Power grid equipment state and data management system

By building the initial autonomous layer and real-time data dynamic adjustment, combining the health index and autonomous layer, the problem of lag in response to grid equipment status monitoring and insufficient accuracy is solved, intelligent management and risk prediction of grid equipment are realized, and operational safety is improved Sex and reliability.

CN119090278AActive Publication Date: 2024-12-06이너 몽골리아 일렉트릭 파워 그룹 컴퍼니 리미티드 이너 몽골리아 일렉트릭 파워 리서치 인스티튜트 브랜치

Patent Information

Application Number
CN202411288495.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-12-06
Estimated Expiration
2044-09-13

AI Technical Summary

Technical Problem

The response of existing power grid equipment status monitoring and data management is lagging, lack of dynamic adjustment and insufficient accuracy, resulting in low accuracy of equipment status assessment and risk prediction.

Method used

By building the initial autonomous layer and dynamically adjusting based on real-time running data, the health index and autonomous layer are introduced, and data collection, data processing, dynamic adjustment and risk determination modules are used to generate health index and risk reports in combination with preset algorithms.

Benefits of technology

It improves the intelligence and efficiency of power grid equipment management, can timely detect potential risks, and improves the safety and reliability of power grid equipment operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090278A_ABST
    Figure CN119090278A_ABST
Patent Text Reader

Abstract

The invention provides a power grid equipment state and data management system, and belongs to the technical field of power system monitoring, and the system comprises a data collection module which collects the operation related data of each equipment in a power grid and the related data of the power grid; the data processing module is used for constructing a plurality of initial autonomous layers of the power grid based on the operation related data of each device in the power grid; the dynamic adjustment module is used for adjusting the initial autonomous layer based on the operation data of each device in the power grid divided by the initial autonomous layer; the state judgment module is used for obtaining real-time operation data of each device in the power grid based on the adjusted initial autonomous layer, and then generating a health index of each device in the power grid; and the risk judgment module is used for determining the risk level of each device based on the health index of each device in the power grid and the real-time operation data of each device so as to generate a risk judgment report. And the operation safety and reliability of the power grid equipment are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system monitoring, and in particular to a power grid equipment status and data management system. Background Art

[0002] With the continuous expansion of power grid scale and the increase of equipment complexity, how to effectively manage the operating status and data of power grid equipment has become an important issue in power grid operation and maintenance.

[0003] In the prior art, the status monitoring and data management of power grid equipment mainly rely on independent monitoring systems, which usually obtain the basic operating data of power grid equipment through fixed collection devices. However, there is a problem of slow response to changes in the power grid status, and it is difficult to dynamically adjust the correlation between different devices, resulting in low accuracy of equipment status assessment and risk prediction. For example, some existing systems only rely on preset threshold alarm mechanisms and cannot adjust the power grid management strategy in real time according to the operating data of the equipment.

[0004] Therefore, the present invention provides a power grid equipment status and data management system. Summary of the invention

[0005] The present invention provides a power grid equipment status and data management system, which can make the health status assessment of power grid equipment more accurate by constructing an initial autonomous layer and making dynamic adjustments based on real-time operation data, and provide targeted risk levels. The introduction of health indexes and autonomous layers makes the management of power grid equipment more intelligent and efficient, and can timely discover potential risks and generate corresponding reports, thereby improving the safety and reliability of power grid equipment operation. The problem of delayed response, lack of dynamic adjustment and insufficient accuracy of power grid equipment status monitoring and management in the prior art is solved. The present invention provides a power grid equipment status and data management system, comprising: Data acquisition module: collects operation-related data of each device in the power grid and related data of the power grid based on the preset acquisition device; Data processing module: builds several initial autonomous layers of the power grid based on the operation-related data of each device in the power grid; Dynamic adjustment module: obtains the operating data of each device in the power grid after the initial autonomous layer division, and adjusts the initial autonomous layer based on the operating data of all devices in the power grid; Status determination module: Based on the adjusted initial autonomous layer, it obtains the real-time operation data of each device in the power grid, and then generates the health index of each device in the power grid in combination with the preset algorithm; Risk determination module: Determine the risk level of each device based on the health index of each device in the power grid and the real-time operation data of each device, and then generate a risk determination report.

[0006] The present invention provides a power grid equipment status and data management system, a data acquisition module, including Equipment collection unit: Based on the preset sensor network, it collects the initial operating status data of each device in the power grid; Node collection unit: collects the load conditions of each node in the power grid based on the preset monitoring equipment; History acquisition unit: obtains the historical load conditions of each node in the power grid based on the historical operation data of the power grid.

[0007] The present invention provides a power grid equipment status and data management system, a data processing module, comprising: A first scoring unit: determining an initial status score of each device in the power grid based on initial operating status data of each device in the power grid; ;in, Score the initial state of the kth device in the power grid, is the total number of initial operating status data of the kth device in the power grid, is the historical operation reliability factor of the kth device in the power grid, is the environmental adaptability factor of the kth device, is the operating angle of the kth device in the power grid, is the g-th initial operating status data measurement value of the k-th device in the power grid, is the weight of the g-th initial operating status data of the k-th device in the power grid, is the operating time attenuation factor of the kth device in the power grid, is the cumulative operating time of the kth device in the power grid, is the absolute value of the difference between the initial load of the kth device in the grid and its rated load, is the rated load of the kth device in the power grid, is the relative importance coefficient of the kth device in the power grid, is the maintenance frequency coefficient of the kth device in the power grid, is the designed maintenance period of the kth device in the power grid

