Comprehensive energy system operation optimization method and system for electric power spot market
The integrated energy system optimization method synchronizes with electricity spot market prices through day-ahead, intraday, and real-time optimization to enhance energy utilization and reduce costs, addressing the inefficiencies of real-time market participation.
Patent Information
- Application Number
- CN202411586905.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-08
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technologies lack effective strategies for integrated energy systems to participate in real-time electricity markets, particularly in the electricity spot market, where prices fluctuate, leading to inefficiencies and increased costs.
A comprehensive optimization method and system that includes day-ahead, intraday, and real-time optimization stages to minimize energy costs by synchronizing with electricity spot market prices, using data from new energy output, load forecasts, and conventional generation plans, and controlling devices to adjust power generation and consumption.
Improves energy utilization rate, reduces grid electricity purchase costs, and enhances system reliability by optimizing energy cascade utilization and coordinating daily and real-time plans.
Smart Images

Figure CN119093371A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of resource allocation optimization of integrated energy systems, and in particular to an integrated energy system operation optimization method and system for a power spot market. Background Art
[0002] At present, existing technologies mainly focus on the research of optimized operation strategies for multiple types of energy in integrated energy systems to participate in the medium- and long-term electricity market, and most of them are concentrated in the day-ahead stage. There are few studies on the integrated energy system's participation in the intraday market and the real-time market, especially the lack of research on how multiple types of resources participate in the real-time market when the purchase price of electricity fluctuates in real time. Therefore, it is urgent to propose an optimized economic operation strategy for the integrated energy system to participate in the electricity spot market under multiple time scales based on the classification and grading regulation capabilities of the integrated energy system, targeting the operation mechanism of the electricity spot market, and for large-scale integrated energy systems that are operated autonomously. Summary of the invention
[0003] The purpose of the present invention is to provide a method and system for optimizing the operation of an integrated energy system for the electricity spot market, thereby improving the adaptability of the integrated energy system to price fluctuations in the electricity spot market and achieving more efficient use of energy.
[0004] To achieve the purpose of the present invention, the technical solution provided by the present invention is as follows: First aspect This application provides a comprehensive energy system operation optimization method for the electricity spot market, comprising the following steps: Step S1: Obtain the day-ahead new energy output forecast data, day-ahead load forecast data, and day-ahead conventional power generation plan data of the integrated energy system; Step S2: combining the day-ahead new energy output forecast data, the day-ahead load forecast data, and the day-ahead conventional power generation plan data to obtain a preliminary power purchase and sales curve; Step S3: In the day-ahead optimization stage, the preliminary power purchase and sales curve is optimized, with the goal of minimizing the comprehensive energy cost of the integrated energy system for the next day, to obtain the optimal power purchase and sales curve for the next day, and the optimal power purchase and sales curve for the next day is reported to the power trading center; Step S4: In the intraday optimization stage, in combination with the published electricity spot market clearing electricity price and the prediction of the real-time electricity price, the optimal purchase and sale electricity curve for the next day is corrected with the goal of minimizing the comprehensive energy cost, and a corrected purchase and sale electricity curve is obtained; the intraday power generation and consumption plan of the comprehensive energy system is arranged in advance according to the corrected purchase and sale electricity curve, and the intraday time-sharing power plan curve is obtained; Step S5: In the real-time stage, the intra-day time-of-use power plan curve is optimized synchronously with the power spot market with a rolling optimization cycle of 15 minutes, with the goal of minimizing the comprehensive energy cost, to obtain the latest power generation and consumption plan curve; Step S6: Control each device in the integrated energy system to output power according to the latest power generation and consumption plan curve.
