Modular basement side wall post-cast strip plugging mechanism and mounting method
Through the modular rear casting strip sealing mechanism, prefabricated plates and expansion water stop strips are installed using tower cranes, the problems of affected and uneven sealing of the waterproof layer in basement construction are solved, and efficient and stable waterproofing effect and construction progress are achieved.
Patent Information
- Application Number
- CN202411004991.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During basement construction, the long retention time of the post-watering belt leads to the impact of the waterproof layer, and the infusion of rainwater requires a large amount of drainage. The traditional sealing method manual layout of the wire mesh leads to inconsistent waterproof performance, and the steel plate is prone to deform, affecting the construction progress and quality .
Modular rear casting tape sealing mechanism, including insulation layer, waterproof coil, rear casting tape sealing module, sealing reinforcement and water stop screw, and modular prefabricated plate and expansion water stop bar are installed through tower crane to ensure sealing Module stability and waterproof performance.
The post-pouring tape sealing process is simplified, manpower and material consumption is reduced, the waterproof performance is ensured, construction risks and material use are reduced, construction efficiency and safety are improved.
Smart Images

Figure CN119083609A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of basement post-cast strips, and in particular relates to a modular basement side wall post-cast strip sealing mechanism and an installation method. Background Art
[0002] With the booming development of my country's construction industry, especially large-scale buildings and large commercial buildings, the depth and area of basements are also increasing. In order to solve the problems of uneven shrinkage, cracking and water leakage of complex and long concrete cast walls, a post-cast strip structure is usually adopted. According to the design or construction specifications, post-cast strips are set at the corresponding positions of the foundation slab, wall and beam. The post-cast strip temporarily divides the structure into several parts. After the internal shrinkage of the components, the construction joint concrete is poured again after a period of time to connect the structure into a whole.
[0003] In the construction of basements designed with post-cast strips, the post-cast strips are left for a long time, which affects the waterproof layer on the outside of the basement, and the backfill soil cannot be constructed in time. If it rains, the basement will be filled with rainwater, which requires huge manpower and material resources for drainage, and protective measures must be taken. For construction sites with narrow construction sites or projects that require precipitation, if the subsequent waterproof layer, backfill soil, hardened site construction, etc. cannot be carried out in time, it will also seriously affect the layout of the on-site construction plane and the construction progress, and extend the construction period. The traditional construction method of post-cast strip blocking is generally to use a blocking plate directly for blocking, and the blocking plate is generally made of steel plates, brickwork and other materials.
[0004] The steel plate is fixed by the steel bars pre-buried in the side wall of the basement. After fixing, waterproof mortar is applied for waterproofing. The height difference between the steel plate and the side wall of the basement generally forms a gap. The method for dealing with this gap is to fill the gap with steel mesh and then fill the gap with waterproof mortar, which can generally enhance the tensile performance of the gap. When blocking the gap, the steel mesh is manually placed. In order to ensure the uniform strength of each part, the steel mesh must be evenly distributed in the gap, so that the performance of each part can be guaranteed when backfilling the waterproof mortar. However, the manual laying of the steel mesh cannot ensure that the steel mesh is evenly laid in the gap, which affects the tensile performance of the waterproof mortar at this place after the gap is backfilled, making it easy to crack in the subsequent construction, affecting the waterproof performance. And because the steel plate is a flexible material, it is very easy to cause the steel plate to deform during the backfilling and compaction of the foundation pit fertilizer trough, resulting in a reduction in the cross-sectional size of the basement outer wall and a loss of control of the backfilling and compaction quality.
[0005] Brickwork sealing is to lay solid bricks with a thickness of 120 or 240mm on both sides of the post-cast joint. Both sides are longer than 300mm of the width of the post-cast joint. After the masonry is completed, it is smoothed for the second time. After drying, the waterproof layer and the insulation layer are constructed. Due to the increasing depth of the basement of buildings, it is risky to lay bricks alone at the post-cast joint position, and the mortar layer of the masonry structure is easily damaged during the backfilling and compaction of the fertilizer trough in the foundation pit, and the masonry surface is easily sunken. Summary of the invention
[0006] The object of the present invention is to provide a modular basement side wall post-cast strip sealing mechanism and installation method to solve the problems raised in the above-mentioned background technology and to achieve short-term sealing of the basement side wall post-cast strip.
