Method and apparatus for uplink transmission in a communication system
By dynamically reconfiguring uplink symbols and adjusting SRS configuration in response to changing resource needs, the method addresses the challenge of PUSCH repurposing in 5G wireless communication systems, enhancing reliability and efficiency in uplink transmission.
Patent Information
- Application Number
- CN202411291069.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2019-04-03
- Filing Date
- 2019-04-04
- Publication Date
- 2024-12-06
AI Technical Summary
In wireless communication systems, particularly 5G, there is a need to address the issue of uplink transmission reliability when a physical uplink shared channel (PUSCH) is allocated for an alternate purpose, leading to inefficiencies and potential performance degradation.
The method involves re-indicating flexible symbols as uplink symbols through Slot Format Indicator (SFI) information and adjusting SRS configuration, allowing for dynamic resource allocation and flexible use of PUSCH resources based on DCI format 2_0, enabling the terminal to adapt transmission to available resources.
This approach enhances communication system performance by optimizing resource utilization and ensuring reliable uplink transmission, even when initial PUSCH allocation is repurposed, thereby improving overall system efficiency.
Smart Images

Figure CN119095179A_ABST
Abstract
Description
[0001] This patent application is a divisional application of Chinese invention patent application PCT / KR2019 / 003970 filed on April 4, 2019, which entered the national phase of the People's Republic of China on October 9, 2020, with application number 201980024808.4 and invention name "Method and device for uplink transmission in a communication system". Technical Field
[0002] The present invention relates to a technology for uplink transmission, and more particularly, to an uplink transmission technology for satisfying reliability requirements in a communication system. Background Art
[0003] With the development of information and communication technology, various wireless communication technologies are being developed. Typical wireless communication technologies include Long Term Evolution (LTE), New Radio (NR), etc. defined in the 3rd Generation Partnership Project (3GPP) standard. LTE may be one of the fourth generation (4G) wireless communication technologies, and NR may be one of the fifth generation (5G) wireless communication technologies.
[0004] A 5G communication system (hereinafter, referred to as an NR communication system) using a higher frequency band (e.g., a frequency band of 6 GHz or more) than a frequency band (e.g., a frequency band below 6 GHz) of a 4G communication system is being considered for handling wireless data that has soared after the commercialization of a 4G communication system (e.g., a communication system supporting LTE). The 5G communication system may support enhanced mobile broadband (eMBB), ultra-reliable low latency communication (URLLC), massive machine type communication (mMTC), and the like.
[0005] In addition, when, after sending a first DCI (i.e., a downlink control channel) including first resource allocation information, it is determined that a first physical uplink shared channel (PUSCH) indicated by the first resource allocation information for a first transport block is to be used for another purpose, a method for stopping transmission of a first transport block in a first PUSCH is needed. Summary of the invention
[0006]
Technical issues
[0007] The present invention is directed to a method and apparatus for uplink transmission according to a reliability request in a communication system.
[0008]
Technical solution
[0009] In order to achieve the above-mentioned purpose, the operation method of the terminal according to the first embodiment of the present invention may include: receiving first SFI (slot format indicator) information indicating n flexible symbols from a base station; receiving an SRS configuration message configured to send an SRS (sounding reference signal) to the base station from the base station; receiving second SFI information from the base station, the second SFI information re-indicating m symbols among the n flexible symbols as uplink (UL) symbols; and sending the SRS to the base station by re-indicating m symbols among the n flexible symbols indicated as flexible symbols as UL symbols, wherein each of n and m is a natural number.
[0010] Here, k symbols among the symbols constituting the time slot configured based on the first SFI information and the second SFI information can be configured for the transmission of SRS, SRS can be sent through m symbols among the k symbols that are re-indicated as UL symbols, SRS may not be sent as flexible symbols among the k symbols, and k can be an integer equal to or greater than 2.
[0011] Here, the second SFI information may re-indicate the remaining symbols except for m symbols among the n flexible symbols as downlink (DL) symbols or flexible symbols.
[0012] Here, the second SFI information may be received in a downlink control information (DCI) format 2_0.
[0013] Here, an information element required for receiving DCI format 2_0 may be received from a base station through a higher layer message, and the information element may include information about a control resource set (CORESET) and a search space for DCI format 2_0.
[0014] Here, the SRS configuration message may include: information indicating a first symbol in which the SRS is transmitted in a time slot; and information indicating the number of symbols in which the SRS is transmitted in the time slot.
[0015] In order to achieve the above-mentioned purpose, the operation method of the base station according to the second embodiment of the present invention may include: sending first SFI information indicating n flexible symbols to the terminal; sending an SRS configuration message to the terminal, which SRS configuration message is configured to send SRS to the base station; sending second SFI information to the terminal, which second SFI information re-indicates m symbols among the n flexible symbols as uplink (UL) symbols; and receiving SRS from the terminal through m symbols among the n flexible symbols indicated as flexible symbols that are re-indicated as UL symbols, wherein each of n and m is a natural number.
[0016] Here, k symbols among the symbols constituting the time slot configured based on the first SFI information and the second SFI information can be configured for the transmission of SRS, SRS can be sent through m symbols among the k symbols that are re-indicated as UL symbols, SRS may not be sent as flexible symbols among the k symbols, and k can be an integer equal to or greater than 2.
[0017] Here, the second SFI information may re-indicate the remaining symbols except for m symbols among the n flexible symbols as downlink (DL) symbols or flexible symbols.
[0018] Here, the information element required for receiving DCI format 2_0 may be transmitted to the terminal through a higher layer message, and the information element may include information about a control resource set (CORESET) and a search space for DCI format 2_0.
[0019] Here, the SRS configuration message may include: information indicating a first symbol in which the SRS is transmitted in a time slot; and information indicating the number of symbols in which the SRS is transmitted in the time slot.
[0020] In order to achieve the above-mentioned purpose, the operating method of the terminal according to the third embodiment of the present invention may include: receiving a first DCI including first resource allocation information for a first transmission block from a base station; receiving a second DCI including second resource allocation information for the first transmission block from the base station; and sending the first transmission block to the base station through a second PUSCH (physical uplink shared channel) indicated by the second resource allocation information, wherein the resources occupied by the first PUSCH indicated by the first resource allocation information are different from the resources occupied by the second PUSCH.
[0021] Here, when the first PUSCH is allocated for transmission of uplink control information (UCI), the first PUSCH may not be transmitted.
[0022] Here, when the first PUSCH is allocated for transmission of UCI, the UCI may be transmitted through a physical uplink control channel (PUCCH) instead of the first PUSCH.
[0023] Here, when the first PUSCH may be allocated for transmission of UCI, the UCI is transmitted through the second PUSCH instead of the first PUSCH.
[0024] Here, when a first code block for a first transport block is generated based on the first DCI, the first code block may be mapped to a second PUSCH indicated by a second DCI instead of the first PUSCH.
[0025] Here, each of a hybrid automatic repeat request (HARQ) process identifier and a new data indicator (NDI) included in the first DCI may be equal to each of the HARQ process identifier and the NDI included in the second DCI.
[0026] Here, when the time resources occupied by the first PUSCH are the same as the time resources occupied by the second PUSCH, the second resource allocation information may include an offset between the starting frequency resources of the first PUSCH and the starting frequency resources of the second PUSCH.
[0027] Here, when the frequency resources occupied by the first PUSCH are the same as the frequency resources occupied by the second PUSCH, the second resource allocation information may include an offset between the starting time resources of the first PUSCH and the starting time resources of the second PUSCH.
[0028] Here, the first PUSCH may be used for another purpose instead of transmission of the first transport block.
[0029]
Beneficial Effects
[0030] According to the present invention, after a first downlink control channel (DCI) including first resource allocation information for a first transmission block is sent, if it is determined that a first physical uplink shared channel (PUSCH) indicated by the first resource allocation information is used for another purpose, the base station may send a second DCI to the terminal, the second DCI including second resource allocation information for the first transmission block. The resources occupied by the second PUSCH indicated by the second resource allocation information may be different from the resources occupied by the first PUSCH. The terminal may receive the first DCI and the second DCI from the base station, and perform UL transmission based on the information included in the last second DCI among the first DCI and the second DCI. In this case, since the first PUSCH is not used for UL transmission, it can be used for another purpose. Therefore, the performance of the communication system can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 is a conceptual diagram showing a first embodiment of a communication system.
[0032] Figure 2 is a block diagram showing a first embodiment of a communication node constituting a communication system.
[0033] Figure 3is a conceptual diagram showing a first embodiment of a UL transmission method in a communication system.
[0034] Figure 4 is a conceptual diagram showing a second embodiment of a UL transmission method in a communication system.
[0035] Figure 5 is a conceptual diagram showing a third embodiment of a UL transmission method in a communication system.
[0036] Figure 6 is a conceptual diagram showing a fourth embodiment of a UL transmission method in a communication system.
[0037] Figure 7 is a conceptual diagram showing a fifth embodiment of a UL transmission method in a communication system.
[0038] Figure 8 is a conceptual diagram showing a sixth embodiment of a UL transmission method in a communication system.
[0039] Fig. 9 is a conceptual diagram showing a seventh embodiment of a UL transmission method in a communication system.
[0040] Fig.10 is a conceptual diagram illustrating a first embodiment of a search space (eg, logical search space) for a DL control channel in a communication system.
[0041] Fig.11 is a conceptual diagram illustrating a second embodiment of a search space (eg, logical search space) for a DL control channel in a communication system.
[0042] Fig.12 is a conceptual diagram showing a first embodiment of a UL reference resource in a communication system.
[0043] Fig.13 is a conceptual diagram illustrating a second embodiment of a UL reference resource in a communication system.
[0044] Fig.14 is a conceptual diagram illustrating a third embodiment of a UL reference resource in a communication system.
[0045] Fig.15 is a conceptual diagram showing an eighth embodiment of a UL transmission method in a communication system.
[0046] Fig.16 is a conceptual diagram showing a first embodiment of a method of mapping UL control information in a communication system.
[0047] Fig.17 is a conceptual diagram showing a second embodiment of a method of mapping UL control information in a communication system.
[0048] Fig.18 is a conceptual diagram showing a third embodiment of a method of mapping UL control information in a communication system.
[0049] Fig.19 is a conceptual diagram showing a fourth embodiment of a method of mapping UL control information in a communication system.
[0050] Fig. 20 is a conceptual diagram showing a fifth embodiment of a method of mapping UL control information in a communication system.
[0051] Fig.21 is a conceptual diagram showing a ninth embodiment of a UL transmission method in a communication system.
[0052] Fig. 22 is a conceptual diagram showing a tenth embodiment of a UL transmission method in a communication system.
[0053] Fig.23 It shows that according to Fig. 22 A conceptual diagram of a first embodiment of a UL data channel #2 of a UL transmission method is shown.
[0054] Fig.24 It shows that according to Fig. 22 A conceptual diagram of a second embodiment of a UL data channel #2 of a UL transmission method shown in FIG.
[0055] Fig.25 is a conceptual diagram showing an eleventh embodiment of a UL transmission method in a communication system.
[0056] Fig.26 is a conceptual diagram showing a twelfth embodiment of a UL transmission method in a communication system.
[0057] Fig. 27 is a sequence diagram showing a first embodiment of an SRS transmission method in a communication system.
[0058] Fig.28 is a conceptual diagram showing a first embodiment of a method for determining a symbol type in a communication system.
[0059] Fig.29 is a conceptual diagram showing a thirteenth embodiment of a UL transmission method in a communication system.
[0060] Fig.30 is a conceptual diagram showing a sixth embodiment of a method of mapping UL control information in a communication system. DETAILED DESCRIPTION
[0061] Although the present invention is susceptible to various modifications and alternative forms, specific embodiments are shown by way of example in the accompanying drawings and described in detail. However, it should be understood that this description is not intended to limit the present invention to specific embodiments, but on the contrary, the present invention will cover all modifications, equivalents and alternative forms that fall within the spirit and scope of the present invention.
[0062] Although the terms "first", "second", etc. may be used herein with respect to various elements, such elements should not be construed as being limited by these terms. These terms are only used to distinguish one element from another element. For example, a first element may be referred to as a second element, and a second element may be referred to as a first element, without departing from the scope of the present invention. The term "and / or" includes any and all combinations of one or more associated listed items.
[0063] It will be understood that when an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element, or there can be intervening elements. Conversely, when an element is referred to as being "directly connected" or "directly coupled" to another element, there are no intervening elements.