[0008] A second scoring unit: determining a load score of each node in the power grid based on the load condition of each node in the power grid and the historical load condition; ;in, is the load score of the qth node in the power grid, is the maximum allowable load of the qth node in the power grid, is the rated load of the qth node in the power grid, is the weight of the maximum allowable load of the qth node in the power grid, is the load of the qth node in the power grid at the historical time point t, is the total number of time points of historical load records of the qth node in the power grid, The weight of the historical load of the qth node in the power grid, is the historical load fluctuation factor of the qth node in the power grid, is the historical load average of the qth node in the power grid; Device determination unit: determines a number of associated devices corresponding to each node in the power grid based on the initial state score of each device in the power grid and the load score of each node in the power grid combined with a preset analysis algorithm; Network construction unit: constructs a node network based on all nodes in the power grid and several associated devices corresponding to each node; Initial division unit: Analyze the node network and divide the initial autonomous layer based on the analysis results. Each autonomous layer contains several nodes and devices associated with each node.

[0009] The present invention provides a power grid equipment status and data management system, the initial division unit includes: Partition determination subunit: forming a node partition corresponding to each node based on the range where each node and the corresponding associated device are located; Module optimization subunit: Move the nodes and devices associated with each node partition to the node partition of the adjacent node and determine the modularity of each node in the adjacent partition. When the modularity reaches the maximum, the node will stop and the node partition of the adjacent node where it stops will be determined as the adjacent partition. Partition formation subunit: Each node forms a supernode partition with the nodes in the adjacent partition and the devices corresponding to the nodes in the adjacent partition where it stays; Partition optimization subunit: moves several nodes of each supernode partition to adjacent supernode partitions and determines the modularity of each supernode partition in the adjacent supernode partition until the modularity reaches the maximum value; First optimization subunit: repeat the above steps until the modularity of each super node partition no longer increases, then stop the iteration, and then form several comprehensive node partitions; The second optimization subunit: optimizes all integrated node partitions based on a preset splitting algorithm, and determines an initial autonomous layer based on the optimized integrated node partitions.

[0010] The present invention provides a power grid equipment status and data management system, the second optimization subunit comprising: Betweenness optimization block: based on the betweenness of each edge in each integrated node partition, the edge with the largest betweenness is gradually deleted. At the same time, the modularity of each integrated node partition is determined in the process of deleting edges; Optimization control block: Determine the change rate of the modularity of each integrated node partition during the edge deletion process. When the change rate of the modularity is greater than the preset change rate threshold, stop the deletion to form an optimized integrated node partition.

[0011] The present invention provides a power grid equipment status and data management system, a dynamic adjustment module, comprising: A first scoring unit: acquiring operation data of each device in the power grid after the initial autonomous layer division, and then determining a first state score of each device in the power grid; Re-dividing unit: Re-dividing the initial autonomous layer based on the status scores of all devices in the power grid and the load scores of each node in the power grid combined with the preset analysis algorithm; Optimizing division unit: Optimizing the initial autonomous layer after redivision based on a preset optimization algorithm, and then determining a number of adjusted autonomous layers.

[0012] The present invention provides a power grid equipment status and data management system, a risk determination module, comprising: Risk determination unit: determines a number of corresponding risk factors for each device based on the health index of the devices in the power grid and the real-time operation data of each device; Index determination unit: determines the risk index of each device based on the corresponding risk factors, health index and real-time operation data of each device: ;in, is the risk index of the kth device, is the i-th risk factor of the k-th device, is the weight of the i-th risk factor of the k-th device, is the number of risk factors of the kth device, is the health index of the kth device, is the health index weight coefficient of the kth device, is the weight coefficient of the real-time operation data impact coefficient of the kth device; in, is the real-time operation data impact coefficient of the kth device: ;in, is the actual measured value of the jth real-time operation data of the kth device, is the preset reference value of the jth real-time operation data of the kth device, is the preset maximum allowable deviation threshold of the jth real-time operation data of the kth device, is the weight of the jth real-time running data of the kth device, is the number of real-time operation data of the kth device; Report generating unit: determines the risk level of each device based on the risk index of each device, and generates a risk report corresponding to each device based on a preset risk level-risk report database.

[0013] The present invention provides a power grid equipment status and data management system, wherein risk factors include: risk factors related to equipment performance, risk factors related to operating environment, risk factors related to operation and use, risk factors related to design and manufacturing, and risk factors related to external environment.

[0014] The present invention provides a power grid equipment status and data management system, which can make the health status assessment of power grid equipment more accurate by constructing an initial autonomous layer and making dynamic adjustments based on real-time operation data, and provide highly targeted risk levels. The introduction of health indexes and autonomous layers makes the management of power grid equipment more intelligent and efficient, and can timely discover potential risks and generate corresponding reports, thereby improving the safety and reliability of power grid equipment operation. It solves the problems of delayed response, lack of dynamic adjustment and insufficient accuracy of power grid equipment status monitoring and management in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a structural diagram of a power grid equipment status and data management system provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0017] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] Example 1 like Figure 1As shown, an embodiment of the present invention provides a power grid equipment status and data management system, including: Data acquisition module: collects operation-related data of each device in the power grid and related data of the power grid based on the preset acquisition device; Data processing module: builds several initial autonomous layers of the power grid based on the operation-related data of each device in the power grid; Dynamic adjustment module: obtains the operating data of each device in the power grid after the initial autonomous layer division, and adjusts the initial autonomous layer based on the operating data of all devices in the power grid; Status determination module: Based on the adjusted initial autonomous layer, it obtains the real-time operation data of each device in the power grid, and then generates the health index of each device in the power grid in combination with the preset algorithm; Risk determination module: Determine the risk level of each device based on the health index of each device in the power grid and the real-time operation data of each device, and then generate a risk determination report.

