Large-tonnage deep well hoisting skip bucket loading compensation device and method
By adopting a one-way reverse stop compensation mechanism and sensor control system in the mine lifting system, the problems of skip sinking and oil cylinder leakage are solved, safe and reliable skip loading and upgrading are achieved, and the safety and efficiency of the system are improved.
Patent Information
- Application Number
- CN202411180432.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-27
AI Technical Summary
The existing mine skip lifting system is stretched under heavy load, causing the skip to sink, causing the ore sprinkler problem. The power compensation device driven by the oil cylinder is short in service life and is prone to leakage, affecting safe operation.
A one-way reverse stop compensation mechanism is adopted to detect the position and compensation mechanism status of the skip through sensors and controllers, and realize mechanical one-way locking and automatic retraction, avoiding the skip sinking and reducing dependence on the oil cylinder.
It improves the safety and efficiency of the bucket loading process, reduces the canning operation, avoids sprinkling and equipment damage, extends the service life of the system, and reduces investment costs.
Smart Images

Figure CN119079757A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, and in particular to a vertical shaft hoisting skip loading system. Background Art
[0002] As shallow resources gradually decrease, resource extraction is developing towards deep underground. There are more and more wells exceeding one kilometer deep for underground mining, and the lifting vessels are also getting larger and larger, especially in non-coal mines such as metallurgy and nonferrous metals.
[0003] When the above-mentioned mine skip is loading materials at the bottom, the lifting wire rope is stretched and shaped under the heavy load, causing the length of the lifting wire rope to lengthen. The skip sinks a large amount during loading, and the position of the loading point changes greatly, resulting in serious ore spillage. At the same time, the spilled ore damages the shaft equipment and bottom equipment, affecting the safe operation of the lifting system.
[0004] A domestic patent with publication number CN 117246884 A discloses a mine skip hoisting loading power compensation system, specifically a mine skip hoisting loading power compensation system, including a shaft, a skip, a hoist, and an ore loading device. The hoist drives the skip and the tail rope suspended at the bottom of the skip to move up and down through a head rope. A power compensation device is arranged below the loading position of the skip, and the power compensation device resists the skip to prevent the skip from sinking too much.
[0005] However, the above device still has the problem of using a cylinder-driven compensation device to lift the bucket. The lifting force when the cylinder is under heavy load cannot form effective mechanical self-locking. The cylinder has to bear a large dynamic load each time loading, which affects the service life of the cylinder. At the same time, there is a technical problem that the bucket locking fails due to cylinder leakage. Summary of the invention
[0006] In view of the above technical problems, the present invention proposes a large-tonnage deep well lifting bucket loading compensation device, which can lock the bucket in one direction and automatically retract the bucket when it is lifted, is safe and reliable, and does not affect the bucket lifting efficiency. It reduces the operation of supporting the tank when replacing the wire rope or the suspension device. At the same time, it can avoid the bucket being damaged and spilling due to excessive impact during loading caused by excessive sinking of the bucket.
[0007] In order to achieve the above technical objectives, the present invention adopts the following technical means: A large-tonnage deep well lifting skip loading compensation device, comprising: A one-way check compensating mechanism is installed in the hoistway and is located below the loading position of the bucket. The one-way check compensating mechanism can extend toward or retract the bucket. A first position sensor is installed on the wellbore casing frame and is used to detect whether the skip has reached the loading position; A second position sensor is used to detect whether the one-way check compensation mechanism is extended to the correct position; A third position sensor is used to detect whether the one-way check compensation mechanism is retracted into place; The controller has a signal input end connected to the first position sensor and the second and third position sensors, and a signal output end connected to the one-way check compensation mechanism.
[0008] The one-way check compensating mechanism comprises 4 groups, and the 4 groups of one-way check compensating mechanisms are installed at the same horizontal position at the four corners of the bucket.
[0009] The one-way check compensation mechanism comprises: A column, the upper end of which is fixed to the upper fixed beam in the hoistway, and the lower end of which is fixed to the lower fixed beam in the hoistway; A connecting beam, one end of which is fixedly connected to the column, and the other end of which extends toward the side of the bucket and is provided with a supporting seat; A support plate group, the bottom end of which is rotatably connected to the support seat via a rotary shaft, and a support surface is provided on the upper end of the support plate group close to the bucket; A driving unit is connected between the upright column and the supporting plate assembly and is used for driving the supporting plate assembly to extend toward or retract toward the side of the bucket.
