Power conversion device and method for controlling same
By controlling the duty cycle and carrier amplitude of the switch tube, alternating the phase relationship, the problem of unbalanced bridge arm loss is solved, the output characteristics of the power conversion device are realized, and the phase shift function is the same as that of the traditional phase shift scheme, and the switch is made Loss equalization.
Patent Information
- Application Number
- CN202411274711.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-12-06
AI Technical Summary
In the internal phase shift modulation method, the switching loss between the bridge arms is unbalanced, which limits the output power of the converter.
By controlling the duty cycle and carrier amplitude of the first and fourth switch tubes, the phase relationships thereof are altered alternately, and the phase relationship between the first and second bridge arms is rotated, thereby achieving equalization of switching losses.
The same phase shift function as the traditional phase shift scheme is realized, while the switching losses in the first and second bridge arms are balanced, avoiding the transition process and ensuring seamless rotation of the phase relationship.
Smart Images

Figure CN119093750A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power supply technology, and in particular to a power conversion device and a control method thereof. Background Art
[0002] The internal phase-shift modulation method can achieve wide input, suppress oscillation, etc., and thus is widely used. However, the phase relationship between the two bridge arms in the internal phase-shift modulation method is often fixed, which will cause the switching loss of the leading bridge arm to be higher than the switching loss of the lagging bridge arm, making the switching loss between the bridge arms unbalanced, thereby limiting the output power of the converter. Summary of the invention
[0003] The present application provides a power conversion device and a control method thereof, which can not only realize the phase shift function, but also realize the loss balance of the switch tubes in the first bridge arm and the second bridge arm.
[0004] In a first aspect, the present application provides a power conversion device, which includes a positive DC bus, a negative DC bus, a first bridge arm, a second bridge arm, a power output circuit and a controller. The first bridge arm and the second bridge arm are connected in parallel or in series between the positive DC bus and the negative DC bus, and the midpoint of the first bridge arm and the midpoint of the second bridge arm are connected to the power output circuit; the first bridge arm includes a first switch tube and a second switch tube connected in series, and the second bridge arm includes a third switch tube and a fourth switch tube connected in series, the first switch tube is connected to the positive DC bus, and the fourth switch tube is connected to the negative DC bus. The controller is used to control the duty cycle of the first switch tube to be D in a first time interval. 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 ; In the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 , so as to alternately change the phase relationship between the first switch tube and the fourth switch tube. Wherein, the first time interval and the second time interval are any two adjacent time intervals. 10 and D 20 can be understood as the initial duty cycle of the first switch tube and the fourth switch tube when no phase shift is added. Specifically, D 10 is the duty cycle of the first switch tube in the first time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; D 20 is the duty cycle of the first switch tube in the second time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycle is the same. Assuming that the phase difference between the first switch tube and the fourth switch tube is θ, then ΔD 10 and ΔD20 It can be understood that the phase difference between the first switch tube and the fourth switch tube is θ / 2, and the duty cycle change of the first switch tube and the fourth switch tube relative to the initial duty cycle. Specifically, ΔD 10 It is half of the ratio of the phase shift time of the first switch tube and the fourth switch tube to the switching period of the first switch tube in the first time interval. 20 The phase shift time between the first switch tube and the fourth switch tube is half of the ratio of the phase shift time between the first switch tube and the fourth switch tube to the switching period of the first switch tube in the second time interval. The phase shift time between the first switch tube and the fourth switch tube is usually used to indicate the time required for the phase difference between the first switch tube and the fourth switch tube to adjust from 0 to θ, which is specifically equal to the product of (θ / 360°) and the switching period.
[0005] In this embodiment, the power conversion device can control the average value of the duty cycle of the first switch tube and the duty cycle of the fourth switch tube in any time interval to always be the initial duty cycle, and the duty cycles of the first switch tube and the fourth switch tube are different from the initial duty cycle by the duty cycle change amount, so that the output characteristics of the power conversion device are the same as the output characteristics of the power conversion device when the conventional phase shifting scheme is adopted in which the phase difference between the first switch tube and the fourth switch tube is always controlled to be θ and the duty cycle is the same. In other words, the power conversion device can achieve the same phase shifting function as the conventional phase shifting scheme. In addition, since the magnitude relationship between the duty cycle of the first switch tube and the duty cycle of the fourth switch tube in any two adjacent time intervals is different, it can be obtained that the phase relationship between the first bridge arm and the second bridge arm in any two adjacent time intervals is different. In other words, the phase relationship between the first bridge arm and the second bridge arm is alternately changed, so that the loss of the switch tube in the first bridge arm can be close to the loss of the switch tube in the second bridge arm, and the switching loss is balanced.
[0006] In a possible implementation manner, when the power conversion device is in a steady state, D 10 With D 20 Same, ΔD 10 With ΔD 20 The same, wherein the electrical data of the power conversion device in steady state is fixed or changes periodically.
[0007] In this embodiment, when the power conversion device is in a steady state, the duty cycle of the first switch tube and the duty cycle of the fourth switch tube are controlled to alternately exchange the phase rotation mode, so that before and after the phase relationship between the first bridge arm and the second bridge arm is rotated, the output voltage waveform between the first bridge arm and the second bridge arm does not change, and therefore, no transition process is brought to the power conversion device, thereby achieving seamless rotation of the phase relationship between the first bridge arm and the second bridge arm. In addition, when the power conversion device is in a steady state, in addition to achieving the same phase shifting function as the traditional phase shifting scheme, the switching losses in the first bridge arm and the second bridge arm can also be balanced.
[0008] In a possible implementation manner, when the power conversion device is in a transient state, D 10 With D 20 Different, or, ΔD 10 With ΔD 20 Different, in which the electrical data of the power conversion device changes suddenly under transient conditions.
[0009] In this embodiment, when the power conversion device is in a transient state, in addition to achieving the same phase shifting function as a traditional phase shifting solution, the switching losses in the first bridge arm and the second bridge arm can also be balanced.
[0010] In a possible implementation manner, within the first time interval, the controller is used to keep the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube unchanged, and control the modulation wave amplitude of the first switch tube and (D 10 +ΔD 10 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 10 -ΔD 10 ) is positively correlated, so that the duty cycle of the first switch tube in the first time interval is D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the controller is used to keep the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube unchanged, and control the modulation wave amplitude of the first switch tube and (D 20 -ΔD 20 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 20 +ΔD 20 ) is positively correlated, so that the duty cycle of the first switch tube in the second time interval is D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 .
[0011] In this embodiment, the power conversion device can change the carrier amplitude of each switch tube in the first switch tube and the fourth switch tube so that the average of the duty cycle of the first switch tube and the duty cycle of the fourth switch tube in any time interval is always the initial duty cycle, and the duty cycle of the first switch tube and the fourth switch tube differs from the initial duty cycle by the duty cycle change amount, so that the power conversion device can achieve the same phase shifting function as the traditional phase shifting scheme.
[0012] In a possible implementation manner, within the first time interval, the controller is used to keep the modulation wave of the first switch tube and the modulation wave of the fourth switch tube unchanged, and control the carrier amplitude of the first switch tube and (D 10 +ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 10 -ΔD 10 ) is negatively correlated, so that in the first time interval, the duty cycle of the first switch tube is D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the controller is used to keep the modulation wave of the first switch tube and the modulation wave of the fourth switch tube unchanged, and control the carrier amplitude of the first switch tube and (D 20 -ΔD 20 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 20 +ΔD 20 ) is negatively correlated, so that in the second time interval, the duty cycle of the first switch tube is D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 .
[0013] In this embodiment, the power conversion device can change the modulation wave amplitude of each switch tube in the first switch tube and the fourth switch tube so that the average of the duty cycle of the first switch tube and the duty cycle of the fourth switch tube in any time interval is always the initial duty cycle, and the duty cycle of the first switch tube and the fourth switch tube differs from the initial duty cycle by the duty cycle change amount, so that the power conversion device can achieve the same phase shifting function as the traditional phase shifting scheme.
