Bidding optimization method for uncertain energy hub participating in energy and reserve market

By establishing uncertainty models and optimization algorithms, the risks faced by energy hubs in the power market are solved, the accuracy and flexibility of bids are improved, and market risks are reduced.

CN119090603AActive Publication Date: 2024-12-06ZHEJIANG UNIV +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410948109.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-12-06
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

The existing power energy market approach failed to effectively consider unit capacity value, resulting in energy hubs being exposed to risk in the market.

Method used

By inputting basic information of the market and energy hub, establishing an uncertainty model, using Matlab to describe the two-layer optimization problem, and using the gurobi commercial solver to optimize the bidding strategy of the energy hub, considering the uncertainty factors of the market and new energy.

Benefits of technology

It significantly improves the accuracy and flexibility of energy hub bidding, reduces market risks, and improves the efficiency of energy hub participation in the market.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090603A_ABST
    Figure CN119090603A_ABST
Patent Text Reader

Abstract

The invention discloses a bidding optimization method for an uncertain energy hub to participate in an energy and standby market, and relates to the technical field of power markets, comprising the steps of inputting basic information of the market, basic information of the energy hub and parameter information of new energy, and establishing an uncertain model of new energy output outside the energy hub; a self-scheduling model of the comprehensive energy is established based on the comprehensive energy information, the internal energy relation of the comprehensive energy and the safe operation condition; establishing a comprehensive clearing model of the day-ahead energy market and the standby market according to the market information, the new energy information and the network information; and describing a double-layer optimization problem by using Matlab, and solving by using a gurobi commercial solver to obtain the optimal bidding method of the energy hub considering the uncertainty. According to the method, the influence of uncertain factors of new energy units in the market on energy hub bidding is considered, market factors outside the energy hub are fully considered, and the optimized bidding method has remarkable accuracy improvement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power market, in particular to a bidding optimization method for uncertain energy hubs participating in energy and reserve markets. Background Art

[0002] In the context of the gradual marketization of the power system, various power system components participate in market transactions. However, there are many new energy participants in the power market, and their output is uncertain and volatile, which will have a significant impact on the market electricity price. Energy hubs contain a variety of energy equipment, which can meet their own multi-energy needs from various markets. Due to their multi-energy complementarity, they also have sufficient adjustable and backup potential. However, the uncertainty and fluctuations in the market will bring huge transaction risks to energy hubs. Therefore, how energy hubs can formulate reasonable bidding strategies to try to avoid uncertainties in the market has sufficient research value. Summary of the invention

[0003] In view of the above-mentioned problems, the present invention is proposed.

[0004] Therefore, the technical problem solved by the present invention is that the existing traditional electricity energy market method has the defect of not considering the value of unit capacity, and the energy hub as a market participant does not consider the interaction with the market and is exposed to market risks.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a bidding optimization method for uncertain energy hubs participating in the energy and reserve market, including inputting basic market information, basic information of the energy hub and parameter information of new energy, and establishing an uncertainty model of new energy output outside the energy hub. Based on comprehensive energy information, energy relations within the comprehensive energy, and safe operation conditions, a self-dispatching model of comprehensive energy is established. A comprehensive clearing model of the day-ahead energy market and the reserve market is established based on market information, new energy information, and network information. Matlab is used to describe the two-layer optimization problem, and the gurobi commercial solver is used to solve it, to obtain an optimized bidding method for energy hubs considering uncertainty.

[0006] As a preferred scheme of the bidding optimization method for the uncertain energy hub participating in the energy and reserve market described in the present invention, the basic information of the input market and the basic information of the energy hub include network information, basic information of other participants in the energy market and the reserve market, and information of various equipment inside the comprehensive energy.

[0007] Network information includes the upper and lower limits F of the transmission capacity of the transmission line l l max ,F l min , the output upper and lower limits of other units g At time t, the upper and lower limits of load d The reserve R required by the market at time t t , network topology, node admittance matrix X.

[0008] Market information includes the cost coefficient Ceg of other units g g , the reserve compensation cost coefficient Crg of other units g g Cost coefficient Ced for other loads d d .

[0009] The multi-energy equipment inside the integrated energy commercial complex includes small gas units, small cogeneration units, electric hot pots, gas hot pots, electric energy storage, thermal energy storage and small photovoltaics. The energy equipment plus transformers constitute the energy hub of the integrated energy commercial complex.

[0010] Small gas generator set GI power output upper and lower limits Gas-to-electricity efficiency The upper and lower limits of the electric output climbing: Operation cost coefficient CeGI gi .

[0011] The upper and lower limits of the power output of small combined heat and power units c Thermal output upper and lower limits Gas-to-electricity efficiency ηCHP c G2P , gas-to-heat efficiency The upper and lower limits of the electric output Thermal output climbing upper and lower limits: Operating cost coefficient CeCHP c .

[0012] The upper and lower limits of the thermal output of the electric boiler eb Efficiency of electricity to heat Thermal output climbing upper and lower limits Operating cost coefficient CeEB eb .

[0013] The upper and lower limits of thermal output of gas boiler gb Efficiency of electricity to heat Thermal output climbing upper and lower limits Operation cost coefficient CeGB gb .

[0014] The upper and lower limits of charging power for electric energy storage e Discharge power upper and lower limits Energy state SOC upper and lower limits The initial value of the energy state SOC0, the energy storage charging and discharging efficiency ηec e ,ηed e, operating cost coefficient CeES e .

