Road risk evaluation method, device and equipment and storage medium
Through the combination of multi-dimensional road indicators and correction coefficients, the problem of inaccurate road risk assessment in the existing technology is solved, and the accuracy of road risk assessment is improved.
Patent Information
- Application Number
- CN202411190405.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-06
AI Technical Summary
The existing road risk assessment methods rely on road surface images, and the computing power is consumed very much and is not accurate enough to fully reflect the risk level, resulting in large errors in the evaluation results.
The index value is obtained by using multi-dimensional road indicators (geological conditions, ground settlement, pipeline networks, underground structures, road loads, water environment), combined with the risk values and weights of each indicator, and through multiple correction coefficient adjustments, the road risk score is finally generated and evaluation results.
The accuracy of road risk assessment is improved, and the road risk level is determined more accurately through multi-dimensional considerations and coefficient correction, and errors are reduced.
Smart Images

Figure CN119090272A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a road risk assessment method, device, equipment and storage medium. Background Art
[0002] Road safety is closely related to the safety of people’s lives and property. Timely and effective assessment of road risks and risk warnings are one of the effective ways to reduce traffic accidents caused by road safety.
[0003] At present, in order to effectively evaluate the risk of roads, a neural network model can be constructed, and the collected road surface images are input into the neural network model to obtain the risk level output by the neural network model. This method not only requires computing equipment with huge computing power, but also cannot fully reflect the risk level by only collecting road surface images, and the specific problem is inaccurate.
[0004] Therefore, the road assessment results obtained by the current road risk assessment method have large errors. Summary of the invention
[0005] The present application provides a road risk assessment method, device, equipment and storage medium, which can improve the accuracy of road risk assessment.
[0006] In order to achieve the above objectives, this application adopts the following technical solutions:
[0007] In a first aspect, the present application provides a road risk assessment method, the method comprising:
[0008] Obtaining index values of multiple road indicators of the road to be evaluated, wherein the multiple road indicators include geological condition indicators, ground subsidence indicators, pipe network indicators, underground structure indicators, road load indicators, and water environment indicators;
[0009] Determine the risk value of each road indicator according to the indicator value of each road indicator among the plurality of road indicators and the risk value determination strategy corresponding to each road indicator;
[0010] Determining a first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator;
[0011] According to the construction disturbance correction coefficient of the road to be evaluated, the first score is corrected to obtain a second score of the road to be evaluated; according to the construction disturbance reduction coefficient of the road to be evaluated, the second score is corrected to obtain a third score of the road to be evaluated; according to the preset situation correction coefficient of the road to be evaluated, the first score is corrected to obtain a fourth score of the road to be evaluated;
[0012] Determine a fifth score of the road to be evaluated according to the maximum value among the second score, the third score and the fourth score and the superposition correction coefficient of the road to be evaluated; determine a sixth score of the road to be evaluated according to the maximum value among the first score, the second score, the third score, the fourth score and the fifth score and the preset meteorological correction coefficient of the road to be evaluated;
[0013] A first evaluation result of the road to be evaluated is generated according to the sixth score of the road to be evaluated.
[0014] Optionally, the method further includes:
[0015] Determining a target risk level of the road to be evaluated according to the first evaluation result;
[0016] According to the target risk level and the predetermined correspondence between the risk level and the treatment measure, the target treatment measure corresponding to the target risk level is determined.
[0017] Optionally, the method further includes:
[0018] The target processing measure is presented to a user so that the user processes the road to be evaluated according to the target processing measure.
[0019] Optionally, the method further includes:
[0020] Determine a seventh score of the road to be evaluated according to a maximum value among the first score, the second score, the third score, the fourth score and the fifth score and a construction re-measurement reduction coefficient of the road to be evaluated;
[0021] A second evaluation result of the road to be evaluated is generated according to the seventh score.
[0022] Optionally, determining the first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator includes:
[0023]
[0024] Wherein, P0 is the first score of the road to be evaluated, w n is the weight corresponding to the nth road index, i n is the risk value corresponding to the nth road indicator, and N is the total number of road indicators in the multiple road indicators.
[0025] Optionally, the method further includes:
[0026] If the target risk level is greater than or equal to a preset level threshold, a prompt message is generated, wherein the prompt message is used to instruct the user to close the road to be evaluated.
[0027] Optionally, the geological condition indicators include: fill layer thickness and state indicators, distance to underground rivers and hidden bays indicators, saturated silt top plate burial depth indicators, saturated silt layer thickness indicators and soft evaluation ratio indicators, wherein the soft evaluation ratio is the ratio of soft soil layer thickness to evaluation depth;
[0028] The ground subsidence index includes: ground cumulative subsidence index and ground subsidence rate index;
[0029] The pipe network index includes: water supply pipe network density index and drainage pipe network density index;
[0030] The underground structure indicators include: the range indicator from the underground operating rail line, the range indicator from the underground tunnel and the range indicator from the underground pipeline gallery;
[0031] The water environment indicators include: road surface water condition indicators and current water system distribution density indicators.
