Subway tunnel deformation and leakage monitoring device

By designing the deformation and leakage monitoring device of subway tunnels, and using components such as curved plates, cameras and rollers, automated inspection is realized, solving the problem of low manual detection efficiency and improving detection efficiency and safety.

CN119083273AInactive Publication Date: 2024-12-06于海涛
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411208857.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the safety inspection of subway tunnels mainly relies on manual methods, which leads to large workload and low efficiency of staff inspection, making it difficult to deal with the deformation and leakage problems of tunnel tops in a timely manner.

Method used

A deformation and leakage monitoring device for subway tunnels was designed, using curved plates, cameras, lighting lamps, fixed columns, compression springs, sliders, rollers and brushes to detect leakage in the inner wall of the tunnel, rollers and tunnels through the camera. The top is fit, and the slider brings a brush to draw deformation tracks on the cardboard to improve detection efficiency.

Benefits of technology

Automatic detection is realized, which reduces the inconvenience of manual detection and improves detection efficiency, facilitates maintenance personnel to intuitively understand the deformation of the top of the tunnel, and improves the ability to eliminate safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083273A_ABST
    Figure CN119083273A_ABST
Patent Text Reader

Abstract

The invention provides a deformation and leakage monitoring device for a subway tunnel, and relates to the technical field of subway tunnel detection. The deformation and leakage monitoring device for the subway tunnel comprises a bottom plate, a driving mechanism is arranged at the bottom of the bottom plate, a supporting column and an electric cylinder are fixedly connected to the top of the bottom plate, the supporting column is located on the left side of the electric cylinder, a first movable cavity is formed in the supporting column, and a limiting block is slidably connected to the interior of the first movable cavity; the top of the limiting block is fixedly connected with a limiting rod, the top of the limiting rod is fixedly connected with an arc-shaped plate, the arc-shaped plate is located above the supporting column, a camera and illuminating lamps are arranged on the arc-shaped face of the arc-shaped plate, and the illuminating lamps are located on the left side and the right side of the camera. The deformation of the top of the tunnel and the leakage of the tunnel can be conveniently detected, the inconvenience caused by manual detection is effectively solved, and the detection efficiency is favorably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of subway tunnel detection, in particular to a deformation and leakage monitoring device for a subway tunnel. Background Art

[0002] The subway is a fast, high-capacity, electric-powered rail transit system built in the city. The trains run on fully enclosed lines, and the lines in the central city are basically set up in underground tunnels. Since the subway runs in underground tunnels, the safety of the subway tunnels is very important. It is necessary to regularly inspect the subway tunnels to facilitate timely treatment of deformation of the tunnel top and leakage problems in the tunnel, and eliminate safety hazards.

[0003] At present, tunnel safety inspections are all carried out manually by staff entering the tunnel. Since subway tunnels are long, the staff have a huge workload and their work efficiency is low. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies in the prior art, the present invention provides a deformation and leakage monitoring device for a subway tunnel, which solves the problem of using manual detection to perform tunnel safety detection, which causes a huge workload for staff and low work efficiency due to the long subway tunnel.

[0006] (II) Technical solution

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: A deformation and leakage monitoring device for a subway tunnel, comprising a bottom plate, a driving mechanism is arranged at the bottom of the bottom plate, a support column and an electric cylinder are fixedly connected to the top of the bottom plate, and the support column is located on the left side of the electric cylinder, a first movable cavity is arranged inside the support column, a limit block is slidably connected inside the first movable cavity, a limit rod is fixedly connected to the top of the limit block, an arc plate is fixedly connected to the top of the limit rod, and the arc plate is located above the support column, a camera and a lighting lamp are arranged on the arc surface of the arc plate, and the lighting lamp is located on the left and right sides of the camera;

[0008] The movable end of the electric cylinder is fixedly connected to a fixed column, a second movable cavity is arranged inside the fixed column, a compression spring is fixedly connected to the bottom of the second movable cavity, a slider is fixedly connected to the top of the compression spring, a column is fixedly connected to the top of the slider, a mounting groove is arranged on the top of the fixed column, and a roller is rotatably connected inside the mounting groove;

[0009] The front side wall of the fixed column is provided with a first sliding hole and a sliding rod, and the sliding rod is located at the left and right sides of the first sliding hole, a paintbrush is slidably connected inside the first sliding hole, one end of the paintbrush located inside the second movable cavity is fixedly connected to the sliding block, a sliding cylinder is slidably connected to the circumferential surface of the sliding rod, a third movable cavity is provided inside the sliding cylinder, and an extrusion block is fixedly connected to the one end of the sliding rod located inside the third movable cavity, a tightening spring is sleeved on the circumferential surface of the sliding rod, and the tightening spring is located inside the third movable cavity, an end of the sliding cylinder away from the fixed column is fixedly connected to a mounting plate, a side of the mounting plate close to the fixed column is provided with a cardboard placement groove, and a cardboard is placed inside the cardboard placement groove, and a handle is fixedly connected to the side of the mounting plate away from the cardboard placement groove;

[0010] A fixing rod is fixedly connected to the right side wall of the arc-shaped plate, and one end of the fixing rod away from the arc-shaped plate is fixedly connected to the column.