[0064] The terms used herein are only for the purpose of describing specific embodiments, and are not intended to limit embodiments of the present invention. As used herein, the singular forms "one", "an" and "the" are also intended to include plural forms, unless the context clearly indicates otherwise. It will also be understood that when used in this article, the terms "comprise", "include", "include" and / or "include" specify the existence of stated features, integers, steps, operations, elements, parts and / or combinations thereof, but do not exclude the existence or addition of one or more other features, integers, steps, operations, elements, parts and / or combinations thereof.
[0065] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those commonly understood by those of ordinary skill in the art to which the present invention belongs. It will also be understood that, unless expressly defined as such herein, terms defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the prior art, and will not be interpreted in an idealized or overly formal sense.
[0066] Hereinafter, exemplary embodiments of the present invention will be described in more detail with reference to the accompanying drawings. In order to facilitate an overall understanding of the present invention, the same reference numerals refer to the same elements throughout the description of the accompanying drawings, and the description of the same components will not be repeated.
[0067] A communication system according to an embodiment of the present disclosure will be described. However, the communication system to which the embodiment of the present disclosure is applied is not limited to the communication system to be described below. That is, the embodiment of the present disclosure can be applied to various communication systems. Here, the term "communication system" can have the same meaning as the term "communication network".
[0068] Figure 1 is a conceptual diagram showing a first embodiment of a communication system.
[0069] refer to Figure 1 , the communication system 100 may include a plurality of communication nodes 110-1, 110-2, 110-3, 120-1, 120-2, 130-1, 130-2, 130-3, 130-4, 130-5, and 130-6. The plurality of communication nodes may support 4G communication (e.g., Long Term Evolution (LTE), Advanced LTE (LTE-A)), 5G communication (e.g., New Radio (NR)), etc. 4G communication may be performed in a frequency band below 6 GHz, and 5G communication may be performed in a frequency band above 6 GHz and a frequency band below 6 GHz.
[0070] For example, for 4G communication and 5G communication, multiple communication nodes can support code division multiple access (CDMA) technology, wideband CDMA (WCDMA) technology, time division multiple access (TDMA) technology, frequency division multiple access (FDMA) technology, orthogonal frequency division multiplexing (OFDM) technology, filtered OFDM technology, cyclic prefix OFDM (CP-OFDM) technology, discrete Fourier transform spread spectrum OFDM (DFT-s-OFDM) technology, single carrier FDMA (SC-FDMA) technology, non-orthogonal multiple access (NOMA) technology, generalized frequency division multiplexing (GFDM) technology, filter bank multi-carrier (FBMC) technology, universal filtered multi-carrier (UFMC) technology, space division multiple access (SDMA) technology, and the like.
[0071] In addition, the communication system 100 may further include a core network. When the communication system supports 4G communication, the core network may include a serving gateway (S-GW), a packet data network (PDN) gateway (P-GW), a mobility management entity (MME), etc. When the communication system 100 supports 5G communication, the core network may include an access and mobility management function (AMF), a user plane function (UPF), a session management function (SMF), etc.
[0072] In addition, each of the plurality of communication nodes 110-1, 110-2, 110-3, 120-1, 120-2, 130-1, 130-2, 130-3, 130-4, 130-5, and 130-6 constituting the communication system 100 may have the following structure.
[0073] Figure 2 is a block diagram showing a first embodiment of a communication node constituting a communication system.
[0074] refer to Figure 2 , the communication node 200 may include at least one processor 210, a memory 220, and a transceiver 230 connected to a network to perform communication. In addition, the communication node 200 may further include an input interface device 240, an output interface device 250, a storage device 260, etc. When connected through a bus 270, each component included in the communication node 200 may communicate with each other.
[0075] However, each component included in the communication node 200 may not be connected to the common bus 270, but may be connected to the processor 210 via a separate interface or a separate bus. For example, the processor 210 may be connected to at least one of the memory 220, the transceiver 230, the input interface device 240, the output interface device 250, and the storage device 260 via a dedicated interface.
[0076] The processor 210 may run a program stored in at least one of the memory 220 and the storage device 260. The processor 210 may refer to a central processing unit (CPU), a graphics processing unit (GPU), or a dedicated processor on which the method according to an embodiment of the present disclosure is executed. Each of the memory 220 and the storage device 260 may be composed of at least one of a volatile storage medium and a non-volatile storage medium. For example, the memory 220 may include at least one of a read-only memory (ROM) and a random access memory (RAM).
[0077] Reference again Figure 1, the communication system 100 may include a plurality of base stations 110-1, 110-2, 110-3, 120-1, and 120-2 and a plurality of terminals 130-1, 130-2, 130-3, 130-4, 130-5, and 130-6. Each of the first base station 110-1, the second base station 110-2, and the third base station 110-3 may form a macro cell, and each of the fourth base station 120-1 and the fifth base station 120-2 may form a small cell. The fourth base station 120-1, the third terminal 130-3, and the fourth terminal 130-4 may belong to the cell coverage of the first base station 110-1. In addition, the second terminal 130-2, the fourth terminal 130-4, and the fifth terminal 130-5 may belong to the cell coverage of the second base station 110-2. In addition, the fifth base station 120-2, the fourth terminal 130-4, the fifth terminal 130-5 and the sixth terminal 130-6 may belong to the cell coverage of the third base station 110-3. In addition, the first terminal 130-1 may belong to the cell coverage of the fourth base station 120-1, and the sixth terminal 130-6 may belong to the cell coverage of the fifth base station 120-2.
[0078] Here, each of the plurality of base stations 110-1, 110-2, 110-3, 120-1, and 120-2 may be referred to as a Node B, an evolved Node B (eNB), a base transceiver station (BTS), a radio base station, a radio transceiver, an access point, an access node, etc. In addition, each of the plurality of terminals 130-1, 130-2, 130-3, 130-4, 130-5, and 130-6 may be referred to as a user equipment (UE), a terminal, an access terminal, a mobile terminal, a station, a subscriber station, a mobile station, a portable subscriber station, a node, a device, etc.
[0079] In addition, each of the multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2 can operate in the same frequency band or in different frequency bands. The multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2 can be connected to each other via an ideal backhaul or a non-ideal backhaul, and exchange information with each other via an ideal backhaul or a non-ideal backhaul. In addition, each of the multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2 can be connected to the core network via an ideal or non-ideal backhaul. Each of the multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2 can send a signal received from the core network to the corresponding terminal 130-1, 130-2, 130-3, 130-4, 130-5 or 130-6, and send a signal received from the corresponding terminal 130-1, 130-2, 130-3, 130-4, 130-5 or 130-6 to the core network.
[0080] In addition, each of the multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2 can support multiple-input multiple-output (MIMO) transmission (e.g., single-user MIMO (SU-MIMO), multi-user MIMO (MU-MIMO), massive MIMO, etc.), coordinated multi-point (CoMP) transmission, carrier aggregation (CA) transmission, transmission in unlicensed bands, device-to-device (D2D) communication (or proximity service (ProSe)), etc. Here, each of the multiple terminals 130-1, 130-2, 130-3, 130-4, 130-5 and 130-6 can perform operations corresponding to the operations of the multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2 (i.e., operations supported by the multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2). For example, the second base station 110-2 may send a signal to the fourth terminal 130-4 in SU-MIMO mode, and the fourth terminal 130-4 may receive a signal from the second base station 110-2 in SU-MIMO mode. Optionally, the second base station 110-2 may send a signal to the fourth terminal 130-4 and the fifth terminal 130-5 in MU-MIMO mode, and the fourth terminal 130-4 and the fifth terminal 130-5 may receive a signal from the second base station 110-2 in MU-MIMO mode.
[0081] The first base station 110-1, the second base station 110-2 and the third base station 110-3 can send signals to the fourth terminal 130-4 in a CoMP transmission manner, and the fourth terminal 130-4 can receive signals from the first base station 110-1, the second base station 110-2 and the third base station 110-3 in a CoMP manner. In addition, each of the multiple base stations 110-1, 110-2, 110-3, 120-1 and 120-2 can exchange signals with the corresponding terminal 130-1, 130-2, 130-3, 130-4, 130-5 or 130-6 belonging to its cell coverage in a CA manner. Each of base stations 110-1, 110-2, and 110-3 may control D2D communication between the fourth terminal 130-4 and the fifth terminal 130-5, and thus the fourth terminal 130-4 and the fifth terminal 130-5 may perform D2D communication under the control of the second base station 110-2 and the third base station 110-3.
[0082] Next, an uplink (UL) transmission method in a communication system will be described. Even when a method to be performed at a first communication node among communication nodes (e.g., transmission or reception of a signal) is described, a corresponding second communication node may perform a method corresponding to the method performed at the first communication node (e.g., reception or transmission of a signal). That is, when describing the operation of a terminal, a corresponding base station may perform an operation corresponding to the operation of the terminal. Conversely, when describing the operation of a base station, a corresponding terminal may perform an operation corresponding to the operation of the base station.
[0083] ■Ultra-Reliable and Low-Latency Communications (URLLC) Physical Uplink Shared Channel (PUSCH) and Enhanced Mobile Broadband Dynamic multiplexing of PUSCH with (eMBB)
[0084] The URLLC PUSCH may be a PUSCH for a URLLC service. For example, URLLC data may be sent via the URLLC PUSCH. The URLLC data may be data sent in accordance with a request for a URLLC service. The eMBB PUSCH may be a PUSCH for an eMBB service. For example, eMBB data may be sent via the eMBB PUSCH. The eMBB data may be data sent in accordance with a request for an eMBB service.
[0085] √ Uplink (UL) re-grant
[0086] The method proposed below may be applied to a scenario in which a UL data channel (eg, PUSCH) is transmitted based on information (eg, downlink control information (DCI)) included in a downlink (DL) control channel (eg, physical downlink control channel (PDCCH)).
[0087] The terminal may determine the size of the resource block based on the size of the resource elements available for the UL data channel. Here, the transport block may include UL data. The terminal may assign a hybrid automatic repeat request (HARQ) process identifier to the transport block. The HARQ process identifier may indicate a retransmission transport block. For example, a retransmission transport block may be indicated by a HARQ process identifier and a new data indicator (NDI).
[0088] The base station may configure the terminal to support the transmission of two or more data (e.g., URLLC data and eMBB data) with different requests. The request may include one or more of an error rate, a transmission rate, and a delay. The priority of the data (e.g., URLLC data and eMBB data) may be determined based on the request. The base station may send a high-level message (e.g., a radio resource control (RRC) message) including information indicating the priority of the data to the terminal. The terminal may receive a high-level message from the base station and identify the priority of the data based on the information included in the high-level message. Optionally, the priority of the data may be defined in a technical specification known to the base station and the terminal.
[0089] The proposed method can be applied to DL transmission as well as UL transmission. In the proposed method, when a DL control channel including resource allocation information of the same transmission block is received more than once, the terminal may perform UL transmission based on information (e.g., DCI) included in the last DL control channel among the received DL control channels. The terminal may not process instructions according to DL control channels other than the last DL control channel among the received DL control channels.
[0090] In the following description, a method for a base station to indicate a transport block will be described. The HARQ process identifier and NDI can be used to indicate the same transport block. In this case, the base station can send a DL control channel (e.g., DCI) including the HARQ process identifier and the NDI indicating the same transport block to the terminal. In the retransmission procedure of the code block group (CBG), the HARQ process identifier, NDI, CBG transmission indicator (CBTGI) and CBG flushing information (CBGFI) can be used to indicate the same transport block. In this case, the base station can send a DL control channel (e.g., DCI) including the HARQ process identifier, NDI, CBGTI and CBGFI indicating the same transport block to the terminal.
[0091] In addition, the terminal may receive a DL control channel #1 including resource allocation information (e.g., resource allocation information of a transport block) from the base station, and map the transport block indicated by the DL control channel #1 to the UL data channel #1. After receiving the DL control channel #1, the terminal may receive a DL control channel #2 including resource allocation information (e.g., resource allocation information of a transport block) from the base station. When the transport block indicated by the DL control channel #2 is the same as the transport block indicated by the DL control channel #1 (e.g., when the HARQ process identifier and NDI included in the DL control channel #1 are the same as the HARQ process identifier and NDI included in the DL control channel #2), the terminal may map the transport block to the UL data channel #2 based on the information (e.g., DCI) included in the DL control channel #2. That is, the terminal may not process the instruction according to the DL control channel #1. Here, the information included in the DL control channel #1 may be the same as the information included in the DL control channel #2, and the size of the DL control channel #1 (e.g., the number of CCEs) may be the same as the size of the DL control channel #2 (e.g., the number of CCEs). Optionally, the size of DL control channel #1 may be different from the size of DL control channel #2.
