Power generation byproduct management method and equipment based on Internet architecture

Through the power generation by-product management system based on the Internet architecture, the problem of thin functions of thermal power solid waste management software is solved, efficient management and security guarantees are achieved, management efficiency and sales revenue are improved, and management costs are reduced.

CN119090493APending Publication Date: 2024-12-06CHINA POWER GUORUI LOGISTICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411056239.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing solid waste management software has thin functions and has failed to effectively solve the professional management needs of thermal power solid waste. Moreover, traditional software is difficult to cope with business expansion and scenario changes, resulting in low management efficiency and high cost.

Method used

Adopt the power generation by-product management system based on the Internet architecture, combine mobile Internet technology and APP system to reconstruct business processes, realize the electronic management of data, vehicle information and business data, establish a demander evaluation system through data statistics correlation analysis, and introduce Emergency backup system to provide security.

Benefits of technology

It realizes the professional management software for thermal power solid waste, improves management efficiency, reduces management costs, enhances the flexibility and security of business processes, increases sales revenue and reduces management costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090493A_ABST
    Figure CN119090493A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a power generation by-product management method and equipment based on an Internet architecture, and the method is based on an Internet B / S architecture, combines an Internet + sales mode, integrates a mobile Internet technology, and constructs a power generation by-product management system based on an Internet (B / S) + APP technology system. On the basis of a platform under an internet architecture, a power generation byproduct management business process is reconstructed by combining a mobile technology and process monitoring, and electronic management of data, carrier information and business data is formed; performing statistical analysis on the execution condition of the scheduling plan of the power generation byproduct demander through data statistical association analysis, and establishing a power generation byproduct demander evaluation system; and an emergency standby system is established to provide safety guarantee. According to the invention, specialized management software suitable for the thermal power solid waste can be provided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of secondary utilization technology, and in particular to a method, device, equipment and medium for managing power generation byproducts based on an Internet architecture. Background Art

[0004] Bulk solid waste has the characteristics of pollution, which will cause prominent water-soil-air complex pollution and become one of the main factors that induce environmental and safety problems. In recent years, based on the high attention paid to solid waste management, the application of information platforms has been vigorously promoted in order to comprehensively improve the comprehensive management level of solid waste, implement the concept of green development, and reduce environmental risks. After the promulgation of the new solid waste law, the information management of solid waste has achieved initial results, as shown by: the establishment of a solid waste management information system, and the realization of online handling of major solid waste management businesses. At present, there are some solid waste management software developed by enterprises as the implementing entities, but the number is small and the functions are weak. Some traditional software developers, manufacturers, and sellers focus mainly on the field of general tools for larger markets, such as customer management, HR software, collaborative office OA, ERP, etc., which are aimed at various industries. Due to professional limitations, vertical industry segmentation has not yet been carried out to develop products for the pain points in the solid waste field. Summary of the invention

[0005] The present invention discloses a method, device, equipment and medium for managing power generation byproducts based on an Internet architecture, aiming to provide professional management software suitable for thermal power solid waste.

[0006] The technical solution of the present disclosure is as follows:

[0007] In a first aspect, an embodiment of the present disclosure provides a method for managing power generation byproducts based on an Internet architecture, comprising:

[0008] Based on the Internet B / S architecture, combined with the "Internet + sales" model, integrating mobile Internet technology, we build a power generation by-product management system based on the Internet (B / S) + APP technology system;

[0009] Based on the platform under the Internet architecture, combined with mobile technology and process monitoring, the business process of power generation by-product management is reconstructed to form electronic management of information, carrier information and business data;

[0010] Through data statistical correlation analysis, statistical analysis is conducted on the execution of the dispatch plan of power generation by-product demanders, and an evaluation system for power generation by-product demanders is established;

[0011] Establish emergency backup systems to provide safety protection.

[0012] In a possible implementation, in the method provided in the embodiment of the present invention, the power generation byproduct management system includes the following business management process:

[0013] Queuing and calling business process, parking lot waiting process, calling number to enter process, card swiping to enter process, empty vehicle weighing process, waiting for loading process, card swiping to ship process, card swiping to ship end process, heavy vehicle weighing process and card swiping to leave the factory process.