[0019] In this embodiment, the preset collection device refers to a device pre-installed in the power grid, which is used to collect the operating data of each device in the power grid and the overall status of the power grid, and is a sensor, a smart meter, a monitoring device, etc. For example, in a substation, the preset collection device includes a temperature sensor, a current sensor, a smart meter and a voltage monitor, which are used to monitor the operating status data of the transformer such as temperature, current and voltage in real time; In this embodiment, operation-related data refers to the specific operation status data of the power grid equipment, including real-time operation data, historical reference data, standard reference data of the equipment, such as voltage, current, temperature, etc. The relevant data of the power grid refers to the overall operation status of the entire power grid, such as frequency, total power, load distribution, etc. For example, the operation-related data of a substation includes the current load of the transformer is 600A and the voltage is 110kV; the relevant data of the power grid includes the current frequency of the entire power grid is 50Hz, and the total power output is 500MW.

[0020] In this embodiment, the initial autonomous layer is a multiple hierarchical structure established based on the operating data of each device in the power grid. Each autonomous layer contains a group of power grid devices with similar functions or interrelated functions to facilitate independent operation analysis and control. For example, an initial autonomous layer can be composed of transformers, distribution cabinets and switchgear located in the same geographical area. These devices are jointly responsible for the power transmission and distribution of a local power grid.

[0021] In this embodiment, the operating data of each device in the power grid after the initial autonomous layer division is adjusted. After the initial autonomous layer division, the system will continuously obtain the real-time operating data of each device in each autonomous layer, and dynamically adjust the structure of the autonomous layer and the ownership of the equipment based on the changes in these data to optimize the power grid operation. If in a certain initial autonomous layer, the load of a group of devices suddenly increases, while the load in another autonomous layer decreases, the dynamic adjustment module will reallocate some of the heavily loaded devices to another lighter loaded autonomous layer to balance the load.

[0022] In this embodiment, the preset algorithm is an algorithm used in the system to calculate and analyze the health status of power grid equipment. The algorithm combines the real-time operation data, historical data and other factors of the equipment to calculate the health index of the equipment. It is an algorithm based on support vector machine (SVM) or neural network, which is used to analyze the current, temperature and other data of the transformer to determine whether its operation is abnormal and generate a health index; In this embodiment, the health index of each device in the power grid refers to the health status assessment value of each device in the power grid, which is usually expressed as a percentage or level, reflecting whether the current working status of the device is normal or there is a potential failure risk. For example, the health index of a transformer is 85%, indicating that it is in good working condition, but there is a slight overheating phenomenon, which requires regular inspection and maintenance.

[0023] In this embodiment, the risk level of each device is a device risk category determined based on the health index of the device and real-time operation data, and is generally divided into low, medium, and high levels, which are used to indicate the possibility of equipment failure and its severity. For example, the risk level of a high-voltage circuit breaker is assessed as "high" because its health index is 45%, accompanied by abnormal current fluctuations, and there may be a risk of poor contact or internal damage; In this embodiment, the risk assessment report is a report generated by the system based on the risk level of each device, which includes risk assessment results, potential problem analysis and maintenance suggestions for each device for management personnel to refer to and take corresponding preventive measures. For example, the risk assessment report shows that transformer No. 4 of a substation requires emergency maintenance because its risk level is "high", the health index is 35%, and it is accompanied by abnormal voltage fluctuations and temperature increases.

[0024] The beneficial effects of the above technical solution are: by constructing an initial autonomous layer and making dynamic adjustments based on real-time operation data, the health status assessment of power grid equipment can be made more accurate, and a highly targeted risk level can be provided. The introduction of health indexes and autonomous layers makes the management of power grid equipment more intelligent and efficient, and potential risks can be discovered in a timely manner and corresponding reports can be generated, thereby improving the safety and reliability of power grid equipment operation, and solving the problems of delayed response, lack of dynamic adjustment and insufficient accuracy of power grid equipment status monitoring and management in the prior art. Example 2 An embodiment of the present invention provides a power grid equipment status and data management system, a data acquisition module, including: Equipment collection unit: Based on the preset sensor network, it collects the initial operating status data of each device in the power grid; Node collection unit: collects the initial load conditions of each node in the power grid based on the preset monitoring equipment; History acquisition unit: obtains the historical load conditions of each node in the power grid based on the historical operation data of the power grid.

[0025] In this embodiment, the preset sensor network refers to a series of sensor devices pre-deployed in the power grid, which are used to collect the operating status of each device in the power grid in real time. These sensors are installed on equipment such as transformers, circuit breakers, and transmission lines to form a network that can cover key nodes and equipment in the power grid. For example, a preset sensor network may include a temperature sensor, a current sensor, and a voltage sensor installed on a power transformer to monitor the temperature, current, and voltage changes of the transformer; In this embodiment, the initial operating status data refers to the basic data collected by the power grid equipment at the initial stage of operation, including information such as current, voltage, and power when the equipment is started. For example, when a transformer in a substation is started, its initial operating status data may include information such as input voltage 220kV, output power 50MW, and oil temperature and load current after startup.

