Unit start-stop optimization method and system considering new energy confidence capacity
Through wind power confidence interval prediction and unit combination model optimization, the problem of instability of new energy output is solved, the reliability and economy of the power system are improved, and more flexible energy scheduling and clean energy utilization are achieved.
Patent Information
- Application Number
- CN202411004345.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-12-06
AI Technical Summary
The existing technology is difficult to effectively solve the instability of new energy output, resulting in a decrease in peak shaving capacity of the power system and an increase in the amount of wind and light abandonment, and it is impossible to accurately predict the uncertainty of wind power power, affecting power generation planning and operation scheduling.
By collecting historical power data of wind farms, we can predict the wind power power confidence interval, build a unit combination model, set the objective function and constraints, perform linearization processing, optimize the unit combination model to obtain the optimal start-stop state and output plan, and verify in simulation Dynamic performance adjustment and model parameter iteration in the environment.
A more accurate wind power power prediction model has been built, which improves the reliability and economy of the power system, enhances scheduling flexibility and response speed, can better cope with the fluctuations in new energy output, and promotes the efficient utilization of clean energy.
Smart Images

Figure CN119093490A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of unit start-stop optimization, and in particular to a method and system for optimizing unit start-stop by considering the confidence capacity of new energy. Background Art
[0002] In response to the rapid deterioration of environmental problems such as global warming, many countries have implemented relevant policies aimed at establishing clean energy systems. Therefore, establishing a new power system centered on renewable energy has become the primary goal of the power systems of these countries. With the development of my country's economy and society, the load demand of the power system has increased rapidly. In addition, the output of renewable energy has great instability. Therefore, when arranging the power generation plan, it is necessary to allocate sufficient operating reserves to ensure the reliability of power supply. A large part of these operating reserves is borne by thermal generators, which inevitably reduces the overall peak-shaving potential of the system. This limitation is not conducive to the integration of renewable energy and traditional energy, and thus hinders the development of a new power system centered on renewable energy.
[0003] Due to the instability of renewable energy output, power systems with renewable energy require larger operating reserves than traditional power systems. A large part of the operating reserve is borne by thermal generators. This limitation reduces the system's peak-shaving capacity and increases the amount of wind and solar power abandoned. Therefore, the peak-shaving capacity and stability of large-scale power systems with wind power and photovoltaic power, as well as the wind and photovoltaic power absorption capacity of large-scale power systems with wind power and photovoltaic power, are insufficient.
[0004] The natural randomness and volatility of wind power generation make it a sharp contrast with traditional conventional power sources. The challenges of large-scale wind power grid connection to the power system run through all aspects of power production, transmission and consumption. With the development of modern forecasting technology, physical or statistical methods can be used to predict wind power based on numerical weather forecasts and historical data. Compared with the more complex physical methods, statistical methods such as time series method, Kalman filter method, support vector machine method, wavelet analysis method, artificial neural network method, etc. only need the time series of wind speed and power for prediction, so they are widely used.
[0005] However, most of these methods are deterministic point predictions, which usually only give an exact value, and cannot estimate the probability of the value appearing, nor can they determine the possible fluctuation range of the prediction results. According to statistics, the average relative error of short-term output forecasts of wind farms is generally between 15% and 40%, and the accuracy of wind power forecasts is far from the accuracy of load forecasts. Giving only a deterministic wind power forecast curve is not enough to fully describe the uncertainty of wind power, which is not conducive to the reporting of wind farm power generation plans and the operation and scheduling of wind power. Summary of the invention
[0006] In view of the problems existing in the existing unit start-stop optimization method considering the confidence capacity of new energy, the present invention is proposed. Therefore, the problem to be solved by the present invention is how to provide a unit start-stop optimization method and system considering the confidence capacity of new energy.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0008] In a first aspect, the present invention provides a method for optimizing the start and stop of a unit taking into account the confidence capacity of new energy, which includes collecting historical power output data of wind farms to predict the confidence interval of wind power and identifying the probability distribution law of wind power; constructing a unit combination model, setting the objective function and constraints and performing linearization processing; optimizing the unit combination model taking into account the confidence capacity of new energy, solving the optimized unit combination model to obtain the optimal unit start and stop state and output plan; testing the optimization results in a simulation environment, and verifying the performance dynamic adjustment confidence interval and model parameter iterative optimization model under different scenarios.
