Hydroelectric generating set maintenance grade intelligent recommendation method and device and storage medium

The method and device optimize hydropower unit maintenance by using a database and optimization techniques to address inefficiencies in existing maintenance level determination, improving flexibility and reducing costs.

CN119090292AInactive Publication Date: 2024-12-06CHINA YANGTZE POWER

Patent Information

Application Number
CN202411042913.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing methods for determining maintenance levels of hydropower units are inflexible and do not adequately consider complex factors, leading to inefficient maintenance decisions.

Method used

A method and device utilizing a maintenance item database, knowledge graph technology, and constrained optimization to recommend maintenance levels based on unit status scores, maintenance item attributes, and rolling maintenance plans, optimizing maintenance efficiency or minimizing costs.

Benefits of technology

Provides a more flexible and intelligent maintenance level recommendation by comprehensively considering various factors, enhancing maintenance efficiency and reducing overall costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090292A_ABST
    Figure CN119090292A_ABST
Patent Text Reader

Abstract

The invention discloses a hydroelectric generating set maintenance grade intelligent recommendation method and device and a storage medium. The method comprises the steps of creating a maintenance item database; according to the remaining defects, the technical transformation plan and the maintenance plan of each unit, a preliminary maintenance item table of each unit is formed for each unit; importing the maximum number of maintainers which can be developed or planned to be developed in the whole plant, and counting in sequence according to different maintenance grades to obtain the number of units at different maintenance grades; performing state scoring on each unit; and according to the number of maintenance units planned to be developed by the whole plant, the maintenance items, the state scoring result and the last maintenance completion time, the maintenance grade of each unit is intelligently recommended.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of maintenance of hydropower units, and in particular to a method, a device and a storage medium for intelligently recommending maintenance levels of hydropower units. Background Art

[0002] Hydropower stations generally contain multiple hydro-turbine generators, and a maintenance plan for all the units in the entire power station needs to be made every year. First, a maintenance project decision must be made to determine which maintenance projects need to be carried out for each unit to be maintained, and then a maintenance level decision must be made to determine the maintenance level of each unit that needs maintenance.

[0003] There are many solutions for unit equipment maintenance decision-making on the market today. However, the existing unit equipment maintenance decision-making solutions often determine the maintenance level through the unit standard maintenance items, and simply divide the maintenance level into major maintenance and minor maintenance. It is difficult to make decisions on the unit maintenance level under complex factors. Summary of the invention

[0004] The invention provides a method, a device and a storage medium for intelligently recommending the maintenance level of a hydropower unit.

[0005] In a first aspect, a method for intelligently recommending maintenance levels of hydropower units is provided, the method comprising: Create a maintenance item database, and use knowledge graph technology to store the maintenance item database; According to the remaining defects, technical transformation plan and maintenance plan of each unit, a preliminary maintenance item list is formed for each unit; Import the maximum number of units that can be or are planned to be overhauled in the entire plant, count them in sequence according to different overhaul levels, and obtain the number of units at different overhaul levels; Provide status score for each unit; According to the number of units planned for maintenance, maintenance items, status score results, and the time of completion of the last maintenance in the entire plant, the maintenance level of each unit is intelligently recommended.

[0006] Furthermore, the number of units at different maintenance levels is calculated, and a constrained optimization problem is introduced to determine the optimal maintenance level allocation scheme, with maximizing maintenance efficiency or minimizing total cost as the objective function. The optimization model is as follows:

[0007] ; in, is the total number of units, It is The cost of overhauling a unit, is a binary variable representing the Whether the unit has been selected for maintenance, This is the maximum number of maintenance units that can be carried out in the entire factory. is a binary variable representing the Is the unit of the maintenance level? , It is the maintenance level The maximum number of units allowed.

[0008] Furthermore, the maintenance items are specifically: Each maintenance item contains the following attributes: maintenance project name, minimum maintenance level, whether it belongs to the A-level maintenance standard item, whether it belongs to the B-level maintenance standard item, whether it belongs to the C-level maintenance standard item, whether it belongs to the D-level maintenance standard item, the number of days for extending the A-level maintenance period, the number of days for extending the B-level maintenance period, the number of days for extending the C-level maintenance period, and the number of days for extending the D-level maintenance period; among which A is the lowest, and B, C, and D increase in turn.