[0014] In a possible implementation, the power output circuit includes a resonance unit, a transformer, a third bridge arm and a fourth bridge arm, and the transformer includes a primary winding and a secondary winding. The first bridge arm and the second bridge arm are connected in series between the positive DC bus and the negative DC bus. The primary winding and the resonance unit are connected in series between the midpoint of the first bridge arm and the midpoint of the second bridge arm, and the two ends of the secondary winding are connected to the midpoint of the third bridge arm and the midpoint of the fourth bridge arm, respectively, and the third bridge arm and the fourth bridge arm are connected in parallel.
[0015] In this embodiment, the power conversion device is a three-level LC resonant converter.
[0016] In a possible implementation, the power output circuit includes a resonance unit, a transformer, a first rectifier diode and a second rectifier diode, and the transformer includes a primary winding, a first secondary winding and a second secondary winding. The first bridge arm and the second bridge arm are connected in parallel between the positive DC bus and the negative DC bus. The primary winding and the resonance unit are connected in series between the midpoint of the first bridge arm and the midpoint of the second bridge arm, the first secondary winding and the second secondary winding are connected in series between the anode of the first rectifier diode and the anode of the second rectifier diode, and the cathode of the first rectifier diode is connected to the cathode of the second rectifier diode.
[0017] In this embodiment, the power conversion device is a phase-shifted full-bridge converter.
[0018] In a second aspect, the present application provides a control method for a power conversion device, which is applied to a power conversion device, wherein the power conversion device includes a positive DC bus, a negative DC bus, a first bridge arm, a second bridge arm, and a power output circuit. The first bridge arm and the second bridge arm are connected in parallel or in series between the positive DC bus and the negative DC bus, and the midpoint of the first bridge arm and the midpoint of the second bridge arm are connected to the power output circuit. The first bridge arm includes a first switch tube and a second switch tube connected in series, and the second bridge arm includes a third switch tube and a fourth switch tube connected in series, the first switch tube is connected to the positive DC bus, and the fourth switch tube is connected to the negative DC bus. The method includes: in a first time interval, controlling the duty cycle of the first switch tube to be D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 , and in the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 , so as to alternately change the phase relationship between the first switch tube and the fourth switch tube. Wherein, the first time interval and the second time interval are any two adjacent time intervals; D 10 is the duty cycle of the first switch tube in the first time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 10 is half of the ratio of the phase shift time of the first switch tube and the fourth switch tube to the switching period of the first switch tube in the first time interval; D 20 is the duty cycle of the first switch tube in the second time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 20It is half of the ratio of the phase shift time of the first switch tube and the fourth switch tube to the switching period of the first switch tube in the second time interval.
[0019] In a possible implementation manner, when the power conversion device is in a steady state, D 10 With D 20 Same, ΔD 10 With ΔD 20 The same, wherein the electrical data of the power conversion device in steady state is fixed or changes periodically.
[0020] In a possible implementation manner, when the power conversion device is in a transient state, D 10 With D 20 Different, or, ΔD 10 With ΔD 20 Different, in which the electrical data of the power conversion device changes suddenly under transient conditions.
[0021] In a possible implementation manner, within the first time interval, the power conversion device keeps the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube unchanged, and controls the modulation wave amplitude of the first switch tube and (D 10 +ΔD 10 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 10 -ΔD 10 ) is positively correlated, so that the duty cycle of the first switch tube in the first time interval is D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the power conversion device keeps the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube unchanged, and controls the modulation wave amplitude of the first switch tube and (D 20 -ΔD 20 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 20 +ΔD 20 ) is positively correlated, so that the duty cycle of the first switch tube in the second time interval is D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 .
[0022] In a possible implementation manner, within the first time interval, the power conversion device keeps the modulation wave of the first switch tube and the modulation wave of the fourth switch tube unchanged, and controls the carrier amplitude of the first switch tube and (D 10 +ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 10 -ΔD 10) is negatively correlated, so that in the first time interval, the duty cycle of the first switch tube is D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the power conversion device keeps the modulation wave of the first switch tube and the modulation wave of the fourth switch tube unchanged, and controls the carrier amplitude of the first switch tube and (D 20 -ΔD 20 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 20 +ΔD 20 ) is negatively correlated, so that in the second time interval, the duty cycle of the first switch tube is D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 .
[0023] It should be understood that the implementation and beneficial effects of the above-mentioned aspects of the present application can be referenced to each other. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of an application scenario of the power conversion device provided in this application;
[0025] Figure 2 It is a structural schematic diagram of a power conversion device provided by the present application;
[0026] Figure 3 It is a control timing diagram of the power conversion device provided by the present application;
[0027] Figure 4 is another control timing diagram of the power conversion device provided by the present application;
[0028] Figure 5 is another control timing diagram of the power conversion device provided by the present application;
[0029] Figure 6 It is another control timing diagram of the power conversion device provided by the present application;
[0030] Figure 7 is another structural schematic diagram of the power conversion device provided by the present application;
[0031] Figure 8 is another structural schematic diagram of the power conversion device provided by the present application;
[0032] Fig. 9 It is a flow chart of the control method of the power conversion device provided in the present application. DETAILED DESCRIPTION
[0033] The power conversion device provided in this application can be applied to various application fields such as photovoltaic power generation, energy storage power generation, new energy intelligent microgrid, power transmission and distribution, new energy electric vehicles, data center power supply, etc. The power conversion device provided in this application can be applied to power electronic converters with a bridge arm number greater than or equal to 2, such as: photovoltaic optimizers, inverters, energy storage converters (Power Convers ion System, PCS), uninterrupted power supplies (Uninterrupted Power Supply, UPS), charging piles, on-board chargers (On-board Charger, OBC), server power supplies and chargers for electronic devices (such as mobile phones, tablets, portable computers, etc.), etc., and is suitable for different application scenarios, such as photovoltaic power supply scenarios, energy storage power supply scenarios, light storage hybrid power supply scenarios, UPS power supply scenarios, electric vehicle battery charging and discharging scenarios, server power supply scenarios, electronic equipment power supply scenarios, etc. The photovoltaic power supply scenario is used as an example for explanation.
[0034] See also Figure 1 , Figure 1 Schematic diagram of the application scenario of the power conversion device provided by this application. In the photovoltaic power supply scenario, the power conversion device provided by this application is Figure 1 The photovoltaic optimizer shown, the DC end of the photovoltaic optimizer is connected to the photovoltaic string, and the AC end of the photovoltaic optimizer is connected to the AC power grid through the box-type substation and the booster station in turn. The photovoltaic optimizer includes a positive DC bus BUS+, a negative DC bus BUS-, a first bridge arm, a second bridge arm, a power output circuit and a controller. The power output circuit includes a transformer T, an inductor Lr, a third bridge arm and a fourth bridge arm, and the transformer T includes a primary winding Lp and a secondary winding Ls. The first bridge arm is composed of a first switch tube S1 and a second switch tube S2 connected in series, the second bridge arm is composed of a third switch tube S3 and a fourth switch tube S4 connected in series, the third bridge arm is composed of a fifth switch tube S5 and a sixth switch tube S6 connected in series, and the fourth bridge arm is composed of a seventh switch tube S7 and an eighth switch tube S8 connected in series. Among them, the first bridge arm and the second bridge arm are connected in parallel between the positive DC bus BUS+ and the negative DC bus BUS-, the first switch tube S1 is connected to the positive DC bus BUS+, the fourth switch tube S4 is connected to the negative DC bus BUS-, and the positive DC bus BUS+ and the negative DC bus BUS- are connected to the DC end of the photovoltaic optimizer. The midpoint of the first bridge arm and the midpoint of the second bridge arm are respectively connected to the two ends of the primary winding Lp, the secondary winding Ls and the inductor Lr are connected in series between the midpoint of the third bridge arm and the midpoint of the fourth bridge arm, and the third bridge arm and the fourth bridge arm are connected in parallel to the AC end of the photovoltaic optimizer.
