Engineering budget real-time monitoring and adjusting method based on BIM technology
Through BIM technology, the construction simulation model and data mining were built, and the budget indicators were dynamically adjusted, which solved the problem of mismatch between the budget indicators and the actual construction status in traditional monitoring methods, real-time monitoring and dynamic adjustment of the project budget were realized, and budget monitoring and adjustment were improved. accuracy and efficiency.
Patent Information
- Application Number
- CN202411098685.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-12-06
AI Technical Summary
Traditional engineering budget monitoring methods are based on fixed budget indicators and fail to capture fluctuations in construction costs in a timely manner, resulting in poor matching between budget indicators and actual construction status, reducing the practicality and accuracy of budget monitoring.
Real-time monitoring and adjustment methods of engineering budgets based on BIM technology are adopted, and by building construction simulation models, data mining and cost trend prediction, budget indicators are dynamically adjusted to match construction status and optimize cost control.
It improves the accuracy and efficiency of project budget management, ensures that project costs are controlled within an acceptable range, and enhances the practicality and accuracy of budget monitoring and adjustment.
Smart Images

Figure CN119090189A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of financial management technology, specifically to the field of budget monitoring technology, and in particular to a method for real-time monitoring and adjustment of engineering budgets based on BIM technology. Background Art
[0002] In the rapidly developing construction industry, the complexity and uncertainty of construction projects have become increasingly prominent, becoming a major challenge for project managers. These projects often involve multiple stages, multiple resources, and complex construction processes, making construction costs a highly dynamic and difficult to accurately predict factor. Cost fluctuations not only come from changes in market factors such as raw material prices and labor costs, but are also constrained by multiple factors such as design changes and changes in construction conditions. Traditional engineering budget monitoring methods mainly rely on static and fixed budget indicators, which are often based on certain assumptions and predictions when they are formulated. However, in the actual construction process, these assumptions and predictions are often difficult to fully realize. Therefore, when construction costs fluctuate, traditional monitoring methods often fail to capture and make corresponding adjustments in a timely manner, resulting in a significant reduction in the matching degree between budget indicators and actual construction status. This not only reduces the practicality of budget monitoring, but also affects the accuracy of budget adjustments, making it difficult for project managers to effectively control costs and ensure the smooth progress of the project. Summary of the invention
[0003] This application provides a real-time monitoring and adjustment method for engineering budgets based on BIM technology, aiming to solve the technical problem that traditional monitoring methods are based on fixed budget indicators, do not take into account the fluctuations in construction costs, resulting in a poor match between budget indicators and actual construction status, and cause the practicality and accuracy of budget monitoring and adjustment to be insufficient, so as to achieve real-time monitoring and dynamic adjustment of engineering budgets, improve the match between budget indicators and actual construction status, and enhance the practicality and accuracy of budget monitoring and adjustment.
[0004] In view of the above problems, this application provides a real-time monitoring and adjustment method for engineering budget based on BIM technology.
[0005] The present application provides a method for building a construction simulation model based on BIM technology according to the project attribute information of a target project, dividing the construction simulation model according to the expected construction process, and determining a plurality of construction simulation units, wherein the construction simulation units correspond to the construction stages one by one; selecting the first construction stage, taking the project attribute information, the expected project budget, the first construction stage and the predetermined cost type as constraints, performing data mining based on the building Internet, and determining a first initial budget threshold, wherein the first initial budget threshold includes a plurality of first initial budget indicators; constructing a cost trend predictor based on the predetermined cost type, predicting the cost fluctuation of the first construction stage through the cost trend predictor, outputting a plurality of cost prediction trends, correcting the plurality of first initial budget indicators according to the plurality of cost prediction trends, and determining a plurality of first monitoring indicators; judging whether the sum of the plurality of first monitoring indicators is greater than the sum of the plurality of first initial budget indicators, and if so, calculating and obtaining the first indicator deviation, and performing cost optimization analysis for the purpose of eliminating the first indicator deviation, and determining a first adjustment strategy; optimizing the plurality of first monitoring indicators according to the first adjustment strategy, and obtaining a plurality of first optimized monitoring indicators; and performing engineering budget monitoring and adjustment of the first construction stage according to the plurality of first optimized monitoring indicators based on the first construction simulation unit.
