Power transformation and distribution investment control method based on building electrical load rapid estimation
By calculating the transformer load based on the building's electricity consumption indicators, establishing a mathematical relationship between the price of the transformer and distribution project and the power load, the complex problem of the control method of the transformer and distribution investment in the EPC project is solved, and a rapid estimation of the investment in the transformer and distribution project is achieved. Improved estimation level and investment control capabilities.
Patent Information
- Application Number
- CN202410640432.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2024-12-06
AI Technical Summary
The control method for the investment of the switch distribution in existing EPC projects is complex, requiring in-depth participation of electrical design professionals, and it is not suitable for rapid estimation of investment in the switch distribution project during the project proposal or bidding stage.
By determining the power load based on the power consumption indicators of the building, calculating the transformer load, and establishing a mathematical relationship between the price of the transformer and distribution project and the power load, a rapid estimation of the investment in the transformer and distribution is achieved.
In the early stage of the project, rapid estimation of substation investment was achieved, the estimation level was improved, the bid quotation process was simplified, and the investment control of construction projects was suitable.
Smart Images

Figure CN119090410A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of EPC general contracting project investment estimation, and in particular relates to a power transformation and distribution investment control method based on rapid estimation of building power load. Background Art
[0002] Project investment estimation refers to the estimation of the fixed asset investment required during the construction period of the proposed project and the production working capital required after the project is put into production. Investment estimation is an important part of the forecast of the basic economic data of the project. The accuracy of the estimation directly affects the enterprise cost and income after the project is completed and put into production, and is a key issue in project investment and loan decisions. In the EPC model, the engineering project not only includes specific design work, but also includes the overall planning of the entire construction project content and the planning and specific work of the organization and management of the implementation of the entire construction project. Procurement is not the procurement of construction equipment and materials in the general sense, but needs to further include the procurement of professional equipment and materials. EPC project investment is a multi-stage, continuous work. For the investment estimation of the power distribution project in the EPC project, it used to be necessary to have a preliminary feasibility study plan or preliminary design plan, according to the equipment table of the plan (transformer, ring network cabinet, low-voltage switch cabinet, capacitor compensation cabinet, power monitoring system, etc.), and focus on referring to and comparing the specific investment data of each stage of the implemented project, such as the unit price of equipment in the implemented project. However, with the improvement of drawing conditions and the rise in the price of the same materials in the market, the data of each link has become independent of each other. For EPC projects, when the project is confirmed, it is necessary to make an estimate based on the electricity consumption index. Therefore, the estimate should be matched with the corresponding preliminary design budget, construction drawing budget, and the corresponding winning bid price of the project procurement, so as to achieve a quick estimate of the investment in the power distribution project. However, this method requires in-depth participation of electrical design professionals, and the estimation method is complex. It is limited in the project proposal stage or bidding estimation stage, and is not applicable to the quick estimation in the early stages of the power distribution project. Summary of the invention
[0003] In order to solve the above problems, the present invention provides a power distribution investment control method based on rapid estimation of building power load, so as to solve the problems that the existing EPC project power distribution investment control method requires in-depth participation of electrical design professionals, the estimation method is complex, and it is limited in the project proposal stage or the bidding estimation stage, and is not applicable to the rapid estimation in the early stages of the power distribution engineering project.
[0004] To achieve the above object, the present invention provides a method for controlling power distribution investment based on rapid estimation of building power load, comprising: Step 1: Determine the power load of the building according to the power consumption index of the building; Step 2: Estimate the investment in power transformation and distribution according to the power load; Step 3: Estimate the price of power transformation and distribution project.
[0005] According to a specific embodiment of the present invention, determining the power load of a building according to the power consumption index of the building includes: Determine the electricity load of civil buildings according to the electricity consumption indicators of civil buildings, and Determine the electricity load of industrial buildings based on the actual process equipment load or industrial building plant load indicators.
[0006] According to a specific embodiment of the present invention, determining the power load of an industrial building according to the actual process equipment load or the industrial building plant load index further includes: Determine the power load of industrial buildings based on process equipment data of process input conditions in the early stage of industrial construction, or When process personnel are unable to determine the load of process equipment through investigation, the power load of industrial buildings shall be determined based on the load index of industrial building plants.
[0007] According to a specific embodiment of the present invention, estimating the power transformation and distribution investment according to the power load includes: Determine transformer load according to power load; Calculate the price of power transformation and distribution projects based on transformer load; Establish a mathematical relationship between the price of power transformation and distribution projects and the power load.
