Business data processing method and equipment of engineering project and medium
The method and device streamline business data processing in engineering projects by associating project status with specific business systems and enabling information sharing, addressing inefficiencies in locating relevant systems and functions, and enhancing data processing efficiency.
Patent Information
- Application Number
- CN202411122824.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-06
AI Technical Summary
In the construction industry, the inefficiency arises from the difficulty in quickly locating the appropriate business system required to complete designated work items due to the presence of multiple business systems, leading to low efficiency in processing business data for engineering projects.
A method and device that determine the current project status of an engineering project, associate it with a specific business system, and display its interface for data input, while also enabling information sharing across systems and user-type specific data management, including enterprise-level project oversight and risk scoring.
This approach allows for quick localization of the relevant business system and functions, reduces redundant data entry, and enhances overall business data processing efficiency by minimizing the need to check multiple systems, thereby improving project management and decision-making.
Smart Images

Figure CN119090428A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering projects, and in particular to a method, device and medium for processing business data of an engineering project. Background Art
[0002] In the construction industry, in order to realize the information management of engineering projects, various business systems are generally established for engineering projects, such as market development system, engineering management system, safety management system, financial management system, etc. Relevant personnel can complete designated tasks in the corresponding business system, such as reporting the project schedule, technology, quality, business, finance, safety and materials data in the project to the corresponding business system to promote the development of the project.
[0003] However, when there are many business systems related to an engineering project, relevant personnel cannot quickly locate the business system required to complete designated work items, and need to check a large number of business systems one by one, resulting in low efficiency in business data processing for the engineering project. Summary of the invention
[0004] The embodiments of the present application provide a method, device and medium for processing business data of an engineering project, aiming to improve the efficiency of processing business data of the engineering project.
[0005] In a first aspect, an embodiment of the present application provides a method for processing business data of an engineering project, the method for processing business data of the engineering project comprising:
[0006] Obtaining a first engineering project to be processed;
[0007] Determining a current project status of the first engineering project;
[0008] Determining a first business system associated with the current project status among a plurality of preset business systems;
[0009] Displaying the interface of the first business system to receive first business data input into the interface of the first business system;
[0010] The first business data is used to determine first project information of the first engineering project in the first business system.
[0011] In some embodiments of the present application, after determining the first business system associated with the current project status among the plurality of preset business systems, the method further includes:
[0012] Determine a first business function associated with the current project status among a plurality of preset business functions included in the first business system;
[0013] The step of displaying the interface of the first business system to receive first business data input into the interface of the first business system includes:
[0014] An interface of the first business function in the first business system is displayed to receive the first business data input into the interface of the first business function.
[0015] In some embodiments of the present application, after determining the first project information of the first engineering project in the first business system by using the first business data, the method further includes:
[0016] Acquire identification information of the first engineering project from the first project information;
[0017] In a second business system, obtaining project information having the identification information and using the project information as second project information, wherein the second business system and the first business system are different preset business systems;
[0018] The second project information is subjected to information sharing processing using the first project information.
[0019] In some embodiments of the present application, obtaining the first engineering project to be processed includes:
[0020] Determine the user type of the currently logged in user;
[0021] When the user type is a project-level user, the engineering project undertaken by the currently logged-in user is taken as the first engineering project.
[0022] In some embodiments of the present application, after determining the user type to which the currently logged-in user belongs, the method further includes:
[0023] When the user type is an enterprise-level user, displaying a plurality of the preset business systems to determine a selected target business system from the plurality of the preset business systems;
[0024] Obtaining a target project status associated with the target business system;
[0025] Acquire engineering projects undertaken by multiple project-level users under the enterprise-level user and use them as second engineering projects;
[0026] Determining a plurality of third engineering projects having the target project status among the plurality of the second engineering projects;
[0027] Display the third project information of the plurality of third engineering projects in the target business system.
[0028] In some embodiments of the present application, after displaying the third project information of the plurality of third engineering projects in the target business system, the method further includes:
[0029] When receiving a project status modification instruction, obtaining the third engineering project targeted by the project status modification instruction and using it as the fourth engineering project;
[0030] According to the project status modification instruction, the current project status of the fourth engineering project is modified.
[0031] In some embodiments of the present application, the displaying of the third project information of the plurality of third engineering projects in the target business system includes:
[0032] Obtaining a project risk score for each of the third engineering projects;
[0033] Determining a ranking among the plurality of third engineering projects based on the project risk scores;
[0034] According to the sorting, the third project information of the plurality of third engineering projects in the target business system is displayed in sequence.
[0035] In some embodiments of the present application, determining the ranking among the plurality of third engineering projects based on the project risk scores includes:
[0036] Determine the project delivery object of each of the third project;
[0037] Obtaining the object level of the engineering project deliverable object;
[0038] Based on the object level, modifying the project risk score corresponding to the third engineering project to obtain a modified project risk score;
[0039] According to the revised project risk scores, the ranking among the plurality of third engineering projects is determined.
[0040] In a second aspect, an embodiment of the present application provides a business data processing device for an engineering project, the business data processing device for the engineering project comprising:
[0041] A project acquisition module, used for acquiring a first engineering project to be processed;
[0042] A first determining module, used to determine the current project status of the first engineering project;
[0043] A second determination module, configured to determine a first business system associated with the current project status from among a plurality of preset business systems;
[0044] An interface display module, used to display the interface of the first business system to receive first business data input into the interface of the first business system;
[0045] The third determination module is used to determine first project information of the first engineering project in the first business system by using the first business data.