[0006] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0007] The above-mentioned real-time monitoring and adjustment method of engineering budget based on BIM technology is based on BIM technology to build a construction simulation model for the target project. This model is divided into multiple construction simulation units according to the expected construction process, and each unit corresponds to a specific construction stage. The purpose of this is to manage the budget of each stage more finely. Subsequently, the first construction stage is obtained, and the project attributes, expected project budget, first construction stage and predetermined cost type are used as constraints. The first initial budget threshold is determined by mining a large amount of data on the building Internet. This threshold consists of multiple specific budget indicators. After that, in order to cope with the volatility of costs, a cost trend predictor is constructed. This predictor predicts the cost of the first construction stage based on the predetermined cost type and generates multiple possible cost change trends. According to these predicted trends, the budget indicators initially set are adjusted to form more accurate monitoring indicators. If the sum of the adjusted multiple monitoring indicators exceeds the sum of the initial budget indicators, it is calculated that there is a budget deviation. In order to solve this problem, a cost optimization analysis is carried out to find the cause of the deviation and formulate a corresponding adjustment strategy. According to this adjustment strategy, the monitoring indicators are optimized again to ensure that they are both in line with the actual situation and can effectively control costs. Then, based on the optimized monitoring indicators, real-time monitoring and adjustment of the project budget were implemented in the first construction simulation unit to ensure that the project was carried out smoothly according to the budget. The whole process fully utilized the advantages of BIM technology, and effectively improved the accuracy and efficiency of project budget management through refined modeling, data-driven prediction and optimization, and real-time monitoring and adjustment.
[0008] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0010] Figure 1 A flowchart of a method for real-time monitoring and adjusting a project budget based on BIM technology in one embodiment;
[0011] Figure 2 The present invention is a flowchart of determining a first initial budget threshold value of a method for real-time monitoring and adjusting a project budget based on BIM technology in one embodiment. DETAILED DESCRIPTION
[0012] The embodiments of the present application provide a real-time monitoring and adjustment method for engineering budgets based on BIM technology, thereby solving the technical problem that traditional monitoring methods are based on fixed budget indicators for monitoring, do not take into account the fluctuations in construction costs, result in a poor match between budget indicators and actual construction status, and cause the practicality and accuracy of budget monitoring and adjustment to be insufficient.
[0013] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0014] It should be noted that the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or inherent to these processes, methods, products or devices.
[0015] Examples, such as Figure 1 As shown, the present application provides a method for real-time monitoring and adjustment of engineering budget based on BIM technology, the method comprising:
[0016] Based on BIM technology, a construction simulation model is built according to the project attribute information of the target project, and the construction simulation model is divided according to the expected construction process to determine a plurality of construction simulation units, wherein the construction simulation units correspond to the construction stages one by one.
[0017] In the embodiment of the present application, in order to accurately simulate each stage of construction, the system terminal first collects various attribute information of the target project, which includes but is not limited to basic project information (project name, geographical location, etc.), structural design information (building structure type, foundation form, etc.), construction condition information (geological conditions, climatic conditions, etc.), material and equipment information (material specifications, equipment models, etc.), construction plan and progress information (construction tasks, time arrangements, etc. at each stage). Subsequently, using BIM technology, according to the collected project attribute information, a construction simulation model is built on the BIM platform. Specifically, the system terminal establishes a three-dimensional geometric model of the project based on the basic information and structural design information of the project, and then associates the collected attribute information such as materials, equipment, and construction conditions to the three-dimensional geometric model of the project, forming a BIM model containing rich information, integrating the construction plan and progress information into the BIM model, realizing the dynamic association between the model and the construction process, and obtaining a construction simulation model. Afterwards, according to the staged division of the expected construction process, the construction simulation model is divided into simulation units corresponding to the construction stage. For example, it can be divided into the basic construction stage, the main structure construction stage, the decoration and renovation construction stage, etc. In each stage, the simulation unit is divided according to the specific construction task. For example, during the main structure construction phase, it can be divided into simulation units such as column construction, beam and slab construction, and wall construction. Then, in combination with the construction schedule, specific time nodes and durations are set for each simulation unit to ensure that each simulation unit can accurately reflect changes in the construction process. In this way, the construction simulation model can simulate and predict the entire construction process, thereby achieving fine simulation and effective management of the construction process.
[0018] The first construction phase is selected, and data mining is performed based on the construction Internet with project attribute information, expected project budget, the first construction phase and predetermined cost type as constraints to determine a first initial budget threshold, wherein the first initial budget threshold includes multiple first initial budget indicators.
[0019] In one embodiment, the system terminal selects the first construction stage from multiple construction stages as the first construction stage, and uses the project's attribute information, the expected total project budget, the specific characteristics of the stage and the predetermined cost type as key constraints, and uses the huge data platform of the Internet of Buildings to conduct in-depth data mining and analysis. The purpose of data mining is to extract highly relevant and valuable information about the first construction stage of the current project from multiple dimensions such as historical project data, industry benchmarks, and market trends. This information will help the system terminal more accurately predict and evaluate the various costs that may be incurred in this stage. Subsequently, the system terminal calculates the mean and deviation values of the extracted data to obtain the first initial budget threshold of the first construction stage. This first initial budget threshold contains multiple specific budget indicators, that is, multiple first initial budget indicators, each of which represents the upper limit of a certain type of cost in this stage, providing project managers with clear cost control goals and reference basis.
