Power transformation engineering design review method and system
By using dense database and electronic signature technology in substation engineering design review in the power industry, the problems of data security and reliability in on-site review are solved, the accuracy and security of online reviews are achieved, and data loss is reduced. and risk of leakage.
Patent Information
- Application Number
- CN202410893797.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-12-06
AI Technical Summary
In the existing technology, substation engineering design review in the power industry relies on on-site review and lacks technical system guarantees, resulting in high risks of data loss, tampering and leakage, and the review process is not safe and reliable enough.
Use a dense database to encrypt project information and materials, conduct online pre-examination and regular review, use electronic signature technology and SM3 algorithm to ensure data security and traceability, organize review processes through the management terminal of the Planning and Operation Department to improve the accuracy and security of review sex.
It improves the accuracy and security of the review materials, reduces the risks of data loss and leakage, and realizes traceability and security of the review process.
Smart Images

Figure CN119090411A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of project review, and in particular to a substation engineering design review method and system. Background Art
[0002] At present, the design review of substation engineering in the power industry is all conducted in the form of on-site review. The purpose of this process is to ensure that the design plan meets the relevant laws, regulations, standards, industry specifications and the actual needs of the project, so as to ensure the safety, economy, feasibility and efficiency of the power project. The following are the specific contents of the design review: 1. Completeness and accuracy of design documents: The reviewers will conduct a comprehensive inspection of all drawings, materials, calculation books, etc. in the design plan to ensure that these documents are complete, accurate and without any omissions. Verify the data, parameters and calculation results in the design documents to ensure that they are all based on correct input and reasonable methods. 2. Feasibility of the design plan: Evaluate the technical feasibility of the design plan, check whether the various structures, equipment, processes, etc. in the plan are feasible, and whether they can meet the needs of the project. Evaluate the construction and operation and maintenance feasibility of the design plan, and check whether the plan is convenient for construction, maintenance and daily operation. 3. Compliance of the design plan: Evaluate whether the design plan complies with relevant laws, regulations, standards and industry specifications to ensure that the design is legal and compliant. Check whether the design plan meets the relevant national energy-saving and environmental protection requirements to ensure that the design is environmentally friendly and energy-saving. 4. Economic feasibility of the design scheme: Evaluate the various financial budgets, capital performance ratios, etc. in the design scheme to ensure that the design is economically feasible. Check whether the design scheme has room for optimization and whether the project cost can be reduced by adjusting the design. 5. Innovation of the design scheme: Evaluate the various innovative points in the design scheme to check whether the design is at the leading level in the industry. Consider whether the design scheme can bring new ideas and technologies to the development of power engineering and promote the progress of the industry. 6. Qualification and selection of design units: Review the qualifications of the design unit to ensure that the design unit has the corresponding design capabilities and experience. Evaluate whether the selection of the design unit is reasonable and whether the relevant bidding regulations and procedures are followed. 7. Management of design changes: Review the scope and reasons for the design changes to ensure that the design changes are necessary and reasonable. Check whether the procedures for design changes are compliant and whether the necessary review procedures have been performed. In summary, the design review in the power industry is a comprehensive evaluation of the design scheme of power engineering, involving the completeness and accuracy of the design documents, the feasibility, compliance, economy, innovation of the design scheme, and the qualifications and selection of the design unit. The purpose of this process is to ensure that the design scheme meets the relevant requirements and to provide guarantee for the smooth progress and ultimate successful implementation of the power project.
[0003] Currently, the reviewers are basically relying on on-site judgment, and there are no protective measures through technical systems to ensure the security, reliability and confidentiality of the design review process. At the same time, there is no pre-review of the project, resulting in incomplete and inaccurate project materials, requiring multiple reviews, which is time-consuming and labor-intensive. After the on-site personnel conduct the review, since all the materials are paper materials, they are easily lost or damaged during transmission, storage and use, which may lead to the loss of important data, and the modification and transmission of materials are difficult to track and audit, which increases the risk of data tampering or leakage. At the same time, confidentiality is insufficient and there is a risk of leaking sensitive information. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems in the above-mentioned technology to a certain extent. To this end, the first purpose of the present invention is to propose a substation engineering design review method, which pre-reviews materials, facilitates modification according to pre-review opinions, improves the accuracy of materials, and thus improves the accuracy of review, avoids the loss of important data by reviewing the project online, and at the same time improves the traceability of materials, reduces the risk of data tampering or leakage, and improves the security of data.
