Maximum power vacancy estimation method for new energy power system containing wind power
By constructing a frequency response model of the new energy power system, the maximum power shortage under different new energy penetration rates is estimated, and the grid frequency decoupling problem caused by new energy generator sets is solved, and the stability and disturbance resistance of the system are improved.
Patent Information
- Application Number
- CN202411543099.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-12-06
AI Technical Summary
The new energy generator set introduces power electronic converters when connected to the grid, resulting in the decoupling of the grid frequency from the transmission power, reducing the frequency regulation capability and disturbance resistance of the power system, threatening the stability of the system, and making it difficult to effectively predict the difference in the existing technology. The maximum power shortage of power systems under new energy penetration rate.
Build a new energy power system frequency response model that considers the permeability of wind power. According to the system frequency safety indicator constraints, by constructing a new energy power system frequency response model, obtain the power shortage under the system frequency deviation and maximum frequency change rate constraints, and compare the minimum value as Estimated value of the system's maximum power shortage.
The maximum power shortage of power systems under different new energy penetration rates has been achieved, which is conducive to the safe and stable operation of the new energy power system and improves the system's disturbance resistance and frequency regulation capabilities.
Smart Images

Figure CN119093413A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of stability and control of new energy power systems, and in particular to a method for estimating the maximum power shortage of a new energy power system containing wind power. Background Art
[0002] In recent years, as the proportion of renewable energy power generation capacity in the power grid continues to increase, the stable operation of the power system faces challenges. Compared with synchronous generators, renewable energy generators introduce power electronic converters when connected to the grid, which decouples the grid frequency from its transmission power and cannot actively respond to changes in system frequency. Therefore, they often show obvious weak inertia or even no inertia characteristics, which reduces the frequency regulation ability of the power system, greatly reduces the system's anti-disturbance ability, and threatens the stability of the system. Therefore, with the frequency safety index as a constraint, the maximum power shortage of the power system under different renewable energy penetration rates is estimated, thereby guiding the system operation control, which is conducive to the safe and stable operation of the renewable energy power system. Summary of the invention
[0003] In view of the above-mentioned defects of the prior art, the technical problem to be solved by the present invention is how to estimate the maximum power shortage of the power system under different new energy penetration rates.
[0004] To achieve the above-mentioned purpose, the present invention provides a method for estimating the maximum power shortage of a new energy power system containing wind power, constructs a frequency response model of a new energy power system considering the wind power penetration rate, and estimates the maximum power shortage of the system under different new energy penetration rates according to the constraints of the system frequency security index; the estimation method comprises the following steps:
[0005] S1. Construct a frequency response model of the new energy power system:
[0006] ;
[0007] in, θ is the wind power penetration rate; R sys The system equivalent adjustment coefficient taking into account the wind power penetration rate; D sys is the system equivalent damping factor taking into account the wind power penetration level; k p is the proportional coefficient of the frequency deviation value;
[0008] S2. Obtaining the system power shortage under the system frequency deviation constraint Power shortage under the constraint of maximum frequency change rate of the system ;
[0009] S3. Compare the system power shortage under the system frequency deviation constraint Power shortage under the constraint of maximum frequency change rate of the system , and take the minimum value as the estimated value of the system's maximum power shortage.
[0010] Furthermore, the wind power penetration rate θ for:
[0011] ;
[0012] in, is the total capacity of all generator sets in the system; is the total capacity of all synchronous generator sets in the system; is the total capacity of all wind turbines in the system; For the system i Capacity of synchronous units; For the system j The capacity of the typhoon generators; n is the number of synchronous units in the system when the wind power penetration rate is 0; m The wind power penetration rate is θ The number of synchronous units replaced when .
[0013] Further, step S2 includes:
[0014] Let the differential of the system frequency response be zero and find the moment when the frequency reaches the lowest point. t 0, and the moment t Substituting 0 into the frequency response model in the time domain, the maximum frequency deviation of the system is obtained , and then the system power shortage under the system frequency deviation constraint is obtained ;
[0015] The maximum frequency change rate of the system is obtained by Laplace initial value theorem , and then the power shortage under the constraint of the maximum frequency change rate of the system is obtained .