[0092] The above method can be applied to both slot-based transmission and non-slot-based transmission. DL control channel #2 can indicate that the transport block is mapped to other resources besides UL data channel #1. Optionally, DL control channel #2 can indicate UL data channel #2 so that the transport block is sent in a slot or symbol different from that of UL data channel #1.
[0093] The above method can be applied to the scenario where the terminal sends and receives multiple layers. For example, multiple layers can be allocated to the terminal through one DL control channel, and therefore one or more transport blocks can be allocated to the terminal. In this case, the terminal can operate according to the indication of the last DL control channel among the received DL control channels.
[0094] Figure 3 is a conceptual diagram showing a first embodiment of a UL transmission method in a communication system.
[0095] refer to Figure 3, the base station may send a DL control channel #1 (e.g., DCI) including resource allocation information for a transport block to the terminal. DL control channel #1 may indicate UL data channel #1. After sending DL control channel #1, when it is determined that UL data channel #1 is to be used for another purpose, the base station may send a DL control channel #2 (e.g., DCI) including resource allocation information for the same transport block indicated by DL control channel #1 to the terminal. DL control channel #2 may indicate UL data channel #2 instead of UL data channel #1. In this case, DL control channel #2 may be used to stop transmission of UL data channel #1. The HARQ process identifier and NDI included in DL control channel #2 may be the same as the HARQ process identifier and NDI included in DL control channel #1. Optionally, when CBG is used, the HARQ process identifier, NDI, CBGTI, and CBGFI included in DL control channel #2 may be the same as the HARQ process identifier, NDI, CBGTI, and CBGFI included in DL control channel #1. Alternatively, each CBGTI and CBGFI included in the DL control channel #2 may be different from each CBGTI and CBGFI included in the DL control channel #1.
[0096] The terminal may receive DL control channels #1 and #2 including resource allocation information of the same transport block from the base station. DL control channel #1 may indicate the UL data channel #1 to which the transport block is mapped, and DL control channel #2 may indicate the UL data channel #2 to which the transport block is mapped. In this case, the frequency resource through which the UL data channel is sent may be changed. For example, the offset between the starting frequency resource (e.g., starting subcarrier or starting resource block) of UL data channel #1 and the starting frequency resource (e.g., starting subcarrier or starting resource block) of UL data channel #2 may be Δ. DL control channel #2 may notify the terminal of the offset Δ. The base station may use the corresponding frequency resource (e.g., bandwidth #1) for another purpose by changing the frequency resource of the UL data channel. For example, the base station may allocate the corresponding frequency resource to (one or more) other terminals.
[0097] The terminal may send UL data channel #2 according to the indication of the last DL control channel #2 among DL control channels #1 and #2. That is, UL data channel #1 allocated by DL control channel #1 may not be used. Here, the transmission duration #1 of UL data channel #1 may be the same as the transmission duration #2 of UL data channel #2. Optionally, the transmission duration #1 of UL data channel #1 may be different from the transmission duration #2 of UL data channel #2. The bandwidth #1 of UL data channel #1 may be the same as the bandwidth #2 of UL data channel #2. Optionally, the bandwidth #1 of UL data channel #1 may be different from the bandwidth #2 of UL data channel #2.
[0098] Figure 4 is a conceptual diagram showing a second embodiment of a UL transmission method in a communication system.
[0099] refer to Figure 4 , the base station may send a DL control channel #1 (e.g., DCI) including resource allocation information for a transport block to the terminal. DL control channel #1 may indicate UL data channel #1. After sending DL control channel #1, when it is determined that UL data channel #1 is to be used for another purpose (e.g., allocating UL data channel #1 to (one or more) other terminals), the base station may send resource allocation information (e.g., DCI) including the same transport block indicated by DL control channel #1 to the terminal. DL control channel #2 may indicate UL data channel #2 instead of UL data channel #1. In this case, DL control channel #2 may be used to stop transmission of UL data channel #1. The HARQ process identifier and NDI included in DL control channel #2 may be the same as the HARQ process identifier and NDI included in DL control channel #1. Optionally, when CBG is used, the HARQ process identifier, NDI, CBGTI, and CBGFI included in DL control channel #2 may be the same as the HARQ process identifier, NDI, CBGTI, and CBGFI included in DL control channel #1. Alternatively, each CBGTI and CBGFI included in the DL control channel #2 may be different from each CBGTI and CBGFI included in the DL control channel #1.
[0100] In addition, the size of the transport block mapped to the UL data channel may vary according to the number of resource elements allocated by the DL control channel #1. For example, the size of the transport block to which the discrete Fourier transform (DFT) precoded UL data channel is mapped may be determined according to the number of resource elements allocated by the DL control channel and the parameters indicated by the RRC message. Therefore, when the base station allocates different numbers of resource elements through the DL control channel #1 and the DL control channel #2, the size of the transport block to be included in the UL data channel #1 may be configured to be different from the size of the transport block to be included in the UL data channel #2.
[0101] In order to enable the terminal to send the same transport block to the base station, the size of the transport block to be included in the UL data channel #1 and the UL data channel #2 is preferably kept the same. In order to notify the terminal that the size of the transport block to be mapped to the UL data channel #2 is the same as the size of the transport block to be mapped to the UL data channel #1, the base station can configure the MCS index (e.g., IMCS) included in the DL control channel #2 in the MCS index range for retransmission instead of the MCS index range for initial transmission. Here, when 256 quadrature amplitude modulation (256QAM) is used, the MCS index range for initial transmission can be 0, 1, ... and 27, and when 256QAM is not used, the MCS index range for initial transmission can be 0, 1, ... and 28. Here, when 256QAM is used, the MCS index range for retransmission can be 28, 29, 30 and 31, and when 256QAM is not used, the MCS index range for retransmission can be 29, 30 and 31. However, the corresponding transport block (eg, the transport block indicated by the DL control channel #2) may be an initial transport block or a retransmission transport block transmitted from the base station to the terminal.
[0102] The terminal may receive DL control channels #1 and #2 including resource allocation information of the same transport block from the base station. DL control channel #1 may indicate the UL data channel #1 to which the transport block is mapped, and DL control channel #2 may indicate the UL data channel #2 to which the transport block is mapped. In this case, the time resource through which the UL data channel is sent may be changed. For example, the offset between the starting time resource (e.g., starting symbol or starting time slot) of UL data channel #1 and the starting time resource (e.g., starting symbol or starting time slot) of UL data channel #2 may be Δ. DL control channel #2 may notify the terminal of the offset Δ. The base station may use the corresponding time resource for another purpose by changing the time resource of the UL data channel. For example, the base station may allocate the corresponding time resource to (one or more) other terminals.
[0103] The terminal may send UL data channel #2 according to the indication of the last DL control channel #2 among DL control channels #1 and #2. For example, if the decoding operation of DL control channel #2 is completed before the transmission of UL data channel #1, the terminal may send UL data channel #2 without sending UL data channel #1. In addition, time may be required to perform the transmission operation of UL data channel #1. Optionally, the terminal may receive DL control channel #2 while sending UL data channel #1. When a part of UL data channel #1 is sent before the decoding operation of DL control channel #2 is completed, the terminal may not send the rest of UL data channel #1. Thereafter, the terminal may send UL data channel #2 indicated by DL control channel #2.
[0104] When DL control channel #2 includes resource allocation information for retransmitted transport blocks, resources for UL data channel #2 can be allocated without restriction. Since the resources of the UL data channel can be adaptively reallocated by the base station, the above embodiment can be effectively applied to dynamic resource allocation schemes (e.g., dynamic time division duplex (TDD) allocation schemes) and URLLC services. In addition, both the time and frequency resources of UL data channel #2 can be changed.
[0105] In the process of mapping the same transport block to UL data channel #2 after mapping the transport block to UL data channel #1, the terminal may no longer be able to use the results that have been performed in the mapping procedure of UL data channel #1. If the size of DL control channel #1 (e.g., the number of CCEs) is equal to the size of DL control channel #2, DL control channel #2 may include a portion of the entire resource allocation information. If the transport blocks can be mapped equally to UL data channels #1 and #2, the time available for UL transmission at the terminal can be further ensured. Therefore, the transmission delay of the transport block can be reduced.
[0106] The base station may send information indicated by a common field (e.g., a field indicating common information) included in a DL control channel for transmitting resource allocation information of the same transport block to the terminal by using high-layer signaling. Alternatively, the common field included in the DL control channel for transmitting resource allocation information of the same transport block may be defined in a technical specification known to the base station and the terminal.
[0107] When DL control channels #1 and #2 include resource allocation information of the same transport block and DL control channels #1 and #2 are successfully received, the terminal can decode DL control channel #1 and DL control channel #2 together. For example, the decoding result of DL control channel #2 can be combined with the decoding result of DL control channel #1. On the other hand, when DL control channels #1 and #2 include resource allocation information of the same transport block and DL control channel #1 is not successfully received, the terminal can only decode DL control channel #2.
[0108] For example, as in Figure 3 In the illustrated embodiment, only the frequency resources of the UL data channel may be changed, and the remaining resources (eg, time resources) of the UL data channel may be equally allocated. Figure 4 In the illustrated embodiment, only the time resources of the UL data channel may be changed, and the remaining resources (eg, frequency resources) of the UL data channel may be equally allocated.
[0109] When the size of the transport blocks is the same and the modulation and coding scheme (MCS) used for the transport blocks is the same, the size of the time resources and the size of the frequency resources occupied by UL data channel #2 can be the same as the size of the time resources and the size of the frequency resources occupied by UL data channel #1. In this case, the starting time resources (e.g., starting symbol or starting time slot) of UL data channel #2 can be configured differently from the starting time resources (e.g., starting symbol or starting time slot) of UL data channel #1. Optionally, the starting frequency resources (e.g., starting subcarrier or starting resource block) of UL data channel #2 can be configured to be different from the starting frequency resources (e.g., starting subcarrier or starting RB) of UL data channel #1. In this case, the terminal may not re-encode the transport block, perform a scrambling operation (e.g., time domain scrambling operation) on the already generated code blocks, and map the scrambled code blocks to UL data channel #2.
[0110] In the procedure of generating DL control channel #2, the base station may assume that DL control channel #1 has been successfully received at the terminal, and generate DL control channel #2 including information changed from the information included in DL control channel #1. Therefore, the size of the information (e.g., codeword) included in DL control channel #2 can be reduced, so that the code rate of DL control channel #2 can be reduced, and the reception reliability of DL control channel #2 can be improved. For example, when DL control channels #1 and #2 include resource allocation information for the same transport block, the base station may send DL control channel #2 including time resource information (e.g., transmission time point) of UL data channel #2. In this case, since the size of the information included in DL control channel #2 is smaller than the size of the information in DL control channel #1, the format of DL control channel #2 may be different from the format of DL control channel #1.
[0111] The above method can be applied not only to the transmission of the DL control channel including resource allocation information for the same transport block, but also to the transmission of the DL control channel including resource allocation information for different transport blocks.
[0112] Transmission of uplink control information (UCI) via PUSCH
[0113] The terminal may send a UL data channel in a time slot configured for transmitting UL control information (UCI). The base station may send information elements required for transmission of the UL control channel through high-layer signaling or a DL control channel. In the case where the starting symbol of the UL control channel is the same as the starting symbol of the UL data channel, the terminal may use the UL data channel instead of the UL control channel to send the UL control information. In this case, the UL data channel may include both a transport block (e.g., UL data) and UL control information.
[0114] Hereinafter, a method for transmitting a UL data channel including UL control information will be described. The terminal may receive a DL control channel #1 including resource allocation information for UL transmission, and map a transport block and UL control information to the UL data channel #1 based on the information included in the DL control channel #1. That is, a UL data channel #1 including a transport block and UL control information may be transmitted. Here, the transport block mapped to the UL data channel may also refer to a code block generated based on the transport block, and the UL control information mapped to the UL data channel may refer to the encoded UL control information.
[0115] When receiving DL control channel #1 including resource allocation information for UL transmission and receiving DL control channel #2 including resource allocation information for UL (re) transmission, the terminal may perform UL (re) transmission based on information included in DL control channel #2 instead of DL control channel #1. For example, the terminal may map a transport block (or a transport block and UL control information) to UL data channel #2 indicated by DL control channel #2. That is, the terminal may transmit UL data channel #2 instead of UL data channel #1 indicated by DL control channel #1.