[0005] In the second aspect, the present application provides an integrated energy system operation optimization system for the electricity spot market, including the following units: a data acquisition unit, a preliminary power purchase and sales curve acquisition unit, a day-ahead optimization stage processing unit, an intraday optimization stage processing unit, a real-time stage processing unit, and an output unit; The data acquisition unit is used to acquire the day-ahead new energy output forecast data, day-ahead load forecast data, and day-ahead conventional power generation plan data of the integrated energy system; The preliminary power purchase and sale curve acquisition unit is used to obtain a preliminary power purchase and sale curve by combining the day-ahead new energy output forecast data, the day-ahead load forecast data, and the day-ahead conventional power generation plan data; The day-ahead optimization stage processing unit is used to optimize the preliminary power purchase and sales curve in the day-ahead optimization stage, with the goal of minimizing the comprehensive energy cost of the comprehensive energy system on the next day, obtain the optimal power purchase and sales curve for the next day, and report the optimal power purchase and sales curve for the next day to the power trading center; The intraday optimization stage processing unit is used to, in the intraday optimization stage, combine the published electricity spot market clearing electricity price and the prediction of the real-time electricity price, with the goal of minimizing the comprehensive energy cost, to correct the optimal purchase and sale curve of the next day, and obtain the corrected purchase and sale curve of electricity; arrange the intraday power generation and consumption plan of the comprehensive energy system in advance according to the corrected purchase and sale curve of electricity, and obtain the intraday time-sharing power plan curve; The real-time stage processing unit is used to perform rolling optimization on the intra-day time-of-use power plan curve in real-time stage, with the goal of minimizing the comprehensive energy cost, with a cycle of 15 minutes, synchronously with the power spot market, to obtain the latest power generation and consumption plan curve; The output unit is used to control each device in the integrated energy system to output power according to the latest power generation and consumption plan curve.
[0006] Compared with the prior art, the solution provided by the present invention can be applied to the energy cascade utilization of the electric-heat-cold integrated energy system, thereby improving the energy utilization rate of the system; more importantly, by designing an optimization method synchronized with the operation mechanism of the electricity spot market, rolling optimization is implemented in the real-time optimization stage, which is conducive to the coordination between the daily global plan and the real-time local plan of the park. At the same time, the solution provided by the present invention can reduce the cost of purchasing electricity from the power grid for the integrated energy system, greatly improve the energy utilization rate and the new energy consumption rate, and improve the reliability of the power grid operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] Figure 1 A schematic diagram of a method flow chart provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0008] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0009] like Figure 1 As shown, this embodiment provides an integrated energy system operation optimization method for the power spot market, including the following steps: Step S1: Obtain the day-ahead new energy output forecast data, day-ahead load forecast data, and day-ahead conventional power generation plan data of the integrated energy system; Step S2: combining the day-ahead new energy output forecast data, the day-ahead load forecast data, and the day-ahead conventional power generation plan data to obtain a preliminary power purchase and sales curve; Step S3: In the day-ahead optimization stage, the preliminary power purchase and sales curve is optimized, with the goal of minimizing the comprehensive energy cost of the integrated energy system for the next day, to obtain the optimal power purchase and sales curve for the next day, and the optimal power purchase and sales curve for the next day is reported to the power trading center; Step S4: In the intraday optimization stage, in combination with the published electricity spot market clearing electricity price and the prediction of the real-time electricity price, the optimal purchase and sale electricity curve for the next day is corrected with the goal of minimizing the comprehensive energy cost, and a corrected purchase and sale electricity curve is obtained; the intraday power generation and consumption plan of the comprehensive energy system is arranged in advance according to the corrected purchase and sale electricity curve, and the intraday time-sharing power plan curve is obtained; Step S5: In the real-time stage, the intra-day time-of-use power plan curve is optimized synchronously with the power spot market with a rolling optimization cycle of 15 minutes, with the goal of minimizing the comprehensive energy cost, to obtain the latest power generation and consumption plan curve; Step S6: Control each device in the integrated energy system to output power according to the latest power generation and consumption plan curve.
[0010] It should be noted that the above-mentioned day-ahead optimization stage, intraday optimization stage and real-time stage are all common terms in the industry. Among them, the day-ahead optimization stage refers to the day before the actual electricity consumption of power market participants, and the intraday optimization stage refers to any time on the actual operation day of the system until the actual delivery of electricity; the real-time stage refers to the time period closest to the actual power delivery in power trading and dispatching. At this stage, the integrated energy system operator conducts instant power dispatching and trading according to the current power grid conditions and demand changes.