[0032] In a second aspect, the present application provides a road risk assessment device, the device comprising:
[0033] An acquisition module, used to acquire index values of multiple road indicators of the road to be evaluated, wherein the multiple road indicators include geological condition indicators, ground subsidence indicators, pipe network indicators, underground structure indicators, road load indicators and water environment indicators;
[0034] A determination module, for determining a risk value of each road indicator according to an indicator value of each road indicator in the multiple road indicators and a risk value determination strategy corresponding to each road indicator; determining a first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator; correcting the first score according to a construction interference correction coefficient of the road to be evaluated to obtain a second score of the road to be evaluated; correcting the second score according to a construction interference reduction coefficient of the road to be evaluated to obtain a third score of the road to be evaluated; correcting the first score according to a preset situation correction coefficient of the road to be evaluated to obtain a fourth score of the road to be evaluated; determining a fifth score of the road to be evaluated according to a maximum value among the second score, the third score and the fourth score and a superposition correction coefficient of the road to be evaluated; determining a sixth score of the road to be evaluated according to a maximum value among the first score, the second score, the third score, the fourth score and the fifth score and a preset meteorological correction coefficient of the road to be evaluated;
[0035] An evaluation module is used to generate a first evaluation result of the road to be evaluated according to the sixth score of the road to be evaluated.
[0036] In a third aspect, the present application provides a computing device, including a memory and a processor;
[0037] One or more computer programs are stored in the memory, and the one or more computer programs include instructions; when the instructions are executed by the processor, the computing device executes the method as described in any one of the first aspects.
[0038] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium is used to store a computer program, and the computer program is used to execute the method as described in any one of the first aspects.
[0039] It can be seen from the above technical solution that the present application has at least the following beneficial effects:
[0040] The present application provides a road risk assessment method, which includes obtaining the index values of multiple road indicators of a road to be evaluated, wherein the indicators include address condition indicators, ground subsidence indicators, pipe network indicators, underground structure indicators, road load indicators and water environment indicators; then determining a strategy based on the index values of these indicators and the risk values corresponding to each road indicator, determining the risk value of each road indicator, and then determining the first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator. Then, based on the construction interference correction coefficient, the first score is corrected to obtain the second score, based on the construction interference reduction coefficient, the second score is corrected to obtain the third score, and based on the preset situation correction coefficient, the first score is corrected to obtain the fourth score. Then, based on the maximum value of the second score, the third score and the fourth score and the superposition correction coefficient, the fifth score is determined, and based on the maximum value of the first score, the second score, the third score, the fourth score and the fifth score and the preset meteorological correction coefficient, the sixth score of the road to be evaluated is determined; finally, based on the sixth score, the first evaluation result of the road to be evaluated is generated. In this method, not only the risk value of the road is considered from multiple different dimensions, but also multiple coefficients that affect the risk value are considered. With the correction of these coefficients, the road risk level can be determined more accurately, thereby improving the accuracy of road evaluation.
[0041] It should be understood that the description of technical features, technical solutions, beneficial effects or similar language in this application does not imply that all features and advantages can be realized in any single embodiment. On the contrary, it is understood that the description of features or beneficial effects means that specific technical features, technical solutions or beneficial effects are included in at least one embodiment. Therefore, the description of technical features, technical solutions or beneficial effects in this specification does not necessarily refer to the same embodiment. Furthermore, the technical features, technical solutions and beneficial effects described in the present embodiment can also be combined in any appropriate manner. Those skilled in the art will understand that the embodiment can be realized without one or more specific technical features, technical solutions or beneficial effects of a specific embodiment. In other embodiments, additional technical features and beneficial effects can also be identified in a specific embodiment that does not embody all embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 A flow chart of a road risk assessment method provided in an embodiment of the present application;
[0043] Figure 2 A schematic diagram of a road risk assessment device provided in an embodiment of the present application;
[0044] Figure 3 A schematic diagram of a computing device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0045] The terms "first", "second", "third", etc. in the specification of this application and the accompanying drawings are used to distinguish different objects rather than to limit a specific order.
[0046] In the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0047] An embodiment of the present application provides a road evaluation method, which can be executed by a processing device, and the processing device can be a terminal or a server.
[0048] like Figure 1 As shown, the figure is a flow chart of a road evaluation method provided in an embodiment of the present application, the method comprising:
[0049] S101. A processing device obtains index values of a plurality of road indexes of a road to be evaluated.
[0050] Among them, multiple road indicators include address condition indicators, ground subsidence indicators, pipe network indicators, underground structure indicators, road load indicators and water environment indicators. Furthermore, the geological condition indicators include: fill layer thickness and state indicators, range indicators from underground rivers and bays, saturated silt top plate burial depth indicators, saturated silt layer thickness indicators and soft evaluation ratio indicators, the soft evaluation ratio is the ratio of soft soil layer thickness to evaluation depth; the ground subsidence indicators include: ground cumulative subsidence indicators and ground subsidence rate indicators; the pipe network indicators include: water supply network density indicators and drainage network density indicators; the underground structure indicators include: range indicators from underground operating rail lines, range indicators from underground tunnels and range indicators from underground pipe corridors; the water environment indicators include: road surface water status indicators and current water system distribution density indicators.