[0014] In a possible implementation, in the method provided in the embodiment of the present invention, the power generation byproduct management system includes:

[0015] The production module is used to connect with the power generation by-product production equipment to generate and issue power generation by-product output estimates and scheduling plans;

[0016] The monitoring module is used to monitor the process of power generation by-product demanders obtaining power generation by-products.

[0017] In a possible implementation, in the method provided in the embodiment of the present invention, after the subscription is successful, the power generation byproduct management business process is reconstructed, including:

[0018] Introducing the CRM customer relationship management concept, combined with data correlation statistical analysis, formulating a business control model, realizing electronic contracts, digital vehicle management, and standardizing business processes;

[0019] Introduce the idea of ​​electronic payment management, virtualize the payment, combine it with the real-time nature of mobile phone APP, achieve real-time interoperability of power generation by-product sales results, and check the deduction status of each transaction and each vehicle.

[0020] In a possible implementation, in the method provided in the embodiment of the present invention, an emergency backup system is established to provide security, including:

[0021] The emergency backup system is put into use. The two systems serve as backup for each other. When one system stops, the other system will be automatically awakened and started, ensuring that the on-site shipping order remains normal;

[0022] After the original system was decommissioned, the hardware was transformed into an emergency backup server through information technology.

[0023] In a possible implementation, in the method provided in the embodiment of the present invention, a power generation byproduct management system based on the Internet (B / S) + APP technology system is used.

[0024] Through the B / S structure, the system operation is separated from data storage and processing. User roles access and operate through browsers / clients, and business data is uploaded to the cloud server for storage and processing.

[0025] Business logic and data are in the cloud, and operation and maintenance personnel perform service upgrades and system maintenance in the cloud, collect data to the cloud, achieve full linkage between multiple nodes, realize resource allocation, conduct dynamic inventory, implement online monitoring, and logistics tracking.

[0026] In a possible implementation, in the method provided in the embodiment of the present invention, the types of power generation byproducts include at least:

[0027] Coal gangue, fly ash, tailings, smelting slag, industrial by-product gypsum, construction waste or straw.

[0028] In a second aspect, the present disclosure also provides a power generation byproduct management device based on an Internet architecture, including:

[0029] The construction module is used to build a power generation byproduct management system based on the Internet B / S architecture, combined with the "Internet + sales" model, and integrated with mobile Internet technology, with the Internet (B / S) + APP technology system;

[0030] The reconstruction module is used to reconstruct the business process of power generation byproduct management based on the platform under the Internet architecture, combining mobile technology and process monitoring to form electronic management of information, vehicle information and business data;

[0031] The analysis module is used to conduct statistical analysis on the execution of the dispatch plan of power generation by-product demanders through data statistical correlation analysis, and establish an evaluation system for power generation by-product demanders;

[0032] The safety assurance module is used to establish an emergency backup system to provide safety assurance.

[0033] In a third aspect, an embodiment of the present disclosure further provides an electronic device, including:

[0034] processor;

[0035] a memory for storing processor-executable instructions;

[0036] The processor is configured to execute instructions to implement the method of the first aspect.

[0037] In a fourth aspect, an embodiment of the present disclosure further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the method of the first aspect when executed by a processor.

[0038] In a fifth aspect, an embodiment of the present disclosure further provides a computer program product, comprising a computer program / instructions, wherein the computer program / instructions implement the method of the first aspect when executed by a processor.

[0039] The technical solution provided by the embodiments of the present disclosure brings at least the following beneficial effects:

[0040] In the embodiments of the present disclosure, based on the Internet B / S architecture, combined with the "Internet + sales" model, and integrating mobile Internet technology, a power generation byproduct management system based on the Internet (B / S) + APP technology system is constructed; based on the platform under the Internet architecture, combined with mobile technology and process monitoring, the power generation byproduct management business process is reconstructed to form electronic management of data, vehicle information, and business data; through data statistical correlation analysis, the execution of the scheduling plan of power generation byproduct demanders is statistically analyzed, and an evaluation system for power generation byproduct demanders is established; an emergency backup system is established to provide safety protection. Through the present invention, professional management software suitable for thermal power solid waste can be provided.

[0041] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The drawings herein are incorporated into and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the description are used to explain the principles of the present disclosure, and do not constitute improper limitations on the present disclosure.