[0011] It should be noted that the above method includes three optimization processes, namely the day-ahead optimization stage, the intraday optimization stage, and the real-time stage, which is a rolling optimization performed synchronously with the spot market. The intraday optimization stage is similar to the day-ahead optimization stage, but the difference is that the day-ahead optimization stage is based on the predicted electricity price, while in the intraday optimization stage, the clearing electricity price has been released and the spot price of the day-ahead market has been determined, so the intraday optimization stage is based on the known clearing electricity price.
[0012] It should be noted that the goal of the day-ahead optimization stage is to minimize the comprehensive energy cost of the integrated energy system for the next day. In terms of constraints, energy balance constraints, equipment operation constraints, random probability constraints on load and distributed energy output, power constraints, and deviation penalties between the day-ahead predicted electricity price and the medium- and long-term contract electricity price must also be considered.
[0013] It should be noted that in the day-ahead optimization, the uncertainty factors of load and distributed generation output are taken into account, so random probability constraints are required, and the form of probability constraints is as follows: ; in, express A The probability that the condition is true, Indicates the confidence that the condition is true. express Output of CCHP system during the period, express Purchase power from the grid during the period. , They represent the discharging and charging power of the energy storage, respectively. Indicates the electrical load, Indicates the output of distributed generation equipment.
[0014] It should be noted that the intraday optimization stage is based on the cleared market electricity price and the prediction of the real-time electricity price. The intraday optimization stage also aims to minimize the comprehensive energy cost of the park, and further optimizes the day-ahead optimization curve in combination with the regulation capacity of each device.
[0015] It should be noted that the current real-time spot electricity market adopts a rolling optimization clearing method to synchronize with the market. The real-time optimization stage also adopts a rolling optimization method with a cycle of 15 minutes. The real-time rolling optimization stage is synchronized with the spot market. This stage needs to achieve two main goals: 1. Track and predict the real-time electricity price according to a fixed cycle (15 minutes), so as to optimize the power of each unit, energy storage and other equipment in the system within the range allowed by the difference contract, thereby reducing the cost of purchasing electricity from the power grid in the park; 2. With the goal of minimizing the comprehensive energy cost, correct the deviation of the day-ahead plan and achieve coordination between the intraday plan and the real-time plan.
[0016] It should be noted that the integrated energy system is an electricity-heat-cold integrated energy system.
[0017] The day-ahead new energy output forecast data includes the total system power generation and the total system heating power; the day-ahead load forecast data includes the electric load, heat load and cooling load; Specifically, in step S2, the preliminary electricity purchase and sales curve is obtained through the following steps: Step S2.1: Compare the total power generation power and the power load of the system to obtain a first power gap value; compare the total heating power and the heat load of the system to obtain a first heat gap value; the total power generation power of the system is provided by distributed energy output, gas turbine power supply and electric energy storage discharge; the total heating power of the system is provided by gas turbine heat supply; It should be noted that the first electricity gap value = electricity load - total system power generation power; the first heat gap value = heat load - total system heating power.
[0018] Step S2.2: If the value of the first electricity gap is greater than 0, increase the amount of electricity purchased from the power grid, and the amount of electricity to be purchased is recorded as the second electricity gap value; if the value of the first electricity gap is less than or equal to 0, the remaining electricity is used to generate power for the electric refrigeration equipment; if there is still electricity left after being used for the electric refrigeration equipment, electricity is sold to the power grid to obtain electricity sales data; If the value of the first heat gap is greater than 0, add a gas boiler to assist in providing heat energy. If the heat load cannot be met even when the gas boiler is fully powered, the remaining unmet heat load is recorded as the value of the second heat gap. If the value of the first heat gap is less than or equal to 0, the remaining heat is used to power the lithium bromide refrigeration equipment. Step S2.3: Calculate whether the total output of the electric refrigeration equipment and the lithium bromide refrigeration equipment meets the cooling load requirement. If so, the electric refrigeration equipment and the lithium bromide refrigeration equipment supply the cooling load, and the electric refrigeration equipment is used first; if not, a first cooling gap value is generated; It should be noted that the first cold gap value = cooling load - total output of electric refrigeration equipment and lithium bromide refrigeration equipment.
