Electronic circuit board circulation withstand voltage test system and test method
By designing the electronic circuit board cyclic pressure test system, using test molds, hydraulic test units and pneumatic testing units, combined with wheel patrol and cross-space control, the problem that existing equipment is difficult to meet the cycle test needs, and the circuit board is realized Continuous pressure resistance testing meets strict testing requirements.
Patent Information
- Application Number
- CN202411236545.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-12-06
AI Technical Summary
Existing electronic circuit board voltage-resistant testing equipment is difficult to meet the needs of continuous cycle testing and cannot adapt to the increasingly stringent testing requirements.
An electronic circuit board cycle pressure test system is designed, including a test mold, a hydraulic test unit and a pneumatic test unit. The hydraulic test and pneumatic test are carried out in the order of wheel patrol and/or cross-space through the control device to ensure the mutual connection of each mode. Minimum interference, enabling continuous cyclic testing.
Continuous cycle testing of electronic circuit boards is realized, which meets different testing needs and improves the flexibility and efficiency of testing.
Smart Images

Figure CN119086291A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of withstand voltage testing, and in particular to a cyclic withstand voltage testing system and a testing method for an electronic circuit board. Background Art
[0002] The voltage resistance of electronic circuit boards is one of the important characteristics to ensure their stable operation, especially for circuit boards of electronic equipment used in harsh environments. Therefore, after the processing of this type of circuit board is completed, its voltage resistance performance needs to be tested, including high-voltage resistance test and low-voltage resistance test. The test method is to place the circuit board to be tested in a liquid or gas test medium, apply a certain amount of pressure, and maintain it for a certain period of time, and then test the performance of the circuit board to determine whether it is still in a normal state. If so, it means that the voltage resistance performance is qualified, otherwise it is judged as unqualified. However, the existing test equipment and test methods are difficult to meet the needs of continuous cycle testing and cannot adapt to the increasingly stringent testing requirements. Summary of the invention
[0003] In view of the above-mentioned shortcomings of the prior art, an object of the present invention is to provide an electronic circuit board cyclic voltage withstand test system and test method, which has the advantage of being able to implement cyclic testing of circuit boards.
[0004] To achieve the above-mentioned purpose and other related purposes, the present invention discloses an embodiment of a first aspect, providing an electronic circuit board cyclic withstand voltage test system, comprising:
[0005] A test mold, wherein the test mold has a plurality of test chambers for sealing and containing circuit boards to be tested;
[0006] A hydraulic test unit, used for injecting or discharging a liquid medium into the test chamber to form a first high pressure threshold or a first low pressure threshold to implement a hydraulic test;
[0007] A gas pressure test unit, used for injecting or exhausting gaseous medium into the test chamber to form a second high pressure threshold or a second low pressure threshold to implement a gas pressure test; and
[0008] A control device is used to control the hydraulic test unit and the air pressure test unit to implement hydraulic testing or air pressure testing within a corresponding predetermined time period in the order of patrol and / or cross intervals, wherein the hydraulic test includes: a first test mode for performing a high-pressure test at the first high-pressure threshold for a first predetermined time period, and a second test mode for performing a low-pressure test at the first low-pressure threshold for a second predetermined time period, and the air pressure test includes: a third test mode for performing a high-pressure test at the second high-pressure threshold for a third predetermined time period, and a fourth test mode for performing a low-pressure test at the second low-pressure threshold for a fourth predetermined time period.
[0009] To implement the above technical solution, during testing, the circuit boards to be tested are placed in each test chamber respectively, and then the test mold is sealed to ensure that the test chamber can withstand sufficient pressure. Subsequently, the control device controls the hydraulic test unit and the air pressure test unit to perform tests in different modes. The various modes can be performed in the order of patrol or cross interval, or patrol first and then cross interval, or cross interval first and then patrol. When switching between modes, it is necessary to first drain the liquid medium or gas medium therein, and then perform the test of the next mode, so as to minimize the mutual interference between the modes, thereby controlling the test cycles of different modes and realizing continuous cyclic testing to meet different testing requirements.
[0010] As a preferred embodiment of the invention, the test mold comprises:
[0011] A base, wherein a communicating cavity for liquid medium or gas medium to flow is provided in the base, and a liquid inlet and a gas inlet are provided on the top of the base;
[0012] A plurality of pressure-bearing templates sealedly connected to the surface of the base, the pressure-bearing templates are provided with a plurality of flow openings communicating with the connecting cavity, and the test chamber is formed in the pressure-bearing templates; and,
[0013] A plurality of sealing covers are used to cover and seal each of the pressure-bearing templates.