[0026] In this embodiment, the preset monitoring equipment refers to equipment used to monitor the operation of power grid nodes, usually including cameras, intelligent monitoring systems or other sensing devices. These devices collect information such as load and flow of nodes to facilitate real-time management and scheduling. For example, the monitoring equipment installed at the node of the transmission line can monitor the voltage and current load of the node in real time. If the load of a node suddenly increases, the monitoring equipment can immediately feedback to the control center; In this embodiment, the initial load condition refers to the load borne by each node in the power grid when the system starts to operate. The load condition includes the current passing through the node, the power demand, etc., and is an important parameter for evaluating the operation status of the power grid. For example, the initial load condition of a substation may be: the total current passing through the station is 500A, the voltage is 110kV, and the power demand is 55MW.

[0027] In this embodiment, the historical load situation refers to the load change data of a certain grid node in the past period of time, which is used to analyze the long-term trend of grid operation, evaluate the health status of equipment, and predict future load demand. For example, the historical load situation of a transmission line in the past month shows that the load current reaches 800A during the morning peak period and is only 400A during the night valley period. These data can be used for grid scheduling and optimization configuration.

[0028] The beneficial effects of the above technical solution are: through equipment and node data collection, as well as historical load acquisition mechanism, all-round dynamic monitoring of power grid equipment status and historical data tracing are realized. Based on sensor networks and monitoring equipment, not only can the equipment operation status be obtained in real time, but also load management can be optimized in combination with historical data, which significantly improves the safety and efficiency of power grid operation and reduces the risk of failure. At the same time, it provides a basis for predictive maintenance, thereby realizing autonomous adjustment and management of smart grids.

[0029] Example 3 An embodiment of the present invention provides a power grid equipment status and data management system, a data processing module, including: A first scoring unit: determining an initial status score of each device in the power grid based on initial operating status data of each device in the power grid; ;in, Score the initial state of the kth device in the power grid, is the total number of initial operating status data of the kth device in the power grid, is the historical operation reliability factor of the kth device in the power grid, is the environmental adaptability factor of the kth device, is the operating angle of the kth device in the power grid, is the g-th initial operating status data measurement value of the k-th device in the power grid, is the weight of the g-th initial operating status data of the k-th device in the power grid, is the operating time attenuation factor of the kth device in the power grid, is the cumulative operating time of the kth device in the power grid, is the absolute value of the difference between the initial load of the kth device in the grid and its rated load, is the rated load of the kth device in the power grid, is the relative importance coefficient of the kth device in the power grid, is the maintenance frequency coefficient of the kth device in the power grid, is the designed maintenance period of the kth device in the power grid; A second scoring unit: determining a load score of each node in the power grid based on the load condition of each node in the power grid and the historical load condition; ;in, is the load score of the qth node in the power grid, is the maximum allowable load of the qth node in the power grid, is the rated load of the qth node in the power grid, is the weight of the maximum allowable load of the qth node in the power grid, is the load of the qth node in the power grid at the historical time point t, is the total number of time points of historical load records of the qth node in the power grid, The weight of the historical load of the qth node in the power grid, is the historical load fluctuation factor of the qth node in the power grid, is the historical load average of the qth node in the power grid; Device determination unit: determines a number of associated devices corresponding to each node in the power grid based on the initial state score of each device in the power grid and the load score of each node in the power grid combined with a preset analysis algorithm; Network construction unit: constructs a node network based on all nodes in the power grid and several associated devices corresponding to each node; Initial division unit: Analyze the node network and divide the initial autonomous layer based on the analysis results. Each autonomous layer contains several nodes and devices associated with each node.

[0030] In this embodiment, the historical operation reliability factor reflects the past performance and reliability of the equipment, and is usually determined based on indicators such as failure rate or mean time between failures (MTBF); In this embodiment, the environmental adaptation factor reflects the physical angle of the device in space. Especially in devices that are sensitive to position or angle, this parameter may affect their performance; In this embodiment, the operating angle reflects the physical angle of the device in space. Especially in devices that are sensitive to position or angle, this parameter may affect their performance; In this embodiment, the difference between the initial load and the rated load indicates the deviation of the current operating load of the equipment from the design standard. The closer the load is to the rated value, the smaller the deviation; In this embodiment, the relative importance coefficient reflects the importance of the device in the entire power grid system. The higher the importance coefficient, the more critical the device is in the system; In this embodiment, the maintenance frequency coefficient represents the actual maintenance frequency of the equipment. If the maintenance frequency of the equipment is higher, its condition is usually better.

[0031] In this embodiment, the rated load of the node is the designed load capacity of the node, which is used to measure the maximum load that the node can withstand under ideal conditions.

[0032] In this embodiment, the historical complexity factor refers to the degree of change in the load (power demand or usage) of a power grid node within a historical time range. It is used to quantify and reflect the fluctuation of the node's load between different time points. The greater the load fluctuation, the higher the fluctuation factor; conversely, the smaller the fluctuation, the lower the factor.

[0033] In this embodiment, the initial status score of each device in the power grid and the load score of each node in the power grid are combined with the preset analysis algorithm to determine the number of associated devices corresponding to each node in the power grid. The initial status score of the device and the load score of the node are comprehensively considered to determine the device that each node should be associated with. Assuming that the load score of a node is 75 points, the node needs to be associated with a device with a status score higher than 80. After algorithm calculation, 3 transformers (with status scores of 85, 90, and 95, respectively) are determined as the associated devices of the node, which can optimize the load distribution and ensure the stable operation of the node.

[0034] In this embodiment, the node network is the devices and nodes in the power grid, and the edges represent the connection relationship and mutual influence between the devices and nodes.