[0009] As a preferred solution of the unit start-stop optimization method considering the confidence capacity of new energy in the present invention, the wind power confidence interval prediction includes the following steps: drawing a wind power short-term power prediction error distribution curve, calculating the sample mean, and obtaining the confidence interval; collecting the actual value of historical wind power and the corresponding predicted value, and calculating the difference between the predicted value and the actual value, that is, the wind power short-term power prediction error, and the calculation formula is:
[0010] e t =P a (t)-P p (t)
[0011] In the formula, e t is the prediction error at time point t, P a (t) and P p (t) are the actual power and predicted power respectively;
[0012] The scattered points of the probability distribution of power forecast errors are connected into a line to construct the distribution curve of wind power short-term power forecast errors. The sample mean of all forecast errors is calculated as the starting point for selecting the confidence interval. The calculation formula is:
[0013]
[0014] In the formula, is the sample mean, N is the number of prediction errors; the confidence level and confidence interval are determined based on the wind power prediction error distribution, and the wind power prediction range is given; the wind power prediction accuracy is used as the statistical sample for the new energy power prediction, and the confidence interval of the wind power prediction accuracy is used to convert the power confidence interval of the wind power prediction target period.
[0015] As a preferred solution of the unit start-stop optimization method considering the confidence capacity of new energy sources described in the present invention, wherein: the objective function includes optimizing with the goal of minimizing the total operating cost, including fuel cost, startup cost and shutdown cost, and the expression of the unit combination model objective function is:
[0016]
[0017] In the formula, It represents the total cost of combined operation of the units; represents the set of all coal-fired power units; Indicates the total number of combined operation time periods of the units; c g represents the power generation cost curve of coal-fired power unit g; represents the startup cost of coal-fired power unit g; represents the shutdown cost of coal-fired power unit g; p g,t represents the output of coal-fired power unit g at time t; u g,t represents the startup state of coal-fired power unit g at time t, d g,t Represents the shutdown state of coal-fired power unit g at time t.
[0018] As a preferred solution of the method for optimizing the start and stop of a unit considering the confidence capacity of new energy sources described in the present invention, the linearization process includes the following steps: the power generation cost curve of the coal-fired power unit is expressed by a quadratic function, and the expression is:
[0019]
[0020] In the formula, a i , b i , c i They represent the quadratic, linear and constant terms of the cost curve of coal-fired power unit g respectively; x g,t Indicates the start and stop status of the coal-fired power unit; the coal-fired power generation cost curve in the form of a quadratic function is piecewise linearized to obtain the coal-fired power generation cost after piecewise linearization, which is expressed as:
[0021]
[0022] In the formula, Represents the union of all segments; They represent the upper and lower bounds of the i-th segment of the power generation cost curve of coal-fired power unit g after piecewise linearization. The power generation cost curve of coal-fired power unit is linearized and added into the unit combination model as a linear constraint. The expression is:
[0023]
[0024] The generation cost curve of coal-fired power generation units in the form of piecewise linearized generation cost replacing quadratic function is obtained.
[0025] As an optimal solution of the unit start-stop optimization method considering the new energy confidence capacity described in the present invention, wherein: the constraints include power supply operation constraints and system-level constraints; the power supply operation constraints include coal-fired power unit operating state logic constraints, coal-fired power unit output limit constraints, coal-fired power unit maximum climbing limit constraints, coal-fired power unit minimum start-stop time constraints, photovoltaic unit output limit constraints, interconnection line planned power constraints and load demand constraints; the system-level constraints include power balance constraints and operating reserve constraints.
[0026] As a preferred solution of the unit start-stop optimization method considering the confidence capacity of new energy sources described in the present invention, the expression of the operating state logic constraint of the coal-fired power unit is:
[0027]
[0028]
[0029] In the formula, x g,t ,u g,t , d g,t are the operating state variables of the coal-fired power units. g,t =1, it means that the coal-fired power unit g is in the start-up state at time t, otherwise the coal-fired power unit is in the shutdown state; when u g,t =1, it means that the coal-fired power unit g starts at time t, that is, it enters the start-up state from the shutdown state; when d g,t =1, it means that the thermal power unit g is shut down at time t, that is, it enters the shutdown state from the startup state; the expression of the output limit constraint of the coal-fired power unit is:
[0030]
[0031] In the formula, Indicates the maximum output limit of coal-fired power unit g; p g Indicates the minimum output limit of coal-fired power unit g; Indicates that the state of coal-fired power unit g at time t is x g,t The maximum output limit when x g,t p g Indicates that the state of coal-fired power unit g at time t is x g,t The minimum output limit when ; the expression of the maximum climbing limit constraint of the coal-fired power unit is:
[0032]
[0033] In the formula, represents the maximum ramp rate of coal-fired power unit g, represents the maximum down-slope rate of the coal-fired power unit g; when the coal-fired power unit enters the startup state from the shutdown state, the maximum climbing limit at the next moment is relaxed to the minimum technical output; when the coal-fired power unit enters the shutdown state from the startup state, the maximum climbing limit at the next moment is also relaxed to the minimum technical output; the expression of the minimum start-stop time constraint of the coal-fired power unit is:
[0034]
[0035] In the formula, Indicates the minimum startup duration of coal-fired power unit g; represents the minimum shutdown duration of coal-fired power unit g, T represents the end period of combined operation of the units; the expression of the output limit constraint of the photovoltaic unit is:
[0036]
[0037] In the formula, p s,t represents the output of photovoltaic unit s at time t; S s,t represents the resource level of PV unit s at time t, represents the installed capacity of photovoltaic unit s; the expression of the tie line planned power constraint is:
[0038]
[0039] In the formula, p l,t represents the exchange power of tie line l at time t; represents the planned exchange power of tie line l at time t; the expression of the load demand constraint is:
[0040]
[0041] In the formula, p d,t represents the load demand of load d at time t; represents the actual required power of load d at time t; the expression of the power balance constraint is:
[0042]
[0043] The expression of the running standby constraint is:
[0044]
[0045] In the formula, p g,t represents the output of coal-fired power unit g at time t; p w,t represents the output of wind turbine g at time t; p s,t represents the output of photovoltaic unit s at time t; Indicates the maximum output limit of coal-fired power unit g; α r Indicates the proportion of operating standby to load, α guar New energy confidence capacity ratio.