[0020] Further, if Figure 2 As shown, the present application provides a method for determining a first initial budget threshold, including:
[0021] Taking construction as a search condition, data mining is performed based on the construction Internet to obtain a search data set, and taking project attribute information, expected project budget, first construction phase and predetermined cost type as constraints, the search data set is screened to determine a sample data set, wherein the sample data includes multiple sample budget thresholds; randomly selecting multiple first sample budget indicators from the multiple sample budget thresholds, and calculating the mean of the first sample budget indicators; calculating the deviation value of the multiple first sample budget indicators based on the mean of the first sample budget indicators, selecting the first sample budget indicator whose first deviation value is less than the first deviation threshold, and obtaining multiple first standard budget indicators; setting the mean of the multiple first standard budget indicators as the first initial budget indicator, and adding it to the first initial budget threshold.
[0022] Preferably, the system terminal uses construction as a search condition and uses the construction Internet to perform data mining to obtain a wide range of search data sets related to construction. This data set contains various information of many projects, such as project attributes, budgets, construction stage details, etc. Subsequently, the project attribute information, expected project budget, specific requirements of the first construction stage, and predetermined cost types are used as constraints to screen this huge search data set to find sample data that is most similar or relevant to the current project in the first construction stage to form a sample data set. This sample data set contains multiple sample budget thresholds, each of which represents the budget forecast of different projects in the first construction stage. Afterwards, multiple budget indicators belonging to the same cost type are randomly selected from these sample budget thresholds as first sample budget indicators, where the cost types include material costs, labor costs, equipment costs, etc. Then, the average value of all first sample budget indicators is calculated, that is, the first sample budget indicator mean. This mean is a reference point for evaluating the degree of deviation of each first sample budget indicator. Then, the deviation value of each first sample budget indicator from this mean is calculated, and indicators with deviation values less than the preset first deviation threshold are found. These indicators are considered to be more stable and reliable because of their small deviation from the mean, so they are selected as the first standard budget indicators. Among them, the first deviation threshold is set according to historical data and industry standards. Finally, the system terminal determines the mean of all first standard budget indicators as the first initial budget indicator and adds it to the first initial budget threshold. In this way, the system terminal obtains an initial budget threshold that is more in line with the actual situation of the first construction phase of the current project, which contains multiple specific and verified standard budget indicators.
[0023] Furthermore, the present application provides screening of the search data set, including:
[0024] A first retrieval data is randomly selected from the retrieval data set, wherein the first retrieval data corresponds to a cost type, including sample project attributes, sample project budgets, and sample construction stages; a similarity comparison is performed between the sample project attributes and other project attributes in the retrieval data set, and the number of similarities greater than a predetermined attribute similarity threshold is counted and recorded as a first correlation degree; if the first correlation degree is greater than the predetermined correlation threshold, a similarity comparison is performed between the sample project budget and other project budgets in the retrieval data set to determine a second correlation degree; if the second correlation degree is greater than the predetermined correlation threshold, a similarity comparison is performed between the sample construction stage and other construction stages in the retrieval data set to determine a third correlation degree; if the third correlation degree is greater than the predetermined correlation threshold, the first retrieval data is added to the sample data set.
[0025] Optionally, the system terminal selects the retrieval data that meets the predetermined association threshold from the retrieval data set and adds it to the sample data set. This screening and adding process ensures that the added data has a high correlation with the existing sample data set through multi-level similarity comparison, thereby improving the efficiency and accuracy of data mining. Specifically, the system terminal first randomly selects a group of retrieval data from the retrieval data set as the first retrieval data. These data have a clear correspondence with the cost type, including but not limited to key information such as sample project attributes, sample project budgets, and sample construction stages. Subsequently, the system terminal uses absolute cosine similarity to compare the similarity of the sample project attributes in the first retrieval data with the attributes of other projects in the retrieval data set, and calculates multiple similarities. These similarities are then compared with the predetermined attribute similarity threshold, and the number of other projects with similarities greater than the predetermined attribute similarity threshold is counted, and this number is used as the first correlation. If this first correlation exceeds the predetermined correlation threshold, this indicates that the first retrieval data has a high similarity with multiple projects in the data set at the attribute level, that is, it has a high-frequency feature. After the first correlation meets the conditions, the system terminal uses the absolute difference to compare the similarity of the sample project budget in the first search data with the budget of other projects in the data set, and counts the number of similarities greater than the predetermined budget similarity threshold as the second correlation. If this second correlation also exceeds the predetermined correlation threshold, it means that at the budget level, the first search data and multiple projects in the data set also have a high degree of similarity. In the case that the second correlation also meets the predetermined correlation threshold, the cosine similarity is used to compare the similarity of the sample construction phase in the first search data with the construction phase of other projects in the data set, and counts the number of similarities greater than the predetermined phase similarity threshold as the third correlation. If the third correlation still exceeds the predetermined correlation threshold, it indicates that the first search data is highly similar to multiple projects in the data set in the three key dimensions of attributes, budget and construction phase. Through the above multi-level similarity comparison, only when the first search data meets the requirements of high-frequency feature retrieval in all three dimensions, the system terminal will add the first search data to the sample data set to ensure that only data that is highly relevant to the existing sample data set will be included, thereby avoiding the interference of irrelevant data on data mining and improving the efficiency and accuracy of data mining.