[0035] The beneficial effects of the above technical solution are: through comprehensive equipment status scoring and node load scoring, combined with preset algorithms, nodes and devices are accurately matched, an optimized node network is constructed, and the autonomous layer is further divided. Starting from the nonlinear and complex relationship between power grid equipment and nodes, the adaptability and operation efficiency of the power grid are improved, and the optimized management of the autonomous level is realized, which brings more stable and flexible power grid control, reduces the risk of load fluctuations and equipment failures, and significantly improves the reliability and maintenance efficiency of the power grid.

[0036] Example 4 An embodiment of the present invention provides a power grid equipment status and data management system, the initial division unit comprising: Partition determination subunit: forming a node partition corresponding to each node based on the range where each node and the corresponding associated device are located; Module optimization subunit: Move the nodes and devices associated with each node partition to the node partition of the adjacent node and determine the modularity of each node in the adjacent partition. When the modularity reaches the maximum, the node will stop and the node partition of the adjacent node where it stops will be determined as the adjacent partition. Partition formation subunit: Each node forms a supernode partition with the nodes in the adjacent partition and the devices corresponding to the nodes in the adjacent partition where it stays; Partition optimization subunit: moves several nodes of each supernode partition to adjacent supernode partitions and determines the modularity of each supernode partition in the adjacent supernode partition until the modularity reaches the maximum value; First optimization subunit: repeat the above steps until the modularity of each super node partition no longer increases, then stop the iteration, and then form several comprehensive node partitions; The second optimization subunit: optimizes all integrated node partitions based on a preset splitting algorithm, and determines an initial autonomous layer based on the optimized integrated node partitions.

[0037] In this embodiment, the range where each node and the corresponding associated device are located refers to the distribution area of ​​a node in the power grid and its associated power grid devices in the physical space or logical network. This range determines the influence range of the interaction between the node and the device. Assuming that a node controls multiple power transformers, the range of the node and its associated devices is the area where these transformers are located; In this embodiment, node partitioning is to divide the nodes and their associated equipment in the power grid into different groups by geography or function. Each group corresponds to a certain area or specific function in the power grid. If a power grid has several power supply stations, each power supply station is responsible for a specific area, these power supply stations and the regional equipment they are responsible for can be divided into different node partitions.

[0038] In this embodiment, adjacent nodes refer to other nodes in the power grid that are close to a node and directly or indirectly connected to it. If one node controls a substation and the other controls a power plant next to it, these two nodes are adjacent nodes; In this embodiment, modularity is an indicator used to measure the quality of the node partition structure in the power grid, and evaluates the difference between the connection density within the node partition and the connection sparsity between different partitions. If the nodes in a partition are closely connected, but have fewer connections with external partitions, the modularity of the partition is high; In this embodiment, adjacent partitions refer to other partitions that are close to a node or partition in the power grid and have more connections. If one partition covers the power system of a city, and the adjacent partition manages the power supply to the outer area of ​​the city, these two partitions are adjacent partitions.

[0039] In this embodiment, a supernode partition is a larger partition formed by multiple nodes and their associated devices, which is used to simplify the management and optimization of the power grid structure. Each supernode represents a community composed of multiple original nodes. If there are multiple small node partitions in an area originally, these partitions are optimized and combined into a large supernode partition for more efficient management.

[0040] In this embodiment, the comprehensive node partitioning is achieved through multiple optimization and iteration of node partitioning to achieve the best modularity and become a stable partitioning structure in the power grid. For example, a stable comprehensive partition is formed after repeated adjustment and optimization of multiple adjacent partitions, which is responsible for managing a larger range of power equipment.

[0041] In this embodiment, the preset splitting algorithm refers to an algorithm that further splits or adjusts certain node partitions according to predetermined rules, and is used to optimize the partition structure. For example, if a power partition is too large to be managed, the system uses a splitting algorithm to split it into two, forming two smaller partitions for better management.

[0042] In this embodiment, the initial autonomous layer of the power grid is formed based on the optimized integrated node partitioning to ensure that each autonomous layer can independently handle management and control tasks. For example, after multiple optimizations, the power system of a large area is divided into multiple autonomous layers, each autonomous layer contains several nodes, and can independently complete power dispatching and maintenance.

[0043] The beneficial effects of the above technical solution are: through the combination of node partitioning and modularity optimization, innovative and efficient partition management of power grid equipment status and data management is achieved, the ownership of nodes and equipment is dynamically adjusted so that the modularity of each partition reaches the maximum value, and the autonomy and stability of power grid management are improved. The comprehensive node partitioning is further optimized through the splitting algorithm to form an autonomous layer, which realizes the precision and intelligence of power grid status management, reduces manual intervention, and achieves efficient self-optimization.

[0044] Example 5 An embodiment of the present invention provides a power grid equipment status and data management system, wherein the second optimization subunit includes: Betweenness optimization block: based on the betweenness of each edge in each integrated node partition, the edge with the largest betweenness is gradually deleted. At the same time, the modularity of each integrated node partition is determined in the process of deleting edges; Optimization control block: Determine the change rate of the modularity of each integrated node partition during the edge deletion process. When the change rate of the modularity is greater than the preset change rate threshold, stop the deletion to form an optimized integrated node partition.

[0045] In this embodiment, the betweenness of an edge is a concept in graph theory, which indicates the ratio of the number of paths connected by the edge to all the shortest paths in a graph (such as a power grid network). The betweenness of an edge reflects the importance and influence of the edge on the node connection in the network. The larger the betweenness, the greater the influence of the edge on the network structure. Suppose in a network graph of a power grid, there is an edge AB connecting two key nodes. If many shortest paths must pass through this edge to connect other nodes, then the betweenness of this edge will be very high. Deleting this edge may significantly affect the connectivity of the network.

