MES-based production line cooperative control system and control method

By setting up a collaborative control system on the production line, automatically monitoring and analyzing the workpiece operation parameters, and adjusting the cache delivery parameters of the accumulated conveying line, the problem of mismatch in material flow speed is solved, the production capacity and material distribution efficiency are improved, and the accuracy is achieved synchronous docking of workpieces.

CN119087924AInactive Publication Date: 2024-12-06SUZHOU WEIYUANSHI INFORMATION TECHNOLOGY CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411035523.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the existing accumulation conveying line handles material flow speeds that do not match, all upstream workpieces need to be cached before putting them out, which affects production capacity and material distribution efficiency.

Method used

A production line collaborative control system based on MES was designed. By setting up monitoring, defect handling, collaborative analysis, compensation adjustment and conveying control modules on the processing node and the accumulation conveying line, it automatically monitors and analyzes the workpiece operation parameters, calculates and adjusts them. The cache delivery parameters of the accumulated delivery conveyor line realize automatic matching and grouping of workpieces and synchronous delivery.

Benefits of technology

The number of workpiece cache and delivery operations of the accumulated conveyor line is reduced, the production capacity and material distribution efficiency of the production line are improved, and precise collaborative management and workpiece synchronization docking are realized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119087924A_ABST
    Figure CN119087924A_ABST
Patent Text Reader

Abstract

The invention discloses an MES-based production line cooperative control system and control method, and relates to the technical field of production line cooperative control systems, the MES-based production line cooperative control system comprises a processing monitoring unit which comprises a plurality of monitoring modules which are respectively arranged on a processing node and an accumulation and free conveyor line, the collecting module is used for collecting operation parameters of an upstream machining node and a downstream machining node of the power and free conveying line and conveying parameters of the power and free conveying line, and the collaborative analysis module is used for calculating, analyzing and obtaining cache putting adjustment parameters of the power and free conveying line based on the obtained operation parameters of the machining nodes and the conveying parameters of the power and free conveying line. According to the method, all the workpieces put in the upstream processing nodes do not need to be cached, all the workpieces are put on the basis of the operation parameters of the downstream processing nodes, the number of times of workpiece caching and putting operation of the power and free conveying line is reduced, the production capacity of the production line and the material distribution efficiency are improved, and precise collaborative management workpiece synchronous butt joint is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production line collaborative control systems, and specifically to a production line collaborative control system and a control method based on MES. Background Art

[0002] As is known, a production line is an industrial system that completes the manufacturing process of a product through serially connected processes and machines, thereby improving production efficiency and reducing production costs. At present, adjacent processing nodes on the production line are transported and connected through accumulation and release conveyor lines. Accumulation and release conveyor lines are a commonly used material conveying device and are widely used in production lines in various industries, especially in scenarios where a large amount of material needs to be processed and the material flow speeds do not match. The main function of the accumulation and release conveyor line is to realize the temporary storage and delivery of materials during the material transportation process, that is, when the processing speeds of the upstream processing node and the downstream processing node of the conveyor line do not match, when the workpiece is delivered to the accumulation and release conveyor line after being processed by the upstream processing node, the workpiece is cached by the cache unit on the accumulation and release conveyor line, and then the workpiece is delivered through the delivery unit on the accumulation and release conveyor line based on the processing speed of the downstream processing node, so as to solve the problem of mismatched material flow speeds on the production line and improve the production efficiency of the production line.

[0003] Although the speed mismatch problem between the upstream and downstream processing nodes of the production line can be solved by the accumulation and release conveyor line, it is necessary to cache all the workpieces delivered upstream and then deliver them one by one based on the downstream processing speed adaptation, which affects the production capacity and the efficiency of material distribution. Summary of the invention

[0004] The purpose of the present invention is to provide a production line collaborative control system and control method based on MES to solve the above-mentioned deficiencies in the prior art.