[0005] The second object of the present invention is to provide a substation engineering design review system.
[0006] To achieve the above-mentioned object, a first embodiment of the present invention provides a substation engineering design review method, comprising:
[0007] Based on the management terminal of the planning and operation department, maintenance project information and project data about the substation project are created, and the project information and project data are encrypted using a secret database to obtain encrypted data;
[0008] Obtaining attribute information of encrypted data and determining whether to conduct a preliminary review;
[0009] When the pre-examination is determined, a pre-examination task is generated based on the encrypted data and sent to the heads of each review department; the heads of each review department forward it to the review expert based on the review specialty of the pre-examination task;
[0010] Receive the preliminary review opinions given by the review experts and forward them to the construction unit terminal / design unit terminal. The construction unit terminal / design unit terminal adds / maintains the project review materials based on the preliminary review opinions and performs preliminary review of the documents. When the verification is confirmed to be passed, the project review materials are reviewed based on the planning and operation department management terminal.
[0011] According to some embodiments of the present invention, the project review materials are reviewed based on the management terminal of the planning and operation department, including:
[0012] Based on the management terminal of the Planning and Operation Department, the review meeting notice is sent to the heads of each review department; based on the heads of each review department, the meeting information is sent to the experts who attend the meeting;
[0013] Collect meeting content and organize data, upload meeting minutes and fill in review comments based on the results;
[0014] Based on the planning and operation department management terminal initiating the closing review, each participating expert terminal responds to the closing review, and when it is determined that the project review materials added / maintained according to the final review opinions are passed, each participating expert terminal initiates a countersignature; each participating expert terminal countersigns and writes a review opinion, and each participating expert terminal signs the completed review opinion report. The head of each review department and the construction unit terminal / design unit terminal stamp the signed review opinion report, completing the final review processing of the construction unit terminal / design unit terminal.
[0015] According to some embodiments of the present invention, each participating expert signs based on electronic signature technology.
[0016] According to some embodiments of the present invention, it also includes: encrypting the signatures of the prepared review opinion reports by the participating experts and the electronic signatures of the signed review opinion reports by the heads of the review departments and the construction unit terminals / design unit terminals based on a cryptographic machine.
[0017] According to some embodiments of the present invention, it also includes storing signature information of each participating expert when signing the completed review opinion report, and the signature information includes the original signature, signature value, timestamp value and certificate value of each participating expert.
[0018] According to some embodiments of the present invention, when each participating expert signs the completed review opinion report, a parallel processing strategy is adopted to generate a corresponding hash value from the signature value of each participating expert, and the signature is performed through a cryptographic machine based on the SM3 algorithm.
[0019] According to some embodiments of the present invention, after each participating expert completes the signature, the signature hash value of each participating expert is sorted by the signing time, and the signature values of all participating expert ends are hashed to generate a unified signature group hash value; then the signature group hash value needs to be bound to the stamped file hash value, and the corresponding meeting minutes file hash0 is generated according to the stamped meeting minutes file.
[0020] According to some embodiments of the present invention, when each participating expert signs the completed review opinion report, it also includes:
[0021] Obtain signature information from each participating expert and add timestamp information;
[0022] Obtain the bandwidth information of the corresponding transmission channel of each participating expert, and determine the transmission duration of each byte based on the bandwidth information;
[0023] Determine the delay information for data transmission of the signature information according to the signature information of each participating expert and the transmission time of each byte;
[0024] Based on the timestamp information and delay information, estimate the reception time of the signature information of each participating expert;
[0025] The order of the signatures in the signature area of the server is determined based on the estimated time of receiving the signature information of each participating expert and a preview is performed.
[0026] According to some embodiments of the present invention, when each participating expert terminal signs the completed review opinion report, the server sends a wake-up message to each participating expert terminal, and determines the reception time of the participating expert terminal based on the attribute information of the participating expert terminal;
[0027]
[0028] Wherein, Tq is the reception time of the participating expert end; M is the length of the wake-up information; DG is the spreading factor of the participating expert end; NE is the bandwidth of the participating expert end; VT is the preset coding rate in the participating expert end;
[0029] When the expert participating in the conference receives the wake-up information and is in the wake-up state, the signature information is generated and transmitted to the server, and the transmission time for transmitting the signature information to the server is determined;
[0030]
[0031] Wherein, Td is the transmission time of transmitting the signature information to the server; AZ is the number of bytes of the signature information; J is the error factor, J=0.6; To round the data, when the data is negative, take 0;
[0032] The sum of the receiving time and the transmission time is calculated as the response time of the participating experts. The signatures are sorted from small to large based on the response time. The order of the signatures in the signature area of the server is generated according to the sorting results and previewed.