[0026] A cost trend predictor is constructed based on the predetermined cost type, and cost fluctuations in the first construction phase are predicted by the cost trend predictor. A plurality of cost prediction trends are output, and the plurality of first initial budget indicators are corrected according to the plurality of cost prediction trends to determine a plurality of first monitoring indicators.
[0027] In one embodiment, the system terminal retrieves multiple sample data sets from the construction Internet based on a predetermined cost type, and trains the BP neural network according to these sample data sets to obtain multiple cost trend prediction units. Subsequently, a mapping relationship is established between these cost trend prediction units and the corresponding cost types, and these cost trend prediction units are connected in parallel to construct a cost trend predictor. After the cost trend predictor is constructed, the system terminal uses the cost trend predictor to predict cost fluctuations for the first construction stage. This step will output multiple possible cost prediction trends, which reflect the possible changes in the cost of the first construction stage. Afterwards, according to these cost prediction trends, the system terminal corrects the multiple first initial budget indicators obtained. Specifically, the system terminal compares the cost prediction trend with the first initial budget indicator, identifies possible deviations and areas that need to be adjusted, and then analyzes the impact of each cost prediction trend on the initial budget, calculates the budget value that needs to be adjusted, and then adjusts the initial budget indicator according to the calculated budget value to more accurately reflect possible future cost changes. Then, the system terminal determines multiple first monitoring indicators based on the corrected budget indicators. These first monitoring indicators will be used to monitor and compare costs in real time during the actual construction process to ensure that project costs are controlled within an acceptable range.
[0028] Furthermore, the present application provides a construction cost trend predictor, comprising:
[0029] The predetermined cost type includes N cost types, a first cost type is selected from the N cost types, and a first associated fluctuation index of the first cost type is analyzed and determined, wherein N is an integer greater than 3; with the first construction stage, the first cost type and the first associated fluctuation index as constraints, a first sample data set is retrieved and obtained, wherein the first sample data includes a sample fluctuation index and a sample fluctuation trend, and the sample fluctuation trend includes a trend direction and a trend amplitude; with the first sample data set as training data, supervised training and verification training are performed on the BP neural network to generate a first cost trend prediction unit; the cost trend predictor is constructed based on the mapping association between the first cost type and the first cost trend prediction unit.
[0030] Preferably, the system terminal randomly selects a cost type from N cost types in the predetermined cost type as the first cost type. Wherein, N is an integer greater than 3. Subsequently, for the first cost type, the system terminal collects relevant background information. This includes but is not limited to the historical data, market trends, industry reports, etc. of the cost type. This information will help to understand the change law and influencing factors of the cost type. Then analyze the change of the first cost type and identify the factors closely related to its change. These associated factors may come from multiple aspects, such as market demand, supply chain conditions, raw material prices, labor costs, etc. Among the identified associated factors, the factors with the greatest and most direct impact on the fluctuation of the first cost type are selected as the first associated fluctuation index. These indicators need to be quantifiable and easy to obtain and monitor. For example, if the first cost type is material cost, then factors such as the rise and fall of material prices, changes in supply and demand, and the stability of raw material suppliers may become the first associated fluctuation index. Labor costs may be affected by special factors such as high salaries on holidays and high temperature fees in summer. Afterwards, the first sample data set related to the construction Internet is retrieved with the first construction stage, the first cost type, and the first associated fluctuation index as constraints. These sample data include sample fluctuation index and sample fluctuation trend. Among them, sample fluctuation index refers to the specific change value of cost. Sample fluctuation trend includes trend direction and trend amplitude, which describes how cost changes over time or other factors. Then, the system terminal designs the structure of BP neural network according to the characteristics of the first cost type and the forecasting requirements, including determining the number of layers of the network, the number of neurons in each layer, the selection of activation function, and optimization algorithm. Then, the first sample data set is divided into training set and verification set, and the parameters of BP neural network, including weights and biases, are initialized with random numbers. After the BP neural network is initialized, the system terminal uses the training set to supervise the BP neural network. During the training process, the samples in the training set are input into the network, the output value is calculated through the forward propagation of the network, and the loss value of the output value and the sample label is calculated using the mean square error loss function. Based on this loss value, the gradient is calculated using the back propagation algorithm, and the parameters of the BP neural network are updated. This process is repeated many times until the error is less than the predetermined error threshold. After each training cycle, the system terminal verifies the trained BP neural network using the verification set. The generalization ability of the BP neural network is evaluated by calculating performance indicators on the validation set, such as accuracy, recall, etc. If the performance on the validation set begins to decline, that is, overfitting occurs, the system terminal takes measures to prevent overfitting, such as stopping training early, adding regularization terms, using dropout, etc. After sufficient training, the BP neural network will learn the complex relationship between the first cost type and its associated volatility indicators, and be able to predict future cost trends based on the input data.At this point, the system terminal encapsulates the trained neural network into the first cost trend prediction unit. This unit can accept new input data and output the corresponding cost forecast trend. Finally, the system terminal builds a complete cost trend predictor based on the mapping association between the first cost type and the first cost trend prediction unit, combined with the remaining cost trend prediction units built using the same method, to improve the accuracy and practicality of cost prediction and provide strong support for project management decisions.