[0116] Figure 5 is a conceptual diagram showing a third embodiment of a UL transmission method in a communication system.
[0117] refer to Figure 5 , DL control channel #1 may indicate UL data channel #1 (e.g., UL data channel #1 used for transmission of UL control information), and DL control channel #2 may indicate UL data channel #2 (e.g., UL data channel 2 used for transmission of transport blocks). Some time resources among the time resources of UL data channel #2 may be the same as the time resources of UL data channel #1. In addition, the starting time resource of UL data channel #2 may be the same as the starting time resource of UL data channel #1.
[0118] The terminal may receive DL control channels #1 and #2 (e.g., DCI #1 and DCI #2) from the base station, and may perform UL transmission based on information in DL control channel #2 instead of information in DL control channel #1. For example, the terminal may map the transport block and UL control information to UL data channel #2 indicated by DL control channel #2.
[0119] In addition, the base station may send a DL control channel #1 including resource allocation information for UL control information (e.g., resource allocation information indicating UL data channel #1), and send a DL control channel #2 including resource allocation information indicating UL data channel #2, which has a time resource (e.g., a starting symbol or a starting time slot) different from the time resource of UL data channel #1. In this case, the terminal may not be able to map the UL control information to UL data channel #2. This is because the transmission time point of UL data channel #2 is different from the transmission time point of UL data channel #1. That is, since the base station expects to receive the UL control information during the time resource of UL data channel #1, the base station may not be able to receive the UL control information when the UL control information is sent through UL data channel #2. Therefore, the terminal may not send both UL data channel #1 and UL control information.
[0120] In order to feed back the UL control information earlier than the time configured by the base station, the processing time at the terminal should be shortened. On the other hand, if the UL control information is fed back later than the time configured by the base station, the transmission delay of the data will increase. Therefore, it is preferred that the UL control information can be fed back at the time configured by the base station. In the proposed method, the terminal can generate a UL control channel, map the UL control information to the UL control channel, and send the UL control channel including the UL control information instead of the UL data channel.
[0121] Figure 6 is a conceptual diagram showing a fourth embodiment of a UL transmission method in a communication system, and Figure 7 is a conceptual diagram showing a fifth embodiment of a UL transmission method in a communication system.
[0122] refer to Figure 6 and Figure 7 , the time resources of UL data channel #2 may be different from the time resources of UL data channel #1. For example, the starting symbol or starting time slot of UL data channel #2 may be different from the starting symbol or starting time slot of UL data channel #1. In this case, the terminal may not map the UL control information to UL data channel #2. The terminal may map the UL control information to a separate UL control channel instead of UL data channel #2, and may send the UL control channel. The time resources used for transmission of the UL control channel may belong to the time resources of UL data channel #1. For example, the starting symbol or starting time slot of the UL control channel may be the same as the starting symbol or starting time slot of UL data channel #1. Figure 6 In the embodiment shown, UL data channel #1 may not be sent, and Figure 7 In the illustrated embodiment, a portion of UL data channel #1 may be transmitted.
[0123] In order to determine the resources of the UL control channel (e.g., the starting symbol, the duration of the symbol, the starting time slot, the location of the frequency resource, the bandwidth and the sequence information), the terminal may use the control channel element (CCE), the confirmation resource indicator (ARI), the ACK / NACK resource indicator or the PUCCH resource indicator associated with the most recently received DL control channel. In addition, the terminal may determine the resources of the UL control channel by using the information configured by the high-layer signaling and the DL control channel. Optionally, the terminal may determine the resources of the UL control channel using only the information configured by the high-layer signaling.
[0124] In the proposed method, the terminal may newly calculate the size of the UL control information (e.g., the number of resource elements) and map the corresponding UL control information to the UL data channel. When the number of resource elements of UL data channel #2 is greater than the number of resource elements of UL data channel #1, the size of the UL control information mapped to UL data channel #2 may be greater than the size of the UL control information mapped to UL data channel #1. Therefore, when the UL control information is transmitted through UL data channel #2, the terminal may increase the size of the UL control information within the range of maintaining the coding rate configured by the base station. For example, when the channel state information part 2 (e.g., channel state information (CSI) part 2) that cannot be mapped to UL data channel #1 is mapped to UL data channel #2, if the reference coding rate CT configured by the base station is satisfied, the terminal may map the channel state information part 2 to UL data channel #2. In the above method, since the size of the channel state information part 2 should be assumed differently depending on the presence or absence of the DL control channel #2, the terminal may not discard the calculation result after calculating the size of the channel state information part 2.
[0125] On the other hand, when the number of resource elements of UL data channel #2 is less than the number of resource elements of UL data channel #1, the size of the UL control information mapped to UL data channel #2 can be smaller than the size of the UL control information mapped to UL data channel #1. Therefore, when the UL control information is sent through UL data channel #2, the terminal can reduce the size of the UL control information within the range of maintaining the coding rate configured by the base station. For example, when a portion of the channel state information part 2 (e.g., CSI part 2) that can be mapped to UL data channel #1 is mapped to UL data channel #2, if the reference coding rate CT configured by the base station is not satisfied, the terminal may not map a portion of the channel state information part 2 to UL data channel #2.
[0126] In another proposed method, when it is determined to transmit the UL control information through UL data channel #2 instead of UL data channel #1 after determining the size of the UL control information to be transmitted through UL data channel #1, the terminal may map the UL control information having the determined size to UL data channel #2, and transmit the UL data channel #2 to which the UL control information is mapped. This scheme may be effectively applied when the processing time for transmission of UL data channel #2 is insufficient. That is, the terminal may omit the operation of newly encoding the UL control information and the mapping operation of the encoded UL control information. Optionally, the terminal may omit the operation of remapping the encoded UL control information.
[0127] In the case where the UL data channel is transmitted in a frequency hopping manner and the UL control information is classified by type, the terminal may map a portion of the UL control information (e.g., the first type of UL control information) to the UL data channel corresponding to the first frequency hopping, and may map another portion of the UL control information (e.g., the second type of UL control information) to the UL data channel corresponding to the second frequency hopping. When the size of the channel state information part 2 is changed, the terminal may map the UL data to the UL data channel in consideration of the changed size of the channel state information part 2.
[0128] The base station and the terminal can calculate the size of the UL control information based on the mathematical equation defined in the technical specification. For each type of UL control information, the reference coding rate can be different. For example, in the NR communication system, when the UL control information is HARQ ACK, the terminal can use the following equation 1 to calculate the size of the UL control information (e.g., the number of resource elements to which the UL control information is mapped).
[0129] [Equation 1]
[0130]
[0131] Where A=(O+L)·β,B=∑ r K r , C = ∑ s M(s),D=∑ s N(s)
[0132] The size of other UL control information (e.g., CSI part 1, CSI part 2) other than HARQ ACK may be calculated based on a scheme similar to Equation 1. Each of M(s) and N(s) may indicate the number of subcarriers in the sth symbol. When the number of resource elements of UL data channel #2 is different from the number of resource elements of UL data channel #1, the terminal may recalculate Q′ ACK In addition, when the number of resource elements of UL data channel #2 is different from the number of resource elements of UL data channel #1, the terminal may recalculate Q′ CSI-1 and Q′ CSI-2 . Q′ CSI-1 may be the number of resource elements to which CSI part 1 is mapped, and Q′ CSI-2 It can be the number of resource elements to which CSI part 2 is mapped. A coding rate matching operation (eg, rate matching operation) of the UL data channel can be performed after determining the resource elements not occupied by the UL control information. The recalculated Q′ can be used ACK , Q′ CSI-1 and Q′ CSI-2 To perform the coding rate matching operation of the UL control information.
[0133] Alternatively, the terminal may not newly calculate the size of the UL control information (e.g., the number of resource elements), and may map the encoded UL control information generated in the mapping procedure of UL data channel #1 to UL data channel #2. That is, the UL control information may be encoded based on the information indicated by UL data channel #1 instead of the information indicated by UL data channel #2.
[0134] For example, C in Equation 1 may be determined based on UL data channel #1. That is, the coding rate of HARQ ACK may be determined based on UL data channel #1. The coding rate to be used to determine Q′ may be determined based on UL data channel #1 or #2. ACK In addition, Q′ can be determined based on the above scheme. CSI-1 and Q′ CSI-2 .
[0135] In the case of calculating D using the resource allocation information of UL data channel #1, the terminal may not newly encode the UL control information, but map the encoded UL control information generated in the mapping procedure of UL data channel #1 to UL data channel #2. However, when the resources occupied by the UL data channel are changed, D calculated based on DL control channel #1 may be different from D calculated based on DL control channel #2. In this case, the UL control information may be mapped to too many resource elements among the resource elements used for UL data channel #2. Therefore, when D is calculated using the resource allocation information of UL data channel #2, the resource elements occupied by the transport block (e.g., UL data) among the resource elements used for UL data channel #2 can be ensured.
[0136] When Q′ ACK When D of Q′ changes, the terminal may newly encode the UL control information. Channel state information part 2 (eg, some or all of channel state information part 2) may not be mapped to UL data channel #1, but may be mapped to UL data channel #2 according to Q′. CSI-2 Optionally, the channel state information part 2 (eg, some or all of the channel state information part 2) may not be mapped to the UL data channel #2, but may be mapped according to Q′ CSI-2 D is mapped to UL data channel #1.
[0137] The terminal may map the transport block to the UL data channel #2 based on the information included in the UL control channel #2. The base station may allocate resources of sufficient size (e.g., the number of resource elements) to the UL data channel #2. Therefore, when mapping the transport block and the UL control information to the UL data channel #2, an appropriate coding rate may be used.
[0138] The above scheme may be applied to the case where only UL control information is mapped to DL control channel #1. The amount of UL control information may be determined based on a mathematical equation defined in the technical specification. The number of resource elements used for UL data channel #2 may be equal to the number of resource elements used for UL data channel #1. Alternatively, the number of resource elements used for UL data channel #2 may be different from the number of resource elements used for UL data channel #1.
[0139] Processing time
[0140] In order to apply the above method, processing time for UL transmission at the terminal may be required. The processing time may include time for decoding DL control channels, time for encoding transport blocks, etc. In the case where the time allocated by the base station to the terminal is too short, the terminal may not be able to perform all procedures according to its processing capacity. The following method can be applied to the UL transmission procedure with the above method. Optionally, only the following method can be applied to the UL transmission procedure.
[0141] The (re)allocation procedure of transport blocks is not performed earlier than a time known by the base station and the terminal.The time shared by the base station and the terminal may be determined based on the processing capabilities of the terminal exchanged in the initial access procedure of the terminal.
[0142] Optionally, the (re)allocation procedure of the transport block may be performed earlier than the time shared by the base station and the terminal. The base station may perform an initial access procedure with the terminal, and may identify the processing capability of the terminal in the initial access procedure. For example, the minimum time required for a processing operation based on a DL control channel may be determined based on the processing capability of the terminal. The minimum time required may be expressed differently and determined for each subcarrier spacing. In addition, the minimum required time may be configured in units of symbols or time slots.
[0143] When the base station transmits two or more DL control channels including resource allocation information of the same transport block, since the two or more DL control channels include resource allocation information of the same transport block, the terminal having received the two or more DL control channels may not perform all processing operations. That is, the terminal may not perform certain operations (e.g., coding rate matching operations). Therefore, the minimum time required for the processing operation based on the DL control channel for reallocating the same transport block may be configured to be different from the minimum time required for the processing operation based on the DL control channel for allocating the transport block.
[0144] When DL control channel #1 indicates multiplexing of UL control information and transport blocks (e.g., UL data), the terminal may receive a new DL control channel #2. In this case, the terminal may map the UL control information and the transport blocks to different physical channels (e.g., UL control channel and UL data channel). Alternatively, the terminal may send a UL data channel including only transport blocks without sending UL control information. Since the time required for each of the processing operations is different, it is necessary to distinguish the time required for each processing operation.
[0145] The time required for processing the UL control information can be distinguished from the time required for processing the transport block. When the terminal ensures the time required for processing the UL control information, the terminal can map the UL control information to the UL control channel. Optionally, the terminal can multiplex the UL control information and the transport block on the UL data channel.