[0043] Figure 1 A schematic diagram of a flow chart of a power generation byproduct management method based on Internet architecture provided in an embodiment of the present disclosure;

[0044] Figure 2 A schematic diagram of the structure of a power generation by-product management system in a power generation by-product management method based on an Internet architecture provided in an embodiment of the present disclosure;

[0045] Figure 3 A schematic diagram of the structure of a power generation byproduct management device based on Internet architecture provided in an embodiment of the present disclosure;

[0046] Figure 4 A schematic diagram of the structure of an electronic device provided in an embodiment of the present disclosure. DETAILED DESCRIPTION

[0047] In order to enable ordinary persons in the art to better understand the technical solutions of the present disclosure, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings.

[0048] It should be noted that the terms "first", "second", etc. in the specification and claims of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are merely examples of devices and methods consistent with some aspects of the present disclosure as detailed in the appended claims.

[0049] Figure 1 A flowchart of a power generation byproduct management method based on Internet architecture is provided for the first embodiment of the present disclosure, such as Figure 1 As shown, the method may include the following steps:

[0050] S101, based on the Internet B / S architecture, combines the "Internet + sales" model, integrates mobile Internet technology, and builds a power generation by-product management system based on the Internet (B / S) + APP technology system.

[0051] In a specific embodiment of the present invention, the power generation byproducts involved are wastes generated in the process of thermal power generation that cannot be used for further power generation, but these wastes can be used in other fields and can be sold for profit. They can be solid coal slag, waste liquid or waste gas.

[0052] The power generation byproduct management system of the present invention introduces advanced IT technologies such as RFID radio frequency technology, industrial automatic control technology, GPS positioning, video monitoring technology, etc., to achieve remote operation and interconnection, and maintenance personnel can also remotely and promptly solve system problems.

[0053] Specifically, the power generation byproduct management system includes the following business management processes:

[0054] Queuing and calling business process, parking lot waiting process, calling number to enter process, card swiping to enter process, empty vehicle weighing process, waiting for loading process, card swiping to ship process, card swiping to ship end process, heavy vehicle weighing process and card swiping to leave the factory process.

[0055] like Figure 2 As shown, the power generation byproduct management system involved in the present invention includes:

[0056] The production module is used to connect with the power generation by-product production equipment to generate and issue power generation by-product output estimates and scheduling plans; the production module is Figure 2 Sales production system in.

[0057] The monitoring module is used to monitor the process of power generation by-product demanders obtaining power generation by-products. Figure 2 Sales monitoring system in.

[0058] S102, based on the platform under the Internet architecture, combines mobile technology and process monitoring to reconstruct the business process of power generation by-product management, and form electronic management of information, vehicle information and business data.

[0059] In the embodiment of the present invention, based on the platform under the Internet architecture, combined with mobile technology and process monitoring, the business process of power generation byproduct sales is reconstructed to form electronic management of customer information, electronic management of vehicle information, and electronic settlement of goods and payments. At the same time, the entire business process of production estimation, dispatching plan issuance, vehicle queuing to enter the factory, loading and unloading, settlement, and vehicle leaving the factory is monitored.

[0060] Restructure the business process of power generation byproduct management, including:

[0061] Introducing the CRM customer relationship management concept, combined with data correlation statistical analysis, formulating a business control model, realizing electronic contracts, digital vehicle management, and standardizing business processes;

[0062] Introduce the idea of ​​electronic payment management, virtualize the payment, combine it with the real-time nature of mobile phone APP, achieve real-time interoperability of power generation by-product sales results, and check the deduction status of each transaction and each vehicle.

[0063] S103, through data statistical correlation analysis, statistical analysis is performed on the execution of the scheduling plan of power generation by-product demanders, and an evaluation system for power generation by-product demanders is established.

[0064] Specifically, after commissioning, through on-site data collection, the accuracy of plan preparation has been improved, and the relevant functions of real-time adjustment of scheduling plans according to sudden changes in unit operating conditions have been achieved, which has greatly reduced the occurrence of emergency scheduling situations in the company and improved the service satisfaction of contractors.

[0065] When emergency dispatch is needed, dispatchers can log into the system anytime and anywhere with network access to make emergency dispatch arrangements, greatly shortening the time for emergency dispatch arrangements.