[0016] Furthermore, the system power shortage under the system frequency deviation constraint for:
[0017] ;
[0018] in, is the maximum frequency deviation of the system.
[0019] Furthermore, the power shortage under the system maximum frequency change rate constraint for:
[0020] ;
[0021] in, is the maximum frequency change rate of the system, H sys is the system equivalent inertia constant taking into account the wind power penetration level.
[0022] Furthermore, the system equivalent adjustment coefficient taking into account the wind power penetration rate R sys for:
[0023] ;
[0024] in, R It is the system equivalent adjustment coefficient when wind power is not included.
[0025] Furthermore, the system equivalent damping coefficient taking into account the wind power penetration level D sys for:
[0026] ;
[0027] in, D is the equivalent damping coefficient of the system when the wind power penetration rate is 0.
[0028] Furthermore, the system equivalent inertia constant taking into account the wind power penetration level H sys for:
[0029] ;
[0030] in, H is the equivalent inertia constant of the system without wind power.
[0031] Compared with the prior art, the present invention has the following technical effects:
[0032] The present invention adds wind turbines to the maximum power shortage prediction research, and realizes the prediction of the maximum power shortage of the power system under different renewable energy penetration rates under the constraint of frequency safety index, which is beneficial to the safe and stable operation of the renewable energy power system.
[0033] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of the solution flow of the present invention;
[0035] Figure 2 A frequency response model diagram of a new energy power system considering wind power penetration rate constructed for a specific embodiment of the present invention;
[0036] Figure 3 A model diagram of a power system simulated by an embodiment of the present invention;
[0037] Figure 4 The frequency response curve of the system obtained by the present invention through example simulation under the condition of maximum power shortage disturbance. DETAILED DESCRIPTION
[0038] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0039] It should be noted that the illustrations provided in the following embodiments are only used to illustrate the basic concept of the present invention in a schematic manner, and thus the illustrations only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.
[0040] While some exemplary embodiments of the present invention have been described for the purpose of illustration, it should be understood that the present invention may be implemented in other ways not specifically shown in the drawings.
[0041] In a specific embodiment, a method for estimating the maximum power shortage of a new energy power system including wind power is provided, wherein the power system includes a synchronous generator set and a wind generator set, wherein the synchronous generator set is a thermal power unit, and the estimation method is as follows: Figure 1 As shown, the following steps are included:
[0042] S1. Construct a frequency response model of the new energy power system, such as Figure 2 As shown, in this embodiment, when constructing the frequency response model of the new energy power system, the effect of wind power frequency regulation is taken into consideration, and PD comprehensive control is adopted for the wind turbine set, so that the wind turbine set has the ability to provide frequency modulation power to the system. The frequency modulation power Δ P T for:
[0043] (1)
[0044] Among them, Δ f is the system frequency deviation; k p and k dare the proportional coefficient and differential coefficient of the frequency deviation value.
[0045] Construct a frequency response model of the new energy power system, and the frequency domain expression of the system frequency response model is:
[0046] (2)
[0047] in, θ is the wind power penetration rate; Δ P is the system disturbance power; R is the primary equivalent frequency regulation coefficient of the system when the wind power penetration rate is 0; F H is the work ratio of the high-pressure cylinder of the system turbine; T R is the system reheat time constant; H is the equivalent inertia time constant of the system when the wind power penetration rate is 0; D is the equivalent damping coefficient of the system when the wind power penetration rate is 0.
[0048] In this embodiment, it is assumed that the wind turbine replaces the m synchronous units, the wind power penetration rate θ The proportion of wind turbine grid-connected capacity to the total system capacity is:
[0049] (3)
[0050] in, S sys is the total capacity of all generator sets in the system; S s is the total capacity of all synchronous generator sets in the system; S w is the total capacity of all wind turbines in the system; S i For the system i Capacity of synchronous units; S j For the system j The capacity of the typhoon generators; n is the number of synchronous units in the system when the wind power penetration rate is 0; m The wind power penetration rate is θ The number of synchronous units replaced when .