[0046] In a third aspect, an embodiment of the present application provides an electronic device, the electronic device comprising:
[0047] one or more processors;
[0048] Memory; and
[0049] One or more applications, wherein the one or more applications are stored in the memory and are configured to be executed by the processor to implement any of the above-mentioned business data processing methods for engineering projects.
[0050] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program is loaded by a processor to execute the steps in the business data processing method for an engineering project described in any one of the above items.
[0051] In a fifth aspect, an embodiment of the present application provides a computer program product, including a computer program or instructions, which are executed by a processor to implement a business data processing method for an engineering project as described in any one of the above items.
[0052] Beneficial effects of the embodiments of the present application:
[0053] In an embodiment of the present application, a first engineering project to be processed is obtained, the current project status of the first engineering project is determined, and among multiple preset business systems, a first business system associated with the current project status is determined, and the interface of the first business system is displayed to receive first business data input into the interface of the first business system, and the first project information of the first engineering project in the first business system is determined using the first business data. The present application determines the current project status of the first engineering project and then displays the first business system associated with the current project status, thereby quickly locating the business system that needs to complete the specified work items, avoiding checking a large number of business systems one by one, thereby improving the business data processing efficiency of the engineering project. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0055] Figure 1 It is a schematic diagram of an embodiment of a method for processing business data of an engineering project provided in an embodiment of the present application;
[0056] Figure 2 It is a schematic diagram of an embodiment of the association relationship between the project status and the preset business system in the embodiment of the present application;
[0057] Figure 3 It is a flowchart of another embodiment of the method for processing business data of an engineering project provided in an embodiment of the present application;
[0058] Figure 4 It is a flowchart of another embodiment of the method for processing business data of an engineering project provided in the embodiments of the present application;
[0059] Figure 5 It is a schematic diagram of the structure of an embodiment of a business data processing device for an engineering project provided in an embodiment of the present application;
[0060] Figure 6 It is a schematic diagram of the structure of an embodiment of an electronic device provided in the embodiments of the present application. DETAILED DESCRIPTION
[0061] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present application. In addition, in the description of the present application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically limited.
[0062] First, the business data processing method of the engineering project provided by the embodiment of the present application is introduced. The business data processing method of the engineering project uses the business data processing device of the engineering project as the execution subject. For the sake of simplicity and convenience of description, the execution subject will be omitted in the subsequent method embodiments.
[0063] See also Figure 1 , Figure 1 The following is a flow chart of an embodiment of a method for processing business data of an engineering project provided in an embodiment of the present application. The method for processing business data of an engineering project includes:
[0064] 101. Obtain a first engineering project to be processed.
[0065] In the embodiments of the present application, a project refers to a project in the construction industry that uses engineering construction as a carrier, with buildings or structures as target outputs, that requires payment of a certain fee, and that is completed within a certain period of time according to a certain procedure, and that meets quality requirements. At each stage of the project construction, the data in the project (such as the construction period, technology, quality, business, finance, safety, and materials) needs to be reported to the corresponding business system to realize the information management of the project. Therefore, the project that needs to process business data in the corresponding business system can be regarded as the first project to be processed.
[0066] 102. Determine the current project status of the first engineering project.
[0067] In the embodiment of the present application, a corresponding project status is set for each engineering project, and the project status represents the corresponding stage of the engineering project at the engineering construction, so each engineering project has a unique project status at the same time point. The project status may include, for example, business opportunity status, unstarted status, under construction status, suspended and delayed construction status, completed but not settled status, completed and settled status, etc., so the current project status of the first engineering project may be any of these statuses.
[0068] 103. Determine a first business system associated with the current project status among multiple preset business systems.
[0069] In the embodiments of the present application, the preset business system is a business system related to the engineering project, such as a market development system, an engineering management system, a safety management system, a financial management system, a business management system, a settlement management system, etc. Multiple preset business systems are established based on the same business platform, that is, multiple preset business systems are deployed in the same business platform, so that multiple preset business systems can share data based on the business platform.
[0070] In an embodiment of the present application, an association relationship between each project status and a preset business system is established in advance, so that based on the association relationship, the preset business system associated with the current project status is determined and used as the first business system. The association relationship can be set by relevant personnel based on actual conditions. For example, relevant personnel can correspond each engineering project to a project status at each stage of engineering construction, and associate the preset business system that needs to process business data at this stage with the project status, thereby obtaining the association relationship. Taking the business opportunity status as an example, the engineering project needs to register information, bid, review contracts, etc. in the business opportunity status, and enter the corresponding business data in the market development system.
[0071] In some embodiments, reference Figure 2 , Figure 2 This is an example diagram of the relationship between project status and preset business system. Figure 2 In the project status, the project status includes business opportunity status, not started status, under construction status, suspended and slowed construction status, completed but not settled status, completed and settled status, etc. The preset business systems include market development system, engineering management system, safety management system, business management system, financial management system, settlement management system, etc. Figure 2 The connection between the project status and the preset business system represents the association relationship between the project status and the preset business system. For example, the preset business system associated with the project status of business opportunity status is the market development system, the preset business systems associated with the project status of not started status are the engineering management system, safety management system, business management system, and financial management system, the preset business systems associated with the project status of completed but not settled status are the business management system, financial management system, and settlement management system, and the preset business system associated with the project status of completed and settled status is the settlement management system.
[0072] 104. Display an interface of the first business system to receive first business data input into the interface of the first business system.