[0009] Furthermore, the last maintenance completion time includes: the last A-level maintenance completion time, the last B-level maintenance completion time, the last C-level maintenance completion time, and the last D-level maintenance completion time.

[0010] Furthermore, the method further comprises: Automatically calculate the time since the last A-level maintenance was completed, the time since the last B-level maintenance was completed, the time since the last C-level maintenance was completed, and the time since the last D-level maintenance was completed.

[0011] Furthermore, the intelligent recommendation of the maintenance level of each unit includes: Grade recommendations are made based on the rolling maintenance plan, the time since the last completion of maintenance at grade A, B, C or D, and the number of maintenance items at grade A, B, C or D. The maintenance grade of all units is adjusted. If a unit has the largest number of maintenance items at grade A, B, C or D, it is recommended to be maintained at the corresponding grade first. If the unit status evaluation score is high, the grade of maintenance required for the unit is downgraded. If the maintenance interval of the unit is short, the grade of maintenance required for the unit is downgraded.

[0012] Furthermore, the method further comprises: According to the recommended results, after manual adjustment and confirmation, the maintenance level of each unit is finally generated; Units that have been recommended for a high maintenance level will no longer participate in the recommendation assessment for a low maintenance level.

[0013] In a second aspect, the present invention provides a device for intelligently recommending maintenance levels of hydropower units, the device comprising: Preliminary rating module for: Create a maintenance item database; According to the remaining defects, technical transformation plan and maintenance plan of each unit, a preliminary maintenance item list is formed for each unit; Intelligent recommended maintenance level module for: Import the maximum number of units that can be or are planned to be overhauled in the entire plant, count them in sequence according to different overhaul levels, and obtain the number of units at different overhaul levels; Provide status score for each unit; According to the number of units planned for maintenance, maintenance items, status score results, and the time of completion of the last maintenance in the entire plant, the maintenance level of each unit is intelligently recommended.

[0014] In a third aspect, the present invention provides a device for intelligently recommending maintenance levels of hydropower units, the device comprising: Memory, used to store programs; The processor is used to execute the program stored in the memory. When the program stored in the memory is executed, the processor is used to execute the above method.

[0015] In a fourth aspect, the present invention provides a storage medium storing computer-readable instructions, which, when executed by one or more processors, causes the one or more processors to execute the above method.

[0016] Compared with the prior art, the present invention has the following advantages: Compared with the technical solutions for unit equipment maintenance decision-making on the market, the method of intelligent recommendation of hydropower unit maintenance level in this application comprehensively considers the influence of maintenance level decision factors of all units in the whole plant, and takes the influence of construction period, status evaluation score, maintenance interval duration, and rolling maintenance plan as consideration factors, providing a more flexible and intelligent unit maintenance level recommendation method. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A schematic diagram of a method for intelligently recommending maintenance levels for hydropower units provided by an embodiment of the present invention; Figure 2 A schematic diagram of the composition of a device for intelligently recommending maintenance levels for hydropower units provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0018] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0019] Figure 1 A schematic diagram of a method for intelligently recommending maintenance levels for hydropower units provided in an embodiment of the present invention, the method comprising: A method for intelligently recommending maintenance levels of hydropower units, the method comprising: Create a maintenance item database, and use knowledge graph technology to store the maintenance item database; According to the remaining defects, technical transformation plan and maintenance plan of each unit, a preliminary maintenance item list is formed for each unit; Import the maximum number of units that can be or are planned to be overhauled in the entire plant, count them in sequence according to different overhaul levels, and obtain the number of units at different overhaul levels; Provide status score for each unit; According to the number of units planned for maintenance, maintenance items, status score results, and the time of completion of the last maintenance in the entire plant, the maintenance level of each unit is intelligently recommended.