[0031] Furthermore, the present application provides output of multiple cost forecast trends, including:
[0032] Based on multiple related fluctuation indicators, real-time data collection is performed to determine multiple related fluctuation data sets, and the multiple related fluctuation data sets are input into the cost trend predictor. Multiple initial cost prediction trends are output through multiple cost trend prediction units, wherein the initial cost prediction trend includes an initial trend direction and an initial trend amplitude; multiple prediction accuracies of multiple cost trend prediction units are obtained, multiple initial trend amplitudes are compensated according to the multiple prediction accuracies, and the multiple cost prediction trends are output in combination with the multiple initial trend directions.
[0033] Optionally, the system terminal collects data of multiple fluctuation indicators closely related to cost changes in real time, and forms multiple associated fluctuation data sets based on these data. These indicators include raw material prices, labor costs, market demand, etc., all of which have a significant impact on cost changes. Subsequently, these multiple associated fluctuation data sets collected in real time are input into the cost trend predictor. The cost trend predictor analyzes multiple associated fluctuation data sets through multiple cost trend prediction units for different cost types contained internally. Each cost trend prediction unit independently calculates and analyzes based on the corresponding associated fluctuation data, and outputs the corresponding initial cost prediction trend. These initial prediction trends include the direction of the trend (i.e., whether the cost is rising or falling) and the amplitude of the trend (i.e., the degree of cost change). Afterwards, according to the prediction accuracy of each prediction unit, that is, the accuracy of each prediction unit in the validation set after training, the initial trend amplitude of each output is compensated accordingly. The trend amplitude of the unit with high prediction accuracy will be strengthened or retained; while the trend amplitude of the unit with low prediction accuracy will be weakened or adjusted. Through such a compensation mechanism, the system terminal can reduce errors and improve the accuracy of the overall prediction. Then, combining all compensated initial trend directions, the system terminal outputs multiple comprehensive cost forecast trends. These trends not only consider the impact of a single indicator, but also integrate multiple forecast units, thereby providing a more comprehensive and accurate forecast of cost change trends.
[0034] Furthermore, the present application provides outputting multiple cost prediction trends, and then further includes:
[0035] According to the predetermined operation and maintenance indicators, maintenance demand analysis is performed on N cost types respectively to determine multiple maintenance cost coefficients, wherein the predetermined operation and maintenance indicators at least include storage capacity demand and maintenance demand; and the expected procurement plan is optimized and adjusted according to the multiple cost forecast trends and the multiple maintenance cost coefficients.
[0036] Optionally, the system terminal first obtains predetermined operation and maintenance indicators, which at least include storage capacity requirements and maintenance requirements. Storage capacity requirements refer to the storage capacity of raw materials, inventory items, etc. that need to be maintained in order to ensure production or operation; maintenance requirements refer to the resources and costs required for daily maintenance, upkeep, inspection, etc. of these items. Subsequently, the system terminal analyzes the N cost types one by one, and for each cost type, evaluates its corresponding storage capacity requirements. This includes determining the safety stock level, maximum inventory capacity, minimum inventory, etc., to ensure that while meeting production or operation requirements, the additional costs caused by excessive inventory backlogs are avoided. After that, the maintenance requirements corresponding to each cost type are analyzed. This includes determining the maintenance cycle, maintenance content, maintenance cost, etc. For example, for a certain equipment, it is necessary to regularly replace parts and perform lubrication maintenance; for raw materials, it may be necessary to consider the impact of factors such as their shelf life and storage conditions on maintenance costs. Then, based on the above analysis of storage capacity requirements and maintenance requirements, combined with historical data and industry experience, a maintenance cost coefficient is determined for each cost type. These coefficients reflect the weight of the maintenance cost required for each cost type under different operation and maintenance conditions. After obtaining the maintenance cost coefficient, the system terminal optimizes and adjusts the expected procurement plan in combination with the determined cost trend forecast results. Specifically, when it is predicted that the price of raw materials will show a downward trend, the system terminal will reduce the procurement volume to reduce inventory costs and capital occupation, while taking into account the storage capacity limit to avoid excessive backlogs; on the contrary, when it is predicted that the price of raw materials will rise, the procurement volume will be increased to lock in the current low price and reduce the impact of future cost increases. At the same time, when adjusting the procurement volume, the material maintenance cost will also be comprehensively considered to ensure that while reducing the procurement cost, no additional costs will be added due to improper maintenance.
