Tunnel concrete curing device and construction method thereof

By designing a device including back plate, high-pressure water spraying robotic arm and crank rocker mechanism, the problems of cumbersome concrete maintenance and workers' quality in tunnel projects are solved, and uniform water spraying on the concrete surface is achieved, reducing enterprise costs and meeting the cost. Acceptance standards.

CN119084036APending Publication Date: 2024-12-06CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411414163.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-07-08
Filing Date
2024-10-11
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The concrete curing in tunnel projects is complicated and affected by the technical quality of workers, resulting in water shortage on the concrete surface and it is difficult to achieve uniform water sprinkling and maintenance.

Method used

A device including back plate, high-pressure water jet robot arm, positioning rod, drive motor, high-pressure water supply pipe, water pump and vehicle is designed. The rotation and water jet of the high-pressure water jet robot arm is realized through the crank rocker mechanism to ensure the concrete surface. Evenly maintain.

Benefits of technology

The concrete curing process is simplified, labor intensity is reduced, finished product quality is ensured, design and specification acceptance standards are met, and enterprise costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084036A_ABST
    Figure CN119084036A_ABST
Patent Text Reader

Abstract

The tunnel concrete curing device comprises a back plate, high-pressure water spraying mechanical arms, a positioning rod, a driving motor, a high-pressure water supply pipe, a water pump, a water tank and a carrier, the two high-pressure water spraying mechanical arms are rotationally installed on the upper portions of the two side edges of one side face of the back plate through positioning bolts correspondingly, and the driving motor is installed on the left side of the middle of the back plate; a motor shaft of the driving motor is rotationally connected with the water inlet ends of the two high-pressure water spraying mechanical arms through crank rocker mechanisms, the water outlet ends of the high-pressure water spraying mechanical arms are connected with high-pressure sprayers, the water inlet ends of the high-pressure water spraying mechanical arms are connected with water inlet valves, and the water inlet valves communicate with high-pressure water supply pipes. A high-pressure water supply pipe connected with the two high-pressure water spraying mechanical arms is connected with a water pump through a tee joint, the water pump is placed in a water tank, and the back plate, the high-pressure water supply pipe and the water tank are installed on a carrier. The concrete curing watering device is simple in structure, concrete curing watering is more uniform, the mechanical arm can rotate according to an angle to spray water to the concrete surface, and the finished product quality of concrete is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of concrete curing, and in particular to a tunnel concrete curing device and a construction method thereof. Background Art

[0002] Whenever the engineering support or secondary lining construction of a tunnel project is underway, concrete curing issues will arise. Concrete curing refers to covering or sprinkling water on the concrete surface after the final setting of the concrete building. The purpose is to avoid water shortage during the hardening process of the concrete. Once there is no time to replenish water and the concrete is short of water, cracks will easily appear in the concrete, and the strength of the entire concrete structure will drop significantly. Therefore, sprinkling water during the curing process of concrete is essential. The curing of shotcrete and secondary lining concrete cannot be performed by conventional covering and curing because the concrete curing surface is suspended and the arch height is large. Summary of the invention

[0003] The present invention provides a tunnel concrete curing device to solve the problem of complicated concrete curing in existing tunnel engineering and solve the influence of different technical qualities of personnel on the quality of finished products during the construction process.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A tunnel concrete maintenance device, characterized in that it includes a back plate, a high-pressure water spraying mechanical arm, a positioning rod, a driving motor, a high-pressure water supply pipe, a water pump, a water tank and a carrier, two high-pressure water spraying mechanical arms are rotatably mounted on the upper parts of both sides of one side of the back plate through positioning bolts, a driving motor is installed on the left side of the middle part of the back plate, the motor shaft of the driving motor is rotatably connected to the water inlet ends of the two high-pressure water spraying mechanical arms through a crank rocker mechanism, the water outlet end of the high-pressure water spraying mechanical arm is connected to a high-pressure nozzle, the water inlet end of the high-pressure water spraying mechanical arm is connected to a water inlet valve, the water inlet valve is connected to a high-pressure water supply pipe, the high-pressure water supply pipe connected to the two high-pressure water spraying mechanical arms is connected to the water pump through a tee, the water pump is placed in the water tank, the back plate, the high-pressure water supply pipe and the water tank are installed on the carrier.

