Construction method for removing cast-in-place piles in shield crossing area under viaduct and protecting bridge foundation

The method employs a crawler-type full-casing full-rotation drilling rig and micro-wedge-shaped drill hammer to efficiently remove old piles under viaducts, ensuring the safety and stability of the bridge foundation by minimizing vibration and disturbance.

CN119083431AActive Publication Date: 2024-12-06HANGZHOU NANKUN CONSTRUCTION CO LTD +3

Patent Information

Application Number
CN202411222110.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-12-06
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

The removal of old underground cast-in-place piles under viaducts is challenging due to their deep embedding in rock and the potential for vibration-induced damage to the bridge foundation, with existing methods like impact crushing, rotary drilling, and full-casing extraction being inefficient or unsafe in low-headroom environments.

Method used

A construction method using a crawler-type full-casing full-rotation drilling rig with a low-lying crawler crane and micro-wedge-shaped drill hammer to twist off and remove old piles, followed by grouting to reinforce the site, ensuring minimal disturbance to the bridge foundation.

Benefits of technology

Enables efficient and safe removal of old piles under low clearance conditions, maintaining the integrity of the bridge foundation by using a crawler-type full-casing full-rotation drilling rig and micro-wedge-shaped chisel hammer, with high obstacle removal efficiency and minimal disruption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083431A_ABST
    Figure CN119083431A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of cast-in-place pile removal, and discloses a construction method for removing cast-in-place piles in a shield crossing area under a viaduct and protecting a bridge foundation. Determining the position of an old pile; the crawler-type full-casing full-slewing drilling machine is in place, a low-lying short-arm crawler crane is used for hoisting the casing, and the casing rotates downwards to be cut to surround the periphery of the old pile bearing platform; hoisting a micro wedge-shaped drill hammer, embedding the micro wedge-shaped drill hammer between the old pile bearing platform and the inner side wall of the sleeve, driving the sleeve to rotate until the old pile bearing platform is twisted off, and taking out the old pile bearing platform; the sleeve is driven to continuously press and cut the soil layer until the lower portion of the sleeve surrounds the upper portion of the old pile; the micro wedge-shaped drill hammer is embedded between the old pile and the inner side wall of the sleeve, the sleeve is driven to rotate till the insertion section is twisted off, and the insertion section is taken out; the steps are repeated until the length of the residual pile section is smaller than the set length, and the residual pile section is crushed and the hole is cleaned through a miniature cross-shaped punch hammer; backfilling cement mortar; and the sleeve is pulled out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The patent of this invention relates to the technical field of cast-in-place pile removal, specifically, to a method for removing cast-in-place piles in a shield tunneling area under an elevated bridge and a construction method for protecting the bridge foundation. Background Art

[0002] To meet the needs of urban traffic, subway lines in major cities are constantly expanding, and underground tunnel construction is becoming more and more common. During the tunnel shield construction process, conflicts between the shield line and the old pile foundations of existing buildings often occur. In order to ensure the smooth excavation of the project shield tunnel, the old piles must be removed before the shield construction without affecting the safety of the surrounding infrastructure.

[0003] Taking the newly built southern extension of Guangzhou Metro Line 18 as an example, the tunnel of the project is designed to have a diameter of 8m and a top buried depth of about 24m from the ground. According to the plan, its shield line will pass under the elevated bridge section of Nansha Port Expressway located in the Shiliuyong area. Nansha Port Expressway (bridge) is located in Nansha District, Guangzhou. It was completed and opened to traffic in 2004. The bridge carries a large number of freight vehicles from Nansha Port, with a daily traffic volume of up to 140,000 vehicles. Lingxin Avenue was built 7m below the elevated bridge. The factory buildings on this section of the road were demolished when Lingxin Avenue was built. The shield route conflicts with the old cast-in-place pile foundation of the original factory building of Lingxin Avenue. The number of conflicts between the new shield crossing area and the old piles is 83, of which 55 old piles are distributed in the low clearance area under the bridge. The old piles are concrete cast-in-place piles with a designed pile diameter of 800mm and an average pile length of 34m. The concrete strength of the old pile foundation is C35, which makes it extremely difficult for the shield machine to excavate and pass through.

[0004] In current technology, the removal of old underground piles is usually done by impact crushing, rotary drilling, and full-casing and full-rotation pile extraction. Given that the Nansha site is backfilled with a fish pond, if an impact hammer is used to crush the old piles, the impact process is likely to cause a collapsed hole. In addition, the original old piles are embedded in the rock and are located under the viaduct. The vibration and collapsed hole caused by the impact will have an adverse effect on the upper bridge foundation. If a rotary drilling rig is used for construction, the low-headroom rotary drilling rig has a small torque and the old piles are deep. The low-headroom rotary drilling rig has a slow speed in removing the old piles and consumes a lot of materials. If a full-casing and full-rotation drilling rig is used to remove the old piles, it is also limited by the low-headroom environment, and conventional pile extraction operations cannot be carried out normally on site. Summary of the invention

[0005] The purpose of the present invention is to provide a construction method for removing cast-in-place piles in a shield tunneling area under a viaduct and protecting a bridge foundation, aiming to solve the problem of difficulty in removing old underground piles under a viaduct in the prior art.

