Industrial park wastewater treatment diagnosis method and system based on intelligent environmental protection platform
Through the smart environmental protection platform, collect and process the operation data of the sewage treatment plant, build a water quality control system model, diagnose the operation and maintenance problems of the sewage treatment plant in real time, solve the problem of water quality failure caused by the inability to diagnose in real time in the existing technology, and improve the sewage treatment Factory operation and maintenance efficiency.
Patent Information
- Application Number
- CN202411212163.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing wastewater treatment diagnosis method can only be diagnosed when the equipment fails, and it is impossible to diagnose the problem of water quality that causes normal operating equipment to fail to meet the standards in real time.
Through the smart environmental protection platform, collect operation process data of the sewage treatment plant, perform pretreatment and noise removal, build a water quality control system model, use historical dosing data and current water effluent data to determine target control parameters, and conduct real-time diagnosis and problem positioning.
Real-time diagnosis of wastewater treatment process of sewage treatment plants, positioning operation and maintenance problems and giving specific treatment measures, improving the operation and maintenance technical management level and efficiency of sewage treatment plants.
Smart Images

Figure CN119090141A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of smart environmental protection technology, and in particular to an industrial park wastewater treatment diagnosis and system based on a smart environmental protection platform. Background Art
[0002] In the process of wastewater treatment, most of the current diagnostic methods are aimed at detecting equipment failures in sewage treatment plants. For example, sensor failures lead to inaccurate data collection, which will affect the operator's judgment of the process operation status and easily make unreasonable adjustments to process parameters, resulting in substandard water quality. For example, the equipment in the sewage treatment system includes circulating pumps, fans, fan valves, etc. The failure of these important equipment will cause abnormal operation of the system and substandard water quality. However, the problem with this method is that when the equipment is not faulty, the water quality may not meet the standard. The current diagnostic method can only be used to diagnose when the equipment fails, and it is impossible to diagnose the problem of substandard water quality for the equipment that is operating normally. Therefore, how to perform real-time diagnosis of the wastewater treatment process of the sewage treatment plant has become an urgent problem to be solved.
[0003] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention
[0004] The main purpose of the present invention is to provide an industrial park wastewater treatment diagnosis and system based on a smart environmental protection platform to realize real-time diagnosis of the wastewater treatment process of the sewage treatment plant, solving the problem that the current diagnosis method can only realize diagnosis when the equipment fails.
[0005] To achieve the above object, the present invention provides an industrial park wastewater treatment diagnosis method based on a smart environmental protection platform, and the industrial park wastewater treatment diagnosis method based on a smart environmental protection platform comprises the following steps:
[0006] Use the smart environmental protection platform to collect operational process data of industrial park sewage treatment plants;
[0007] Preprocessing the operation process data to obtain preprocessed operation process data, and determining current water output data according to the preprocessed operation process data;
[0008] Obtain historical dosing data of the industrial park sewage treatment plant;
[0009] Determine the target control parameter based on the historical dosing data and the current water output data through a water quality control system model;
[0010] The industrial park sewage treatment plant is diagnosed based on the target control parameters.
[0011] In some embodiments, the preprocessing the operation process data to obtain preprocessed operation process data includes:
[0012] Building a data warehouse corresponding to the operation process data;
[0013] Dividing the data warehouse into a plurality of sub-data sets;
[0014] respectively obtaining queue data values of any sub-data set, and processing the operation process data based on the queue data values to obtain reference operation process data;
[0015] Based on the collection frequency of the operation process data and the collection time of each data point in the reference operation process data, noise is removed from the reference operation process data to obtain preprocessed operation process data.
[0016] In some embodiments, the industrial park wastewater treatment diagnosis method based on the smart environmental protection platform includes:
[0017] Constructing a sample data set based on uncontrollable factors and controllable factors, wherein the controllable factors include source water data and drug addition data;
[0018] Processing the sample data set, and dividing the sample data set into a training set and a test set based on the processed sample data set;
[0019] Constructing a kernel function, mapping the training set into a high-dimensional space through the kernel function, and then inputting it as input data into the preset model for training;
[0020] Determine a model parameter set, and use a network search method to optimize parameters in a model training process based on the model parameter set to obtain reference model parameters;
[0021] The reference model parameters are evaluated using the test set, the reference model parameters that pass the evaluation are used as target model parameters, and a water quality control system model is constructed based on the target model parameters.