[0066] S104, establish an emergency backup system to provide security.

[0067] The emergency backup server system is an important security measure. Since the main operating carrier of the intelligent sales system is the Internet, when encountering various force majeure or failures, the inability of the Internet system to operate will seriously affect the normal shipping order of power generation by-products, thereby posing a safety hazard to power generation production. After the emergency backup server system is put into use, the two systems serve as backup for each other. When one system is shut down, it automatically wakes up the other system and starts it up, ensuring that the on-site shipping order remains normal. At the same time, the hardware of the original old system is transformed into an emergency backup server through informatization, which also plays a role in reusing old hardware.

[0068] After the method of the present invention is implemented, intelligent queuing and calling for entry into the factory are realized, and all queuing information is made public to avoid disputes; the filling of information such as ash level in ash bin and gasification fan outlet pressure is realized, which improves the accuracy of ash quantity prediction and plan issuance; a hierarchical authorization method is adopted to optimize business process management, realize system intelligent reminders and mutual supervision, and achieve the original design intention of strengthening management and control.

[0069] After commissioning, through functions such as retrieval and summary, the contractor's performance status can be quickly checked and its personalized needs can be analyzed; based on the average transportation unit price in the reference area and the fly ash purchase price of the end user, even the stage break-even point and other information can be calculated, laying the foundation for further strengthening contractor management.

[0070] Taking fly ash sales as an example, the APP sales management system can better predict the price trend of fly ash in the next stage through data analysis and combined with the contractor's shipment completion status, so as to better do a good job in fly ash market pricing sales. It is expected to increase the sales revenue of power generation byproducts by about 10% each year (with the sales volume of fly ash unchanged) and reduce management costs by about 30%.

[0071] The design idea of ​​information management in traditional industries is to carry out fixed full-process design based on known business scenarios. Although this design idea can meet the operation requirements of a single project, it cannot cope with the problems of changing and complex scenarios and diverse processes that come with business expansion. When the actual situation changes, modifying the early design will bring high costs and take a long time, which seriously limits the development and expansion of the business. Through modular design, the entire system is split and abstracted into a combination of several data sources, triggers, and actuators, so that the system can be flexibly adjusted at any time according to changes in business and scenarios, and can even be quickly and flexibly configured according to the actual needs of each access point, which can effectively reduce the later development cost, implementation cost and time.

[0072] Traditional industrial software is mainly based on the C / S architecture. The system is deployed locally, and business data must be processed and stored locally. The initial investment is high, the implementation speed is slow, and it is impossible to achieve the business goal of rapidly expanding the market. Local deployment business upgrades and maintenance are expensive, which brings many inconveniences to the subsequent continuous software services. Under the C / S architecture, data is absolutely private and lacks sharing, making it difficult to meet the business goal of the platform's full network resource allocation and integration.

[0073] Through the B / S structure, the system operation can be separated from data storage and processing: user roles are accessed and operated through browsers / clients; business data is uploaded to the cloud server for storage and processing. This model saves server resources deployed locally, which can effectively reduce implementation costs by more than 80% and access time by more than 20%. Business logic and data are in the cloud, and operation and maintenance personnel can directly perform service upgrades and system maintenance in the cloud, effectively reducing maintenance costs and maintenance time. In addition, by gathering data in the cloud, full linkage between multiple nodes can be achieved, and resource allocation can be realized, such as dynamic inventory, online monitoring, logistics tracking and other functions.

[0074] The integration of offline traditional equipment and online systems is a core issue that Industrial Internet+ needs to consider. Traditional offline equipment generates a huge amount of data, with different formats and standards, unstable communications, and complex business logic. Simple system integration or equipment integration cannot solve the problem well, resulting in slow data processing, high latency, expensive storage, and frequent offline execution errors.

[0075] Through IoT technology, standardized IoT protocols can be defined to achieve seamless access to various heterogeneous devices. At the same time, the device layer is isolated from the data layer and the business logic layer, and offline device data is cleaned, corrected, preprocessed, and standardized. Edge computing, local networking, and shadow technology are used to deal with abnormal situations.

