Cable crane working state identification method based on mass monitoring data
Through the cable machine working state identification method based on massive monitoring data, the cable machine operation mode and working state are identified, and the problem of cable machine monitoring data analysis in the existing technology is solved, and the accuracy of the cable machine efficiency and the reliability of the operating state is achieved. .
Patent Information
- Application Number
- CN202411201876.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-29
AI Technical Summary
The monitoring data obtained in the existing cable machine positioning monitoring system is relatively primitive, making it difficult to accurately analyze the operating efficiency of the cable machine, and pattern recognition technology is required to extract relevant information.
The cable machine working state recognition method based on massive monitoring data is adopted, including obtaining cable machine operation monitoring data, preprocessing, calculating three-dimensional characteristic change rate, determining trend status, single cycle division and identifying four working modes, and identifying them by matching identification parameters. The working status of the cable machine.
Effectively identifying the operating mode and working status of the cable machine provides a reliable basis for the analysis of the cable machine efficiency and improves the accuracy and safety of the operating efficiency of the cable machine.
Smart Images

Figure CN119089333A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of pattern recognition, and relates to a method for identifying the working state of a cable crane, and in particular to a method for identifying the working state of a cable crane based on massive monitoring data. Background Art
[0002] Cable crane is the main construction machinery in the pouring of concrete engineering of water conservancy projects. Because of its large load capacity and high transportation efficiency, it is one of the key construction equipment that affects the strength of concrete pouring, construction period and engineering quality. Therefore, in actual construction, people pay close attention to the working condition of cable crane and put forward higher requirements for its operation.
[0003] With the advancement of the practice of the theory of intelligent dam construction, a new direction has been pointed out for the refined control of the construction process, personnel and equipment, and engineering quality and safety. Information perception is the basis of intelligent dam construction, and the rapid, timely and accurate acquisition of the working status and operating efficiency of the cable crane is an important prerequisite for the safe operation and efficiency optimization of the cable crane. In order to grasp the actual operation of the cable crane, a monitoring system was jointly developed with the manufacturer and operator to achieve all-weather synchronous monitoring of the entire process of cable crane operation, with the characteristics of real-time, accuracy and high refresh rate. However, the monitoring data obtained in the current cable crane positioning monitoring system is relatively primitive, and the relevant data information required for the calculation of the cable crane operation efficiency needs to be analyzed and extracted. To this end, these monitoring data are identified and analyzed, and information mining is carried out to accurately calculate the efficiency of the cable crane and other related information. Pattern recognition is required. Summary of the invention
[0004] In order to solve the above-mentioned technical problems existing in the background technology, the present invention provides a cable crane operation mode recognition method based on massive cable crane operation monitoring data, which can effectively identify the cable crane operation mode and working status, and its recognition result provides a reliable basis for the efficiency analysis of the cable crane.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] A method for identifying the working state of a cable crane based on massive monitoring data, characterized in that: the method for identifying the working state of a cable crane based on massive monitoring data comprises the following steps:
[0007] 1) Obtain cable crane operation monitoring data;
[0008] 2) Preprocessing the cable crane operation monitoring data obtained in step 1);
[0009] 3) Calculate the change rate of the three-dimensional characteristics of the cable crane based on the preprocessed cable crane operation monitoring data;
[0010] 4) determining the trend state of the cable crane according to the rate of change of the three-dimensional characteristics of the cable crane obtained in step 3);
[0011] 5) using the trend state of the cable crane determined in step 4) to perform single-cycle division on the measured data of the cable crane;
[0012] 6) Match the identification parameters of the single cycle in step 5), and identify the four working modes of the cable crane according to the identification parameters.
[0013] Preferably, the specific implementation method of step 1) adopted by the present invention is: using SQL statements to extract required data from the database of the cable machine information monitoring system.
[0014] Preferably, the preprocessing in step 2) of the present invention is to delete time-duplicate data, delete erroneous data, verify and process coordinate data, convert the format of time data, and perform noise reduction on the cable crane operation monitoring data.