[0035] After the PV optimizer starts running, the controller performs maximum power point tracking (MPPT) on the output power of the PV strings connected to the PV optimizer to maximize the output power of the PV strings. At the same time, the controller inverts the DC power at the DC end of the PV optimizer into AC power and outputs it to the box-type substation connected to it. The box-type substation boosts the AC power input to its input end and outputs it to the booster station. The booster station boosts the AC power input to its input end to obtain AC power that meets the requirements of the AC power grid, thereby realizing power supply to the AC power grid.
[0036] In the process of the photovoltaic optimizer supplying stable power to the AC grid, when the controller detects that the AC end current of the photovoltaic optimizer is greater than the current threshold, or the AC end power of the photovoltaic optimizer is greater than the power threshold, it means that there are switch tubes with high junction temperature or loss in the first bridge arm and the second bridge arm, then the controller controls the duty cycle of the first switch tube S1 to be D in the first time interval. 10 +ΔD 10 The duty cycle of the fourth switch tube S4 is D 10 -ΔD 10 , and in the second time interval, the duty cycle of the first switch tube S1 is controlled to be D 20 -ΔD 20 The duty cycle of the fourth switch tube S4 is D 20 +ΔD 20 , so as to alternately change the phase relationship (including overtime and hysteresis) between the first switch tube S1 and the fourth switch tube S4, that is, alternately change the phase relationship between the first bridge arm and the second bridge arm. The first time interval and the second time interval are any two adjacent time intervals. 10 and D 20 can be understood as the initial duty cycle of the first switch tube S1 and the fourth switch tube S4 when no phase shift is added. Specifically, D 10 is the duty cycle of the first switch tube S1 in the first time interval when the phase difference between the first switch tube S1 and the fourth switch tube S4 is 0 and the duty cycles are the same; D 20 is the duty cycle of the first switch S1 in the second time interval when the phase difference between the first switch S1 and the fourth switch S4 is 0 and the duty cycle is the same. Assuming that the phase difference between the first switch S1 and the fourth switch S4 is θ, then ΔD 10 and ΔD 20 It can be understood that the phase difference between the first switch tube S1 and the fourth switch tube S4 is θ / 2, and the duty cycle change of the first switch tube S1 and the fourth switch tube S4 relative to the initial duty cycle. Specifically, ΔD 10It is half of the ratio of the phase shift time of the first switch tube S1 and the fourth switch tube S4 to the switching period of the first switch tube S1 in the first time interval. 20 The phase shift time between the first switch tube S1 and the fourth switch tube S4 is half of the ratio of the phase shift time between the first switch tube S1 and the fourth switch tube S4 to the switching period of the first switch tube S1 in the second time interval. The phase shift time between the first switch tube S1 and the fourth switch tube S4 is usually used to indicate the time required for the phase difference between the first switch tube S1 and the fourth switch tube S4 to adjust from 0 to θ, which is specifically equal to the product of (θ / 360°) and the switching period.
[0037] It can be understood that the photovoltaic optimizer controls the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 in any time interval to always be the initial duty cycle, and the duty cycles of the first switch tube S1 and the fourth switch tube S4 are different from the initial duty cycle by the duty cycle change amount, so that the output characteristics of the photovoltaic optimizer are the same as the output characteristics of the photovoltaic optimizer when the conventional phase shifting scheme is adopted in which the phase difference between the first switch tube S1 and the fourth switch tube S4 is always θ and the duty cycle is the same. In other words, the photovoltaic optimizer can achieve the same phase shifting function as the conventional phase shifting scheme. In addition, since the magnitude relationship between the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 in any two adjacent time intervals is different, it can be obtained that the phase relationship between the first bridge arm and the second bridge arm in any two adjacent time intervals is different. In other words, the phase relationship between the first bridge arm and the second bridge arm is alternating, so that the loss of the switch tube in the first bridge arm can be close to the loss of the switch tube in the second bridge arm, and the switching loss is balanced.
[0038] The above is only an example of the application scenarios of the power conversion device provided in this application, and is not an exhaustive list. This application does not limit the application scenarios.
[0039] Combine the following Figures 2 to 8 The working principle of the power conversion device provided in this application is illustrated by way of example.
[0040] See also Figure 2 , Figure 2 Schematic diagram of a power conversion device provided by the present application. Figure 2As shown, the power conversion device 1 includes an input end (including input end i11 and input end i12), a positive DC bus BUS+, a negative DC bus BUS-, a first bridge arm 111, a second bridge arm 112, a power output circuit 12, a controller 13 and an output end (including output end o11 and output end o12). Among them, the input end i11 and the input end i12 of the power conversion device 1 are used to connect to a DC source (including a photovoltaic string, a battery cluster or a capacitor, etc.), and the output end o11 and the output end o12 of the power conversion device 1 are used to connect to a power grid or a load. The first bridge arm 111 and the second bridge arm 112 are connected in parallel between the positive DC bus BUS+ and the negative DC bus BUS-, and the positive DC bus BUS+ and the negative DC bus BUS- are connected to the input end i11 and the input end i12 of the power conversion device 1 respectively. The first bridge arm 111 includes a first switch tube S1 and a second switch tube S2 connected in series, and the second bridge arm 112 includes a third switch tube S3 and a fourth switch tube S4 connected in series. The first switch tube S1 and the third switch tube S3 are both connected to the positive DC bus BUS+, and the second switch tube S2 and the fourth switch tube S4 are both connected to the negative DC bus BUS-. The midpoint a of the first bridge arm 111 and the midpoint b of the second bridge arm 112 are connected to the output end o11 and the output end o12 of the power conversion device 1 through the power output circuit 12. Optionally, the connection relationship between the first bridge arm 111 and the second bridge arm 112 can be connected in series between the positive DC bus BUS+ and the negative DC bus BUS- in addition to being in parallel. The switch tube in each bridge arm of the power conversion device 1 includes a metal oxide semiconductor field effect transistor (metal oxide semiconductor field effect transistor, MOSFET), an insulated gate bipolar transistor (Insulated Gate Bipolar Transistor, IGBT) or a gallium nitride (Gallium Nitride, GaN) transistor, etc.
[0041] In the process of the power conversion device 1 supplying power to the grid or the load, the controller 13 controls the duty cycle of the first switch tube S1 to be D in the first time interval. 10 +ΔD 10 The duty cycle of the fourth switch tube S4 is D 10 -ΔD 10 , and in the second time interval, the duty cycle of the first switch tube S1 is controlled to be D 20 -ΔD 20 The duty cycle of the fourth switch tube S4 is D 20 +ΔD 20, to alternately change the phase relationship between the first switch tube S1 and the fourth switch tube S4. The phase relationship between the first switch tube S1 and the fourth switch tube S4 specifically includes that the phase of the first switch tube S1 is ahead of the phase of the fourth switch tube S4, and the phase of the first switch tube S1 is behind the phase of the fourth switch tube S4. The first time interval and the second time interval are any two adjacent time intervals, and the interval length of the first time interval and the interval length of the second time interval can be the same or different. Here, with respect to D 10 , ΔD 10 , D 20 and ΔD 20 For an explanation, see Figure 1 The description of the corresponding parts in the application scenario shown is not repeated here.
[0042] In one embodiment, when the power conversion device 1 is in a steady state, D 10 With D 20 Same, ΔD 10 With ΔD 20 The same. In the steady state, the electrical data of the power conversion device 1 is fixed or changes periodically, and the electrical data of the power conversion device 1 includes the duty cycle, phase and switching period of the switch tube, and the periodic change includes a sinusoidal change. Exemplarily, in the sine pulse width modulation (SPWM) modulation mode, the modulation wave of the switch tube is a sinusoidal modulation wave and the carrier is a triangular wave, and the duty cycle in the drive signal of the switch tube changes according to the sinusoidal law.
[0043] Specifically, when the power conversion device 1 is in a steady state, in other words, when the power conversion device 1 is supplying stable power to the grid or the load, the controller 13 controls the duty cycle of the first switch tube S1 to be D in the first time interval. 10 +ΔD 10 The duty cycle of the fourth switch tube S4 is D 10 -ΔD 10 , and in the second time interval, the duty cycle of the first switch tube S1 is controlled to be D 10 -ΔD 10 The duty cycle of the fourth switch tube S4 is D 10 +ΔD 10 In other words, the controller 13 alternately exchanges the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 to alternately exchange the phase relationship between the first switch tube S1 and the fourth switch tube S4.