[0146] The process for mapping the UL control information to the UL control channel may be different from the process for mapping the UL control information to the UL data channel. Here, the required time may be the longer time between the processing time of the UL control information in the mapping procedure of the UL control channel and the processing time of the UL control information in the mapping procedure of the UL data channel. However, it can be assumed that the processing time of the UL control information in the mapping procedure of the UL control channel is the same as the processing time of the UL control information in the mapping procedure of the UL data channel.
[0147] The processing time of the UL control information in the mapping procedure of the UL control channel may be different from the processing time of the UL control information in the mapping procedure of the UL data channel. This is because the terminal may multiplex the UL control information and the transport block in the UL data channel #2 indicated by the DL control channel #1, or the terminal may map the transport block to a new UL control channel after starting the multiplexing operation of the UL control information in the UL data channel #1 indicated by the DL control channel #1. When the UL control information is sent through the UL data channel, the terminal may reuse the encoded UL control information and the rate-matched UL control information. On the other hand, when the UL control information is sent through the UL control channel, the terminal may newly perform the encoding operation and the coding rate matching operation (e.g., rate matching operation) for the UL control information.
[0148] PUSCH bundling
[0149] The UL data channel may be repeatedly transmitted. The base station may use one or more of a high-level message, a DL control channel, and a MAC control element (CE) to send information indicating the number of repeated transmissions of the UL data. The terminal may identify the number of repeated transmissions of the UL data by receiving at least one of a high-level message, a DL control channel, and a MAC CE. The base station may send a DL control channel including resource allocation information for the UL data channel. The terminal may receive a DL control channel from the base station and may repeatedly transmit the UL data channel based on the information included in the DL control channel. Here, the UL data channel may be transmitted using the same resources (e.g., resource blocks, starting symbols, number of symbols, transmit power, HARQ process identifier).
[0150] The terminal may receive a DL control channel #1 including resource allocation information (e.g., UL data) of a transport block from a base station, and may receive a DL control channel #2 from the base station after receiving the DL control channel #1. The DL control channels #1 and #2 may include resource allocation information of the same transport block. The proposed method may be applied not only to a communication procedure using DL control channels #1 and #2 including resource allocation information of the same transport block, but also to a communication procedure using DL control channels #1 and #2 including resource allocation information of different transport blocks.
[0151] After the transmission of UL data channel #1 is completed, the terminal may complete the decoding operation of DL control channel #2. Alternatively, the terminal may complete the decoding operation of DL control channel #2 during the transmission of UL data channel #1. When receiving DL control channel #2, the terminal may perform the decoding operation on DL control channel #2 within a period of time according to its processing capability.
[0152] When the base station allocates UL data channels #1 and #2, the number of repeated transmissions may be the sum of the number of repeated transmissions of UL data channel #1 and the number of repeated transmissions of UL data channel #2. Optionally, when both UL data channels #1 and #2 are transmitted, the number of repeated transmissions may increase. The terminal may transmit UL data channels #1 and #2 by the number of repeated transmissions configured by the base station.
[0153] If the transmission of UL data channel #1 is not completed even after the decoding of DL control channel #2 is completed, the terminal may not send UL data channel #1. In this case, the terminal may not regard UL data channel #1 as being sent. The base station can estimate the completion time of the decoding operation for DL control channel #2 at the terminal, and can determine which UL data channel (e.g., UL data channel #1 or #2) to send. The base station can perform a monitoring operation of UL data channel #1 and a monitoring operation of UL data channel #2 in one or more time slots. Since the transmission timing (e.g., timing advance (TA)) and the processing time of the terminal should be considered, it may not be easy to predict the UL data channel sent from the terminal.
[0154] CBG
[0155] When one transport block is divided into two or more CBGs, the base station may send high-layer information to the terminal, the high-layer message including information indicating that a HARQ response is sent for two or more CBGs instead of one transport block. The base station may send a DL control channel #1 including resource allocation information for the UL data channel #1, and the terminal receiving the DL control channel #1 may send the UL data channel #1 based on the information included in the DL control channel #1.
[0156] Since all transport blocks are reallocated in the transport block reallocation procedure, the size of the resources occupied by the UL data channel #2 to which all transport blocks are mapped may be large. However, when the terminal is allowed to send only some CBGs, the size of the resources occupied by the UL data channel #2 can be reduced. When one transport block is divided into K CBGs, the terminal can send some of the K CBGs through the UL data channel #1 and the remaining CBGs through the UL data channel #2. K can be an integer equal to or greater than 2. Here, the terminal can assume that there are no CBGs that will not be indicated as being sent or that are not reallocated.
[0157] Figure 8 is a conceptual diagram showing a sixth embodiment of a UL transmission method in a communication system.
[0158] refer to Figure 8 , one transport block can be divided into 3 CBGs. For ease of illustration, reference signals are not shown. The base station may transmit a DL control channel #1 including resource allocation information for a transport block (e.g., CBG#1 to CBG#3 constituting a transport block), and may transmit a DL control channel #2 including resource allocation information for CBG#2 to CBG#3 among CBG#1 to CBG#3.
[0159] When a transport block is initially transmitted in the UL data channel #1 indicated by the DL control channel #1, the DL control channel #1 may include resource allocation information for all CBGs constituting the transport block. On the other hand, when a transport block is retransmitted in the UL data channel #1 indicated by the DL control channel #1, the DL control channel #1 may include resource allocation information for all CBGs constituting the transport block or resource allocation information for some CBGs.
[0160] The terminal may receive DL control channels #1 and #2, may transmit UL data channel #1 based on information included in DL control channel #1, and may transmit UL data channel #2 based on information included in DL control channel #2. In the transmission procedure of UL data channel #1, the terminal may transmit CBG #1 that is not indicated by DL control channel #2 among all CBGs #1 to #3 constituting the transport block.
[0161] DL control channel #1 may include information indicating that one transport block is divided into 3 CBGs (i.e., CBG#1 to CBG#3) and / or information indicating that 3 CBGs are mapped to UL data channel #1. DL control channel #2 may include information indicating that CBG#2 to CBG#3 are mapped to UL data channel #2. Since information for transmission of CBG#1 is not included in DL control channel #2, the terminal may send CBG#1 based on the information included in DL control channel #1. In this case, CBG#1 may be sent through UL data channel #1. Since information for transmission of CBG#2 to CBG#3 is included in DL control channel #2, the terminal may send CBG#2 to CBG#3 based on the information included in DL control channel #2 instead of the information included in DL control channel #1. In this case, CBG#2 to CBG#3 may be sent through UL data channel #2. Here, the time and frequency resources of UL data channel #1 may be different from the time and frequency resources of UL data channel #2.
[0162] In the case where only the transmission of some CBGs is allowed, the terminal can send all symbols to which some CBGs are mapped. In UL data channel #1, CBG#1 to CBG#2 can be mapped to the same symbol. In this case, the terminal can map a portion of CBG#2, a null value, or a value (e.g., a specific sequence) preconfigured between the base station and the terminal to a resource for mapping CBG#2 to the same symbol as the symbol to which CBG#1 is mapped. In this case, data can be mapped to all subcarriers in the symbol to which CBG#1 is mapped. When CBG#1 to CBG#2 are configured to be mapped to the same symbol and only CBG#1 is sent in the corresponding symbol, a problem of different power control for each symbol may arise. In this case, it may be difficult to generate a UL data channel #1 with a waveform of appropriate quality.
[0163] The base station may send a DL control channel #2 including information indicating that a CBG mapped after a specific symbol in UL data channel #1 is not transmitted to the terminal. The base station may send a DL control channel #1 including information indicating that CBG#1 and CBG#3 are mapped to UL data channel #1 and information indicating that CBG#2 is mapped to UL data channel #2. The terminal may receive DL control channels #1 and #2, and may perform UL transmission based on the information included in DL control channel #1 and DL control channel #2. In this case, in some symbols belonging to transmission duration #1 in which UL data channel #1 is transmitted, the transmission power may be 0, and in the remaining symbols except for the some symbols in transmission duration #1, the transmission power may be greater than 0. Therefore, it may be difficult to generate a UL data channel #1 having a waveform of appropriate quality.
[0164] To solve this problem, the base station can configure a specific time in the UL data channel #1, and can distinguish between a transmission area (e.g., a transmission symbol) and a non-transmission area (e.g., a non-transmission symbol) based on the specific time. The base station can send a DL control channel #2 including information indicating that the CBG is mapped to the transmission area in the UL data channel #1. The terminal can receive the DL control channel #2 from the base station, and can operate based on the information included in the DL control channel #2. For example, the terminal can map the CBG to the transmission area in the UL data channel #1, and may not map the CBG to the non-transmission area in the UL data channel #1.
[0165] In addition, the terminal may send a reference signal in a transmission zone in UL data channel #1, but not send a reference signal in a non-transmission zone in UL data channel #1. For example, the base station may send a high-layer message to the terminal, which includes configuration information of the reference signal (e.g., a front-loaded demodulation reference signal (DM-RS) to be sent in the first symbol of UL data channel #1 and a reference signal to be sent in the nth symbol of UL data channel #1 (e.g., additional DM-RS)). Here, n may be an integer of 2 or greater. The terminal may obtain configuration information of the reference signal to be sent in UL data channel #1 (e.g., front-loaded DM-RS and additional DM-RS) by receiving a high-layer message from the base station. Therefore, the terminal may send a DM-RS in the first symbol of UL data channel #1. However, when the nth symbol belongs to the non-transmission zone of UL data channel #1, the terminal may not send a DM-RS in the nth symbol of UL data channel #1.
[0166] The base station may send a high-layer message including configuration information for frequency hopping of the UL data channel to the terminal. The terminal may obtain the configuration information for frequency hopping of the UL data channel by receiving a high-layer message from the base station. One CBG may be included in a UL data channel corresponding to two frequency hoppings. For example, all CBGs may be included in a UL data channel (e.g., UL data channel #1) corresponding to the first frequency hopping. Here, when DL control channel #2 is generated to include information indicating the transmission of a CBG to be mapped to a non-transmission area of UL data channel #1 through UL data channel #2, preferably, all CBGs are reallocated. This method may be the same as a reallocation method in units of transport blocks.
[0167] For example, UL control information may be mapped to UL data channel #1. When UL data channel #1 is transmitted without frequency hopping, all UL control information may be mapped to the front symbols in UL data channel #1. In this case, the transport block or CBG may be mapped to the remaining symbols (e.g., symbols located in the rear region of UL data channel #1) among the symbols constituting UL data channel #1 except for the symbols to which the UL control information is mapped. UL control information and transport blocks (or CBGs) may be mapped to UL data channel #1 according to the same rules, regardless of whether an additional reference signal (e.g., an additional DM-RS) is mapped in UL data channel #1. When a DL control channel #2 including resource allocation information of the entire transport block or all CBGs is received, the terminal may send UL control information by using the UL control channel instead of UL data channel #1.
[0168] Optionally, the terminal may map the reference signal and UL control information to UL data channel #1 (e.g., symbols constituting UL data channel #1), and transmit the reference signal and UL control information mapped to the symbols. In this case, among the subcarriers constituting UL data channel #1, there may be remaining subcarriers that are not used for the transmission of reference signals and UL control information. The terminal may map any value, transport block, CBG, or information preconfigured between the terminal and the base station (e.g., a specific sequence) to the remaining subcarriers.
[0169] √UL preemption indication (PI) or dynamic resource reservation
[0170] Fig. 9 is a conceptual diagram showing a seventh embodiment of a UL transmission method in a communication system.
[0171] refer to Fig. 9 , a terminal may use the UL data channel to send data with two or more requirements (e.g., latency and error rate). For example, data #1 may be eMBB data, and data #2 may be URLLC data. The following may happen: terminal #1 or terminal #2 must send data #2 via UL data channel #2, while terminal #1 is sending UL data channel #1 including data #1. Some or all of UL data channel #1 may overlap with UL data channel #2.
[0172] In this case, in order to minimize the interference of UL data channel #2, the base station may control UL data channel #1 not to be transmitted. For example, the base station may transmit UL control channel #3 including information indicating that the terminal does not transmit UL data channel #1 to terminal #1. Terminal #1 may receive DL control channel #3 and may not transmit UL data channel #1 based on the information included in DL control channel #3. Optionally, when a portion of UL data channel #1 is transmitted before the decoding operation for DL control channel #3 is completed, terminal #1 may not transmit the remaining portion of UL data channel #1.
[0173] During transmission of (one or more) DL data channels, the base station may transmit a DL control channel #3 including a bitmap indicating unused time and frequency resources among the time and frequency resources constituting the UL data channel #1. Each bit position included in the bitmap may correspond to a UL reference resource. Terminal #1 may receive the DL control channel #3 and may not transmit the UL data channel #1 in the resources indicated by the bitmap included in the DL control channel #3.