[0011] Preferably, the driving mechanism includes a mounting side plate, a connecting shaft, a track wheel and a dual-axis motor, the mounting side plate and the dual-axis motor are both fixedly connected to the bottom of the base plate, and the mounting side plate is symmetrically arranged on the front and rear sides of the dual-axis motor, the connecting shaft is rotatably connected to the inside of the mounting side plate, and the connecting shaft is fixedly connected to the output shaft of the dual-axis motor, the track wheel is fixedly connected to the end of the connecting shaft away from the dual-axis motor, and the driving mechanism is provided in two numbers, and is symmetrically arranged on the left and right sides of the base plate.

[0012] Preferably, a power supply device is provided on the top of the base plate, and the power supply device is located on the left side of the supporting column, and the dual-axis motor, camera, lighting lamp and electric cylinder are all electrically connected to the power supply device.

[0013] Preferably, a second sliding hole and a scale mark are provided on the right side wall of the fixed column, and the scale mark is located behind the second sliding hole, an indicator rod is slidably connected inside the second sliding hole, one end of the indicator rod located inside the second active cavity is fixedly connected to the slider, and the end of the indicator rod located on the right side of the fixed column is fixedly connected to the indicator mark.

[0014] Preferably, the number of the support column, the first movable cavity, the limiting rod and the limiting block are all two, and they are symmetrically arranged on the front and rear sides of the arc plate, and the limiting rod is slidably connected to the support column.

[0015] Preferably, the number of the cameras and the number of the lighting lamps are both multiple, and the number of the lighting lamps is twice the number of the cameras.

[0016] Preferably, the number of the slide cylinder, the third movable chamber, the extrusion block, the slide rod and the tension spring is four, and they are symmetrically arranged on the left and right sides of the first slide hole.

[0017] (III) Beneficial effects

[0018] The present invention provides a deformation and leakage monitoring device for a subway tunnel, which has the following beneficial effects:

[0019] 1. The present invention, by arranging an arc plate, a camera, a lighting lamp, a fixed column, a second movable cavity, a compression spring, a slider, a column, a mounting groove, a roller, a first sliding hole, a brush and a cardboard placement groove, and using a camera to detect whether leakage occurs on the inner wall of the tunnel, the roller fits with the top of the tunnel under the action of the compression spring, so when the top of the tunnel is deformed, the column controls the slider to drive the brush to move up and down, and draws a corresponding track on the cardboard, so that maintenance personnel can intuitively understand the deformation of the tunnel top, solves many inconveniences caused by manual detection, and is conducive to improving detection efficiency.

[0020] 2. The present invention provides a slide cylinder, a third movable cavity, an extrusion block, a slide rod, a tightening spring and a handle, and the cardboard in the cardboard placement groove fits tightly with the brush under the action of the tightening spring, so that the brush can draw clear tracks on the cardboard. In addition, the mounting plate is separated from the brush by the handle, which facilitates the taking and placement of the cardboard and prevents the brush from drawing non-detection tracks on the cardboard. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a front view of a deformation and leakage monitoring device for a subway tunnel proposed by the present invention;

[0022] Figure 2 A side view of a curved plate of a deformation and leakage monitoring device for a subway tunnel proposed by the present invention;

[0023] Figure 3 A schematic diagram of the internal structure of a support column of a deformation and leakage monitoring device for a subway tunnel proposed by the present invention;

[0024] Figure 4 A schematic diagram of a fixed column and a part of the connection structure of a deformation and leakage monitoring device for a subway tunnel proposed by the present invention;

[0025] Figure 5 A side cross-sectional view of a fixing column of a deformation and leakage monitoring device for a subway tunnel proposed by the present invention;

[0026] Figure 6 A side cross-sectional view of a slide tube of a deformation and leakage monitoring device for a subway tunnel proposed by the present invention;

[0027] Figure 7 This is a schematic diagram of the bottom structure of a floor of a subway tunnel deformation and leakage monitoring device proposed by the present invention.