[0006] The crank rocker mechanism includes a crank, a main traction rod, a positioning rod and two auxiliary traction rods. One end of the crank is connected to the motor shaft of the driving motor, and the other end of the crank is rotatably connected to the main traction rod through a connecting bolt. The positioning rod is installed on the back plate on the right side of the driving motor through a positioning bolt. The two ends of the positioning rod are each connected to an auxiliary traction rod through a connecting bolt, and one end of one auxiliary traction rod connected to the positioning rod is also connected to the main traction rod, and the other ends of the two auxiliary traction rods are rotatably connected to the high-pressure water spraying mechanical arm through the mechanical arm connecting bolts.

[0007] The position where the auxiliary traction rod is connected to the high-pressure water spraying mechanical arm is close to the water inlet end of the high-pressure water spraying mechanical arm.

[0008] The positioning bolt is connected to the high-pressure water spraying mechanical arm near the mechanical arm connecting bolt position.

[0009] The carrier is a vehicle-mounted device with wheels.

[0010] A method for construction using a tunnel concrete curing device, the specific steps are:

[0011] Step 1: First, take out the back plate, install two high-pressure water spraying arms on the back plate, then take out two high-pressure nozzles and two water inlet valves and install them on the high-pressure water spraying arms. Next, take out the drive motor and install it on the back plate. Then take out the main traction and install it on the drive motor shaft. Then take out the positioning rod and install it on the back plate with the positioning screws. After the positioning rod is installed, take out the auxiliary traction rod and install it on the main traction rod.

[0012] Step 2: After the device is installed, install it on the vehicle, which includes but is not limited to a small truck, a pickup truck, and an electric tricycle. After the installation is complete, place the water tank on the vehicle.

[0013] Step 3: Connect the water pump to the water pipe and place it in the water tank. Use a tee to divide the water pipe into two high-pressure water supply pipes. One end of the two high-pressure water supply pipes is connected to the tee, and the other end is connected to the two water inlet valves.

[0014] Step 4: After the above steps are completed, you can fill water into the water tank, adjust the water pressure according to the tunnel section size, turn on the power of the device, and drive the vehicle forward at a constant speed to perform concrete maintenance operations.

[0015] The beneficial effects of the present invention are as follows: the present invention has a simple structure and is easy to operate, which makes the concrete curing watering more uniform and the curing surface wider, eliminating the negative impact of different worker qualities on concrete curing. The mechanical arm can rotate at an angle to spray water on the concrete surface, thereby ensuring the quality of the finished concrete product and reducing the labor intensity of the operators. Ultimately, it is ensured that the concrete meets the design and specification acceptance standards after reaching the age, thereby reducing the enterprise cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the present invention;

[0017] In the figure: 1-high-pressure nozzle; 2-high-pressure water spraying mechanical arm; 3-water inlet valve; 4-positioning rod; 5-auxiliary traction rod; 6-main traction rod; 7-driving motor; 8-back plate; 9-connecting bolt; 10-positioning bolt; 11-high-pressure water supply pipe; 12-tee; 13-water pump; 14-water tank; 15-mechanical arm connecting bolt; 16-positioning bolt; 17-crank; 18-carrier.