[0015] Preferably, the specific implementation method of step 3) adopted by the present invention is:
[0016] 3.1) obtaining the pre-processed cable crane operation monitoring data, wherein the pre-processed cable crane operation monitoring data includes the cable crane station number, the cable crane coordinates during data collection, the state duration, the collection time and the cable crane hoisting weight;
[0017] 3.2) extracting the three-dimensional features of the cable crane from the pre-processed cable crane operation monitoring data; the three-dimensional features of the cable crane include the cable crane hoisting weight and spatial coordinates;
[0018] 3.3) respectively calculating the change rates of the three-dimensional characteristics of the cable crane in step 3.2); the change rates of the three-dimensional characteristics of the cable crane include the change rate of the lifting weight, the change rate of the horizontal displacement and the change rate of the cable crane lifting depth.
[0019] Preferably, the method for calculating the hanging weight change rate in step 3.3) adopted by the present invention is:
[0020]
[0021] The calculation method of the horizontal displacement change rate is:
[0022]
[0023] The calculation method of the cable crane hoisting depth change rate is:
[0024]
[0025] in:
[0026] is the first-order difference value of the hoisting weight, that is, the rate of change of the hoisting weight;
[0027] W nis the hanging weight of the nth row;
[0028] W n+1 It is the weight of the n+1th row;
[0029] ΔW is the difference in lifting weight between the front and rear rows;
[0030] is the first-order difference of horizontal displacement, that is, the rate of change of horizontal displacement;
[0031] X n is the horizontal displacement of the nth row;
[0032] X n+1 is the horizontal displacement of the n+1th row;
[0033] ΔX is the horizontal displacement difference between the previous and next rows;
[0034] is the first-order difference of vertical displacement, that is, the rate of change of vertical displacement;
[0035] Z n is the vertical displacement of the nth row;
[0036] Z n+1 is the vertical displacement of the n+1th row;
[0037] ΔZ is the vertical displacement difference between the previous and next rows;
[0038] t n is the collection time of the nth row;
[0039] t n+1 is the acquisition time of the n+1th row;
[0040] Δt is the time difference between the previous and next lines.
[0041] Preferably, the specific implementation method of step 4) adopted by the present invention is:
[0042] 4.1) Setting change thresholds;
[0043] 4.2) Determine whether the rate of change of the three-dimensional characteristics of the cable crane is within the change threshold set in step 4.1). If so, the cable crane is considered to be in a stable state; if not, proceed to step 4.3);
[0044] 4.3) According to the positive or negative change rate of the three-dimensional characteristics of the cable crane, it is judged whether the cable crane is in an ascending state or a descending state; when the change rate of the three-dimensional characteristics of the cable crane is positive, it indicates that the cable crane is in an ascending state; when the change rate of the three-dimensional characteristics of the cable crane is negative, it indicates that the cable crane is in a descending state.
[0045] Preferably, step 4.3) adopted in the present invention further includes:
[0046] 4.4) The single time points with the same state are aggregated according to the trend state of the three-dimensional feature change. After aggregation, the mean of the feature values in the state interval is calculated respectively. After the state is aggregated, the initial moment of the state is retained; it is used to determine the change trend of the three-dimensional feature between two adjacent states.
[0047] Preferably, the specific implementation of step 5) adopted by the present invention is:
[0048] 5.1) Perform boundary identification based on the trend state identification results at the above single time point;
[0049] 5.2) Numbering the results of step 5.1) in ascending order;
[0050] 5.3) When the trend state of the cable car appears continuously, identify its starting point and end point;
[0051] 5.4) Taking the start time of the trend state of the cable crane as the starting point, complete the single-loop division of the measured data of the cable crane.
[0052] Preferably, the identification parameters in step 6) adopted in the present invention include the number of heavy-load hoisting times, hoisting weight characteristics and time characteristics;
[0053] The four working modes of the cable crane are: concrete lifting mode, miscellaneous object lifting mode, maintenance mode and shutdown mode;
[0054] The identification parameters of the concrete lifting mode are: the number of heavy-load lifting is 2 times; the lifting weight is not higher than 28 tons on the forward trip and not lower than 6.5 tons on the return trip;
[0055] The identification parameters of the mode of lifting scattered objects are: the number of heavy-load lifting is 1; the lifting weight feature is 1 to 30 tons;
[0056] The identification parameters of the maintenance mode are: the number of heavy-load lifting is 0 times; the lifting weight characteristic is 0-1t; the time characteristic is 1h;
[0057] The identification parameters of the shutdown mode are: the number of heavy-load lifting is 0 times; the lifting weight characteristic is 0-1t; and the time characteristic is ≥5min.