[0044] It should be noted that, since different switch tubes may cooperate with different soft switch types (such as zero voltage switch or zero current switch), the switching loss of the switch tube is sometimes a turn-off loss and sometimes a turn-on loss. Exemplarily, if the switch tube is a MOSFET and is turned on at zero voltage, the turn-on loss of the switch tube is 0, and the switching loss of the switch tube is a turn-off loss. When the switching loss of the switch tube is a turn-off loss, the phase of the first switch tube S1 lags behind the phase of the fourth switch tube S4, specifically referring to the turn-off time of the first switch tube S1 being later than the turn-off time of the fourth switch tube; the phase of the first switch tube S1 is ahead of the phase of the fourth switch tube S4, specifically referring to the turn-off time of the first switch tube S1 being earlier than the turn-off time of the fourth switch tube. When the switching loss of the switch tube is conduction loss, the phase of the first switch tube S1 lags behind the phase of the fourth switch tube S4, specifically referring to the conduction time of the first switch tube S1 being later than the conduction time of the fourth switch tube; the phase of the first switch tube S1 is ahead of the phase of the fourth switch tube S4, specifically referring to the conduction time of the first switch tube S1 being earlier than the conduction time of the fourth switch tube. Regardless of whether the switching loss of the switch tube is turn-off loss or turn-on loss, the control method of the power conversion device to achieve phase rotation does not change. Therefore, for the convenience of description, the following is an example of the switch loss of the switch tube being turn-off loss.
[0045] In an optional embodiment, the controller 13 keeps the carrier amplitude of the first switch tube S1 and the carrier amplitude of the fourth switch tube S4 unchanged, and controls the modulation wave amplitude of the first switch tube S1 and (D 10 +ΔD 10 ) and the modulation wave amplitude of the fourth switch tube S4 is positively correlated with (D 10 -ΔD 10 ), and in the second time interval, the modulation wave amplitude of the first switch tube S1 is controlled to be positively correlated with (D 10 -ΔD 10 ) and the modulation wave amplitude of the fourth switch tube S4 is positively correlated with (D 10 +ΔD 10 ), so that the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 are alternately exchanged, and then the phase relationship between the first switch tube S1 and the fourth switch tube S4 is alternately exchanged.
[0046] For example, see Figure 3 , Figure 3 1 is a control timing diagram of a power conversion device provided by the present application. Figure 3As shown, the carrier of the first switch tube S1 and the carrier of the fourth switch tube S4 are the same triangular carrier C. The initial modulation waves of the first switch tube S1 and the fourth switch tube S4 are the same, both of which are L indicated by black parallel dotted lines, and the ratio between the amplitude of the initial modulation wave L and the amplitude of the triangular carrier C (i.e., D 10 ) is 0.5. The initial modulation wave of any switch tube among the first switch tube S1 and the fourth switch tube S4 is the modulation wave amplitude of any switch tube when the phase difference between the first switch tube S1 and the fourth switch tube S4 is 0 and the duty cycle is the same. In other words, the initial modulation wave of any switch tube is the modulation wave of any switch tube without phase shifting. The modulation wave of the first switch tube S1 is L1 indicated by gray interrupted parallel solid lines, and the modulation wave of the fourth switch tube S4 is L4 indicated by black interrupted parallel dotted lines. The interval length of the first time interval is the same as the interval length of the second time interval, and both are N times the switching period of any switch tube in the power conversion device 1, where N is a positive integer. The switching period of each switch tube in the power conversion device 1 is the same. For the sake of convenience of description, the switching period of any switch tube is referred to as the switching period below.
[0047] In the first N switching cycles T before time t1, the controller 13 keeps the amplitude Cm of the triangular carrier C unchanged and controls the amplitude Lm of the modulation wave L1 of the first switch tube S1. 1m =(0.5+ΔD 10 )*Cm, and controls the amplitude L of the modulation wave L4 of the fourth switch tube S4 4m =(0.5-ΔD 10 )*Cm, where ΔD 10 =t PS / (2T),t PS is the phase shift time between the first switch tube S1 and the fourth switch tube S4. Thus, the duty cycle D1 of the first switch tube S1 is equal to 0.5+ΔD 10 And the duty cycle of the fourth switch tube S4 is D4=0.5-ΔD 10 , thereby causing the phase of the first switch tube S1 to lag behind the phase of the fourth switch tube S4 by θ degrees.
[0048] In the N switching cycles T after the time t1, the controller 13 keeps the amplitude Cm of the triangular carrier C unchanged and controls the amplitude Lm of the modulation wave L1 of the first switch tube S1. 1m =(0.5-ΔD 10 )*Cm, and controls the amplitude L of the modulation wave L4 of the fourth switch tube S4 4m =(0.5+ΔD 10 )*Cm. Thus, the duty cycle of the first switch tube S1 is D1=0.5-ΔD 10 And the duty cycle of the fourth switch tube S4 is D4=0.5+ΔD 10, thereby making the phase of the first switch tube S1 lead the phase of the fourth switch tube S4 by θ degrees.
[0049] based on Figure 3 It can be seen from the phase rotation control method shown that at the maximum value of the carrier of the first switch tube S1, the controller 13 controls the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 to be exchanged once every fixed time interval (such as N switching cycles T), so that the phase relationship between the first switch tube S1 and the fourth switch tube S4 is rotated once every fixed time interval. Furthermore, not only can the power conversion device 1 realize the phase shift function, but also it can ensure that the stress, loss and junction temperature of the first switch tube S1 and the fourth switch tube S4 can be rotated once at every fixed time interval. Since the second switch tube S2 is complementary to the first switch tube S1 and the fourth switch tube S4 is complementary to the third switch tube S3, the stress, loss and junction temperature of the second switch tube S2 and the third switch tube S3 can be rotated once at every fixed time interval, so that the loss of the first bridge arm 111 and the loss of the second bridge arm 112 tend to be consistent, the stress of the first bridge arm 111 and the stress of the second bridge arm 112 tend to be consistent, and the junction temperature of the first bridge arm 111 and the junction temperature of the second bridge arm 112 tend to be consistent, in short, the loss, stress and junction temperature of the first bridge arm 111 and the second bridge arm 112 tend to be consistent, that is, the loss, stress and junction temperature of each switch tube in the first bridge arm 111 and the second bridge arm 112 can be balanced. In addition, due to Figure 4 The moment t1 in the figure is the moment when the phase relationship between the first switch tube S1 and the fourth switch tube S4 changes, and the waveform of the output voltage Vab between the first bridge arm 111 and the second bridge arm 112 does not change before and after the moment t1. Therefore, it can be obtained that the phase rotation control method provided in the present application does not bring a transition process to the power conversion device 1 in a steady state, and can achieve seamless rotation of the phase relationship between the first bridge arm 111 and the second bridge arm 112.
[0050] In another optional embodiment, the controller 13 keeps the modulation wave of the first switch tube S1 and the modulation wave of the fourth switch tube S4 unchanged, and controls the carrier amplitude of the first switch tube S1 and (D 10 +ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube S4 is negatively correlated with (D 10 -ΔD 10 ), and the carrier amplitude of the first switch tube S1 is controlled to be negatively correlated with (D 10 -ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube S4 is negatively correlated with (D 10 +ΔD 10) is negatively correlated. Thus, the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 are alternately exchanged, and then the phase relationship between the first switch tube S1 and the fourth switch tube S4 is alternately exchanged.