[0073] In an embodiment of the present application, the interface of the first business system is displayed in the display terminal of the currently logged-in user, so that the currently logged-in user can perform business data processing in the displayed interface of the first business system. In this way, the first business system can receive the first business data input into the interface of the first business system by the currently logged-in user.
[0074] The current logged-in user refers to the current user who has logged into the above business platform. The first business data may be data such as the construction period, technology, quality, business, finance, safety and materials in the project. Taking financial data as an example, financial data may be specific data under business indicators such as project receipts, project payments and fund balances. The first business data input is generally different at different stages of project construction.
[0075] It should be noted that in step 104, only the interface of the first business system is displayed, and the interfaces of other preset business systems except the first business system among multiple preset business systems are not displayed, so that the currently logged-in user can quickly locate the first business system without having to check a large number of business systems one by one.
[0076] 105. Determine first project information of the first engineering project in the first business system using the first business data.
[0077] In the embodiment of the present application, the first project information of the first project in the first business system refers to all data of the first project in the first business system, for example, the first project information may include the first business data. Of course, the first project information may also include other data of the first project, such as identification information of the first project, project contract information, etc., and the identification information may be the name and number of the first project.
[0078] It can be seen that in the above-mentioned embodiment of the present application, by determining the current project status of the first engineering project and then displaying the first business system associated with the current project status, the business system that needs to complete the specified work items can be quickly located, thereby avoiding checking a large number of business systems one by one, thereby improving the business data processing efficiency of the engineering project.
[0079] In some embodiments of the present application, in order to further improve the business data processing efficiency of the engineering project, after step 103, it may also include: determining a first business function associated with the current project status among multiple preset business functions included in the first business system.
[0080] In the embodiment of the present application, a large number of preset service functions are set in each preset service system, so the first service system may also include multiple preset service functions, for example, Figure 2 In the market development system, there are functions A1, A2, etc., and the engineering management system includes functions B1, B2, etc. Taking the financial management system as an example, the first business system may include a large number of preset business functions such as project receipt reporting function, project payment reporting function, and fund balance reporting function. Therefore, the currently logged-in user also needs to check a large number of preset business functions one by one in the first business system, and cannot quickly locate the business functions that need to complete the specified work items, resulting in low efficiency in business data processing of engineering projects.
[0081] In this regard, an association relationship between each project status and a preset business function can also be established in advance, so that based on the association relationship, the preset business function associated with the current project status can be determined and used as the first business function. The association relationship can be set by relevant personnel based on actual conditions. For example, relevant personnel can correspond each engineering project to a project status at each stage of engineering construction, and associate the preset business function that needs to process business data at this stage with the project status, thereby obtaining the association relationship.
[0082] Therefore, step 104 may specifically include: displaying an interface of a first business function in the first business system to receive first business data input into the interface of the first business function.
[0083] In an embodiment of the present application, the interface of the first business function in the first business system is displayed in the display terminal of the currently logged-in user, so that the currently logged-in user can process business data in the displayed interface of the first business function, so that the first business system can receive the first business data input by the currently logged-in user into the interface of the first business function. It should be noted that in step 104, only the interface of the first business function is displayed, and the interfaces of other preset business functions in the first business system except the first business function are not displayed, so that the currently logged-in user can quickly locate the first business function without having to check a large number of preset business functions one by one, so as to further improve the business data processing efficiency of the engineering project.
[0084] In some embodiments of the present application, in the related technology, since the same engineering project may have duplicate data in different preset business systems, the currently logged-in user needs to re-submit the data in different preset business systems. For example, the currently logged-in user needs to first report the amount of project payment in the financial management system, and then needs to report the amount of project payment again in the settlement management system, resulting in low efficiency in processing business data for engineering projects. In this regard, the embodiments of the present application also provide an information sharing mechanism between different business systems. Specifically, Figure 3 As shown, in Figure 1 or Figure 2 On the basis of the illustrated embodiment, after determining the first project information of the first engineering project in the first business system by using the first business data, the following may also be included:
[0085] 301. Obtain identification information of a first engineering project from first project information.
[0086] In an embodiment of the present application, the first project information includes identification information of the first engineering project. In the above-mentioned business platform, each engineering project has unique identification information.
[0087] 302. In the second business system, project information with identification information is obtained and used as second project information.
[0088] In an embodiment of the present application, the project information with the above identification information in the second business system is all the data of the above first engineering project in the second business system. The second business system and the first business system are different preset business systems, so it is necessary to share at least part of the data in the first project information with the second project information in the second business system.
[0089] 303. Use the first project information to perform information sharing processing on the second project information.
[0090] In an embodiment of the present application, in the step of using the first project information to perform information sharing processing on the second project information, specifically, repeated business indicators are determined in the first project information and the second project information, and then the specific data under the repeated business indicators in the first project information are synchronized to the repeated business indicators in the second project information, so that different business systems can automatically share data, avoid information islands between different business systems and avoid the current logged-in user from repeatedly filling in data, thereby improving the business data processing efficiency of the engineering project.
[0091] In some embodiments of the present application, Figure 4 As shown, in Figures 1 to 3 Based on the illustrated embodiment, obtaining the first engineering project to be processed may include:
[0092] 401. Determine the user type of the currently logged-in user.