[0007] To achieve the above object, the present invention provides the following technical solutions:
[0008] A modular basement side wall post-cast strip sealing mechanism comprises a thermal insulation layer at the bottom, a waterproof roll is laid on the top of the thermal insulation layer; the middle part of the thermal insulation layer is concave downward;
[0009] A post-cast strip plugging module is installed in the middle of the waterproof membrane, and plugging reinforcement members are arranged on both sides of the post-cast strip plugging module;
[0010] A post-cast strip is arranged on the top of the post-cast strip plugging module, and a water-stop screw rod 1 is arranged in the post-cast strip, and a butterfly card is installed on the water-stop screw rod 1;
[0011] The plugging reinforcement includes a prefabricated hole, the bottom of the prefabricated hole is filled with asphalt, a screw is installed on the asphalt, the screw is installed vertically and a coarse-thread screw sleeve is installed on the top, the screw is threadedly connected with the coarse-thread screw sleeve, and the coarse-thread screw sleeve is located at the top of the post-cast strip plugging module.
[0012] In a further technical solution, the outer side of the bottom of the screw is filled with sealant, and a double nut is installed on the sealant, a rubber gasket is installed on the top of the double nut, and fine concrete is installed on the rubber gasket.
[0013] In a further technical solution, the post-cast strip blocking module is stepped, and an expansion water stop strip is installed around the stepped surface.
[0014] In a further technical solution, the contact surface between the post-cast strip sealing module and the post-cast strip is roughened.
[0015] In a further technical solution, the post-cast strip blocking module also includes a bottom modular prefabricated panel and an upper modular prefabricated panel, wherein the upper modular prefabricated panel is installed on the upper side of the bottom modular prefabricated panel; an expansion water stop strip is installed between the bottom modular prefabricated panel and the upper modular prefabricated panel.
[0016] In a further technical solution, a reinforcement formwork is installed outside the basement side wall, a vertical wooden plank is installed outside the reinforcement formwork, a steel pipe is installed outside the wooden plank, and a pipe clamp is installed outside the steel pipe. The pipe clamp is suitable for clamping on the steel pipe and is installed with two water-stop screws.
[0017] A modular basement side wall post-cast strip sealing mechanism comprises the following steps:
[0018] Step 1: Basement exterior wall structure construction
[0019] A1. Before the reinforcement formwork is installed, the tongue and groove should be reserved and the expansion water stop strip should be buried according to the designed post-casting strip position;
[0020] Tie the water stop screw and install the butterfly clip on the top of the water stop screw;
[0021] A2. According to the size of the module, bury and securely fix the pre-buried coarse thread screw sleeve, with a spacing of 500-1000mm;
[0022] A3. Pouring concrete for basement exterior walls;
[0023] Step 2: Factory modular processing
[0024] B1. Determine the module size and processing and installation method according to the basement height;
[0025] B2. According to the post-casting zone closure schedule, module materials are brought into the site;
[0026] Step 3: Install and fix the plugging module
[0027] C1. Install the post-casting strip plugging module by using a tower crane, and connect it with the coarse thread screw sleeve pre-buried in the main structure through a screw rod. The outside is firmly fixed by adding a rubber washer and a double nut;
[0028] C2. After the reserved connection holes are firmly fixed with double nuts, fill them with sealant and then cover them with asphalt.
[0029] Step 4: Waterproofing, insulation and backfilling of foundation pit fertilizer tank
[0030] D1. Make an additional waterproof layer at the junction of the blocking module and the basement exterior wall, and lay waterproof membrane according to the design requirements of the drawings;
[0031] D2, laying insulation board;
[0032] D3. Backfill the fertilizer trough in the foundation pit and continue to compact it layer by layer according to the specifications.