[0006] The present invention is achieved by: a construction method for removing cast-in-place piles in a shield tunneling area under a viaduct and protecting a bridge foundation, comprising the following construction steps:

[0007] 1) Determine a blocking area between the shield route and the bridge foundation, perform MJS pile construction in the blocking area to form a plurality of blocking piles, and the plurality of blocking piles are arranged at intervals along the length direction of the blocking area;

[0008] 2) According to the shield route, measure and lay out the lines to determine the positions of the old piles;

[0009] 3) The crawler-type full-casing full-rotation drilling rig is in place. The crawler-type full-casing full-rotation drilling rig has a center hole in the middle. The casing is hoisted by a low-lying short-arm crawler crane. The casing passes through the center hole, and the bottom of the casing is pressed against the old pile position; the crawler-type full-casing full-rotation drilling rig drives the casing to rotate and cut downward until the casing embraces the outer periphery of the old pile cap, and there is a cap gap between the outer periphery of the old pile cap and the inner side wall of the casing;

[0010] 4) Use a low-lying short-arm crawler crane to hoist a micro wedge-shaped drill hammer, which is embedded in the cap gap from top to bottom, and is clamped and fixed between the old pile cap and the casing; use a crawler-type full-casing full-rotation drilling rig to drive the casing to rotate until the old pile cap is twisted off, and then remove the old pile cap from the casing;

[0011] 5) Using a crawler-type full-casing full-rotation drilling rig to drive the casing to continue pressing down to cut the soil layer until the bottom of the casing is pressed down to a set distance, and then stop driving the casing to rotate, and the lower part of the casing embraces the upper part of the old pile; the old pile has an insertion section inserted into the casing and a residual pile section located below the casing, and a pile interval is formed between the outer periphery of the insertion section and the inner side wall of the casing;

[0012] 6) Use a micro wedge-shaped drill hammer to embed into the pile interval from top to bottom. The micro wedge-shaped drill hammer is clamped and fixed between the old pile and the casing. Use a crawler-type full-casing full-rotation drill rig to drive the casing to rotate until the inserted section is twisted off, and then remove the inserted section from the casing;

[0013] 7) Repeat the above construction steps 5) to 6) until the length of the residual pile segment is less than the set length, use a micro cross hammer to break the residual pile segment into debris, and then use a micro grab to take the debris out of the casing, forming a hole to be filled in the casing;

[0014] 8) Install a grouting frame and a grouting conduit, and backfill cement mortar into the hole to be filled through the grouting conduit;

[0015] 9) Pull out the casing.

[0016] Optionally, in the construction step 1), an infrared displacement monitoring device for monitoring the displacement of the bridge deck is deployed.

[0017] Optionally, in the construction step 3), a positioning base plate is suspended on the old pile position, and then the crawler-type full-casing full-rotation drilling rig is moved. A positioning hole penetrating vertically is formed in the middle of the positioning base plate, and the positioning hole is aligned with the center hole vertically.

[0018] Optionally, a plurality of positioning grooves are formed on the top of the positioning base plate, and the crawler-type full-casing full-rotation drilling rig has a plurality of legs that can telescope up and down;

[0019] In the construction step 3), after the crawler-type full-casing full-rotation drilling rig is moved to a set position, the plurality of legs are extended and moved downward until the bottom of the legs is pressed against the positioning groove.

[0020] Optionally, in the construction step 5), the casing includes a plurality of vertically connected section pipes, and adjacent section pipes are connected to each other via a connecting structure;

[0021] In the construction step 5), during the process of using a crawler-type full-casing and full-rotation drilling rig to drive the casing to continue to press down and cut the soil layer, the casing has an upper extension section extending above the center hole. When the length of the upper extension section is less than 50 cm, the casing is stopped from being driven to rotate, and a waterproof membrane is rolled on the outer periphery of the upper extension section to form a waterproof layer, and then butter is applied on the waterproof layer to form a lubricating layer; a low-lying short-arm crawler crane is used to hoist the joint pipe, and the hoisted joint pipe is connected to the top of the upper extension section through a connecting structure, and the waterproof layer is clamped and fixed between the upper extension section and the hoisted joint pipe.

[0022] Optionally, the bottom of the sleeve is provided with a plurality of cutting shoes, and the plurality of cutting shoes are arranged at intervals along the circumference of the sleeve; the inner side wall of the bottom of the sleeve is provided with a plurality of inner cutter heads, the inner ends of the inner cutter heads are connected to the inner side wall of the sleeve, and the outer ends of the inner cutter heads are extended toward the center of the sleeve; the outer periphery of the bottom of the sleeve is welded with protruding strips, and the plurality of protruding strips form a protruding grid on the outer periphery of the sleeve;

[0023] In the construction step 3), during the process of the crawler-type full-casing full-rotation drilling rig driving the casing to rotate and cut downward, an annular cap spacing is formed on the old pile position under the action of the inner cutter head;

[0024] In the construction step 5), during the process of the crawler-type full-casing and full-rotation drilling rig driving the casing to rotate and cut downward, an annular pile interval is formed on the old pile position under the action of the inner cutter head.