[0005] In order to achieve the above object, the present invention provides the following technical solution: a production line collaborative control system based on MES, wherein the production line includes at least two processing nodes, and the workpiece conveying and docking processing is realized between the two processing nodes through a power-on-power conveyor line, and further includes:

[0006] A processing monitoring unit, which includes a plurality of monitoring modules respectively arranged at processing nodes and accumulation-and-release conveyor lines, to collect operating parameters of upstream processing nodes and downstream processing nodes of the accumulation-and-release conveyor lines and conveying parameters of the accumulation-and-release conveyor lines;

[0007] A defect processing unit is arranged on the accumulation and release conveyor line to automatically monitor the workpieces processed by the upstream processing node, automatically remove the defective workpieces and collect the removal parameters;

[0008] A collaborative analysis module, which calculates and analyzes the cache delivery adjustment parameters of the power-and-free conveyor line based on the acquired processing node operation parameters and the conveying parameters of the power-and-free conveyor line;

[0009] A compensation adjustment unit, which is used to collect the culling parameters to adaptively correct and adjust the cache delivery adjustment parameters, and obtain the cache delivery adjustment correction parameters;

[0010] The conveying control module generates a cache delivery control instruction based on the cache delivery adjustment parameters of the accumulation and release conveyor line, adjusts the cache delivery control instruction based on the rejection parameters, and then automatically controls the accumulation and release conveyor line through the cache delivery control instruction.

[0011] As a further description of the above technical solution: Based on the obtained operating parameters of the processing nodes and the conveying parameters of the accumulation and release conveyor line, the adjustment parameters of the accumulation and release conveyor line are calculated and analyzed to obtain the specific adjustment parameters of the accumulation and release conveyor line:

[0012] The workpiece spacing L1 placed on the accumulation and release conveyor line is calculated based on the operating parameters of the upstream processing node. The calculation method of the workpiece spacing L1 is: L1 = t1*V S , where t1 represents the time it takes for the upstream processing node to process a workpiece, V S is the conveying speed of the power-and-free conveyor line;

[0013] The workpiece spacing L2 of the docking accumulation conveyor line is calculated based on the operating parameters of the downstream processing node. The calculation method of the workpiece spacing L2 is: L2 = t2*V S , where t2 represents the time it takes for the downstream processing node to process a workpiece;

[0014] Calculate the overlap distance L between the delivery distance and the target distance workpiece secondary position on the accumulation and release conveyor line based on the workpiece distance L1 and workpiece distance L2 s , where L s is the least common multiple of L1 and L2;

[0015] Calculate the length of the secondary overlap spacing Ls corresponding to the number of workpieces J1 placed at the upstream processing node, and the number of workpieces J2 docked at the downstream processing node;

[0016] The buffer placement parameters of the accumulation and release conveyor line are calculated based on the number of workpieces J1 placed by the upstream processing node and the number of workpieces J2 docked by the downstream processing node.

[0017] As a further description of the above technical solution: the calculation formula for the number of workpieces J1 delivered by the upstream processing node and the number of workpieces J2 docked by the downstream processing node is:

[0018]

[0019] As a further description of the above technical solution: the calculation of the buffer placement parameters of the accumulation and release conveyor line based on the number of workpieces J1 placed by the upstream processing node and the number of workpieces J2 targeted for docking by the downstream processing node is specifically:

[0020] Calculate the number of workpieces J1 placed by the upstream processing node and the number of workpieces cached in the accumulation and release conveyor line H;

[0021] The calculation formula of the workpiece cache quantity H is: H = J1-1;

[0022] Calculate the number of workpieces J2 docked at the downstream processing node and the number of workpieces F put into the accumulation conveyor line;

[0023] The calculation formula for the number of workpieces F is: F=J2-1.

[0024] As a further description of the above technical solution: the defect processing unit includes a monitoring and analysis module and a rejection module;

[0025] The monitoring and analysis module is used to collect images of workpieces transported on the accumulation and release conveyor line and perform defect analysis, and transmit signals to the rejection module when defects are detected in the workpieces;

[0026] The rejection module is used to automatically reject defective workpieces and collect the rejection parameters of the current defective workpieces, wherein the rejection parameters of the defective workpieces are the conveying arrangement data of the defective workpieces on the accumulation and release conveyor line and are recorded as I.

[0027] As a further description of the above technical solution: the acquisition of the culling parameters and the associated adaptive correction and adjustment of the cache delivery adjustment parameters are specifically:

[0028] Based on the defective workpiece conveying arrangement data I on the accumulation and release conveyor line, the number of groups n of the current defective workpiece placed at the upstream processing node and the number of its arrangement bits m in the placed group number n are calculated, where m is The remainder of divisibility.