[0046] In this embodiment, the preset change rate threshold is a system-set value used to measure the sensitivity of modularity changes. The modularity change rate refers to the speed of change of modularity during the optimization process. When the modularity change rate exceeds this preset threshold, it means that the change of modularity has been too fast or unstable. Therefore, the current operation should be stopped to prevent adverse effects on system stability. If the preset change rate threshold is set to 0.05 (i.e. 5%), when an edge is deleted, the modularity change rate reaches or exceeds 5%, indicating that the current operation has too much impact on the system structure. At this time, the optimization control block will stop further deleting the edge, thereby protecting the overall stability of the system.

[0047] The beneficial effects of the above technical solution are: the edges with the largest betweenness are gradually deleted through the betweenness optimization block, and under the monitoring of the optimization control block, the modularity change rate is used as the stopping standard, thereby realizing the adaptive optimization of the comprehensive node partitioning, avoiding excessive or insufficient edge deletion operations, ensuring the stability of the power grid structure and the maximization of modularity, and improving the accuracy and flexibility of power grid equipment status management.

[0048] Example 6 An embodiment of the present invention provides a power grid equipment status and data management system, a dynamic adjustment module, including: A first scoring unit: acquiring operation data of each device in the power grid after the initial autonomous layer division, and then determining a first state score of each device in the power grid; Re-dividing unit: re-dividing the initial autonomous layer based on the first state scores of all devices in the power grid and the load score of each node in the power grid combined with a preset analysis algorithm; Optimizing division unit: Optimizing the initial autonomous layer after redivision based on a preset optimization algorithm, and then determining a number of adjusted autonomous layers.

[0049] In this embodiment, the first status score is a score calculated based on the operating data of each device in the power grid, which is used to evaluate the current operating status of the device, reflecting the health status, performance and possible problems of the device. If the operating data of a transformer shows that its temperature and load are stable within the normal range, it may get a higher first status score, indicating that the device is in good condition. On the contrary, if the operating data of a transmission line shows that the current is too high and fluctuates abnormally, its first status score may be low, indicating that attention or maintenance is needed; In this embodiment, the preset analysis algorithm is a set of pre-set rules or methods for analyzing and processing the status scores of power grid equipment and the node load scores, so as to determine how to re-divide the initial autonomous layer, including data clustering, threshold judgment, pattern recognition and other technologies. For example, a preset analysis algorithm may combine the first status scores of each device and the load scores of the nodes to identify areas in the power grid with high load and poor health. Based on these identification results, the algorithm can re-divide the autonomous layers of these areas to improve the operating efficiency and safety of the power grid.

[0050] In this embodiment, the preset optimization algorithm is a pre-designed algorithm for further optimizing the autonomous layer structure based on the preliminary division, including genetic algorithm, simulated annealing, particle swarm optimization, etc., for improving the modularity or other performance indicators of the autonomous layer. Assuming that in the preliminary division, the autonomous layer of a certain area has multiple small-scale sub-areas, the preset optimization algorithm can further optimize the merging or segmentation of these sub-areas to form a more balanced and stable adjustment autonomous layer; In this embodiment, adjusting the autonomous layer refers to the autonomous layer structure that has been re-divided and optimized to better adapt to the dynamic changes of the power grid. The formation of the adjusted autonomous layer means that the regional division of the power grid has been updated according to the real-time operation data and optimization algorithm to ensure the stability and efficiency of the system. For example, in the case of changes in the load of the power grid, the adjusted autonomous layer may merge the area with higher load with the adjacent area with lower load to disperse the load pressure and optimize the overall resource allocation and management efficiency of the power grid.

[0051] The beneficial effects of the above technical solution are: by dynamically adjusting the autonomous layer division of power grid equipment, comprehensive evaluation and optimized management of power grid equipment status and load are achieved. Combined with the equipment status score and node load score, the autonomous layer is re-divided and optimized through preset analysis and optimization algorithms, thereby improving the operating efficiency and stability of the power grid, improving the ability to predict and prevent equipment failures, realizing dynamic allocation of power grid resources, and reducing overall operating risks.

[0052] Example 7 An embodiment of the present invention provides a power grid equipment status and data management system, a risk determination module, including: Risk determination unit: determines a number of corresponding risk factors for each device based on the health index of the devices in the power grid and the real-time operation data of each device; Index determination unit: determines the risk index of each device based on the corresponding risk factors, health index and real-time operation data of each device: ;in, is the risk index of the kth device, is the i-th risk factor of the k-th device, is the weight of the i-th risk factor of the k-th device, is the number of risk factors of the kth device, is the health index of the kth device, is the health index weight coefficient of the kth device, is the weight coefficient of the real-time operation data impact coefficient of the kth device; in, is the real-time operation data impact coefficient of the kth device: ;in, is the actual measured value of the jth real-time operation data of the kth device, is the preset reference value of the jth real-time operation data of the kth device, is the preset maximum allowable deviation threshold of the jth real-time operation data of the kth device, is the weight of the jth real-time running data of the kth device, is the number of real-time operation data of the kth device; Report generating unit: determines the risk level of each device based on the risk index of each device, and generates a risk report corresponding to each device based on a preset risk level-risk report database.