[0028] Among them, 1. bottom plate; 2. support column; 3. first movable cavity; 4. limit rod; 5. limit block; 6. arc plate; 7. camera; 8. lighting lamp; 9. fixing rod; 10. electric cylinder; 11. fixing column; 12. second movable cavity; 13. compression spring; 14. slider; 15. column; 16. mounting groove; 17. roller; 18. first sliding hole; 19. paintbrush; 20. mounting plate; 21. slide cylinder; 22. third movable cavity; 23. extrusion block; 24. slide rod; 25. tightening spring; 26. handle; 27. cardboard placement groove; 28. second sliding hole; 29. ​​indicator rod; 30. indicator mark; 31. scale mark; 32. mounting side plate; 33. connecting shaft; 34. track wheel; 35. dual-axis motor; 36. power supply device. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] Example:

[0031] like Figure 1-7 As shown, an embodiment of the present invention provides a deformation and leakage monitoring device for a subway tunnel, comprising a base plate 1, a driving mechanism is arranged at the bottom of the base plate 1, the driving mechanism is mainly used to control the base plate 1 to travel on the track, a support column 2 and an electric cylinder 10 are fixedly connected to the top of the base plate 1, and the support column 2 is located on the left side of the electric cylinder 10, a first active cavity 3 is arranged inside the support column 2, and a limiting block 5 is slidably connected inside the first active cavity 3, and the setting of the limiting block 5 prevents the limiting rod 4 from falling off from the support column 2, and the support column 2, the limiting rod 4 and the first The setting of the movable cavity 3 facilitates the arc plate 6 to move up and down with the column 15. When the roller 17 is in contact with the top of the tunnel, the camera 7 can shoot at close range, and the camera 7 transmits the shot picture to the operator's computer. The top of the limit block 5 is fixedly connected to the limit rod 4, and the top of the limit rod 4 is fixedly connected to the arc plate 6, and the arc plate 6 is located above the support column 2. The camera 7 and the lighting lamp 8 are arranged on the arc surface of the arc plate 6, and the lighting lamp 8 is located on the left and right sides of the camera 7. The lighting lamp 8 mainly provides lighting;

[0032] The movable end of the electric cylinder 10 is fixedly connected with a fixed column 11. The electric cylinder 10 is mainly used to adjust the position of the fixed column 11. When the roller 17 fits the top of the tunnel, the electric cylinder 10 controls the fixed column 11 to move up, so that the slider 14 is located in the middle position of the second movable cavity 12, which is convenient for the paintbrush 19 to draw an up and down moving track on the cardboard. The second movable cavity 12 is arranged inside the fixed column 11, and the bottom of the second movable cavity 12 is fixedly connected with a compression spring 13, which is always in a compressed state. The top of the compression spring 13 is fixedly connected with a slider 14, and the top of the slider 14 is fixedly connected with a column 15. The top of the column 15 is provided with a mounting groove 16, and the mounting groove 16 is located above the fixed column 11. The inside of the mounting groove 16 is rotatably connected with a roller 17. The setting of the roller 17 facilitates the column 15 to slide on the top of the tunnel.

[0033] The front side wall of the fixed column 11 is provided with a first sliding hole 18 and a sliding rod 24, and the sliding rod 24 is located on the left and right sides of the first sliding hole 18, and a paintbrush 19 is slidably connected inside the first sliding hole 18. When the tunnel top is deformed, the column 15 controls the slider 14 to drive the paintbrush 19 to move up and down (convex or concave), and draws the moving trajectory on the cardboard, and one end of the paintbrush 19 located inside the second active cavity 12 is fixedly connected to the slider 14, and a sliding cylinder 21 is slidably connected to the circumferential surface of the sliding rod 24, and a third active cavity 22 is provided inside the sliding cylinder 21, and one end of the sliding rod 24 located inside the third active cavity 22 is fixedly connected to an extrusion block 23, and a tightening spring 25 is sleeved on the circumferential surface of the sliding rod 24, and the tightening spring 25 is The spring 25 is located inside the third active cavity 22, the tension spring 25 is always in a compressed state, and the elastic force of the tension spring 25 is used to control the slide 21 to drive the mounting plate 20 to move toward one side of the fixed column 11, so that the cardboard inside the cardboard placement groove 27 fits with the paintbrush 19, and the end of the slide 21 away from the fixed column 11 is fixedly connected with the mounting plate 20, and the side of the mounting plate 20 close to the fixed column 11 is provided with a cardboard placement groove 27, and cardboard is placed inside the cardboard placement groove 27, and the side of the mounting plate 20 away from the cardboard placement groove 27 is fixedly connected with a handle 26, and the handle 26 mainly separates the mounting plate 20 from the paintbrush 19, which is convenient for taking and placing the cardboard and preventing the paintbrush 19 from drawing non-detection tracks on the cardboard;

[0034] A fixing rod 9 is fixedly connected to the right side wall of the arc plate 6 . The setting of the fixing rod 9 facilitates the arc plate 6 to move up and down together with the column 15 . One end of the fixing rod 9 away from the arc plate 6 is fixedly connected to the column 15 .