[0022] In some embodiments, constructing a kernel function includes:
[0023] Constructing a first function, wherein the first function is a support vector machine related function;
[0024] Constructing a second function, where the second function is a loss function;
[0025] A kernel function is constructed based on a preset error, the first function, and the second function.
[0026] In some embodiments, the diagnosing the industrial park sewage treatment plant based on the target control parameter includes:
[0027] Obtaining current control parameters of the industrial park sewage treatment plant when treating wastewater;
[0028] Performing parameter comparison between the target control parameter and the current control parameter;
[0029] Determine the difference in parameter types and the size of parameter differences through parameter comparison;
[0030] Based on the parameter type differences, the problems existing in the sewage treatment process of the industrial park sewage treatment plant are located, and the problem level is determined based on the size of the parameter difference, and the current control parameters are adjusted based on the above.
[0031] In addition, to achieve the above-mentioned purpose, the present invention also proposes an industrial park wastewater treatment diagnosis system based on a smart environmental protection platform, and the industrial park wastewater treatment diagnosis system based on a smart environmental protection platform is applied to the industrial park wastewater treatment diagnosis method based on a smart environmental protection platform as described above, and the industrial park wastewater treatment diagnosis system based on a smart environmental protection platform includes:
[0032] The collection module is used to collect the operation process data of the industrial park sewage treatment plant using the smart environmental protection platform;
[0033] A processing module, used for preprocessing the operation process data to obtain preprocessed operation process data, and determining current water output data according to the preprocessed operation process data;
[0034] The acquisition module is used to obtain the historical dosing data of the industrial park sewage treatment plant;
[0035] An analysis module, used for determining target control parameters based on the historical dosing data and the current effluent data through a water quality control system model;
[0036] A diagnosis module is used to diagnose the industrial park sewage treatment plant based on the target control parameters.
[0037] In some embodiments, the processing module is used to build a data warehouse corresponding to the operation process data;
[0038] Dividing the data warehouse into a plurality of sub-data sets;
[0039] respectively obtaining queue data values of any sub-data set, and processing the operation process data based on the queue data values to obtain reference operation process data;
[0040] Based on the collection frequency of the operation process data and the collection time of each data point in the reference operation process data, noise is removed from the reference operation process data to obtain preprocessed operation process data.
[0041] In some embodiments, the industrial park wastewater treatment diagnostic system based on the smart environmental protection platform further includes a construction module;
[0042] The construction module is used to construct a sample data set based on uncontrollable factors and controllable factors, wherein the controllable factors include source water data and drug addition data;
[0043] Processing the sample data set, and dividing the sample data set into a training set and a test set based on the processed sample data set;
[0044] Constructing a kernel function, mapping the training set into a high-dimensional space through the kernel function, and then inputting it as input data into the preset model for training;
[0045] Determine a model parameter set, and use a network search method to optimize parameters in a model training process based on the model parameter set to obtain reference model parameters;
[0046] The reference model parameters are evaluated using the test set, the reference model parameters that pass the evaluation are used as target model parameters, and a water quality control system model is constructed based on the target model parameters.
[0047] In some embodiments, the construction module is used to construct a first function, and the first function is a support vector machine related function;
[0048] Constructing a second function, where the second function is a loss function;
[0049] A kernel function is constructed based on a preset error, the first function, and the second function.
[0050] In some embodiments, the diagnostic module is used to obtain current control parameters of the industrial park sewage treatment plant when treating wastewater;
[0051] Performing parameter comparison between the target control parameter and the current control parameter;
[0052] Determine the difference in parameter types and the size of parameter differences through parameter comparison;
[0053] Based on the parameter type differences, the problems existing in the sewage treatment process of the industrial park sewage treatment plant are located, and the problem level is determined based on the size of the parameter difference, and the current control parameters are adjusted based on the above.