[0020] Furthermore, the number of units at different maintenance levels is calculated, and a constrained optimization problem is introduced to determine the optimal maintenance level allocation scheme, with maximizing maintenance efficiency or minimizing total cost as the objective function. The optimization model is as follows:

[0021] ; in, is the total number of units, It is The cost of overhauling a unit, is a binary variable representing the Whether the unit has been selected for maintenance, This is the maximum number of maintenance units that can be carried out in the entire factory. is a binary variable representing the Is the unit of the maintenance level? , It is the maintenance level The maximum number of units allowed.

[0022] In one embodiment, the maintenance items are specifically: Each maintenance item contains the following attributes: maintenance project name, minimum maintenance level, whether it belongs to the A-level maintenance standard item, whether it belongs to the B-level maintenance standard item, whether it belongs to the C-level maintenance standard item, whether it belongs to the D-level maintenance standard item, the number of days for extending the A-level maintenance period, the number of days for extending the B-level maintenance period, the number of days for extending the C-level maintenance period, and the number of days for extending the D-level maintenance period; among which A is the lowest, and B, C, and D increase in turn.

[0023] In one embodiment, the last maintenance completion time includes: the last A-level maintenance completion time, the last B-level maintenance completion time, the last C-level maintenance completion time, and the last D-level maintenance completion time.

[0024] In one embodiment, the method further comprises: Automatically calculate the time since the last A-level maintenance was completed, the time since the last B-level maintenance was completed, the time since the last C-level maintenance was completed, and the time since the last D-level maintenance was completed.

[0025] In one embodiment, the intelligent recommendation of the maintenance level of each unit includes: Grade recommendations are made based on the rolling maintenance plan, the time since the last completion of maintenance at grade A, B, C or D, and the number of maintenance items at grade A, B, C or D. The maintenance grade of all units is adjusted. If a unit has the largest number of maintenance items at grade A, B, C or D, it is recommended to be maintained at the corresponding grade first. If the unit status evaluation score is high, the grade of maintenance required for the unit is downgraded. If the maintenance interval of the unit is short, the grade of maintenance required for the unit is downgraded.

[0026] In one embodiment, the method further comprises: According to the recommended results, after manual adjustment and confirmation, the maintenance level of each unit is finally generated; Units that have been recommended for a high maintenance level will no longer participate in the recommendation assessment for a low maintenance level.

[0027] Figure 2 A schematic diagram of a device for intelligently recommending maintenance levels of hydropower units provided in an embodiment of the present invention, the device comprising: Preliminary rating module for: Create a maintenance item database; According to the remaining defects, technical transformation plan and maintenance plan of each unit, a preliminary maintenance item list is formed for each unit; Intelligent recommended maintenance level module for: Import the maximum number of units that can be or are planned to be overhauled in the entire plant, count them in sequence according to different overhaul levels, and obtain the number of units at different overhaul levels; Provide status score for each unit; According to the number of units planned for maintenance, maintenance items, status score results, and the time of completion of the last maintenance in the entire plant, the maintenance level of each unit is intelligently recommended.

[0028] An embodiment of the present invention provides an intelligent recommendation device for maintenance level of a hydropower unit, the device comprising: Memory, used to store programs; The processor is used to execute the program stored in the memory. When the program stored in the memory is executed, the processor is used to execute the above method.

[0029] In addition, an embodiment of the present invention provides a storage medium storing computer-readable instructions, and when the computer-readable instructions are executed by one or more processors, the one or more processors execute the above method.

[0030] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for intelligently recommending maintenance levels of hydropower units, characterized in that: The method comprises: Create a maintenance item database, and use knowledge graph technology to store the maintenance item database; According to the remaining defects, technical transformation plan and maintenance plan of each unit, a preliminary maintenance item list is formed for each unit; Import the maximum number of units that can be or are planned to be overhauled in the entire plant, count them in sequence according to different overhaul levels, and obtain the number of units at different overhaul levels; Provide status score for each unit; According to the number of units planned for maintenance, maintenance items, status score results, and the time of completion of the last maintenance in the entire plant, the maintenance level of each unit is intelligently recommended.