[0035] The driving mechanism includes an installation side plate 32, a connecting shaft 33, a track wheel 34 and a dual-axis motor 35. The installation side plate 32 and the dual-axis motor 35 are both fixedly connected to the bottom of the base plate 1, and the installation side plate 32 is symmetrically arranged on the front and rear sides of the dual-axis motor 35. The dual-axis motor 35 mainly controls the connecting shaft 33 to drive the track wheel 34 to rotate, thereby controlling the base plate 1 to move on the track. The connecting shaft 33 is rotatably connected to the inside of the installation side plate 32, and the connecting shaft 33 is fixedly connected to the output shaft of the dual-axis motor 35. The track wheel 34 is fixedly connected to the end of the connecting shaft 33 away from the dual-axis motor 35. There are two driving mechanisms, which are symmetrically arranged on the left and right sides of the base plate 1.

[0036] A power supply device 36 is provided on the top of the base plate 1. The power supply device 36 mainly provides power for the dual-axis motor 35, the camera 7, the lighting lamp 8 and the electric cylinder 10. The dual-axis motor 35, the camera 7, the lighting lamp 8 and the electric cylinder 10 are mainly remotely controlled by an external controller, and the power supply device 36 is located on the left side of the support column 2. The dual-axis motor 35, the camera 7, the lighting lamp 8 and the electric cylinder 10 are all electrically connected to the power supply device 36. A second sliding hole 28 and a scale mark 31 are provided on the right side wall of the fixed column 11, and the scale mark 31 is located behind the second sliding hole 28. An indicator rod 29 is slidably connected inside the second sliding hole 28. One end of the indicator rod 29 located inside the second active cavity 12 is fixedly connected to the slider 14. One end of the indicator rod 29 located on the right side of the fixed column 11 is fixedly connected to the indicator mark 30. The second sliding hole 28, the indicator rod 29, the indicator mark 30 and the scale mark 31 are arranged to facilitate accurately moving the slider 14 to the middle of the second active cavity 12.

[0037] There are two support columns 2, first movable cavities 3, limit rods 4 and limit blocks 5, which are symmetrically arranged on the front and rear sides of the arc plate 6. The limit rod 4 is slidably connected to the support column 2. There are multiple cameras 7 and lighting lamps 8, and the number of lighting lamps 8 is twice the number of cameras 7. There are four slide cylinders 21, third movable cavities 22, extrusion blocks 23, slide rods 24 and tightening springs 25, which are symmetrically arranged on the left and right sides of the first sliding hole 18.

[0038] Working principle: When in use, the staff controls the fixed column 11 to move up through the electric cylinder 10, and observes the positions of the indicator mark 30 and the scale mark 31 at the same time, so as to move the slider 14 to the middle position of the second active cavity 12, and then separates the mounting plate 20 from the brush 19 through the handle 26, and then inserts the new cardboard into the cardboard placement slot 27. After placement, release the handle 26. At this time, the cardboard fits with the brush 19 under the action of the tightening spring 25, and then starts the dual-axis motor 35, the camera 7 and the lighting 8. When the bottom plate 1 is running on the track, the camera 7 will capture the picture and transmit it to the remotely operated computer. When the roller 17 moves to the position where the top of the tunnel is deformed, the column 15 will control the slider 14 to move up and down, and control the brush 19 to draw the motion trajectory on the cardboard. After the inspection is completed, the maintenance personnel will remove the cardboard, so that the maintenance personnel can intuitively understand the deformation of the top of the tunnel.