[0025] Optionally, the outer side of the micro wedge-shaped drill hammer is formed with an arc-shaped outer side surface, and the inner side of the micro wedge-shaped drill hammer is formed with a concave-convex inner side surface, and the two sides of the outer side surface are respectively connected to the two sides of the inner side surface, and along the direction from top to bottom, the outer side surface is arranged to extend obliquely toward the inner side surface;

[0026] In the construction step 3), after the miniature wedge-shaped drill hammer is embedded in the cap gap, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the old pile cap;

[0027] In the construction step 6), after the miniature wedge-shaped drill hammer is embedded in the pile interval, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the insertion section.

[0028] Optionally, a hanging ear for connecting with a wire rope is provided on the top of the micro wedge-shaped drill hammer. In the construction step 3), the micro wedge-shaped drill hammer is lifted to the top of the cap gap by the wire rope, and after the outer side surface is closely fitted with the inner side wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the cap gap from top to bottom;

[0029] In the construction step 6), the micro wedge-shaped drill hammer is hoisted to the top of the pile interval by a wire rope, and after the outer side surface is tightly fitted with the inner wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the pile interval from top to bottom.

[0030] Optionally, the micro wedge-shaped drill hammer comprises a plurality of steel plates, the plurality of steel plates are welded to each other, the outer end surface of the steel plate is formed with an abutment surface for abutting against the inner wall of the casing, the abutment surfaces of the plurality of steel plates are combined to form the outer side surface, and the abutment surface is provided with an elastic counter-pressure convex strip;

[0031] In the construction step 3), when the micro wedge-shaped drill hammer is embedded into the cap gap under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile cap, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner side surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile cap;

[0032] In the construction step 6), when the micro wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile.

[0033] Optionally, the inner end surface of the steel plate is formed with an inclined surface, and along the direction from top to bottom, the inclined surface is arranged to extend obliquely toward the abutting surface, and a plurality of the inclined surfaces of the steel plates are combined to form the inner side surface; a through hole is provided in the middle of the steel plate, which penetrates the steel plate front and back, and the outer end of the through hole penetrates the abutting surface, and the inner end of the steel plate penetrates the inclined surface;

[0034] The counter-pressure convex strip has a telescopic section embedded in the through hole; a moving block is provided in the through hole, the inner end of the moving block is connected to the outer end of the telescopic section, the outer end of the moving block is provided with a pressing cutter head arranged toward the inclined surface, and the upper and lower ends of the moving block are provided with outwardly protruding convex blocks; two guide rails are provided in the through hole, and a spring for driving the moving block to reset is provided in the guide rail, the inner end of the spring is fixedly arranged, and the outer end of the spring presses on the convex block;

[0035] In the construction step 3), after the micro wedge-shaped drill hammer is embedded into the cap gap under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head is pressed against the old pile cap;

[0036] In the construction step 6), after the miniature wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head presses against the old pile;

[0037] When the miniature wedge-shaped chisel hammer is taken out from the platform interval or pile interval, under the action of elastic force, the spring pressing protrusion moves toward the abutment surface, the moving block squeezes the telescopic section to deform and shorten, the pressing cutter head moves into the through hole, and the counter-pressure protrusion expands and deforms outward.

[0038] Compared with the prior art, the present invention provides a method for removing cast-in-place piles and protecting the bridge foundation in the shield tunneling area under the viaduct. The crawler-type full-casing full-rotation drilling rig adopts a crawler self-propelled mechanism, which can move freely and accurately into position without the cooperation of a large crane. The old pile removal process adopts a low-lying crawler crane and a modified micro-grab bucket, a micro-cross hammer, and a micro-wedge-shaped chisel hammer to achieve barrier-free construction under low clearance conditions and ensure the normal construction. In addition, the crawler-type full-casing full-rotation drilling rig is quick and efficient to put in place; the full-casing full-rotation drilling rig is used to sink the casing to cover the old pile, and the micro-wedge-shaped chisel hammer is inserted into the gap between the pedestal and the pile interval. The crawler-type full-casing full-rotation drilling rig rotates in coordination and twists off the old pile pedestal and the insertion section, and then the broken pile is pulled out with the help of a micro-grab bucket or a low-lying short-arm crawler crane, and the overall obstacle removal efficiency is high.

[0039] Then, the whole process of removing the old piles is followed up by casing. By measuring the length of the pulled-out and inserted section, the situation of the residual pile section in the casing is judged. When the length of the residual pile section is short, the micro cross hammer and micro impact grab bucket are used to repeatedly grab and remove the slag in the casing to ensure that the obstacle is completely cleared and clear the obstacles for the subsequent shield crossing. In addition, before the old pile removal construction, this method pre-reinforces the middle area between the bridge pier, the bridge foundation and the outer line of the shield. During the construction process, the full-casing and full-rotation drilling rig drives the casing to advance and drill into the old pile, isolating the operation in the hole from causing excessive disturbance to the bridge foundation. After the old piles are removed, the super-slow-setting cement mortar is immediately filled in the hole to reinforce the site again to ensure the safety and stability of the bridge foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a schematic flow chart of a construction method for removing cast-in-place piles and protecting bridge foundation in a shield tunneling crossing area under a viaduct provided by the present invention;

[0041] Figure 2 It is a schematic diagram of the structure of cast-in-place piles and bridge foundation in the shield tunneling area under the viaduct provided by the present invention;

[0042] Figure 3 It is a structural schematic diagram of a low-lying short-arm crawler crane provided by the present invention;

[0043] Figure 4 It is a structural schematic diagram of a positioning substrate provided by the present invention;

[0044] Figure 5 It is a schematic structural diagram of the miniature wedge-shaped drill hammer provided by the present invention;

[0045] Figure 6 is a front view schematic diagram of the bottom of the casing provided by the present invention;

[0046] Figure 7 It is a cross-sectional schematic diagram of the steel plate provided by the present invention. DETAILED DESCRIPTION

[0047] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0048] The implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0049] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0050] Reference Figure 1-7 The figure shows a preferred embodiment of the present invention.