[0051] The index value refers to the specific numerical value of the index. For example, for the cumulative ground settlement index, the index value may be 500 mm.
[0052] In some embodiments, the indicator values of the above-mentioned indicators can be determined by on-site survey or by consulting the log files corresponding to the roads.
[0053] S102: The processing device determines a risk value for each road indicator according to an indicator value of each road indicator among a plurality of road indicators and a risk value determination strategy corresponding to each road indicator.
[0054] Different road indicators have different risk value determination strategies. Table 1 provides a schematic table of risk value determination strategies corresponding to various road indicators.
[0055] Table 1:
[0056]
[0057] Among them, taking the thickness and status indicators of the fill layer as an example, when the index value is loose fill greater than 3 meters, it can be determined that the risk value is between 80-100, and the larger the index value, the closer the risk value is to 100. When the index value is 3 meters, the risk value can be 80; if the index value is loose fill of 1.5 meters to 3 meters, it can be determined that the risk value is between 50-80, and the larger the index value, the greater the risk value; if the index value is loose fill or dense fill less than 1.5 meters, the risk value is between 0-50, and the larger the index value, the greater the risk value.
[0058] It should be noted that the present application does not specifically limit the method for obtaining the index values of each road index in the above Table 1. In some examples, the above index values can be obtained through on-site surveys, and then combined with the above Table 1 to determine the risk value range corresponding to each indicator.
[0059] After the processing device determines the risk value interval, a specific risk value can be determined within the risk value interval based on the magnitude of the indicator value.
[0060] For example, taking the fill layer thickness and state index as an example, when the index value is 5 meters of loose fill, it can be determined that the risk value is between 80-100, and then the risk value corresponding to the 5 meters of loose fill is selected from 80-100. For example, the risk value determination function corresponding to the fill layer thickness and state index can be pre-fitted, and the corresponding risk value can be obtained by bringing the above index value into the pre-fitted risk value determination function. For example, the risk value corresponding to 5 meters is 85.
[0061] S103: The processing device determines a first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator.
[0062] The weights corresponding to the various road indicators can be seen in Table 1 above.
[0063] In some embodiments, the processing device may determine the first score of the road to be evaluated by the following formula:
[0064]
[0065] Among them, P0 is the first score of the road to be evaluated, w n is the weight corresponding to the nth road index, i n is the risk value corresponding to the nth road indicator, and N is the total number of road indicators in the multiple road indicators.
[0066] Continuing the example shown in Table 1 above, N is 15, assuming i1 = 80, i2 = 90, i3 = 70, i4 = 60, i5 = 80, i6 = 70, i7 = 90, i8 = 50, i9 = 20, i 10 =30,i 11 =20,i 12 =30,i 13 =50,i 14 =80,i 15 =10, through the above formula and the weights corresponding to the various road indicators shown in Table 1, the first score of the road to be evaluated can be calculated.
[0067] S104: The processing device corrects the first score according to the construction interference correction coefficient of the road to be evaluated to obtain a second score of the road to be evaluated.
[0068] If there is construction or other conditions near the road to be evaluated, the processing device corrects the first score based on the specific construction interference conditions. In some examples, the construction interference correction factor can be determined based on geological conditions and construction interference factors. Table 2 is a table of construction interference correction factors provided in an embodiment of the present application.
[0069] Table 2:
[0070]
[0071] Among them, the geological conditions and construction interference factors in Table 2 can be obtained by surveying the road to be evaluated. μ is the ratio of the diameter of the crossing channel of the jacking pipe, shield, and dragging pipe to the buried depth of the top of the channel, and h is the excavation depth or the buried depth of the top plate of the jacking pipe, shield, and dragging pipe. The value of the risk correction coefficient α is between 1.05 and 1.80, and α is the empirical value obtained after comprehensive analysis of the causes of road collapse and historical case experience and simulation verification; α in the table is the risk correction coefficient for the road range ≤h (i.e., 1 times the excavation depth) from the construction boundary; when the road range is h<&≤2h from the construction boundary, the risk correction coefficient α will be multiplied by the reduction coefficient 0.9; when the road range is 2h<&≤3h from the construction boundary, the risk correction coefficient α will be multiplied by the reduction coefficient 0.8; when the risk correction coefficient α is <1.0 after the reduction calculation, α is taken as 1.0. When some strata or specific factors occur at the same time, the calculation is based on the principle of the highest possible value. When the dragging pipe construction is 0.6≤μ<1.0, it is determined that the design is unreasonable or there are problems in the construction management, and the risk probability is evaluated as E level (highly likely to occur in the near future).