[0033] To achieve the above-mentioned purpose, a second embodiment of the present invention provides a substation engineering design review system, comprising:
[0034] A creation module is used to create maintenance project information and project data about the substation project based on the planning and operation department management terminal, and encrypt the project information and project data using a secret database to obtain encrypted data;
[0035] The acquisition module is used to obtain the attribute information of the encrypted data and determine whether to conduct a preliminary review;
[0036] The generation module is used to generate a pre-examination task based on the encrypted data when the pre-examination is determined, and send it to the head of each review department; the head of each review department forwards it to the review expert according to the review specialty of the pre-examination task;
[0037] The processing module is used to receive the preliminary review opinions given by the review experts and forward them to the construction unit terminal / design unit terminal. The construction unit terminal / design unit terminal adds / maintains the project review materials according to the preliminary review opinions and performs preliminary review of the documents. When the verification is determined to be passed, the project review materials are reviewed based on the planning and operation department management terminal.
[0038] The present invention proposes a substation engineering design review method and system, which pre-review materials to facilitate modifications based on pre-review opinions, thereby improving the accuracy of the materials and further improving the accuracy of the review. By conducting project review online, the loss of important data is avoided, while the traceability of materials is improved, the risk of data tampering or leakage is reduced, and the security of data is improved.
[0039] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings.
[0040] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0042] Figure 1 is a flow chart of a substation engineering design review method according to an embodiment of the present invention;
[0043] Figure 2 is a flow chart of a method for conducting a positive review of project review materials according to an embodiment of the present invention;
[0044] Figure 3 The present invention is a block diagram of a substation engineering design review system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0045] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0046] like Figure 1 As shown, the first embodiment of the present invention proposes a substation engineering design review method, including steps S1-S4:
[0047] S1. Create maintenance project information and project data about the substation project based on the management terminal of the planning and operation department, and encrypt the project information and project data using a secret database to obtain encrypted data;
[0048] S2, obtaining attribute information of the encrypted data and determining whether to conduct a preliminary review;
[0049] S3. When the pre-examination is determined, a pre-examination task is generated based on the encrypted data and sent to the heads of each review department; the heads of each review department forward it to the review expert based on the review specialty of the pre-examination task;
[0050] S4. Receive the preliminary review opinions given by the review experts and forward them to the construction unit terminal / design unit terminal. The construction unit terminal / design unit terminal adds / maintains the project review materials according to the preliminary review opinions and performs preliminary review of the documents. When the verification is confirmed to be passed, the project review materials are reviewed based on the planning and operation department management terminal.
[0051] Working principle of the above technical solution: In this embodiment, the attribute information includes project characteristics, importance, review time urgency, and project type. When it is determined that at least one item in the attribute information is consistent with the preset pre-review conditions, it is judged that a pre-review is required. When it is determined to conduct a pre-review, a pre-review task is generated based on the encrypted data and sent to the head of each review department; the head of each review department forwards it to the review expert based on the review specialty of the pre-review task; the pre-review opinion given by the review expert is received and forwarded to the construction unit terminal / design unit terminal, and the construction unit terminal / design unit terminal adds / maintains the project review materials based on the pre-review opinion, and performs pre-review document verification processing. When it is determined that the verification is passed, the project review materials are reviewed based on the planning and operation department management terminal.
[0052] The beneficial effects of the above technical solution are: pre-examination of materials facilitates modification based on pre-examination opinions, improves the accuracy of materials, and thus improves the accuracy of the review. By conducting project reviews online, the loss of important data is avoided, while the traceability of materials is improved, the risk of data tampering or leakage is reduced, and the security of data is improved.
[0053] like Figure 2As shown, according to some embodiments of the present invention, the project review materials are reviewed based on the management terminal of the planning and operation department, including steps S41-S43:
[0054] S41. Based on the management terminal of the planning and operation department, the notice of the review meeting is issued to the heads of each review department; based on the heads of each review department, the meeting information is issued to the experts who attend the meeting;
[0055] S42. Collect meeting content and organize data, upload meeting minutes and fill in review comments based on the results;
[0056] S43. Based on the planning and operation department management terminal, a closing review is initiated. Each participating expert terminal responds to the closing review. When it is determined that the project review materials added / maintained according to the review opinions have been passed, each participating expert terminal initiates a joint signature. Each participating expert terminal conducts a joint signature and writes review opinions. Each participating expert terminal signs the completed review opinion report. The head of each review department and the construction unit terminal / design unit terminal stamp the signed review opinion report, completing the review processing of the construction unit terminal / design unit terminal.