[0051] The invention provides a method for removing cast-in-place piles and protecting bridge foundation in a shield tunneling area under a viaduct, comprising the following construction steps:

[0052] 1) A blocking area is determined between the shield route 30 and the bridge foundation 10, and MJS pile construction is performed in the blocking area to form a plurality of blocking piles, and the plurality of blocking piles are arranged at intervals along the length direction of the blocking area;

[0053] 2) According to the shield route 30, measure and lay out the lines to determine the position of the old pile 20;

[0054] 3) The crawler-type full-casing full-rotation drilling rig is in place. The crawler-type full-casing full-rotation drilling rig has a center hole in the middle. The casing 400 is hoisted by a low-lying short-arm crawler crane 100. The casing 400 passes through the center hole, and the bottom of the casing 400 is pressed against the position of the old pile 20; the crawler-type full-casing full-rotation drilling rig drives the casing 400 to rotate and cut downward until the casing 400 embraces the outer periphery of the old pile cap 20, and there is a cap gap between the outer periphery of the old pile cap 20 and the inner side wall of the casing 400;

[0055] 4) Using a low-lying short-arm crawler crane 100 to hoist the micro wedge-shaped drill hammer 300, the micro wedge-shaped drill hammer 300 is embedded into the gap between the pile caps from top to bottom, and the micro wedge-shaped drill hammer 300 is clamped and fixed between the old pile cap 20 and the casing 400; using a crawler-type full-casing full-rotation drilling rig to drive the casing 400 to rotate until the old pile cap 20 is twisted off, and the old pile cap 20 is taken out of the casing 400;

[0056] 5) Using a crawler-type full-casing full-rotation drilling rig to drive the casing 400 to continue to press down and cut the soil layer until the bottom of the casing 400 is pressed down to a set distance, and the casing 400 is stopped from rotating, and the lower part of the casing 400 is surrounded by the upper part of the old pile 20; the old pile 20 has an insertion section inserted into the casing 400 and a residual pile section located below the casing 400, and a pile interval is formed between the outer periphery of the insertion section and the inner side wall of the casing 400;

[0057] 6) Use the miniature wedge drill hammer 300 to embed into the pile interval from top to bottom. The miniature wedge drill hammer 300 is clamped and fixed between the old pile 20 and the casing 400. Use the crawler-type full-casing full-rotation drilling rig to drive the casing 400 to rotate until the inserted section is twisted off, and then remove the inserted section from the casing 400;

[0058] 7) Repeat the above construction steps 5) to 6) until the length of the residual pile segment is less than the set length, use a micro cross hammer to break the residual pile segment into debris, and then use a micro grab bucket to remove the debris from the casing 400, forming a hole to be filled in the casing 400;

[0059] 8) Install the grouting frame and grouting conduit, and backfill cement mortar into the hole to be filled through the grouting conduit;

[0060] 9) Pull out casing 400.

[0061] The above-mentioned construction method for removing cast-in-place piles and protecting the bridge foundation in the shield tunneling area under the viaduct adopts a crawler-type full-casing full-rotation drilling rig, which can move freely and accurately into position through the crawler self-propelled mechanism without the cooperation of a large crane. The old pile 20 is removed by a low-lying crawler crane 100 and a modified micro-grab bucket, micro-cross hammer, and micro-wedge-shaped chisel hammer 300 to achieve barrier-free construction under low clearance conditions and ensure the normal progress of construction. In addition, the crawler-type full-casing full-rotation drilling rig is put into position quickly and efficiently; the full-casing full-rotation drilling rig is used to sink the casing 400 to cover the old pile 20, and the micro-wedge-shaped chisel hammer 300 is inserted into the gap between the pedestal and pile intervals. The crawler-type full-casing full-rotation drilling rig rotates in coordination and twists off the old pile pedestal 20 and the insertion section, and then the broken pile is pulled out with the help of a micro-grab bucket or a low-lying short-arm crawler crane 100, and the overall obstacle removal efficiency is high.

[0062] Then, the casing 400 is used to follow up the removal of the old pile 20. By measuring the length of the pulled-out and inserted section, the situation of the residual pile section in the casing 400 is determined. When the length of the residual pile section is short, the micro cross hammer and micro impact grab bucket are used to repeatedly grab and remove the slag in the casing 400 to ensure that the obstacle is completely cleared and clear the obstacles for the subsequent shield crossing. In addition, before the removal of the old pile 20, this method pre-reinforces the middle area between the pier foundation 10 and the outer line of the shield. During the construction process, the casing 400 is driven by a full-casing and full-rotation drilling rig to advance and drill into the old pile 20, isolating the entire process from causing excessive disturbance to the bridge foundation 10. After the removal of the old pile 20 is completed, the super-slow-setting cement mortar is immediately filled in the hole to reinforce the site again to ensure the safety and stability of the bridge foundation 10.