[0051] Wind turbines are connected to the grid through power electronic equipment, and the rotor speed is decoupled from the grid frequency, so the wind turbines do not show inertia characteristics to the power system. When wind turbines replace synchronous units to connect to the power system, the equivalent inertia constant of the system is:
[0052] (4)
[0053] Where: H sys is the system equivalent inertia constant taking into account the wind power penetration level; H i For the system i Inertia constant of synchronous units; H is the equivalent inertia constant of the system when the wind power penetration rate is 0.
[0054] When the wind turbine replaces the synchronous unit to connect to the power system, since the wind turbine does not show damping characteristics to the power system, the equivalent damping coefficient of the system is:
[0055] (5)
[0056] Where: D sys is the system equivalent damping factor taking into account the wind power penetration level; D is the equivalent damping coefficient of the system when the wind power penetration rate is 0; Δ T mi For the system i The mechanical torque increment of a synchronous generator; Δ ω mi For the system i The speed increment of a synchronous generator.
[0057] Similarly, the expression of the system equivalent adjustment coefficient can be obtained as follows:
[0058] (6)
[0059] Where: R sys It is the system equivalent adjustment coefficient taking into account the wind power penetration rate.
[0060] S2. According to the frequency response model of the new energy power system, obtain the system power shortage Δ under the system frequency deviation constraint condition. P MDF and the power shortage Δ under the constraint of the maximum frequency change rate of the system P ROCOF .
[0061] The frequency domain expression of the system frequency response described in equation (2) is subjected to an inverse Laplace transform, and the time domain expression of the system frequency response is obtained as follows:
[0062] (7)
[0063] Where:
[0064] (8)
[0065] Let the differential of the system frequency response be zero and find the moment when the frequency reaches the lowest point. t The expression for 0 is:
[0066] (9)
[0067] Substituting the moment when the frequency reaches the lowest point into the time domain expression of the system frequency response, the analytical expression of the maximum frequency deviation of the system is obtained:
[0068] (10)
[0069] The maximum frequency change rate of the system is obtained by Laplace initial value theorem ROCOF max The expression is:
[0070] (11)
[0071] The expressions of the maximum frequency deviation and the maximum frequency change rate of the system are sorted out, and the system power shortage Δ under the system frequency deviation constraint condition is obtained according to equations (10) and (11). P MDF and the power shortage Δ under the constraint of the maximum frequency change rate of the system P ROCOF They are:
[0072] (12)
[0073] S3. Compare the system power shortage Δ under the system frequency deviation constraint P MDF and the power shortage Δ under the constraint of the maximum frequency change rate of the system P ROCOF , and take the minimum value as the estimated value of the system's maximum power shortage.
[0074] In this embodiment, the maximum power shortage of the system is estimated based on the constraints of the system frequency deviation and the frequency change rate. The estimated value Δ of the maximum power shortage of the system is P max for:
[0075] ΔP max =min{ ΔP MDF , ΔP ROCOF} (13)
[0076] Where: Δ P max is the estimated value of the maximum power shortage of the new energy power system including wind power; Δ PMDF is the power shortage under the maximum frequency deviation constraint of the system; Δ P ROCOF is the power shortage under the constraint of the maximum frequency change rate of the system.
[0077] In order to further illustrate the method of the above embodiment, in a specific embodiment, the following is established: Figure 3 The simulation model of a 3-machine 9-bus system including synchronous generator sets and wind farms is shown. Figure 3 In the figure, G1 and G2 are synchronous generators; T1, T2, and T3 are transformers; and L1, L2, and L3 are loads. The wind farm capacity is 100MW, consisting of 54 double-fed wind turbines. The operating parameters of the synchronous units and wind turbines in the system are shown in Table 1 and Table 2, respectively.
