Coal seam occurrence exploration method and system under complex geological conditions
By adopting the method of implementing ground directional wells and detailed geological well recording in batches under complex geological conditions, the problems of low accuracy and low efficiency of traditional coal seam storage exploration methods are solved, and accurate exploration of coal seam storage conditions and construction safety guarantees are achieved. .
Patent Information
- Application Number
- CN202411086091.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-12-06
AI Technical Summary
Under complex geological conditions, traditional coal seam storage exploration methods have problems of low accuracy, low efficiency and high cost, which are difficult to meet the needs of coal mining.
The ground directional wells on the intended working surface are adopted, and the branch drilling is implemented in multiple batches, combining geological well recording and drilling structure design, including cutting well recording, core well recording, drilling well recording and drilling fluid well recording. geological data collection and analysis, obtain accurate geological information, and deal with geological changes and gas problems.
It has achieved accurate exploration of the presence of coal seams under complex geological conditions, a comprehensive understanding of the strata and structure, timely respond to geological changes, ensure construction safety, effectively deal with gas problems, and provide reliable data support for coal mining and geological research.
Smart Images

Figure CN119083995A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of coal mining, and in particular to a method and system for coal seam exploration under complex geological conditions. Background Art
[0002] Coal is one of the main energy sources. In the process of coal mining, it is necessary to explore the occurrence of coal seams in order to determine the location, thickness, inclination and other parameters of the coal seams, and provide a basis for coal mining. However, under complex geological conditions, such as deep coal seam burial depth, complex geological structure, large changes in coal seam thickness, possible gas problems such as gas, and difficulties encountered during drilling, traditional coal seam occurrence exploration methods have problems such as low accuracy, low efficiency, and high cost, which are difficult to meet the needs of coal mining.
[0003] After searching, CN104809266B discloses a method for accurately predicting the occurrence of coal seams in a working face based on spline curves. It is based on the collection of on-site engineering data, combined with corresponding geodetic exploration data, to establish a three-dimensional geological information database of the coal mining working face; to make a geological exploration profile based on the three-dimensional geological information database; to combine the three-dimensional geological information database, geological exploration profiles and top and bottom plate contour exploration data, and use the stretching, cutting, and lofting function modules of SolidWorks software to establish a three-dimensional model of the working face; to establish a predicted sectioning auxiliary surface in the three-dimensional model of the coal mining working face, and to section the three-dimensional model of the coal mining working face, and to accurately measure and mark the geological data of the coal seam and fault on the sectioning surface; to analyze the development laws of geological structures such as coal seam faults in the coal mining working face based on the predicted profile, to guide actual production, and to provide a basis for production design adjustment and disaster prevention. This scheme is based on an ideal mathematical geological model and lacks the ability to apply to field conditions under complex geological conditions. Summary of the invention
[0004] 1. Technical issues
[0005] Based on the above-mentioned prior art, the technical problem addressed by this application is how to achieve the exploration of coal seam occurrence in a complex field geological environment.
[0006] (II) Technical solution
[0007] According to a method for coal seam exploration under complex geological conditions of the present application, it is characterized by comprising the following steps:
[0008] Surface directional wells are arranged along the coal seam direction at the planned working face, and the spacing between branch hole targets is not more than 300m in principle.
[0009] Branch drilling is carried out in multiple batches. The first batch is to construct the main hole to understand the strata, structure and coal seam thickness. Then, the subsequent batches of holes are constructed based on the geological data revealed by the first batch of drilling holes.
[0010] Geological logging is carried out at each working face, including cuttings logging, core logging, drilling logging, drilling fluid logging and simple hydrological observation.
[0011] After the hole is completed, standard logging is performed on the open hole section to divide the formation and identify the lithology. The depth ratio of standard logging is 1:500.
[0012] The borehole is closed.
[0013] Furthermore, the drilling structure of the ground directional well includes an exploration hole.