[0015] The upper and lower limits of the charging power of the thermal energy storage h Discharge power upper and lower limits Upper and lower limits of thermal energy storage capacity The initial value of the energy state EHS0, the energy storage charging and discharging efficiency ηhc h ,ηhd h , operating cost coefficient CeHS h .

[0016] The upper limit of the power output of small photovoltaic v,t Cost coefficient of abandoned photovoltaic power CePVcur v , operating cost coefficient CePV v .

[0017] As a preferred solution of the bidding optimization method for the energy hub participating in the energy and reserve market of uncertainty described in the present invention, the parameter information of the new energy includes external wind power w information, and the average wind power output predicted at time t obtained according to historical data Standard deviation of wind power output According to the two historical parameters, the Monte Carlo sampling method and the scenario compression method based on probability distance are used to obtain S uncertainty scenarios. The probability of each scenario is

[0018] In a certain scenario of s, at time t, the maximum output of wind power w is

[0019] Wind power operation cost coefficient CeWT w , wind curtailment cost coefficient CeWTcur w .

[0020] As a preferred scheme of the bidding optimization method for the uncertain energy hub participating in the energy and reserve market described in the present invention, wherein: the establishment of a self-dispatching model of comprehensive energy based on comprehensive energy information, energy relations within the comprehensive energy, and safe operation conditions includes determining the constraints on the operation and bidding of the energy hub and determining the objective function.

[0021] According to the energy relationship within the comprehensive energy and the safe operation conditions, safe operation and establishment of energy coupling constraints.

[0022] Safe operation of internal equipment at time t, scenario s.

[0023] The safety constraints of small gas generator sets are expressed as:

[0024] GiG gi,t,s =K gasViGI gi,t,s

[0025]

[0026] 0≤PoGI gi,t,s +RGI gi,t,s ≤PoGI g m i ax

[0027]

[0028] 0≤RGI gi,t,s

[0029]

[0030] Among them, GiGI gi,t,s is the power of the gas combustion input to the GI unit, K gas is the low combustion value of natural gas, ViGI gi,t,s is the volume of natural gas input to the gas generator set, PoGI gi,t,s is the electrical output of a small gas unit, RGI gi,t,s It is the spare capacity provided by small gas units.

[0031] The safety constraints of small CHP units are expressed as:

[0032] GJP c,t,s =K gas ·ViCHP c,t,s

[0033]

[0034] 0≤RCHP c,t,s

[0035]

[0036] Among them, GiCHP c,t,s is the power of the gas combustion input to unit c, ViCHP c,t,s is the volume of natural gas input to CHP, PoCHP c,t,s , HoCHP c,t,s They are the electrical output and thermal output of small combined heat and power units, RCHP c,t,s It is the spare capacity provided by small cogeneration units.

[0037] The safety constraint of electric boiler is expressed as:

[0038]

[0039] Among them, HoEB eb,t,s is the heat output of the electric boiler EB, PiEB eb,t,s is the electrical power input to the electric hot pot.

[0040] The safety constraint of gas boiler is expressed as:

[0041] GJ gb,t,s =K gas ·ViGB gb,t,s

[0042]

[0043] Among them, GiGB gb,t,s is the power of the gas combustion input to the GB boiler, ViGB gb,t,s is the volume of natural gas input into GB. HoGB gb,t,s It is the heat output of the gas boiler gb.

[0044] The battery safety constraint is expressed as:

[0045]

[0046] 0≤RES e,t,s

[0047]

[0048] SOC e,t,s =SOC e,t-1,s +(ηec e ·Pc e,t,s -Pd e,t,s / ηed e )·Δt

[0049] SOC e,T,s =SOC0

[0050] Among them, Pc e,t,s , Pd e,t,s They are respectively the charging and discharging power of the energy storage e, SOC e,t,s is the state of charge of the energy storage e, Δt is the time interval, T is the total time, SOC e,T,s is the final energy state of energy storage, RES e,t,s It is the backup capacity provided by battery safe energy storage.

[0051] The thermal energy storage safety constraint is expressed as:

[0052]

[0053] EHS h,t,s =EHS h,t-1,s +(ηhc h·Hc h,t,s -Hd h,t,s / ηhd h )·Δt

[0054] EHS e,T,s =EHS0

[0055] Among them, Hc h,t,s , Hd h,t,s are the charging and discharging power of thermal energy storage h, EHS e,t,s is the state of charge of the thermal energy storage h, EHS e,T,s It is the final energy state of thermal energy storage.

[0056] The safety constraint of small photovoltaic is expressed as:

[0057]

[0058] Among them, PoPV v,t,s is the output of photovoltaic v.

[0059] The energy coupling relationship of the energy hub including the electrical load balance is expressed as:

[0060]

[0061] Among them, Po t,s ,Pi t,s are the power sold and purchased by the energy hub, D t It is the electrical load within the comprehensive energy.

[0062] The heat load balance is expressed as:

[0063]

[0064] Among them, H t It is the heat load within the comprehensive energy.

[0065] The gas composition balance is expressed as:

[0066]

[0067] Among them, Vi t,s It is the total gas purchase volume for comprehensive energy.

[0068] The capacity composition balance is expressed as:

[0069]

[0070] Among them, REH t,s It is the total amount of backup provided by comprehensive energy.