[0058] Preferably, the cable machine working state identification method based on massive monitoring data adopted by the present invention further comprises, after step 6):
[0059] 7) Based on the recognition result of step 6), the three-dimensional features are matched to identify the working status of the cable crane in a single cycle; the working status of the cable crane includes waiting for loading, lifting and rising, transportation preparation, horizontal transportation, descending into the warehouse, warehouse surface alignment, unloading, warehouse exit preparation, rising out of the warehouse, empty tank return, platform alignment, descending back to the position, maintenance status and shutdown status.
[0060] The advantages of the present invention are:
[0061] The present invention discloses a cable crane working state identification method based on massive monitoring data, including: 1) obtaining cable crane operation monitoring data from a database; 2) preprocessing the cable crane operation monitoring data obtained in step 1); 3) performing first-order difference calculation according to the characteristic value of the preprocessed data in step 2), and calculating the characteristic change rate; 4) setting a threshold to judge the trend state; 5) dividing the single cycle according to the trend state in step 4); 6) matching the single cycle identification parameters in step 5) to identify four working modes of the cable crane; 7) matching the three-dimensional features on the basis of the identification result of step 6) to identify the working state of the cable crane. The present invention is a method for identifying, analyzing and mining relatively original massive monitoring data in the current cable crane positioning monitoring system, and accurately extracting relevant information such as calculating the efficiency of the cable crane. The present invention utilizes pattern recognition technology to extract a large number of attribute characteristic values, utilizes its regularity to perform feature classification, extracts relevant information of various efficiency analyses from massive monitoring data, and identifies the operation mode and working state of the cable crane. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 It is a flow chart of the cable crane working state identification method based on massive monitoring data provided by the present invention;
[0063] Figure 2 The cable crane operation mode used in the present invention is divided into four modes;
[0064] Figure 3 It is a structural diagram of the concrete lifting mode adopted by the present invention;
[0065] Figure 4 It is a structural diagram of the hoisting of scattered objects adopted by the present invention;
[0066] Figure 5 It is a flow chart of cable machine working state identification adopted by the present invention;
[0067] Figure 6 The present invention uses the method of extracting the original cable machine operation data graph from the database;
[0068] Figure 7 It is the state aggregation and feature value recognition result diagram adopted by the present invention;
[0069] Figure 8 It is a single-cycle recognition result diagram of the operation mode adopted by the present invention;
[0070] Fig. 9 This is the working status recognition result diagram adopted by the present invention. DETAILED DESCRIPTION
[0071] See also Figure 1The present invention provides a method for identifying the working state of a cable machine based on massive monitoring data, and the identification method comprises the following steps:
[0072] Step 1: Obtain cable crane operation monitoring data from the database, specifically:
[0073] The database of the cable crane information monitoring system contains about 16 million monitoring data of each cable crane from April 10, 2017 to December 15, 2020. The corresponding data can be extracted from it using SQL statements as needed.
[0074] Step 2: pre-process the acquired cable crane operation monitoring data, specifically:
[0075] Clean up the data before construction starts; delete the data with duplicate time; verify and process the coordinate data; clean up the data with elevation lower than the foundation surface; clean up the data that exceeds the lifting limit; convert the format of time data; and perform noise reduction on the data.
[0076] Step 3, perform first-order difference calculation on the characteristic values of the cable crane operation monitoring data, and calculate the characteristic change rate, specifically:
[0077] The operation monitoring data of the cable crane includes the cable crane station number, the cable crane coordinates at the time of data collection, the state duration, the collection time, the cable crane weight and other information. In this method, the cable crane weight (w) and the spatial coordinates (x, y) are called the three-dimensional characteristics of the cable crane. The change rate of each feature is calculated separately, that is, the ratio of the characteristic value to the time difference between two adjacent data. The weight change rate and trend state (the trend state is determined according to the positive or negative change rate. For example, when the weight change rate is negative, it means that the weight is decreasing, and when it is positive, it means that the weight is increasing), the displacement change rate and trend state, the lifting depth change rate and trend state can be obtained. The calculation formulas are as follows: (1), (2) and (3) respectively. The present invention describes the operation state of the cable crane by calculating the change rate of the three-dimensional characteristics of the cable crane.
[0078]
[0079] In formula (1), is the first-order difference value of the hoisting weight, that is, the rate of change of the hoisting weight; W n is the weight of the nth row, W n+1 is the weight of the n+1th row, ΔW is the difference between the weights of the previous and next rows; t n is the acquisition time of the nth row, t n+1 is the acquisition time of the n+1th row, and Δt is the time difference between the previous and next two rows.