[0033] 1. Factory modular processing, the module size is determined according to the basement height. For example, when the basement height is 4.0m and the width of the post-casting belt is 800mm, the total width of the module is 1400mm. The cross-sectional area of the module is about 0.16㎡, and the unit volume concrete weight is 24KN / m 3 Therefore, the unit module weight is 24*0.16=3.84KN / m, which is 384kg / m for this module. Since the tower crane top lifting weight commonly used on construction sites is 1t, this module can be processed and installed with a bottom module length of 2m and an upper module length of 2m.
[0034] 2. The process is simple. It only needs to fix the modules with bolts, which solves the time-consuming and labor-intensive masonry work and the risk of high-altitude masonry work with local frame erection in some deep basements. It also effectively controls the quality and safety of the post-casting strip sealing and the backfilling of the foundation pit fertilizer tank.
[0035] 3. Convenient construction. Generally, the external wall sealing of the post-casting belt is in the main structure construction stage. Now the tower cranes can be used normally, the module weight is calculated and determined in advance, and the tower crane top position can be lifted normally;
[0036] 4. Save materials and reduce the amount of masonry work for post-casting strip blocking;
[0037] 5. The structure is stable, and the arc-shaped module structure is more convenient for laying and protecting waterproof membranes. It can also offset the lateral soil pressure formed by layered compaction during the fertilizer trough backfilling process, thus ensuring the quality of the foundation pit fertilizer trough backfilling;
[0038] Beneficial Effects
[0039] (1) The simplified support device and method for post-casting strips of the present invention can effectively solve the problems of time-consuming and labor-intensive post-casting strips and protection of the support frame;
[0040] (2) The simplified support device and method for post-casting strips of the present invention can effectively solve the problem of the amount of steel pipes and fasteners used in the post-casting strip support frame, greatly saving rental costs;
[0041] (3) The simplified support device and use method of the post-cast strip of the present invention can effectively solve the problem of the subsequent engineering work surface being limited during the period when the post-cast strip is not closed. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0043] Figure 1This is a schematic diagram of the installation of a modular post-cast strip sealing device.
[0044] Figure 2 for Figure 1 A magnified view of part A;
[0045] Figure 3 This is a schematic diagram of the upper and lower layer installation of the modular post-cast strip sealing device.
[0046] Figure 4 This is a schematic diagram of the outside of the basement with a modular post-cast strip sealing device.
[0047] Figure 5 Schematic diagram of the basement inner side reinforcement using a modular post-cast strip sealing device.
[0048] In the figure: 1. Waterstop screw; 2. Butterfly clip; 3. Expansion waterstop strip; 4. Coarse thread screw sleeve; 5. Screw; 6. Double nut; 7. Rubber gasket; 8. Sealant; 9. Asphalt material; 10. Waterproof membrane; 11. Insulation board; 12. Bottom modular prefabricated board; 13. Upper modular prefabricated board; 14. Steel pipe; 15. Formwork; 16. Wooden square; 17. Roughening of contact surface. DETAILED DESCRIPTION
[0049] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0050] The application principle of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0051] Example 1
[0052] See also Figure 1-5 As shown, an embodiment of the present invention provides a modular basement side wall post-cast strip sealing mechanism, comprising an insulation layer 11 at the bottom, and a waterproof coiled material 10 is laid on the top of the insulation layer 11; the middle part of the insulation layer 11 is concave downward;
[0053] A post-cast strip plugging module is installed in the middle of the waterproof coiled material 10, and plugging reinforcement members are arranged on both sides of the post-cast strip plugging module;
[0054] A post-cast strip is arranged on the top of the post-cast strip plugging module, and a water-stop screw 1 is arranged in the post-cast strip, and a butterfly card 2 is installed on the water-stop screw 1;
[0055] The plugging reinforcement includes a prefabricated hole, the bottom of which is filled with asphalt material 9, a screw 5 is installed on the asphalt material 9, the screw 5 is installed vertically and a coarse-thread screw sleeve 4 is installed on the top, the screw 5 is threadedly connected with the coarse-thread screw sleeve 4, and the coarse-thread screw sleeve 4 is located at the top of the post-cast strip plugging module.