[0071] Safe operation constraints and energy coupling relationships constitute the operation constraints of comprehensive energy.

[0072] As a preferred solution of the bidding optimization method for the uncertain energy hub participating in the energy and reserve market described in the present invention, the self-dispatching model of the comprehensive energy based on the comprehensive energy information, the energy relationship within the comprehensive energy and the safe operation conditions also includes constructing the objective function of the comprehensive energy dispatch with the minimum operation cost as the goal, which is expressed as:

[0073]

[0074]

[0075] in, They represent the gas purchase cost, electricity purchase cost, operation cost, solar power cutting cost, and reserve market income under scenario s. They represent the natural gas price at time t, the clearing electricity price of node N, the clearing capacity price, and F s is the total cost of the energy hub.

[0076] As a preferred scheme of the bidding optimization method for uncertain energy hubs participating in the energy and reserve markets described in the present invention, wherein: the establishment of a comprehensive clearing model for the day-ahead energy market and the reserve market based on market information, new energy information and network information includes determining market rule conditions and network security operation conditions, and constructing an objective function.

[0077] According to the new energy information, network information and safe operation conditions, market and network constraints are established, including common unit constraints, which are expressed as:

[0078]

[0079] 0≤RG g,t,s

[0080] Among them, PG g,t,s , R.G. g,t,s They are the output and reserve capacity of unit g at time t and scenario s respectively.

[0081] The adjustable load is expressed as:

[0082]

[0083] Among them, PD d,t,s is the load amount of load d at time t and scenario s.

[0084] The wind turbine is represented by:

[0085]

[0086] Among them, PW w,t,sis the output of wind turbine w at time t and scenario s.

[0087] The line network constraints are expressed as:

[0088] F l min ≤PF l,t,s ≤F l max

[0089]

[0090] -π≤θ n,t,s ≤π

[0091] θ ref,t,s =0

[0092] Among them, PF l,t,s is the excess flow of line l at time t and scenario s, θ n,t,s is the phase angle of node n at time t and scenario s, θ ref,t,s is the phase angle at the reference node ref, X nm is the admittance from n node to m node in the node admittance matrix X.

[0093] The energy hub bidding winning constraints are expressed as:

[0094] 0≤Po t,s ≤Pobid t

[0095] 0≤Pi t,s ≤Pibid t

[0096] 0≤REH t,s ≤REHbid t

[0097] 0≤αo t ≤αo max

[0098] 0≤αi t ≤αi max

[0099] 0≤αr t ≤αr max

[0100]

[0101] 0≤Pobid t

[0102] 0≤REH t,s

[0103]

[0104] Among them, Pobid t ,Pibid t ,REHbid t They are the electricity sales, electricity purchase bidding, and capacity bidding of comprehensive energy at time t, αo t , αi t , αr t , αo max , αi max , αr max They are the quotations for electricity sales, electricity purchases and capacity, as well as the upper limits of the three quotations.

[0105] The node power balance constraint is expressed as:

[0106]

[0107] Among them, PD d(n),t,s , P.G. g(n),t,s , PW w(n),t,s , Po (n),t,s ,Pi (n),t,s Indicated by PD d,t,s , P.G. g,t,s , PW w,t,s , Po t,s ,Pi t,s The node form of the conversion. is the dual variable of the constraint, which is the node electricity price of the market clearing in the scenario s at time t. It is the energy price at node N where the energy hub is located.

[0108] The capacity balance is expressed as:

[0109]

[0110] in, is the dual variable of the constraint, and is the capacity electricity price for market clearing in scenario s at time t.

[0111] The objective function constructed with the goal of maximizing social welfare is expressed as:

[0112]

[0113] As a preferred solution of the bidding optimization method for the uncertain energy hub participating in the energy and reserve market described in the present invention, the method includes: using Matlab to describe the two-level optimization problem and using the gurobi commercial solver to solve it, including programming the optimization problem with Matlab and solving it with Gurobi, so as to obtain the bidding method of the energy hub under the condition of new energy fluctuations.

[0114] Another object of the present invention is to provide a bidding optimization system for uncertain energy hubs to participate in the energy and reserve market, which can solve the problems contained in the current single energy market technology by adding the capacity market and considering the interaction between the energy hub and the market: the defect of not considering the capacity value of the unit, and the energy hub as a market participant does not consider the interaction with the market and is exposed to market risks.

[0115] As a preferred solution of the bidding optimization system for uncertain energy hubs participating in the energy and reserve market described in the present invention, it includes: a data input module, an energy scheduling module, a clearing module, and a bidding solution module.

[0116] The data input module is used to input basic market information, basic information of the energy hub and parameter information of new energy, and establish an uncertainty model of the output of new energy outside the energy hub.

[0117] The energy scheduling module is used to establish a self-scheduling model of comprehensive energy based on comprehensive energy information, energy relations within comprehensive energy, and safe operation conditions.

[0118] The clearing module is used to establish a comprehensive clearing model for the day-ahead energy market and the reserve market based on market information, new energy information and network information.

[0119] The bidding solution module uses Matlab to describe the two-level optimization problem and uses the gurobi commercial solver to solve it, thereby obtaining an optimized bidding method for energy hubs considering uncertainty.