[0054] The present invention collects the operation process data of the industrial park sewage treatment plant by utilizing the intelligent environmental protection platform; pre-processes the operation process data to obtain the pre-processed operation process data, and determines the current effluent data according to the pre-processed operation process data; obtains the historical drug addition data of the industrial park sewage treatment plant; determines the target control parameters based on the historical drug addition data and the current effluent data through the water quality control system model; diagnoses the industrial park sewage treatment plant based on the target control parameters, and can diagnose the wastewater treatment process in real time, thereby locating the problems existing in the operation and maintenance of the sewage treatment plant, and giving specific treatment measures and suggestions, thereby improving the technical management level and efficiency of the operation and maintenance of the sewage treatment plant. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a flow chart of the first embodiment of the industrial park wastewater treatment diagnosis method based on the smart environmental protection platform of the present invention;
[0056] Figure 2 This is a structural block diagram of the first embodiment of the industrial park wastewater treatment diagnostic system based on the smart environmental protection platform of the present invention.
[0057] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0058] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0059] The embodiment of the present invention provides a method for diagnosing wastewater treatment in an industrial park based on a smart environmental protection platform. Figure 1 , Figure 1 This is a flow chart of a first embodiment of an industrial park wastewater treatment diagnostic method based on a smart environmental protection platform of the present invention.
[0060] In this embodiment, the industrial park wastewater treatment diagnosis method based on the smart environmental protection platform includes the following steps:
[0061] Step S10: Use the smart environmental protection platform to collect operation process data of the industrial park sewage treatment plant.
[0062] In this embodiment, the executor of this embodiment is an industrial park wastewater treatment diagnostic system based on a smart environmental protection platform, wherein the industrial park wastewater treatment diagnostic system based on a smart environmental protection platform has functions such as data processing, data communication and program running. The industrial park wastewater treatment diagnostic equipment based on the smart environmental protection platform can be a computer terminal device or other network equipment, and of course it can also be other equipment with similar functions, and this embodiment does not limit this.
[0063] It should be noted that in the process of wastewater treatment, most of the current diagnostic methods are aimed at detecting equipment failures in sewage treatment plants. For example, sensor failures lead to inaccurate data collection, which will affect the operator's judgment of the process operation status and easily make unreasonable adjustments to process parameters, resulting in substandard water quality. For example, the equipment in the sewage treatment system includes circulating pumps, fans, fan valves, etc. The failure of these important equipment will cause abnormal operation of the system and substandard water quality. However, the problem with this method is that when the equipment is not faulty, the water quality may not meet the standard. The current diagnostic method can only be used to diagnose when the equipment fails, and it is impossible to diagnose the problem of substandard water quality for equipment that is operating normally. Therefore, how to perform real-time diagnosis of the wastewater treatment process of the sewage treatment plant has become an urgent problem to be solved.
[0064] In order to solve the above technical problems, this embodiment collects the operation process data of the industrial park sewage treatment plant by utilizing the smart environmental protection platform; preprocesses the operation process data to obtain the preprocessed operation process data, and determines the current effluent data according to the preprocessed operation process data; obtains the historical drug addition data of the industrial park sewage treatment plant; determines the target control parameters based on the historical drug addition data and the current effluent data through the water quality control system model; diagnoses the industrial park sewage treatment plant based on the target control parameters, and can perform real-time diagnosis of the wastewater treatment process, thereby locating the problems existing in the operation and maintenance of the sewage treatment plant, and giving specific treatment measures and suggestions, thereby improving the technical management level and efficiency of the operation and maintenance of the sewage treatment plant.
[0065] In the specific implementation, this embodiment needs to first use the smart environmental protection platform to collect the operation process data of the industrial park sewage treatment plant, where the smart environmental protection platform includes the equipment perception layer (mainly pressure gauges, flow meters, liquid level gauges, various water quality parameter analyzers, etc.), communication layer (wired or wireless network), data center (cloud database), logic layer (various models and algorithms for data collection, classification, calculation and judgment) and application layer. The operation process data of the industrial park sewage treatment plant obtained includes water quality data, control parameters and other data.
[0066] Step S20: preprocessing the operation process data to obtain preprocessed operation process data, and determining current water output data according to the preprocessed operation process data.