2. The method for intelligently recommending maintenance levels of hydropower units according to claim 1, characterized in that: The number of units at different maintenance levels is calculated, and a constrained optimization problem is introduced to determine the optimal maintenance level allocation scheme, with maximizing maintenance efficiency or minimizing total cost as the objective function. The optimization model is as follows: ; in, is the total number of units, It is The cost of overhauling a unit, is a binary variable representing the Whether the unit has been selected for maintenance, This is the maximum number of maintenance units that can be carried out in the entire factory. is a binary variable representing the Is the unit of the maintenance level? , It is the maintenance level The maximum number of units allowed.

3. The method for intelligently recommending maintenance levels of hydropower units according to claim 1, characterized in that: The maintenance items are specifically: Each maintenance item contains the following attributes: maintenance project name, minimum maintenance level, whether it belongs to the A-level maintenance standard item, whether it belongs to the B-level maintenance standard item, whether it belongs to the C-level maintenance standard item, whether it belongs to the D-level maintenance standard item, the number of days for extending the A-level maintenance period, the number of days for extending the B-level maintenance period, the number of days for extending the C-level maintenance period, and the number of days for extending the D-level maintenance period; among which A is the lowest, and B, C, and D increase in turn.

4. The method for intelligently recommending maintenance levels of hydropower units according to claim 2, characterized in that: The last maintenance completion time includes: the last A-level maintenance completion time, the last B-level maintenance completion time, the last C-level maintenance completion time, and the last D-level maintenance completion time.

5. The method for intelligently recommending maintenance levels of hydropower units according to claim 4, characterized in that: The method further comprises: Automatically calculate the time since the last A-level maintenance was completed, the time since the last B-level maintenance was completed, the time since the last C-level maintenance was completed, and the time since the last D-level maintenance was completed.

6. The method for intelligently recommending maintenance levels of hydropower units according to claim 1, characterized in that: The intelligent recommendation of maintenance level of each unit includes: Grade recommendations are made based on the rolling maintenance plan, the time since the last completion of maintenance at grade A, B, C or D, and the number of maintenance items at grade A, B, C or D. The maintenance grade of all units is adjusted. If a unit has the largest number of maintenance items at grade A, B, C or D, it is recommended to be maintained at the corresponding grade first. If the unit status evaluation score is high, the grade of maintenance required for the unit is downgraded. If the maintenance interval of the unit is short, the grade of maintenance required for the unit is downgraded.

7. The method for intelligently recommending maintenance levels of hydropower units according to claim 1, characterized in that: The method further comprises: According to the recommended results, after manual adjustment and confirmation, the maintenance level of each unit is finally generated; Units that have been recommended for a high maintenance level will no longer participate in the recommendation assessment for a low maintenance level.

8. An intelligent recommendation device for maintenance level of hydropower units, characterized in that: The device comprises: Preliminary rating module for: Create a maintenance item database; According to the remaining defects, technical transformation plan and maintenance plan of each unit, a preliminary maintenance item list is formed for each unit; Intelligent recommended maintenance level module for: Import the maximum number of units that can be or are planned to be overhauled in the entire plant, count them in sequence according to different overhaul levels, and obtain the number of units at different overhaul levels; Provide status score for each unit; According to the number of units planned for maintenance, maintenance items, status score results, and the time of completion of the last maintenance in the entire plant, the maintenance level of each unit is intelligently recommended.

9. An intelligent recommendation device for maintenance level of hydropower units, characterized in that: The device comprises: Memory, used to store programs; A processor, configured to execute the program stored in the memory; when the program stored in the memory is executed, the processor is configured to execute the steps of the method as claimed in any one of claims 1 to 7.

10. A storage medium storing computer-readable instructions, wherein when the computer-readable instructions are executed by one or more processors, the one or more processors are caused to perform the steps of the method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • A giant hydraulic power plant state maintenance model and a construction method

    CN109902447A

  • Automatic maintenance method of power transmission and transformation equipment

    CN111369021A

  • Generator set maintenance scheme intelligent generation method, system, device and medium

    CN115392508A

  • Wind generating set maintainability evaluation and resource allocation scheme planning method

    CN117035729A

  • Urban rail train inspection and transportation integrated plan optimization method considering operation calendar

    CN118036933A

Cited By

  • Hydroelectric generating unit condition-based maintenance system and method based on multi-source situation awareness

    CN122946983A