[0046] As a preferred solution of the unit start-stop optimization method considering the confidence capacity of new energy sources described in the present invention, wherein: the solving the optimized unit combination model to obtain the optimal unit start-stop state includes the following steps: according to the establishment of the unit combination model, the initial values of variables and parameters are set for solving; the model is iteratively calculated and solved using an optimization solver to find the optimal solution that meets all constraints until the result that minimizes the objective function is found, and the global optimal solution is output; it is checked whether the solution result meets all constraints, and a unit dispatching operation instruction is generated according to the solution result, and the dispatching instruction is issued to execute the unit start-stop plan; the operating status of the power system is monitored in real time, and when the actual operation deviates from the plan, the dispatching strategy is adjusted, the dispatching plan is updated, and the unit start-stop optimization is completed.
[0047] In the second aspect, the present invention provides a unit start-stop optimization system that takes into account the confidence capacity of new energy, which includes: a collection module for collecting historical power output data of wind farms to predict wind power confidence intervals and identify the probability distribution law of wind power; a construction module for constructing a unit combination model, setting objective functions and constraints and performing linearization processing; a solution module for optimizing the unit combination model taking into account the confidence capacity of new energy, solving the optimized unit combination model to obtain the optimal unit start-stop state and output plan; an optimization module for testing the optimization results in a simulation environment, verifying the performance and reliability under different scenarios, and dynamically adjusting the confidence intervals and model parameters to iteratively optimize the model.
[0048] In a third aspect, the present invention provides a computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the processor executes the computer program, the steps of a method for optimizing the start and stop of a unit taking into account the confidence capacity of new energy are implemented.
[0049] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, the steps of a method for optimizing the start and stop of a unit taking into account the confidence capacity of new energy are implemented.
[0050] The beneficial effects of the present invention are that it helps to build a more accurate wind power prediction model, improve the reliability and economy of power system operation, improve the flexibility and response speed of power system scheduling, quickly respond to market changes and fluctuations in renewable energy output, and be able to more flexibly cope with the challenges of future energy transformation and promote the efficient use of clean energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0052] Figure 1 The figure is a flow chart of the unit start-stop optimization method considering the confidence capacity of renewable energy.
[0053] Figure 2 The wind power prediction accuracy of the unit start-stop optimization method considering the confidence capacity of renewable energy.
[0054] Figure 3 It is the feasible area diagram of the power generation cost of piecewise linear thermal power units. DETAILED DESCRIPTION
[0055] In order to make the above-mentioned purposes, features and advantages of the present invention more understandable, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0056] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0057] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0058] Example 1
[0059] Reference Figure 1-Figure 3 , which is the first embodiment of the present invention, and provides a method for optimizing the start and stop of a unit considering the confidence capacity of new energy, including:
[0060] S1: Collect historical power output data of wind farms to predict wind power confidence intervals and identify the probability distribution of wind power;
[0061] Specifically, using the wind power confidence interval as a prediction indicator can highlight the distribution characteristics of the predicted power. If the mean is used as the wind power short-term power prediction indicator, it will not be able to reflect the discrete degree of power distribution; if the extreme value is used as an indicator, it will not be able to reflect the output level under high probability conditions. Therefore, this method adopts the analytical thinking of probability theory and uses the confidence interval as a prediction indicator for wind power short-term power to avoid the defects of the mean and extreme value as indicators.