[0093] In an embodiment of the present application, the currently logged-in user may have a corresponding user type, such as a project-level user, an enterprise-level user, etc. A project-level user refers to a user in a project department that undertakes a corresponding engineering project, and the user in the project department needs to process business data in a corresponding preset business system during the implementation of the corresponding engineering project. An enterprise-level user is a superior department or a higher-level part of a project-level user, such as a manager of a company headquarters, branch, or subsidiary, who needs to manage engineering projects undertaken by multiple project departments (e.g., make relevant decisions and allocate resources).
[0094] 402. When the user type is a project-level user, the engineering project undertaken by the currently logged-in user is taken as the first engineering project.
[0095] In an embodiment of the present application, when the user type is a project-level user, it indicates that the currently logged-in user needs to perform business data processing in the corresponding preset business system. Therefore, the engineering project undertaken by the currently logged-in user can be taken as the first engineering project to improve the business data processing efficiency of the engineering project.
[0096] In some embodiments of the present application, after step 401, the following steps may also be included:
[0097] When the user type is an enterprise-level user, multiple preset business systems are displayed to determine the selected target business system among the multiple preset business systems; the target project status associated with the target business system is obtained; the engineering projects undertaken by multiple project-level users under the enterprise-level user are obtained and used as second engineering projects; among the multiple second engineering projects, multiple third engineering projects with the target project status are determined; and the third project information of the multiple third engineering projects in the target business system is displayed.
[0098] In the embodiment of the present application, since the enterprise-level user needs to manage a large number of engineering projects at the same time, multiple preset business systems may be displayed first to facilitate the enterprise-level user to select the target business system to be managed.
[0099] In the embodiment of the present application, the target project status associated with the target business system can be determined by using the association relationship between each project status and the preset business system established in advance, which can be specifically referred to in step 103 and will not be described in detail here.
[0100] In the embodiment of the present application, by screening out multiple third engineering projects with the target project status from multiple second engineering projects and displaying them, it is possible to avoid displaying the project information of all engineering projects in the same target business system, so that enterprise-level users can quickly locate multiple third engineering projects that need to be managed without having to check a large number of engineering projects one by one, thereby improving the business management efficiency of engineering projects. It is understandable that if multiple third engineering projects with the target project status are not screened out and displayed, it will become extremely troublesome for enterprise-level users to manage engineering projects, because all engineering projects will be displayed in the interface at the same time. When the scale of the enterprise is large, the number of engineering projects displayed at the same time is hundreds or even thousands.
[0101] In an embodiment of the present application, the third project information of the third engineering project in the target business system may also include data such as the duration, technology, quality, business, finance, safety and materials in the third engineering project, as well as the first project information and the second project information. By displaying the third project information, enterprise-level users can more clearly understand the specific construction status of the third engineering project, thereby making more effective decisions and resource allocation. In addition, a project ledger is also provided in the above-mentioned business platform, and enterprise-level users can query the historical project information of completed historical engineering projects in any preset business system in the project ledger.
[0102] In a further embodiment, after displaying the third project information of multiple third engineering projects in the target business system, it may also include: when receiving a project status modification instruction, obtaining the third engineering project targeted by the project status modification instruction and using it as the fourth engineering project; and modifying the current project status of the fourth engineering project according to the project status modification instruction.
[0103] In an embodiment of the present application, a project status modification instruction can be manually triggered by an enterprise-level user, and the third engineering project targeted by the project status modification instruction refers to an engineering project that needs to modify the current project status according to the project status modification instruction. The project status modification instruction can, for example, be an instruction to modify the current project status of the fourth engineering project to any of the following states: business opportunity state, unstarted state, under construction state, suspended and delayed construction state, completed and unsettled state, and completed and settled state. By triggering the project status modification instruction, the current project status of the engineering project can be adjusted.
[0104] In a further embodiment, displaying third project information of multiple third engineering projects in the target business system may include: obtaining a project risk score for each third engineering project; determining a ranking among the multiple third engineering projects based on the project risk score; and displaying the third project information of the multiple third engineering projects in the target business system in sequence according to the ranking.
[0105] In an embodiment of the present application, since a large number of third engineering projects need to display the third project information at the same time, enterprise-level users need to conduct key inspections on a large amount of third project information one by one, which is inefficient. Therefore, multiple third engineering projects can also be sorted from large to small based on the project risk scores, so that enterprise-level users only need to conduct key inspections on part of the third project information, thereby improving the management efficiency of enterprise-level users over engineering projects.
[0106] In an embodiment of the present application, the third project information of multiple third engineering projects in the target business system is displayed in sequence according to the sorting, which can include: displaying the third project information of the third engineering projects that are ranked high in the sorting in the front position in the interface of the target business system and / or highlighting it in the interface of the target business system, so as to facilitate enterprise-level users to focus on checking the third engineering projects that are ranked high.
[0107] In a further embodiment, determining the ranking among multiple third engineering projects based on the project risk score may include: determining the project delivery object of each third engineering project, the project delivery object being the object to which the construction party needs to deliver the third engineering project after completing the third engineering project; obtaining the object level of the project delivery object, which object level may be pre-set; based on the object level, correcting the project risk score of the corresponding third engineering project to obtain a corrected project risk score, for example, the project risk score may be corrected using a risk score correction coefficient associated with the object level; determining the ranking among the multiple third engineering projects according to the corrected project risk score, for example, sorting the multiple third engineering projects according to the size relationship between the corrected project risk scores of the multiple third engineering projects.