[0120] A computer device includes a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps of a bidding optimization method for uncertain energy hubs to participate in energy and reserve markets.

[0121] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of a bidding optimization method for uncertain energy hubs participating in energy and reserve markets.

[0122] Beneficial effects of the present invention: The bidding optimization method for energy hubs participating in the energy and reserve market with uncertainty provided by the present invention takes into account the impact of uncertainty factors of new energy units in the market on energy hub bidding, and fully considers market factors outside the energy hub. The optimized bidding method has significantly improved accuracy. The energy market and capacity market are taken into account, reflecting the flexibility of the energy hub's participation in the market. The present invention achieves better results in terms of accuracy and flexibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0123] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0124] Figure 1 An overall flow chart of a bidding optimization method for an uncertain energy hub participating in the energy and reserve market provided in the first embodiment of the present invention.

[0125] Figure 2 An overall flow chart of a bidding optimization system for an uncertain energy hub participating in the energy and reserve market provided in the third embodiment of the present invention. DETAILED DESCRIPTION

[0126] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0127] Example 1

[0128] Reference Figure 1 , which is an embodiment of the present invention, provides a bidding optimization method for energy hubs participating in energy and reserve markets with uncertainty, including:

[0129] S1: Input basic market information, basic information of energy hubs and parameter information of new energy, and establish an uncertainty model for the output of new energy outside the energy hub.

[0130] Furthermore, the basic information of the market and the energy hub is input, including network information, basic information of other participants in the energy market and the backup market, and information of various equipment within the comprehensive energy.

[0131] Network information includes the upper and lower limits F of the transmission capacity of the transmission line l l max ,F l min , the output upper and lower limits of other units g At time t, the upper and lower limits of load d The reserve R required by the market at time t t , network topology, node admittance matrix X.

[0132] Market information includes the cost coefficient Ceg of other units gg , the reserve compensation cost coefficient Crg of other units g g Cost coefficient Ced for other loads d d .

[0133] The multi-energy equipment inside the integrated energy commercial complex includes small gas units, small cogeneration units, electric hot pots, gas hot pots, electric energy storage, thermal energy storage and small photovoltaics. The energy equipment plus transformers constitute the energy hub of the integrated energy commercial complex.

[0134] Small gas generator set GI power output upper and lower limits Gas-to-electricity efficiency The upper and lower limits of the electric output climbing: Operation cost coefficient CeGI gi .

[0135] The upper and lower limits of the power output of small combined heat and power units c Thermal output upper and lower limits Gas-to-electricity efficiency Gas-to-heat efficiency The upper and lower limits of the electric output Thermal output climbing upper and lower limits: Operating cost coefficient CeCHP c .

[0136] The upper and lower limits of the thermal output of the electric boiler eb Efficiency of electricity to heat Thermal output climbing upper and lower limits Operating cost coefficient CeEB eb .

[0137] The upper and lower limits of thermal output of gas boiler gb Efficiency of electricity to heat Thermal output climbing upper and lower limits Operation cost coefficient CeGB gb .

[0138] The upper and lower limits of charging power for electric energy storage e Discharge power upper and lower limits Energy state SOC upper and lower limits The initial value of the energy state SOC0, the energy storage charging and discharging efficiency ηec e ,ηed e , operating cost coefficient CeES e .

[0139] The upper and lower limits of the charging power of the thermal energy storage h Discharge power upper and lower limits Upper and lower limits of thermal energy storage capacity The initial value of the energy state EHS0, the energy storage charging and discharging efficiency ηhc h ,ηhd h , operating cost coefficient CeHS h .

[0140] The upper limit of the power output of small photovoltaic v,t Cost coefficient of abandoned photovoltaic power CePVcur v , operating cost coefficient CePV v .

[0141] It should be noted that the parameter information of new energy includes external wind power w information, and the average wind power output predicted at time t obtained based on historical data Standard deviation of wind power output According to the two historical parameters, the Monte Carlo sampling method and the scenario compression method based on probability distance are used to obtain S uncertainty scenarios. The probability of each scenario is

[0142] In a certain scenario, at time t, the maximum output of wind power w is

[0143] Wind power operation cost coefficient CeWT w , wind curtailment cost coefficient CeWTcur w .

[0144] S2: Based on comprehensive energy information, energy relations within comprehensive energy, and safe operation conditions, a self-dispatching model of comprehensive energy is established.

[0145] Furthermore, based on the integrated energy information, the energy relations within the integrated energy, and the safe operation conditions, a self-dispatching model of integrated energy is established, including determining the constraints of energy hub operation and bidding and determining the objective function.

[0146] According to the energy relationship within the comprehensive energy and the safe operation conditions, safe operation and establishment of energy coupling constraints.

[0147] Safe operation of internal equipment at time t, scenario s.

[0148] The safety constraints of small gas generator sets are expressed as:

[0149] GiG gi,t,s =K gas ViGI gi,t,s

[0150]

[0151] 0≤RGI gi,t,s

[0152]

[0153] Among them, GiGI gi,t,s is the power of the gas combustion input to the GI unit, K gas is the low combustion value of natural gas, ViGI gi,t,s is the volume of natural gas input to the gas generator set, PoGI gi,t,s is the electrical output of a small gas unit, RGI gi,t,s It is the reserve capacity provided by small gas-fired units. Reserve capacity refers to power reserve, which means that the unit uses part of its large power generation capacity for power generation and part of it for reserve, and the reserve capacity is used for emergency power generation in emergency situations (failures, etc.).