[0080] In formula (2), is the first-order difference value of horizontal displacement, that is, the rate of change of horizontal displacement; X n is the horizontal displacement of the nth row, Xn+1 is the horizontal displacement of the n+1th row, and ΔX is the difference in horizontal displacement between the previous and next rows.
[0081] In formula (3), is the first-order difference value of the vertical displacement, that is, the rate of change of the vertical displacement; Z n is the vertical displacement of the nth row, Z n+1 is the vertical displacement of the n+1th row, and ΔZ is the vertical displacement difference between the previous and next rows.
[0082] Step 4: Set the threshold to determine the trend status, specifically:
[0083] The three-dimensional characteristic values in the cable crane data are first-order differentiated in chronological order, and a change threshold is set. When the difference value is within the threshold range, it is considered to be in a stable state. When it is greater than this range, it is judged to be an upward or downward state based on the positive or negative situation of the difference value. The interval of the measured data of the cable crane is 5s. This paper sets the lifting weight threshold to 1t, the X threshold to 2m, and the Z threshold to 1m. At the same time, each trend state is numbered: stable state number "0"; rising state number "1"; descending state number "-1"; when the cable crane lifting weight is 0, it is marked as, and the cable crane unloaded state number "2".
[0084] Then, the average of the eigenvalues is calculated in the aggregated state, specifically:
[0085] Therefore, the single time points with the same state are aggregated according to the trend state of the three-dimensional feature change, and the mean of the feature values in the state interval is calculated respectively after aggregation. After the state is aggregated, the initial moment of the state is retained. It is used to judge the change trend of the three-dimensional feature between two adjacent states.
[0086] Step 5: Use the trend status in step 4 to divide the single cycle, specifically:
[0087] According to the trend state identification results of the above single time point, the boundary identification is performed. It is necessary to number all data in ascending order. When the trend state appears continuously, its starting point and end point are identified. Taking the cable crane lifting concrete as an example, it is considered that the cable crane goes from the no-load state to the lifting weight rising stage, the stable stage, the lifting weight descending stage, the stable stage, the lifting weight descending stage, and the no-load state is a cycle of the cable crane lifting concrete, in which the no-load state is the boundary. Exemplarily, the no-load state in the previous cycle is the end point of the previous cycle, but it is also the starting point of the next cycle. Because the cyclical nature of the cable crane's work is essentially the head-to-tail connection of single cycles and single cycles, the starting point of a single cycle is also the end point of the previous cycle. Taking the starting time of trend state "2" (cable crane no-load state) as the starting point, the single cycle division of the cable crane's measured data is completed. After completing the division of the single cycle, it is necessary to further determine the mode to which the cycle belongs based on the characteristics of the mode cycle.
[0088] Step 6, by matching the parameters in Table 1, identify the four working modes of the cable crane, specifically:
[0089] In pattern recognition, a set of samples with the same or similar working status is called a pattern category. The working status of the cable crane is initially divided into four types: concrete lifting mode, miscellaneous object lifting mode, maintenance mode, and shutdown mode. The basic operation mode structure of the cable crane is as follows: Figure 2 As shown. The working state of the cable crane is composed of a combination of basic working states. The working state of the cable crane has significant three-dimensional characteristics, including both spatial position and time sequence. The significant difference in the lifting weight characteristics between different modes is used, that is, the lifting weight value interval is greatly different, which is different from the number of liftings. The difference between the lifting weight characteristics and the number of liftings between different modes of different cable cranes is used to identify the working mode of the cable crane.
[0090] The concrete hoisting mode is actually the main part of the cable crane's work. There are two hoisting times in a single cycle, and the distribution of its activity space is sequential. Concrete is hoisted from the feeding platform to the warehouse surface for pouring. The hoisting weight value rises from 0 (at this time, the cable crane is in an empty state, and the cable crane is in a stage of preparing to hoist objects) to the sum of the weight of the hoisting tank and the concrete during the platform hoisting process. It remains unchanged during the forward transportation, and is unloaded after arriving at the warehouse surface. After unloading to the empty tank, it begins to return. During the return journey, the weight of the empty tank remains unchanged. When the hoisting tank returns to the feeding platform, the hoisting weight is reduced to 0 during the landing and return process. The specific structural mode is as follows Figure 3 shown.