[0072] In some embodiments, the processing device may modify the first score by the following formula to obtain the second score:
[0073] P 2-1 =P0·α
[0074] Among them, P 2-1 is the second score, P0 is the first score, and α is the construction interference correction coefficient. α can be determined by the above Table 2. For example, the geological condition is that the ratio of soft soil thickness to evaluation depth is ≥40%, and the construction interference factor is μ<0.2 in the top pipe, shield / towed pipe, and the range is ≤h; the construction interference correction coefficient is 1.1. If the road range is h<&≤2h from the construction boundary, further correction is required. The risk correction coefficient α will be multiplied by the reduction factor 0.9 to obtain the corrected construction interference correction coefficient of 0.99. It can be seen that the corrected construction interference correction coefficient is less than 1, so the construction interference correction coefficient can be determined as 1.
[0075] S105. The processing device corrects the second score according to the construction disturbance reduction coefficient of the road to be evaluated to obtain a third score of the road to be evaluated.
[0076] In some examples, the construction interference reduction factor can be determined by construction monitoring factors and design safety factors. It should be noted that if the design plan has obvious safety loopholes or the construction unit has low credit score (engineering safety factors) or the construction unit does not follow the design drawings and other violations, the possibility of road collapse risk here will be characterized as E level; if the design plan is qualified after review and the construction unit has excellent safety management quality, the matrix method is used to assign the construction interference reduction factor β, and the P in the vicinity of the construction project will be 2-1 Multiply by the corresponding risk reduction factor β to get the risk probability score P 2-2 Table 3 is a table of a construction disturbance reduction system provided in an embodiment of the present application.
[0077] Table 3:
[0078]
[0079] For example, the construction monitoring factor can be the displacement change rate of the foundation pit, and the design safety factor can be determined based on the specifications during construction. In Table 3, k is the safety factor required by the specifications; 0.7 to 1.0 is the risk reduction factor β for specific situations, and β is the empirical value obtained after comprehensive analysis of the causes of road collapse and historical case experience and simulation verification; the corporate credit evaluation of the construction unit is queried through a pre-built information management system. If the corporate credit evaluation is E-level (low credit due to safety reasons), the construction area it is responsible for is qualitatively classified as the E-level risk possibility; the construction interference reduction factor is based on the evaluation carried out after the construction unit provides the road management unit with a complete design plan, construction plan and monitoring data. If there is no detailed relevant information, the risk reduction factor cannot be evaluated, and the third score cannot be calculated, then the second score is used to divide the risk possibility; the above safety factor k, design plan and construction safety management related issues need to be determined based on expert review opinions.
[0080] In some embodiments, the road to be evaluated can be surveyed to determine which of the conditions in Table 3 the road to be evaluated belongs to, and then the specific construction interference reduction coefficient can be determined. The processing device can determine the third score by the following formula:
[0081] P 2-2 =P 2-1 β
[0082] Among them, P 2-2 For the third score, P 2-1 is the second score, and β is the construction disturbance reduction coefficient.
[0083] S106: The processing device corrects the first score according to a preset situation correction coefficient of the road to be evaluated to obtain a fourth score of the road to be evaluated.
[0084] In some examples, the preset situation correction coefficient can be determined by geological conditions and specific factors. Through comprehensive analysis of the causes of road collapse and historical case experience and simulation verification, it is found that there are high risk hazards in pipeline leakage areas, areas with abnormal road conditions, and areas with serious road diseases in history, so the matrix method is used to assign the preset situation correction coefficient γ. Table 4 is a schematic table of preset situation correction coefficients provided in an embodiment of the present application.
[0085] Table 4:
[0086]
[0087]
[0088] In some embodiments, the road to be evaluated can be surveyed to determine which of the conditions in Table 4 the road to be evaluated belongs to, and then determine the specific preset condition correction coefficient. The processing device can determine the fourth score by the following formula:
[0089] P3=P0·γ
[0090] Among them, P3 is the fourth score, P0 is the first score, and γ is the preset situation correction coefficient.
[0091] S107: The processing device determines a fifth score of the road to be evaluated according to a maximum value among the second score, the third score, and the fourth score and a superposition correction coefficient of the road to be evaluated.
[0092] Due to the interference of construction near the road and the interaction and superposition of specific situations, a superposition effect will be generated. Therefore, by analyzing the importance and harmfulness of each factor, the weight value η0 of each factor is calculated using the nine-level scaling method. As shown in Table 5, this table is a schematic table of a superposition correction coefficient provided in an embodiment of the present application.