[0062] A confidence interval is an estimated interval of a population parameter constructed from a sample statistic. In statistics, a confidence interval of a probability sample is an interval estimate of a population parameter of the sample. The confidence interval shows the degree to which the true value of the parameter has a certain probability of falling around the measurement result. It gives the degree of credibility of the measured value of the measured parameter, that is, the "probability" required above. Confidence interval estimation can quantify the changes in prediction results caused by uncertainty factors, so that the actual observed value falls within the prediction interval corresponding to a certain confidence level, providing more information to decision makers, which helps them better understand the uncertainties and risks that may exist in the future changes of the predicted quantity.
[0063] When finding the predicted value θ' of a true value θ, the predicted value is only an approximation of the true value. In many cases, it cannot meet the requirements, and the situation where the predicted value is exactly equal to the true value almost does not exist. Confidence interval prediction is a method to describe the uncertainty of the predicted value. By statistically analyzing the wind power prediction error, the probability distribution law of the point prediction error is found. On the basis of deterministic prediction, the probability theory method can be used to obtain the confidence interval under a given confidence level, and then determine the possibility that the confidence interval contains the wind power point prediction value.
[0064] The intervals obtained by interval prediction are divided into the following three forms: two-sided confidence interval (a, b), one-sided confidence interval (-∞, a) and (b, +∞). A one-sided confidence interval refers to a confidence interval set only on one side of the estimated parameter, the left or right side, with the upper confidence limit taken as +∞ or the lower confidence limit taken as -∞. A two-sided confidence interval is an interval consisting of the upper and lower confidence limits of the statistic as the upper and lower limits.
[0065] The one-sided confidence interval can be expressed as: For a given value α (0<α<1), if the sample X1, X2,…, X n Determined Statistics θ = θ (X1,X2,…,X n ), for any θ∈Θ, where Θ represents the uncertain set of statistics:
[0066] P θ (θ> θ )≥1-α, then it is called a random interval ( θ,+∞) is a one-sided confidence interval of θ with a confidence level of 1-α, θ The confidence level of θ is called the one-sided lower confidence limit of 1-α.
[0067] Draw the distribution curve of wind power short-term power forecast error, calculate the sample mean, and obtain the confidence interval;
[0068] Collect the actual values of historical wind power and the corresponding predicted values, and calculate the difference between the predicted value and the actual value, that is, the short-term wind power prediction error. The calculation formula is:
[0069] e t =P a (t)-P p (t)
[0070] In the formula, e t is the prediction error at time point t, P a (t) and P p (t) are the actual power and predicted power respectively;
[0071] Connect the scattered points of the probability distribution of power forecast error into a line to construct the distribution curve of wind power short-term power forecast error;
[0072] The sample mean of all prediction errors is calculated as the starting point for selecting the confidence interval. The calculation formula is:
[0073]
[0074] In the formula, is the sample mean, N is the number of prediction errors;
[0075] The confidence interval is based on the distribution of wind power forecast errors and gives the acceptable range of wind power forecasts. It is used as the basis for the analysis of power grid operation data. Generally, according to the requirements of application accuracy, an 80% or 95% confidence interval can be used as the consideration of accuracy. The 80% confidence interval of the sample is based on the sample mean. Take the integral from the center to both sides until it reaches 80%, that is:
[0076] In the formula, P represents the probability of wind power forecast error occurring in the corresponding interval. The same is true for the 95% confidence interval as the confidence interval of the corresponding precision.
[0077] The wind power prediction accuracy is used as the statistical sample for the new energy power prediction, and the confidence interval of the power prediction accuracy is used to convert the power confidence interval of the prediction target period. When the confidence interval of wind power is 90%, the actual output can reach 27.43% of the day-ahead prediction value, and when the confidence interval is 95%, the actual output can reach 16.81% of the day-ahead prediction value.
[0078] S2: Construct the unit commitment model, set the objective function and constraints, and perform linearization;
[0079] Specifically, the goal of the unit commitment problem is to minimize the total operating cost, which includes fuel costs, startup costs and shutdown costs. The objective function of the conventional unit commitment model can be described as:
[0080]
[0081] In the formula, It represents the total cost of combined operation of the units; represents the set of all coal-fired power units; Indicates the total number of combined operation time periods of the units; c g represents the power generation cost curve of coal-fired power unit g; represents the startup cost of coal-fired power unit g; represents the shutdown cost of coal-fired power unit g; p g,t represents the output of coal-fired power unit g at time t; u g,t represents the startup state of coal-fired power unit g at time t, that is, u g,t =1 indicates that the coal-fired power unit g changes from shutdown state to startup state at time t; d g,t represents the shutdown state of coal-fired power unit g at time t, that is, d g,t =1 indicates that the coal-fired power unit g changes from the start-up state to the shutdown state at time t.