[0076] In addition, by cooperating with various traditional equipment manufacturers to establish standard protocols and interface libraries, we can achieve rapid access to offline devices, reduce implementation time and costs, form effective business barriers, and establish a relative monopoly advantage.

[0077] Traditional e-commerce platforms need to invest a lot of resources in data storage and backup and information evidence to deal with complex reconciliation disputes that may arise in product inventory, transaction signing, contract management, order generation, and logistics handover. At the same time, as a special pollutant, once the power generation byproduct leaks or is dumped unreasonably, it will cause environmental problems, so being able to trace every link in the logistics process is also an unavoidable focus.

[0078] To address these potential risks, the platform actively introduces blockchain technology to create a "dual-chain integration" model of blockchain and supply chain. Through alliance chain technology, all power plants and purchasers participating in the platform can join the blockchain network as a node and participate in data storage.

[0079] Every transaction information on the blockchain (transaction parties, transaction time, transaction content, etc.) will be recorded in a block and stored in the distributed ledger of each node on the chain, which ensures the integrity, reliability and high transparency of the information. Every dispute has a fair natural proof, and any accident can clearly identify the responsible party.

[0080] Based on the same inventive concept, the embodiment of the present disclosure also provides a power generation byproduct management device based on the Internet architecture. Figure 3 As shown, the device 300 includes:

[0081] The construction module 310 is used to build a power generation byproduct management system based on the Internet B / S architecture, combined with the "Internet + sales" model, and integrated with mobile Internet technology, with the Internet (B / S) + APP technology system;

[0082] The reconstruction module 320 is used to reconstruct the business process of power generation byproduct management based on the platform under the Internet architecture, combining mobile technology and process monitoring, and forming electronic management of information, vehicle information and business data;

[0083] The analysis module 330 is used to statistically analyze the execution of the scheduling plan of the power generation by-product demanders through data statistical correlation analysis, and establish an evaluation system for the power generation by-product demanders;

[0084] The safety guarantee module 340 is used to establish an emergency backup system to provide safety guarantee.

[0085] The specific implementation method and technical effect of the device provided in the embodiment of the present disclosure are similar to those of the above-mentioned method embodiment, and will not be repeated here.

[0086] In addition, combined Figure 1-Figure 3 The power generation byproduct management method and device based on Internet architecture described in the embodiments of the present application can be implemented by electronic devices. Figure 4 A schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present application is shown.

[0087] like Figure 4As shown, the electronic device 1000 may include a processing device (e.g., a central processing unit, a graphics processor, etc.) 1001, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 1002 or a program loaded from a storage device 1008 to a random access memory (RAM) 1003 to implement the battery capacity prediction method of the embodiment described in the present disclosure. In the RAM 1003, various programs and data required for the operation of the electronic device 1000 are also stored. The processing device 1001, the ROM 1002, and the RAM 1003 are connected to each other via a bus 1004. An input / output (I / O) interface 1005 is also connected to the bus 1004.

[0088] Typically, the following devices may be connected to the I / O interface 1005: an input device 1006 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 1007 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 1008 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 1009. The communication device 1009 may allow the electronic device 1000 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 4 The electronic device 1000 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.

[0089] In particular, according to an embodiment of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present disclosure includes a computer program product, which includes a computer program carried on a non-transitory computer-readable medium, and the computer program contains a program code for executing the method shown in the flowchart, thereby implementing the voice control method as described above. In such an embodiment, the computer program can be downloaded and installed from the network through the communication device 1009, or installed from the storage device 1008, or installed from the ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment of the present disclosure are executed.

[0090] It should be noted that the computer-readable medium disclosed above may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, device or device. In the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to an electromagnetic signal, an optical signal, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0091] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0092] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.

[0093] The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device:

[0094] Based on the Internet B / S architecture, combined with the "Internet + sales" model, integrating mobile Internet technology, we build a power generation by-product management system based on the Internet (B / S) + APP technology system;

[0095] Based on the platform under the Internet architecture, combined with mobile technology and process monitoring, the business process of power generation by-product management is reconstructed to form electronic management of information, carrier information and business data;

[0096] Through data statistical correlation analysis, statistical analysis is conducted on the execution of the dispatch plan of power generation by-product demanders, and an evaluation system for power generation by-product demanders is established;

[0097] Establish emergency backup systems to provide safety protection.