[0093] Serial number Construction interference, special situation factors <![CDATA[Importance and harmfulness weight value η0]]> 1 Shallow construction near the road 0.015 2 μ<0.2 in jacking pipe, shield / towed pipe 0.015 3 0.2≤μ<0.4 in jacking pipe, shield / towed pipe 0.024 4 0.4≤μ<0.6 in jacking pipe, shield / towed pipe 0.1 5 0.6≤μ<1.0 in jacking pipe and shield tunneling 0.2 6 Depth of foundation pit under construction: 4m 0.025 7 The depth of the foundation pit is 4 to 10m 0.048 8 The depth of the foundation pit is 10 to 20 meters. 0.1 9 The depth of the foundation pit is 20 to 30m 0.2 10 Pipeline network leakage area 0.1 11 There are large areas of irregular and obvious cracks, potholes, cracks, etc. on the road surface 0.048 12 Severe cracks or subsidence areas on the road 0.1 13 Areas with severe disease in history 0.025
[0094] Among them, shallow construction near the road refers to the construction of ground sections such as building construction and road construction, except for jacking, shield / drag pipe construction and foundation pit construction being excavated. Table 5 shows 13 weights. In some examples, the road to be evaluated can be surveyed to determine whether the road to be evaluated includes several of the above 13 situations. The weights corresponding to the included situations are accumulated to obtain the superposition correction coefficient. For example, if the road to be evaluated belongs to the situations corresponding to sequence number 2, sequence number 6 and sequence number 10, the weight 0.015 corresponding to sequence number 2, the weight 0.025 corresponding to sequence number 6 and the weight 0.1 corresponding to sequence number 10 are accumulated to obtain the superposition correction coefficient of the road to be evaluated.
[0095] After the processing device obtains the superposition correction coefficient of the road to be evaluated, it can first select the maximum value from the first score, the second score and the third score, and then use the superposition correction coefficient to correct the maximum value to obtain the fifth score. Specifically, the fifth score can be determined by the following formula:
[0096] P4=max(P0,P 2-1 , P 2-2 , P3)·η
[0097] P4 is the fifth score, P0 is the first score, P 2-1 For the second score, P 2-2 is the third score, P3 is the fourth score, and η is the superposition correction coefficient.
[0098] S108. The processing device determines a sixth score for the road to be evaluated according to the maximum value among the first score, the second score, the third score, the fourth score and the fifth score and a preset weather correction coefficient for the road to be evaluated.
[0099] Because the construction interference area and the above-mentioned preset conditions are exposed to the wild space for a long time, the risk impact will increase sharply under special meteorological conditions (long-term rainfall (accumulated rainfall of 50mm or more within three days) or short-term heavy rainfall (yellow warning for heavy rain or above), typhoon weather, etc.), so the preset meteorological correction coefficient λ is assigned according to the risk factors. As shown in Table 6, this table is a schematic table of preset meteorological correction coefficients provided in an embodiment of the present application.
[0100] Table 6:
[0101]
[0102]
[0103] Among them, shallow construction near roads refers to construction of ground sections such as building construction and road construction, excluding construction of jacking pipes, shield / trailer pipes and foundation pits being excavated. General situations refer to other situations except those described in Table 6 above. The preset meteorological correction coefficient λ is an empirical value obtained through comprehensive analysis of historical case experience and simulation verification; areas affected by special meteorology are mainly areas exposed to external space for a long time, such as foundation pit construction areas, areas with severe cracks or subsidence on the road surface, etc.
[0104] In some embodiments, the preset weather correction coefficient can be determined by surveying the road to be evaluated and combining the above Table 6, and then the maximum value is determined from the first score, the second score, the third score, the fourth score and the fifth score, and the maximum value is corrected to obtain the sixth score. Specifically, the processing device determines the sixth score based on the following formula:
[0105] P5=max(P0,P 2-1 , P 2-2 , P3, P4)·λ
[0106] Among them, P5 is the sixth score, P0 is the first score, P 2-1 For the second score, P 2-2 is the third score, P3 is the fourth score, P4 is the fifth score, and λ is the preset meteorological correction coefficient.
[0107] S109: The processing device generates a first evaluation result of the road to be evaluated according to the sixth score of the road to be evaluated.
[0108] The first evaluation result can be characterized by a scoring level. As shown in Table 7, this table is a schematic table of scoring levels provided in an embodiment of the present application.
[0109] Table 7:
[0110]
[0111] Among them, the scoring levels include five levels: A, B, C, D and E. After the sixth score is determined, the corresponding scoring level can be determined based on the sixth score.
[0112] In some embodiments, the collapse consequence level can also be determined based on the potential hazards and social impact of road collapse, as shown in Table 8, which is a schematic table of collapse consequence levels provided in an embodiment of the present application.
[0113] Table 8:
[0114]
[0115] Among them, the size of potential hazards is evaluated after summarizing the case experience of road diseases. Road diseases are mainly voids and looseness, and their hazards are relatively small. When there is a foundation pit construction area near the road, the potential scale is evaluated based on factors such as the scale, nature, and on-site management of the construction area. According to case experience, road collapse around deep foundation pits is often large in scale and its hazards are relatively large.
[0116] Among them, the potential harm is extremely small, which means there is no underground disease body on the road; the potential harm is small, which means general loose disease; the potential harm is generally severe loose disease; the potential harm is large, which means severe loose disease; the potential harm is extremely large, which means cavity disease. Social impact is mainly divided according to traffic volume. Very small traffic volume refers to 0-200 vehicles / hour, small traffic volume refers to 201-500 vehicles / hour, general traffic volume refers to 501-1000 vehicles / hour, large traffic volume refers to 1001-2000 / vehicle hour, and extremely large traffic volume refers to more than 2000 / vehicle hour.