[0082] In the formula, the power generation cost curve of coal-fired power units can be approximated by a quadratic function, specifically:
[0083]
[0084] In the formula, a i , b i , c i They represent the quadratic, linear and constant terms of the cost curve of coal-fired power unit g respectively; x g,t Indicates the start and stop status of the coal-fired power unit, that is, x g,t =1 means that the coal-fired power unit g remains in the on state at time t, otherwise the coal-fired power unit remains in the off state.
[0085] The coal-fired power generation cost curve approximated by a quadratic function will bring unnecessary computational burden to the solution of the unit combination problem. Therefore, the coal-fired power generation cost curve in the form of a quadratic function is generally piecewise linearized. The coal-fired power generation cost results obtained after piecewise linearization are as follows:
[0086]
[0087] In the formula, Represents the union of all segments; They represent the upper and lower bounds of the i-th segment of the power generation cost curve of coal-fired power unit g after piecewise linearization;
[0088] It is also necessary to further linearize equation (4) so that it can be processed as a linear constraint and embedded into the unit commitment model. The specific processing method is as follows:
[0089]
[0090] Therefore, the piecewise linearized coal-fired power generation cost can be used to approximately replace the coal-fired power generation cost curve in the form of a quadratic function.
[0091] In addition, since the conventional unit commitment model needs to consider resource abandonment and load interruption, it is also necessary to appropriately punish resource abandonment and load interruption in the objective function. represents the penalty cost of wind turbine w abandoning a unit of wind power resource power, the penalty cost of photovoltaic unit s wind turbine w abandoning a unit of photovoltaic resource power, and the penalty cost of load d interrupting a unit of load power. Usually, the penalty cost of interrupting a unit of load power is taken as
[0092] In summary, the objective function of the conventional unit commitment model is expressed as:
[0093]
[0094] S3: Optimize the unit combination model considering the confidence capacity of new energy sources, and solve the optimized unit combination model to obtain the optimal unit start and stop status and output plan;
[0095] Specifically, considering only three types of power sources, namely coal-fired power units, wind power units and photovoltaic units, in the conventional unit combination model, the following operating constraints for each type of power source and corresponding system-level constraints can be established around the above power types.
[0096] Specifically, the operation of coal-fired power units generally needs to consider their upper and lower output limits, maximum climbing rate, and minimum start and stop time.
[0097] Through the binary integer variable x g,t ,u g,t, d g,t Three state variables are used to represent the operating status of coal-fired power units, among which x g,t =1 means that the coal-fired power unit g is in the start-up state at time t, otherwise the coal-fired power unit is in the shutdown state; u g,t =1 means that the coal-fired power unit g starts at time t, that is, it enters the startup state from the shutdown state; d g,t =1 indicates that the thermal power unit g is shut down at time t, that is, it enters the shutdown state from the startup state.
[0098] 1) Logical constraints on the operating status of coal-fired power units
[0099]
[0100] A binary integer variable used to constrain the description of the operating status of coal-fired power units.
[0101] 2) Output limit of coal-fired power units
[0102]
[0103] In the formula, They represent the maximum output limit of coal-fired power unit g respectively; p g They represent the minimum output limit of coal-fired power unit g respectively; It is determined that the state of coal-fired power unit g at time t is x g,t The maximum output limit when x g,t p g It is determined that the state of coal-fired power unit g at time t is x g,t The minimum output limit when .
[0104] 3) Maximum climbing limit of coal-fired power units
[0105]
[0106] In the formula, Indicates the maximum ramp rate of coal-fired power unit g; Indicates the maximum ramp-down rate of coal-fired power unit g.
[0107] In order to avoid the inability to start or shut down normally due to the maximum ramp rate limit, a reasonable relaxation is made to the maximum ramp rate limit of the coal-fired power unit.
[0108] When a coal-fired power unit enters the startup state from the shutdown state, the maximum climbing limit at the next moment is relaxed to the minimum technical output; similarly, when a coal-fired power unit enters the shutdown state from the startup state, the maximum climbing limit at the next moment is also relaxed to the minimum technical output, and the rest are considered in the maximum climbing limit constraint of the thermal power unit according to the power regulation limit of the coal-fired power unit.
[0109] 4) Minimum start and stop time of coal-fired power units
[0110]
[0111] In the formula, Indicates the minimum startup duration of coal-fired power unit g; It represents the minimum shutdown duration of coal-fired power unit g, and T represents the end period of combined operation of the units.
[0112] It is generally believed that wind turbines have sufficient regulation capabilities. In this article, the operation of wind turbines only considers the limitations of installed capacity and wind power resources. Specifically:
[0113] 6) Output limit of photovoltaic units
[0114]
[0115] In the formula, p s,t represents the output of photovoltaic unit s at time t; S s,t represents the resource level of PV unit s at time t, Represents the installed capacity of photovoltaic unit s.
[0116] Similarly, the photovoltaic resources are converted here, that is, through It represents the output capacity of photovoltaic unit s at time t.