[0014] To implement the above technical solution, liquid medium or gaseous medium is injected into the connecting cavity, the connecting cavity is connected to each pressure-bearing template, and then liquid medium or gaseous medium can be simultaneously injected into each test chamber through the flow port to form various high-pressure conditions or low-pressure conditions for testing. After the circuit board to be tested is placed, the sealing cover is closed to seal it with the pressure-bearing template to achieve a sealed connection between the test mold and the pressure-bearing template.
[0015] As a preferred solution of the invention, the pressure-bearing template is symmetrically arranged on both sides of the base.
[0016] Implementing the above technical solution can effectively utilize the space on both sides of the base to meet the needs of more test stations.
[0017] As a preferred solution of the invention, the hydraulic test unit comprises:
[0018] A liquid supply module, used for storing and providing liquid medium;
[0019] a high-pressure liquid circuit, used for injecting a liquid medium into the test chamber and maintaining the test chamber at a first high-pressure threshold for a first predetermined period of time;
[0020] a low-pressure liquid circuit, used for injecting a liquid medium into the test chamber and maintaining the test chamber at a first low-pressure threshold for a second predetermined period of time; and
[0021] The reflux liquid circuit is used to discharge the liquid medium in the test chamber and return it to the liquid supply module to achieve pressure relief.
[0022] To implement the above technical solution, the liquid supply module injects liquid medium into the test chamber through the high-pressure liquid circuit to reach a first high-pressure threshold, thereby realizing liquid high-pressure testing, and the liquid supply module injects liquid medium into the test chamber through the low-pressure liquid circuit to reach a first low-pressure threshold, thereby realizing liquid low-pressure testing. After the test is completed, the liquid medium in the test chamber and the connecting cavity can be returned to the liquid supply module through the reflux liquid circuit for the next mode of testing, thereby realizing the reuse of the liquid medium.
[0023] As a preferred solution of the invention, the liquid supply module is connected with a first liquid supply pipe and a second liquid supply pipe for outputting liquid medium, the first liquid supply pipe and the second liquid supply pipe are respectively connected with a first liquid supply valve and a second liquid supply valve to control the on-off of the liquid circuit, the first liquid supply pipe is connected with a first pressure control valve for controlling the liquid medium to reach a first high pressure threshold, and the second liquid supply pipe is connected with a second pressure control valve for controlling the liquid medium to reach a first low pressure threshold;
[0024] The ends of the first liquid supply pipe and the second liquid supply pipe are connected to a manifold through a three-way joint, the manifold is connected to the liquid inlet to inject liquid into the communication cavity, and the manifold is connected to a liquid inlet control valve;
[0025] The first liquid supply pipe, the first liquid supply valve, the first pressure control valve, the manifold and the liquid inlet control valve are connected to form the high-pressure liquid circuit;
[0026] The second liquid supply pipe, the second liquid supply valve, the second pressure control valve, the manifold and the liquid inlet control valve are connected to form the low-pressure liquid circuit.
[0027] To implement the above technical solution, after opening the first liquid supply valve, the liquid medium is discharged from the first liquid supply pipe and the liquid pressure is regulated to the first high-pressure threshold value through the first pressure control valve, and then after being converged by the manifold, the liquid inlet control valve is opened to inject the liquid medium into the connecting cavity, and finally the pressure in the test chamber reaches the first high-pressure threshold value, thereby forming a liquid high-pressure test state; correspondingly, after opening the second liquid supply valve, the liquid medium is discharged from the second liquid supply pipe and the liquid pressure is regulated to the second high-pressure threshold value through the second pressure control valve, and then after being converged by the manifold, the liquid inlet control valve is opened to inject the liquid medium into the connecting cavity, and finally the pressure in the test chamber reaches the first low-pressure threshold value, thereby forming a liquid low-pressure test state.
[0028] As a preferred embodiment of the invention, the reflux liquid circuit comprises:
[0029] a liquid return pipe, one end of which is connected to the bottom of the base and communicates with the communicating cavity, and the other end of which is connected to the liquid supply module; and
[0030] The liquid return control valve connected to the liquid return pipe is used to control the liquid flow interruption of the liquid return pipe.
[0031] To implement the above technical solution, after the test of the liquid medium is completed, the liquid return control tube is opened, and the liquid medium in the test chamber and the connecting cavity can flow back to the liquid supply module through the liquid return tube.
