CN116142409A
Construction method for liquid dome area of dual-fuel container ship
CN116620505A
Hole sealing method for ship cargo hold broadside process hole
CN116691950A
Hole opening method for ship cargo hold broadside process hole
CN116729583A