[0051] For example, see Figure 4 , Figure 4 is another control timing diagram of the power conversion device provided by the present application. Figure 4 As shown, the modulation wave of the first switch tube S1 is L1, and the modulation wave of the fourth switch tube S4 is L4. The carrier of the first switch tube S1 and the carrier of the fourth switch tube S4 are both triangular carriers, and the carrier amplitudes of the first switch tube S1 before and after adjusting the phase relationship are C 1m and C 1m ', the carrier amplitudes before and after the fourth switch tube S4 adjusts the phase relationship are C 4m and C 4m '. The length of the first time interval is the same as the length of the second time interval, which is N times the switching period. 10 =0.5, for example, Figure 4 Make an introduction.
[0052] In the N switching cycles T before the time 2T, the controller 13 maintains the amplitude L of the modulation wave L1 of the first switch tube S1 1m and the amplitude L of the modulation wave L4 of the fourth switch tube S4 4m The carrier amplitude C of the first switch tube S1 is controlled 1m =L 1m / (0.5+ΔD 10 ), and controls the carrier amplitude C of the fourth switch tube S4 4m =L 4m / (0.5-ΔD 10 ), where ΔD 10 =t PS / (2T),t PS is the phase shift time between the first switch tube S1 and the fourth switch tube S4. Thus, the duty cycle D1 of the first switch tube S1 is equal to 0.5+ΔD 10 And the duty cycle of the fourth switch tube S4 is D4=0.5-ΔD 10 , thereby making the phase of the first switch tube S1 lag behind the phase of the fourth switch tube S4 by θ degrees. θ is the phase shift time t PS The corresponding phase difference between the first switch tube S1 and the fourth switch tube S4.
[0053] In order to achieve seamless switching of the phase relationship between the first switch tube S1 and the fourth switch tube S4, that is, to achieve seamless switching of the phase of the first switch tube S1 to the leading fourth switch tube S4 between 1.5T and 2.5T, at the time 2T, the controller 13 maintains the amplitude L of the modulation wave L1 of the first switch tube S1 1m and the amplitude L of the modulation wave L4 of the fourth switch tube S4 4m The carrier amplitude of the first switch tube S1 is controlled from C 1m Change to C 1m ', and control the carrier amplitude of the fourth switch tube S4 from C 4m Change to C 4m ′, and C 1m ′ and C 4m ′ needs to satisfy the following formula: At the same time, it is required that the phase of the first switch tube S1 is ahead of the phase of the fourth switch tube S4 within N switching cycles T after the time 2.5T, so the controller 13 also needs to control C′ 1m =L 1m / (0.5-ΔD 10 ) and C 4m ′=L 4m / (0.5+ΔD 10 ). Thus, the duty cycle of the first switch tube S1 is D1 = 0.5-ΔD 10 And the duty cycle of the fourth switch tube S4 is D4=0.5+ΔD 10 , thereby making the phase of the first switch tube S1 ahead of the phase of the fourth switch tube S4 by θ degrees, and making the waveform of the output voltage between the first bridge arm 111 and the second bridge arm 112 remain unchanged within 2N switching cycles before and after the moment 2T. Therefore, it can be obtained that the phase rotation control method provided in the present application does not bring a transition process to the power conversion device 1 when the power conversion device 1 is in a steady state, and can realize seamless rotation of the phase relationship between the first bridge arm 111 and the second bridge arm 112.
[0054] based on Figure 4 It can be seen from the phase rotation control method shown that at the maximum value of the carrier of the first switch tube S1 or the fourth switch tube S4, the magnitude relationship between the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 is changed once every fixed time interval (such as N switching cycles T), thereby making the phase relationship between the first switch tube S1 and the fourth switch tube S4 change once every fixed time interval. In addition, the power conversion device 1 can not only realize the phase shift function, but also the loss, stress and junction temperature of each switch tube in the first bridge arm 111 and the second bridge arm 112 can be balanced, and the seamless rotation of the phase relationship between the first bridge arm 111 and the second bridge arm 112 can be realized.
[0055] In another embodiment, when the power conversion device 1 is in a transient state, D 10 With D 20 Different, or, ΔD 10 With ΔD 20 Different. In the transient state, the electrical data of the power conversion device 1 suddenly changes. Exemplarily, due to a sudden change or switch in the load connected to the power conversion device 1, the switching cycle, duty cycle or phase of the switch tube suddenly changes, so that the power conversion device 1 is in a transient state.
[0056] Specifically, when the power conversion device 1 is in a transient state, the controller 13 controls the duty cycle of the first switch tube S1 to be D in the first time interval. 10 +ΔD 10 The duty cycle of the fourth switch tube S4 is D 10 -ΔD 10 , and in the second time interval, the duty cycle of the first switch tube S1 is controlled to be D 20 -ΔD 20 The duty cycle of the fourth switch tube S4 is D 20 +ΔD 20 , so as to alternately change the magnitude relationship between the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4, thereby alternately changing the phase relationship between the first switch tube S1 and the fourth switch tube S4.
[0057] In an optional embodiment, the controller 13 keeps the carrier amplitude of the first switch tube S1 and the carrier amplitude of the fourth switch tube S4 unchanged, and controls the modulation wave amplitude of the first switch tube S1 and (D 10 +ΔD 10 ) and the modulation wave amplitude of the fourth switch tube S4 is positively correlated with (D 10 -ΔD 10 ), and in the second time interval, the modulation wave amplitude of the first switch tube S1 is controlled to be positively correlated with (D 20 -ΔD 20 ) and the modulation wave amplitude of the fourth switch tube S4 is positively correlated with (D 20 +ΔD 20 ), so that the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 are alternately exchanged, and then the phase relationship between the first switch tube S1 and the fourth switch tube S4 is alternately exchanged.
[0058] For example, see Figure 5 , Figure 5 is another control timing diagram of the power conversion device provided by the present application. Figure 5As shown, the carrier of the first switch tube S1 is a triangular carrier C1, and the carrier of the fourth switch tube S4 is a triangular carrier C4. The initial modulation wave of the first switch tube S1 is L1 indicated by a black solid line, and the initial modulation wave of the fourth switch tube S4 is L4 indicated by a black solid line. Obviously, the initial duty cycle of the first switch tube S1 in any two adjacent switching cycles T is different. The modulation wave applied to the first switch tube S1 with a phase relationship rotation is L1' indicated by a gray solid line, and the modulation wave applied to the fourth switch tube S4 with a phase relationship rotation is L4' indicated by a gray solid line. The interval length of the first time interval is the same as the interval length of the second time interval, both of which are the switching cycle T.
[0059] Between 0.5T and 1.5T, the controller 13 maintains the amplitude C of the carrier C1 of the first switch tube S1. 1m and the amplitude C of the carrier C4 of the fourth switch tube S4 4m The amplitude L′ of the modulation wave L1′ of the first switch tube S1 is controlled unchanged. 1m =(D 10 -ΔD 10 )*C 1m , and controls the amplitude L′ of the modulation wave L4′ of the fourth switch tube S4 4m =(D 10 +ΔD 10 )*C 4m , where C 1m is the amplitude of the carrier C1 of the first switch tube S1, C 4m is the amplitude of the carrier C4 of the fourth switch tube S4; L 1m1 is the amplitude of the initial modulation wave L1 of the first switch tube S1 in the time period from 0.5T to 1.5T, L 4m1 is the amplitude of the initial modulation wave L4 of the fourth switch tube S4 in the time period from 0.5T to 1.5T; ΔD 10 =t PS1 / (2T),t PS1 is the phase shift time in the time period from 0.5T to 1.5T. Thus, the duty cycle D1 of the first switch tube S1 is D 10 -ΔD 10 And the duty cycle D4 of the fourth switch tube S4 is D 10 +ΔD 10 , and thus the phase of the first switch tube S1 is ahead of the phase of the fourth switch tube S4.