[0067] It should be noted that, in order to improve the accuracy of diagnosis, in this embodiment, the collected operation process data needs to be preprocessed to obtain preprocessed operation process data.
[0068] In some embodiments, the preprocessing process of the operation process data is specifically to construct a data warehouse corresponding to the operation process data; divide the data warehouse into several sub-data sets; obtain the queue data values of any sub-data set respectively, and process the operation process data based on the queue data values to obtain reference operation process data; remove noise from the reference operation process data based on the collection frequency of the operation process data and the collection time of each data point in the reference operation process data to obtain preprocessed operation process data.
[0069] Specifically, first build a data warehouse Q, and then divide the data warehouse Q into several sub-datasets {Q1, Q2, ..., Qn}. The processing method adopted for any sub-dataset is the same, so for any sub-dataset, its corresponding queue data value can be obtained. The queue data value is the data point arranged in time order in the sub-dataset, and the processing of the operation process data based on the queue data value is specifically filtering processing to obtain reference operation process data, for example, y = 1 / (N-1)*x, where N represents the specific number of data points, and x represents a data point in the queue. After completing the filtering, noise removal is also required, for example Where a represents the acquisition frequency, and t represents the acquisition time corresponding to the data point.
[0070] Furthermore, after obtaining the pre-processed operation process data, data related to water quality characteristics can be extracted from the pre-processed operation process data by feature extraction, thereby obtaining current effluent data. The current effluent data includes water quality data and water quantity data, etc. The current effluent data can reflect the water quality of the sewage treatment plant.
[0071] Step S30: Acquire historical drug addition data of the industrial park sewage treatment plant.
[0072] During the diagnosis process, in this embodiment, historical medication data also needs to be collected. The historical medication data includes medication type and medication time: recording the specific time of each medication addition, which can be date and time, medication amount, medication location, and medication concentration, etc.
[0073] Step S40: determining target control parameters based on the historical dosing data and the current water output data through a water quality control system model.
[0074] Diagnosis requires reference to a certain standard. In this embodiment, this standard is determined by the water quality control system model. Specifically, historical dosing data and current effluent data can be input into the water quality control system model to obtain target control parameters. The target control parameters represent the control parameters that the sewage treatment plant should take to ensure that the water quality meets the standards.
[0075] The construction process of the water quality control system model in this embodiment is specifically to construct a sample data set based on uncontrollable factors and controllable factors, wherein the controllable factors include source water data and dosing data; process the sample data set, and divide the training set and the test set based on the processed sample data set; construct a kernel function, and use the kernel function to map the training set into a high-dimensional space and then input it as input data into the preset model for training; determine a model parameter set, and use a network search method to optimize parameters during the model training process based on the model parameter set to obtain reference model parameters; use the test set to evaluate the reference model parameters, use the reference model parameters that have passed the evaluation as target model parameters, and construct a water quality control system model based on the target model parameters.
[0076] Specifically, the uncontrollable factors in this embodiment include factors such as weather, and the controllable factors include source water data and dosing data, such as flow, turbidity, temperature, and pH value of source water, and dosing data such as dosing amount and dosing frequency. The division of training set and test set is, for example, 10,000 groups of sample data sets, which are subdivided into training and prediction sets, of which 5,000 groups are used as training set samples, and the remaining 5,000 groups of sample data are used as test sets. The model parameter set can select inlet water quality parameters, outlet water quality parameters, and environmental factor parameters, etc., and then adopt a network search method to optimize parameters during the model training process to obtain reference model parameters, and finally input the reference model parameters into the trained model, and compare the output results with the test set to complete the evaluation.
[0077] In some embodiments, the kernel function is composed of a first function, a second function, and a preset error, wherein the first function is a support vector machine related function, such as K(x, x') = x i T x or, K(x,x') = tan(kx i T x+θ), the second function is the loss function, for example ef((x)-y)=max(0,|f(xy)|-β) or ef((x)-y)=f((x)-y) 2 , and then construct a kernel function based on the preset error, the first function and the second function, for example, h = e k (α+y k -aK(x i ,x k )), where e k represents the second function, K(x i ,x k ) represents the first function, α represents the preset error, and it should be emphasized that the first function and the second function are arbitrarily selected from the above functions.