[0019] Step S2.4: Compare the first cold gap value with the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment. If the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment still cannot meet the cooling load, the remaining unmet cooling load is recorded as the second cold gap value; Step S2.5: Based on the second electricity gap value, the second heat gap value and the second cold gap value, the required electric energy is purchased from the power grid, and the purchased required electric energy should satisfy the second electricity gap value, the second heat gap value and the second cold gap value can all be filled, thereby obtaining the electricity purchase data; Step S2.6: Obtain the preliminary electricity purchase and sales curve based on the electricity purchase data and the electricity sales data.
[0020] It should be noted that this method is a cascaded energy utilization for the trigeneration system. In the first tier, the requirements of the electric load are considered first, and the electric load is supplied by the output of electric energy storage equipment, distributed energy, gas turbines and other equipment; at the same time, the gas turbine generates thermal power in the form of electricity to heat, thereby meeting the first-level supply of electricity and heat loads and forming corresponding electricity and heat gaps.
[0021] It should be noted that in the second stage, based on the electricity and heat gaps generated in the first stage, on the basis of meeting the electricity and heat loads, it is considered whether the total output of electric refrigeration and lithium bromide refrigeration can meet the cooling load requirements.
[0022] Accordingly, the present embodiment further provides a comprehensive energy system operation optimization system for the power spot market, comprising the following units: a data acquisition unit, a preliminary power purchase and sales curve acquisition unit, a day-ahead optimization phase processing unit, an intraday optimization phase processing unit, a real-time phase processing unit, and an output unit; The data acquisition unit is used to acquire the day-ahead new energy output forecast data, day-ahead load forecast data, and day-ahead conventional power generation plan data of the integrated energy system; The preliminary power purchase and sale curve acquisition unit is used to obtain a preliminary power purchase and sale curve by combining the day-ahead new energy output forecast data, the day-ahead load forecast data, and the day-ahead conventional power generation plan data; The day-ahead optimization stage processing unit is used to optimize the preliminary power purchase and sales curve in the day-ahead optimization stage, with the goal of minimizing the comprehensive energy cost of the comprehensive energy system on the next day, obtain the optimal power purchase and sales curve for the next day, and report the optimal power purchase and sales curve for the next day to the power trading center; The intraday optimization stage processing unit is used to, in the intraday optimization stage, combine the published electricity spot market clearing electricity price and the prediction of the real-time electricity price, with the goal of minimizing the comprehensive energy cost, to correct the optimal purchase and sale curve of the next day, and obtain the corrected purchase and sale curve of electricity; arrange the intraday power generation and consumption plan of the comprehensive energy system in advance according to the corrected purchase and sale curve of electricity, and obtain the intraday time-sharing power plan curve; The real-time stage processing unit is used to perform rolling optimization on the intra-day time-of-use power plan curve in real-time stage, with the goal of minimizing the comprehensive energy cost, with a cycle of 15 minutes, synchronously with the power spot market, to obtain the latest power generation and consumption plan curve; The output unit is used to control each device in the integrated energy system to output power according to the latest power generation and consumption plan curve.
[0023] Among them, the integrated energy system is an electricity-heat-cold integrated energy system.