[0053] In this embodiment, the risk index of each device is a comprehensive indicator that indicates the potential risk level of a device in the power grid. It is calculated using a weighted formula by combining multiple risk factors, health index, and real-time operation data of the device. The higher the risk index, the greater the risk of the device, and measures may need to be taken for prevention or maintenance. For example, a transformer has a low health index (indicating that it is in poor condition) and its load current frequently exceeds the safe range (abnormal real-time operation data). These factors lead to a high risk index. This indicates that the transformer may be about to fail and requires priority maintenance; In this embodiment, the preset maximum allowable deviation threshold is a pre-set standard value used to measure the degree of deviation of the real-time operation data of the device from the normal value. If the actual data of the device deviates from the threshold, there may be risks or abnormal conditions. For example, the normal temperature of a motor is 60°C, and the preset maximum allowable deviation threshold is 10°C. If the real-time measured temperature of the motor reaches 72°C, which exceeds the allowable deviation value (60°C + 10°C), it is considered that the device is at risk of overheating, and cooling or shutdown measures may need to be taken immediately.

[0054] In this embodiment, the preset risk level-risk report database is a database that stores equipment risk levels and corresponding risk reports, including a mapping relationship between equipment risk index and risk level, and detailed report templates preset for different risk levels. When the risk index of a certain equipment is calculated, the system generates a corresponding risk report according to its corresponding risk level, assuming that the risk level is divided into three levels: low, medium, and high. The risk index of a certain substation equipment is high, so it is classified as a "high risk" level. The system selects a standard report template for a high risk level from the database and generates a risk report containing the specific failure risk, impact range, and recommended maintenance measures for the equipment.

[0055] The beneficial effects of the above technical solution are: by comprehensively analyzing the health index, risk factors and real-time operation data of the equipment, a multi-level risk determination model is constructed, the risk level of the equipment is dynamically evaluated, and a customized risk report can be generated. This method provides more refined equipment status monitoring and risk prediction capabilities, effectively improves the safety management level of the power grid, and reduces the impact of potential faults on the overall operation of the power grid.

[0056] Example 8 An embodiment of the present invention provides a power grid equipment status and data management system, wherein risk factors include: risk factors related to equipment performance, risk factors related to operating environment, risk factors related to operation and use, risk factors related to design and manufacturing, and risk factors related to external environment.

[0057] In this embodiment, the risk factors related to equipment performance include: failure rate: the frequency of equipment or system failures, aging degree: the age and wear of the equipment, maintenance record: the frequency, quality and history of equipment maintenance, operating time: the time the equipment is continuously running, which is usually proportional to the probability of failure; In this embodiment, the risk factors related to the operating environment are temperature: the impact of ambient temperature on the device, extreme temperature may cause device performance degradation or failure, humidity: high humidity may cause corrosion or short circuit of internal components of the device, vibration: the vibration conditions of the environment where the device is located, excessive vibration may cause damage to the mechanical structure of the device, dust: dust accumulation in the air may affect the heat dissipation of the device and the normal operation of electronic components; In this embodiment, the risk factors related to operation and use include: operator experience and skills: the operator's technical level and experience directly affect the safe operation of the equipment, frequency of use: the frequency of use and load conditions of the equipment, excessive use may cause early wear of the equipment, incorrect operation: risks caused by operating errors, including setting errors or improper operation, overload operation: the equipment is in or close to its maximum load for a long time, which may increase the risk of failure; In this embodiment, the risk factors related to design and manufacturing include: Design defects: defects left over from the design stage of the device may cause the device to behave abnormally or fail in certain circumstances. Material quality: quality problems of materials used in the manufacturing process of equipment. Poor-quality materials may shorten the life of the equipment or reduce its performance. Process problems: process problems that occur during the manufacturing process, such as welding defects, assembly errors, etc. In this embodiment, risk factors related to the external environment include: power quality: the stability of the power supply system, voltage fluctuations or short power outages may affect the equipment; network environment: for networked devices, factors such as network stability, latency, and packet loss will affect the operation of the equipment; natural disasters: natural disasters such as earthquakes, floods, and lightning strikes may directly affect the operation of the equipment.

[0058] The beneficial effects of the above technical solution are: by comprehensively introducing multi-dimensional risk factors such as equipment performance, operating environment, usage behavior, design and manufacturing, and external environment, a comprehensive risk assessment model is established, which can more accurately and meticulously identify the potential risks of power grid equipment, enhance the accuracy of risk prediction and fault prevention, and significantly improve the safety and stability of power grid equipment.

[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A power grid equipment status and data management system, It is characterized in that include: Data acquisition module: collects operation-related data of each device in the power grid and related data of the power grid based on the preset acquisition device; Data processing module: builds several initial autonomous layers of the power grid based on the operation-related data of each device in the power grid; Dynamic adjustment module: obtains the operating data of each device in the power grid after the initial autonomous layer division, and adjusts the initial autonomous layer based on the operating data of all devices in the power grid; Status determination module: Based on the adjusted initial autonomous layer, it obtains the real-time operation data of each device in the power grid, and then generates the health index of each device in the power grid in combination with the preset algorithm; Risk determination module: Determine the risk level of each device based on the health index of each device in the power grid and the real-time operation data of each device, and then generate a risk determination report.

2. A power grid equipment status and data management system according to claim 1, It is characterized in that Data acquisition module, including Equipment collection unit: Based on the preset sensor network, it collects the initial operating status data of each device in the power grid; Node collection unit: collects the load conditions of each node in the power grid based on the preset monitoring equipment; History acquisition unit: obtains the historical load conditions of each node in the power grid based on the historical operation data of the power grid.