[0010] A protrusion that contacts the support surface is fixed on the bucket; A positioning wheel assembly is provided on the top of the support plate assembly close to the bucket side; When the wire rope extends the bucket to reach the compensation position, the positioning wheel assembly can abut against the protrusion.
[0011] It also includes: a guide frame, which is arranged between the upright column and the support plate group, and when the support plate group is extended or retracted toward the bucket side, the guide frame can guide the support plate group; The second position sensor and the third position sensor are installed on the guide frame.
[0012] The bottom rear end of the support plate group is a hook-shaped structure, and a limit plate is provided on the support seat. The hook-shaped structure cooperates with the limit plate to limit the maximum displacement of the support plate group toward the bucket side.
[0013] It also includes: a counterweight, which is installed on the upper end of the support plate group close to the side of the column. When it is in a non-working state, the center of gravity of the support plate group is located behind the center line of the rotating shaft, and the weight of the equipment itself can ensure that it is in place, avoiding the equipment from extending toward the bucket due to a failure of the cylinder.
[0014] The driving unit is a hydraulic cylinder.
[0015] The supporting surface of the supporting plate group is a downwardly inclined inclined surface structure, and a line connecting the center of the supporting surface and the center of the rotary shaft is perpendicular to the supporting surface, so as to ensure that when supporting the bucket, the driving cylinder is basically not subjected to an external load.
[0016] The present invention further discloses a working method of the large-tonnage deep-well lifting skip loading compensation device. When the skip reaches the loading position, the first position sensor transmits a loading compensation signal to the controller, and the controller controls the one-way check compensation mechanism to extend. After the second position sensor gives an in-place signal, the skip is loaded with materials. When the wire rope extends the skip to the compensation position, the one-way check compensation mechanism can lock the skip to prevent it from sinking. After the loading is completed, the skip is lifted, and the one-way check compensation mechanism is retracted at the same time, and the third position sensor gives a retraction in-place signal. Beneficial Effects
[0017] 1. The large-tonnage deep well lifting bucket loading compensation device of the present invention adopts a mechanical one-way check compensation structure to lock the bucket in one direction and can be automatically retracted when the bucket is lifted. It is safe and reliable and does not affect the bucket lifting efficiency. It can be used when replacing the wire rope or the suspension device, reducing the tank support operation when replacing the wire rope or the suspension device.
[0018] 2. The large-tonnage deep-well lifting bucket loading compensation device of the present invention can lock the bucket in one direction during loading, thereby preventing the bucket from sinking due to the elongation of the wire rope, and can effectively reduce the height of the bucket loading room. At the same time, it can prevent the bucket from being damaged and spilling due to excessive impact during loading caused by excessive sinking of the bucket.
[0019] 3. The large-tonnage deep well lifting bucket loading compensation device of the present invention is driven by hydraulic control and can be shared with the loading hydraulic system, reducing additional investment. The system is equipped with an in-place sensor and a related control system, which can be locked with the lifting system to meet the requirements of automatic operation and improve the safety of the system.
[0020] 4. The large-tonnage deep-well hoisting skip loading compensation device of the present invention can compensate for the change of wire rope tension during the loading process, maintain the stability of the lifting system tension during the loading process, increase the safety of the system, and avoid the accident of the skip sliding down and falling into the well due to excessive loading. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the large-tonnage deep well lifting skip loading and compensating device of the present invention; Among them, 1. bucket; 2. one-way check compensation mechanism; 3. second position sensor; 4. upper fixed beam; 5. lower fixed beam; 6. supporting beam; 7. loading; 8. hydraulic station and supporting control system; Figure 2 It is a structural schematic diagram of the one-way check compensation mechanism of the present invention; Among them, 2-1, column; 2-2, counterweight; 2-3, positioning wheel; 2-4, positioning wheel shaft; 2-5, support plate group; 2-6, support seat; 2-7, rotary shaft; 2-8, guide frame; 2-9, driving cylinder; 2-10, cylinder seat; Figure 3 It is a cross-sectional view of the one-way check compensation mechanism of the present invention; Among them, 2-11, limit plate; 2-12, connecting beam; 2-13, oil cylinder connecting pin; 2-14, support center connection line; 2-15, support surface; Figure 4 It is a top view of the one-way check compensation mechanism of the present invention. DETAILED DESCRIPTION
[0022] The technical solution of the present invention is further described in detail below in conjunction with specific embodiments and the accompanying drawings.