[0032] As a preferred embodiment of the invention, the air pressure testing unit comprises:
[0033] A high-pressure gas source, connected to the gas inlet through a first gas supply pipe, and used for injecting gas medium into the test chamber to a second high-pressure threshold;
[0034] A high-pressure gas control valve connected to the first gas supply pipe for controlling the on-off of the gas circuit;
[0035] A low-pressure gas source, connected to the gas inlet through a second gas supply pipe, and used for injecting gaseous medium into the test chamber to a second low-pressure threshold;
[0036] A low-pressure air control valve connected to the second air supply pipe for controlling the on-off of the air circuit; and
[0037] The air relief valve connected to the first air supply pipe or the second air supply pipe is used to release the air pressure in the test chamber.
[0038] To implement the above technical solution, after the high-pressure gas source is started, the high-pressure gas control valve can be opened to inject gas medium into the test chamber, thereby realizing gas high-pressure testing; after the corresponding low-pressure gas source is started, the low-pressure gas control valve can be opened to inject gas medium into the test chamber, thereby realizing gas low-pressure testing, and the air pressure in the test chamber can be released through the air release valve after the gas test is completed, so as to realize the next mode of testing.
[0039] As a preferred embodiment of the invention, it also includes:
[0040] a liquid adding funnel, the liquid adding funnel being connected to the liquid supply module via a liquid adding tube and being used for adding liquid medium to the liquid supply module; and
[0041] The liquid adding control valve is connected to the liquid adding pipe and is used to control the on-off of the liquid circuit.
[0042] To implement the above technical solution, when the liquid medium in the liquid supply module is reduced, the liquid medium can be added to the liquid adding funnel, and the liquid medium can be added to the liquid supply module after the liquid adding control valve is opened, thereby ensuring that the test process can continue.
[0043] As a preferred solution of the invention, a liquid receiving tray is further provided below the test mold for receiving the liquid medium leaked from the test mold, and a liquid drain pipe is provided at the bottom of the liquid receiving pipe.
[0044] To implement the above technical solution, when the test is completed and the circuit board is taken out, some liquid medium will usually remain in the test chamber. At this time, the liquid receiving tray can receive this part of the liquid medium and then discharge it through the drain pipe, thereby reducing the liquid medium pollution setting.
[0045] According to a second aspect of the disclosed embodiment of the present invention, a method for cyclic withstand voltage testing of an electronic circuit board is provided. The method is implemented based on the testing system according to the first aspect, and includes:
[0046] After placing the circuit board to be tested into each of the test chambers, the test mold is sealed;
[0047] Controlling the hydraulic test unit and the pneumatic test unit to inject liquid medium or gas medium into the test chamber, and implementing hydraulic test or pneumatic test within a corresponding predetermined time period in a patrol and / or cross-interval sequence;
[0048] Among them, the hydraulic test includes: a first test mode for performing a high-pressure test with the first high-pressure threshold for a first predetermined time, and a second test mode for performing a low-pressure test with the first low-pressure threshold for a second predetermined time; the air pressure test includes: a third test mode for performing a high-pressure test with the second high-pressure threshold for a third predetermined time, and a fourth test mode for performing a low-pressure test with the second low-pressure threshold for a fourth predetermined time.
[0049] As described above, the present invention has the following beneficial effects:
[0050] The embodiment of the present invention provides an electronic circuit board cyclic pressure resistance test system and test method. During the test, the circuit boards to be tested are placed in each test chamber respectively, and then the test mold is sealed to ensure that the test chamber can withstand sufficient pressure. Then the control device controls the hydraulic test unit and the air pressure test unit to perform tests in different modes. The various modes can be performed in the order of patrol or cross interval, or patrol first and then cross interval, or cross interval first and then patrol. When switching between modes, it is necessary to first empty the liquid medium or gas medium therein, and then perform the test of the next mode, so as to minimize the mutual interference of each mode, thereby controlling the test cycle of different modes, and realizing continuous cyclic testing to meet different testing requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 Shown is a schematic structural diagram of an electronic circuit board cyclic voltage withstand test system according to an embodiment of the present invention.
[0052] Figure 2 Shown is a structural schematic diagram of an electronic circuit board cyclic voltage withstand test system from another perspective in an embodiment of the present invention.
[0053] Figure 3 It is a schematic diagram of the connection structure between the test mold and the liquid receiving tray in an embodiment of the present invention.
[0054] Figure 4 Shown is a schematic structural diagram of a test mold in an embodiment of the present invention.
[0055] Figure 5 Shown is a cross-sectional view of a test mold in an embodiment of the present invention.