3. A power grid equipment status and data management system according to claim 1, It is characterized in that Data processing module, including: A first scoring unit: determining an initial status score of each device in the power grid based on initial operating status data of each device in the power grid; ;in, Score the initial state of the kth device in the power grid, is the total number of initial operating status data of the kth device in the power grid, is the historical operation reliability factor of the kth device in the power grid, is the environmental adaptability factor of the kth device, is the operating angle of the kth device in the power grid, is the g-th initial operating status data measurement value of the k-th device in the power grid, is the weight of the g-th initial operating status data of the k-th device in the power grid, is the operating time attenuation factor of the kth device in the power grid, is the cumulative operating time of the kth device in the power grid, is the absolute value of the difference between the initial load of the kth device in the grid and its rated load, is the rated load of the kth device in the power grid, is the relative importance coefficient of the kth device in the power grid, is the maintenance frequency coefficient of the kth device in the power grid, is the designed maintenance period of the kth device in the power grid; A second scoring unit: determining a load score of each node in the power grid based on the load condition of each node in the power grid and the historical load condition; ;in, is the load score of the qth node in the power grid, is the maximum allowable load of the qth node in the power grid, is the rated load of the qth node in the power grid, is the weight of the maximum allowable load of the qth node in the power grid, is the load of the qth node in the power grid at the historical time point t, is the total number of time points of historical load records of the qth node in the power grid, The weight of the historical load of the qth node in the power grid, is the historical load fluctuation factor of the qth node in the power grid, is the historical load average of the qth node in the power grid; Device determination unit: determines a number of associated devices corresponding to each node in the power grid based on the initial state score of each device in the power grid and the load score of each node in the power grid combined with a preset analysis algorithm; Network construction unit: constructs a node network based on all nodes in the power grid and several associated devices corresponding to each node; Initial division unit: Analyze the node network and divide the initial autonomous layer based on the analysis results. Each autonomous layer contains several nodes and devices associated with each node.

4. A power grid equipment status and data management system according to claim 3, It is characterized in that Initial division unit, including: Partition determination subunit: forming a node partition corresponding to each node based on the range where each node and the corresponding associated device are located; Module optimization subunit: Move the nodes and devices associated with each node partition to the node partition of the adjacent node and determine the modularity of each node in the adjacent partition. When the modularity reaches the maximum, the node will stop and the node partition of the adjacent node where it stops will be determined as the adjacent partition. Partition formation subunit: each node forms a super node partition with the nodes in the adjacent partition where it stays and the devices corresponding to the nodes; Partition optimization subunit: moves several nodes of each supernode partition to adjacent supernode partitions and determines the modularity of each supernode partition in the adjacent supernode partition until the modularity reaches the maximum value; First optimization subunit: repeat the above steps until the modularity of each super node partition no longer increases, then stop the iteration, and then form several comprehensive node partitions; The second optimization subunit: optimizes all integrated node partitions based on a preset splitting algorithm, and determines an initial autonomous layer based on the optimized integrated node partitions.

5. A power grid equipment status and data management system according to claim 4, It is characterized in that The second optimization subunit comprises: Betweenness optimization block: based on the betweenness of each edge in each integrated node partition, the edge with the largest betweenness is gradually deleted. At the same time, the modularity of each integrated node partition is determined in the process of deleting edges; Optimization control block: Determine the change rate of the modularity of each integrated node partition during the edge deletion process. When the change rate of the modularity is greater than the preset change rate threshold, stop the deletion to form an optimized integrated node partition.

6. A power grid equipment status and data management system according to claim 3, It is characterized in that Dynamic adjustment modules, including: A first scoring unit: acquiring operation data of each device in the power grid after the initial autonomous layer division, and then determining a first state score of each device in the power grid; Re-dividing unit: Re-dividing the initial autonomous layer based on the status scores of all devices in the power grid and the load scores of each node in the power grid combined with the preset analysis algorithm; Optimizing division unit: Optimizing the initial autonomous layer after redivision based on a preset optimization algorithm, and then determining a number of adjusted autonomous layers.

7. A power grid equipment status and data management system according to claim 3, It is characterized in that Risk determination module, including: Risk determination unit: determines a number of corresponding risk factors for each device based on the health index of the devices in the power grid and the real-time operation data of each device; Index determination unit: determines the risk index of each device based on the corresponding risk factors, health index and real-time operation data of each device: ;in, is the risk index of the kth device, is the i-th risk factor of the k-th device, is the weight of the i-th risk factor of the k-th device, is the number of risk factors of the kth device, is the health index of the kth device, is the health index weight coefficient of the kth device, is the weight coefficient of the real-time operation data impact coefficient of the kth device; in, is the real-time operation data impact coefficient of the kth device: ;in, is the actual measured value of the jth real-time operation data of the kth device, is the preset reference value of the jth real-time operation data of the kth device, is the preset maximum allowable deviation threshold of the jth real-time operation data of the kth device, is the weight of the jth real-time running data of the kth device, is the number of real-time operation data of the kth device; Report generating unit: determines the risk level of each device based on the risk index of each device, and generates a risk report corresponding to each device based on a preset risk level-risk report database.

8. A power grid equipment status and data management system according to claim 7, It is characterized in that Risk factors include: risk factors related to equipment performance, risk factors related to the operating environment, risk factors related to operation and use, risk factors related to design and manufacturing, and risk factors related to the external environment.

Citation Information

Patent Citations

  • An intelligent evaluation system and method of substation equipment state based on big data

    CN109102171A

  • Electric energy quality and reliability analysis method based on big data

    CN109462223A

  • State perception and hidden danger assessment method and system based on power distribution equipment

    CN117574207A

  • Method and system for monitoring health state of transformer of power station

    CN117630758A

  • Power grid dynamic partitioning method and system considering electrical characteristics

    CN118100139A

Cited By

  • Predictive maintenance strategy optimization method for transformer area equipment maintenance

    CN119359287A