[0117] In some examples, experts can survey the road to be evaluated, and then determine the potential hazards and social impacts corresponding to the road to be evaluated, and then determine the collapse consequence level in combination with the above table. Among them, the collapse consequence level is level 1, indicating that the consequence impact is negligible, the collapse consequence level is level 2, indicating that the consequence impact is small, the collapse consequence level is level 3, indicating that the consequence impact is general, the collapse consequence level is level 4, indicating that the consequence impact is serious, and the collapse consequence level is level 5, indicating that the consequence impact is very serious.
[0118] In some embodiments, the processing device can also use the risk matrix method to divide the road collapse risk level of the road to be evaluated into five levels: I, II, III, IV, and V based on the scoring level and collapse consequence level of the road to be evaluated. As shown in Table 9, this table is a schematic table of road collapse risk levels provided in an embodiment of the present application.
[0119] Table 9:
[0120]
[0121] For example, if the scoring level is C and the collapse consequence level is 3, the road collapse risk level is determined to be III, which can be called the target risk level.
[0122] The above describes that the processing device determines the target risk level of the road to be evaluated according to the first evaluation result. The following describes how to determine the corresponding target processing measures according to the target risk level. As shown in Table 10, this table is a schematic table of processing measures provided in an embodiment of the present application.
[0123] Table 10:
[0124]
[0125] Continuing with the above example, if the target risk level of the processing equipment is determined to be III, it means that the risk is general and a yellow mark can be used. The corresponding target processing measures are regular inspections and regular tests (once every 6 months).
[0126] After the processing device determines the above target processing measures, the above target processing measures can be presented to the user, thereby reminding the user to process the road to be evaluated according to the target processing measures.
[0127] In some embodiments, after engineering treatment is performed on the road to be evaluated with a higher target risk level, it can be tested again. Table 11 shows a table of construction retest reduction coefficients.
[0128] Table 11:
[0129]
[0130] The specific risk reduction coefficient can be determined by field surveying the road to be evaluated. After obtaining the risk reduction coefficient, the seventh score of the road to be evaluated can be determined from the maximum value of the first score, the second score, the third score, the fourth score and the fifth score and the construction re-test reduction coefficient of the road to be evaluated. Specifically:
[0131] P6=max(P0,P 2-1 , P 2-2 , P3, P4)·δ
[0132] Among them, P6 is the seventh score, and 6 is the construction re-measurement reduction coefficient.
[0133] After the processing device determines the seventh score, it can generate a second evaluation result of the road to be evaluated based on the seventh score. This process is similar to the process of generating the first evaluation result, and will not be repeated here.
[0134] It should be noted that urban road collapse often has the characteristics of suddenness, mass occurrence and secrecy (suddenness is reflected in the fact that its formation process is not achieved overnight, but the process of occurrence is in an instant, mass occurrence is reflected in the fact that disaster groups are often concentrated in a certain period of time in the same area, and secrecy is reflected in the fact that the precursors of disasters are not obvious and are easily overlooked). Therefore, it is necessary to conduct regular monitoring of various influencing factors, and once the evaluation indicators show abnormal conditions, it is necessary to re-analyze and evaluate the risk of the abnormal area.
[0135] In some embodiments, the processing device can also determine whether the target risk level is greater than or equal to a preset level threshold. If it is greater than or equal to, a prompt message is generated. The prompt message is used to instruct the user to close the road to be evaluated, thereby reducing the number of vehicles entering the road to be evaluated, thereby further reducing the impact.
[0136] The road risk assessment method provided in the embodiment of the present application, after determining the evaluation index, adopts "single factor risk classification + multi-factor superposition" to form a risk basic map, and then superimposes factors such as construction interference, pipeline leakage points, road surface conditions, and areas with serious diseases in history, and performs certain risk coefficient corrections and reductions based on case experience and simulation verification, and finally performs road subsidence risk level zoning. When there are abnormalities in detection, monitoring, and daily inspections, the road subsidence risk level of the relevant area is re-analyzed and rezoned to achieve the effect of dynamic update. In this method, not only the risk value of the road is considered from multiple different dimensions, but also multiple coefficients that affect the risk value are considered. With the correction of these coefficients, the road risk level can be determined more accurately, thereby improving the accuracy of road evaluation.
[0137] Combination of the above Figure 1 The road risk assessment method provided in the embodiment of the present application is introduced in detail. The device and equipment provided in the embodiment of the present application will be introduced in conjunction with the accompanying drawings.