[0029] As a further description of the above technical solution: based on the number of arrangement bits m, the correction value of the cache quantity and the correction value of the workpiece delivery quantity are analyzed and calculated as follows:

[0030] When m=1, the correction value of the cache quantity H corresponding to the nth group of workpieces J1 placed by the upstream processing node is Hx=H; the correction value of the workpiece placement quantity F of the accumulation type conveyor line corresponding to the group of workpieces J2 docked by the downstream processing node is Fx=F+1;

[0031] When m≠1, the buffer quantity correction value Hx=H-1 corresponding to the nth group of workpieces J1 placed by the upstream processing node, and the correction value F of the workpiece placement quantity F of the accumulation and release conveyor line corresponding to a group of workpieces J2 docked by the downstream processing node is Fx=F.

[0032] As a further description of the above technical solution: generating a cache delivery control instruction based on the cache delivery adjustment parameter of the accumulation and release conveyor line, and adjusting the cache delivery control instruction based on the rejection parameter is specifically as follows:

[0033] Generate a set of cache timing instruction data sets Uh and delivery timing instruction data sets Uf for workpieces based on the cache delivery adjustment parameters of the accumulation and release conveyor line;

[0034] Cache sequential instruction data set Uh: Uh∈(2t1, 3t1, ....Ht1);

[0035] Release timing instruction data set Uf: Uf∈(2t2, 3t2, ....Ft2);

[0036] Based on the number of arrangement bits m, the cache timing instruction data set and the delivery timing instruction data set are adjusted.

[0037] When m=1, the delivery timing instruction data set Uf: Uf∈(2t2, 3t2, ....Ft2) is modified to add a t2 cache timing instruction, that is, the revised delivery timing instruction data set Ufx∈(t2, 2t2, 3t2, ....Ft2);

[0038] When m≠1, the cache timing instruction data set Uh: Uh∈(2t1, 3t1, ....Ht1) is modified to remove a delivery timing instruction of mt1;

[0039] When m=0, the cache timing instruction data set Uh: Uh∈(2t1, 3t1, ....Ht1) is modified to remove a delivery timing instruction of Ht1.

[0040] As a further description of the above technical solution: it also includes a production line status display platform, which calculates and displays the current status parameters of the accumulation and release conveyor line based on the cache release adjustment correction parameters of the accumulation and release conveyor line and the load data of the accumulation and release conveyor line.

[0041] A production line collaborative control method based on MES, comprising the following steps:

[0042] Collect the operating parameters of the upstream processing nodes and downstream processing nodes of the power-and-free conveyor line and the conveying parameters of the power-and-free conveyor line;

[0043] Automatically monitor the workpieces processed by the upstream processing nodes, automatically remove defective workpieces and collect the removal parameters;

[0044] Based on the obtained operating parameters of the processing nodes and the conveying parameters of the power-and-free conveyor line, the cache delivery adjustment parameters of the power-and-free conveyor line are calculated and analyzed to obtain;

[0045] Collect and eliminate parameters to adaptively correct and adjust cache delivery adjustment parameters, and obtain cache delivery adjustment correction parameters;

[0046] A cache delivery control instruction is generated based on the cache delivery adjustment parameters of the accumulation and release conveyor line, and the cache delivery control instruction is adjusted based on the rejection parameters, and then the accumulation and release conveyor line is automatically controlled through the cache delivery control instruction.

[0047] In the above technical solution, the present invention provides a production line collaborative control system and control method based on MES, which have the following beneficial effects:

[0048] The MES-based production line collaborative control system and control method realize automatic matching of workpiece grouping based on the conveying parameters of the accumulation and release conveyor line based on the operating parameters of the upstream processing node and the downstream processing node, and determine the workpiece cache quantity and workpiece release quantity of the accumulation and release conveyor line based on a group of situations for the workpiece release situation of the upstream processing node and the workpiece docking situation of the downstream processing node. There is no need to cache all the workpieces released by the upstream processing node and release all the workpieces based on the operating parameters of the downstream processing node, which reduces the number of workpiece caching and release operations of the accumulation and release conveyor line, improves the production capacity of the production line and the material distribution efficiency, and realizes precise collaborative management of workpiece synchronous docking. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0050] Figure 1 A schematic diagram of a production line collaborative control system based on MES is provided for an embodiment of the present invention;