[0008] According to a specific embodiment of the present invention, the transformer load calculation formula is: Tp=A1*Yp In the formula, Tp is the transformer load, Yp is the power load, and A1 is the electrical design coefficient.
[0009] According to a specific embodiment of the present invention, the calculation formula for the power transformation and distribution project price is: F=F1+F2+F3+F4+F5 In the formula, F is the price of the building power transformation and distribution project, F1 is the price of the ring network cabinet equipment, F2 is the price of the transformer equipment, F3 is the price of the low-voltage switchgear equipment, F4 is the price of the power monitoring system equipment, and F5 is the price of auxiliary materials and equipment installation.
[0010] According to a specific embodiment of the present invention, the mathematical relationship between the power transformation and distribution project price and the power load is: F=A2*Tp=A2*A1*Yp In the formula, F is the price of the building's power transformation and distribution project, Tp is the transformer load, Yp is the power load, A1 is the electrical design coefficient, and A2 is the average cost index of the transformer load.
[0011] According to a specific embodiment of the present invention, estimating the price of a power transformation and distribution project includes: The price of power transformation and distribution projects is estimated based on the mathematical relationship between the price of power transformation and distribution projects and the power load.
[0012] Compared with the prior art, the present invention provides a method for controlling power distribution investment based on rapid estimation of building power load. First, the power load Yp is calculated, then the transformer load Tp is calculated based on the power load Yp, and finally the power distribution project price F is estimated according to the transformer load Tp. Aiming at the characteristics of the early stage of the construction project, the present invention gives full play to the advantages of the integration of design and cost professionals, and estimates the power distribution investment in the early stage according to the power load. In the early stage of project investment estimation, especially in the process of bidding and quoting using the plan, the transformer, ring network cabinet, low-voltage switch cabinet, capacitor compensation cabinet, power monitoring system and other power distribution engineering estimates are determined according to the transformer capacity, investment control is realized, the level of power distribution estimation is improved, and the purpose of rapid estimation of power distribution engineering investment is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 The present invention is a flow chart of a method for controlling power transformation and distribution investment based on rapid estimation of building power load according to an embodiment of the present invention.
[0014] Figure 2 The present invention is a flowchart of a method for determining a building's power load based on power consumption indicators provided in an embodiment of the present invention.
[0015] Figure 3 The present invention is a flowchart of a method for determining the power load of an industrial building provided according to an embodiment of the present invention.
[0016] Figure 4 The present invention is a flowchart of a method for estimating power transformation and distribution investment based on power load provided in accordance with an embodiment of the present invention. DETAILED DESCRIPTION
[0017] In order to make those skilled in the art understand the concept and thought of the present invention more clearly, the present invention is described in detail below in conjunction with specific embodiment.It should be understood that the embodiment provided herein is only a part of all embodiments that the present invention may have.Those skilled in the art, after reading the specification of the application, have the ability to make improvements, transformations, or replacements to part or the whole of the following embodiments, and these improvements, transformations, or replacements are also included in the scope of the present invention.
[0018] In this article, the terms "first", "second" and other similar words are not intended to imply any order, quantity and importance, but are only used to distinguish different elements. In this article, the terms "one", "an" and other similar words are not intended to indicate that there is only one thing, but to indicate that the relevant description is only for one of the things, and the thing may have one or more. In this article, the terms "comprise", "include" and other similar words are intended to indicate logical mutual relations, and cannot be regarded as indicating spatial structural relations. For example, "A includes B" is intended to indicate that B belongs to A logically, but does not mean that B is located inside A in space. In addition, the meanings of the terms "comprise", "include" and other similar words should be regarded as open, rather than closed. For example, "A includes B" is intended to indicate that B belongs to A, but B does not necessarily constitute the whole of A, and A may also include other elements such as C, D, and E.
[0019] In this document, the terms "embodiment", "this embodiment", "one embodiment", and "an embodiment" do not mean that the relevant description is only applicable to a specific embodiment, but rather that the description may also be applicable to one or more other embodiments. Those skilled in the art should understand that in this document, any description of a certain embodiment can be replaced, combined, or combined in other ways with the relevant descriptions in one or more other embodiments, and the new embodiments generated by the replacement, combination, or combination in other ways are easily conceivable by those skilled in the art and fall within the scope of protection of the present invention.