[0078] Step S50: diagnose the industrial park sewage treatment plant based on the target control parameters.
[0079] After obtaining the target control parameter, the target control parameter is compared with the current control parameter. After the parameter comparison, the difference between the target control parameter and the current control parameter can be determined. Through this difference, the problem of the industrial park sewage treatment plant in the sewage treatment process can be located. The difference after the parameter comparison includes the parameter type difference and the parameter difference size. The parameter type difference is such as the dosage difference. The parameter difference size is such as the dosage difference. It is greater than the target control parameter or less than the target control parameter. If the parameter type difference is the dosage difference, it means that there is a dosing problem in the industrial park sewage treatment plant. The parameter difference size corresponds to different problem levels. Each pre-set problem level has a corresponding difference range. The problem level can be determined by comparing the difference range. The difference range can be set according to demand, and this is not limited in this embodiment. If the parameter difference size is negative, that is, the target control parameter is less than the current control parameter, then the current control parameter needs to be reduced, such as reducing the dosage. If the parameter difference size is positive, that is, the target control parameter is greater than the current control parameter, then the current control parameter needs to be increased, such as increasing the dosage.
[0080] This embodiment collects the operation process data of the industrial park sewage treatment plant by utilizing the smart environmental protection platform; pre-processes the operation process data to obtain pre-processed operation process data, and determines the current effluent data according to the pre-processed operation process data; obtains the historical drug addition data of the industrial park sewage treatment plant; determines the target control parameters based on the historical drug addition data and the current effluent data through the water quality control system model; diagnoses the industrial park sewage treatment plant based on the target control parameters, and can diagnose the wastewater treatment process in real time, thereby locating the problems existing in the operation and maintenance of the sewage treatment plant, and giving specific treatment measures and suggestions, thereby improving the technical management level and efficiency of the operation and maintenance of the sewage treatment plant.
[0081] Reference Figure 2 , Figure 2 This is a structural block diagram of the first embodiment of the industrial park wastewater treatment diagnostic system based on the smart environmental protection platform of the present invention.
[0082] like Figure 2 As shown, the industrial park wastewater treatment diagnosis system based on the smart environmental protection platform proposed in the embodiment of the present invention includes:
[0083] The collection module 10 is used to collect the operation process data of the industrial park sewage treatment plant using the smart environmental protection platform.
[0084] The processing module 20 is used to preprocess the operation process data to obtain preprocessed operation process data, and determine current water output data according to the preprocessed operation process data.
[0085] The acquisition module 10 is used to obtain the historical dosing data of the industrial park sewage treatment plant;
[0086] The analysis module 30 is used to determine the target control parameters based on the historical dosing data and the current water output data through a water quality control system model.
[0087] The diagnosis module 40 is used to diagnose the industrial park sewage treatment plant based on the target control parameters.
[0088] This embodiment collects the operation process data of the industrial park sewage treatment plant by utilizing the smart environmental protection platform; pre-processes the operation process data to obtain pre-processed operation process data, and determines the current effluent data according to the pre-processed operation process data; obtains the historical drug addition data of the industrial park sewage treatment plant; determines the target control parameters based on the historical drug addition data and the current effluent data through the water quality control system model; diagnoses the industrial park sewage treatment plant based on the target control parameters, and can diagnose the wastewater treatment process in real time, thereby locating the problems existing in the operation and maintenance of the sewage treatment plant, and giving specific treatment measures and suggestions, thereby improving the technical management level and efficiency of the operation and maintenance of the sewage treatment plant.
[0089] In some embodiments, the processing module 10 is used to construct a data warehouse corresponding to the operation process data; divide the data warehouse into several sub-data sets; obtain the queue data values of any sub-data set respectively, and process the operation process data based on the queue data values to obtain reference operation process data; remove noise from the reference operation process data based on the collection frequency of the operation process data and the collection time of each data point in the reference operation process data to obtain preprocessed operation process data.