[0056] The numbers and letters in the figure represent the corresponding component names:
[0057] 10. Test mold; 11. Base; 111. Communication cavity; 112. Liquid inlet; 113. Air inlet; 12. Pressure template; 121. Flow port; 122. Test chamber; 13. Sealing cover; 20. Hydraulic test unit; 21. Liquid supply module; 22. First liquid supply pipe; 23. Second liquid supply pipe; 24. First liquid supply valve; 25. Second liquid supply valve; 26. First pressure control valve; 27. The second pressure control valve; 28, manifold; 29, liquid inlet control valve; 210, liquid return pipe; 211, liquid return control valve; 30, air pressure test unit; 31, high-pressure gas source; 32, high-pressure gas control valve; 33, low-pressure gas source; 34, low-pressure gas control valve; 35, air relief valve; 40, control device; 50, liquid adding funnel; 51, liquid adding pipe; 52, liquid adding control valve; 60, liquid receiving tray; 61, liquid drain pipe. DETAILED DESCRIPTION
[0058] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0059] See also Figures 1 to 5 In a first aspect, an embodiment of the present invention provides an electronic circuit board cyclic pressure test system, comprising: a test mold 10, the test mold 10 having a plurality of test chambers 122 for sealing and containing circuit boards to be tested; a hydraulic test unit 20, for injecting or discharging a liquid medium into the test chamber 122 to form a first high pressure threshold or a first low pressure threshold to implement a hydraulic test; a pneumatic test unit 30, for injecting or discharging a gaseous medium into the test chamber 122 to form a second high pressure threshold or a second low pressure threshold to implement a pneumatic test; and a control device 40, for controlling the hydraulic test unit 20 and the pneumatic test unit 30 to implement a hydraulic test or a pneumatic test within a corresponding predetermined time period in a patrol and / or cross-interval order.
[0060] Specifically, to facilitate installation, each functional module in this embodiment is installed on a frame, and the test mold 10 includes: a base 11, a connecting cavity 111 for liquid medium or gas medium to flow therein is provided in the base 11, and a liquid inlet 112 and an air inlet 113 are provided on the top of the base 11; a plurality of pressure-bearing templates 12 sealedly connected to the surface of the base 11, a plurality of flow ports 121 connected to the connecting cavity 111 are provided on the pressure-bearing template 12, and a test chamber 122 is formed in the pressure-bearing template 12; and a plurality of sealing covers 13 for covering and sealing each pressure-bearing template 12.
[0061] Among them, the pressure plate can be sealed and connected with the base 11 by screws, and the sealing cover 13 and the pressure template 12 can also be sealed and connected with the pressure plate by screws. In order to improve the sealing between the pressure plate and the base 11, and between the sealing cover 13 and the pressure plate, sealing rings can be provided on one side of the pressure plate and the sealing cover 13; preferably, the pressure template 12 is symmetrically arranged on both sides of the base 11, so that the space on both sides of the base 11 can be effectively utilized to meet the needs of more test stations; at the same time, a bracket can also be provided on the base 11 for the installation of relevant components of the hydraulic test unit 20 or the air pressure test unit 30.
[0062] By injecting liquid medium or gaseous medium into the connecting cavity 111, the connecting cavity 111 is connected to each pressure-bearing template 12, and then liquid medium or gaseous medium can be simultaneously injected into each test chamber 122 through the flow port 121 to form various high-pressure conditions or low-pressure conditions to achieve testing. After the circuit board to be tested is placed, the sealing cover 13 is closed to seal it with the pressure-bearing template 12, so that a sealed connection of the test mold 10 can be achieved.
[0063] The hydraulic test unit 20 includes: a liquid supply module 21 for storing and providing liquid medium; a high-pressure liquid circuit for injecting liquid medium into the test chamber 122 and maintaining the test chamber 122 at a first high-pressure threshold within a first predetermined time period; a low-pressure liquid circuit for injecting liquid medium into the test chamber 122 and maintaining the test chamber 122 at a first low-pressure threshold within a second predetermined time period; and a reflux liquid circuit for discharging the liquid medium in the test chamber 122 and refluxing it to the liquid supply module 21 to achieve pressure relief.
[0064] The liquid supply module 21 injects liquid medium into the test chamber 122 through the high-pressure liquid circuit to reach the first high-pressure threshold, thereby realizing the liquid high-pressure test. The liquid supply module 21 injects liquid medium into the test chamber 122 through the low-pressure liquid circuit to reach the first low-pressure threshold, thereby realizing the liquid low-pressure test. After the test is completed, the liquid medium in the test chamber 122 and the connecting cavity 111 can be returned to the liquid supply module 21 through the reflux liquid circuit for the next mode of testing and the reuse of the liquid medium.
[0065] The liquid medium may be water, oil or other media, for example, and the liquid supply module 21 may be a liquid storage tank with a built-in infusion pump, for example, to pump out the liquid medium by providing infusion power through the built-in infusion pump.