[0024] The day-ahead new energy output forecast data includes the total system power generation and the total system heating power; the day-ahead load forecast data includes the electric load, heat load and cooling load; The preliminary electricity purchase and sales curve is obtained through the following steps: Step S2.1: Compare the total power generation power and the power load of the system to obtain a first power gap value; compare the total heating power and the heat load of the system to obtain a first heat gap value; the total power generation power of the system is provided by distributed energy output, gas turbine power supply and electric energy storage discharge; the total heating power of the system is provided by gas turbine heat supply; Step S2.2: If the value of the first electricity gap is greater than 0, increase the amount of electricity purchased from the power grid, and the amount of electricity to be purchased is recorded as the second electricity gap value; if the value of the first electricity gap is less than or equal to 0, the remaining electricity is used to generate power for the electric refrigeration equipment; if there is still electricity left after being used for the electric refrigeration equipment, electricity is sold to the power grid to obtain electricity sales data; If the value of the first heat gap is greater than 0, add a gas boiler to assist in providing heat energy. If the heat load cannot be met even when the gas boiler is fully powered, the remaining unmet heat load is recorded as the value of the second heat gap. If the value of the first heat gap is less than or equal to 0, the remaining heat is used to power the lithium bromide refrigeration equipment. Step S2.3: Calculate whether the total output of the electric refrigeration equipment and the lithium bromide refrigeration equipment meets the cooling load requirement. If so, the electric refrigeration equipment and the lithium bromide refrigeration equipment supply the cooling load, and the electric refrigeration equipment is used first; if not, a first cooling gap value is generated; Step S2.4: Compare the first cold gap value with the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment. If the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment still cannot meet the cooling load, the remaining unmet cooling load is recorded as the second cold gap value; Step S2.5: Based on the second electricity gap value, the second heat gap value and the second cold gap value, the required electric energy is purchased from the power grid, and the purchased required electric energy should satisfy the second electricity gap value, the second heat gap value and the second cold gap value can all be filled, thereby obtaining the electricity purchase data; Step S2.6: Obtain the preliminary electricity purchase and sales curve based on the electricity purchase data and the electricity sales data.
[0025] When the day-ahead optimization stage processing unit is executed, probability constraints need to be performed, and the form of the probability constraints is as follows: ; in, express A The probability that the condition is true, Indicates the confidence that the condition is true. express Output of CCHP system during the period, express Purchase power from the grid during the period. , They represent the discharging and charging power of the energy storage, respectively. Indicates the electrical load, Indicates the output of distributed generation equipment.
[0026] Finally, it should be noted that the above embodiments are only used to illustrate and explain the present invention, and are not intended to limit the present invention to the scope of the described embodiments. In addition, those skilled in the art can understand that the present invention is not limited to the above embodiments, and more variations and modifications can be made according to the teachings of the present invention, and these variations and modifications all fall within the scope of the protection claimed by the present invention.
Claims
1. A comprehensive energy system operation optimization method for the electricity spot market, characterized in that: The steps include: Step S1: Obtain the day-ahead new energy output forecast data, day-ahead load forecast data, and day-ahead conventional power generation plan data of the integrated energy system; Step S2: combining the day-ahead new energy output forecast data, the day-ahead load forecast data, and the day-ahead conventional power generation plan data to obtain a preliminary power purchase and sales curve; Step S3: In the day-ahead optimization stage, the preliminary power purchase and sales curve is optimized, with the goal of minimizing the comprehensive energy cost of the integrated energy system for the next day, to obtain the optimal power purchase and sales curve for the next day, and the optimal power purchase and sales curve for the next day is reported to the power trading center; Step S4: In the intraday optimization stage, in combination with the published electricity spot market clearing electricity price and the prediction of the real-time electricity price, the optimal purchase and sale electricity curve for the next day is corrected with the goal of minimizing the comprehensive energy cost, and a corrected purchase and sale electricity curve is obtained; the intraday power generation and consumption plan of the comprehensive energy system is arranged in advance according to the corrected purchase and sale electricity curve, and the intraday time-sharing power plan curve is obtained; Step S5: In the real-time stage, the intra-day time-of-use power plan curve is optimized synchronously with the power spot market with a rolling optimization cycle of 15 minutes, with the goal of minimizing the comprehensive energy cost, to obtain the latest power generation and consumption plan curve; Step S6: Control each device in the integrated energy system to output power according to the latest power generation and consumption plan curve.
2. The method for optimizing the operation of an integrated energy system for the electricity spot market according to claim 1, characterized in that: The integrated energy system is an electricity-heat-cold integrated energy system.