[0014] Furthermore, the structure of the exploration hole is as follows: according to the requirements of directional construction, a two-opening structure is selected, and a wall protection pipe is lowered after the first opening is completed; a straight hole section is opened, and the borehole diameter and casing specifications of different well groups are different, and cement is used to isolate loose formations; the second opening is an inclination section and an inclination stabilization section, the well diameter is φ152mm, and it is an open hole. After directional drilling passes through the third coal group for 40m, coring drilling begins, and coring drilling ends at a coal thickness of 30m.
[0015] Furthermore, the specific requirements for the rock cuttings logging are: no sand sampling is required for the Quaternary System, but the bedrock interface must be determined; when drilling into the Shihezi and Shihezi Formation formations, take a bag of rock cuttings sample every 2 meters; when drilling into the Shanxi Formation formations, take a bag of rock cuttings sample every 1 meter; starting from 50 meters above the coal seam, take a bag of rock cuttings sample every 0.5 meters; the delay time is calculated by theoretical calculation and actual measurement, and an actual measurement correction is carried out every 50 meters.
[0016] Furthermore, the specific requirements of the core logging are as follows: before starting core logging, the drilling work should be checked, and the core should be named and specifically described after being processed. The description should include information such as structure, color, hardness, and composition. Careful records and preservation should be made, and the geological target layer should be determined according to the specific conditions of the core; when designing the fixed-layer coring, the standard layer, marker layer, special lithology layer encountered in the well, as well as the lithology combination characteristics and drilling time changes should be compared with the data of adjacent wells, and the comparative logging depth should be determined within 30m above the coring target layer, and the coring depth should be determined according to the logging data comparison results. While conducting formation comparison, the coring depth should be accurately determined in time according to the drilling time, gas logging and lithology changes; if drilling time changes are found in the target layer section, drilling should be stopped immediately for geological circulation, the drilling fluid tank surface display should be observed, the gas logging data and drilling fluid performance changes should be understood, preparations should be made to replace drilling tools, and the target layer should be found in time When coring at a certain depth, the driller should follow the design requirements. When the core is stuck before coring, the driller should deliver the drill evenly to prevent false drilling. When coring, the length of each round should not exceed the effective length of the core tube. When using a clamp to clamp the core, the specifications and quantity of the clamp should be determined according to the lithology and core length, and the holes should be fully punched to ensure that the clamp is firmly clamped. When clamping the core, dry drilling or strong drilling tools should be strictly prevented. When drilling into sand layers, low speed and small pump volume should be used, and the number of rounds should be limited. The drilling time and footage length, or the use of water pump-free drilling, to ensure the core recovery rate of the sand layer; when the coal core is taken, when the rock of the coal seam roof is soft or broken, double-tube drilling should be used; when the coal seam roof is hard, alloy or diamond drill bits can be used for drilling; when drilling in the coal seam, a double-tube single-action coring device must be used, the three major technical parameters of drilling should be reasonable, the footage should be uniform, so that the coal core can naturally and smoothly enter the containing tube; after the coal core is taken out, it should be placed in the original order and properly kept; the coring rate is more than 60%.
[0017] Furthermore, the specific requirements for drilling logging are as follows: from the second opening to the bottom of the well, record one drilling point every 1m; record one drilling point every 0.5m starting from 50m above the target coal seam; record the sudden change points of drilling time at any time; keep the drilling parameters relatively stable, and record the non-geological factors that cause false drilling; frequently calibrate the drill tool length and well depth, and the well depth must be calibrated before drilling, and the well depth error must not exceed 0.1m; the number of missed drilling points in the whole well shall not exceed 1% of the total number of drilling points in the whole well, and no drilling points shall be missed when drilling in the coal seam section.
[0018] The present application also discloses a coal seam exploration system under complex geological conditions, which uses the coal seam exploration method under complex geological conditions, and is characterized in that it includes a ground directional well arranged at a planned working face, the ground directional well includes multiple hole groups, and each hole group includes a vertical well and a directional branch.
[0019] Furthermore, after the surface directional well is constructed as a directional exploration hole, part of the hole group can be constructed as a horizontal production well.