[0174] In order to notify the terminal that transmits the UL data channel #1 of the bitmap, the base station may transmit the DL control channel #3 to the terminal by using identification information common to the terminal (e.g., slot format indicator (SFI)-radio network temporary identifier (SFI-RNTI), interrupt RNTI (INT-RNTI) or common RNTI)) instead of identification information for a specific terminal (e.g., cell radio RNTI (C-RNTI)). For example, the CRC value of the downlink control information (DCI) included in the DL control channel #3 may be scrambled by the SFI-RNTI, INT-RNTI or common RNTI. In this case, the base station may use a special format of the DL control channel (e.g., group common PDCCH) to notify the terminal of the format of some time slots.
[0175] Application of regular UL carrier or supplementary UL carrier
[0176] The DL control channel may include not only resource allocation information of the UL data channel, but also information indicating a carrier through which the UL data channel is transmitted (e.g., a regular UL carrier or a SUL carrier). For example, a bitmap indicating UL reference resources belonging to a regular UL carrier (e.g., a bitmap indicating resources through which the UL data channel is not transmitted) may be transmitted through DL control channel #1, and a bitmap indicating UL reference resources belonging to a SUL carrier may be transmitted through DL control channel #2. The carrier through which DL control channel #1 is transmitted may be different from the carrier through which DL control channel #2 is transmitted. In this case, the terminal may receive a DL control channel for each carrier (e.g., DL control channels #1 and #2), and may determine whether to transmit the UL data channel based on the bitmap included in the DL control channel.
[0177] Optionally, the DL control channel may include a bitmap #1 indicating a UL reference resource belonging to a normal UL carrier and a bitmap #2 indicating a UL reference resource belonging to a SUL carrier. In this case, the terminal may identify bitmap #1 and bitmap #2 by receiving a DL control channel, and may determine whether to send a UL data channel based on bitmap #1 and bitmap #2.
[0178] The bitmap #1 for the normal UL carrier and the bitmap #2 for the SUL carrier may be included in one DL control channel #3. Which carrier (e.g., normal UL carrier or SUL carrier) the bitmap included in the DL control channel #3 corresponds to may be indicated by high-layer signaling. For example, the terminal may know which carrier the bitmap should be applied to at a specific position of the DL control channel #3. Therefore, the base station may send the same DL control channel to several terminals, and each terminal may decode the bitmap at a specific position in the received DL control channel.
[0179] √ UL PI passed by SFI
[0180] Each of the symbols constituting a time slot may be a DL symbol, a UL symbol, or a flexible symbol (or an unknown symbol). The base station may use a high-layer message, a DL control channel, or a MAC CE to send an SFI indicating a time slot format. For example, the base station may send system information or a high-layer message including an SFI. Alternatively, the base station may send a DCI including an SFI via a DL control channel. The UE terminal may obtain the SFI by receiving a high-layer message, a DL control channel, or a MAC CE. For example, the terminal may receive a DL control channel in resources (e.g., time and frequency resources) configured by high-layer signaling of the base station, and may identify the SFI included in the DL control channel.
[0181] Reference again Fig. 9 , the base station may transmit a DL control channel #3 including information indicating a flexible symbol or a DL symbol among symbols constituting the UL data channel #1 allocated by the DL control channel #1. For example, among the symbols constituting the UL data channel #1, symbols configured as UL symbols by the higher layer signaling or the DL control channel #1 may be overwritten as flexible symbols or DL symbols by the DL control channel #3. The terminal may receive the DL control channel #3 from the base station and identify the flexible symbol or the DL symbol among the symbols constituting the UL data channel #1 based on the information included in the DL control channel #3.
[0182] In this case, the terminal may not send UL data channel #1. Optionally, in UL data channel #1, flexible symbols or DL symbols may not be used for UL transmission. For example, when CBG is mapped to UL data channel #1, the terminal may perform UL transmission using the remaining symbols of the symbols constituting UL data channel #1 except for the symbols configured as flexible symbols or DL symbols by DL control channel #3. Optionally, when the transport block is mapped to UL data channel #1, the terminal may not send UL data channel #1.
[0183] Since DL control channel #3 indicates symbols that are not used for UL transmission in UL data channel #1, the terminal may not transmit UL data channel #1 in the entire bandwidth. When some resource blocks in UL data channel #1 are used for UL transmission and the transmission of UL data channel #1 does not interfere with the transmission of UL data channel #2, the above method may occupy many resources.
[0184] In one example, information about the SFI and information about the UL PI may be juxtaposed in one DCI. The base station may indicate to the terminal, through high-layer signaling, information (e.g., an index or a bitmap) used to indicate the position of the SFI and the position of the UL PI within one DCI. The base station may send the corresponding DCI in a DL control channel, and the (one or more) terminals receiving the DCI may obtain the necessary information (e.g., SFI and / or UL PI) at a specific position in the DCI. The identification information (e.g., RNTI) for decoding the DCI may be an SFI-RNTI, an INT-RNTI, or another RNTI, and the base station may use high-layer signaling to send the identification information for decoding the DCI to one or more terminals.
[0185] √UL PI via DL PI
[0186] The resources constituting the time slot may be divided into a plurality of DL reference resources, and the time and frequency resources (e.g., DL reference resources) used for one or more time slots may be indicated by a plurality of bits. A bitmap (e.g., DL PI) consisting of a plurality of bits may be sent by a DCI in a specific format. The terminal may receive the DCI through a DL control channel, and may not receive a DL control channel or a DL data channel in a DL reference resource indicated by a bitmap included in the DCI. One bit included in the bitmap may indicate whether a DL control channel or a DL data channel is received in a specific time and frequency resource (e.g., a specific DL reference resource).
[0187] The UL reference resource may be defined similarly to the DL reference resource. The base station may generate a DCI including a bitmap (e.g., UL PI) indicating whether a UL control channel or a UL data channel is sent in a time and frequency resource (e.g., UL reference resource), and send the DCI through the DL control channel. Here, the bitmap may indicate a UL reference resource for one or more time slots. The terminal may receive the DCI through the DL control channel, and may not send a UL control channel or a UL data channel in the UL reference resource indicated by the bitmap included in the DCI.
[0188] In the proposed method, the DL PI and the UL PI may be included in the same DL control channel (e.g., the same DCI). When the DL PI has a bitmap indicating a DL reference resource for 2 time slots, bitmap #1 may indicate a DL reference resource for one DL time slot, and bitmap #2 may indicate a UL reference resource for one UL time slot. In this case, the UL reference resource may be a regular UL carrier or a SUL carrier. The base station may send a high-layer message including information indicating whether the UL reference resource is a regular UL carrier or a SUL carrier to the terminal. The terminal may receive a high-layer message from the base station, and may determine whether the UL reference resource is a regular UL carrier or a SUL carrier based on the information included in the high-layer message. Optionally, (one or more) bitmaps for DL reference resources and (one or more) bitmaps for UL reference resources may be juxtaposed in one DCI. The base station may send a high-layer message including information indicating the position of (one or more) bitmaps for DL reference resources and the position of (one or more) bitmaps for UL reference resources in the DCI to the terminal. The terminal may receive a high-layer message from the base station, and may determine the position of the bitmap (one or more) for the DL reference resource and the position of the bitmap (one or more) for the UL reference resource in the DCI. For example, the terminal may identify which position of the bitmap for the DL reference resource in the DCI corresponds to the DL carrier, and may identify which position of the bitmap for the UL reference resource in the DCI corresponds to the UL carrier (e.g., a normal UL carrier or a SUL carrier).
[0189] In another proposed method, the DL control channel including the DL PI may be different from the UL control channel including the UL PI. The DL PI may be configured according to a conventional method. The UL PI for the SUL carrier may be generated independently of the UL PI for the conventional UL carrier. In this case, the base station may send a high-layer message including information required to receive the UL PI for the SUL carrier to the terminal. The terminal may receive the high-layer message from the base station and receive the UL PI for the SUL carrier based on the information included in the high-layer message. For example, the terminal may detect the UL PI in a specific search space for the DL control channel. That is, the terminal knowing the search space may perform blind detection (e.g., blind decoding) based on CCE.
[0190] In the proposed method, identification information for UL PI may not be configured separately, and conventional identification information (e.g., INT-RNTI) may be used as identification information for UL PI. When a high-layer message including information indicating detection of UL PI is received from a base station, the terminal may use the identification information configured by the base station to perform a detection operation in a specific search space for a DL control channel to obtain UL PI. When a high-layer message including information indicating detection of DL PI and UL PI is received from a base station, the terminal may perform a detection operation in a specific search space for a DL control channel using one identification information to obtain DL PI and UL PI. Here, DL PI and UL PI may be included in the same DCI (e.g., DCI having the same format). In this case, the terminal may use one identification information to obtain DL PI and UL PI.
[0191] In another proposed method, the identification information for the UL PI may be different from the identification information for the DL PI. The terminal may perform blind detection to obtain a DCI including the UL PI in a search space for a DL control channel, and may perform blind detection to obtain a DCI including the DL PI in a search space for a DL control channel. The format of the DCI including the UL PI may be different from the format of the DCI including the DL PI. Information indicating the size of the UL PI may be sent from the base station to the terminal via a high-layer message. The base station may configure (one or more) candidates for the CCE aggregation level for the DL control channel so that the terminal can decode the DCI. In this case, the number of search spaces may increase. In order to reduce the reception complexity of the terminal, a method that does not increase the number and size of search spaces may be required.
[0192] In the proposed method, the number of search spaces for UL PI can be configured to be equal to or less than the number of preconfigured search spaces (e.g., the maximum number of search spaces). For example, the number of search spaces for UL PI can be one or two. Optionally, the base station can send a high-layer message to the terminal, which includes information indicating the number of search spaces for UL PI. Optionally, the terminal can estimate the number of search spaces for UL PI using parameters configured by high-layer signaling. The location of the search space for UL PI can be determined by the CCE aggregation level. The terminal can identify the search space for UL PI based on the above method, and can obtain UL PI by performing a detection operation in the identified search space.
[0193] In the proposed method, the search space for UL PI (e.g., the control resource set (CORESET) to which the search space belongs) can be the same as the search space for DL PI (e.g., the CORESET to which the search space belongs). In this case, the number of search spaces for the terminal to perform detection operations can be reduced.
[0194] Fig.10 is a conceptual diagram illustrating a first embodiment of a search space (eg, a logical search space) for a DL control channel in a communication system, and Fig.11 is a conceptual diagram illustrating a second embodiment of a search space (eg, logical search space) for a DL control channel in a communication system.
[0195] refer to Fig.10 , when a high-layer message including configuration information for detecting UL PI is received and a high-layer message including configuration information for detecting DL PI is not received, the terminal may perform a detection operation for detecting UL PI. For example, the terminal may perform a detection operation in PDCCH candidate #1 and PDCCH candidate #2 included in the search space. That is, a detection operation for obtaining DL PI may not be performed.
[0196] refer to Fig.11 , a high-layer message including configuration information for detecting UL PI and DL PI may be received, and the search space of ULPI and the search space of DLPI may belong to the same CORESET. The terminal may obtain DL PI by performing a detection operation on PDCCH candidate #1 and PDCCH candidate #2, and may perform a detection operation on PDCCH candidates other than the PDCCH candidate from which DL PI is obtained among PDCCH candidate #1 and PDCCH candidate #2. In this case, a separate search space for UL PI (e.g., the CORESET to which the search space belongs) may not be configured. Since UL PI is transmitted through a PDDCH candidate that does not transmit DL PI, the number of times blind detection is performed may be reduced.
[0197] Bitmap
[0198] UL PI can be configured as a bitmap. Each bit included in the bitmap can indicate a UL reference resource (e.g., time domain and frequency domain). The UL reference resource may belong to the effective bandwidth part (BWP) of the terminal and may consist of B resource blocks and T symbols. B and T may be configured by the base station. Each of B and T may be an integer equal to or greater than 1. DL PI may indicate DL reference resources according to two schemes (e.g., Scheme #1 and Scheme #2). The base station may send a high-level message including information indicating one of the two schemes to the terminal. The terminal may receive a high-level message from the base station and interpret the DL PI according to the scheme indicated by the high-level message.