[0060] In order to achieve seamless switching of the phase relationship between the first switch tube S1 and the fourth switch tube S4 between 1.5T and 2.5T, that is, in order to achieve seamless switching of the phase of the first switch tube S1 to the lagging fourth switch tube S4 between 1.5T and 2.5T, at the time of 1.5T, the controller 13 maintains the amplitude C of the carrier C1 of the first switch tube S1 1m and the amplitude C of the carrier C4 of the fourth switch tube S4 4m The amplitude L' of the modulation wave L1' of the first switch tube S1 is controlled to remain unchanged. 1m =(D 20 +ΔD 20 )*C 1m , and controls the amplitude L′ of the modulation wave L4′ of the fourth switch tube S4 4m =(D 20 -ΔD 20 )*C 4m ,in, L 1m2 is the amplitude of the initial modulation wave L1 of the first switch tube S1 in the time period from 1.5T to 2.5T, L 4m2 is the amplitude of the initial modulation wave L4 of the fourth switch tube S4 in the time period from 1.5T to 2.5T; ΔD 10 =t PS2 / (2T),t PS2 is the phase shift time in the time period from 1.5T to 2.5T. Thus, the duty cycle D1 of the first switch tube S1 is D 20 +ΔD 20 And the duty cycle D4 of the fourth switch tube S4 is D 20 -ΔD 20 , and thus the phase of the first switch tube S1 lags behind the phase of the fourth switch tube S4.
[0061] based on Figure 5It can be seen from the phase rotation control method shown that the average of the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 in any switching cycle T is always equal to the initial duty cycle of the first switch tube S1 and the fourth switch tube S4, and the absolute value of the difference between the duty cycle of each switch tube in the first switch tube S1 and the fourth switch tube S4 and the initial duty cycle in the switching cycle T is always the duty cycle change amount in the switching cycle T, so that the power conversion device 1 can still achieve the same phase shift function as the traditional phase shift scheme when it is in a transient state. In addition, at the maximum value of the carrier of the first switch tube S1 or the fourth switch tube S4, the magnitude relationship between the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 is changed once every fixed time interval (such as the switching cycle T), thereby causing the phase relationship between the first switch tube S1 and the fourth switch tube S4 to change once every fixed time interval. Furthermore, it is ensured that at every fixed interval, the stress, loss and junction temperature of the first switch tube S1 and the fourth switch tube S4 can be rotated once, and the stress, loss and junction temperature of the second switch tube S2 and the third switch tube S3 can be rotated once, so that the loss, stress and junction temperature of the first bridge arm 111 and the second bridge arm 112 are respectively consistent, that is, the loss, stress and junction temperature of each switch tube in the first bridge arm 111 and the second bridge arm 112 can be balanced.
[0062] also, Figure 5 The illustrated embodiment is introduced by taking the scenario where the transient state is the change in the duty cycle of the switch tube as an example. The phase rotation control method provided in this embodiment is also applicable to the scenario where the transient state is the change in the switch cycle.
[0063] For example, see Figure 6 , Figure 6 is another control timing diagram of the power conversion device provided by the present application. Figure 6 As shown, the carrier of the first switch tube S1 is a triangular carrier C1, and the carrier of the fourth switch tube S4 is a triangular carrier C4. The initial modulation wave of the first switch tube S1 is L1 indicated by a black solid line, and the initial modulation wave of the fourth switch tube S4 is L4 indicated by a black solid line. The modulation waves applied to the first switch tube S1 with a phase relationship rotation are L1' and L1", indicated by gray solid lines, and the modulation waves applied to the fourth switch tube S4 with a phase relationship rotation are L4' and L4", indicated by gray solid lines.
[0064] Before time t1, the switching period is T, and the controller 13 maintains the amplitude C of the carrier C1 of the first switch tube S1. 1m and the amplitude C of the carrier C4 of the fourth switch tube S4 4m The amplitude L′ of the modulation wave L1′ of the first switch tube S1 is controlled unchanged. 1m =(D 10 -ΔD 10 )*C 1m, and controls the amplitude L′ of the modulation wave L4′ of the fourth switch tube S4 4m =(D 10 +ΔD 10 )*C 4m ,in, L 1m is the amplitude of the initial modulation wave L1 of the first switch tube S1, L 4m is the amplitude of the initial modulation wave L4 of the fourth switch tube S4; ΔD 10 =t PS / (2T). Thus, the duty cycle of the first switch tube S1 is greater than the duty cycle of the fourth switch tube S4, and further, the phase of the first switch tube S1 lags behind the phase of the fourth switch tube S4.
[0065] At time t1, the switching cycle changes from a smaller T to a larger T'. In order to switch the phase relationship between the first switch tube S1 and the fourth switch tube S4, that is, to switch the phase of the first switch tube S1 to lead the fourth switch tube S4 in the first switching cycle T' after time t1, at time t1, the controller 13 maintains the amplitude C of the carrier C1 of the first switch tube S1 1m and the amplitude C of the carrier C4 of the fourth switch tube S4 4m The amplitude L" of the modulation wave L1" of the first switch tube S1 is controlled unchanged. 1m =(D 20 +ΔD 20 )*C 1m , and controls the amplitude L" of the modulation wave L4" of the fourth switch tube S4 4m =(D 20 -ΔD 20 )*C 4m ,in, ΔD 20 =t PS / (2T′). Thus, the duty cycle of the first switch tube S1 is smaller than the duty cycle of the fourth switch tube S4, and the phase of the first switch tube S1 is ahead of the phase of the fourth switch tube S4.
[0066] based on Figure 6It can be seen from the phase rotation control method shown that the average of the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 in the integer switching cycles T before and after the time t1 is always equal to the initial duty cycle of the first switch tube S1 and the fourth switch tube S4, and the absolute value of the difference between the duty cycle of each switch tube in the first switch tube S1 and the fourth switch tube S4 and the initial duty cycle in the integer switching cycle T is always the duty cycle change amount in the integer switching cycle T, so that the power conversion device 1 can still achieve the same phase shift function as the traditional phase shift scheme when it is in a transient state. In addition, at the maximum value of the carrier of the first switch tube S1 or the fourth switch tube S4, the magnitude relationship between the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 is changed once every integer switching cycles, thereby causing the phase relationship between the first switch tube S1 and the fourth switch tube S4 to change once every integer switching cycle. Furthermore, it is ensured that the stress, loss and junction temperature of the first switch tube S1 and the fourth switch tube S4 can be rotated once every integer switching cycles, and the stress, loss and junction temperature of the second switch tube S2 and the third switch tube S3 can be rotated once, so that the loss, stress and junction temperature of the first bridge arm 111 and the second bridge arm 112 are respectively consistent, that is, the loss, stress and junction temperature of each switch tube in the first bridge arm 111 and the second bridge arm 112 can be balanced.
[0067] In another optional embodiment, the controller 13 keeps the modulation wave of the first switch tube S1 and the modulation wave of the fourth switch tube S4 unchanged, and controls the carrier amplitude of the first switch tube S1 and (D 10 +ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube S4 is negatively correlated with (D 10 -ΔD 10 ), and the carrier amplitude of the first switch tube S1 is controlled to be negatively correlated with (D 20 -ΔD 20 ) is negatively correlated and the carrier amplitude of the fourth switch tube S4 is negatively correlated with (D 20 +ΔD 20 ) is negatively correlated. Thus, the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 are alternately exchanged, and then the phase relationship between the first switch tube S1 and the fourth switch tube S4 is alternately exchanged. For the specific implementation of this embodiment, please refer to Figure 4 The description of the corresponding parts in the illustrated embodiment will not be expanded here.
[0068] It should be noted that in the above embodiments, the relationship between the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 is adjusted starting from the maximum value of the carrier. In fact, the starting position for adjusting the duty cycle relationship can be anywhere on the carrier, such as the minimum value of the carrier. The above embodiments all interchange the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 once every fixed interval. When the interval time is no longer fixed, the power conversion device 1 can also achieve seamless rotation of the phase relationship between the first bridge arm 111 and the second bridge arm 112 when in a steady state, and can also achieve the same phase shifting function as the traditional phase shifting scheme when in a transient state. The present application does not limit the carrier shape and modulation wave shape of the switch tube.