[0154] The safety constraints of small CHP units are expressed as:

[0155] GJP c,t,s =K gas ·ViCHP c,t,s

[0156]

[0157] 0≤RCHP c,t,s

[0158]

[0159] Among them, GiCHP c,t,s is the power of the gas combustion input to unit c, ViCHP c,t,s is the volume of natural gas input to CHP, PoCHP c,t,s , HoCHP c,t,s They are the electrical output and thermal output of small combined heat and power units, RCHP c,t,s It is the spare capacity provided by small cogeneration units.

[0160] The safety constraint of electric boiler is expressed as:

[0161]

[0162] Among them, HoEB eb,t,s is the heat output of the electric boiler EB, PiEB eb,t,s is the electrical power input to the electric hot pot.

[0163] The safety constraint of gas boiler is expressed as:

[0164] GiB gb,t,s =K gas ·ViGB gb,t,s

[0165]

[0166] Among them, GiGB gb,t,s is the power of the gas combustion input to the GB boiler, ViGB gb,t,s is the volume of natural gas input into GB. HoGB gb,t,s It is the heat output of the gas boiler gb.

[0167] The battery safety constraint is expressed as:

[0168]

[0169] 0≤RES e,t,s

[0170]

[0171] SOC e,t,s =SOC e,t-1,s +(ηec e ·Pc e,t,s -Pd e,t,s / ηed e )·Δt

[0172] SOC e,T,s =SOC0

[0173] Among them, Pc e,t,s , Pd e,t,s They are respectively the charging and discharging power of the energy storage e, SOC e,t,s is the state of charge of the energy storage e, Δt is the time interval, T is the total time, SOC e,T,s is the final energy state of energy storage, RES e,t,s It is the backup capacity provided by battery safe energy storage.

[0174] The thermal energy storage safety constraint is expressed as:

[0175]

[0176] EHS h,t,s =EHS h,t-1,s +(ηhc h ·Hc h,t,s -Hd h,t,s / ηhd h )·Δt

[0177] EHS e,T,s =EHS0

[0178] Among them, Hc h,t,s , Hd h,t,s are the charging and discharging power of thermal energy storage h, EHS e,t,s is the state of charge of the thermal energy storage h, EHS e,T,sIt is the final energy state of thermal energy storage.

[0179] The safety constraint of small photovoltaic is expressed as:

[0180]

[0181] Among them, PoPV v,t,s is the output of photovoltaic v.

[0182] The energy coupling relationship of the energy hub including the electrical load balance is expressed as:

[0183]

[0184] Among them, Po t,s ,Pi t,s are the power sold and purchased by the energy hub, D t It is the electrical load within the comprehensive energy.

[0185] The heat load balance is expressed as:

[0186]

[0187] Among them, H t It is the heat load within the comprehensive energy.

[0188] The gas composition balance is expressed as:

[0189]

[0190] Among them, Vi t,s It is the total gas purchase volume for comprehensive energy.

[0191] The capacity composition balance is expressed as:

[0192]

[0193] Among them, REH t,s It is the total amount of backup provided by comprehensive energy.

[0194] Safe operation constraints and energy coupling relationships constitute the operation constraints of comprehensive energy.

[0195] It should be noted that, based on the comprehensive energy information, the energy relationship within the comprehensive energy, and the safe operation conditions, the establishment of the comprehensive energy self-dispatching model also includes constructing the objective function of comprehensive energy dispatch with the minimum operation cost as the goal, which is expressed as:

[0196]

[0197]

[0198] in, They represent the gas purchase cost, electricity purchase cost, operation cost, solar power cutting cost, and reserve market income under scenario s. They represent the natural gas price at time t, the clearing electricity price of node N, the clearing capacity price, and F s is the total cost of the energy hub.

[0199] S3: Establish a comprehensive clearing model for the day-ahead energy market and the reserve market based on market information, new energy information and network information.

[0200] Furthermore, a comprehensive clearing model for the day-ahead energy market and the reserve market is established based on market information, new energy information and network information, including determining market rule conditions and network security operating conditions, and constructing an objective function.

[0201] According to the new energy information, network information and safe operation conditions, market and network constraints are established, including common unit constraints, which are expressed as:

[0202]

[0203] 0≤RG g,t,s

[0204] Among them, PG g,t,s , R.G. g,t,s They are the output and reserve capacity of unit g at time t and scenario s respectively.

[0205] The adjustable load is expressed as:

[0206]

[0207] Among them, PD d,t,s is the load amount of load d at time t and scenario s.

[0208] The wind turbine is represented by:

[0209]

[0210] Among them, PW w,t,s is the output of wind turbine w at time t and scenario s.

[0211] The line network constraints are expressed as:

[0212] F l min ≤PF l,t,s ≤F l max

[0213]

[0214] -π≤θ n,t,s≤π

[0215] θ ref,t,s =0

[0216] Among them, PF l,t,s is the excess flow of line l at time t and scenario s, θ n,t,s is the phase angle of node n at time t and scenario s, θ ref,t,s is the phase angle at the reference node ref, X nm is the admittance from n node to m node in the node admittance matrix X.