[0023] like Figure 1 As shown, it is a schematic diagram of the overall structure of the large-tonnage deep well lifting skip loading compensation device of the present invention; it includes a skip 1, a one-way check compensation mechanism 2, a second position sensor 3, an upper fixed beam 4, a lower fixed beam 5, a supporting beam 6, a loading 7, and a hydraulic station and a matching control system 8; The first position sensor is a proximity switch installed on the wellbore casing frame and is used to detect whether the skip has reached the loading position; The second position sensor 3 is a proximity switch, used to detect whether the one-way check compensation mechanism is extended to the right position; A third position sensor, which is a proximity switch, is used to detect whether the one-way check compensation mechanism is retracted into place; The controller has a signal input end connected to the first position sensor and the second and third position sensors, and a signal output end connected to the one-way check compensation mechanism.
[0024] The working principle of the device of the present invention is as follows: when the bucket reaches the loading position, the first position sensor gives a loading compensation signal, the one-way check compensation mechanism extends, and after the second position sensor 3 gives an in-place signal, the bucket is loaded with materials, and when the wire rope is extended and the bucket reaches the compensation position, the one-way check compensation mechanism can effectively lock the bucket to prevent the bucket from sinking. After the loading is completed, the bucket is lifted and the one-way check compensation mechanism is retracted at the same time; the third position sensor gives a retracted in-place signal.
[0025] like Figure 2 and Figure 3 The figure is a schematic diagram of the structure of the one-way check compensation mechanism of the present invention. The one-way check compensation mechanism consists of the following parts: The upper end of the column 2-1 is fixed to the upper fixed beam 4 in the hoistway, and the lower end is fixed to the lower fixed beam 5 in the hoistway; A connecting beam 2-12, one end of which is fixedly connected to the column 2-1, and the other end of which extends toward the side of the bucket and is provided with a supporting seat 2-6; The bottom end of the support plate group 2-5 is rotatably connected to the support seat 2-6 via a rotary shaft 2-7, and a support surface 2-15 is provided on the upper end of the support plate group 2-5 near the bucket; The driving cylinder 2-9 is connected between the upright column and the supporting plate group, and is used for driving the supporting plate group 2-5 to extend or retract toward the side of the skip.
[0026] Depend on Figure 2 As shown, when the one-way check compensation mechanism is working, the support plate group 2-5 extends to the bucket support point position.
[0027] As a further preferred solution of the above embodiment of the large-tonnage deep-well lifting skip loading compensation device of the present invention: the one-way check compensation mechanism includes 4 groups, and the 4 groups of one-way check compensation mechanisms are installed at the same horizontal position at the four corners of the skip, and are respectively connected and fixed to the upper fixed beam 4, the lower fixed beam 5, and the supporting beam 6, and the supporting beam 6 has a certain strength to meet the weight of the supporting skip and the material.
[0028] As a further preferred scheme of the above-mentioned embodiment of the large-tonnage deep-well lifting skip loading compensation device of the present invention: a protrusion abutting against the supporting surface is fixed on the skip; a positioning wheel assembly is provided on the top of the supporting plate group close to the skip side; when the wire rope extends the skip to reach the compensation position, the positioning wheel assembly can abut against the protrusion.
[0029] As a further preferred scheme of the above embodiment of the large-tonnage deep-well lifting skip loading compensation device of the present invention: it also includes: a guide frame, which is arranged between the column and the support plate group, and when the support plate group is extended or retracted toward the skip side, the guide frame can guide the support plate group; the second position sensor and the third position sensor are installed on the guide frame.
[0030] As a further preferred solution of the above embodiment of the large-tonnage deep-well lifting skip loading compensation device of the present invention: the bottom rear end of the support plate group 2-5 is a hook-shaped structure, and a limit plate is provided on the support seat 2-6. The hook-shaped structure cooperates with the limit plate to limit the maximum displacement of the support plate group toward the skip side. This can prevent the support plate group from exceeding the normal working position and turning into the wellbore due to an accident or when replacing the oil cylinder.
[0031] As a further preferred solution of the above embodiment of the present invention: it also includes: a counterweight, which is installed on the upper end of the support plate group close to the side of the column. When the support plate group is retracted, the counterweight can ensure that the support plate group is in place to avoid the equipment extending toward the bucket due to a failure of the cylinder.
[0032] As a further preferred scheme of the above-mentioned embodiment of the large-tonnage deep-well lifting bucket loading compensation device of the present invention: the supporting surface of the supporting plate group is a small-angle inclined surface structure, and the line connecting the center of the supporting surface and the center of the rotating shaft is perpendicular to the supporting surface. In this way, it can be ensured that when supporting the bucket, the driving cylinder is basically not subjected to external loads, and at the same time cooperates with the positioning roller to achieve self-locking.