[0117] 7) Planned power of tie lines
[0118]
[0119] In the formula, p l,t represents the exchange power of tie line l at time t; represents the planned exchange power of tie line l at time t.
[0120] 8) Load demand
[0121]
[0122] In the formula, p d,t represents the load demand of load d at time t; Represents the actual required power of load d at time t.
[0123] This method takes into account two system-level operating constraints, including 1) power balance constraints and 2) operating reserve constraints. The details are as follows:
[0124] 9) Power balance constraints
[0125]
[0126] This constraint ensures that the whole system power is balanced in each time period.
[0127] 10) Run backup constraints
[0128]
[0129] In the formula, α r represents the proportion of operating reserve to load. Here, only reliable coal-fired power units are considered to provide operating reserve. Usually, α r The value of α is between 2% and 5%. If there are special requirements, the setting can be increased, but generally not more than 10%. guar New energy confidence capacity ratio.
[0130] According to the establishment of unit commitment model, the initial values of variables and parameters are set for solution;
[0131] The model is solved iteratively using an optimization solver to find the optimal solution that satisfies all constraints until the result that minimizes the objective function is found, and the global optimal solution is output;
[0132] Check whether the solution meets all constraints, generate unit dispatching instructions based on the solution, and issue the dispatching instructions to execute the unit start and stop plan;
[0133] Monitor the operating status of the power system in real time, adjust the dispatch strategy when the actual operation deviates from the plan, update the dispatch plan, and complete the unit start and stop optimization.
[0134] The model objective is to minimize the expected operating costs, including power generation costs and unit start-up and shutdown costs; the model is subject to constraints including unit operating state logic, unit maximum climbing limit, unit maximum and minimum start-up and shutdown time, system active power balance, and backup demand constraints without considering wind power as a backup. By solving the model, the optimal start-up and shutdown state of thermal power units considering wind power as a backup can be obtained.
[0135] S4: Test the optimization results in a simulation environment to verify the performance in different scenarios and dynamically adjust the confidence intervals and model parameters to iteratively optimize the model.
[0136] Specifically, create a virtual environment that can simulate real-world conditions. Including system status: for example, power system load, renewable energy output, price signals, etc. Dynamic changes: consider changes in time series, such as seasonality, weather effects, etc. Uncertain factors: simulate random events, such as equipment failures, demand fluctuations, etc.
[0137] Apply the optimization results (such as unit combination, scheduling plan, etc.) to the simulation environment and observe their performance. Execute the strategy and execute the decisions in the simulation according to the rules set by the optimization results. Collect data and record various data during the execution process, such as cost, resource utilization, delay, etc.
[0138] Based on the simulation results, the effectiveness and stability of the optimization scheme are evaluated. The evaluation indicators include: Cost-effectiveness: total cost, revenue, return on investment, etc. Resource efficiency: resource utilization, energy consumption, waste generation, etc. Reliability: system stability, fault recovery time, etc. Adaptability: the ability to respond to uncertainty and change.
[0139] The width of the confidence interval is adjusted according to the statistical results of the simulation to more accurately predict future uncertainties and dynamically adjust the confidence interval and model parameters of the model.
[0140] Using simulation results as feedback, the model parameters are iteratively optimized and the performance of the model is tested in a variety of scenarios, including: system operation under conventional conditions, unconventional situations such as natural disasters, and different scenarios that may occur in the future based on historical trends and assumptions. All simulation results are integrated to provide suggestions for improvement and optimization.
[0141] Furthermore, this embodiment also provides a unit start-stop optimization system that takes into account the confidence capacity of new energy, including: a collection module, which is used to collect historical power output data of wind farms to predict the confidence interval of wind power and identify the probability distribution law of wind power; a construction module, which is used to construct a unit combination model, set the objective function and constraints and perform linearization processing; a solution module, which is used to optimize the unit combination model considering the confidence capacity of new energy, and solve the optimized unit combination model to obtain the optimal unit start-stop state and output plan; an optimization module, which is used to test the optimization results in a simulation environment, verify the performance and reliability under different scenarios, and dynamically adjust the confidence interval and model parameters to iteratively optimize the model.
[0142] This embodiment also provides a computer device, which is suitable for the case of a unit start-stop optimization method considering the confidence capacity of new energy, including: a memory and a processor; the memory is used to store computer executable instructions, and the processor is used to execute computer executable instructions to implement all or part of the steps of the method described in the embodiment of the present invention as proposed in the above embodiment.
[0143] This embodiment also provides a storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the method in any optional implementation of the above embodiment is executed. In the formula, the storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read Only Memory, referred to as EPROM), programmable read-only memory (Programmable Red-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0144] The storage medium proposed in this embodiment and the data storage method proposed in the above embodiment belong to the same inventive concept. The technical details not fully described in this embodiment can be found in the above embodiment, and this embodiment has the same beneficial effects as the above embodiment.