[0091] The mode of lifting miscellaneous objects is also an important part of the operation of the cable crane. This mode has fewer cycles and has a significant lifting characteristic compared to lifting concrete, and the lifting is only done once in a single cycle. A single cycle of the mode of lifting miscellaneous objects will go through the following tasks: the cable crane moves empty to the loading location; waits for loading at the target location; the operator hangs heavy objects on the cable crane hook; lifts and rises; lifts the heavy load to the target location; the cable crane fine-tunes the position on the warehouse surface; and unloads at the target location. According to the loading location and target location, it can be further subdivided into: "flat-warehouse" lifting mode, "warehouse-flat" lifting mode, warehouse surface transfer mode, and platform transfer mode. Specific structural modes are as follows: Figure 4 shown.
[0092] The maintenance mode is quite special. In this mode, there is no hoisting weight and only movement in the X and Z directions occurs. The cableway is generally overhauled twice a day, at around 6:00 and 18:00 every day. The maintenance time generally lasts for 1 hour. During the maintenance process, the cableway will perform an empty-load operation from the left bank to the right bank.
[0093] The cable crane may enter the shutdown mode at any time except for the daily scheduled maintenance when it is in long-term high-load operation. The three-dimensional characteristic values of the cable crane generally do not change in the shutdown mode, but they may be fine-tuned and wait for instructions. When the three-dimensional characteristics generally do not change for more than 5 minutes and do not occur at the time and place of the maintenance mode, the cable crane is considered to have entered the shutdown state. The single-cycle identification parameters of the cable crane working state are shown in Table 1 below.
[0094] Table 1 Operation mode single cycle identification parameter table
[0095]
[0096] If there are multiple heavy-load lifting in one cycle (which may be caused by the staged decrease of the lifting weight, which often occurs when pouring special structures), it is difficult to identify only from the number of heavy-load lifting. Based on the relationship between the number of liftings, the heavy-load lifting state is further scored to distinguish the lifting concrete mode from the sporadic object mode to improve the accuracy of the recognition model. Since the number of liftings for cable crane lifting concrete and zero lifting is the same, both are one-way. Therefore, it cannot be identified by relying on the number of liftings. Therefore, it is necessary to score according to the lifting weight characteristics in the number of liftings. For lifting concrete, the lifting weight from the warehouse surface to the platform is basically about 6.5t, and the X state trend is negative, while there is no such feature for zero lifting. Based on this feature, cable crane lifting zero can be distinguished from lifting concrete. The method adopts the method of scoring the lifting weight characteristics of heavy-load lifting to distinguish the lifting concrete and zero lifting modes. The scoring principle is to distinguish the lifting characteristics of heavy-load lifting, distinguish the heavy-load lifting status of the round trip and the two stages, and score them separately, namely the status score, with different orders of magnitude. Accordingly, the sum of the forward score and the sum of the return score form a value, namely the mode score. The specific scoring rules are shown in Table 2 below.
[0097] In the table, the lifting weight greater than 1t and 6-8t will not conflict, because when querying SQL Server, the identification of 6-8t is performed first and then the identification of greater than 1t, and the two will not be repeated. The differential trend of X is the change trend of the mean value of X in the heavy-load lifting state. After the state aggregation, the positive and negative situations mean whether the heavy-load lifting state belongs to the forward trip or the return trip.
[0098] Table 2 Single-cycle recognition scoring table
[0099]
[0100] The cable crane working state is identified by the sum of the state scores in a single cycle, i.e., the mode. For the mode of lifting sporadic objects, there is only one lifting process. If the number of lifting times is not 1, 1 point is given for the forward state and 10 points are given for the return state. The total score can only be within 0 to 9 points or divisible by 10. The remaining score is for the concrete lifting mode. The corresponding relationship between the score and the operation mode is shown in Table 3 below.
[0101] Table 3 Correspondence between operation mode scores
[0102]
[0103] After all parameters and scoring rules are determined, the recognition process of the single-loop operation mode is:
[0104] 1) Use the starting point of the cable car's no-load section to divide the operating mode into a single cycle.
[0105] 2) If the no-load time exceeds 1 hour and is within the maintenance time range, it is identified as maintenance mode; if the other no-load time exceeds 5 minutes, it is identified as shutdown mode.
[0106] 3) Use SQL statements to statistically query trend states of "0" and duration greater than 25s, record the number of heavy-load lifting times, and then identify the lifting patterns of concrete and miscellaneous objects based on the scoring rules.