[0063] Specifically, the JAR-210H full-casing full-rotation drilling rig was modified, and a crawler walking mechanism was installed on its base to form a full-casing full-rotation drilling rig. The whole machine is 4m high and can move to the pile hole without the assistance of a large crane, meeting the low-headroom construction requirements.

[0064] Specifically, the arm 110 of the YTQU100HD crawler crane 100 is dismantled and adjusted to a low-lying state, forming a low-lying short-arm crawler crane 100 with a maximum lifting load of 100t and a total height of only 3.5m, which can meet the lifting operations in low-clearance environments.

[0065] Specifically, the bucket body of the conventional impact grab bucket is 5m long, which cannot meet the construction requirements in low clearance environments. Therefore, this method specially develops a micro impact grab bucket for low clearance environments, with a bucket body length of 2m.

[0066] Specifically, the miniature wedge-shaped drill hammer 300 has a total hammer body length of only 2 m and is composed of a plurality of trapezoidal steel plates 310 , the curvature of which fits the inner wall of the casing 400 .

[0067] Specifically, the conventional hammer is 5m long, which cannot meet the construction requirements in low clearance environments. Therefore, this method reduces the length of the cross hammer. The miniature cross hammer has a diameter of 1.2m and a length of 2m. The hammer body is designed with multiple steel plates 310 to compensate for the effect of being too light due to the reduced length.

[0068] Specifically, blocking piles are driven in rows with a pile diameter of 1.5m, a pile spacing of 1.3m and a pile length of 34m to enclose and reinforce the bridge piers to reduce the adverse effects of pile pulling on the existing bridge.

[0069] In construction step 1), an infrared displacement monitoring device is installed to monitor the displacement of the bridge deck. In this way, the deformation is automatically monitored 24 hours a day.

[0070] In construction step 3), a positioning base plate 200 is suspended on the position of the old pile 20, and then the crawler-type full-casing full-rotation drilling rig is moved. A positioning hole 201 that passes through the middle of the positioning base plate 200 is formed, and the positioning hole 201 is aligned with the center hole. In this way, the positioning base plate 200 can ensure that the axis of the casing 400 is in the same straight line with the axis of the old pile 20, and the crawler-type full-casing full-rotation drilling rig can be positioned, which is convenient for operating and moving the crawler-type full-casing full-rotation drilling rig to a set position.

[0071] A plurality of positioning grooves 202 are formed on the top of the positioning base plate 200, and the crawler-type full-casing full-rotation drilling rig has a plurality of legs that can telescope up and down;

[0072] In construction step 3), after the crawler-type full casing 400 is moved to the set position, the multiple legs are extended and moved downward until the bottom of the legs are pressed against the positioning groove 202. In this way, the crawler-type full casing full rotary drilling rig is prevented from being displaced.

[0073] In construction step 5), the casing 400 includes a plurality of vertically connected joint pipes, and adjacent joint pipes are connected to each other via a connecting structure;

[0074] In construction step 5), the casing 400 is driven by a crawler-type full-casing full-rotation drilling rig to continue to press down and cut the soil layer. The casing 400 has an upper extension section extending above the center hole. When the length of the upper extension section is less than 50 cm, the casing 400 is stopped from rotating. A waterproof film is rolled on the outer periphery of the upper extension section to form a waterproof layer, and then butter is applied on the waterproof layer to form a lubricating layer. The low-lying short-arm crawler crane 100 is used to hoist the section pipe, and the hoisted section pipe is connected to the top of the upper extension section through a connecting structure. The waterproof layer is clamped and fixed between the upper extension section and the hoisted section pipe. In this way, the sealing is ensured by the design of the waterproof layer, and the design of the lubricating layer allows the section pipes of the upper section to be smoothly embedded in the process of extension and insertion.

[0075] The bottom of the sleeve 400 is provided with a plurality of cutting shoes 410, which are arranged at intervals along the circumference of the sleeve 400; the inner side wall of the bottom of the sleeve 400 is provided with a plurality of inner cutter heads 420, the inner ends of the inner cutter heads 420 are connected to the inner side wall of the sleeve 400, and the outer ends of the inner cutter heads 420 are extended toward the center of the sleeve 400; the outer periphery of the bottom of the sleeve 400 is welded with protruding strips, and the plurality of protruding strips form a protruding grid on the outer periphery of the sleeve 400;

[0076] In construction step 3), when the crawler-type full-casing full-rotation drilling rig drives the casing 400 to rotate and cut downward, an annular cap spacing is formed on the pile position of the old pile 20 under the action of the inner cutter head 420;

[0077] In construction step 5), when the crawler-type full-casing full-rotation drill drives the casing 400 to rotate and cut downward, an annular pile interval is formed on the pile position of the old pile 20 under the action of the inner cutter head 420. In this way, the inner cutter head 420 is used to break a gap in the casing 400, which is convenient for the micro-wedge drill hammer 300 to be embedded, and the cutting body to be grabbed and lifted out. And the design of the protruding grid facilitates the lowering of the casing 400.

[0078] The width of the inner blade head 420 is greater than 12 cm.