[0051] Figure 2 A schematic diagram of a production line collaborative control method based on MES provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0052] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0053] See also Figure 1 The embodiment of the present invention provides a technical solution: a production line collaborative control system based on MES, wherein the production line includes at least two processing nodes, and the two processing nodes are connected by a power-on-power conveyor line to realize workpiece transportation and docking processing, and the power-on-power conveyor line has a cache operation unit and a delivery operation unit, the cache operation unit is used to cache the workpieces transported on the power-on-power conveyor line, and the delivery operation unit is used to deliver the cached workpieces to the power-on-power conveyor line, and also includes:

[0054] A processing monitoring unit, which includes a plurality of monitoring modules respectively arranged at processing nodes and the accumulation and release type conveyor line, collects the operation parameters of the upstream processing nodes and the downstream processing nodes of the accumulation and release type conveyor line and the conveying parameters of the accumulation and release type conveyor line; wherein the operation parameters of the upstream processing node and the downstream processing node are the time for the upstream processing node to process a workpiece and the time for the downstream processing node to process a workpiece, and the conveying parameter of the accumulation and release type conveyor line is the conveying speed of the accumulation and release type conveyor line;

[0055] Furthermore, a defect processing unit is provided on the accumulation and release conveyor line for automatically monitoring the workpieces processed by the upstream processing node, automatically removing the defective workpieces and collecting the removal parameters;

[0056] The defect processing unit includes a monitoring and analysis module and a rejection module;

[0057] The monitoring and analysis module is used to collect images of workpieces transported on the accumulation and release conveyor line and perform defect analysis, and transmit signals to the rejection module when defects are detected in the workpieces;

[0058] The rejection module is used to automatically reject defective workpieces and collect the rejection parameters of the current defective workpieces, wherein the rejection parameters of the defective workpieces are the conveying arrangement data of the defective workpieces on the accumulation and release conveyor line, and are recorded as I. The defective workpieces after processing at the upstream processing node are automatically rejected by the cutting processing unit to prevent them from entering the subsequent processing flow and affecting the processing efficiency.

[0059] Furthermore, a collaborative analysis module calculates and analyzes the cache delivery adjustment parameters of the power-and-free conveyor line based on the acquired processing node operation parameters and the conveying parameters of the power-and-free conveyor line;

[0060] The specific adjustment parameters of the accumulation and release conveyor line obtained by calculation and analysis are as follows:

[0061] The workpiece spacing L1 placed on the accumulation and release conveyor line is calculated based on the operating parameters of the upstream processing node. The calculation method of the workpiece spacing L1 is: L1 = t1*V S , where t1 represents the time it takes for the upstream processing node to process a workpiece, V S is the conveying speed of the power-and-free conveyor line;

[0062] The workpiece spacing L2 of the docking accumulation conveyor line is calculated based on the operating parameters of the downstream processing node. The calculation method of the workpiece spacing L2 is: L2 = t2*V S , where t2 represents the time it takes for the downstream processing node to process a workpiece, V S is the conveying speed of the power-and-free conveyor line;

[0063] Calculate the overlap distance L between the delivery distance and the target distance workpiece secondary position on the accumulation and release conveyor line based on the workpiece distance L1 and workpiece distance L2 s , where L s is the least common multiple of L1 and L2;

[0064] Calculate the length of the secondary overlap spacing Ls corresponding to the number of workpieces J1 placed at the upstream processing node, and the number of workpieces J2 docked at the downstream processing node;

[0065] The calculation formula for the number of workpieces J1 delivered by the upstream processing node and the number of workpieces J2 docked by the downstream processing node is:

[0066]

[0067] The buffer placement parameters of the accumulation and release conveyor line are calculated based on the number of workpieces J1 placed by the upstream processing node and the number of workpieces J2 docked by the downstream processing node.

[0068] The specific parameters for calculating the buffer placement of the accumulation type conveyor line based on the number of workpieces J1 placed at the upstream processing node and the number of workpieces J2 targeted for docking at the downstream processing node are:

[0069] Calculate the workpiece cache quantity H of the accumulation type conveyor line corresponding to a group of workpiece quantity J1 placed by the upstream processing node; the calculation formula of the workpiece cache quantity H is: H = J1-1;

[0070] Calculate the number of workpieces J2 connected to the downstream processing node and the number of workpieces F placed on the accumulation and release conveyor line; the calculation formula for the number of workpieces F is: F = J2-1.