[0107] Step 7, based on the recognition results in step 6, match the three-dimensional features and identify the 14 cable crane working states shown below, specifically:
[0108] After dividing the measured data into single cycles and determining the operation mode, it is necessary to further identify the working status within the single cycle. Each piece of data carries relevant information such as trend status, lifting weight, coordinates, etc., and the working status is identified within the cycle based on the three-dimensional feature information of the data. The specific process is as follows: Figure 5 The specific identification method is as follows:
[0109] (1) Waiting for loading: This stage is the starting state of a single cycle, and the cable crane hook is stationary on the platform or warehouse surface. The three eigenvalues are all in a stable state with the same trend. The hoisting weight is 0-1t. If the X value is within the platform range and the elevation is at the platform elevation, the platform is waiting for loading; if the X value is within the dam range and the elevation is lower than the transportation elevation, the warehouse surface is waiting for loading. Therefore, the SQL keyword casewhen combined with the trend state and the eigenvalue value range can be used to identify them respectively.
[0110] (2) Lifting and rising: During the entire lifting process, the main feature is that the lifting weight value rises from no load to the lifting weight value of the target object. If the concrete is fully loaded, the lifting weight is about 28t. There is rarely a pause in this process. The W trend state is 1, which is the only one that exists in all states. The difference is that the lifting and rising of the concrete lifting mode occurs in the platform range, while the "warehouse-level" lifting mode and transfer mode occur in the dam range. Therefore, the change rate of the W value is identified as rising, and the lifting position is determined in combination with the X value range.
[0111] (3) Transportation preparation: This state is a transitional state with a short duration. After the cable car lifts the heavy object, it stays still in the air for a period of time. The trend state of the three eigenvalues is 0. The W value is the heavy load, and the elevation is within the transportation elevation range. The X value can determine whether it is above the platform or above the warehouse surface.
[0112] (4) Horizontal transportation: After transportation preparation, the cable car starts horizontal heavy-load transportation. The hoisting weight value and Z value trend state are 0, the X value trend state is 1, the elevation is within the transportation elevation range, and the W value is heavy-load hoisting weight.
[0113] (5) Descending into the warehouse: The cable car runs above the warehouse surface and descends into the warehouse surface. The trend status of the lifting weight value and the X value is 0, the trend status of the Z value is -1, the W value is heavy load lifting weight, and the X value is within the dam body range.
[0114] (6) Warehouse surface alignment: After the cable crane bucket is directed by the commander to enter the warehouse, it may be necessary to change the unloading point and make slight adjustments. Since the adjustment speed is slower than that during horizontal transportation, the X value trend state is still judged as 0 during identification, and the hoisting weight value and Z value trend state are also 0. The elevation is the warehouse surface elevation, the X value is within the dam body, and the W value is the heavy load hoisting weight.
[0115] (7) Unloading: During the unloading process, the W value decreases significantly, the trend state is -1, and the X value trend state is 0. During unloading, the hanging tank will rise slightly and the speed is slow. The Z value is still considered as 0. When the pouring elevation is close to the elevation of the feeding platform, it will cause misjudgment of the descending return state. The Z value range should not be judged by the elevation, but can only be limited by the elevation below the transportation elevation. At the same time, the X value range is used to distinguish the descending return state.
[0116] (8) Preparation for leaving the warehouse: Before the cable crane hook leaves the warehouse, the trend state of the three characteristic values is 0. If the concrete is hoisted, the W value of the empty tank is between 6 and 8 tons, and the W value of the zero-hanging mode is heavy load. In addition, the X value is within the range of the dam body and the Z value is lower than the transportation elevation range. This feature is unique and not easy to misjudge.
[0117] (9) Ascending out of the warehouse: During the ascent of the cable crane hook, the Z value trend state is 1. The only state where the Z value rises is the lifting ascent state, but the W value also rises in the lifting ascent state. Therefore, the ascent out of the warehouse state can be directly identified by combining the W and X value trend states of 0.
[0118] (10) Empty tank return: During the empty tank return process, the X value trend state is -1. Compared with the zero hanging mode, the empty tank return has the characteristics of lifting weight. The W value of the zero hanging mode return is empty. Combined with the W and Z value trend states of 0, the empty tank return state can be directly identified.