[0066] The liquid supply module 21 is connected to a first liquid supply pipe 22 and a second liquid supply pipe 23 for outputting liquid medium. The first liquid supply pipe 22 and the second liquid supply pipe 23 are respectively connected to a first liquid supply valve 24 and a second liquid supply valve 25 to control the on-off of the liquid circuit. The first liquid supply valve 24 and the second liquid supply valve 25 can both be solenoid valves. The first liquid supply pipe 22 is connected to a first pressure control valve 26 for controlling the liquid medium to reach a first high pressure threshold, and the second liquid supply pipe 23 is connected to a second pressure control valve 27 for controlling the liquid medium to reach a first low pressure threshold; the first liquid supply pipe 22 and the second liquid supply pipe 23 are respectively connected to a first liquid supply valve 24 and a second liquid supply valve 25 to control the on-off of the liquid circuit. The first liquid supply pipe 22 and the second liquid supply pipe 23 are respectively connected to a first pressure control valve 26 for controlling the liquid medium to reach a first high pressure threshold. The ends of the first and second liquid supply pipes 22 and 23 are connected to a manifold 28 through a three-way joint. The manifold 28 is connected to the liquid inlet 112 to inject liquid into the communicating chamber 111, and the manifold 28 is connected to a liquid inlet control valve 29, which can also be a solenoid valve. The first liquid supply pipe 22, the first liquid supply valve 24, the first pressure control valve 26, the manifold 28 and the liquid inlet control valve 29 are connected to form a high-pressure liquid circuit. The second liquid supply pipe 23, the second liquid supply valve 25, the second pressure control valve 27, the manifold 28 and the liquid inlet control valve 29 are connected to form a low-pressure liquid circuit.
[0067] After the first liquid supply valve 24 is opened, the liquid medium is discharged from the first liquid supply pipe 22 and the liquid pressure is regulated to the first high-pressure threshold value through the first pressure control valve 26. After the liquid medium is converged through the manifold 28, the liquid inlet control valve 29 is opened to inject the liquid medium into the connecting cavity 111, and finally the pressure in the test chamber 122 reaches the first high-pressure threshold value, thereby forming a liquid high-pressure test state; correspondingly, after the second liquid supply valve 25 is opened, the liquid medium is discharged from the second liquid supply pipe 23 and the liquid pressure is regulated to the second high-pressure threshold value through the second pressure control valve 27. After the liquid medium is converged through the manifold 28, the liquid inlet control valve 29 is opened to inject the liquid medium into the connecting cavity 111, and finally the pressure in the test chamber 122 reaches the first low-pressure threshold value, thereby forming a liquid low-pressure test state.
[0068] The return liquid circuit includes: a return liquid pipe 210, one end of which is connected to the bottom of the base 11 and communicates with the communication chamber 111, and the other end is connected to the liquid supply module 21; and a return liquid control valve 211 connected to the return liquid pipe 210, which is used to control the flow of the return liquid pipe 210. After the test of the liquid medium is completed, the return liquid control pipe is opened, and the liquid medium in the test chamber 122 and the communication chamber 111 can flow back to the liquid supply module 21 through the return liquid pipe 210.
[0069] Furthermore, it also includes: a liquid adding funnel 50, which is connected to the liquid supply module 21 through a liquid adding pipe 51 and is used to add liquid medium to the liquid supply module 21; and a liquid adding control valve 52, which is connected to the liquid adding pipe 51 and is used to control the on and off of the liquid circuit; the liquid adding funnel 50 is fixed to the frame, and a protective cover is hinged on the frame, which is used to cover the top of the liquid adding funnel 50 to prevent dust, impurities, etc. from entering the liquid supply module 21 and causing pipeline blockage. When the liquid medium in the liquid supply module 21 is reduced, the liquid medium can be added to the liquid adding funnel 50, and the liquid medium can be added to the liquid supply module 21 after the liquid adding control valve 52 is opened, so as to ensure that the test process can be carried out continuously.
[0070] At the same time, a liquid receiving tray 60 is also provided below the test mold 10. The test mold 10 is fixed to the liquid receiving tray 60 by a number of support columns arranged at the bottom thereof. The liquid receiving tray 60 is used to receive the liquid medium leaked from the test mold 10, and a drain pipe 61 is provided at the bottom of the liquid receiving pipe. A drain hole is opened on the liquid receiving tray 60, and the drain pipe 61 is connected to the drain hole. A through sleeve is also provided on the liquid receiving tray 60. The height of the sleeve is flush with the edge of the liquid receiving tray 60. The sleeve is used for the return liquid pipe 210 to pass through for pipeline layout. When the test is completed and the circuit board is taken out, some liquid medium usually remains in the test chamber 122. At this time, this part of the liquid medium can be received by the liquid receiving tray 60 and then discharged through the drain pipe 61, thereby reducing the liquid medium pollution setting.