[0056] In a further technical solution, the outer side of the bottom of the screw rod 4 is filled with sealant 8, and a double nut 6 is installed on the sealant 8, a rubber gasket 7 is installed on the top of the double nut 6, and fine concrete is installed on the rubber gasket 7.
[0057] In a further technical solution, the post-cast strip blocking module is stepped, and an expansion water stop strip 3 is installed around the stepped surface.
[0058] In a further technical solution, the contact surface between the post-cast strip plugging module and the post-cast strip is roughened 17 .
[0059] In a further technical solution, the post-cast strip blocking module also includes a bottom modular prefabricated panel 12 and an upper modular prefabricated panel 13, wherein the upper modular prefabricated panel 13 is installed on the upper side of the bottom modular prefabricated panel 12; an expansion water stop strip 3 is installed between the bottom modular prefabricated panel 12 and the upper modular prefabricated panel 13.
[0060] In a further technical solution, a reinforcement formwork 15 is installed outside the basement side wall, a vertical wooden beam 16 is installed outside the reinforcement formwork 15, a steel pipe 14 is installed outside the wooden beam 16, and a pipe clamp is installed outside the steel pipe 14, the pipe clamp is suitable for clamping on the steel pipe 14, and is installed with a water stop screw 18.
[0061] For example, if the basement height is 4.0m and the width of the post-casting strip is 800mm, the total width of the module is 1400mm. The cross-sectional area of the module is about 0.16㎡, and the concrete weight per unit volume is 24KN / m 3 Therefore, the unit module weight is 24*0.16=3.84KN / m, which is 384kg / m for this module. Since the tower crane top lifting capacity commonly used on construction sites is 1t, this module can be carried out with a bottom module length of 2m and a weight of 768kg; an upper module length of 2m and a weight of 768kg.
[0062] A modular basement side wall post-cast strip sealing mechanism comprises the following steps:
[0063] Step 1: Basement exterior wall structure construction
[0064] A1. Before the reinforcement formwork 15 is installed, the tongue and groove should be reserved and the expansion water stop strip 3 positions should be buried according to the designed post-casting strip position;
[0065] Tie the water stop screw 1 and install the butterfly clip 2 on the top of the water stop screw 1;
[0066] A2. According to the size of the module, bury and securely fix the pre-buried coarse thread screw sleeve 4, with a spacing of 500-1000mm;
[0067] A3. Pouring concrete for basement exterior walls;
[0068] Step 2: Factory modular processing
[0069] B1. Determine the module size and processing and installation method according to the basement height;
[0070] B2. According to the post-casting zone closure schedule, module materials are brought into the site;
[0071] Step 3: Install and fix the plugging module
[0072] C1. Install the post-casting strip plugging module by using a tower crane, and connect it with the coarse thread screw sleeve 4 embedded in the main structure through the screw 5. The outer side is firmly fixed by adding a rubber washer 7 and a double nut 6;
[0073] C2. After the connection reserved hole is firmly fixed by the double nut 6, fill it with sealant 8 to seal it, and then cover it with asphalt material 9.
[0074] Step 4: Waterproofing, insulation and backfilling of foundation pit fertilizer tank
[0075] D1. Make an additional waterproof layer at the junction of the blocking module and the basement exterior wall, and lay waterproof membrane 10 according to the design requirements of the drawings;
[0076] D2, laying insulation board 11;
[0077] D3. Backfill the fertilizer trough in the foundation pit and continue to compact it layer by layer according to the specifications.
[0078] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.