[0037] Determine whether the sum of the multiple first monitoring indicators is greater than the sum of the multiple first initial budget indicators. If so, calculate and obtain the first indicator deviation, and perform cost optimization analysis for the purpose of eliminating the first indicator deviation to determine the first adjustment strategy.
[0038] In one embodiment, the system terminal summarizes multiple first monitoring indicators and calculates their sum. This sum is then compared with the sum of multiple first initial budget indicators. This step is intended to evaluate whether the actual cost exceeds the budget range. If the sum of multiple first monitoring indicators is greater than the sum of multiple first initial budget indicators, it means that the actual cost has exceeded the budget. At this time, the system terminal determines that there is a first indicator deviation, and quantifies the first indicator deviation by calculating the difference between the sum of the first monitoring indicators and the sum of the first initial budget indicators. This first indicator deviation represents the cost portion that exceeds the budget. After identifying the first indicator deviation, the system terminal determines multiple first flexible costs and multiple first rigid costs based on the N cost types of the first construction stage, and performs cost optimization analysis based on the adjustable first flexible costs to obtain the first adjustment strategy. These strategies are intended to reduce or eliminate the first indicator deviation by adjusting the cost structure of the first flexible cost, optimizing resource allocation, and so on, so as to ensure that the actual cost can return to the budget range.
[0039] Furthermore, the present application provides an impedance fitness evaluation function, including:
[0040] Performing cost characteristic analysis on N cost types in the first construction phase to determine a plurality of first flexible costs; performing cost optimization analysis on the plurality of first flexible costs for the purpose of eliminating the first indicator deviation, and outputting the first adjustment strategy.
[0041] Preferably, in the first construction stage, the system terminal first analyzes the cost characteristics of N cost types to understand the cost attribute information such as the nature, source, and composition of each cost item. Then, based on these cost attribute information, determine whether it has adjustability, flexibility, and market conditions, and divide the N cost types according to the analysis results to obtain multiple first flexible costs and multiple first rigid costs. Among them, the first flexible cost refers to a cost item that can be flexibly adjusted and optimized within a certain range and will not have a significant negative impact on the construction progress, quality, etc. These cost items are usually related to the material purchase price, the variable part of the labor cost, and certain indirect costs. They are characterized by large adjustment space, and the total cost can be significantly reduced through reasonable optimization measures. The first rigid cost refers to those cost items that are relatively fixed, difficult to adjust directly, or have high adjustment costs. These cost items may include equipment depreciation, land rent, fixed salary expenditure, etc. They are characterized by strong stability and are not easily disturbed by external factors, but they are also difficult to adjust. Subsequently, in order to eliminate the first indicator deviation found in the first monitoring process, the system terminal collects historical data, current data, market trends and other information of each flexible cost item. Compare the first monitoring indicator of each flexible cost item with the first initial budget indicator to find out the reasons and influencing factors of the difference. Then analyze the cost saving potential that can be achieved through optimization measures for each flexible cost item, consider the impact of the optimization measures on construction progress, quality, safety, etc., and evaluate its comprehensive benefits. After that, for each flexible cost item, formulate the first adjustment strategy based on historical experience and actual needs. This first adjustment strategy explains how to adjust the first flexible cost item to eliminate the deviation of the first indicator and ensure that the actual cost can return to the budget range. These adjustment measures include adjusting material procurement strategies, optimizing human resource allocation, and many other aspects.
[0042] The multiple first monitoring indicators are optimized according to the first adjustment strategy to obtain multiple first optimized monitoring indicators.
[0043] In one embodiment, the system terminal operates and adjusts multiple first monitoring indicators according to the formulated first adjustment strategy. These first monitoring indicators originally reflect the real-time cost status of the construction phase, but due to deviations, the data they display do not fully meet expectations. By executing various measures in the first adjustment strategy, for example, optimizing material procurement channels, adjusting human resource allocation, etc., the cost status represented by these monitoring indicators can be changed. With the gradual implementation of these optimization measures, the cost data reflected by the first monitoring indicators will also change accordingly. When the first adjustment strategy is executed and after a period of monitoring, the system terminal re-evaluates these first monitoring indicators to obtain the first optimized monitoring indicators. They more accurately reflect the cost status of the construction phase after the optimization measures are taken, and are closer to or consistent with the budgeted cost.