[0020] (III) Beneficial effects
[0021] This solution has achieved many beneficial exploration effects under complex geological conditions, including accurate exploration of coal seam occurrence, comprehensive understanding of strata and structures, timely response to geological changes, ensuring construction safety, effectively dealing with gas and other issues, and providing reliable data support for subsequent work. Through reasonable hole layout, branch drilling implementation, detailed geological logging and drilling structure design, it is possible to obtain accurate geological information, respond to various geological challenges, ensure construction safety, and provide strong support for coal mining and geological research. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the hole arrangement on the first working surface according to the present application;
[0023] Figure 2 This is a schematic diagram of the hole arrangement on the second working surface according to the present application;
[0024] Figure 3 For the application Figure 1 Schematic diagram of the cross section of the No. 1 hole group;
[0025] Figure 4 This is the overall flow chart of this application. DETAILED DESCRIPTION
[0026] The present invention will be further described below in conjunction with the embodiments.
[0027] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0028] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings, and "multiple" generally includes at least two, but does not exclude the inclusion of at least one.
[0029] Embodiment 1:
[0030] A method and system for coal seam exploration under complex geological conditions, the specific implementation plan is as follows:
[0031] Exploring the hole layout principle:
[0032] In the planned working face, two groups of surface directional wells are arranged along the coal seam in the first working face to explore the coal thickness of the coal seam in the working face. The spacing between branch hole targets is arranged in principle not more than 300m, and the main holes of the two well groups are 825m apart.
[0033] Among the planned working faces, a group of ground directional wells will be arranged at the second working face to explore the coal thickness and distribution of the coal seams at the second working face.
[0034] See the layout of the exploration holes on the first working surface for details. Figure 1 , the second working surface inspection hole see Figure 2 .
[0035] Branch drilling implementation:
[0036] The branch drilling of the first working face was implemented in two batches. The first batch was to construct the main holes 1-1 and 2-1 to understand the strata, structure and coal thickness. Then, based on the geological data revealed by the first batch of drilling holes, three-sided work was carried out to consider the construction of the second batch of holes 1-2, 1-3, 2-2 and 2-3. Based on the geological data of the first and second batches of drilling, combined with the coal thickness data of other working faces, the third batch of holes 1-4, 2-4, 2-5 and 2-6 were considered to be constructed in other directions.
[0037] The branch drilling of the second working face was carried out in two batches. The first batch was to carry out the main hole 3-1 to understand the strata, structure and coal thickness. Then, based on the geological data revealed by the first batch of drilling holes and the coal thickness conditions of other working faces, three-side work was carried out, and the construction of the second batch of holes 3-2, 3-3, 3-4 and 3-5 was considered.
[0038] Drilling structure:
[0039] Exploration hole: According to the requirements of directional construction, the drilling structure is selected as a two-opening structure. At the same time, in order to ensure construction safety, the wall protection pipe is lowered after the first opening is completed.
[0040] The borehole diameter of Well Group 1 is φ215.9mm. Φ177.8×8.05mm J55 oil casing is run in and cement is used to isolate the loose formation.
[0041] The borehole diameter of No. 2 well group is φ425mm, and φ339.7×9.65mmJ55 oil casing is put in, cement is cemented, and loose formations are isolated.
[0042] The borehole diameter of No. 3 well group is φ215.9mm. Φ177.8×8.05mmJ55 oil casing is put into the well and cement is used to isolate the loose formation.
[0043] The second wellbore diameter of No. 1, No. 2 and No. 3 hole groups is φ152mm, open hole, and directional drilling begins after passing through the three coal groups for 40m, and the core drilling ends 30m behind the coal.
[0044] Drilling design workload:
[0045] The exploration holes in this plan are designed with 3 well sites, 3 hole groups, 3 vertical wells and 12 directional branches. Coring starts 40m after drilling through the three coal groups and ends 30m after drilling through the coal. The total drilling workload is 9402.85m and the coring workload is 1291.89m. There is 1 horizontal well with a workload of 1883.47m.