[0071] Automatically match workpiece grouping by associating the conveying parameters of the accumulation and release conveyor line based on the operating parameters of the upstream processing node and the downstream processing node, and determine the workpiece cache quantity and workpiece release quantity of the accumulation and release conveyor line based on a group of situations, such as the workpiece release situation of the upstream processing node and the workpiece docking situation of the downstream processing node. There is no need to cache all the workpieces released by the upstream processing node and release all the workpieces based on the operating parameters of the downstream processing node, which reduces the number of workpiece caching and release operations of the accumulation and release conveyor line, improves the production capacity of the production line and the material distribution efficiency, and realizes precise collaborative management of workpiece synchronous docking.

[0072] A compensation adjustment unit, which is used to collect the culling parameters to adaptively correct and adjust the cache delivery adjustment parameters, and obtain the cache delivery adjustment correction parameters;

[0073] The specific steps of collecting the culling parameters and associating the cache delivery adjustment parameters for adaptive correction are as follows:

[0074] Based on the defective workpiece conveying arrangement data I on the accumulation and release conveyor line, the number of groups n of the current defective workpiece placed at the upstream processing node and the number of its arrangement bits m in the placed group number n are calculated, where m is The remainder of divisibility.

[0075] The calculation of the buffer quantity correction value and the workpiece delivery quantity correction value based on the arrangement number m is as follows:

[0076] When m=1, the correction value of the cache quantity H of the accumulation and release conveyor line corresponding to the nth group of workpieces J1 placed by the upstream processing node is Hx=H; the correction value of the workpiece placement quantity F of the accumulation and release conveyor line corresponding to the group of workpieces J2 docked by the downstream processing node is Fx=F+1;

[0077] When m≠1, the buffer quantity correction value Hx=H-1 corresponding to the nth group of workpieces J1 placed by the upstream processing node, and the correction value F of the workpiece placement quantity F of the accumulation and release conveyor line corresponding to a group of workpieces J2 docked by the downstream processing node is Fx=F.

[0078] The number of workpieces put into the power-and-free conveyor line and the number of buffers of the power-and-free conveyor line can be adaptively adjusted according to the rejection parameters of the defect processing unit, so as to accurately understand and display the current buffer status of the power-and-free conveyor line, which is convenient for the staff to make adjustments according to needs.

[0079] Furthermore, a conveying control module generates a cache delivery control instruction based on the cache delivery adjustment parameters of the accumulation and release conveyor line, adjusts the cache delivery control instruction based on the rejection parameters, and then automatically controls the accumulation and release conveyor line through the cache delivery control instruction.

[0080] Generate a cache delivery control instruction based on the cache delivery adjustment parameters of the accumulation and release conveyor line, and adjust the cache delivery control instruction based on the rejection parameters as follows:

[0081] Generate a set of cache timing instruction data sets Uh and delivery timing instruction data sets Uf for workpieces based on the cache delivery adjustment parameters of the accumulation and release conveyor line;

[0082] Cache sequential instruction data set Uh: Uh∈(2t1, 3t1, ....Ht1);

[0083] Release timing instruction data set Uf: Uf∈(2t2, 3t2, ....Ft2);

[0084] Based on the number of arrangement bits m, the cache timing instruction data set and the delivery timing instruction data set are adjusted.

[0085] When m=1, the delivery timing instruction data set Uf: Uf∈(2t2, 3t2, ....Ft2) is modified to add a t2 cache timing instruction, that is, the revised delivery timing instruction data set Ufx∈(t2, 2t2, 3t2, ....Ft2);

[0086] When m≠1, the cache timing instruction data set Uh: Uh∈(2t1, 3t1, ....Ht1) is modified to remove a delivery timing instruction of mt1;

[0087] When m=0, the cache timing instruction data set Uh: Uh∈(2t1, 3t1, ....Ht1) is corrected to remove the delivery timing instruction of Ht1. According to the rejection parameters of the defect processing unit, the workpiece cache timing instruction data set and delivery timing instruction data set of the accumulation and release conveyor line are adaptively corrected and adjusted to achieve adaptive correction and precise control to ensure the stability and timeliness of material supply.

[0088] It also includes a production line status display platform, which calculates and displays the current status parameters of the power-and-free conveyor line based on the cache release adjustment correction parameters of the power-and-free conveyor line and the load data of the power-and-free conveyor line.