[0119] (11) Platform alignment: After the empty tank returns, the cable crane hook is aligned on the platform. The characteristics of this process are that the trend state of the three characteristic values is 0, the X value is within the platform range, the elevation value is greater than the platform elevation, and the empty tank in the mixed lifting mode is between 6 and 8 tons, which is easy to identify; the lifting weight range of the zero lifting mode is larger, so the W value is not constrained.
[0120] (12) Lowering and returning: The lowering and returning process includes the lowering and unloading of the cable crane hook. Since the platform unloading duration is short, it is incorporated into the lowering and returning state. In this process, the X value trend state is 0, which is within the platform range; the Z value trend state is -1 at first, and then changes to 0 when unloading. At this time, the W value trend state is -1; the empty tank lifting weight in the lifting mixed mode is between 6 and 8 tons; the lifting weight range in the lifting zero mode is larger, so the W value is not constrained.
[0121] (13) Maintenance state: The maintenance state has obvious hoisting characteristics and a long duration, which can be distinguished from the waiting state of the hoisting mixed mode and the hoisting zero mode. Therefore, the method to identify the maintenance state is that the hoisting value is between 0 and 1t, the trend state is 2, and the occurrence time is within the maintenance time period. The keyword datepart in SQL can be used to obtain the hour integer value at any time, and the duration threshold is set to 1h.
[0122] (14) Shutdown state: The lifting characteristics of the shutdown state and the maintenance state are the same, and the key to distinguishing them is the duration and the time of occurrence. The identification method is that outside the maintenance period, the no-load duration exceeds the upper limit of the waiting time of the mixed and zero lifting modes, and this threshold is set to 5 minutes.
[0123] The technical solution provided by the present invention can effectively identify the working status of the cable crane based on massive monitoring data. The method of the present invention is verified using test data. The original cable crane operation data extracted from the database on January 1, 2020 for cable crane 1# is as follows: Figure 6 As shown. The single time points with the same state are aggregated according to the trend state of the weight change, and the mean of the characteristic values in the state interval is calculated respectively. After the state is aggregated, the initial moment of the state is retained, as shown below Figure 7After the cable machine single cycle identification process, some results are as follows Figure 8 Taking the data of 5# cable crane on May 1, 2019 as an example, the working status recognition results are shown in Fig. 9 .
Claims
1. A method for identifying the working status of a cable crane based on massive monitoring data, characterized in that: The cable crane working state identification method based on massive monitoring data comprises the following steps: 1) Obtain cable crane operation monitoring data; 2) Preprocessing the cable crane operation monitoring data obtained in step 1); 3) Calculate the change rate of the three-dimensional characteristics of the cable crane based on the preprocessed cable crane operation monitoring data; 4) determining the trend state of the cable crane according to the rate of change of the three-dimensional characteristics of the cable crane obtained in step 3); 5) using the trend state of the cable crane determined in step 4) to perform single-cycle division on the measured data of the cable crane; 6) Match the identification parameters of the single cycle in step 5), and identify the four working modes of the cable crane according to the identification parameters.
2. The cable crane working status identification method based on massive monitoring data according to claim 1 is characterized in that: The specific implementation method of step 1) is: using SQL statements to extract required data from the database of the cable machine information monitoring system.
3. The cable crane working status identification method based on massive monitoring data according to claim 2 is characterized in that: The pre-processing in step 2) is to delete the time-duplicate data, delete the erroneous data, verify and process the coordinate data, convert the format of the time data and perform noise reduction on the cable crane operation monitoring data.
4. The cable crane working status identification method based on massive monitoring data according to claim 3 is characterized in that: The specific implementation method of step 3) is: 3.1) obtaining the pre-processed cable crane operation monitoring data, wherein the pre-processed cable crane operation monitoring data includes the cable crane station number, the cable crane coordinates during data collection, the state duration, the collection time and the cable crane hoisting weight; 3.2) extracting the three-dimensional features of the cable crane from the pre-processed cable crane operation monitoring data; the three-dimensional features of the cable crane include the cable crane hoisting weight and spatial coordinates; 3.3) respectively calculating the change rates of the three-dimensional characteristics of the cable crane in step 3.2); the change rates of the three-dimensional characteristics of the cable crane include the change rate of the lifting weight, the change rate of the horizontal displacement and the change rate of the cable crane lifting depth.