[0044] Based on the first construction simulation unit, the project budget monitoring and adjustment of the first construction phase is performed according to the plurality of first optimization monitoring indicators.
[0045] In one embodiment, the system terminal uses the first construction simulation unit in the construction simulation model as a core tool, and performs refined monitoring of the project budget of the first construction phase according to the obtained multiple first optimization monitoring indicators. In order to achieve real-time monitoring and feedback control, the system terminal further subdivides the first construction phase into multiple monitoring nodes. These nodes can be time nodes, such as weekly, monthly or at the end of a specific construction phase, or they can be key tasks or milestone nodes. At each monitoring node, the system terminal collects and analyzes relevant cost data, and compares it with the first optimization monitoring indicator to evaluate whether the cost status of the current construction phase meets expectations. If the monitoring results show that the current cost exceeds the range set by the first optimization monitoring indicator, the system terminal will immediately trigger the feedback control mechanism. This mechanism will re-perform the aforementioned cost optimization analysis process, aiming to quickly bring the cost back within the budget range and ensure that the construction progress is not affected.
[0046] Furthermore, the application provides for the monitoring and adjustment of the project budget during the execution of the first construction phase, and then includes
[0047] Based on the first construction simulation unit, a first actual project budget of the first construction phase is recorded; a remaining budget analysis is performed on the expected project budget and the first actual project budget, and the remaining project budget is set as the expected project budget of the subsequent construction phase.
[0048] Preferably, the system terminal simulates and simulates the first construction stage based on the first construction simulation unit, thereby recording the first actual project budget of the stage. This actual budget reflects the sum of various cost expenditures actually incurred by the project in the first construction stage. Subsequently, the first actual project budget is compared and analyzed with the expected project budget. This comparative analysis process is to find out the difference between the two, that is, the situation of the remaining budget. The remaining budget refers to how much budget is left in the project after the first construction stage is completed and can be used for subsequent construction stages. Through the remaining budget analysis, the system terminal obtains a remaining project budget, which represents the expected project budget that can be used in the subsequent construction stage. The system terminal sets the remaining project budget as the expected project budget for the subsequent construction stage. Doing so can help the system terminal more accurately plan and manage the use of funds in the subsequent construction stage, ensuring that the project can be smoothly promoted within the budget. At the same time, this also provides important decision-making basis for project managers so that timely adjustments and optimizations can be made when necessary.
[0049] In summary, the embodiments of the present application have at least the following technical effects:
[0050] The embodiment of the present application establishes a construction simulation model, combines project attribute information, divides the construction process into multiple simulation units, and uses the building Internet for data mining to determine the initial budget threshold. The cost trend predictor is used to predict the cost fluctuations in the construction phase, and adjusts the initial budget indicators according to the predicted trend, and then determines the monitoring indicators. If the monitoring indicators show a budget deviation, a cost optimization analysis is performed to determine the adjustment strategy, and the monitoring indicators are optimized accordingly, so as to achieve budget monitoring and adjustment in the construction phase. In addition, by screening and analyzing historical data, a cost trend prediction model is constructed, and it is continuously updated and adjusted in actual construction to ensure the accuracy and practicality of budget monitoring. After the construction is completed, the remaining budget analysis will be performed based on the actual budget and the expected budget to provide a more accurate budget forecast for the subsequent construction phase. These technical effects jointly solve the technical problems that the traditional monitoring method is based on fixed budget indicators for monitoring, does not consider the fluctuations in construction costs, leads to poor matching between budget indicators and actual construction status, and causes the practicality and accuracy of budget monitoring and adjustment. It realizes real-time monitoring and dynamic adjustment of the project budget, improves the matching between budget indicators and actual construction status, and enhances the practicality and accuracy of budget monitoring and adjustment.
[0051] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. The processes depicted in the accompanying drawings do not necessarily require the specific order and continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0052] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
[0053] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. A real-time monitoring and adjustment method for engineering budget based on BIM technology, characterized in that: include: Based on BIM technology, a construction simulation model is built according to the project attribute information of the target project, and the construction simulation model is divided according to the expected construction process to determine multiple construction simulation units, wherein the construction simulation units correspond to the construction stages one by one; The first construction phase is selected, and a first initial budget threshold is determined based on data mining based on the Internet of Buildings with project attribute information, expected project budget, the first construction phase, and predetermined cost type as constraints, wherein the first initial budget threshold includes a plurality of first initial budget indicators; Building a cost trend predictor based on the predetermined cost type, predicting cost fluctuations in the first construction phase through the cost trend predictor, outputting a plurality of cost forecast trends, correcting the plurality of first initial budget indicators according to the plurality of cost forecast trends, and determining a plurality of first monitoring indicators; Determine whether the sum of the plurality of first monitoring indicators is greater than the sum of the plurality of first initial budget indicators, and if so, calculate and obtain the first indicator deviation, and perform cost optimization analysis for the purpose of eliminating the first indicator deviation, and determine a first adjustment strategy; Optimizing the plurality of first monitoring indicators according to the first adjustment strategy to obtain a plurality of first optimized monitoring indicators; Based on the first construction simulation unit, the project budget monitoring and adjustment of the first construction phase is performed according to the plurality of first optimization monitoring indicators.