[0098] Optionally, when the above one or more programs are executed by the electronic device, the electronic device may also execute other steps described in the above embodiments.

[0099] Computer program code for performing the operations of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including, but not limited to, object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., through the Internet using an Internet service provider).

[0100] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs the specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0101] The units involved in the embodiments described in the present disclosure may be implemented by software or hardware, wherein the name of a unit does not, in some cases, limit the unit itself.

[0102] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0103] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0104] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0105] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0106] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0107] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0108] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0109] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for managing power generation byproducts based on Internet architecture, characterized in that: include: Based on the Internet B / S architecture, combined with the "Internet + sales" model, integrating mobile Internet technology, we build a power generation byproduct management system based on the Internet (B / S) + APP technology system; Based on the platform under the Internet architecture, combined with mobile technology and process monitoring, the business process of power generation by-product management is reconstructed to form electronic management of information, carrier information and business data; Through data statistical correlation analysis, statistical analysis is conducted on the execution of the dispatch plan of power generation by-product demanders, and an evaluation system for power generation by-product demanders is established; Establish emergency backup systems to provide safety protection.

2. The power generation byproduct management method based on Internet architecture according to claim 1 is characterized in that: The power generation byproduct management system includes the following business management processes: Queuing and calling business process, parking lot waiting process, calling number to enter process, card swiping to enter process, empty vehicle weighing process, waiting for loading process, card swiping to ship process, card swiping to ship end process, heavy vehicle weighing process and card swiping to leave the factory process.

3. The power generation byproduct management method based on Internet architecture according to claim 2 is characterized in that: The power generation byproduct management system includes: The production module is used to connect with the power generation by-product production equipment to generate and issue power generation by-product output estimates and scheduling plans; The monitoring module is used to monitor the process of power generation by-product demanders obtaining power generation by-products.

4. The method for managing power generation byproducts based on Internet architecture according to claim 1, characterized in that: Restructure the business process of power generation byproduct management, including: Introducing the CRM customer relationship management concept, combined with data correlation statistical analysis, formulating a business control model, realizing electronic contracts, digital vehicle management, and standardizing business processes; Introduce the idea of ​​electronic payment management, virtualize the payment, combine it with the real-time nature of mobile phone APP, achieve real-time interoperability of power generation by-product sales results, and check the deduction status of each transaction and each vehicle.

5. The method for managing power generation byproducts based on Internet architecture according to claim 1, characterized in that: Establish emergency backup systems to provide safety protection, including: The emergency backup system is put into use. The two systems serve as backup for each other. When one system stops, the other system will be automatically awakened and started, ensuring that the on-site shipping order remains normal; After the original system was decommissioned, the hardware was transformed into an emergency backup server through information technology.

6. The method for managing power generation byproducts based on the Internet architecture according to claim 1, characterized in that: Power generation byproduct management system based on Internet (B / S) + APP technology system, Through the B / S structure, the system operation is separated from data storage and processing. User roles access and operate through browsers / clients, and business data is uploaded to the cloud server for storage and processing. Business logic and data are in the cloud, and operation and maintenance personnel perform service upgrades and system maintenance in the cloud, collect data to the cloud, achieve full linkage between multiple nodes, realize resource allocation, conduct dynamic inventory, implement online monitoring, and logistics tracking.

7. The power generation byproduct management method based on Internet architecture according to claim 1, characterized in that: Types of power generation by-products include at least: Coal gangue, fly ash, tailings, smelting slag, industrial by-product gypsum, construction waste or straw.

8. A power generation byproduct management device based on Internet architecture, characterized in that: include: The construction module is used to build a power generation byproduct management system based on the Internet B / S architecture, combined with the "Internet + sales" model, and integrated with mobile Internet technology, with the Internet (B / S) + APP technology system; The reconstruction module is used to reconstruct the business process of power generation byproduct management based on the platform under the Internet architecture, combining mobile technology and process monitoring to form electronic management of information, vehicle information and business data; The analysis module is used to conduct statistical analysis on the execution of the dispatch plan of power generation by-product demanders through data statistical correlation analysis, and establish an evaluation system for power generation by-product demanders; The safety assurance module is used to establish an emergency backup system to provide safety assurance.

9. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the method according to any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.