[0046] The first working surface has two hole groups, numbered 1 and 2, with a total of 2 straight holes and 8 directional holes; the second working surface has one hole group, with a total of 1 straight hole and 4 directional holes.
[0047] Rock and coal samples are tested once at each working face.
[0048] Geological logging
[0049] Rock cuttings logging: No sand samples are taken for the Quaternary System, but the bedrock interface must be determined. When drilling into the Shihezi and Shihezi formations, take a bag of rock cuttings every 2 meters; when drilling into the Shanxi formation, take a bag of rock cuttings every 1 meter; starting from 50 meters above the coal seam, take a bag of rock cuttings every 0.5 meters. The rock cuttings sample should not be less than 500g. The delay time adopts the theoretical calculation method and the actual measurement method, and the actual measurement correction is carried out every 50 meters.
[0050] Core logging: Before starting core logging, the drilling work should be checked, such as drilling progress, hydrological observation records, coal core sampling records, etc., to verify the authenticity and accuracy of the core return. After the core is processed, it should be named and described in detail. The description should include information such as structure, color, hardness, and composition. Careful records and preservation should be made, and the geological target layer should be determined according to the specific situation of the core. When designing the fixed-stratum coring, the standard layer, marker layer, special lithology layer encountered in the well, as well as the lithology combination characteristics and drilling time changes are compared with the data of the neighboring wells. The comparison logging depth is determined within 30m above the coring target layer, and the coring depth is determined according to the comparison results of the logging data. While performing formation comparison, the coring depth should be accurately determined in time according to the drilling time, gas logging and lithology changes. If drilling time changes are found in the target layer, the drilling should be stopped immediately for geological circulation, the drilling fluid tank surface display should be observed, the gas logging data and the changes in drilling fluid performance should be understood, and preparations for replacing drilling tools should be made. If the target layer is found, coring should be carried out in time. When coring at a fixed depth is designed, it should be carried out according to the design requirements. When the layer is stuck before coring, the driller is required to deliver the drill evenly to prevent false drilling.
[0051] Core collection: The footage length of each round shall not exceed the effective length of the core tube. When using a clamp to take the core, the specifications and quantity of the clamp should be determined according to the lithology and core length, and the holes should be fully punched to ensure that the clamp is firmly taken. When taking the core, dry drilling or violent drilling of the drill tool should be strictly prevented. When drilling into the sand layer, a low speed and a small pump volume should be used, and the footage time and footage length of each round should be limited, or drilling without a water pump should be used to ensure the core collection rate of the sand layer.
[0052] Coal core extraction: When the coal seam roof is soft or broken, double-tube drilling should be used; when the coal seam roof is hard, alloy or diamond drill bits can be used for drilling. When drilling in coal seams, a double-tube single-action corer must be used. The three major technical parameters of drilling should be reasonable and the penetration rate should be uniform so that the coal core can naturally and smoothly enter the holding tube. After taking out the coal core, it should be placed in the original order and properly stored.
[0053] Coring rate: Coring rate is more than 60%.
[0054] Mud logging while drilling:
[0055] From the second opening to the bottom of the well, record a drilling time point every 1m; start from 50m above the target coal seam and record a drilling time point every 0.5m, so as to judge the buried depth and thickness of the coal seam and determine the location of the interlayer.
[0056] Record the sudden changes during drilling at any time to timely discover the coal seam and accurately determine the depth and thickness of the coal seam.
[0057] The drilling parameters are kept relatively stable, and the non-geological factors that cause false drilling are recorded so that the formation lithology can be better reflected during drilling.
[0058] The drilling tool length and well depth should be checked regularly. The well depth must be checked before drilling. The well depth error should not exceed 0.1m.
[0059] The number of missed drilling points in the whole well shall not exceed 1% of the total number of drilling points in the whole well, and no points shall be missed when drilling in the 21 coal seam section.