[0079] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A modular basement side wall post-cast strip sealing mechanism, characterized by: It comprises a thermal insulation layer (11) at the bottom, and a waterproof coiled material (10) is laid on the top of the thermal insulation layer (11); the middle part of the thermal insulation layer (11) is arranged to be concave downwards; A post-cast strip plugging module is installed in the middle of the waterproof coiled material (10), and plugging reinforcement members are arranged on both sides of the post-cast strip plugging module; A post-cast strip is arranged on the top of the post-cast strip blocking module, and a water-stop screw rod (1) is arranged in the post-cast strip, and a butterfly clip (2) is installed on the water-stop screw rod (1); The plugging reinforcement member comprises a prefabricated hole, the bottom of which is filled with asphalt (9), a screw (5) is installed on the asphalt (9), the screw (5) is installed vertically and a coarse-thread screw sleeve (4) is installed on the top, the screw (5) is threadedly connected to the coarse-thread screw sleeve (4), and the coarse-thread screw sleeve (4) is located at the top of the post-cast strip plugging module.
2. A modular basement side wall post-cast strip sealing mechanism according to claim 1, characterized in that: The outer side of the bottom of the screw rod (4) is filled with a sealant (8), and a double nut (6) is installed on the sealant (8), a rubber gasket (7) is installed on the top of the double nut (6), and fine concrete is then installed on the rubber gasket (7).
3. A modular basement side wall post-cast strip sealing mechanism according to claim 2, characterized in that: The post-cast strip plugging module is in a stepped shape, and an expansion water stop strip (3) is installed around the stepped surface.
4. A modular basement side wall post-cast strip sealing mechanism according to claim 3, characterized in that: The contact surface between the post-cast strip blocking module and the post-cast strip is roughened (17).
5. A modular basement side wall post-cast strip sealing mechanism according to claim 3, characterized in that: The post-cast strip plugging module also includes a bottom modular prefabricated panel (12) and an upper modular prefabricated panel (13), wherein the upper modular prefabricated panel (13) is installed on the upper side of the bottom modular prefabricated panel (12); an expansion water stop strip (3) is installed between the bottom modular prefabricated panel (12) and the upper modular prefabricated panel (13).
6. A modular basement side wall post-cast strip sealing mechanism according to claim 5, characterized in that: A reinforcement formwork (15) is installed outside the side wall of the basement, a vertical wooden beam (16) is installed outside the reinforcement formwork (15), a steel pipe (14) is installed outside the wooden beam (16), and a pipe clamp is installed outside the steel pipe (14), the pipe clamp is suitable for clamping on the steel pipe (14), and is installed with a second water stop screw (18).
7. A modular basement side wall post-cast strip sealing mechanism as claimed in claim 6, characterized in that: The following steps are involved: Step 1: Basement exterior wall structure construction A1. Before the reinforcement formwork (15) is installed, the tongue and groove are reserved and the expansion water stop strip (3) is buried according to the designed post-casting strip position; Tie the water stop screw (1) and install the butterfly clip (2) on the top of the water stop screw (1); A2. According to the size of the module, embed and securely fix the pre-embedded coarse thread screw sleeve (4) with a spacing of 500 to 1000 mm; A3. Pouring concrete for basement exterior walls; Step 2: Factory modular processing B1. Determine the module size and processing and installation method according to the basement height; B2. According to the post-casting zone closure schedule, module materials are brought into the site; Step 3: Install and fix the plugging module C1. Install the post-casting strip plugging module by using a tower crane, and connect it with the coarse thread screw sleeve (4) pre-buried in the main structure through a screw (5), and securely fix it on the outside by adding a rubber gasket (7) and a double nut (6); C2. After the connection reserved hole is firmly fixed by the double nut (6), it is filled with sealant (8) and sealed with asphalt material (9). Step 4: Waterproofing, insulation and backfilling of foundation pit fertilizer tank D1. Make an additional waterproof layer at the junction of the blocking module and the basement exterior wall, and lay waterproof membrane according to the design requirements (10); D2, laying insulation board (11); D3. Backfill the fertilizer trough in the foundation pit and continue to compact it layer by layer according to the specifications.
Citation Information
Patent Citations
Construction method for post-cast strip of waterproof shear wall of basement
CN112609736A
Post-cast strip prefabricated assembly type protection wall and construction method thereof
CN116240987A
Post-cast strip formwork support-free mounting device and method
CN117071883A
Basement outer wall post -cast strip shutoff waterproof construction
CN206143936U
Side wall post-cast strip plugging structure
CN212294762U