[0145] Example 2
[0146] Referring to Table 1, which is the second embodiment of the present invention, this embodiment provides a method for optimizing the start and stop of a unit taking into account the confidence capacity of new energy. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.
[0147] Table 1 Technical characteristics comparison table
[0148]
[0149] As can be seen from the above, this method is based on big data analysis and statistical principles, which helps to build a more accurate wind power prediction model. Power dispatchers can better understand and quantify the uncertainty of wind power output, improve the reliability and economy of power system operation, reduce unnecessary start-up and shutdown costs, ensure the balance of power supply and demand, and avoid system instability caused by wind power output fluctuations. Ensure the stable operation of the power system and avoid accidents caused by violations of technical specifications. Speed up the model solution and reduce the errors that may occur in the solution process. Improve the flexibility and response speed of power system dispatching, be able to quickly respond to market changes and fluctuations in renewable energy output, and improve the overall efficiency and competitiveness of the power system. By testing the optimization results in a simulation environment, a comprehensive evaluation of the model performance can be achieved. Improve the overall operation efficiency and sustainability of the power system, be able to more flexibly respond to the challenges of future energy transformation, and promote the efficient use of clean energy.
[0150] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A method for optimizing the start and stop of a unit considering the confidence capacity of new energy, characterized by: include, Collect historical power output data of wind farms to predict wind power confidence intervals and identify wind power probability distribution patterns; Construct unit commitment model, set objective function and constraint conditions and perform linearization; The unit combination model is optimized considering the confidence capacity of new energy sources, and the optimized unit combination model is solved to obtain the optimal unit start-stop status and output plan; Test the optimization results in a simulation environment to verify the performance in different scenarios and dynamically adjust the confidence intervals and model parameters to iteratively optimize the model.
2. The method for optimizing the start and stop of a unit considering the confidence capacity of new energy sources as claimed in claim 1, characterized in that: The wind power confidence interval prediction comprises the following steps: Draw the distribution curve of wind power short-term power forecast error, calculate the sample mean, and obtain the confidence interval; Collect the actual values of historical wind power and the corresponding predicted values, and calculate the difference between the predicted value and the actual value, that is, the short-term wind power prediction error. The calculation formula is: e t =P a (t)-P p (t) In the formula, e t is the prediction error at time point t, P a (t) and P p (t) are the actual power and predicted power respectively; Connect the scattered points of the probability distribution of power forecast error into a line to construct the distribution curve of wind power short-term power forecast error; The sample mean of all prediction errors is calculated as the starting point for selecting the confidence interval. The calculation formula is: In the formula, is the sample mean, N is the number of prediction errors; Determine the confidence level and confidence interval based on the wind power prediction error distribution, and give the wind power prediction range; The wind power prediction accuracy is used as the statistical sample for the new energy power prediction, and the confidence interval of the wind power prediction accuracy is used to convert the power confidence interval of the wind power prediction target period.
3. The method for optimizing the start and stop of a unit considering the confidence capacity of new energy sources as claimed in claim 2, characterized in that: The objective function includes optimizing with the goal of minimizing the total operating cost, including fuel cost, startup cost and shutdown cost. The expression of the objective function of the unit commitment model is: In the formula, It represents the total cost of combined operation of the units; represents the set of all coal-fired power units; Indicates the total number of combined operation time periods of the units; c g represents the power generation cost curve of coal-fired power unit g; represents the startup cost of coal-fired power unit g; represents the shutdown cost of coal-fired power unit g; p g,t represents the output of coal-fired power unit g at time t; u g,t represents the startup state of coal-fired power unit g at time t, d g,t Represents the shutdown state of coal-fired power unit g at time t.
4. The method for optimizing the start and stop of a unit considering the confidence capacity of new energy sources as claimed in claim 3, characterized in that: The linearization process comprises the following steps: The coal-fired power generation cost curve is expressed as a quadratic function: In the formula, a i , b i , c i They represent the quadratic, linear and constant terms of the cost curve of coal-fired power unit g respectively; x g,t Indicates the start and stop status of the coal-fired power unit; The coal-fired power generation cost curve in the form of a quadratic function is piecewise linearized to obtain the coal-fired power generation cost after piecewise linearization, which is expressed as follows: In the formula, Represents the union of all segments; They represent the upper and lower bounds of the i-th segment of the power generation cost curve of coal-fired power unit g after piecewise linearization; The power generation cost curve of coal-fired power units is linearized and added into the unit combination model as a linear constraint. The expression is: The generation cost curve of coal-fired power generation units in the form of piecewise linearized generation cost replacing quadratic function is obtained.