[0057] The working principle and beneficial effects of the above technical solution: When the preliminary review stage is passed, an offline on-site review meeting is held to conduct a comprehensive assessment of the power engineering design solution, involving multiple aspects such as the completeness and accuracy of the design documents, the feasibility, compliance, economy, innovation of the design solution, and the qualifications and selection of the design unit. However, during the main review process, auxiliary review is provided based on the corresponding terminal to facilitate improving the accuracy of the review.
[0058] According to some embodiments of the present invention, each participating expert signs based on electronic signature technology.
[0059] According to some embodiments of the present invention, it also includes: encrypting the signatures of the prepared review opinion reports by the participating experts and the electronic signatures of the signed review opinion reports by the heads of the review departments and the construction unit terminals / design unit terminals based on a cryptographic machine.
[0060] The working principle and beneficial effects of the above technical solution are as follows: encryption processing is performed based on the CA cipher machine using the national secret SM3 algorithm. SM3 is a cryptographic hash algorithm released by the China National Cryptography Administration and is used for security applications such as data integrity verification and digital signatures, thereby improving data security.
[0061] According to some embodiments of the present invention, it also includes storing signature information of each participating expert when signing the completed review opinion report, and the signature information includes the original signature, signature value, timestamp value and certificate value of each participating expert.
[0062] According to some embodiments of the present invention, when each participating expert signs the completed review opinion report, a parallel processing strategy is adopted to generate a corresponding hash value from the signature value of each participating expert, and the signature is performed through a cryptographic machine based on the SM3 algorithm.
[0063] According to some embodiments of the present invention, after each participating expert completes the signature, the signature hash value of each participating expert is sorted by the signing time, and the signature values of all participating expert ends are hashed to generate a unified signature group hash value; then the signature group hash value needs to be bound to the stamped file hash value, and the corresponding meeting minutes file hash0 is generated according to the stamped meeting minutes file.
[0064] The working principle and beneficial effects of the above technical solution: The signature group is a collection of signatures of multiple people. Multiple signature hashes are combined into a signature group hash, and the generation process is recorded by the database. When all experts have completed the signature, they need to stamp the confirmation seal uniformly. At this time, the signature hash value of each expert needs to be sorted by the signing time, and then the signature value hash of all experts is used to generate a unified signature group hash value through an algorithm. Then the signature group hash value needs to be bound to the stamped file hash value. First, the corresponding meeting minutes file hash0 needs to be generated based on the stamped meeting minutes file. Bind the stamped meeting minutes file hash0 with the signature group hash1234 to generate the hash of the corresponding official seal, and encrypt the hash through the national secret SM2 algorithm (the asymmetric encryption algorithm in the national secret is the SM2 algorithm. SM2 is an asymmetric encryption algorithm based on elliptic curve cryptography).
[0065] In one embodiment, the same document is stamped multiple times, and an expert signs before each stamping. Each execution process includes: expert signature -> confirmation -> stamping. Only when all the stamps of the document are stamped can the document take effect. When the content of the meeting minutes document is modified, it must be stamped and signed again, and the original text, signature value, timestamp value, and certificate value generated last time need to be saved.
[0066] According to some embodiments of the present invention, when each participating expert signs the completed review opinion report, it also includes:
[0067] Obtain signature information from each participating expert and add timestamp information;
[0068] Obtain the bandwidth information of the corresponding transmission channel of each participating expert, and determine the transmission duration of each byte based on the bandwidth information;
[0069] Determine the delay information for data transmission of the signature information according to the signature information of each participating expert and the transmission time of each byte;
[0070] Based on the timestamp information and delay information, estimate the reception time of the signature information of each participating expert;
[0071] The order of the signatures in the signature area of the server is determined based on the estimated time of receiving the signature information of each participating expert and a preview is performed.