[0020] Example 1 Additional aspects and advantages of embodiments of the present invention will be described in part in the following description, and will become apparent from the following description, or will be learned through practice of embodiments of the present invention. Figure 1-Figure 4 The embodiment of the present invention provides a method for controlling power distribution investment based on rapid estimation of building power load, comprising: S1: Determine the electricity load of the building based on the building's electricity consumption indicators.
[0021] S2: Estimate the investment in power transformation and distribution based on power load.
[0022] S3: Estimate the price of power transformation and distribution project.
[0023] Specifically, step S1 determines the power load of the building according to the power consumption index of the building, including: S11: Determine the electricity load of civil buildings based on the electricity consumption indicators of civil buildings, and S12: Determine the power load of industrial buildings based on the actual process equipment load or industrial building plant load indicators.
[0024] In a specific embodiment of the present invention, the power load of civil buildings is determined according to the power consumption index of the buildings. The power consumption per square meter varies greatly in different regions, different equipment, different usage conditions, and different project scales, and it is difficult to have a unified standard. The power consumption index of various buildings in the "National Civil Construction Engineering Design Technical Measures" can be referred to as a reference for providing a plan or estimating the power consumption index in the preliminary design stage, where the power consumption index of various buildings is shown in Table 1. Serial number Building Type Power consumption index W / m2 Serial number Building Type Power consumption index W / m2 1 apartment 30~50 7 Hospital 40~70 2 hostel 40~70 8 Colleges and universities 20~40 3 Office 30~70 9 Primary and secondary schools 12~20 4 Business Generally 40~80 10 Exhibition Hall 50~80 5 physical education 40~70 11 Studio 250~500 6 theater 50~80 12 Car Park 8~15
[0025] Table 1 Electricity consumption indicators of various buildings Specifically, step S12 further includes: determining the power load of the industrial building according to the actual process equipment load or the industrial building plant load index: S121: Determine the power load of industrial buildings based on process equipment data of process input conditions in the early stage of industrial construction, or S122: When process personnel are unable to determine the load of process equipment through investigation, the power load of industrial buildings shall be determined based on the load index of industrial building plants.
[0026] Specifically, step S2 estimates the power transformation and distribution investment according to the power load, including: S21: Determine the transformer load according to the power load, where the transformer load calculation formula is: Tp=A1*Yp (1) In the formula, Tp is the transformer load, Yp is the power load, and A1 is the electrical design coefficient.
[0027] S22: Calculate the price of the power distribution project based on the transformer load, where the calculation formula for the power distribution project price is: F=F1+F2+F3+F4+F5 (2) In the formula, F is the price of the building power transformation and distribution project, F1 is the price of the ring network cabinet equipment, F2 is the price of the transformer equipment, F3 is the price of the low-voltage switchgear equipment, F4 is the price of the power monitoring system equipment, and F5 is the price of auxiliary materials and equipment installation.
[0028] For example, according to the cost range of power transformation and distribution projects, a relationship database between power transformation and distribution projects and power load indicators is established as shown in Table 2. Through research and analysis, it is found that the average cost indicator of power transformer load in the factory is 1,478 yuan / KVA. Serial number Project Name Equipment cost (ten thousand yuan) Auxiliary materials and installation fees (ten thousand yuan) Subtotal (ten thousand yuan) Building Area Transformer capacity KVA Capacity index (yuan) 1 XX Factory-No. 102 Military Product Assembly and Test Plant 12.37 37.69 210.05 20648.00 1600 1312.83 2 No. 11 Machine Processing Plant of XX Factory 188.58 53.79 242.38 20851.00 2000 1211.89 3 XX Factory-Building 4 143.78 39.90 183.68 4138.30 1000 1836.85 4 XX Factory-905 Power Station 325.05 20.06 345.12 3073.16 1600 2156.97 5 XX Factory-No. 5 Heat Treatment Plant 122.10 19.85 141.95 8512.00 1250 1135.61 6 XX Factory-No. 201 Comprehensive Production Plant 85.35 11.90 97.25 17395.00 800 1215.65
[0029] Table 2 Relationship database between power distribution engineering and power load indicators in power plants S23: Establish a mathematical relationship between the price of the power transformation and distribution project and the power load, wherein the mathematical relationship between the price of the power transformation and distribution project and the power load is: F=A2*Tp=A2*A1*Yp (3) In the formula, F is the price of the building's power transformation and distribution project, Tp is the transformer load, Yp is the power load, A1 is the electrical design coefficient, and A2 is the average cost index of the transformer load.