[0108] In the embodiments of the present application, generally speaking, the higher the object level, the larger the risk score correction coefficient associated with the object level, and the larger the final corrected project risk score, thereby making the corrected project risk score of the third engineering project for the corresponding engineering project delivery object more accurate and reasonable. In this way, enterprise-level users can more accurately and effectively focus on the third engineering projects that need to be focused on.
[0109] The following is an example of how to calculate the project risk score. For example, obtaining the project risk score of each third engineering project may include the following steps:
[0110] Step 1: For a single third engineering project, obtain business data under multiple different business indicators included in the third engineering project.
[0111] In an embodiment of the present application, the business indicators in the third engineering project may be business indicators in dimensions such as duration, technology, quality, business, finance, safety, and materials in the third engineering project. Each dimension may include multiple business indicators, and the business indicators in different dimensions are different. Taking the financial dimension as an example, the business indicators in the financial dimension of the third engineering project may include business indicators such as project collection, project payment, and fund balance. The business data under the business indicator refers to the specific data under the business indicator, for example, the business data under the business indicator of project collection may be the specific amount of project collection.
[0112] Step 2: Determine a target risk detection scheme that matches the third engineering project among multiple preset risk detection schemes.
[0113] In an embodiment of the present application, a plurality of different risk detection schemes are pre-set based on the different actual risk situations of different engineering projects. Each risk detection scheme includes a plurality of different business indicators, and the business indicators in different risk detection schemes are not exactly the same. The target risk detection scheme matched with the third engineering project can be manually selected based on actual needs, or based on the project type to which the third engineering project belongs, the corresponding risk detection scheme is determined and used as the target risk detection scheme.
[0114] Step 3: Obtain multiple different business indicators in the target risk detection plan.
[0115] Step 4: Use the business indicators that exist in both the target risk detection plan and the third engineering project as target business indicators.
[0116] In the embodiment of the present application, the business indicators that exist in both the target risk detection scheme and the third project are the business indicators that need to be used for calculating the project risk score in the third project, so these business indicators can be used as target business indicators for subsequent processing. Business indicators that exist in the third project but do not exist in the target risk detection scheme do not need to be used for calculating the project risk score.
[0117] Step 5: Determine the business risk score of the business data under the target business indicator in the third engineering project by using the preset scoring rules associated with the target business indicator in the target risk detection scheme.
[0118] In an embodiment of the present application, each risk detection scheme also includes a preset scoring rule associated with each business indicator in the risk detection scheme, and the preset scoring rule is used to calculate a corresponding business risk score based on business data.
[0119] Step 6: Based on the business risk scores of the business data under all target business indicators, determine the project risk score of the third engineering project.
[0120] In an embodiment of the present application, the business risk scores of the business data under all target business indicators can be comprehensively calculated to obtain the project risk score of the third project. For example, the business risk scores of the business data under all target business indicators can be summed, and the summed result is used as the project risk score of the third project. Of course, other methods can also be used to calculate the project risk score of the third project, which is not limited here.
[0121] In a further embodiment, determining the business risk score of the business data under the target business indicator in the third engineering project by using the preset scoring rule associated with the target business indicator in the target risk detection scheme may include:
[0122] When the business data under the target business indicator is structured data, quantitative calculation processing is performed on the business data under the target business indicator to obtain a numerical result, and the business risk score of the business data under the target business indicator is determined by using the preset scoring rules associated with the target business indicator in the target risk detection scheme and the numerical result.
[0123] In the embodiments of the present application, the forms of business data under different target business indicators may be different. For example, the business data under some target business indicators are structured data, and the business data under some target business indicators are unstructured data. Therefore, different forms of business data need to be processed differently. Taking structured data as an example, the business data under the target business indicator can be quantitatively calculated and processed to obtain numerical results, and then the preset scoring rules and numerical results associated with the target business indicator in the target risk detection scheme are used to determine the business risk score of the business data under the target business indicator. Among them, structured data can refer to data composed of numbers and values, and unstructured data can include text, pictures, audio, video, etc.
[0124] In some embodiments, quantitative calculation processing is performed on business data under the target business indicator to obtain numerical results, which may include: determining expected data of the business data under the target business indicator, wherein the expected data is pre-set based on previous data of the project, and taking the business data under the target business indicator as the specific amount of project collection as an example, the expected data is the expected amount of project collection; taking the business data under the target business indicator as the number of start days of the project as an example, the expected data is the number of days of the contractual construction period of the project, or the expected data is a pre-set standard threshold; based on the ratio of the business data under the target business indicator to the expected data, determining the numerical result, for example, the ratio of the business data under the target business indicator to the expected data may be used as the completion rate of the target business indicator, and the completion rate may be used as the numerical result of the quantitative calculation processing.
[0125] In some embodiments, determining the business risk score of business data under the target business indicator by using the preset scoring rules and numerical results associated with the target business indicator in the target risk detection scheme may include: obtaining multiple different numerical intervals in the preset scoring rules associated with the target business indicator in the target risk detection scheme, and different data intervals correspond to different business risk scores. Taking the completion rate of the target business indicator as an example, the multiple different numerical intervals include a numerical interval with a completion rate less than 60%, a numerical interval with a completion rate greater than or equal to 60% and less than 80%, and a numerical interval with a completion rate greater than or equal to 80%. The numerical interval with a completion rate less than 60% indicates that the target business indicator has a serious deviation, and its corresponding business risk score is 2. The numerical interval with a completion rate greater than or equal to 60% and less than 80% indicates that the target business indicator has a deviation, and its corresponding business risk score is 1. The numerical interval with a completion rate greater than or equal to 80% indicates that the target business indicator is normal, and its corresponding business risk score is 0; comparing the numerical result with the multiple different numerical intervals to determine the numerical interval where the numerical result is located; and using the business risk score corresponding to the numerical interval where the numerical result is located as the business risk score of the business data under the target business indicator.