[0217] The energy hub bidding winning constraints are expressed as:

[0218] 0≤Po t,s ≤Pobid t

[0219] 0≤Pi t,s ≤Pibid t

[0220] 0≤REH t,s ≤REHbid t

[0221] 0≤αo t ≤αo max

[0222] 0≤αi t ≤αi max

[0223] 0≤αr t ≤αr max

[0224]

[0225] 0≤Pobid t

[0226] 0≤REH t,s

[0227]

[0228] Among them, Pobid t ,Pibid t ,REHbid t They are the electricity sales, electricity purchase bidding, and capacity bidding of comprehensive energy at time t, αo t , αi t , αr t , αo max , αi max , αr maxThey are the quotations for electricity sales, electricity purchases and capacity, as well as the upper limits of the three quotations.

[0229] The node power balance constraint is expressed as:

[0230]

[0231] Among them, PD d(n),t,s , P.G. g(n),t,s , PW w(n),t,s , Po (n),t,s ,Pi (n),t,s Indicated by PD d,t,s , P.G. g,t,s , PW w,t,s , Po t,s ,Pi t,s The node form of the conversion. is the dual variable of the constraint, which is the node electricity price of the market clearing in the scenario s at time t. It is the energy price at node N where the energy hub is located.

[0232] The capacity balance is expressed as:

[0233]

[0234] in, is the dual variable of the constraint, and is the capacity electricity price for market clearing in scenario s at time t.

[0235] The objective function constructed with the goal of maximizing social welfare is expressed as:

[0236]

[0237] S4: The two-level optimization problem is described using Matlab and solved using the gurobi commercial solver to obtain the optimal bidding method for energy hubs considering uncertainty.

[0238] Furthermore, the two-level optimization problem is described using Matlab and solved using the gurobi commercial solver, which includes programming the optimization problem with Matlab and solving it with Gurobi, to obtain the bidding method for energy hubs under the condition of renewable energy fluctuations.

[0239] Example 2

[0240] An embodiment of the present invention provides a bidding optimization method for energy hubs participating in energy and reserve markets with uncertainty. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments. The specific process of the experiment is mainly introduced here. The specific settings of the parameters are too many and will not be described in detail here.

[0241] Firstly, for energy hubs, the method proposed in the present invention increases the revenue of energy hubs and effectively avoids some market risks compared with ordinary bidding methods that do not consider market fluctuations.

[0242] Within the 24-hour trading range, and in the market environment, under the condition that the parameters of other market participants and new energy remain unchanged, change the bidding method of the energy hub. One method uses the method proposed by the present invention, taking into account the market clearing and new energy fluctuations; the other method does not consider the above factors and simply acts as a participant who passively accepts market prices. Design experiments to compare the size of the final benefits of energy hubs. The results are shown in the following table:

[0243]

[0244]

[0245] It can be seen that the method proposed in the present invention increases the revenue of energy hubs, reduces their additional costs due to market risks, increases the enthusiasm of energy hubs to participate in market transactions, and taps the potential of energy hubs to participate in market regulation.

[0246] Example 3

[0247] Reference Figure 2 , which is an embodiment of the present invention, provides a bidding optimization system for an uncertain energy hub participating in the energy and reserve market, including a data input module, an energy scheduling module, a clearing module, and a bidding solution module.

[0248] Among them, the data input module is used to input basic market information, basic information of energy hubs and parameter information of new energy, and establish an uncertainty model of new energy output outside the energy hub; the energy scheduling module is used to establish a self-scheduling model of comprehensive energy based on comprehensive energy information, energy relations within comprehensive energy and safe operation conditions; the clearing module is used to establish a comprehensive clearing model of the day-ahead energy market and the reserve market based on market information, new energy information and network information; the bidding solution module uses Matlab to describe the two-layer optimization problem, and uses the gurobi commercial solver to solve it, and obtains the optimal bidding method for energy hubs considering uncertainty.

[0249] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0250] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0251] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering, or processing in another suitable manner as necessary, and then stored in a computer memory.

[0252] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc. It should be noted that the above embodiments are only used to illustrate the technical solution of the present invention and are not limited. Although the present invention is described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

[0253] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. An optimization method for bidding on energy hubs participating in energy and reserve markets under uncertainty. It is characterized in that include: Input basic market information, basic information of energy hubs and parameter information of new energy, and establish an uncertainty model of new energy output outside the energy hub; Based on comprehensive energy information, energy relations within comprehensive energy, and safe operation conditions, a self-dispatching model for comprehensive energy is established; Establish a comprehensive clearing model for the day-ahead energy market and reserve market based on market information, new energy information and network information; The bi-level optimization problem is described using Matlab and solved using the gurobi commercial solver to obtain the optimal bidding method for energy hubs considering uncertainties.