[0079] The outer side of the micro wedge-shaped drill hammer 300 is formed with an arc-shaped outer side surface 301, and the inner side of the micro wedge-shaped drill hammer 300 is formed with a concave-convex inner side surface 302. The two sides of the outer side surface 301 are respectively connected to the two sides of the inner side surface 302. From top to bottom, the outer side surface 301 is arranged to extend obliquely toward the inner side surface 302.

[0080] In construction step 3), after the miniature wedge-shaped drill hammer 300 is embedded in the gap between the caps, the outer side surface 301 abuts against the inner wall of the casing 400, and the inner side surface 302 abuts against the outer periphery of the old pile cap 20;

[0081] In construction step 6), after the micro wedge-shaped drill hammer 300 is embedded in the pile interval, the outer side surface 301 abuts against the inner side wall of the casing 400, and the inner side surface 302 abuts against the outer periphery of the insertion section. In this way, the design of the outer side surface 301 facilitates the determination of the final position of the micro wedge-shaped drill hammer 300 before it is lowered, so as to facilitate its accurate placement.

[0082] The top of the micro wedge-shaped drill hammer 300 is provided with a hanging ear for connecting with a wire rope. In the construction step 3), the micro wedge-shaped drill hammer 300 is lifted to the top of the cap gap by the wire rope, and after the outer side surface 301 is closely fitted with the inner wall of the casing 400, the wire rope is released. Under the action of gravity, the micro wedge-shaped drill hammer 300 is embedded in the cap gap from top to bottom;

[0083] In construction step 6), the miniature wedge drill hammer 300 is hoisted to the top of the pile interval by a steel wire rope, and after the outer side surface 301 is closely fitted with the inner side wall of the casing 400, the steel wire rope is released, and the miniature wedge drill hammer 300 is embedded into the pile interval from top to bottom under the action of gravity. In this way, the miniature wedge drill hammer 300 is embedded in advance by its own gravity, so that it is stably engaged in the cap interval or the pile interval, and when the casing 400 rotates, the torque can be better transmitted to the cut body.

[0084] When the miniature wedge-shaped drill hammer 300 fails to achieve the desired effect after one insertion, the operation may be repeated for multiple times until the miniature wedge-shaped drill hammer 300 is stuck.

[0085] The miniature wedge-shaped drill hammer 300 includes a plurality of steel plates 310, which are welded to each other. The outer end surface of the steel plate 310 is formed with an abutting surface 311 for abutting against the inner wall of the sleeve 400. The abutting surfaces 311 of the plurality of steel plates 310 are combined to form an outer side surface 301, and an elastic counter-pressure convex strip 320 is provided on the abutting surface 311.

[0086] In construction step 3), when the micro wedge-shaped drill hammer 300 is embedded into the gap between the pile caps under the action of gravity, the micro wedge-shaped drill hammer 300 is pressed by the old pile cap 20, and the counter-pressure convex strip 320 is compressed. Under the action of elastic force, the inner side surface 302 of the micro wedge-shaped drill hammer 300 is pressed against the outer periphery of the old pile cap 20;

[0087] In construction step 6), when the micro wedge drill hammer 300 is embedded into the pile interval under the action of gravity, the micro wedge drill hammer 300 is pressed by the old pile 20, and the counter-pressure convex strip 320 is compressed. Under the action of elastic force, the inner side surface 302 of the micro wedge drill hammer 300 is pressed against the outer periphery of the old pile 20. In this way, through the action of gravity acceleration, the counter-pressure convex strip 320 is squeezed to a compressed state after falling, absorbing the force squeezed on the micro wedge drill hammer 300, and under the action of elastic force, the micro wedge drill hammer 300 is counter-pressed on the cut body, thereby improving the insertion effect of the micro wedge drill hammer 300 and increasing the probability of getting stuck.

[0088] As a preferred embodiment, the inner end surface of the steel plate 310 is formed with an inclined surface 312, and along the top-down direction, the inclined surface 312 is arranged to extend obliquely toward the abutting surface 311, and a plurality of inclined surfaces 312 of the steel plates 310 are combined to form the inner side surface 302; a through hole is provided in the middle of the steel plate 310, which penetrates the steel plate 310 front and back, and the outer end of the through hole penetrates the abutting surface 311, and the inner end of the steel plate 310 penetrates the inclined surface 312;

[0089] The counter-pressure convex strip 320 has a telescopic section 321 embedded in the through hole; a moving block 330 is provided in the through hole, the inner end of the moving block 330 is connected to the outer end of the telescopic section 321, the outer end of the moving block 330 is provided with a pressing cutter head 331 arranged toward the inclined surface 312, and the upper and lower ends of the moving block 330 are provided with outwardly protruding convex blocks 332; two guide rails are provided in the through hole, and a spring 333 for driving the moving block 330 to return is provided in the guide rail, the inner end of the spring 333 is fixedly arranged, and the outer end of the spring 333 presses on the convex block 332;

[0090] In construction step 3), after the miniature wedge-shaped drill hammer 300 is embedded into the gap between the pile caps under the action of gravity, the counter-pressure convex strip 320 is squeezed by the inner wall of the casing 400, the counter-pressure convex strip 320 is compressed, and the telescopic section 321 is deformed and extended toward the inclined surface 312, driving the moving block 330 to move toward the inclined surface 312, and the convex block 332 squeezes the spring 333 to deform, until the pressing cutter head 331 is pressed against the old pile cap 20;