[0126] In other embodiments of the present application, the business risk score of the business data under the target business indicator in the third engineering project is determined by using the preset scoring rules associated with the target business indicator in the target risk detection scheme, which can also include: when the business data under the target business indicator is unstructured data, the business data under the target business indicator is qualitatively analyzed and processed to obtain text results, and the business risk score of the business data under the target business indicator is determined by using the preset scoring rules associated with the target business indicator in the target risk detection scheme and the text results. Among them, the unstructured business data, such as the project safety status and project technical plan described in the target business indicator.
[0127] In some embodiments, qualitative analysis and processing are performed on business data under the target business indicator to obtain text results, which may include: determining a target text tag corresponding to the business data under the target business indicator from a plurality of preset text tags, for example, by extracting key information from the business data under the target business indicator, and corresponding the key information to the target text tag, such as keywords, key information, etc.; for example, the target text tag corresponding to the business data under the target business indicator may be identified by a preset recognition model of unstructured data, such as a text semantic recognition model, an image recognition model, an audio recognition model, a video recognition model, etc., and the preset plurality of text tags may be, for example, text tags such as normal, deviation, and severe deviation; based on the target text tag, determining the text result, for example, the target text tag may be directly used as the text result.
[0128] In some embodiments, determining the business risk score of business data under the target business indicator using the preset scoring rules and text results associated with the target business indicator in the target risk detection scheme may include: obtaining business risk scores corresponding to multiple different preset text results in the preset scoring rules associated with the target business indicator in the target risk detection scheme, the multiple different preset text results including preset text results such as normal, deviation, and severe deviation, taking the preset text result of normal as an example, the corresponding business risk score is 0, taking the preset text result of deviation as an example, the corresponding business risk score is 1, and taking the preset text result of severe deviation as an example, the corresponding business risk score is 2; comparing the text result with multiple different preset text results to determine the business risk score corresponding to the preset text result that is the same as the text result; using the business risk score corresponding to the preset text result that is the same as the text result as the business risk score of the business data under the target business indicator.
[0129] It can be seen that in the above embodiments of the present application, different methods are used to determine the corresponding business risk scores for structured and unstructured business data, respectively, so that the calculation of the project risk score of the third engineering project is more convenient.
[0130] In some embodiments of the present application, determining the project risk score of the third engineering project based on the business risk scores of the business data under all target business indicators may include:
[0131] In the target risk detection plan, the indicator weight associated with each target business indicator is obtained; according to the indicator weight, the business risk scores of the business data under all target business indicators are weighted and summed to obtain a weighted sum result; based on the weighted sum result, the project risk score is determined.
[0132] In the embodiment of the present application, in the target risk detection scheme, since different target business indicators have different influences on the third engineering project, corresponding indicator weights can be pre-associated with different target business indicators. The larger the indicator weight, the greater the influence of the corresponding target business indicator on the third engineering project. For example, the indicator weight associated with target business indicator A is 2, the indicator weight associated with target business indicator B is 3, the indicator weight associated with target business indicator C is 3, the indicator weight associated with target business indicator D is 5, and the indicator weight associated with target business indicator E is 1.
[0133] In an embodiment of the present application, after obtaining the business risk scores of the business data under all target business indicators, the indicator weights associated with the corresponding target business indicators are used for weighted sum calculation. Taking the business risk score of the business data under target business indicator A as 1, the business risk score of the business data under target business indicator B as 0, the business risk score of the business data under target business indicator C as 2, the business risk score of the business data under target business indicator D as 1, and the business risk score of the business data under target business indicator E as 0 as an example, the weighted sum result is 13.
[0134] In the embodiments of the present application, the weighted sum result can be directly used as the project risk score, or the project risk score can be further calculated based on the weighted sum result, which is not limited here.
[0135] In some embodiments, the third project information may also include the risk detection results of the corresponding third engineering project, so that the enterprise-level user can take corresponding measures or decisions in a timely manner based on the displayed risk detection results to reduce the risk of the third engineering project without the need for the enterprise-level user to manually analyze the risk of the third project information, thereby improving the management efficiency of the third project information by the enterprise-level user. Therefore, after obtaining the project risk score of each third engineering project, it may also include: generating the risk detection results of the third engineering project based on the project risk score.
[0136] In some embodiments, generating a risk detection result of the third engineering project based on the project risk score may include: determining the business risk score with the largest value among the business risk scores of the business data under all target business indicators. For example, in the above example, the business risk score with the largest value is 2, which is the business risk score of the business data under the target business indicator C; determining the product of the sum of the indicator weights associated with each target business indicator and the business risk score with the largest value, and using it as the estimated maximum risk score of the third engineering project. For example, in the above example, the sum of the indicator weights associated with each target business indicator is 2+3+3+5+1=14, so the estimated maximum risk score of the third engineering project is 14. ×2=28; determine the ratio of the project risk score to the estimated maximum risk score, such as 13 / 28; based on the ratio, determine the project risk level, such as a plurality of ratio intervals are preset, and different ratio intervals correspond to different project risk levels, such as normal, deviation, severe deviation, etc. For example, taking a ratio of 13 / 28 as an example, the ratio interval of the ratio is 0.3 to 0.5, and the corresponding project risk level is deviation; based on the project risk level, generate the risk detection result of the third engineering project, such as the risk level of the project can be included in the risk detection result, so that enterprise-level users can take corresponding measures in time based on the project risk level to reduce the risk of the third engineering project.