3. The method for optimizing the operation of an integrated energy system for the electricity spot market according to claim 2, characterized in that: The day-ahead new energy output forecast data includes the system total power generation power and the system total heating power; the day-ahead load forecast data includes the electric load, heat load and cooling load.
4. The method for optimizing the operation of an integrated energy system for the electricity spot market according to claim 3, characterized in that: In step S2, the preliminary electricity purchase and sales curve is obtained through the following steps: Step S2.1: Compare the total power generation power and the power load of the system to obtain a first power gap value; compare the total heating power and the heat load of the system to obtain a first heat gap value; the total power generation power of the system is provided by distributed energy output, gas turbine power supply and electric energy storage discharge; the total heating power of the system is provided by gas turbine heat supply; Step S2.2: If the value of the first electricity gap is greater than 0, increase the amount of electricity purchased from the power grid, and the amount of electricity to be purchased is recorded as the second electricity gap value; if the value of the first electricity gap is less than or equal to 0, the remaining electricity is used to generate electricity for the electric refrigeration equipment; If there is still electricity left after using it for electric refrigeration equipment, the electricity will be sold to the power grid to obtain electricity sales data; If the value of the first heat gap is greater than 0, add a gas boiler to assist in providing heat energy. If the heat load cannot be met even when the gas boiler is fully powered, the remaining unmet heat load is recorded as the value of the second heat gap. If the value of the first heat gap is less than or equal to 0, the remaining heat is used to power the lithium bromide refrigeration equipment. Step S2.3: Calculate whether the total output of the electric refrigeration equipment and the lithium bromide refrigeration equipment meets the cooling load requirement. If so, the electric refrigeration equipment and the lithium bromide refrigeration equipment supply the cooling load, and the electric refrigeration equipment is used first; if not, a first cooling gap value is generated; Step S2.4: Compare the first cold gap value with the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment. If the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment still cannot meet the cooling load, the remaining unsatisfied cooling load is recorded as the second cold gap value; Step S2.5: Based on the second electricity gap value, the second heat gap value and the second cold gap value, the required electric energy is purchased from the power grid, and the required electric energy purchased should satisfy the second electricity gap value, the second heat gap value and the second cold gap value can all be filled, thereby obtaining the electricity purchase data; Step S2.6: Obtain the preliminary electricity purchase and sales curve based on the electricity purchase data and the electricity sales data.
5. The method for optimizing the operation of an integrated energy system for the electricity spot market according to claim 4, characterized in that: In step S3, probability constraints are required, and the form of probability constraints is as follows: ; in, express A The probability that the condition is true, Indicates the confidence that the condition is true. express Output of CCHP system during the period, express Purchase power from the grid during the period. , They represent the discharging and charging power of the energy storage, respectively. Indicates the electrical load, Indicates the output of distributed generation equipment.
6. An integrated energy system operation optimization system for the electricity spot market, characterized in that: It includes the following units: data acquisition unit, preliminary power purchase and sales curve acquisition unit, day-ahead optimization stage processing unit, intraday optimization stage processing unit, real-time stage processing unit, and output unit; The data acquisition unit is used to acquire the day-ahead new energy output forecast data, day-ahead load forecast data, and day-ahead conventional power generation plan data of the integrated energy system; The preliminary power purchase and sale curve acquisition unit is used to obtain a preliminary power purchase and sale curve by combining the day-ahead new energy output forecast data, the day-ahead load forecast data, and the day-ahead conventional power generation plan data; The day-ahead optimization stage processing unit is used to optimize the preliminary power purchase and sales curve in the day-ahead optimization stage, with the goal of minimizing the comprehensive energy cost of the comprehensive energy system on the next day, obtain the optimal power purchase and sales curve for the next day, and report the optimal power purchase and sales curve for the next day to the power trading center; The intraday optimization stage processing unit is used to, in the intraday optimization stage, combine the published electricity spot market clearing electricity price and the prediction of the real-time electricity price, with the goal of minimizing the comprehensive energy cost, to correct the optimal purchase and sale curve of the next day, and obtain the corrected purchase and sale curve of electricity; arrange the intraday power generation and consumption plan of the comprehensive energy system in advance according to the corrected purchase and sale curve of electricity, and obtain the intraday time-sharing power plan curve; The real-time stage processing unit is used to perform rolling optimization on the intra-day time-of-use power plan curve in real-time stage, with the goal of minimizing the comprehensive energy cost, with a cycle of 15 minutes, synchronously with the power spot market, to obtain the latest power generation and consumption plan curve; The output unit is used to control each device in the integrated energy system to output power according to the latest power generation and consumption plan curve.