[0072] The working principle and beneficial effects of the above technical solution are as follows: obtain the signature information of each participating expert and add timestamp information; obtain the bandwidth information of the corresponding transmission channel of each participating expert, and determine the transmission time of each byte according to the bandwidth information; determine the delay information when transmitting the signature information according to the signature information of each participating expert and the transmission time of each byte; multiply the number of bytes of the signature information by the transmission time of each byte, and use the product as the delay information. Based on the sum of the timestamp information and the delay information, estimate the reception time of the signature information of each participating expert; determine the arrangement order of the signatures in the signature area of the server according to the estimated reception time of the signature information of each participating expert and preview and display them. It is convenient to carry out orderly signatures and arrangement, and improve the accuracy of signatures.
[0073] According to some embodiments of the present invention, when each participating expert terminal signs the completed review opinion report, the server sends a wake-up message to each participating expert terminal, and determines the reception time of the participating expert terminal based on the attribute information of the participating expert terminal;
[0074]
[0075] Wherein, Tq is the reception time of the participating expert end; M is the length of the wake-up information; DG is the spreading factor of the participating expert end; NE is the bandwidth of the participating expert end; VT is the preset coding rate in the participating expert end;
[0076] When the expert participating in the conference receives the wake-up information and is in the wake-up state, the signature information is generated and transmitted to the server, and the transmission time for transmitting the signature information to the server is determined;
[0077]
[0078] Wherein, Td is the transmission time of transmitting the signature information to the server; AZ is the number of bytes of the signature information; J is the error factor, J=0.6; To round the data, when the data is negative, take 0;
[0079] The sum of the receiving time and the transmission time is calculated as the response time of the participating experts. The signatures are sorted from small to large based on the response time. The order of the signatures in the signature area of the server is generated according to the sorting results and previewed.
[0080] The working principle and beneficial effects of the above technical solution: The attribute information includes bandwidth and spreading factor. When each participating expert signs the completed review opinion report, the server sends a wake-up message to each participating expert, and determines the reception time of the participating expert based on the attribute information of the participating expert. When a signature is required, the participating expert is woken up to extend the service life of the participating expert. When the participating expert receives the wake-up message and is in the awakened state, the signature information is generated and transmitted to the server, the transmission time for transmitting the signature information to the server is determined, and the sum of the reception time and the transmission time is calculated as the response time of the participating expert. The response time is sorted from small to large, and the arrangement order of the signatures in the signature area of the server is generated according to the sorting result and previewed. It is convenient to sign and arrange in an orderly manner to improve the accuracy of the signature.
[0081] like Figure 3 As shown, the second embodiment of the present invention provides a substation engineering design review system, including:
[0082] A creation module is used to create maintenance project information and project data about the substation project based on the planning and operation department management terminal, and encrypt the project information and project data using a secret database to obtain encrypted data;
[0083] The acquisition module is used to obtain the attribute information of the encrypted data and determine whether to conduct a preliminary review;
[0084] The generation module is used to generate a pre-examination task based on the encrypted data when the pre-examination is determined, and send it to the head of each review department; the head of each review department forwards it to the review expert according to the review specialty of the pre-examination task;
[0085] The processing module is used to receive the preliminary review opinions given by the review experts and forward them to the construction unit terminal / design unit terminal. The construction unit terminal / design unit terminal adds / maintains the project review materials according to the preliminary review opinions and performs preliminary review of the documents. When the verification is determined to be passed, the project review materials are reviewed based on the planning and operation department management terminal.
[0086] The beneficial effects of the above technical solution are: pre-examination of materials facilitates modification based on pre-examination opinions, improves the accuracy of materials, and thus improves the accuracy of the review. By conducting project reviews online, the loss of important data is avoided, while the traceability of materials is improved, the risk of data tampering or leakage is reduced, and the security of data is improved.
[0087] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for reviewing the design of a substation project, characterized in that: include: Based on the management terminal of the planning and operation department, maintenance project information and project data about the substation project are created, and the project information and project data are encrypted using a secret database to obtain encrypted data; Obtaining attribute information of encrypted data and determining whether to conduct a preliminary review; When the pre-examination is determined, a pre-examination task is generated based on the encrypted data and sent to the heads of each review department; the heads of each review department forward it to the review expert based on the review specialty of the pre-examination task; Receive the preliminary review opinions given by the review experts and forward them to the construction unit terminal / design unit terminal. The construction unit terminal / design unit terminal adds / maintains the project review materials based on the preliminary review opinions and performs preliminary review of the documents. When the verification is confirmed to be passed, the project review materials are reviewed based on the planning and operation department management terminal.