[0137] In some embodiments, determining the project risk level based on the ratio may include: obtaining the construction site of the third project; determining the risk threshold of the third project based on the geographical area where the construction site is located, and different geographical areas have different corresponding risk thresholds. It can be understood that since the third project in a more important geographical area is also more important, it is necessary to conduct more stringent risk detection on the third project, so the risk threshold corresponding to the geographical area with a higher regional importance level is lower; determining the project risk level based on the relationship between the ratio and the risk threshold, taking the risk threshold of 0.3 as an example, when the ratio is less than 0.3, the project risk level is determined to be normal, and taking the risk threshold of 0.5 as an example, when the ratio is greater than or equal to 0.5, the project risk level is determined to be a serious deviation. It can be seen that determining the corresponding risk threshold based on the geographical area where the construction site of the third project is located can make the risk detection of the third project more accurate and reasonable.
[0138] In some embodiments, after determining the project risk level based on the ratio, the following may also be included: if the project risk level is the target level, determining the construction unit and the project delivery object of the third project, the target level is, for example, the level of severe deviation; obtaining all the projects between the construction unit and the project delivery object of the third project; among all the projects, determining the projects with the project risk level of the target level; calculating the proportion of the number of projects with the project risk level of the target level relative to the number of all the projects; if the proportion is greater than the preset proportion, it indicates that all the projects between the construction unit and the project delivery object of the third project may have greater risks. Therefore, all engineering projects between the construction unit of the third engineering project and the engineering project delivery object can be regarded as engineering projects with risks, wherein the value of the preset ratio is determined based on the object level of the engineering project delivery object, and the higher the object level of the engineering project delivery object, the smaller the value of the preset ratio, and the object level of the engineering project delivery object can be preset; the corresponding prompt information generated for the engineering projects with risks is output to the preset terminal where the enterprise-level user is located, so that the relevant personnel of the preset terminal can timely manually check all engineering projects between the construction unit of the third engineering project and the engineering project delivery object, and take corresponding measures in time, so as to further reduce the risk of the engineering project as a whole. And compared with the method of manually analyzing all engineering projects, this risk detection method is more efficient and accurate.
[0139] In order to better implement the business data processing method of the engineering project in the embodiment of the present application, on the basis of the business data processing method of the engineering project, the embodiment of the present application also provides a business data processing device for the engineering project. Figure 5 As shown, the business data processing device 500 of the engineering project includes:
[0140] A project acquisition module 501 is used to acquire a first engineering project to be processed;
[0141] A first determining module 502, used to determine the current project status of a first engineering project;
[0142] A second determination module 503 is used to determine a first business system associated with the current project status from among multiple preset business systems;
[0143] The interface display module 504 is used to display the interface of the first business system to receive the first business data input into the interface of the first business system;
[0144] The third determining module 505 is used to determine first project information of the first engineering project in the first business system by using the first business data.
[0145] In addition to the above-mentioned project business data processing method and device, the embodiment of the present application also provides an electronic device, which integrates any project business data processing device provided in the embodiment of the present application, such as a PC, a mobile phone, a server, etc. The electronic device includes:
[0146] one or more processors;
[0147] Memory; and
[0148] One or more applications, wherein the one or more applications are stored in a memory and are configured to execute, by a processor, the steps in any embodiment of the business data processing method for the engineering project described above.
[0149] The present application also provides an electronic device that integrates any of the business data processing devices for engineering projects provided in the present application. Figure 6 As shown, it shows a schematic diagram of the structure of the electronic device involved in the embodiment of the present application, specifically:
[0150] The electronic device may include components such as a processor 601 with one or more processing cores, a storage unit 602 with one or more computer-readable storage media, a power supply 603, and an input unit 604. Those skilled in the art will appreciate that Figure 6 The electronic device structure shown in the figure does not constitute a limitation on the electronic device, and may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently.
[0151] The processor 601 is the control center of the electronic device. It uses various interfaces and lines to connect various parts of the entire electronic device. By running or executing software programs and / or modules stored in the storage unit 602 and calling data stored in the storage unit 602, it executes various functions of the electronic device and processes data, thereby monitoring the electronic device as a whole. Optionally, the processor 601 may include one or more processing cores; preferably, the processor 601 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, and the modem processor mainly processes wireless communications. It is understandable that the above-mentioned modem processor may not be integrated into the processor 601.
[0152] The storage unit 602 can be used to store software programs and modules. The processor 601 executes various functional applications and data processing by running the software programs and modules stored in the storage unit 602. The storage unit 602 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the electronic device, etc. In addition, the storage unit 602 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices. Accordingly, the storage unit 602 may also include a memory controller to provide the processor 601 with access to the storage unit 602.
[0153] The electronic device also includes a power supply 603 for supplying power to each component. Preferably, the power supply 603 can be logically connected to the processor 601 through a power management system, so as to manage charging, discharging, power consumption and other functions through the power management system. The power supply 603 can also include one or more DC or AC power supplies, recharging systems, power failure detection circuits, power converters or inverters, power status indicators and other arbitrary components.
[0154] The electronic device may further include an input unit 604, which may be used to receive input digital or character information and generate keyboard, mouse, joystick, optical or trackball signal input related to user settings and function control.