[0078] Table 1 Synchronous generator simulation parameters
[0079]
[0080] Table 2 Wind turbine simulation parameters
[0081]
[0082] According to the power system network constructed in this embodiment, the maximum frequency deviation constraint of the system is set to ±0.5Hz, the maximum frequency change rate constraint is set to ±0.5Hz / s, and the maximum power shortage of the new energy system is calculated to be 116MW when the wind power penetration rate is 20%. Figure 2 The active disturbance of medium load 2 increases by 116MW, and the system frequency response curve is as follows Figure 4 shown.
[0083] Depend on Figure 4 Analysis shows that when the system has a maximum power shortage disturbance of 116MW, the minimum system frequency is 49.506Hz, and the maximum system frequency change rate is 0.29Hz / s. The maximum frequency deviation is close to the limit value when the constraint conditions are met, which verifies the effectiveness of the maximum power shortage estimation method for a new energy power system containing wind power described in the present invention.
[0084] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A method for estimating the maximum power shortage of a new energy power system including wind power, characterized in that: The steps include: S1. Construct a frequency response model of the new energy power system: ; in, θ is the wind power penetration rate; R sys The system equivalent adjustment coefficient taking into account the wind power penetration rate; D sys is the system equivalent damping factor taking into account the wind power penetration level; k p is the proportional coefficient of the frequency deviation value; S2. Obtaining the system power shortage under the system frequency deviation constraint Power shortage under the constraint of maximum frequency change rate of the system ; S3. Compare the system power shortage under the system frequency deviation constraint Power shortage under the constraint of maximum frequency change rate of the system , and take the minimum value as the estimated value of the system's maximum power shortage.
2. According to claim 1, a method for estimating the maximum power shortage of a new energy power system containing wind power is characterized in that: The wind power penetration rate θ for: ; in, is the total capacity of all generator sets in the system; is the total capacity of all synchronous generator sets in the system; is the total capacity of all wind turbines in the system; For the system i Capacity of synchronous units; For the system j The capacity of the typhoon generators; n is the number of synchronous units in the system when the wind power penetration rate is 0; m The wind power penetration rate is θ The number of synchronous units replaced when .
3. According to claim 2, a method for estimating the maximum power shortage of a new energy power system including wind power, characterized in that: Step S2 includes: Let the differential of the system frequency response be zero and find the moment when the frequency reaches the lowest point. t 0, and the moment t Substituting 0 into the frequency response model in the time domain, the maximum frequency deviation of the system is obtained , and then the system power shortage under the system frequency deviation constraint is obtained ; The maximum frequency change rate of the system is obtained by Laplace initial value theorem , and then the power shortage under the constraint of the maximum frequency change rate of the system is obtained .
4. According to claim 3, a method for estimating the maximum power shortage of a new energy power system including wind power, characterized in that: System power shortage under system frequency deviation constraints for: ; in, is the maximum frequency deviation of the system.
5. According to claim 3, a method for estimating the maximum power shortage of a new energy power system including wind power, characterized in that: Power shortage under the constraint of system maximum frequency change rate for: ; in, is the maximum frequency change rate of the system, H sys is the system equivalent inertia constant taking into account the wind power penetration level.
6. The method for estimating the maximum power shortage of a new energy power system including wind power according to claim 1, characterized in that: The system equivalent adjustment coefficient taking into account the wind power penetration rate R sys for: ; in, R It is the system equivalent adjustment coefficient when wind power is not included.
7. The method for estimating the maximum power shortage of a new energy power system including wind power according to claim 1, characterized in that: System equivalent damping factor considering wind power penetration level D sys for: ; in, D is the equivalent damping coefficient of the system when the wind power penetration rate is 0.
8. The method for estimating the maximum power shortage of a new energy power system including wind power according to claim 5, characterized in that: The system equivalent inertia constant taking into account the wind power penetration level H sys for: ; in, H is the equivalent inertia constant of the system without wind power.