7. The integrated energy system operation optimization system for the electricity spot market according to claim 6 is characterized in that: The integrated energy system is an electricity-heat-cold integrated energy system.
8. The integrated energy system operation optimization system for the electricity spot market according to claim 7 is characterized in that: The day-ahead new energy output forecast data includes the system total power generation power and the system total heating power; the day-ahead load forecast data includes the electric load, heat load and cooling load.
9. The integrated energy system operation optimization system for the electricity spot market according to claim 8, characterized in that: The preliminary electricity purchase and sales curve is obtained through the following steps: Step S2.1: Compare the total power generation power and the power load of the system to obtain a first power gap value; compare the total heating power and the heat load of the system to obtain a first heat gap value; the total power generation power of the system is provided by distributed energy output, gas turbine power supply and electric energy storage discharge; the total heating power of the system is provided by gas turbine heat supply; Step S2.2: If the value of the first electricity gap is greater than 0, increase the amount of electricity purchased from the power grid, and the amount of electricity to be purchased is recorded as the second electricity gap value; if the value of the first electricity gap is less than or equal to 0, the remaining electricity is used to generate electricity for the electric refrigeration equipment; If there is still electricity left after using it for electric refrigeration equipment, the electricity will be sold to the power grid to obtain electricity sales data; If the value of the first heat gap is greater than 0, add a gas boiler to assist in providing heat energy. If the heat load cannot be met even when the gas boiler is fully powered, the remaining unmet heat load is recorded as the value of the second heat gap. If the value of the first heat gap is less than or equal to 0, the remaining heat is used to power the lithium bromide refrigeration equipment. Step S2.3: Calculate whether the total output of the electric refrigeration equipment and the lithium bromide refrigeration equipment meets the cooling load requirement. If so, the electric refrigeration equipment and the lithium bromide refrigeration equipment supply the cooling load, and the electric refrigeration equipment is used first; if not, a first cooling gap value is generated; Step S2.4: Compare the first cold gap value with the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment. If the remaining power of the electric refrigeration equipment and the lithium bromide refrigeration equipment still cannot meet the cooling load, the remaining unsatisfied cooling load is recorded as the second cold gap value; Step S2.5: Based on the second electricity gap value, the second heat gap value and the second cold gap value, the required electric energy is purchased from the power grid, and the required electric energy purchased should satisfy the second electricity gap value, the second heat gap value and the second cold gap value can all be filled, thereby obtaining the electricity purchase data; Step S2.6: Obtain the preliminary electricity purchase and sales curve based on the electricity purchase data and the electricity sales data.
10. The integrated energy system operation optimization system for the electricity spot market according to claim 9, characterized in that: When the processing unit of the day-ahead optimization stage is executed, probability constraints need to be performed, and the form of probability constraints is as follows: ; in, express A The probability that the condition is true, Indicates the confidence that the condition is true. express Output of CCHP system during the period, express Purchase power from the grid during the period. , They represent the discharging and charging power of the energy storage, respectively. Indicates the electrical load, Indicates the output of distributed generation equipment.
Citation Information
Patent Citations
Park-level distributed energy system optimization method, device, equipment and medium
CN117853273A
Comprehensive energy system optimization design method, device, equipment and medium
CN117892884A
Factory integrated energy system optimization operation method for electric power spot market
CN118114828A
Resource scheduling method and system considering electric energy and multi-time scale point-to-point transaction
CN118410961A
Cited By
Power transaction method, device and system based on Markov optimization
CN119850247A