[0071] The air pressure testing unit 30 includes: a high-pressure air source 31, connected to the air inlet 113 through a first air supply pipe, and used to inject gaseous medium into the test chamber 122 to a second high-pressure threshold; a high-pressure air control valve 32, connected to the first air supply pipe for controlling the on-off of the air circuit; a low-pressure air source 33, connected to the air inlet 113 through a second air supply pipe, and used to inject gaseous medium into the test chamber 122 to a second low-pressure threshold; a low-pressure air control valve 34, connected to the second air supply pipe for controlling the on-off of the air circuit; and a relief valve 35 connected to the first air supply pipe or the second air supply pipe, used to relieve the air pressure in the test chamber 122.
[0072] The gas medium can be, for example, air, nitrogen, helium, etc. The high-pressure gas source 31 and the low-pressure gas source 33 are respectively used to control the discharge of high-pressure gas or low-pressure gas. Of course, in some embodiments, the high-pressure gas source 31 and the low-pressure gas source 33 can also use the same gas source, and then control the high or low pressure of the gas by controlling the gas generation amount.
[0073] After the high-pressure gas source 31 is started, the high-pressure gas control valve 32 is opened to inject gas medium into the test chamber 122, thereby realizing the gas high-pressure test; after the corresponding low-pressure gas source 33 is started, the low-pressure gas control valve 34 is opened to inject gas medium into the test chamber 122, thereby realizing the gas low-pressure test, and the air pressure in the test chamber 122 can be released through the air release valve 35 after the gas test is completed, so as to realize the next mode of testing.
[0074] The control device 40 is used to control the start and stop of the liquid supply module 21, and the on and off control of various valves. The control device 40 may include, for example, a microcontroller unit (MCU), a central processing unit (CPU), a microprocessor (Microprocessor), a digital signal processor (DSP), a programmable controller, a programmable logic device (PLD) or other similar devices or a combination of these devices, and the present invention is not limited. In addition, in some embodiments, the various functions of the control device 40 can be implemented by multiple coding programs, which are stored in a storage medium and executed by the control device 40. Alternatively, in some embodiments, the various functions of the control device 40 can be implemented by one or more circuits, and the present invention does not limit the implementation of the various functions of the control device 40 by software or hardware.
[0075] The control device 40 controls the hydraulic test unit 20 and the air pressure test unit 30 to perform hydraulic tests or air pressure tests in the order of patrol and / or cross-intervals, wherein the hydraulic test includes: a first test mode for performing a high-pressure test at a first high-pressure threshold for a first predetermined time, and a second test mode for performing a low-pressure test at a first low-pressure threshold for a second predetermined time, and the air pressure test includes: a third test mode for performing a high-pressure test at a second high-pressure threshold for a third predetermined time, and a fourth test mode for performing a low-pressure test at a second low-pressure threshold for a fourth predetermined time.
[0076] It should be noted that the order of patrol refers to the hydraulic test and the air pressure test being cyclically performed in the order of the first test mode, the second test mode, the third test mode and the fourth test mode, and the order of cross-interval refers to the hydraulic test and the air pressure test being cyclically performed in the order of the first test mode, the third test mode, the second test mode, the fourth test mode, or in the order of the fourth test mode, the second test mode, the third test mode, the first test mode, etc. Of course, it is also possible to first perform several rounds of cyclic tests in the order of patrol, and then perform several rounds of cyclic tests in the order of cross-intervals, and so on. In this embodiment, it is preferred to perform the tests in the order of cross-detection, and after the first test mode and the second test mode are completed, the liquid medium in the test chamber 122 must be emptied before performing the test of the next mode, and in the third test mode and the fourth test mode, the gas medium in the test chamber 122 must be depressurized to the normal air pressure before performing the test of the next mode.
[0077] The first high pressure threshold, the first low pressure threshold, the second high pressure threshold, the second low pressure threshold, the first predetermined time length, the second predetermined time length, the third predetermined time length and the fourth predetermined time length can all be set according to actual needs. Usually, for ease of control, the first predetermined time length, the second predetermined time length, the third predetermined time length and the fourth predetermined time length can be set to the same.
[0078] In order to facilitate control operations, the control device 40 is usually also connected to a human-machine interaction module such as a touch screen and an operation switch, and the control device 40 can also be connected to an alarm device such as a three-color light and an audible and visual alarm to provide an alarm prompt when a device fails.