[0089] See also Figure 2 The embodiment of the present invention provides another technical solution, a production line collaborative control method based on MES, comprising the following steps:

[0090] Collect the operating parameters of the upstream processing nodes and downstream processing nodes of the power-and-free conveyor line and the conveying parameters of the power-and-free conveyor line;

[0091] Automatically monitor the workpieces processed by the upstream processing nodes, automatically remove defective workpieces and collect the removal parameters;

[0092] Based on the obtained operating parameters of the processing nodes and the conveying parameters of the power-and-free conveyor line, the cache delivery adjustment parameters of the power-and-free conveyor line are calculated and analyzed to obtain;

[0093] Collect and eliminate parameters to adaptively correct and adjust cache delivery adjustment parameters, and obtain cache delivery adjustment correction parameters;

[0094] A cache delivery control instruction is generated based on the cache delivery adjustment parameters of the accumulation and release conveyor line, and the cache delivery control instruction is adjusted based on the rejection parameters, and then the accumulation and release conveyor line is automatically controlled through the cache delivery control instruction.

[0095] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A production line collaborative control system based on MES, wherein the production line includes at least two processing nodes, and the workpiece conveying and docking processing is realized by a power-and-release conveyor line between the two processing nodes. It is characterized in that Also includes: A processing monitoring unit, which includes a plurality of monitoring modules respectively arranged at processing nodes and accumulation-and-release conveyor lines, to collect operating parameters of upstream processing nodes and downstream processing nodes of the accumulation-and-release conveyor lines and conveying parameters of the accumulation-and-release conveyor lines; A defect processing unit is arranged on the accumulation and release conveyor line to automatically monitor the workpieces processed by the upstream processing node, automatically remove the defective workpieces and collect the removal parameters; A collaborative analysis module, which calculates and analyzes the cache delivery adjustment parameters of the power-and-free conveyor line based on the acquired processing node operation parameters and the conveying parameters of the power-and-free conveyor line; A compensation adjustment unit, which is used to collect the culling parameters to adaptively correct and adjust the cache delivery adjustment parameters, and obtain the cache delivery adjustment correction parameters; The conveying control module generates a cache delivery control instruction based on the cache delivery adjustment parameters of the accumulation and release conveying line, adjusts the cache delivery control instruction based on the rejection parameters, and then automatically controls the accumulation and release conveying line through the cache delivery control instruction.

2. According to the MES-based production line collaborative control system of claim 1, It is characterized in that Based on the obtained operating parameters of the processing nodes and the conveying parameters of the power-and-free conveyor line, the adjustment parameters of the power-and-free conveyor line are calculated and analyzed as follows: Calculate the workpiece spacing L placed on the accumulation and release conveyor line based on the operating parameters of the upstream processing node 1 ; Calculate the workpiece spacing L of the downstream processing node docking accumulation and release conveyor line based on the operating parameters of the downstream processing node 2 ; Based on workpiece distance L 1 And the workpiece distance L 2 Calculate the overlap distance L between the delivery distance and the target distance on the accumulation and release conveyor line s ; Calculate the length of the secondary overlap interval Ls corresponding to the number of workpieces J placed at the upstream processing node 1 , and the number of workpieces J corresponding to the downstream processing node docking 2 ; A set of workpiece quantity J based on the upstream processing node 1 And the number of workpieces J that are connected to the downstream processing node 2 Calculate buffer placement parameters for power-and-free conveyor lines.

3. According to the MES-based production line collaborative control system of claim 2, It is characterized in that The number of workpieces placed by the upstream processing node J 1 And the number of workpieces J that are connected to the downstream processing node 2 The calculation formula is:

4. According to the MES-based production line collaborative control system of claim 2, It is characterized in that The number of workpieces J placed based on the upstream processing node 1 And the number of workpieces J that are targeted for docking at the downstream processing node 2 The specific parameters for calculating the buffer placement of the power-and-free conveyor line are: Calculate the number of workpieces J placed by the upstream processing node 1 The workpiece buffer quantity H corresponding to the accumulation type conveyor line, where the calculation formula of the workpiece buffer quantity H is: H = J 1 -1; Calculate the number of workpieces J that are docked at the downstream processing node 2 The corresponding workpiece delivery quantity F of the accumulation and release conveyor line, where the calculation formula of the workpiece delivery quantity F is: F = J 2 -1.