[0138] like Figure 2 As shown in the figure, a road risk assessment device provided in an embodiment of the present application is provided, and the device comprises:
[0139] An acquisition module 201 is used to acquire index values of multiple road indexes of the road to be evaluated, wherein the multiple road indexes include geological condition index, ground subsidence index, pipe network index, underground structure index, road load index and water environment index;
[0140] The determination module 202 is used to determine the risk value of each road indicator according to the indicator value of each road indicator in the multiple road indicators and the risk value determination strategy corresponding to each road indicator; determine the first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator; correct the first score according to the construction interference correction coefficient of the road to be evaluated to obtain the second score of the road to be evaluated; correct the second score according to the construction interference reduction coefficient of the road to be evaluated to obtain the third score of the road to be evaluated; correct the first score according to the preset situation correction coefficient of the road to be evaluated to obtain the fourth score of the road to be evaluated; determine the fifth score of the road to be evaluated according to the maximum value of the second score, the third score and the fourth score and the superposition correction coefficient of the road to be evaluated; determine the sixth score of the road to be evaluated according to the maximum value of the first score, the second score, the third score, the fourth score and the fifth score and the preset meteorological correction coefficient of the road to be evaluated;
[0141] The evaluation module 203 is used to generate a first evaluation result of the road to be evaluated according to the sixth score of the road to be evaluated.
[0142] Optionally, the determination module 202 is further used to determine the target risk level of the road to be evaluated based on the first evaluation result; and determine the target treatment measure corresponding to the target risk level based on the target risk level and a predetermined correspondence between the risk level and the treatment measure.
[0143] Optionally, the device further comprises an interaction module, and the interaction module is used to present the target processing measures to a user, so that the user processes the road to be evaluated according to the target processing measures.
[0144] Optionally, the determination module 202 is further configured to determine a seventh score of the road to be evaluated according to a maximum value among the first score, the second score, the third score, the fourth score and the fifth score and a construction re-measurement reduction coefficient of the road to be evaluated;
[0145] The evaluation module 203 is further configured to generate a second evaluation result of the road to be evaluated according to the seventh score.
[0146] Optionally, the determination module 202 is further configured to determine the first score by using the following formula:
[0147]
[0148] Wherein, P0 is the first score of the road to be evaluated, w n is the weight corresponding to the nth road index, i n is the risk value corresponding to the nth road indicator, and N is the total number of road indicators in the multiple road indicators.
[0149] Optionally, the device further includes a prompt module, which is used to generate a prompt message if the target risk level is greater than or equal to a preset level threshold, and the prompt message is used to instruct the user to close the road to be evaluated.
[0150] The road risk assessment device according to the embodiment of the present application may correspond to the method described in the embodiment of the present application, and the above-mentioned other operations and / or functions of each module / unit of the road risk assessment device are respectively to achieve Figure 1 For the sake of brevity, the corresponding processes of each method in the illustrated embodiment are not described in detail here.
[0151] The present application also provides a computing device. Figure 3As shown, this figure is a schematic diagram of a computing device provided in an embodiment of the present application, and the computing device 300 includes a bus 301, a processor 302, a communication interface 303 and a memory 304. The processor 302, the memory 304 and the communication interface 303 communicate with each other through the bus 301.
[0152] The bus 301 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus. The bus may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0153] The processor 302 may be any one or more of a central processing unit (CPU), a graphics processing unit (GPU), a microprocessor (MP), or a digital signal processor (DSP).
[0154] The communication interface 303 is used for communicating with the outside.
[0155] The memory 304 may include a volatile memory, such as a random access memory (RAM). The memory 304 may also include a non-volatile memory, such as a read-only memory (ROM), a flash memory, a hard disk drive (HDD), or a solid state drive (SSD).
[0156] The memory 304 stores executable codes, and the processor 302 executes the executable codes to perform the aforementioned road risk assessment method.
[0157] Specifically, in implementing Figure 2 In the case of the embodiment shown, and Figure 2 When each module or unit of the road risk assessment device described in the embodiment is implemented by software, Figure 2The software or program code required for the functions of each module / unit in the system may be partially or completely stored in the memory 304. The processor 302 executes the program code corresponding to each unit stored in the memory 304 to perform the aforementioned road risk assessment method.
[0158] The embodiment of the present application also provides a computer-readable storage medium. The computer-readable storage medium can be any available medium that can be stored by a computing device or a data storage device such as a data center containing one or more available media. The available medium can be a magnetic medium (such as a floppy disk, a hard disk, a tape), an optical medium (such as a DVD), or a semiconductor medium (such as a solid-state hard disk). The computer-readable storage medium includes instructions that instruct the computing device to execute the above-mentioned road risk assessment method.
[0159] The embodiment of the present application further provides a computer program product, which includes one or more computer instructions. When the computer instructions are loaded and executed on a computing device, the process or function described in the embodiment of the present application is generated in whole or in part.
[0160] The computer instructions may be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from one website, computer or data center to another website, computer or data center via wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) means.
[0161] When the computer program product is executed by a computer, the computer executes any of the aforementioned road risk assessment methods. The computer program product may be a software installation package, and when any of the aforementioned road risk assessment methods is needed, the computer program product may be downloaded and executed on a computer.