[0069] In the present application, the power conversion device 1 can make the average of the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 always equal to the initial duty cycle of the first switch tube S1 and the fourth switch tube S4 in any time interval, and make the absolute value of the difference between the duty cycle of each switch tube in the first switch tube S1 and the fourth switch tube S4 and the initial duty cycle in the arbitrary time interval always be the duty cycle change amount in the arbitrary time interval, so that the power conversion device 1 can achieve the same phase shift function as the traditional phase shift scheme. In addition, since the magnitude relationship between the duty cycle of the first switch tube S1 and the duty cycle of the fourth switch tube S4 is changed alternately, it can be obtained that the phase relationship between the first bridge arm 111 and the second bridge arm 112 is alternately rotated, so that the stress, loss and junction temperature of the first bridge arm 111 and the second bridge arm 112 can be alternately rotated, so that the loss, stress and junction temperature of each switch tube in the first bridge arm 111 and the second bridge arm 112 can be balanced. Furthermore, when the power conversion device 1 is in a steady state, the phase relationship between the first bridge arm 111 and the second bridge arm 112 can be seamlessly rotated, and the applicability is strong.
[0070] also, Figure 2 The power conversion device 1 shown can be specifically a phase-shifted full-bridge converter, a dual active bridge (DAB) converter, a resonant converter, an active neutral point clamped (ANPC) three-level converter, etc.
[0071] For example, Figure 2 The power conversion device 1 shown can be used Figure 7 The topology shown in FIG. 1 is a three-level LC resonant converter. Figure 7As shown, the power conversion device 1 includes a positive DC bus BUS+, a negative DC bus BUS-, a positive bus capacitor C11, a negative bus capacitor C12, a first bridge arm 111, a second bridge arm 112 and a power output circuit 12, and the power output circuit 12 includes a resonant unit 121, a transformer T, a third bridge arm 122 and a fourth bridge arm 123. The resonant unit includes a capacitor Cr and an inductor Lr connected in series, and the transformer T includes a primary winding and a secondary winding. The first bridge arm 111 includes a first switch tube S1 and a second switch tube S2 connected in series, the second bridge arm 112 includes a third switch tube S3 and a fourth switch tube S4 connected in series, the third bridge arm 122 includes a fifth switch tube S5 and a sixth switch tube S6 connected in series, and the fourth bridge arm 123 includes a seventh switch tube S7 and an eighth switch tube S8 connected in series. The first bridge arm 111 and the second bridge arm 112 are connected in series between the positive DC bus BUS+ and the negative DC bus BUS-, the positive bus capacitor C11 is connected between the positive DC bus BUS+ and the connection between the first bridge arm 111 and the second bridge arm 112, and the negative bus capacitor C12 is connected between the negative DC bus BUS- and the connection between the first bridge arm 111 and the second bridge arm 112. The primary winding, the capacitor Cr and the inductor Lr are connected in series between the midpoint of the first bridge arm 111 and the midpoint of the second bridge arm 112, and the two ends of the secondary winding are connected to the midpoint of the third bridge arm 122 and the midpoint of the fourth bridge arm 123 respectively. The third bridge arm 122 and the fourth bridge arm 123 are connected in parallel between the output end o21 and the output end o22 of the power conversion device 1.
[0072] For example, Figure 2 The power conversion device 1 shown can be used Figure 8 The topology shown in FIG. 1 is a phase-shifted full-bridge converter. Figure 8 As shown, the power output circuit 12 includes a resonance unit 121, a transformer T, a first rectifier diode D1 and a second rectifier diode D2. The resonance unit 121 includes an inductor Lr, and the transformer T includes a primary winding, a first secondary winding and a second secondary winding. The primary winding and the inductor Lr are connected in series at the midpoint of the first bridge arm 111 and the midpoint of the second bridge arm 112, and the first secondary winding and the second secondary winding are connected in series between the anode of the first rectifier diode D1 and the anode of the second rectifier diode D2. The cathode of the first rectifier diode D1 is connected to the cathode of the second rectifier diode D2 and the output end o21 of the power conversion device 1, and the connection between the first secondary winding and the second secondary winding is connected to the output end o22 of the power conversion device 1.
[0073] See also Fig. 9 , Fig. 9 The control method of the power conversion device provided in the embodiment of the present application is applicable to Figure 2 , Figure 7 and Figure 8The power conversion device 1 shown. The control method of the power conversion device may include the steps of:
[0074] S101, controlling the first bridge arm, the second bridge arm and the power output circuit so that the power conversion device supplies power to a grid or a load.
[0075] S102, when the output current of the power conversion device is greater than the current threshold, controlling the duty cycle of the first switch tube to be D in the first time interval 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 , and in the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 , so as to alternately change the phase relationship between the first switch tube and the fourth switch tube.
[0076] The first time interval and the second time interval are any two adjacent time intervals; D 10 is the duty cycle of the first switch tube in the first time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 10 is half of the ratio of the phase shift time of the first switch tube and the fourth switch tube to the switching period of the first switch tube in the first time interval; D 20 is the duty cycle of the first switch tube in the second time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 20 It is half of the ratio of the phase shift time of the first switch tube and the fourth switch tube to the switching period of the first switch tube in the second time interval.
[0077] In one embodiment, when the power conversion device is in a steady state, D 10 With D 20 Same, ΔD 10 With ΔD 20 The same, wherein the electrical data of the power conversion device in steady state is fixed or changes periodically.
[0078] In another embodiment, when the power conversion device is in a transient state, D 10 With D 20 Different, or, ΔD 10 With ΔD 20 Different, in which the electrical data of the power conversion device changes suddenly under transient conditions.
[0079] Regardless of whether the power conversion device is in a steady state or a transient state, the phase rotation control method of the power conversion device is specifically as follows:
[0080] In an optional embodiment, in the first time interval, the power conversion device keeps the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube unchanged, and controls the modulation wave amplitude of the first switch tube and (D 10 +ΔD 10 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 10 -ΔD 10 ) is positively correlated, so that the duty cycle of the first switch tube in the first time interval is D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the power conversion device keeps the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube unchanged, and controls the modulation wave amplitude of the first switch tube and (D 20 -ΔD 20 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 20 +ΔD 20 ) is positively correlated, so that the duty cycle of the first switch tube in the second time interval is D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 .
[0081] In another optional embodiment, during the first time interval, the power conversion device keeps the modulation wave of the first switch tube and the modulation wave of the fourth switch tube unchanged, and controls the carrier amplitude of the first switch tube and (D 10 +ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 10 -ΔD 10 ) is negatively correlated, so that in the first time interval, the duty cycle of the first switch tube is D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the power conversion device keeps the modulation wave of the first switch tube and the modulation wave of the fourth switch tube unchanged, and controls the carrier amplitude of the first switch tube and (D 20 -ΔD 20 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 20 +ΔD 20 ) is negatively correlated, so that in the second time interval, the duty cycle of the first switch tube is D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D20 +ΔD 20 .
[0082] In a specific implementation, more operations performed by the power conversion device in the control method of the power conversion device provided in this application can be found in Figure 2 , Figure 7 and Figure 8 The implementation method performed by the power conversion device 1 shown is not repeated here. In addition, in the present application, there is no restriction on the triggering condition for the power conversion device to perform the step of alternating the size relationship between the duty cycle of the first switch tube and the duty cycle of the fourth switch tube. For example, the power conversion device can directly perform the step of alternating the size relationship between the duty cycle of the first switch tube and the duty cycle of the fourth switch tube after starting up.
[0083] In the present application, the power conversion device can make the average of the duty cycle of the first switch tube and the duty cycle of the fourth switch tube always equal to the initial duty cycle of the first switch tube and the fourth switch tube in any time interval, and make the absolute value of the difference between the duty cycle of each switch tube in the first switch tube and the fourth switch tube and the initial duty cycle in the arbitrary time interval always equal to the duty cycle change in the arbitrary time interval, so that the power conversion device can achieve the same phase shift function as the traditional phase shift scheme. In addition, since the magnitude relationship between the duty cycle of the first switch tube and the duty cycle of the fourth switch tube is alternately rotated, it can be obtained that the phase relationship between the first bridge arm and the second bridge arm is alternately rotated, therefore, the stress, loss and junction temperature of the first bridge arm and the second bridge arm can be alternately rotated, so that the loss, stress and junction temperature of each switch tube in the first bridge arm and the second bridge arm can be balanced. Furthermore, when the power conversion device is in a steady state, the phase relationship between the first bridge arm and the second bridge arm can be seamlessly rotated, and the applicability is strong.