[0199] When the high-layer message indicates scheme #1, the resource blocks constituting the effective BWP may be divided into 2 sets, the DL symbols belonging to the transmission duration of the transmission period according to the DL PI may be divided into 7 sets, and each set (e.g., 14 sets) may be a DL reference resource. When the high-layer message indicates scheme #2, the resource blocks constituting the effective BWP may belong to one set, the DL symbols belonging to the transmission duration of the transmission period according to the DL PI may be divided into 14 sets, and each set (e.g., 14 sets) may be a DL reference resource. One bit included in the bitmap may indicate whether data is to be transmitted in the DL reference resource corresponding to the corresponding bit.
[0200] The above method may be applicable to a scenario where specific DL data is transmitted through resources including a relatively large bandwidth and a relatively small number of symbols. In addition, the above method may be applied to a scenario where interference occurs between transmissions of different DL data scheduled by a base station, or to a scenario where resources allocated for transmission of DL data #1 are reallocated to transmission of DL data #2.
[0201] In the proposed method, the UL reference resource can be indicated to the terminal in the same manner as the DL reference resource. Unlike the DL reference resource indicating the past resource in the bitmap, the UL reference resource can indicate the future resource in the bitmap, and the terminal can indicate whether to send data in (one or more) future symbol and frequency resources corresponding to the corresponding bit position in the bitmap.
[0202] In addition, in the proposed method, the UL reference resource indicated by the UL PI can be composed of a small number of symbols (e.g., short time) and a wide bandwidth. The reason for using such UL reference resources is that when the terminal sending URLLC UL data is located adjacent to the base station, the terminal can use sufficient power to send URLLC UL data through resources consisting of a short time and a wide bandwidth. Therefore, the bitmap indicating the UL reference resource to the terminal can have characteristics similar to DL PI. That is, for the configuration of the UL reference resource, the effective BWP configured for the terminal can be divided into one or two, and the corresponding time slot can be divided into one or two symbol units.
[0203] Since the UL PI includes a bitmap of a fixed size, the product of the number of divided frequency domains (e.g., effective BWPs) and the number of divided time domains (e.g., time slots belonging to the period of the UL PI) may be constant. In addition, the bitmap included in the UL PI may be applied to one or more time slots, and the base station may notify the terminal of the number of time slots to which the bitmap included in the UL PI is applied by using a high-layer signaling. The number of time slots to which the bitmap is applied may be the same as the monitoring period of the UL PI.
[0204] On the other hand, since the resource allocation scheme for UL data may be different from the resource allocation scheme for DL data, the above method may not be applied to the transmission scenario of UL data. UL data may be sent according to the UL transmission power of the terminal, and the reception quality of UL data in the base station may be determined according to the UL transmission power. Therefore, for UL transmission that meets low latency and high quality requests, the base station may allocate resources for UL data. The terminal may send UL data through a UL data channel consisting of a narrow bandwidth and an appropriate number of symbols. Based on this feature, a UL reference resource indicated by a UL PI may be designed.
[0205] In the proposed method, the frequency domain of the UL reference resource can be finely divided, and the time domain of the UL reference resource can be roughly divided. In order to indicate the time resource of the UL reference resource, the base station can send a high-level message to the terminal, which includes information indicating the detection period (e.g., transmission period) of the UL PI. For example, the detection period of the UL PI can be one, two, or four time slots. The UL symbols belonging to the duration of the detection period according to the UL PI can be divided into A sets. A can be an integer equal to or greater than 1. In order to indicate the frequency resource of the UL reference resource, the effective BWP (e.g., effective UL BWP) can be divided into B sets. B can be 7 or 14. B can be greater than A. The UL PI can be a bitmap consisting of A×B bits. Each bit included in the bitmap can indicate whether UL data is sent in the UL reference resource corresponding to the bit.
[0206] In the proposed method, A×B may be limited to (one or more) specific values. The base station may send a high-layer message including (one or more) specific values to the terminal, and the terminal may identify (one or more) specific values by receiving a high-layer message from the base station. Optionally, (one or more) specific values may be defined in a technical specification known to the base station and the terminal. For example, A×B may be set to 14. According to the scheme, the size of the UL PI may be configured to be equal to the size of the DL PI. Therefore, the size of the DL control channel searched for the UL PI may be the same as the size of the DL control channel searched for the DL PI. In this case, the reception complexity of the DL control channel in the terminal may be reduced.
[0207] Fig.12 is a conceptual diagram showing a first embodiment of a UL reference resource in a communication system, and Fig.13 is a conceptual diagram illustrating a second embodiment of a UL reference resource in a communication system.
[0208] refer to Fig.12 , UL PI may indicate a UL reference resource configured in a resource consisting of a slot and a valid BWP. Symbols (e.g., 14 symbols) included in a slot may be divided into 2 sets. That is, A may be 2. In this case, one UL reference resource may include 7 symbols. The valid BWP may be divided into 7 sets. That is, B may be 7. Therefore, the size of UL PI may be 14 bits.
[0209] refer to Fig.13 , UL PI may indicate a UL reference resource configured in a resource consisting of 2 time slots and an effective BWP. Symbols (e.g., 28 symbols) included in 2 time slots may be divided into 2 sets. That is, A may be 2. In this case, one UL reference resource may include 14 symbols. The effective BWP may be divided into 7 sets. That is, B may be 7. Therefore, the size of UL PI may be 14 bits. Fig.13 In the embodiment A×B can be maintained with Fig.12 Each of A and B may be adjusted according to the transmission period of the UL PI.
[0210] The reception quality of DL PI may be different from the reception quality of UL PI. When DL PI is not received at the terminal, the base station may perform a retransmission operation on the terminal, and thus, the terminal may decode the necessary data. A terminal that has not yet received ULPI may send an unnecessary UL data channel (e.g., a UL data channel indicated by UL PI). In this case, the unnecessary UL data channel may interfere with the UL data channel sent by another terminal, so that the base station may not be able to successfully receive the UL data channel. In order to solve such a problem, the aggregation level of the DL control channel including UL PI may be configured to be different from the aggregation level of the DL control channel including DL PI.
[0211] In the proposed method, the UL PI may be configured to indicate the UL reference resource configured in one time slot. In this case, the size of the UL PI may be C bits. The terminal may assume that the transmission state of the UL reference resource indicated by the UL PI is the same not only in the current time slot but also in (one or more) time slots after the current time slot. In order to improve the reception quality, the base station may send a high-layer message including information indicating repeated transmission of the UL data channel to the terminal.
[0212] The terminal may receive a high-layer message from the base station and determine based on the information included in the high-layer message that repeated transmission of the UL data channel is requested. In this case, the terminal receiving the UL PI may determine to apply the UL PI to a time slot belonging to the duration of the transmission period according to the UL PI. Since one UL PI may indicate the transmission of the UL data channel in multiple time slots, the size of the UL PI may be reduced. However, since the base station should evenly schedule UL transmissions in multiple time slots to which the UL PI is applied, the scheduling flexibility for UL transmission may be reduced.
[0213] Fig.14 is a conceptual diagram illustrating a third embodiment of a UL reference resource in a communication system.
[0214] refer to Fig.14 , UL PI may indicate a UL reference resource configured in a resource consisting of 2 time slots and an effective BWP. Symbols (e.g., 28 symbols) included in 2 time slots may be divided into 4 sets. That is, A may be 4. In this case, one UL reference resource may include 7 symbols. The effective BWP may be divided into 7 sets. That is, B may be 7. Therefore, the size of UL PI may be 28 bits. Fig.14 The size of the UL PI in the embodiment of (i.e., 28 bits) may be Fig.12 or Fig.13When one UL PI is applied to 2 consecutive time slots, the size of the UL PI may be maintained at 14 bits.
[0215] ■URLLC PUCCH power control method
[0216] √Power control method considering payload
[0217] Each of the base station and the terminal may determine the transmission power of the UL control channel based on a predetermined rule. The base station may send a high-layer message, a DL control channel, or a MAC CE to the terminal, including parameters required to determine the transmission power of the UL control channel. The terminal may identify the parameters required to determine the transmission power of the UL control channel by receiving a high-layer message, a DL control channel, or a MAC CE from the base station. The terminal may derive a portion of the parameters required to determine the transmission power of the UL control channel based on a signal received from the base station (e.g., a synchronization signal / physical broadcast channel (SS / PBCH) block, a reference signal (CSI-RS), a phase tracking RS (PT-RS), a DM-RS, etc.).
[0218] The proposed power control method can be applied to a UL data channel, and the transmission power can be adjusted according to the size of a transport block included in the UL data channel. When the UL data channel does not include UL control information, only a function according to the size of the transport block (e.g., UL data) can be used to determine the transmission power. On the other hand, when the UL data channel includes both UL control information and a transport block, the transmission power can be determined using a function according to the size of the UL control information and a function according to the size of the transport block.
[0219] For example, when the UL data channel includes a transport block, the transmission power P applied to the resource element corresponding to the carrier #c of the time slot #i may be determined based on the following equation 2: c (i).
[0220] [Equation 2]
[0221] P c (i) = P O,c +α c ·PL c +Γ c (i)+10·log 10 (2 μ ·M c (i))+f c (i)
[0222] Here, Γ c (i) According to the bit number O of the transport block TB(i) and the size N of the resource elements mapped to the resource blocks in the UL data channel RE (i) To define Γ c (i) For example, Γ c (i) It can be BPRE(i) can be positioned as O TB (i) / N RE (i).
[0223] Alternatively, the rule for transmitting the transmission power of both the transport block and the UL control information may be expressed by the following equation 3. In equation 3, the transmission power applied to the UL data channel in carrier #c of time slot #i may be defined as P c (i).
[0224] [Equation 3]
[0225] P c (i) = P O,c +α c ·PL c +Γ c (i)+Δ c (i)+10·log 10 (2 μ ·M c (i))+f c (i)
[0226] Here, Δ c (i) The UL control information may have a bit Δ c (i) and the size L of the resource elements mapped to the resource blocks in the UL data channel RB (i). For example, Δ c (i) It can be BPRE(i) can be positioned as O UCI (i) / L RB (i).
[0227] Optionally, depending on the size of the UL data, the base station may not inform the terminal of the transmission power. For example, the base station may send a signal including the signal applied to Δ C (i) and the terminal can identify the constant applied to Δ by receiving the high-level message from the base station. C (i) is a constant. Applied to Δ C (i) constant, the size of the UL control information can be configured to be balanced with the size of the UL data. In this case, the size of the UL control information can be configured to be balanced with the size of the UL data by a separate configuration variable (e.g., δ c ) to indicate the transmission power applied to the UL data channel.
[0228] We can C is set to one of multiple values including 0 and 1. The base station may send a signal including δ C The terminal can identify the high-level message as δ by receiving the high-level message from the base station. C The value to set.
[0229] [Equation 4]
[0230] P c (i) = P O,c +α c ·PL c +Γ c (i)+δ c Δ c (i)+10·log 10 (2 μ ·M c (i))+f c (i)
[0231] [Equation 5]
[0232] P c (i) = P O,c +α c ·PL c +δ c ·Γ c (i)+Δ c (i)+10·log 10 (2 μ ·M c (i))+f c (i)
[0233] The terminal may report the power headroom PH to the base station. For example, the terminal may periodically report the PH to the base station. Optionally, when a message requesting to report the PH is received from the base station, the terminal may report the PH to the base station. Optionally, the terminal may send the PH to the base station together with the data. The UE terminal may derive the PH taking into account the size of the transport block, and send the PH to which a separate type is applied to the base station according to the high-layer signaling of the base station.
[0234] ■ URLLC UCI transmission via ongoing PUCCH
[0235] √ PUCCH format 3 / 4 for additional UCI (e.g., URLLC UCI of size 1 or 2 bits)
[0236] For transmission of DL data (e.g., eMBB data and URLLC data) with different latency requests, even after encoding the UL control information, the terminal may send other UL control information (e.g., URLLC UCI) using the UL control channel to which the encoded UL control information (e.g., eMBB UCI) is mapped.
[0237] Fig.15 is a conceptual diagram showing an eighth embodiment of a UL transmission method in a communication system.
[0238] refer to Fig.15 , the base station may send a DL control channel #1 including resource allocation information of DL data channel #1 to the terminal, and may send a HARQ response (e.g., HARQ-ACK) for DL data channel #1 from the terminal to the base station through UL control channel #1 (e.g., UL control channel #1 indicated by DL control channel #1). In addition, the base station may send a DL control channel #2 including resource allocation information of DL data channel #2 to the terminal, and may send a HARQ response for DL data channel #2 from the terminal to the base station through UL control channel #2 (e.g., UL control channel #2 indicated by DL control channel #2).