2. The power transformation engineering design review method according to claim 1, characterized in that: Based on the management terminal of the Planning and Operation Department, the project review materials are reviewed and processed, including: Based on the management terminal of the Planning and Operation Department, the review meeting notice is sent to the heads of each review department; based on the heads of each review department, the meeting information is sent to the experts who attend the meeting; Collect meeting content and organize data, upload meeting minutes and fill in review comments based on the results; Based on the planning and operation department management terminal initiating the closing review, each participating expert terminal responds to the closing review, and when it is determined that the project review materials added / maintained according to the final review opinions are passed, each participating expert terminal initiates a countersignature; each participating expert terminal countersigns and writes a review opinion, and each participating expert terminal signs the completed review opinion report. The head of each review department and the construction unit terminal / design unit terminal stamp the signed review opinion report, and the final review processing of the construction unit terminal / design unit terminal is completed.
3. The power transformation engineering design review method according to claim 2, characterized in that: Each participating expert signed based on electronic signature technology.
4. The power transformation engineering design review method according to claim 2, characterized in that: Also includes: The signatures of the completed review opinion reports by the participating experts and the electronic seals of the signed review opinion reports by the heads of the review departments and the construction unit / design unit are encrypted based on the cryptographic machine.
5. The power transformation engineering design review method according to claim 2, characterized in that: It also includes storing the signature information of each participating expert when signing the completed review opinion report, and the signature information includes the original signature, signature value, timestamp value and certificate value of each participating expert.
6. The power transformation engineering design review method according to claim 2, characterized in that: When each participating expert signs the completed review opinion report, a parallel processing strategy is adopted to generate a corresponding hash value from the signature value of each participating expert, and sign it through a cryptographic machine based on the SM3 algorithm.
7. The power transformation engineering design review method according to claim 6, characterized in that: After all participating experts have completed their signatures, their signature hash values are sorted by signing time, and the signature values of all participating experts are hashed to generate a unified signature group hash value; Then you need to bind the signature group hash value with the stamped file hash value, and generate the corresponding meeting minutes file hash0 based on the stamped meeting minutes file.
8. The power transformation engineering design review method according to claim 2, characterized in that: When the participating experts sign the completed review report, it also includes: Obtain signature information from each participating expert and add timestamp information; Obtain the bandwidth information of the corresponding transmission channel of each participating expert, and determine the transmission duration of each byte based on the bandwidth information; Determine the delay information for data transmission of the signature information according to the signature information of each participating expert and the transmission time of each byte; Based on the timestamp information and delay information, estimate the reception time of the signature information of each participating expert; The order of the signatures in the signature area of the server is determined based on the estimated time of receiving the signature information of each participating expert and a preview is performed.
9. The power transformation engineering design review method according to claim 2, characterized in that: When each participating expert terminal signs the completed review opinion report, the server sends a wake-up message to each participating expert terminal, and determines the reception time of the participating expert terminal based on the attribute information of the participating expert terminal; Wherein, Tq is the reception time of the participating expert end; M is the length of the wake-up information; DG is the spreading factor of the participating expert end; NE is the bandwidth of the participating expert end; VT is the preset coding rate in the participating expert end; When the expert participating in the conference receives the wake-up information and is in the wake-up state, the signature information is generated and transmitted to the server, and the transmission time for transmitting the signature information to the server is determined; Wherein, Td is the transmission time of transmitting the signature information to the server; AZ is the number of bytes of the signature information; J is the error factor, J=0.6; To round the data, when the data is negative, take 0; The sum of the receiving time and the transmission time is calculated as the response time of the participating experts. The signatures are sorted from small to large based on the response time. The order of the signatures in the signature area of the server is generated according to the sorting results and previewed.
10. A substation engineering design review system, characterized in that: include: A creation module is used to create maintenance project information and project data about the substation project based on the planning and operation department management terminal, and encrypt the project information and project data using a secret database to obtain encrypted data; The acquisition module is used to obtain the attribute information of the encrypted data and determine whether to conduct a preliminary review; The generation module is used to generate a pre-examination task based on the encrypted data when the pre-examination is determined, and send it to the head of each review department; the head of each review department forwards it to the review expert according to the review specialty of the pre-examination task; The processing module is used to receive the preliminary review opinions given by the review experts and forward them to the construction unit terminal / design unit terminal. The construction unit terminal / design unit terminal adds / maintains the project review materials according to the preliminary review opinions and performs preliminary review of the documents. When the verification is determined to be passed, the project review materials are reviewed based on the planning and operation department management terminal.