[0155] Although not shown, the electronic device may further include a display unit, etc., which will not be described in detail herein. Specifically, in the embodiment of the present application, the processor 601 in the electronic device will load the executable file corresponding to the process of one or more application programs into the storage unit 602 according to the following instructions, and the processor 601 will run the application program stored in the storage unit 602, thereby implementing the steps in any of the business data processing methods for engineering projects provided in the embodiment of the present application, for example:
[0156] Obtain a first engineering project to be processed; determine a current project status of the first engineering project; determine a first business system associated with the current project status among multiple preset business systems; display an interface of the first business system to receive first business data input into the interface of the first business system; and determine first project information of the first engineering project in the first business system using the first business data.
[0157] To this end, the embodiment of the present application provides a computer-readable storage medium, which may include: a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk, etc. The computer-readable storage medium stores a plurality of instructions, which can be loaded by a processor to execute the steps in any of the business data processing methods for engineering projects provided in the embodiment of the present application, for example:
[0158] Obtain a first engineering project to be processed; determine a current project status of the first engineering project; determine a first business system associated with the current project status among multiple preset business systems; display an interface of the first business system to receive first business data input into the interface of the first business system; and determine first project information of the first engineering project in the first business system using the first business data.
[0159] In addition, an embodiment of the present application further provides a computer program product or a computer program, the computer program product or the computer program including computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of an electronic device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the electronic device executes to implement the business data processing method for an engineering project as described in any one of the above items, for example:
[0160] Obtain a first engineering project to be processed; determine a current project status of the first engineering project; determine a first business system associated with the current project status among multiple preset business systems; display an interface of the first business system to receive first business data input into the interface of the first business system; and determine first project information of the first engineering project in the first business system using the first business data.
[0161] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0162] The above is a detailed introduction to the business data processing method, equipment and medium for an engineering project provided by an embodiment of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation method and application scope, and the content of this specification should not be understood as a limitation on the present application.
Claims
1. A method for processing business data of an engineering project, characterized in that: The business data processing method of the engineering project includes: Obtaining a first engineering project to be processed; Determining a current project status of the first engineering project; Determining a first business system associated with the current project status among a plurality of preset business systems; Displaying the interface of the first business system to receive first business data input into the interface of the first business system; The first business data is used to determine first project information of the first engineering project in the first business system.
2. The method for processing business data of an engineering project according to claim 1, characterized in that: After determining the first business system associated with the current project status among the plurality of preset business systems, the method further includes: Determine a first business function associated with the current project status among a plurality of preset business functions included in the first business system; The step of displaying the interface of the first business system to receive first business data input into the interface of the first business system includes: An interface of the first business function in the first business system is displayed to receive the first business data input into the interface of the first business function.
3. The business data processing method for an engineering project according to claim 1, characterized in that: After determining the first project information of the first engineering project in the first business system by using the first business data, the method further includes: Acquire identification information of the first engineering project from the first project information; In a second business system, obtaining project information having the identification information and using the project information as second project information, wherein the second business system and the first business system are different preset business systems; The second project information is subjected to information sharing processing using the first project information.
4. The method for processing business data of an engineering project according to claim 1, characterized in that: The obtaining of the first engineering project to be processed includes: Determine the user type of the currently logged in user; When the user type is a project-level user, the engineering project undertaken by the currently logged-in user is taken as the first engineering project.
5. The method for processing business data of an engineering project according to claim 4, characterized in that: After determining the user type of the currently logged-in user, the method further includes: When the user type is an enterprise-level user, a plurality of the preset business systems are displayed to determine a selected target business system from the plurality of the preset business systems; Obtaining a target project status associated with the target business system; Acquire engineering projects undertaken by multiple project-level users under the enterprise-level user and use them as second engineering projects; Determining a plurality of third engineering projects having the target project status among the plurality of the second engineering projects; Display the third project information of the plurality of third engineering projects in the target business system.
6. The method for processing business data of an engineering project according to claim 5, characterized in that: After displaying the third project information of the plurality of third engineering projects in the target business system, the method further includes: When receiving a project status modification instruction, obtaining the third engineering project targeted by the project status modification instruction and using it as the fourth engineering project; According to the project status modification instruction, the current project status of the fourth engineering project is modified.
7. The method for processing business data of an engineering project according to claim 5, characterized in that: The displaying of the third project information of the plurality of third engineering projects in the target business system includes: Obtaining a project risk score for each of the third engineering projects; Based on the project risk scores, determining a ranking among the plurality of third engineering projects; According to the sorting, the third project information of the plurality of third engineering projects in the target business system is displayed in sequence.
8. The method for processing business data of an engineering project according to claim 7, characterized in that: The step of determining the ranking of the plurality of third engineering projects based on the project risk scores includes: Determine the project delivery object of each of the third project; Obtaining the object level of the engineering project deliverable object; Based on the object level, modifying the project risk score corresponding to the third engineering project to obtain a modified project risk score; According to the revised project risk scores, the ranking among the plurality of third engineering projects is determined.
9. An electronic device, characterized in that: The electronic device comprises: one or more processors; Memory; and One or more applications, wherein the one or more applications are stored in the memory and are configured to be executed by the processor to implement the business data processing method for the engineering project according to any one of claims 1 to 8.
10. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and the computer program is loaded by a processor to execute the steps in the business data processing method for an engineering project as described in any one of claims 1 to 8.