2. The bidding optimization method for the energy hub to participate in the energy and reserve market under uncertainty as described in claim 1, Features: The basic information of the input market and the basic information of the energy hub include network information, basic information of other participants in the energy market and the backup market, and information of various devices within the comprehensive energy; The network information includes the upper and lower limits F of the transmission capacity of the transmission line l l max ,F l min , the output upper and lower limits of other units g At time t, the upper and lower limits of load d The reserve R required by the market at time t t , the topology of the network, the node admittance matrix X; Market information includes the cost coefficient Ceg of other units g g , the reserve compensation cost coefficient Crg of other units g g Cost coefficient Ced for other loads d d ; The multi-energy equipment inside the integrated energy commercial complex includes small gas units, small cogeneration units, electric hot pots, gas hot pots, electric energy storage, thermal energy storage and small photovoltaics. The energy equipment plus transformers constitute the energy hub of the integrated energy commercial complex. Small gas generator set GI power output upper and lower limits Gas-to-electricity efficiency The upper and lower limits of the electric output climbing: Operation cost coefficient CeGI gi ; The upper and lower limits of the power output of small combined heat and power units c Thermal output upper and lower limits Gas-to-electricity efficiency Gas-to-heat efficiency The upper and lower limits of the electric output Thermal output climbing upper and lower limits: Operating cost coefficient CeCHP c ; The upper and lower limits of the thermal output of the electric boiler eb Efficiency of electricity to heat Thermal output climbing upper and lower limits Operating cost coefficient CeEB eb ; The upper and lower limits of thermal output of gas boiler gb Efficiency of electricity to heat Thermal output climbing upper and lower limits Operation cost coefficient CeGB gb ; The upper and lower limits of charging power for electric energy storage e Discharge power upper and lower limits Energy state SOC upper and lower limits The initial value of the energy state SOC0, the energy storage charging and discharging efficiency ηec e ,ηed e , operating cost coefficient CeES e ; The upper and lower limits of the charging power of the thermal energy storage h Discharge power upper and lower limits Upper and lower limits of thermal energy storage capacity The initial value of the energy state EHS0, the energy storage charging and discharging efficiency ηhc h ,ηhd h , operating cost coefficient CeHS h ; The upper limit of the power output of small photovoltaic v,t CePVcur v , operating cost coefficient CePV v .

3. The bidding optimization method for the energy hub to participate in the energy and reserve market under uncertainty as described in claim 2, Features: The parameter information of the new energy includes external wind power w information, the average wind power output predicted at time t obtained based on historical data Standard deviation of wind power output According to the two historical parameters, the Monte Carlo sampling method and the scenario compression method based on probability distance are used to obtain S uncertainty scenarios. The probability of each scenario is In a certain scenario, at time t, the maximum output of wind power w is Wind power operation cost coefficient CeWT w , wind curtailment cost coefficient CeWTcur w .

4. The bidding optimization method for the energy hub to participate in the energy and reserve market under uncertainty as described in claim 3, Features: The self-dispatching model of comprehensive energy is established based on comprehensive energy information, energy relations within comprehensive energy, and safe operation conditions, including determining the constraints of energy hub operation and bidding and determining the objective function; According to the energy relationship and safe operation conditions within the comprehensive energy, safe operation and establishment of energy coupling constraints; Safe operation of internal equipment, at time t, in scenario s; The safety constraints of small gas generator sets are expressed as: Tooth gi,t,s =K gas ·ViGI gi,t,s 0≤RGI gi,t,s Among them, GiGI gi,t,s is the power of the gas combustion input to the GI unit, K gas is the low combustion value of natural gas, ViGI gi,t,s is the volume of natural gas input to the gas generator set, PoGI gi,t,s is the electrical output of a small gas unit, RGI gi,t,s It is the spare capacity provided by small gas units; The safety constraints of small combined heat and power units are expressed as: GiCHP c,t,s =K gas ·ViCHP c,t,s 0≤RCHP c,t,s Among them, GiCHP c,t,s is the power of the gas combustion input to unit c, ViCHP c,t,s is the volume of natural gas input to CHP, PoCHP c,t,s , HoCHP c,t,s They are the electrical output and thermal output of small combined heat and power units, RCHP c,t,s It is the spare capacity provided by small CHP units; The safety constraint of electric boiler is expressed as: Among them, HoEB eb,t,s is the heat output of the electric boiler EB, PiEB eb,t,s is the electrical power input to the electric hot pot. The safety constraint of gas boiler is expressed as: GB gb,t,s =K gas ·ViGB gb,t,s Among them, GiGB gb,t,s is the power of the gas combustion input to the GB boiler, ViGB gb,t,s is the volume of natural gas input into GB. HoGB gb,t,s It is the heat output of the gas boiler gb. The battery safety constraint is expressed as: 0≤RES e,t,s SOC e,t,s =SOC e,t-1,s +(ηec e ·Pc e,t,s -Pd e,t,s / ηed e )·Δt SOC e,T,s =SOC0 Among them, Pc e,t,s , Pd e,t,s They are respectively the charging and discharging power of the energy storage e, SOC e,t,s is the state of charge of the energy storage e, Δt is the time interval, T is the total time, SOC e,T,s is the final energy state of energy storage, RES e,t,s It is the backup capacity provided by battery safe energy storage; The thermal energy storage safety constraint is expressed as: EHS h,t,s =EHS h,t-1,s +(ηhc h ·Hc h,t,s -Hd h,t,s / ηhd h )·Δt EHS e,T,s =EHS0 Among them, Hc h,t,s , Hd h,t,s are the charging and discharging power of thermal energy storage h, EHS e,t,s is the state of charge of the thermal energy storage h, EHS e,T,s It is the final energy state of thermal energy storage; The safety constraint of small photovoltaic is expressed as: Among them, PoPV v,t,s is the output of photovoltaic v; The energy coupling relationship of the energy hub including the electrical load balance is expressed as: Among them, Po t,s ,Pi t,s are the power sold and purchased by the energy hub, D t It is the electrical load within the integrated energy source; The heat load balance is expressed as: Among them, H t is the heat load within the integrated energy source; The gas composition balance is expressed as: Among them, Vi t,s is the total gas purchase volume for comprehensive energy; The capacity composition balance is expressed as: Among them, REH t,s It is the total amount of backup provided by comprehensive energy; Safe operation constraints and energy coupling relationships constitute the operation constraints of comprehensive energy.