[0060] Drilling fluid logging:
[0061] The drilling fluid logging work is carried out in the whole well section, and the requirements are as follows: For non-coal-bearing well sections, a full set of performance (drilling fluid type, measuring point depth, density, viscosity, water loss, sand content, mud cake, pH value, etc.) should be measured once per shift; density and viscosity should be measured every 2 hours. If abnormalities are found in coal-bearing well sections or non-coal-bearing well sections (such as increased viscosity, faster drilling time, gas invasion in drilling fluid, bubbles on the groove surface, etc.), the density and viscosity of the drilling fluid should be measured continuously, and the full set of performance measurements should be intensified, and records should be kept.
[0062] Accurately record the drilling fluid performance data at the measuring point and well depth, such as drilling fluid type, density, viscosity, water loss, mud cake, pH value, and sand content.
[0063] When handling drilling fluid, the time, well depth, name and amount of treatment agent should be recorded, and the type should be indicated when changing the drilling fluid.
[0064] If gas shows up in the drilling fluid, the well depth, layer position, gas show characteristics, etc. should be recorded.
[0065] When a well blowout or well leakage occurs, the well depth, layer position, drill bit position, working status, start and end time of well blowout or leakage, blowout or leakage volume, etc. should be recorded. If treatment is taken, the measures should be recorded.
[0066] Simple hydrological observations are carried out in the whole well, and the following requirements are made:
[0067] (1) Measure the water level (mud pool liquid level, wellbore liquid level) once after each drilling and before each drilling. Record the drilling fluid consumption in each shift and record the drilling fluid consumption once every hour of drilling. The drilling fluid consumption should also be observed when the drilling time is less than 1 hour but greater than 30 minutes.
[0068] (2) During the drilling process, pay attention to record the leakage (gushing) layer, depth and water level changes. If water gushes from the well, record the gushing height, gushing material and gushing amount, and take samples to determine the water quality type, total mineralization and chloride ion.
[0069] (3) During the drilling process, observations and records of hydrological phenomena should be made, including water vapor outburst, abnormal water temperature, encounters with caves, large fissures and quicksand, hole wall collapse, and drilling tool drop, etc., and relevant personnel should be notified in a timely manner. Construction can only be continued after their approval.
[0070] Geophysical logging
[0071] After the hole is completed, standard logging is performed on the open hole section to divide the formation and identify the lithology. The depth ratio of standard logging is 1:500. The test items include dual lateral direction (DLL), spontaneous potential (SP), natural gamma (GR), and dual caliper (CAL).
[0072] Embodiment 2:
[0073] Taking the first working surface as an example, the implementation process of the present invention is described in detail.
[0074] Hole layout: Two groups of surface directional wells are arranged along the direction of the coal seam at the first working face, and the main holes of the two well groups are 825m apart.
[0075] Branch drilling implementation:
[0076] The first batch: Carry out construction of the 1-1 and 2-1 main holes to understand the strata, structure and coal thickness.
[0077] Second batch: Based on the geological data revealed by the first batch of drilling holes, three-sided work was carried out, considering the construction of holes 1-2, 1-3, 2-2 and 2-3.
[0078] The third batch: Based on the geological data of the first and second batches of drilling construction and the coal thickness data of the 2306 working face, further construction is considered to the north or south end, such as holes 1-4, 2-4, 2-5 and 2-6.
[0079] Drilling structure:
[0080] Probe hole:
[0081] Well Group No. 1: The hole diameter is φ215.9mm, Φ177.8×8.05mmJ55 oil casing is inserted, cement is used to isolate the loose formation.
[0082] Well Group No. 2: The hole diameter is φ425mm, φ339.7×9.65mmJ55 oil casing is inserted, cement is used to isolate the loose formation.
[0083] Second well diameter: The second well diameter of No. 1 and No. 2 hole groups is φ152mm, open hole, and directional drilling begins after passing through the third coal group for 40m, and the core drilling ends 30m behind the coal.
[0084] Geological logging:
[0085] Rock cuttings logging: rock cuttings sampling is carried out at the specified sampling intervals. No sand samples are taken for the Quaternary system, but the bedrock interface is determined. The late time is calculated by combining theoretical calculation method and actual measurement method, and actual measurement correction is carried out every 50 meters.