5. The method for optimizing the start and stop of a unit considering the confidence capacity of new energy sources as claimed in claim 4, characterized in that: The constraints include power supply operation constraints and system-level constraints; the power supply operation constraints include coal-fired power unit operation status logic constraints, coal-fired power unit output limit constraints, coal-fired power unit maximum climbing limit constraints, coal-fired power unit minimum start and stop time constraints, photovoltaic unit output limit constraints, interconnection line planned power constraints and load demand constraints; the system-level constraints include power balance constraints and operation standby constraints.
6. The method for optimizing the start and stop of a unit considering the confidence capacity of new energy sources as claimed in claim 5, characterized in that: The expression of the logical constraint of the coal-fired power unit operation state is: In the formula, x g,t ,u g,t , d g,t are the operating state variables of the coal-fired power units. g,t =1, it means that the coal-fired power unit g is in the start-up state at time t, otherwise the coal-fired power unit is in the shutdown state; when u g,t =1, it means that the coal-fired power unit g starts at time t, that is, it enters the startup state from the shutdown state; when d g,t =1, it means that the thermal power unit g is shut down at time t, that is, it enters the shutdown state from the start state; The expression of the output limit constraint of the coal-fired power unit is: In the formula, Indicates the maximum output limit of coal-fired power unit g; p g Indicates the minimum output limit of coal-fired power unit g; Indicates that the state of coal-fired power unit g at time t is x g,t The maximum output limit when x g,t p g Indicates that the state of coal-fired power unit g at time t is x g,t The minimum output limit when The expression of the maximum climbing limit constraint of the coal-fired power unit is: In the formula, represents the maximum ramp rate of coal-fired power unit g, Indicates the maximum down-slope rate of coal-fired power unit g; when the coal-fired power unit enters the startup state from the shutdown state, the maximum climbing limit at the next moment is relaxed to the minimum technical output; when the coal-fired power unit enters the shutdown state from the startup state, the maximum climbing limit at the next moment is also relaxed to the minimum technical output; The expression of the minimum start-stop time constraint of the coal-fired power unit is: In the formula, Indicates the minimum startup duration of coal-fired power unit g; represents the minimum shutdown duration of coal-fired power unit g, and T represents the end period of combined operation of the units; The expression of the photovoltaic unit output limit constraint is: In the formula, p s,t represents the output of photovoltaic unit s at time t; S s,t represents the resource level of PV unit s at time t, represents the installed capacity of photovoltaic unit s; The expression of the tie line planned power constraint is: Where P l,t represents the exchange power of tie line l at time t; represents the planned exchange power of tie line l at time t; The expression of the load demand constraint is: In the formula, p d,t represents the load demand of load d at time t; represents the actual required power of load d at time t; The expression of the power balance constraint is: The expression of the running standby constraint is: In the formula, p g,t represents the output of coal-fired power unit g at time t; p w,t represents the output of wind turbine g at time t; p s,t represents the output of photovoltaic unit s at time t; Indicates the maximum output limit of coal-fired power unit g; α r Indicates the proportion of operating standby to load, α guar New energy confidence capacity ratio.
7. The method for optimizing the start and stop of a unit considering the confidence capacity of new energy sources as claimed in claim 6, characterized in that: The method of solving the optimized unit combination model to obtain the optimal unit start-stop state includes the following steps: According to the establishment of unit commitment model, the initial values of variables and parameters are set for solution; The model is solved iteratively using an optimization solver to find the optimal solution that satisfies all constraints until the result that minimizes the objective function is found, and the global optimal solution is output; Check whether the solution meets all constraints, generate unit dispatching instructions based on the solution, and issue the dispatching instructions to execute the unit start and stop plan; Monitor the operating status of the power system in real time, adjust the dispatch strategy when the actual operation deviates from the plan, update the dispatch plan, and complete the unit start and stop optimization.
8. A unit start-stop optimization system considering the confidence capacity of new energy sources, based on the unit start-stop optimization method considering the confidence capacity of new energy sources as described in any one of claims 1 to 7, characterized in that: include, The collection module is used to collect historical power output data of wind farms to predict wind power confidence intervals and identify wind power probability distribution patterns; Construction module, used to build the unit combination model, set the objective function and constraints and perform linearization; The solution module is used to optimize the unit combination model considering the confidence capacity of new energy sources, and solve the optimized unit combination model to obtain the optimal unit start and stop status and output plan; The optimization module is used to test the optimization results in a simulation environment, verify the performance and reliability in different scenarios, and dynamically adjust the confidence interval and model parameters to iteratively optimize the model.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the unit start-stop optimization method considering the new energy confidence capacity according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the unit start-stop optimization method considering the new energy confidence capacity as described in any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Photovoltaic power generation confidence capacity evaluation method and device
CN120222320A