[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A deformation and leakage monitoring device for a subway tunnel, comprising a bottom plate (1), characterized in that: A driving mechanism is provided at the bottom of the base plate (1), a support column (2) and an electric cylinder (10) are fixedly connected at the top of the base plate (1), and the support column (2) is located on the left side of the electric cylinder (10), a first movable cavity (3) is provided inside the support column (2), a limit block (5) is slidably connected inside the first movable cavity (3), the top of the limit block (5) is fixedly connected to a limit rod (4), the top of the limit rod (4) is fixedly connected to an arc plate (6), and the arc plate (6) is located above the support column (2), a camera (7) and an illuminating lamp (8) are provided on the arc surface of the arc plate (6), and the illuminating lamp (8) is located on the left and right sides of the camera (7); The movable end of the electric cylinder (10) is fixedly connected to a fixed column (11), a second movable chamber (12) is arranged inside the fixed column (11), a compression spring (13) is fixedly connected to the bottom of the second movable chamber (12), a slider (14) is fixedly connected to the top of the compression spring (13), a column (15) is fixedly connected to the top of the slider (14), a mounting groove (16) is arranged on the top of the fixed column (11), and a roller (17) is rotatably connected to the inside of the mounting groove (16); The front side wall of the fixed column (11) is provided with a first sliding hole (18) and a sliding rod (24), and the sliding rod (24) is located on the left and right sides of the first sliding hole (18), the interior of the first sliding hole (18) is slidably connected with a paintbrush (19), one end of the paintbrush (19) located inside the second active cavity (12) is fixedly connected to the slider (14), the circumferential surface of the sliding rod (24) is slidably connected with a sliding cylinder (21), the interior of the sliding cylinder (21) is provided with a third active cavity (22), and the sliding rod (24) is located inside the third active cavity (22) One end of the slide bar (24) is fixedly connected to an extrusion block (23); a tensioning spring (25) is sleeved on the circumferential surface of the slide bar (24), and the tensioning spring (25) is located inside the third movable chamber (22); one end of the slide tube (21) away from the fixed column (11) is fixedly connected to a mounting plate (20); a side of the mounting plate (20) close to the fixed column (11) is provided with a paperboard placement groove (27), and paperboard is placed inside the paperboard placement groove (27); and a handle (26) is fixedly connected to the side of the mounting plate (20) away from the paperboard placement groove (27); A fixing rod (9) is fixedly connected to the right side wall of the arc-shaped plate (6), and one end of the fixing rod (9) away from the arc-shaped plate (6) is fixedly connected to the column (15).

2. The deformation and leakage monitoring device for a subway tunnel according to claim 1, characterized in that: The driving mechanism comprises a mounting side plate (32), a connecting shaft (33), a track wheel (34) and a dual-axis motor (35); the mounting side plate (32) and the dual-axis motor (35) are both fixedly connected to the bottom of the base plate (1); the mounting side plate (32) is symmetrically arranged on the front and rear sides of the dual-axis motor (35); the connecting shaft (33) is rotatably connected to the inside of the mounting side plate (32); the connecting shaft (33) is fixedly connected to the output shaft of the dual-axis motor (35); the track wheel (34) is fixedly connected to one end of the connecting shaft (33) away from the dual-axis motor (35); and the number of the driving mechanisms is two, and they are symmetrically arranged on the left and right sides of the base plate (1).

3. The deformation and leakage monitoring device for a subway tunnel according to claim 1, characterized in that: A power supply device (36) is provided on the top of the base plate (1), and the power supply device (36) is located on the left side of the support column (2), and the dual-axis motor (35), the camera (7), the lighting lamp (8) and the electric cylinder (10) are all electrically connected to the power supply device (36).

4. The deformation and leakage monitoring device for a subway tunnel according to claim 1, characterized in that: A second sliding hole (28) and a scale mark (31) are provided on the right side wall of the fixed column (11), and the scale mark (31) is located behind the second sliding hole (28). An indicating rod (29) is slidably connected inside the second sliding hole (28), and one end of the indicating rod (29) located inside the second movable cavity (12) is fixedly connected to the slider (14), and one end of the indicating rod (29) located on the right side of the fixed column (11) is fixedly connected to the indicating mark (30).

5. The deformation and leakage monitoring device for a subway tunnel according to claim 1, characterized in that: The supporting column (2), the first movable cavity (3), the limiting rod (4) and the limiting block (5) are each provided with two in number and are symmetrically arranged on the front and rear sides of the arc-shaped plate (6); the limiting rod (4) is slidably connected to the supporting column (2).

6. The deformation and leakage monitoring device for a subway tunnel according to claim 1, characterized in that: The number of the cameras (7) and the number of the lighting lamps (8) are both multiple, and the number of the lighting lamps (8) is twice the number of the cameras (7).

7. The deformation and leakage monitoring device for a subway tunnel according to claim 1, characterized in that: The number of the slide cylinder (21), the third active chamber (22), the extrusion block (23), the slide rod (24) and the tension spring (25) is four and they are symmetrically arranged on the left and right sides of the first slide hole (18).