[0090] In some embodiments, the industrial park wastewater treatment diagnostic system based on the smart environmental protection platform further includes a construction module;
[0091] The construction module is used to construct a sample data set based on uncontrollable factors and controllable factors, wherein the controllable factors include source water data and dosing data; process the sample data set, and divide the sample data set into a training set and a test set based on the processed sample data set; construct a kernel function, and use the kernel function to map the training set into a high-dimensional space and then input it into the preset model as input data for training; determine a model parameter set, and use a network search method to optimize parameters during the model training process based on the model parameter set to obtain reference model parameters; use the test set to evaluate the reference model parameters, use the reference model parameters that have passed the evaluation as target model parameters, and construct a water quality control system model based on the target model parameters.
[0092] In some embodiments, the construction module is used to construct a first function, which is a support vector machine related function; construct a second function, which is a loss function; and construct a kernel function based on a preset error, the first function and the second function.
[0093] In some embodiments, the diagnostic module 40 is used to obtain the current control parameters of the industrial park sewage treatment plant when treating wastewater; perform parameter comparison between the target control parameters and the current control parameters; determine the parameter type difference and the parameter difference size through parameter comparison; locate the problems existing in the sewage treatment process of the industrial park sewage treatment plant based on the parameter type difference, and determine the problem level based on the parameter difference size, and adjust the current control parameters based on the above.
[0094] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions may be transmitted from a website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive Solid State Disk (SSD)), etc.
[0095] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0096] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0097] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
[0098] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.
[0099] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.
[0100] In addition, for technical details not described in detail in this embodiment, please refer to the industrial park wastewater treatment diagnosis method based on the smart environmental protection platform provided in any embodiment of the present invention, which will not be repeated here.
[0101] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0102] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0103] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0104] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
[0105] It is understandable that the system provided by the embodiment of the present invention corresponds to the method provided by the embodiment of the present invention, and the explanation, examples and beneficial effects of the relevant contents can refer to the corresponding parts in the above method.
Claims
1. A method for diagnosing wastewater treatment in industrial parks based on a smart environmental protection platform, characterized in that: The industrial park wastewater treatment diagnostic method based on the smart environmental protection platform includes: Use the smart environmental protection platform to collect operational process data of industrial park sewage treatment plants; Preprocessing the operation process data to obtain preprocessed operation process data, and determining current water output data according to the preprocessed operation process data; Obtain historical dosing data of the industrial park sewage treatment plant; Determine the target control parameter based on the historical dosing data and the current water output data through a water quality control system model; The industrial park sewage treatment plant is diagnosed based on the target control parameters.
2. The industrial park wastewater treatment diagnosis method based on the smart environmental protection platform according to claim 1 is characterized in that: The preprocessing of the operation process data to obtain preprocessed operation process data includes: Building a data warehouse corresponding to the operation process data; Dividing the data warehouse into a plurality of sub-data sets; respectively obtaining queue data values of any sub-data set, and processing the operation process data based on the queue data values to obtain reference operation process data; Based on the collection frequency of the operation process data and the collection time of each data point in the reference operation process data, noise is removed from the reference operation process data to obtain preprocessed operation process data.
3. The industrial park wastewater treatment diagnosis method based on the smart environmental protection platform as claimed in claim 1 is characterized in that: The industrial park wastewater treatment diagnostic method based on the smart environmental protection platform includes: Constructing a sample data set based on uncontrollable factors and controllable factors, wherein the controllable factors include source water data and drug addition data; Processing the sample data set, and dividing the sample data set into a training set and a test set based on the processed sample data set; Constructing a kernel function, mapping the training set into a high-dimensional space through the kernel function, and then inputting it as input data into the preset model for training; Determine a model parameter set, and use a network search method to optimize parameters in a model training process based on the model parameter set to obtain reference model parameters; The reference model parameters are evaluated using the test set, the reference model parameters that pass the evaluation are used as target model parameters, and a water quality control system model is constructed based on the target model parameters.
4. The industrial park wastewater treatment diagnosis method based on the smart environmental protection platform as claimed in claim 3 is characterized in that: The construction of the kernel function comprises: Constructing a first function, wherein the first function is a support vector machine related function; Constructing a second function, where the second function is a loss function; A kernel function is constructed based on a preset error, the first function, and the second function.