5. The bidding optimization method for the energy hub to participate in the energy and reserve market under uncertainty as described in claim 4, Features: The self-dispatching model of comprehensive energy is established based on comprehensive energy information, energy relations within comprehensive energy, and safe operation conditions, and the objective function of comprehensive energy dispatch is constructed with the minimum operation cost as the goal, which is expressed as: Among them, COST s gas , COST s ele , COST s op , COST s cur , They represent the gas purchase cost, electricity purchase cost, operation cost, solar power cutting cost, and reserve market income under scenario s. They represent the natural gas price at time t, the clearing electricity price of node N, the clearing capacity price, and F s is the total cost of the energy hub.

6. The bidding optimization method for the energy hub to participate in the energy and reserve market under uncertainty as described in claim 5, Features: The comprehensive clearing model for the day-ahead energy market and the reserve market is established based on market information, new energy information and network information, including determining market rule conditions and network security operation conditions, and constructing an objective function; According to the new energy information, network information and safe operation conditions, market and network constraints are established, including common unit constraints, which are expressed as: 0≤RG g,t,s Among them, PG g,t,s , R.G. g,t,s They are the output and reserve of unit g at time t and scenario s respectively; The adjustable load is expressed as: Among them, PD d,t,s is the load d at time t and scenario s; The wind turbine is represented by: Among them, PW w,t,s is the output of wind turbine w at time t and scenario s; The line network constraints are expressed as: F l min ≤PF l,t,s ≤F l max -π≤θ n,t,s ≤π i ref,t,s =0 Among them, PF l,t,s is the excess flow of line l at time t and scenario s, θ n,t,s is the phase angle of node n at time t and scenario s, θ ref,t,s is the phase angle at the reference node ref, X nm is the admittance from n node to m node in the node admittance matrix X; The energy hub bidding winning constraints are expressed as: 0≤Po t,s ≤Pobid t 0≤Pi t,s ≤Pibid t 0≤REH t,s ≤REHbid t 0≤αo t ≤αo max 0≤αi t ≤αi max 0≤αr t ≤αr max 0≤Pobid t 0≤REH t,s Among them, Pobid t ,Pibid t ,REHbid t They are the electricity sales, electricity purchase bidding, and capacity bidding of comprehensive energy at time t, αo t , αi t , αr t , αo max , αi max , αr max They are the quotations for electricity sales, electricity purchases, and capacity, as well as the upper limits of the quotations for the three; The node power balance constraint is expressed as: Among them, PD d(n),t,s , P.G. g(n),t,s , PW w(n),t,s , Po (n),t,s ,Pi (n),t,s Indicated by PD d,t,s , P.G. g,t,s , PW w,t,s , Po t,s ,Pi t,s The node form of the transformation; is the dual variable of the constraint, which is the node electricity price of the market clearing in the scenario s at time t. is the energy price at node N where the energy hub is located; The capacity balance is expressed as: in, is the dual variable of the constraint, which is the capacity price of market clearing in scenario s at time t; The objective function constructed with the goal of maximizing social welfare is expressed as:

7. The bidding optimization method for the energy hub to participate in the energy and reserve market under uncertainty as claimed in claim 6, Features: The use of Matlab to describe the double-layer optimization problem and the use of the gurobi commercial solver to solve it includes programming the optimization problem with Matlab and solving it with Gurobi to obtain a bidding method for energy hubs under the condition of new energy fluctuations.

8. A system using the bidding optimization method for energy hubs participating in energy and reserve markets with uncertainty as described in any one of claims 1 to 7, Features: It includes data input module, energy dispatch module, clearing module and bidding solution module; The data input module is used to input basic market information, basic information of energy hubs and parameter information of new energy, and establish an uncertainty model of new energy output outside the energy hub; The energy scheduling module is used to establish a self-scheduling model of comprehensive energy based on comprehensive energy information, energy relations within comprehensive energy, and safe operation conditions; The clearing module is used to establish a comprehensive clearing model for the day-ahead energy market and the reserve market based on market information, new energy information and network information; The bidding solution module uses Matlab to describe the two-level optimization problem and uses the gurobi commercial solver to solve it, thereby obtaining an optimized bidding method for energy hubs considering uncertainty.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the bidding optimization method for the uncertain energy hub participating in the energy and reserve market according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the bidding optimization method for the participation of an uncertain energy hub in the energy and reserve market according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Random-robust optimization operation method for virtual power plant participating in day-ahead dual market

    CN111682536A

  • Clearing method for participation of multi-element small and micro subjects in spot market based on virtual power plant

    CN112529622A

  • Quantitative optimization analysis method and system for uncertain factors of comprehensive service station

    CN113255957A

  • Virtual power plant operator day-ahead electricity market bidding optimization method for risk avoidance

    CN117910655A

  • Energy and auxiliary service joint optimization method considering frequency modulation mileage demand constraint

    WO2023082223A1