[0162] The descriptions of the processes or structures corresponding to the above-mentioned figures have different emphases. For parts that are not described in detail in a certain process or structure, please refer to the relevant descriptions of other processes or structures.
[0163] The above description is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application.
Claims
1. A road risk assessment method, characterized in that: The method comprises: Obtaining index values of multiple road indicators of the road to be evaluated, wherein the multiple road indicators include geological condition indicators, ground subsidence indicators, pipe network indicators, underground structure indicators, road load indicators, and water environment indicators; Determine the risk value of each road indicator according to the indicator value of each road indicator among the plurality of road indicators and the risk value determination strategy corresponding to each road indicator; Determining a first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator; According to the construction disturbance correction coefficient of the road to be evaluated, the first score is corrected to obtain a second score of the road to be evaluated; according to the construction disturbance reduction coefficient of the road to be evaluated, the second score is corrected to obtain a third score of the road to be evaluated; according to the preset situation correction coefficient of the road to be evaluated, the first score is corrected to obtain a fourth score of the road to be evaluated; Determine a fifth score of the road to be evaluated according to the maximum value among the second score, the third score and the fourth score and the superposition correction coefficient of the road to be evaluated; determine a sixth score of the road to be evaluated according to the maximum value among the first score, the second score, the third score, the fourth score and the fifth score and the preset meteorological correction coefficient of the road to be evaluated; A first evaluation result of the road to be evaluated is generated according to the sixth score of the road to be evaluated.
2. The method according to claim 1, characterized in that The method further comprises: Determining a target risk level of the road to be evaluated according to the first evaluation result; According to the target risk level and the predetermined correspondence between the risk level and the treatment measure, the target treatment measure corresponding to the target risk level is determined.
3. The method according to claim 2, characterized in that The method further comprises: The target processing measure is presented to a user so that the user processes the road to be evaluated according to the target processing measure.
4. The method according to claim 3, characterized in that The method further comprises: Determine a seventh score of the road to be evaluated according to a maximum value among the first score, the second score, the third score, the fourth score and the fifth score and a construction re-measurement reduction coefficient of the road to be evaluated; A second evaluation result of the road to be evaluated is generated according to the seventh score.
5. The method according to claim 1, characterized in that Determining the first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator includes: Wherein, P0 is the first score of the road to be evaluated, w n is the weight corresponding to the nth road index, i n is the risk value corresponding to the nth road indicator, and N is the total number of road indicators in the multiple road indicators.
6. The method according to claim 2, characterized in that The method further comprises: If the target risk level is greater than or equal to a preset level threshold, a prompt message is generated, wherein the prompt message is used to instruct the user to close the road to be evaluated.
7. The method according to claim 1, characterized in that The geological condition indicators include: fill layer thickness and state indicators, distance to underground rivers and hidden bays indicators, saturated silt top plate burial depth indicators, saturated silt layer thickness indicators and soft evaluation ratio indicators, the soft evaluation ratio is the ratio of soft soil layer thickness to evaluation depth; The ground subsidence index includes: ground cumulative subsidence index and ground subsidence rate index; The pipe network index includes: water supply pipe network density index and drainage pipe network density index; The underground structure indicators include: the range indicator from the underground operating rail line, the range indicator from the underground tunnel and the range indicator from the underground pipeline gallery; The water environment indicators include: road surface water condition indicators and current water system distribution density indicators.
8. A road risk assessment device, characterized in that: The device comprises: An acquisition module, used to acquire index values of multiple road indicators of the road to be evaluated, wherein the multiple road indicators include geological condition indicators, ground subsidence indicators, pipe network indicators, underground structure indicators, road load indicators and water environment indicators; A determination module, for determining a risk value of each road indicator according to an indicator value of each road indicator in the multiple road indicators and a risk value determination strategy corresponding to each road indicator; determining a first score of the road to be evaluated according to the risk value of each road indicator and the weight corresponding to each road indicator; correcting the first score according to a construction interference correction coefficient of the road to be evaluated to obtain a second score of the road to be evaluated; correcting the second score according to a construction interference reduction coefficient of the road to be evaluated to obtain a third score of the road to be evaluated; correcting the first score according to a preset situation correction coefficient of the road to be evaluated to obtain a fourth score of the road to be evaluated; determining a fifth score of the road to be evaluated according to a maximum value among the second score, the third score and the fourth score and a superposition correction coefficient of the road to be evaluated; determining a sixth score of the road to be evaluated according to a maximum value among the first score, the second score, the third score, the fourth score and the fifth score and a preset meteorological correction coefficient of the road to be evaluated; An evaluation module is used to generate a first evaluation result of the road to be evaluated according to the sixth score of the road to be evaluated.
9. A computing device, characterized in that including memory and processor; One or more computer programs are stored in the memory, and the one or more computer programs include instructions; when the instructions are executed by the processor, the computing device executes the method as claimed in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium is used to store a computer program, and the computer program is used to execute the method according to any one of claims 1 to 7.