2. The method for real-time monitoring and adjustment of engineering budget based on BIM technology according to claim 1 is characterized in that: Determine a first initial budget threshold, including: Taking construction as a search condition, data mining is performed based on the construction Internet to obtain a search data set, and the search data set is screened based on project attribute information, expected project budget, first construction stage and predetermined cost type as constraints to determine a sample data set, wherein the sample data includes multiple sample budget thresholds; Randomly selecting a plurality of first sample budget indicators from the plurality of sample budget thresholds, and calculating a mean value of the first sample budget indicators; Calculate the deviation value of the plurality of first sample budget indicators based on the first sample budget indicator mean value, select the first sample budget indicator whose first deviation value is less than the first deviation threshold value, and obtain a plurality of first standard budget indicators; An average value of the plurality of first standard budget indicators is set as a first initial budget indicator, and is added to the first initial budget threshold.
3. The method for real-time monitoring and adjustment of engineering budget based on BIM technology according to claim 2 is characterized in that: Screening the search data set includes: Randomly selecting first search data from the search data set, wherein the first search data corresponds to a cost type, including sample project attributes, sample project budgets, and sample construction stages; Performing a similarity comparison between the sample item attributes and other item attributes in the search data set, and counting the number of similarities greater than a predetermined attribute similarity threshold, which is recorded as a first correlation degree; If the first relevance is greater than a predetermined relevance threshold, performing a similarity comparison between the sample project budget and other project budgets in the search data set to determine a second relevance; If the second correlation degree is greater than a predetermined correlation threshold, performing a similarity comparison between the sample construction phase and other construction phases in the search data set to determine a third correlation degree; If the third degree of association is greater than a predetermined association threshold, the first search data is added to the sample data set.
4. The method for real-time monitoring and adjustment of engineering budget based on BIM technology according to claim 1 is characterized in that: Build a cost trend predictor, including: The predetermined cost type includes N cost types, a first cost type is selected from the N cost types, and a first associated fluctuation index of the first cost type is analyzed and determined, wherein N is an integer greater than 3; Taking the first construction stage, the first cost type and the first associated fluctuation index as constraints, a first sample data set is retrieved and obtained, wherein the first sample data includes a sample fluctuation index and a sample fluctuation trend, and the sample fluctuation trend includes a trend direction and a trend amplitude; Using the first sample data set as training data, performing supervised training and verification training on the BP neural network to generate a first cost trend prediction unit; The cost trend predictor is constructed based on a mapping association between the first cost type and the first cost trend prediction unit.
5. The method for real-time monitoring and adjustment of engineering budget based on BIM technology according to claim 4 is characterized in that: Output multiple cost forecast trends, including: Based on multiple related fluctuation indicators, real-time collection is performed to determine multiple related fluctuation data sets, the multiple related fluctuation data sets are input into the cost trend predictor, and multiple initial cost prediction trends are output through multiple cost trend prediction units, wherein the initial cost prediction trend includes an initial trend direction and an initial trend amplitude; A plurality of prediction accuracies of a plurality of cost trend prediction units are obtained, a plurality of initial trend amplitudes are compensated according to the plurality of prediction accuracies, and the plurality of cost prediction trends are output in combination with the plurality of initial trend directions.
6. The method for real-time monitoring and adjustment of engineering budget based on BIM technology according to claim 4 is characterized in that: Output multiple cost forecast trends, including: Perform maintenance demand analysis on N cost types respectively according to predetermined operation and maintenance indicators to determine multiple maintenance cost coefficients, wherein the predetermined operation and maintenance indicators at least include storage capacity demand and maintenance demand; The expected procurement plan is optimized and adjusted according to the multiple cost forecast trends and the multiple maintenance cost coefficients.
7. The method for real-time monitoring and adjustment of engineering budget based on BIM technology according to claim 1 is characterized in that: Determine the first adjustment strategy, including: Perform cost characteristic analysis on N cost types in the first construction phase to determine multiple first flexible costs; For the purpose of eliminating the first indicator deviation, cost optimization analysis is performed on the plurality of first flexible costs, and the first adjustment strategy is output.
8. The method for real-time monitoring and adjustment of engineering budget based on BIM technology according to claim 1 is characterized in that: Perform project budget monitoring and adjustment for the first construction phase, and thereafter include: Based on the first construction simulation unit, recording a first actual project budget of the first construction phase; A remaining budget analysis is performed on the expected project budget and the first actual project budget, and the remaining project budget is set as the expected project budget for the subsequent construction stage.