[0030] Specifically, step S3 of estimating the price of the power transformation and distribution project includes: The price of power transformation and distribution projects is estimated based on the mathematical relationship between the price of power transformation and distribution projects and the power load.
[0031] In summary, the present invention provides a method for controlling power distribution investment based on rapid estimation of building power load. First, the power load Yp is calculated, then the transformer load Tp is calculated based on the power load Yp, and finally the power distribution project price F is estimated according to the transformer load Tp. The present invention aims at the characteristics of the early stage of the construction project, gives full play to the advantages of the integration of design and cost professionals, and estimates the power distribution investment in the early stage according to the power load. In the early stage of project investment estimation, especially in the process of bidding and quoting using the plan, the transformer, ring network cabinet, low-voltage switch cabinet, capacitor compensation cabinet, power monitoring system and other power distribution engineering estimates are determined according to the transformer capacity, investment control is realized, the level of power distribution estimation is improved, and the purpose of rapid estimation of power distribution engineering investment is achieved.
[0032] The above describes in detail the concepts, principles and ideas of the present invention in conjunction with specific implementation methods (including embodiments and examples). Those skilled in the art should understand that the implementation methods of the present invention are not limited to the forms given above. After reading this application document, those skilled in the art can make any possible improvements, substitutions and equivalent forms to the steps, methods, systems and components in the above implementation methods. These improvements, substitutions and equivalent forms should be deemed to fall within the scope of the present invention, and the protection scope of the present invention shall be subject only to the claims.
Claims
1. A method for controlling power distribution investment based on rapid estimation of building power load, characterized in that: include: Step 1: Determine the power load of the building according to the power consumption index of the building; Step 2: estimating the power transformation and distribution investment according to the power load; Step 3: Estimate the price of power transformation and distribution project.
2. The power transformation and distribution investment control method based on rapid estimation of building power load according to claim 1 is characterized in that: Determining the power load of a building according to the power consumption index of the building includes: Determine the electricity load of civil buildings according to the electricity consumption indicators of civil buildings, and Determine the electricity load of industrial buildings based on the actual process equipment load or industrial building plant load indicators.
3. The power transformation and distribution investment control method based on rapid estimation of building power load according to claim 2 is characterized in that: Determining the power load of the industrial building according to the actual process equipment load or the industrial building plant load index further includes: Determine the power load of industrial buildings based on process equipment data of process input conditions in the early stage of industrial construction, or When process personnel are unable to determine the load of process equipment through investigation, the power load of industrial buildings shall be determined based on the load index of industrial building plants.
4. The power transformation and distribution investment control method based on rapid estimation of building power load according to claim 1 is characterized in that: The estimating of the power transformation and distribution investment according to the power load comprises: determining a transformer load according to the power load; Calculate the price of the power transformation and distribution project based on the transformer load; A mathematical relationship between the power transformation and distribution project price and the power load is established.
5. The power transformation and distribution investment control method based on rapid estimation of building power load according to claim 4 is characterized in that: The calculation formula of the transformer load is: Tp=A1*Yp In the formula, Tp is the transformer load, Yp is the power load, and A1 is the electrical design coefficient.
6. The power transformation and distribution investment control method based on rapid estimation of building power load according to claim 4 is characterized in that: The calculation formula for the power transformation and distribution project price is: F=F1+F2+F3+F4+F5 In the formula, F is the price of the building power transformation and distribution project, F1 is the price of the ring network cabinet equipment, F2 is the price of the transformer equipment, F3 is the price of the low-voltage switchgear equipment, F4 is the price of the power monitoring system equipment, and F5 is the price of auxiliary materials and equipment installation.
7. The power transformation and distribution investment control method based on rapid estimation of building power load according to claim 4 is characterized in that: The mathematical relationship between the power transformation and distribution project price and the power load is: F=A2*Tp=A2*A1*Yp In the formula, F is the price of the building's power transformation and distribution project, Tp is the transformer load, Yp is the power load, A1 is the electrical design coefficient, and A2 is the average cost index of the transformer load.
8. The power transformation and distribution investment control method based on rapid estimation of building power load according to claim 4 is characterized in that: The estimated power transformation and distribution project price includes: The price of the power transformation and distribution project is estimated based on a mathematical relationship between the price of the power transformation and distribution project and the power load.