5. According to the MES-based production line collaborative control system of claim 4, It is characterized in that The defect processing unit includes a monitoring and analysis module and a rejection module; The monitoring and analysis module is used to collect images of workpieces transported on the accumulation and release conveyor line and perform defect analysis, and transmit signals to the rejection module when defects are detected in the workpieces; The rejection module is used to automatically reject defective workpieces and collect the rejection parameters of the current defective workpieces, wherein the rejection parameters of the defective workpieces are the conveying arrangement data of the defective workpieces on the accumulation and release conveyor line and are recorded as I.

6. According to the MES-based production line collaborative control system of claim 5, It is characterized in that The collecting and eliminating parameters and the associated adaptive correction and adjustment of the cache delivery adjustment parameters are specifically as follows: Based on the defective workpiece conveying arrangement data I on the accumulation and release conveyor line, the number of groups n of the current defective workpiece placed at the upstream processing node and the number of its arrangement bits m in the placed group number n are calculated, where m is The remainder of ; Based on the number of arrangement digits m, the buffer quantity correction value and the workpiece delivery quantity correction value are analyzed and calculated.

7. According to the MES-based production line collaborative control system of claim 6, It is characterized in that The calculation of the buffer quantity correction value and the workpiece delivery quantity correction value based on the arrangement number m is as follows: When m=1, the number of n-th group of workpieces placed by the upstream processing node is J 1 The corresponding correction value of the cache quantity H is Hx = H; the number of workpieces connected to the downstream processing node J 2 The correction value of the number of workpieces F put into the corresponding accumulation type conveyor line is Fx=F+1; When m≠1, the number of n-th group of workpieces placed by the upstream processing node is J 1 The corresponding buffer quantity correction value Hx = H-1, the number of workpieces connected to the downstream processing node J 2 The correction value of the number of workpieces F placed on the accumulation and release conveyor line is Fx=F.

8. According to the MES-based production line collaborative control system of claim 6, It is characterized in that Generate a cache delivery control instruction based on the cache delivery adjustment parameters of the accumulation and release conveyor line, and adjust the cache delivery control instruction based on the rejection parameters as follows: Generate a set of cache timing instruction data sets Uh and delivery timing instruction data sets Uf for workpieces based on the cache delivery adjustment parameters of the accumulation and release conveyor line; Cache timing instruction data set Uh: Uh∈(2t 1 、3t 1 ,....Ht 1 ); The delivery time sequence instruction data set Uf: Uf∈(2t 2 、3t 2 ,....Ft 2 ); Based on the number of arrangement bits m, the cache timing instruction data set and the delivery timing instruction data set are adjusted. When m=1, for the delivery time sequence instruction data set Uf: Uf∈(2t 2 、3t 2 ,....Ft 2 ) to modify and add a t 2 Cache timing instructions, that is, the modified delivery timing instruction data set Ufx∈(t 2 , 2t 2 、3t 2 ,....Ft 2 ); When m≠1, for the cache sequential instruction data set Uh: Uh∈(2t 1 、3t 1 ,....Ht 1 ) to make corrections and remove one mt 1 The delivery timing instructions; When m=0, for the cache sequential instruction data set Uh: Uh∈(2t 1 、3t 1 ,....Ht 1 ) to make corrections and remove one Ht 1 The delivery timing instructions.

9. The MES-based production line collaborative control system according to claim 1, It is characterized in that It also includes a production line status display platform. The production line status display platform calculates and displays the current status parameters of the power-and-free conveyor line based on the cache placement adjustment correction parameters of the power-and-free conveyor line and the load data of the power-and-free conveyor line.

10. A production line collaborative control method based on MES, It is characterized in that The following steps are involved: Collect the operating parameters of the upstream processing nodes and downstream processing nodes of the power-and-free conveyor line and the conveying parameters of the power-and-free conveyor line; Automatically monitor the workpieces processed by the upstream processing nodes, automatically remove defective workpieces and collect the removal parameters; Based on the obtained operating parameters of the processing nodes and the conveying parameters of the power-and-free conveyor line, the cache delivery adjustment parameters of the power-and-free conveyor line are calculated and analyzed to obtain; Collect and eliminate parameters to adaptively correct and adjust cache delivery adjustment parameters, and obtain cache delivery adjustment correction parameters; A cache delivery control instruction is generated based on the cache delivery adjustment parameters of the accumulation and release conveyor line, and the cache delivery control instruction is adjusted based on the rejection parameters. Then, the accumulation and release conveyor line is automatically controlled through the cache delivery control instruction.