[0079] During testing, the circuit boards to be tested are placed in each test chamber 122 respectively, and then the test mold 10 is sealed to ensure that the test chamber 122 can withstand sufficient pressure. Subsequently, the control device 40 controls the hydraulic test unit 20 and the air pressure test unit 30 to perform tests in different modes. The various modes can be performed in the order of patrol or cross interval, or patrol first and then cross interval, or cross interval first and then patrol. When switching between modes, it is necessary to first drain the liquid medium or gas medium therein, and then perform the test of the next mode, so as to minimize the mutual interference of each mode, thereby controlling the test cycle of different modes, and realizing continuous cycle testing to meet different testing requirements.
[0080] A second aspect of an embodiment of the present invention provides a method for cyclic voltage withstand testing of an electronic circuit board. The method is implemented based on the testing system as described in the first aspect, and includes:
[0081] S100, after placing the circuit board to be tested into each test chamber 122, the test mold 10 is sealed, that is, the circuit board to be tested is first placed in the test chamber 122, and then the sealing cover 13 is locked and fixed with the pressure template 12, so that the circuit board to be tested is sealed in the test chamber 122.
[0082] S200, control the hydraulic test unit 20 and the air pressure test unit 30 to inject liquid medium or gas medium into the test chamber 122, and implement hydraulic test or air pressure test within a corresponding predetermined time period in the order of patrol and / or cross interval.
[0083] Among them, the hydraulic test includes: a first test mode for performing a high-pressure test with a first high-pressure threshold for a first predetermined time, and a second test mode for performing a low-pressure test with a first low-pressure threshold for a second predetermined time. The air pressure test includes: a third test mode for performing a high-pressure test with a second high-pressure threshold for a third predetermined time, and a fourth test mode for performing a low-pressure test with a second low-pressure threshold for a fourth predetermined time.
[0084] The order of patrolling refers to the hydraulic test and the air pressure test being cycled in the order of the first test mode, the second test mode, the third test mode and the fourth test mode, and the order of cross-interval refers to the hydraulic test and the air pressure test being cycled in the order of the first test mode, the third test mode, the second test mode, the fourth test mode or in the order of the fourth test mode, the second test mode, the third test mode, the first test mode, etc. Of course, it is also possible to first cycle the test for several rounds in the order of patrolling, and then cycle the test for several rounds in the order of cross-interval, and so on. In this embodiment, it is preferred to test in the order of cross-detection, and after the first test mode and the second test mode are completed, the liquid medium in the test chamber 122 must be emptied before the test of the next mode is performed, and in the third test mode and the fourth test mode, the gas medium in the test chamber 122 must be depressurized to the normal air pressure before the test of the next mode is performed.
[0085] By controlling the hydraulic test unit 20 and the air pressure test unit 30 to perform tests in different modes, various modes can be performed in the order of patrol or cross interval, or patrol first and then cross interval, or cross interval first and then patrol. When switching between modes, it is necessary to first drain the liquid medium or gas medium therein and then perform the test of the next mode, so as to minimize the mutual interference of each mode, thereby controlling the test cycle of different modes and realizing continuous cyclic testing to meet different testing requirements.
[0086] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. An electronic circuit board cyclic withstand voltage test system, It is characterized in that include: A test mold, wherein the test mold has a plurality of test chambers for sealing and containing circuit boards to be tested; A hydraulic test unit, used for injecting or discharging a liquid medium into the test chamber to form a first high pressure threshold or a first low pressure threshold to implement a hydraulic test; A gas pressure test unit, used for injecting or exhausting gaseous medium into the test chamber to form a second high pressure threshold or a second low pressure threshold to implement a gas pressure test; and A control device is used to control the hydraulic test unit and the air pressure test unit to implement hydraulic testing or air pressure testing within a corresponding predetermined time period in the order of patrol and / or cross intervals, wherein the hydraulic test includes: a first test mode for performing a high-pressure test at the first high-pressure threshold for a first predetermined time period, and a second test mode for performing a low-pressure test at the first low-pressure threshold for a second predetermined time period, and the air pressure test includes: a third test mode for performing a high-pressure test at the second high-pressure threshold for a third predetermined time period, and a fourth test mode for performing a low-pressure test at the second low-pressure threshold for a fourth predetermined time period.
2. The electronic circuit board cyclic withstand voltage test system according to claim 1, It is characterized in that The test mold comprises: A base, wherein a communicating cavity for liquid medium or gas medium to flow is provided in the base, and a liquid inlet and a gas inlet are provided on the top of the base; A plurality of pressure-bearing templates sealedly connected to the surface of the base, the pressure-bearing templates are provided with a plurality of flow openings communicating with the connecting cavity, and the test chamber is formed in the pressure-bearing templates; and, A plurality of sealing covers are used to cover and seal each of the pressure-bearing templates.