[0086] Core logging: Before core logging, check the relevant work status, process, name and describe the core, determine the geological target layer according to various conditions, accurately determine the coring depth, coring in time and perform coring operations as required.
[0087] Drilling logging: The intervals for recording drilling time points are adjusted according to different stages, and sudden changes in drilling time are recorded at any time. The drilling parameters are kept stable and related non-geological factors are recorded. The drilling tool length and well depth are frequently checked.
[0088] Drilling fluid logging: Drilling fluid logging is carried out in the entire well section. Corresponding performance measurements and records are made according to different well sections and situations. Records are also made when drilling fluid is processed and gas is displayed. When well kick or well leakage occurs, relevant information is recorded and the treatment measures are recorded.
[0089] Embodiment 3:
[0090] Take the second working surface as an example to illustrate the implementation process.
[0091] Hole layout: Arrange a group of ground directional wells on the second working face.
[0092] Branch drilling implementation:
[0093] The first batch: Conduct construction of the 3-1 main hole to understand the strata, structure and coal thickness.
[0094] The second batch: Based on the geological data revealed by the first batch of drilling holes and the coal thickness conditions of other working faces, three-sided work was carried out, and the construction of holes 3-2, 3-3, 3-4 and 3-5 was considered.
[0095] The drilling structure is similar to that of the first working surface, and the corresponding hole diameter and casing are set according to the actual situation.
[0096] The geological logging work is the same as that of the first working face, and cuttings logging, core logging, drilling logging and drilling fluid logging are carried out in accordance with the prescribed requirements and steps.
[0097] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A method for exploring coal seam occurrence under complex geological conditions, characterized in that: The following steps are involved: S1: Surface directional wells are arranged along the coal seam trend at the planned working face, and the spacing between branch hole targets is arranged in principle not more than 300m; The S2 branch drilling was carried out in multiple batches. The first batch was to construct the main hole to understand the strata, structure and coal seam thickness. Then, the subsequent batches of holes were constructed based on the geological data revealed by the first batch of drilling holes. S3 Geological logging is carried out at each working face, including cuttings logging, core logging, drilling logging, drilling fluid logging and simple hydrological observation; After S4 is completed, standard logging is performed on the open hole section to divide the formation and identify the lithology. The depth ratio of standard logging is 1:500; S5 drilling closure.
2. The method for coal seam exploration under complex geological conditions according to claim 1, characterized in that: The drilling structure of the ground directional well includes an exploration hole.
3. The method for coal seam exploration under complex geological conditions according to claim 2, characterized in that: The structure of the exploration hole is as follows: according to the requirements of directional construction, a two-opening structure is selected, and a wall protection pipe is lowered after the first opening is completed; a straight hole section is opened, and the hole diameters and casing specifications of different well groups are different, and cement is used to isolate loose formations; the second opening is an inclination section and an inclination stabilization section, the well diameter is φ152mm, and it is an open hole. After directional drilling passes through the third coal group for 40m, coring drilling begins, and coring drilling ends when the coal thickness reaches 30m.
4. The method for coal seam exploration under complex geological conditions according to claim 1, characterized in that: The specific requirements for rock cuttings logging are as follows: no sand sampling is required for the Quaternary System, but the bedrock interface must be determined; when drilling into Shihezi and Shihezi Formation formations, take a bag of rock cuttings sample every 2 m; when drilling into Shanxi Formation formations, take a bag of rock cuttings sample every 1 m; starting from 50 m above the coal seam, take a bag of rock cuttings sample every 0.5 m; the delay time is calculated by theoretical calculation and actual measurement, and actual measurement correction is carried out every 50 m.