5. The industrial park wastewater treatment diagnosis method based on the smart environmental protection platform as claimed in claim 1 is characterized in that: The diagnosing the industrial park sewage treatment plant based on the target control parameter includes: Obtaining current control parameters of the industrial park sewage treatment plant when treating wastewater; Performing parameter comparison between the target control parameter and the current control parameter; Determine the difference in parameter types and the size of parameter differences through parameter comparison; Based on the parameter type differences, the problems existing in the sewage treatment process of the industrial park sewage treatment plant are located, and the problem level is determined based on the size of the parameter difference, and the current control parameters are adjusted based on the above.
6. An industrial park wastewater treatment diagnostic system based on a smart environmental protection platform, characterized in that: The industrial park wastewater treatment diagnosis system based on the smart environmental protection platform is applied to the industrial park wastewater treatment diagnosis method based on the smart environmental protection platform as described in any one of claims 1 to 5, and the industrial park wastewater treatment diagnosis system based on the smart environmental protection platform includes: The collection module is used to collect the operation process data of the industrial park sewage treatment plant using the smart environmental protection platform; A processing module, used for preprocessing the operation process data to obtain preprocessed operation process data, and determining current water output data according to the preprocessed operation process data; The acquisition module is used to obtain the historical dosing data of the industrial park sewage treatment plant; An analysis module, used for determining target control parameters based on the historical dosing data and the current effluent data through a water quality control system model; A diagnosis module is used to diagnose the industrial park sewage treatment plant based on the target control parameters.
7. The industrial park wastewater treatment diagnostic system based on the smart environmental protection platform as claimed in claim 6 is characterized in that: The processing module is used to build a data warehouse corresponding to the operation process data; Dividing the data warehouse into a plurality of sub-data sets; respectively obtaining queue data values of any sub-data set, and processing the operation process data based on the queue data values to obtain reference operation process data; Based on the collection frequency of the operation process data and the collection time of each data point in the reference operation process data, noise is removed from the reference operation process data to obtain preprocessed operation process data.
8. The industrial park wastewater treatment diagnostic system based on the smart environmental protection platform as claimed in claim 6 is characterized in that: The industrial park wastewater treatment diagnostic system based on the smart environmental protection platform also includes a construction module; The construction module is used to construct a sample data set based on uncontrollable factors and controllable factors, wherein the controllable factors include source water data and drug addition data; Processing the sample data set, and dividing the sample data set into a training set and a test set based on the processed sample data set; Constructing a kernel function, mapping the training set into a high-dimensional space through the kernel function, and then inputting it as input data into the preset model for training; Determine a model parameter set, and use a network search method to optimize parameters in a model training process based on the model parameter set to obtain reference model parameters; The reference model parameters are evaluated using the test set, the reference model parameters that pass the evaluation are used as target model parameters, and a water quality control system model is constructed based on the target model parameters.
9. The industrial park wastewater treatment diagnostic system based on the smart environmental protection platform as claimed in claim 8, characterized in that: The construction module is used to construct a first function, where the first function is a support vector machine related function; Constructing a second function, where the second function is a loss function; A kernel function is constructed based on a preset error, the first function, and the second function.
10. The industrial park wastewater treatment diagnosis system based on the smart environmental protection platform as claimed in claim 6, characterized in that: The diagnostic module is used to obtain the current control parameters of the industrial park sewage treatment plant when treating wastewater; Performing parameter comparison between the target control parameter and the current control parameter; Determine the difference in parameter types and the size of parameter differences through parameter comparison; Based on the parameter type differences, the problems existing in the sewage treatment process of the industrial park sewage treatment plant are located, and the problem level is determined based on the size of the parameter difference, and the current control parameters are adjusted based on the above.
Citation Information
Patent Citations
Task management method and system for intelligent operation of municipal sewage treatment plant
CN115542858A
Inspection management system and method applied to sewage treatment plant
CN116452186A
Intelligent control method, terminal and system of domestic sewage treatment system
CN117164103A
Artificial intelligence control system for sewage treatment
CN117170221A
Intelligent flocculant adding method and system for waterworks
CN117556196A