[0018] The following is a detailed description of the embodiments of the present invention with reference to the accompanying drawings. DETAILED DESCRIPTION

[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0020] like Figure 1 As shown, a tunnel concrete maintenance device is characterized in that it includes a back plate 8, a high-pressure water spraying mechanical arm 2, a positioning rod 4, a driving motor 7, a high-pressure water supply pipe 11, a water pump 13, a water tank 14 and a carrier. The two high-pressure water spraying mechanical arms 2 are rotatably mounted on the upper parts of both sides of one side of the back plate 8 through positioning bolts 16. The driving motor 7 is installed on the left side of the middle part of the back plate 8. The motor shaft of the driving motor 7 is rotatably connected to the water inlet ends of the two high-pressure water spraying mechanical arms 2 through a crank rocker mechanism. The water outlet end of the high-pressure water spraying mechanical arm 2 is connected with a high-pressure nozzle 1, and the water inlet end of the high-pressure water spraying mechanical arm 2 is connected with a water inlet valve 3. The water inlet valve 3 is connected with a high-pressure water supply pipe 11. The high-pressure water supply pipe 11 connected to the two high-pressure water spraying mechanical arms 2 is connected to the water pump 13 through a tee 12. The water pump 13 is placed in the water tank 14. The back plate 8, the high-pressure water supply pipe 11 and the water tank 14 are installed on the carrier 18.

[0021] The crank rocker mechanism includes a crank 17, a main traction rod 6, a positioning rod 4 and two auxiliary traction rods 5. One end of the crank 17 is connected to the motor shaft of the drive motor 7, and the other end of the crank 17 is rotatably connected to the main traction rod 6 through a connecting bolt 9. The positioning rod 4 is installed on the back plate 8 on the right side of the drive motor 7 through a positioning bolt 10. The two ends of the positioning rod 4 are each connected to an auxiliary traction rod 5 through a connecting bolt 9, and one end of one auxiliary traction rod 5 connected to the positioning rod 4 is also connected to the main traction rod 6, and the other ends of the two auxiliary traction rods 5 are rotatably connected to the high-pressure water spraying robot arm 2 through the robot arm connecting bolt 15.

[0022] The position where the auxiliary traction rod 5 is connected to the high-pressure water spraying mechanical arm 2 is close to the water inlet end of the high-pressure water spraying mechanical arm 2.

[0023] The positioning bolt 16 is connected to the high-pressure water spraying mechanical arm 2 near the mechanical arm connecting bolt 15 .

[0024] The carrier 18 is a vehicle-mounted device with wheels.

[0025] A method for construction using a tunnel concrete curing device, the specific steps are:

[0026] Step 1: First, take out the back plate 8, install the two high-pressure water spraying mechanical arms 2 on the back plate 8, then take out the two high-pressure nozzles 1 and the two water inlet valves 3 respectively and install them on the high-pressure water spraying mechanical arms 2, then take out the drive motor 7 and install it on the back plate 8, then take out the main traction 6 and install it on the drive motor 7 shaft, then take out the positioning rod 4, and install it on the back plate 8 with the positioning screw 10, after the positioning rod 4 is installed, take out the auxiliary traction rod 5 and install it on the main traction rod 6.

[0027] Step 2: After the device is installed, it is installed on a vehicle, which includes but is not limited to a small truck, a pickup truck, and an electric tricycle. After the installation is completed, the water tank 14 is placed on the vehicle 18.

[0028] Step 3: Connect the water pump 13 to the water pipe and place it in the water tank 14. The water pipe is divided into two high-pressure water supply pipes 11 by a tee 12. One end of the two high-pressure water supply pipes 11 is connected to the tee 12, and the other end is connected to the two water inlet valves 3.

[0029] Step 4: After the above steps are installed, water can be poured into the water tank 14, the water pressure can be adjusted according to the cross-sectional size of the tunnel, the power of the device can be turned on, and the vehicle 18 can be driven forward at a constant speed to perform concrete curing operations.