5. The method for coal seam exploration under complex geological conditions according to claim 1, characterized in that: The specific requirements for core logging are as follows: before starting core logging, the drilling situation should be checked, and the cores should be named and specifically described after being processed. The description should include information such as structure, color, hardness, and composition. Careful records and preservation should be made, and the geological target layer should be determined based on the specific situation of the cores. When designing core logging at a fixed position, the standard layer, marker layer, special lithology layer encountered in the well, as well as the lithology combination characteristics and drilling time changes should be compared with the data of adjacent wells. The comparative logging depth should be determined within 30m above the target coring layer, and the coring depth should be determined based on the logging data comparison results. While performing formation comparison, the coring depth should be accurately determined based on the drilling time, gas logging and lithology changes. If drilling time changes are found in the target layer, drilling should be stopped immediately for geological circulation, the drilling fluid tank surface display should be observed, the gas logging data and drilling fluid performance changes should be understood, preparations should be made to replace drilling tools, and the target layer should be cored in time When coring at a designed depth, the design requirements shall be followed; when the core is stuck before coring, the driller is required to deliver the drill evenly to prevent false drilling; when coring, the footage of each round shall not exceed the effective length of the core tube; when using a material to take the core, the material specifications and the number of materials should be determined according to the lithology and core length, and the holes should be fully punched to ensure that the core is firmly taken; when taking the core, dry drilling or violent drilling of the drill tool should be strictly prevented; when drilling into the sand layer, a low speed and a small pump volume should be used, and the footage of each round should be limited. time and footage length, or use water pump-free drilling to ensure the core recovery rate of the sand layer; when taking coal cores, double-tube drilling should be used when the rock of the coal seam roof is soft or broken; when the coal seam roof is hard, alloy or diamond drill bits can be used for drilling; when drilling in coal seams, a double-tube single-action coring device must be used, and the three major technical parameters of drilling should be reasonable, and the footage should be uniform, so that the coal core can naturally and smoothly enter the containing tube; after taking out the coal core, it should be placed in the original order and properly kept; the core recovery rate should be above 60%.
6. The method for coal seam exploration under complex geological conditions according to claim 1, characterized in that: The specific requirements for drilling logging are as follows: from the second opening to the bottom of the well, record one drilling point every 1m; record one drilling point every 0.5m starting from 50m above the target coal seam; record the sudden change points of drilling time at any time; keep the drilling parameters relatively stable, and record the non-geological factors that cause false drilling; frequently calibrate the drill tool length and well depth, and the well depth must be calibrated before drilling, and the well depth error must not exceed 0.1m; the number of missed drilling points in the whole well shall not exceed 1% of the total number of drilling points in the whole well, and no drilling points shall be missed when drilling in the coal seam section.
7. The method for exploring coal seam occurrence under complex geological conditions according to claim 1, characterized in that: The specific requirements for drilling fluid logging are as follows: drilling fluid logging is carried out in the entire well section, and a full set of performance measurements are performed once per shift in non-coal-bearing well sections; density and viscosity are measured every 2 hours; if abnormalities are found in coal-bearing well sections or non-coal-bearing well sections, the density and viscosity of the drilling fluid should be measured continuously, and the full set of performance measurements should be intensified and records should be kept; the drilling fluid performance data of the measuring point and well depth should be accurately recorded; when treating the drilling fluid, the time, well depth, name and amount of the treatment agent should be recorded, and the type should be indicated when replacing the drilling fluid; if gas is shown in the drilling fluid, the well depth, layer, gas display characteristics, etc. should be recorded; when a well blowout or well leakage occurs, the well depth, layer, drill bit position, working status, start and end time of the well blowout or leakage, and the amount of blowout or leakage should be recorded. If any treatment is taken, the measures should be recorded.
8. A coal seam occurrence exploration system under complex geological conditions, using the coal seam occurrence exploration method under complex geological conditions as described in any one of claims 1 to 7, characterized in that: It comprises a ground directional well arranged on a planned working surface, wherein the ground directional well comprises a plurality of hole groups, and each hole group comprises a vertical well and a directional branch.
9. The coal seam occurrence exploration system under complex geological conditions according to claim 8, using the coal seam occurrence exploration method under complex geological conditions according to any one of claims 1 to 7, characterized in that: After the surface directional well is constructed as a directional exploration hole, part of the hole group can be constructed as a horizontal mining well.