Claims
1. A large-tonnage deep well lifting skip loading compensation device, characterized in that: include: A one-way check compensating mechanism is installed in the hoistway and is located below the loading position of the bucket. The one-way check compensating mechanism can extend toward or retract the bucket. A first position sensor is installed on the wellbore casing frame and is used to detect whether the skip has reached the loading position; A second position sensor is used to detect whether the one-way check compensation mechanism is extended to the correct position; A third position sensor is used to detect whether the one-way check compensation mechanism is retracted into place; The controller has a signal input end connected to the first position sensor and the second and third position sensors, and a signal output end connected to the one-way check compensation mechanism.
2. The large-tonnage deep-well lifting skip loading compensation device according to claim 1 is characterized in that: The one-way check compensating mechanism comprises 4 groups, and the 4 groups of one-way check compensating mechanisms are installed at the same horizontal position at the four corners of the bucket.
3. The large-tonnage deep-well lifting skip loading compensation device according to claim 1 is characterized in that: The one-way check compensation mechanism comprises: A column (2-1), the upper end of which is fixed to an upper fixed beam in the shaft, and the lower end of which is fixed to a lower fixed beam in the shaft; A connecting beam (2-12), one end of which is fixedly connected to the column, and the other end of which extends toward the side of the bucket and is provided with a supporting seat (2-6); A support plate group (2-5), the bottom end of which is rotatably connected to the support seat (2-6) via a rotary shaft (2-7), and a support surface (2-6) is provided on the upper end of the support plate group close to the bucket; A driving unit is connected between the upright column (2-1) and the support plate group (2-5), and is used to drive the support plate group (2-5) to extend toward or retract toward the side of the bucket.
4. The large-tonnage deep-well lifting skip loading compensation device according to claim 3 is characterized in that: A protrusion that docks with the supporting surface (2-6) is fixed on the bucket; A positioning wheel assembly is provided on the top of the support plate group (2-5) close to the bucket side; When the wire rope extends the bucket to reach the compensation position, the positioning wheel assembly can abut against the protrusion.
5. The large-tonnage deep-well lifting skip loading compensation device according to claim 3 is characterized in that: Also includes: A guide frame is arranged between the upright column (2-1) and the support plate group (2-5), and when the support plate group (2-5) is extended toward or retracted toward the side of the bucket, the guide frame can guide the support plate group (2-5); The second position sensor and the third position sensor are installed on the guide frame.
6. The large-tonnage deep-well lifting skip loading compensation device according to claim 1 is characterized in that: The bottom rear end of the support plate group (2-5) is a hook-shaped structure, and a limit plate is provided on the support seat (2-6). The hook-shaped structure cooperates with the limit plate to limit the maximum displacement of the support plate group toward the bucket side.
7. The large-tonnage deep-well lifting skip loading compensation device according to claim 1 is characterized in that: Also includes: The counterweight (2-2) is installed on the upper end of the support plate group (2-5) close to the side of the column. When in a non-working state, the center of gravity of the support plate group (2-5) is located behind the center line of the rotating shaft. The weight of the equipment itself can ensure that it remains in place, thereby preventing the equipment from extending toward the bucket due to a malfunction of the oil cylinder.
8. The large-tonnage deep-well lifting skip loading compensation device according to claim 3 is characterized in that: The driving unit is a hydraulic cylinder.
9. The large-tonnage deep-well lifting skip loading compensation device according to claim 3 is characterized in that: The support surface (2-6) of the support plate group (2-5) is a downwardly inclined inclined surface structure, and a line connecting the center of the support surface and the center of the rotary shaft (2-7) is perpendicular to the support surface, so as to ensure that when supporting the bucket, the driving oil cylinder is basically not subjected to an external load.
10. A working method for a large-tonnage deep-well hoisting skip loading and compensating device according to any one of claims 1 to 9, characterized in that: When the skip reaches the loading position, the first position sensor transmits a loading compensation signal to the controller, and the controller controls the one-way check compensation mechanism to extend. After the second position sensor gives an in-place signal, the loader loads the skip. When the wire rope extends the skip to the compensation position, the one-way check compensation mechanism can lock the skip to prevent it from sinking. After loading is completed, the skip is lifted, and the one-way check compensation mechanism is retracted at the same time, and the third position sensor gives a retraction in-place signal.
Citation Information
Patent Citations
Support locking device and method
CN106744217A
Heavy hammer flap valve
CN110274031A
Mine skip bucket lifting and loading power compensation system
CN117246884A
Rocker arm platform device
CN118025942A
Pat a core and control exchange device
CN205243264U