[0030] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0031] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0032] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various improvements are made using the method concept and technical solution of the present invention, or are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A tunnel concrete curing device, It is characterized in that The invention comprises a back plate (8), a high-pressure water spraying mechanical arm (2), a positioning rod (4), a driving motor (7), a high-pressure water supply pipe (11), a water pump (13), a water tank (14) and a carrier. The two high-pressure water spraying mechanical arms (2) are rotatably mounted on the upper parts of both sides of one side of the back plate (8) through positioning bolts (16). The driving motor (7) is mounted on the left side of the middle part of the back plate (8). The motor shaft of the driving motor (7) is rotatably connected to the water inlet ends of the two high-pressure water spraying mechanical arms (2) through a crank rocker mechanism. The water outlet of the high-pressure water spraying mechanical arm (2) is connected to a high-pressure nozzle (1), the water inlet of the high-pressure water spraying mechanical arm (2) is connected to a water inlet valve (3), the water inlet valve (3) is connected to a high-pressure water supply pipe (11), the high-pressure water supply pipe (11) connected to the two high-pressure water spraying mechanical arms (2) is connected to a water pump (13) through a tee (12), the water pump (13) is placed in a water tank (14), and the back plate (8), the high-pressure water supply pipe (11) and the water tank (14) are installed on a carrier (18).

2. A tunnel concrete curing device according to claim 1, It is characterized in that The crank rocker mechanism comprises a crank (17), a main traction rod (6), a positioning rod (4) and two auxiliary traction rods (5); one end of the crank (17) is connected to the motor shaft of the driving motor (7); the other end of the crank (17) is rotatably connected to the main traction rod (6) via a connecting bolt (9); the positioning rod (4) is mounted on the back plate (8) on the right side of the driving motor (7) via a positioning bolt (10); the two ends of the positioning rod (4) are respectively connected to an auxiliary traction rod (5) via a connecting bolt (9); one end of one auxiliary traction rod (5) connected to the positioning rod (4) is also connected to the main traction rod (6); the other ends of the two auxiliary traction rods (5) are rotatably connected to the high-pressure water spraying mechanical arm (2) via a mechanical arm connecting bolt (15).

3. A tunnel concrete curing device according to claim 2, It is characterized in that The position where the auxiliary traction rod (5) is connected to the high-pressure water spraying mechanical arm (2) is close to the water inlet end of the high-pressure water spraying mechanical arm (2).

4. A tunnel concrete curing device according to claim 3, It is characterized in that The positioning bolt (16) is connected to the high-pressure water spraying mechanical arm (2) near the mechanical arm connecting bolt (15).

5. A tunnel concrete curing device according to claim 4, It is characterized in that The carrier (18) is a vehicle-mounted device with wheels.

6. A construction method using the tunnel concrete curing device according to any one of claims 2 to 5, It is characterized in that The steps are: Step 1: first, take out the back plate (8), install two high-pressure water spraying mechanical arms (2) on the back plate (8), then take out two high-pressure nozzles (1) and two water inlet valves (3) respectively and install them on the high-pressure water spraying mechanical arms (2), then take out the driving motor (7) and install it on the back plate (8), then take out the main traction (6) and install it on the shaft of the driving motor (7), then take out the positioning rod (4), and install it on the back plate (8) using the positioning screw (10), after the positioning rod (4) is installed, take out the auxiliary traction rod (5) and install it on the main traction rod (6); Step 2: After the device is installed, it is installed on a vehicle, which includes but is not limited to a small truck, a pickup truck, or an electric tricycle. After the installation is completed, the water tank (14) is placed on the vehicle (18); Step 3: After the water pump (13) is connected to the water pipe, it is placed in the water tank (14). The water pipe is divided into two high-pressure water supply pipes (11) by a tee (12). One end of the two high-pressure water supply pipes (11) is connected to the tee (12), and the other end is connected to the two water inlet valves (3); Step 4: After the above steps are completed, water can be poured into the water tank (14), the water pressure can be adjusted according to the tunnel section size, the device power can be turned on, and the vehicle (18) can be driven forward at a constant speed to perform concrete curing operations.