3. The electronic circuit board cyclic withstand voltage test system according to claim 2, It is characterized in that The pressure-bearing templates are symmetrically arranged on both sides of the base.
4. The electronic circuit board cyclic withstand voltage test system according to claim 2 or 3, It is characterized in that The hydraulic test unit comprises: A liquid supply module, used for storing and providing liquid medium; a high-pressure liquid circuit, used for injecting a liquid medium into the test chamber and maintaining the test chamber at a first high-pressure threshold for a first predetermined period of time; a low-pressure liquid circuit, used for injecting a liquid medium into the test chamber and maintaining the test chamber at a first low-pressure threshold for a second predetermined period of time; and The reflux liquid circuit is used to discharge the liquid medium in the test chamber and return it to the liquid supply module to achieve pressure relief.
5. The electronic circuit board cyclic withstand voltage test system according to claim 4, It is characterized in that The liquid supply module is connected with a first liquid supply pipe and a second liquid supply pipe for outputting liquid medium, the first liquid supply pipe and the second liquid supply pipe are respectively connected with a first liquid supply valve and a second liquid supply valve to control the on-off of the liquid path, the first liquid supply pipe is connected with a first pressure control valve for controlling the liquid medium to reach a first high pressure threshold, and the second liquid supply pipe is connected with a second pressure control valve for controlling the liquid medium to reach a first low pressure threshold; The ends of the first liquid supply pipe and the second liquid supply pipe are connected to a manifold through a three-way joint, the manifold is connected to the liquid inlet to inject liquid into the communication cavity, and the manifold is connected to a liquid inlet control valve; The first liquid supply pipe, the first liquid supply valve, the first pressure control valve, the manifold and the liquid inlet control valve are connected to form the high-pressure liquid circuit; The second liquid supply pipe, the second liquid supply valve, the second pressure control valve, the manifold and the liquid inlet control valve are connected to form the low-pressure liquid circuit.
6. The electronic circuit board cyclic withstand voltage test system according to claim 4, It is characterized in that The reflux liquid path comprises: a liquid return pipe, one end of which is connected to the bottom of the base and communicates with the communicating cavity, and the other end of which is connected to the liquid supply module; and The liquid return control valve connected to the liquid return pipe is used to control the liquid flow interruption of the liquid return pipe.
7. The electronic circuit board cyclic withstand voltage test system according to claim 1, It is characterized in that The air pressure testing unit comprises: A high-pressure gas source, connected to the gas inlet through a first gas supply pipe, and used for injecting gas medium into the test chamber to a second high-pressure threshold; A high-pressure gas control valve connected to the first gas supply pipe for controlling the on-off of the gas circuit; A low-pressure gas source, connected to the gas inlet through a second gas supply pipe, and used for injecting gaseous medium into the test chamber to a second low-pressure threshold; A low-pressure air control valve connected to the second air supply pipe for controlling the on-off of the air circuit; and The air relief valve connected to the first air supply pipe or the second air supply pipe is used to release the air pressure in the test chamber.
8. The electronic circuit board cyclic withstand voltage test system according to claim 4, It is characterized in that Also includes: a liquid adding funnel, the liquid adding funnel being connected to the liquid supply module via a liquid adding tube and being used for adding liquid medium to the liquid supply module; and The liquid adding control valve is connected to the liquid adding pipe and is used to control the on-off of the liquid circuit.
9. The electronic circuit board cyclic withstand voltage test system according to claim 1, It is characterized in that A liquid receiving tray is also provided below the test mold for receiving the liquid medium leaked from the test mold, and a liquid drain pipe is provided at the bottom of the liquid receiving pipe.
10. A method for testing the cyclic withstand voltage of an electronic circuit board. It is characterized in that The method is implemented based on the test system according to any one of claims 1 to 9, comprising: After placing the circuit board to be tested into each of the test chambers, the test mold is sealed; Controlling the hydraulic test unit and the pneumatic test unit to inject liquid medium or gas medium into the test chamber, and implementing hydraulic test or pneumatic test within a corresponding predetermined time period in a patrol and / or cross-interval sequence; Among them, the hydraulic test includes: a first test mode for performing a high-pressure test with the first high-pressure threshold for a first predetermined time, and a second test mode for performing a low-pressure test with the first low-pressure threshold for a second predetermined time; the air pressure test includes: a third test mode for performing a high-pressure test with the second high-pressure threshold for a third predetermined time, and a fourth test mode for performing a low-pressure test with the second low-pressure threshold for a fourth predetermined time.