[0084] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A power conversion device, It is characterized in that The power conversion device comprises a positive DC bus, a negative DC bus, a first bridge arm, a second bridge arm, a power output circuit and a controller, wherein: The first bridge arm and the second bridge arm are connected in parallel or in series between the positive DC bus and the negative DC bus, and the midpoint of the first bridge arm and the midpoint of the second bridge arm are connected to the power output circuit; The first bridge arm includes a first switch tube and a second switch tube connected in series, the second bridge arm includes a third switch tube and a fourth switch tube connected in series, the first switch tube is connected to the positive DC bus, and the fourth switch tube is connected to the negative DC bus; The controller is used to control the duty cycle of the first switch tube to be D in a first time interval. 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 , so as to alternately change the phase relationship between the first switch tube and the fourth switch tube; Wherein, the first time interval and the second time interval are any two adjacent time intervals; 10 is the duty cycle of the first switch tube in the first time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 10 is half of the ratio of the phase shift time between the first switch tube and the fourth switch tube to the switching period of the first switch tube in the first time interval; D 20 is the duty cycle of the first switch tube in the second time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 20 It is half of the ratio of the phase shift time between the first switch tube and the fourth switch tube to the switching period of the first switch tube in the second time interval.
2. The power conversion device according to claim 1, It is characterized in that When the power conversion device is in a steady state, D 10 With D 20 Same, ΔD 10 With ΔD 20 The same, wherein the electrical data of the power conversion device in the steady state is fixed or changes periodically.
3. The power conversion device according to claim 1, It is characterized in that When the power conversion device is in a transient state, D 10 With D 20 Different, or, ΔD 10 With ΔD 20 Different, wherein the electrical data of the power conversion device changes suddenly in the transient state.
4. The power conversion device according to any one of claims 1 to 3, It is characterized in that In the first time interval, the duty cycle of the first switch tube is controlled to be D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 ,include: In the first time interval, the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube are kept unchanged, and the modulation wave amplitude of the first switch tube is controlled to be (D 10 +ΔD 10 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 10 -ΔD 10 ) is positively correlated; In the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 ,include: In the second time interval, the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube are kept unchanged, and the modulation wave amplitude of the first switch tube is controlled to be (D 20 -ΔD 20 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 20 +ΔD 20 ) is positively correlated.
5. The power conversion device according to any one of claims 1 to 3, It is characterized in that In the first time interval, the duty cycle of the first switch tube is controlled to be D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 ,include: In the first time interval, the modulation wave of the first switch tube and the modulation wave of the fourth switch tube are kept unchanged, and the carrier amplitude of the first switch tube is controlled to be (D 10 +ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 10 -ΔD 10 ) negatively correlated; In the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 ,include: In the second time interval, the modulation wave of the first switch tube and the modulation wave of the fourth switch tube are kept unchanged, and the carrier amplitude of the first switch tube is controlled to be (D 20 -ΔD 20 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 20 +ΔD 20 ) is negatively correlated.
6. The power conversion device according to any one of claims 1 to 5, It is characterized in that The power output circuit includes a resonance unit, a transformer, a third bridge arm and a fourth bridge arm, and the transformer includes a primary winding and a secondary winding, wherein: The first bridge arm and the second bridge arm are connected in series between the positive DC bus and the negative DC bus; The primary winding and the resonance unit are connected in series between the midpoint of the first bridge arm and the midpoint of the second bridge arm, and the two ends of the secondary winding are respectively connected to the midpoint of the third bridge arm and the midpoint of the fourth bridge arm, and the third bridge arm is connected in parallel with the fourth bridge arm.
7. The power conversion device according to any one of claims 1 to 5, It is characterized in that The power output circuit includes a resonance unit, a transformer, a first rectifier diode and a second rectifier diode, and the transformer includes a primary winding, a first secondary winding and a second secondary winding, wherein: The first bridge arm and the second bridge arm are connected in parallel between the positive DC bus and the negative DC bus; The primary winding and the resonant unit are connected in series between the midpoint of the first bridge arm and the midpoint of the second bridge arm, the first secondary winding and the second secondary winding are connected in series between the anode of the first rectifier diode and the anode of the second rectifier diode, and the cathode of the first rectifier diode is connected to the cathode of the second rectifier diode.
8. A control method for a power conversion device, It is characterized in that The power conversion device comprises a positive DC bus, a negative DC bus, a first bridge arm, a second bridge arm and a power output circuit, wherein the first bridge arm and the second bridge arm are connected in parallel or in series between the positive DC bus and the negative DC bus, and the midpoint of the first bridge arm and the midpoint of the second bridge arm are connected to the power output circuit; the first bridge arm comprises a first switch tube and a second switch tube connected in series, the second bridge arm comprises a third switch tube and a fourth switch tube connected in series, the first switch tube is connected to the positive DC bus, and the fourth switch tube is connected to the negative DC bus; The method comprises: In the first time interval, the duty cycle of the first switch tube is controlled to be D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 In the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 , so as to alternately change the phase relationship between the first switch tube and the fourth switch tube; Wherein, the first time interval and the second time interval are any two adjacent time intervals; 10 is the duty cycle of the first switch tube in the first time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 10 is half of the ratio of the phase shift time between the first switch tube and the fourth switch tube to the switching period of the first switch tube in the first time interval; D 20 is the duty cycle of the first switch tube in the second time interval when the phase difference between the first switch tube and the fourth switch tube is 0 and the duty cycles are the same; ΔD 20 It is half of the ratio of the phase shift time between the first switch tube and the fourth switch tube to the switching period of the first switch tube in the second time interval.
9. The method according to claim 8, It is characterized in that When the power conversion device is in a steady state, D 10 With D 20 Same, ΔD 10 With ΔD 20 The same, wherein the electrical data of the power conversion device in the steady state is fixed or changes periodically.
10. The method according to claim 8, It is characterized in that When the power conversion device is in a transient state, D 10 With D 20 Different, or, ΔD 10 With ΔD 20 Different, wherein the electrical data of the power conversion device changes suddenly in the transient state.
11. The method according to any one of claims 8 to 10, It is characterized in that In the first time interval, the duty cycle of the first switch tube is controlled to be D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 ,include: In the first time interval, the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube are kept unchanged, and the modulation wave amplitude of the first switch tube is controlled to be (D 10 +ΔD 10 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 10 -ΔD 10 ) is positively correlated; In the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 ,include: In the second time interval, the carrier amplitude of the first switch tube and the carrier amplitude of the fourth switch tube are kept unchanged, and the modulation wave amplitude of the first switch tube is controlled to be (D 20 -ΔD 20 ) is positively correlated and the modulation wave amplitude of the fourth switch tube is positively correlated with (D 20 +ΔD 20 ) is positively correlated.
12. The method according to any one of claims 8 to 10, It is characterized in that In the first time interval, the duty cycle of the first switch tube is controlled to be D 10 +ΔD 10 And the duty cycle of the fourth switch tube is D 10 -ΔD 10 ,include: In the first time interval, the modulation wave of the first switch tube and the modulation wave of the fourth switch tube are kept unchanged, and the carrier amplitude of the first switch tube is controlled to be (D 10 +ΔD 10 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 10 -ΔD 10 ) negatively correlated; In the second time interval, the duty cycle of the first switch tube is controlled to be D 20 -ΔD 20 And the duty cycle of the fourth switch tube is D 20 +ΔD 20 ,include: In the second time interval, the modulation wave of the first switch tube and the modulation wave of the fourth switch tube are kept unchanged, and the carrier amplitude of the first switch tube is controlled to be (D 20 -ΔD 20 ) is negatively correlated and the carrier amplitude of the fourth switch tube is negatively correlated with (D 20 +ΔD 20 ) is negatively correlated.