[0091] In construction step 6), after the miniature wedge-shaped drill hammer 300 is embedded into the pile interval under the action of gravity, the counter-pressure convex strip 320 is squeezed by the inner wall of the casing 400, the counter-pressure convex strip 320 is compressed, and the telescopic section 321 is deformed and extended toward the inclined surface 312, driving the moving block 330 to move toward the inclined surface 312, and the convex block 332 squeezes the spring 333 to deform, until the pressing cutter head 331 presses on the old pile 20;

[0092] When the miniature wedge-shaped chisel hammer 300 is taken out from the interval between the caps or the piles, under the action of the elastic force, the spring 333 pushes the protrusion 332 toward the abutment surface 311, the moving block 330 squeezes the telescopic section 321 to deform and shorten, the pressing cutter head 331 moves into the through hole, and the counter-pressure protrusion 320 expands and deforms outward. In this way, the movement of the pressing cutter head 331 is controlled by the design of the telescopic section 321, so that it is hidden in the through hole in the natural state, and in the embedded state, the pressing cutter head 331 abuts against the cut body, ensuring that its surface is partially broken, so that the steel bars inside are exposed, which is convenient for lifting. In addition, the connection relationship between the miniature wedge-shaped chisel hammer 300 and the cut body is increased to ensure the transmission of torque.

[0093] The pressing blade head 331 may be a diamond bead or the like.

[0094] As a preferred embodiment, during the backfilling of cement mortar, the catheter is pulled out according to the injection surface formed by the cement mortar in the hole to be filled. The bottom of the injection catheter in the hole is always kept at a height of more than 2m above the cement mortar backfilling surface. To ensure the smooth extraction of the catheter and the casing 400, when the cement mortar is backfilled to half of the volume in the hole, the injection hopper is unloaded and the casing 400 is started to be pulled out.

[0095] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under a viaduct, characterized in that: The construction steps include: 1) Determine a blocking area between the shield route and the bridge foundation, perform MJS pile construction in the blocking area to form a plurality of blocking piles, and the plurality of blocking piles are arranged at intervals along the length direction of the blocking area; 2) According to the shield route, measure and lay out the lines to determine the positions of the old piles; 3) The crawler-type full-casing full-rotation drilling rig is in place. The crawler-type full-casing full-rotation drilling rig has a center hole in the middle. The casing is hoisted by a low-lying short-arm crawler crane. The casing passes through the center hole, and the bottom of the casing is pressed against the old pile position; the crawler-type full-casing full-rotation drilling rig drives the casing to rotate and cut downward until the casing embraces the outer periphery of the old pile cap, and there is a cap gap between the outer periphery of the old pile cap and the inner side wall of the casing; 4) Use a low-lying short-arm crawler crane to hoist a micro wedge-shaped drill hammer, which is embedded in the cap gap from top to bottom, and is clamped and fixed between the old pile cap and the casing; use a crawler-type full-casing full-rotation drilling rig to drive the casing to rotate until the old pile cap is twisted off, and then remove the old pile cap from the casing; 5) Using a crawler-type full-casing full-rotation drilling rig to drive the casing to continue pressing down to cut the soil layer until the bottom of the casing is pressed down to a set distance, and then stop driving the casing to rotate, and the lower part of the casing embraces the upper part of the old pile; the old pile has an insertion section inserted into the casing and a residual pile section located below the casing, and a pile interval is formed between the outer periphery of the insertion section and the inner side wall of the casing; 6) Use a micro wedge-shaped drill hammer to embed into the pile interval from top to bottom. The micro wedge-shaped drill hammer is clamped and fixed between the old pile and the casing. Use a crawler-type full-casing full-rotation drill rig to drive the casing to rotate until the inserted section is twisted off, and then remove the inserted section from the casing; 7) Repeat the above construction steps 5) to 6) until the length of the residual pile segment is less than the set length, use a micro cross hammer to break the residual pile segment into debris, and then use a micro grab to take the debris out of the casing, forming a hole to be filled in the casing; 8) Install a grouting frame and a grouting conduit, and backfill cement mortar into the hole to be filled through the grouting conduit; 9) Pull out the casing.

2. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 1, characterized in that: In the construction step 1), an infrared displacement monitoring device for monitoring the displacement of the bridge deck is deployed.

3. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 1, characterized in that: In the construction step 3), a positioning base plate is suspended on the old pile position, and then the crawler-type full-casing full-rotation drilling rig is moved. A positioning hole penetrating vertically is formed in the middle of the positioning base plate, and the positioning hole is aligned with the center hole vertically.

4. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 3 is characterized in that: A plurality of positioning grooves are formed on the top of the positioning base plate, and the crawler-type full-casing full-rotation drilling rig has a plurality of legs that can telescope up and down; In the construction step 3), after the crawler-type full-casing full-rotation drilling rig is moved to a set position, the plurality of legs are extended and moved downward until the bottom of the legs is pressed against the positioning groove.

5. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 1, characterized in that: The sleeve comprises a plurality of vertically connected section pipes, and adjacent section pipes are connected to each other via a connecting structure; In the construction step 5), during the process of using a crawler-type full-casing and full-rotation drilling rig to drive the casing to continue to press down and cut the soil layer, the casing has an upper extension section extending above the center hole. When the length of the upper extension section is less than 50 cm, the casing is stopped from being driven to rotate, and a waterproof membrane is rolled on the outer periphery of the upper extension section to form a waterproof layer, and then butter is applied on the waterproof layer to form a lubricating layer; a low-lying short-arm crawler crane is used to hoist the joint pipe, and the hoisted joint pipe is connected to the top of the upper extension section through a connecting structure, and the waterproof layer is clamped and fixed between the upper extension section and the hoisted joint pipe.

6. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 1, characterized in that: The bottom of the sleeve is provided with a plurality of cutting shoes, and the plurality of cutting shoes are arranged at intervals along the circumference of the sleeve; the inner side wall of the bottom of the sleeve is provided with a plurality of inner cutter heads, the inner ends of the inner cutter heads are connected to the inner side wall of the sleeve, and the outer ends of the inner cutter heads are extended toward the center of the sleeve; the outer periphery of the bottom of the sleeve is welded with protruding strips, and the plurality of protruding strips form a protruding grid on the outer periphery of the sleeve; In the construction step 3), during the process of the crawler-type full-casing full-rotation drilling rig driving the casing to rotate and cut downward, an annular cap spacing is formed on the old pile position under the action of the inner cutter head; In the construction step 5), during the process of the crawler-type full-casing and full-rotation drilling rig driving the casing to rotate and cut downward, an annular pile interval is formed on the old pile position under the action of the inner cutter head.

7. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in any one of claims 1 to 6, characterized in that: The outer side of the micro wedge-shaped drill hammer is formed with an arc-shaped outer side surface, and the inner side of the micro wedge-shaped drill hammer is formed with a concave-convex inner side surface, and the two sides of the outer side surface are respectively connected to the two sides of the inner side surface, and the outer side surface is arranged to extend obliquely toward the inner side surface along the direction from top to bottom; In the construction step 4), after the miniature wedge-shaped drill hammer is embedded in the cap gap, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the old pile cap; In the construction step 6), after the miniature wedge-shaped drill hammer is embedded in the pile interval, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the insertion section.

8. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 7, characterized in that: The top of the micro wedge-shaped drill hammer is provided with a hanging ear for connecting with a wire rope. In the construction step 4), the micro wedge-shaped drill hammer is hoisted to the top of the cap gap by the wire rope, and after the outer side surface is closely fitted with the inner side wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the cap gap from top to bottom; In the construction step 6), the micro wedge-shaped drill hammer is hoisted to the top of the pile interval by a wire rope, and after the outer side surface is tightly fitted with the inner wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the pile interval from top to bottom.

9. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 8, characterized in that: The miniature wedge-shaped drill hammer comprises a plurality of steel plates, the plurality of steel plates are welded to each other, the outer end surface of the steel plate is formed with an abutment surface for abutting against the inner wall of the casing, the abutment surfaces of the plurality of steel plates are combined to form the outer side surface, and the abutment surface is provided with an elastic counter-pressure convex strip; In the construction step 4), when the micro wedge-shaped drill hammer is embedded into the gap between the pile caps under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile cap, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner side surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile cap; In the construction step 6), when the micro wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile.

10. The method for removing cast-in-place piles and protecting bridge foundation in the shield tunneling area under the viaduct as claimed in claim 9, characterized in that: The inner end surface of the steel plate is formed with an inclined surface, and along the direction from top to bottom, the inclined surface is arranged to extend obliquely toward the abutting surface, and a plurality of the inclined surfaces of the steel plates are combined to form the inner side surface; a through hole is provided in the middle of the steel plate, which penetrates the steel plate front and back, and the outer end of the through hole penetrates the abutting surface, and the inner end of the steel plate penetrates the inclined surface; The counter-pressure convex strip has a telescopic section embedded in the through hole; a moving block is provided in the through hole, the inner end of the moving block is connected to the outer end of the telescopic section, the outer end of the moving block is provided with a pressing cutter head arranged toward the inclined surface, and the upper and lower ends of the moving block are provided with outwardly protruding convex blocks; two guide rails are provided in the through hole, and a spring for driving the moving block to reset is provided in the guide rail, the inner end of the spring is fixedly arranged, and the outer end of the spring presses on the convex block; In the construction step 4), after the micro wedge-shaped drill hammer is embedded into the cap gap under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head is pressed against the old pile cap; In the construction step 6), after the miniature wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head presses against the old pile; When the miniature wedge-shaped chisel hammer is taken out from the platform interval or pile interval, under the action of elastic force, the spring pressing protrusion moves toward the abutment surface, the moving block squeezes the telescopic section to deform and shorten, the pressing cutter head moves into the through hole, and the counter-pressure protrusion expands and deforms outward.

Citation Information

Patent Citations

  • Comprehensive pile-forming construction method for low-clearance cast-in-place pile under foundation pit bottom supporting beam

    CN115852945A

  • Urban interchange ramp pile foundation all-casing all-slewing drilling machine dismantling construction method

    CN117166381A

  • Extraction implementation method for ultra-deep PHC pile under ultra-low clearance condition

    CN117552420A

  • Existing bridge pile pulling device is passed through in weak soil shield driving district

    CN206570811U

  • First tube and underground obstacle removal method

    JP2013253455A

Cited By

  • Old pile lossless pulling-out construction method of all-casing full-slewing drilling machine

    CN121161821A