5. The cable crane working status identification method based on massive monitoring data according to claim 4 is characterized in that: The calculation method of the hanging weight change rate in step 3.3) is: The calculation method of the horizontal displacement change rate is: The calculation method of the cable crane hoisting depth change rate is: in: is the first-order difference value of the hoisting weight, that is, the rate of change of the hoisting weight; W n is the weight of the nth row; W n+1 It is the lifting weight of the n+1th row; ΔW is the difference in lifting weight between the front and rear rows; is the first-order difference of horizontal displacement, that is, the rate of change of horizontal displacement; X n is the horizontal displacement of the nth row; X n+1 is the horizontal displacement of the n+1th row; ΔX is the horizontal displacement difference between the previous and next rows; is the first-order difference of vertical displacement, that is, the rate of change of vertical displacement; Z n is the vertical displacement of the nth row; Z n+1 is the vertical displacement of the n+1th row; ΔZ is the vertical displacement difference between the previous and next rows; t n is the acquisition time of the nth row; t n+1 is the acquisition time of the n+1th row; Δt is the time difference between the previous and next lines.
6. The cable crane working status identification method based on massive monitoring data according to claim 5 is characterized in that: The specific implementation method of step 4) is: 4.1) Setting change thresholds; 4.2) Determine whether the rate of change of the three-dimensional characteristics of the cable crane is within the change threshold set in step 4.1). If so, the cable crane is considered to be in a stable state; if not, proceed to step 4.3); 4.3) According to the positive or negative change rate of the three-dimensional characteristics of the cable crane, it is judged whether the cable crane is in an ascending state or a descending state; when the change rate of the three-dimensional characteristics of the cable crane is positive, it indicates that the cable crane is in an ascending state; when the change rate of the three-dimensional characteristics of the cable crane is negative, it indicates that the cable crane is in a descending state.
7. The cable crane working status identification method based on massive monitoring data according to claim 6 is characterized by: The step 4.3) further includes: 4.4) The single time points with the same state are aggregated according to the trend state of the three-dimensional feature change. After aggregation, the mean of the feature values in the state interval is calculated respectively. After the state is aggregated, the initial moment of the state is retained; it is used to determine the change trend of the three-dimensional feature between two adjacent states.
8. The cable crane working status identification method based on massive monitoring data according to claim 7 is characterized in that: The specific implementation of step 5) is: 5.1) Perform boundary identification based on the trend state identification results at the above single time point; 5.2) Numbering the results of step 5.1) in ascending order; 5.3) When the trend state of the cable car appears continuously, identify its starting point and end point; 5.4) Taking the start time of the trend state of the cable crane as the starting point, complete the single-loop division of the measured data of the cable crane.
9. The cable machine working status identification method based on massive monitoring data according to claim 8 is characterized by: The identification parameters in step 6) include the number of heavy-load lifting times, lifting weight characteristics, and time characteristics; The four working modes of the cable crane are: concrete lifting mode, miscellaneous object lifting mode, maintenance mode and shutdown mode; The identification parameters of the concrete lifting mode are: the number of heavy load lifting is 2 times; The lifting capacity is no higher than 28t on the forward trip and no lower than 6.5t on the return trip. The identification parameters of the mode of lifting scattered objects are: the number of heavy load lifting is 1; The lifting weight characteristic is 1 to 30t; The identification parameters of the maintenance mode are: the number of heavy load lifting is 0 times; The lifting weight characteristic is 0~1t; The time feature is 1h; The identification parameters of the shutdown mode are: the number of heavy load lifting is 0 times; The lifting weight characteristic is 0~1t; The time characteristic is ≥5min.
10. The cable machine working status identification method based on massive monitoring data according to claim 9 is characterized in that: The cable crane working state identification method based on massive monitoring data further includes after step 6): 7) Based on the recognition result of step 6), the three-dimensional features are matched to identify the working status of the cable crane in a single cycle; the working status of the cable crane includes waiting for loading, lifting and rising, transportation preparation, horizontal transportation, descending into the warehouse, warehouse surface alignment, unloading, warehouse exit preparation, rising out of the warehouse, empty tank return, platform alignment, descending back to the position, maintenance status and shutdown status.
Citation Information
Patent Citations
Single cyclic processing method of concrete cable crane
CN103121623A
System and method for weighing and identifying objects lifted by cable crane
CN104192710A
Cable crane transportation monitoring and prewarning method in concrete construction
CN109896427A
Method for recognizing pile numbers of cable crane stopping and charging platform in concrete construction
CN111787086A
Concrete pouring blanking monitoring method, device and equipment and medium
CN116858309A