[0239] Here, the interval (e.g., transmission delay) between the reception time point of DL data channel #1 and the transmission time point of UL control channel #1 may be greater than the interval between the reception time point of DL data channel #2 and the transmission time point of UL control channel #2.
[0240] The terminal may obtain resource allocation information for UL control channel #2 from DL control channel #2 received later among DL control channels #1 and #2. The terminal may send UL control channel #2 including UL control information (e.g., HARQ response) for DL data channel #1 and UL control information (e.g., HARQ response) for DL data channel #2. However, when the interval between the reception time point of DL data channel #2 and the transmission time point of UL control channel #2 is very small, the above method may be difficult to apply. This is because the terminal performs the following operations in order to send UL control channel #2, thereby increasing the processing time in the terminal.
[0241] - Operations for demodulating and decoding DL data channel #2
[0242] - Operations for generating a HARQ response for DL data channel #2
[0243] - Operations for encoding the HARQ response for DL data channel #2 together with the HARQ response for DL data channel #1
[0244] - Operations for mapping the coded HARQ response to UL control channel #2
[0245] In the proposed method, the HARQ response for DL data channel #2 may be transmitted through UL control channel #2, and the UL control channel #1 to which the HARQ response for DL data channel #1 is mapped may not be transmitted. The base station may instruct the terminal to perform separate signaling to receive the HARQ response for DL data channel #1.
[0246] In another proposed method, a HARQ response for DL data channel #2 and a HARQ response for DL data channel #1 may be sent through UL control channel #1 instead of UL control channel #2. In this case, the HARQ response for DL data channel #2 may be sent quickly. For example, in an NR communication system, the format (e.g., PUCCH format) of UL control channel #1 may be one of 1 to 4, and UL control channel #1 may include a HARQ response for DL data channel #.
[0247] In order to send a HARQ response for DL data channel #2 through UL control channel #1, it is possible to request that an operation of considering UL control information #2 (e.g., HARQ response for DL data channel #2) in a coding and mapping procedure of UL control information #1 (e.g., HARQ response for DL data channel #1). When the maximum size of UL control information #2 is limited to a specific value, the terminal can estimate the number of symbols to which the encoded UL control information #2 is mapped. In this case, the terminal can identify the modulation rate and / or coding rate of UL control information #2 based on a variable configured by high-layer signaling of the base station or a variable defined in a technical specification known to the terminal.
[0248] The base station may send a high-layer message including information indicating the modulation rate and / or coding rate of UL control information #1 to the terminal. The terminal may identify the modulation rate and / or coding rate of UL control information #1 by receiving the high-layer message from the base station. For example, the modulation rate and / or coding rate of UL control information #2 may be configured regardless of the modulation rate and / or coding rate of UL control information #1. Optionally, the modulation rate and / or coding rate of UL control information #2 may be configured as a value relative to the modulation rate and / or coding rate of UL control information #1.
[0249] In the proposed method, the terminal may replace a portion of UL control information #1 (eg, HARQ response and / or channel state information part 1) with UL control information #2. For example, the terminal may map UL control information #2 to UL control channel #1 based on a puncturing scheme.
[0250] When UL control information #1 includes a HARQ response, the terminal may map the encoded HARQ response for DL data channel #1 to UL control channel #1 regardless of the presence of UL control information #2. When UL control information #1 includes a channel state information part, the terminal may encode channel state information part 1 (e.g., CSI part 1) and channel state information part 2 (e.g., CSI part 2), respectively. When UL control information #1 includes a HARQ response and a channel state information part, the terminal may encode the HARQ response and channel state information part 1 together, and encode channel state information part 2 independently.
[0251] In the proposed method, part of the UL control information #1 may not be transmitted. The part of the UL control information #1 that is not transmitted may be control information of relatively low importance. For example, when the UL control information #1 includes a HARQ response, a channel state information part 1, and a channel state information part 2, part of the channel state information part 2 or the entire channel state information part 2 may not be transmitted.
[0252] In the proposed method, the terminal may transmit UL control information #1 including a HARQ response, a channel state information part 1, and a channel state information part 2. In this case, the terminal may not map UL control information #2 to the resource elements to which the HARQ response and the channel state information part are mapped among the resource elements constituting the UL control channel #1.
[0253] To know the size of channel state information part 2 belonging to UL control information #1, the base station may decode channel state information part 1 belonging to UL control information #1. The position of the resource element (eg, the starting resource element) to which channel state information part 2 is first mapped may not be fixed.
[0254] In order for the base station to obtain UL control information #2 from UL control channel #1, it may be preferable that the base station knows the location of UL control information #1 and the location of UL control information #2 in UL control channel #1. In this case, the reception complexity of UL control channel #1 can be reduced at the base station.
[0255] In the proposed method, the terminal may determine the position (e.g., mapping position) of UL control information #2 regardless of the presence or absence of channel state information part 2 in UL control information #1. The terminal may change the position of the resource element to which UL control information #1 is first mapped in UL control channel #1, and may map the encoded UL control information #1 to the changed resource element.
[0256] UL control information #2 may be encoded to be mapped to a specific number of resource elements. The terminal may map the encoded UL control information #2 to preconfigured resource elements (e.g., remappable resource elements) among the resource elements constituting the UL control channel #1. Since the base station and the terminal know the preconfigured resource elements (e.g., remappable resource elements), the encoded UL control information #2 may be mapped to the resource elements configured between the base station and the terminal.
[0257] Fig.16 is a conceptual diagram showing a first embodiment of a method of mapping UL control information in a communication system.
[0258] refer to Fig.16 , the terminal can map the UL control information to the UL control channel (for example, Fig.15 The remaining resource elements (e.g., 14 resource elements) except the resource elements to which the reference signal is mapped among the resource elements of the UL control channel #1 (shown in FIG. 1 ). The UL control information may be mapped according to the index order of the resource elements. For example, the resource element to which the UL control information is first mapped may be resource element #0. That is, resource element #0 may be the starting resource element to which the UL control information is mapped.
[0259] When the number of remappable resource elements is 5, the terminal may change the starting resource element to which UL control information #1 is mapped from resource element #0 to resource element #5, and may map from resource element #5 to UL control information #1. After completing the mapping of UL control information #1 to resource elements #5 to #13, the remaining UL control information #1 may be mapped from resource element #0.
[0260] When there is UL control information #2 to be mapped to UL control channel #1, the terminal may map UL control information #2 from resource element #0. In this case, UL control information #2 may be mapped to UL control channel #1 instead of UL control information #1. Here, UL control information #2 may be continuously mapped to remappable resource elements. Alternatively, UL control information #2 may be mapped to remappable resource elements according to a preconfigured interval.
[0261] PUCCH format 3
[0262] When using PUCCH format 3, the terminal may map UL control information #1 and #2 to UL control channel #1 as follows. Here, UL control information #1 may be reference Fig.15 The UL control information #1 and UL control information #2 described above can be referenced Fig.15 UL control information #2 described, and UL control channel #1 may be in Fig.15UL control channel #1 shown in .
[0263] Fig.17 is a conceptual diagram showing a second embodiment of a method of mapping UL control information in a communication system.
[0264] refer to Fig.17 , a mapping scheme of UL control information #1 including a HARQ response may be different from a mapping scheme of UL control information #1 including a HARQ response and channel information. Fig.17 The embodiments shown in the specification can be applied not only to scenarios that support frequency hopping, but also to scenarios that do not support frequency hopping.
[0265] Since the channel information is transmitted periodically or at the request of the base station, the terminal can know the time slot to which the channel information is mapped. Fig.17 The embodiment shown in can be applied to the time slot used for the transmission of channel information. On the other hand, Fig.17 The embodiment shown in may not be applied to time slots not used for transmission of channel information. Fig.17 The embodiment shown in can be applied not only to time slots used for transmission of channel information but also to time slots not used for transmission of channel information.
[0266] When UL control information #1 and #2 are transmitted through UL control channel #1, the terminal may first map UL control information #1 to UL control channel #1. If the number of remappable resource elements (e.g., resource elements #0 to #7) in UL control channel #1 is 8, the terminal may map UL control information #1 from resource element #8 of the first symbol. That is, the starting resource element of UL control information #1 may be resource element #8 of the first symbol. When UL control information #1 includes a HARQ response and a channel state information part (e.g., CSI parts 1 and 2), the terminal may encode CSI part 1 together with the HARQ response, and may map the encoded HARQ response and CSI part 1 from resource element #8 of the first symbol. After completing the mapping of the encoded HARQ response and CSI part 1, the terminal may map the encoded CSI part 2 to the remaining resource elements. In this case, the encoded CSI part 2 may also be mapped to the remappable resource elements (e.g., resource elements #0 to #7).
[0267] When the mapping of UL control information #1 is completed, the terminal may map UL control information #2 (e.g., HARQ response) to UL control channel #1. The starting resource element of UL control information #2 may be resource element #0 of the first symbol. Therefore, the terminal may map UL control information #2 to resource elements #0, #3, and #6 of the first symbol. In this case, UL control information #2 may be mapped to resource elements #0, #3, and #6 of the first symbol instead of UL control information #1 (e.g., CSI part 2).
[0268] PUCCH format 4
[0269] When using PUCCH format 4, the terminal may map UL control information #1 and #2 to UL control channel #1 as follows. Here, UL control information #1 may be reference Fig.15 The UL control information #1 and UL control information #2 described above can be referenced Fig.15 UL control information #2 described, and UL control channel #1 may be in Fig.15 UL control channel #1 shown in .
[0270] Fig.18 is a conceptual diagram showing a third embodiment of a method of mapping UL control information in a communication system.
[0271] refer to Fig.18 , the resource element (eg, remappable resource element) to which the UL control information #2 is mapped may be located in the rear region of the UL control channel. Fig.18 The embodiments shown in can be applied not only to scenarios using a frequency hopping scheme, but also to scenarios not using a frequency hopping scheme. When UL control channel #1 is transmitted based on a frequency hopping scheme, the terminal can map UL control information #2 to the last symbol corresponding to the first frequency hop in UL control channel #1. Some of the resource elements to which UL control information #1 is mapped can be used for the transmission of UL control information #2. According to the proposed method, the reception of UL control information #2 at the base station may be delayed. However, the terminal can map UL control information #1 to UL control channel #1 regardless of the size of UL control information #2, and the mapping order of UL control information #1 may not change.
[0272] For example, the terminal may first map UL control information #1 to UL control channel #1. Since there are remappable resource elements in the last symbol in UL control channel #1, the terminal may map UL control information #1 from the first symbol in UL control channel #1 without changing the mapping order of UL control information #1. That is, the starting resource element of UL control information #1 may be resource element #0 of the first symbol. When UL control information #1 includes a HARQ response and a channel state information part (e.g., CSI part 1 and CSI part 2), the terminal may encode CSI part 1 together with the HARQ response, and may map the encoded HARQ response and CSI part 1 from resource element #0 of the first symbol. After completing the mapping of the encoded HARQ response and CSI part 1, the terminal may map the encoded CSI part 2 to the remaining resource elements. In this case, the encoded CSI part 2 may also be mapped to the remappable resource element.
[0273] When mapping of UL control information #1 is completed, the terminal can map UL control information #2 (e.g., HARQ response) to the remapped resource element located in the last symbol in UL control channel #1. In this case, UL control information #2 can be remapped to the remappable resource element instead of some of UL control information #1 (e.g., CSI part 2).
[0274] In addition, the terminal can map the UL control information to the UL control channel based on the spreading code scheme. When PUCCH format 3 or 4 is used, the remappable resource elements can be configured in units of application units of the spreading code. Before applying the spreading code, the terminal can replace the encoded UL control information #1 with the encoded UL control information #2, and can map the encoded UL control information #1 and #2 to the UL control channel #1 by using the spreading code. Optionally, the terminal can map the encoded UL control information #1 to the UL control channel #1 using the spreading code, and then map the encoded UL control information #2 to the UL control channel #1 using the spreading code. In this case, UL control information #2 instead of UL control information #1 can be remapped to some remappable resource elements.
[0275] The following Fig.19 and 20 The illustrated embodiment may illustrate a method of mapping UL control information based on a spreading code scheme. Fig.19 and Fig. 20 The illustrated embodiment can be applied not only to the scenario where frequency hopping is applied, but also to the scenario where frequency hopping is not applied. Fig.19 and Fig. 20 In the embodiment shown, PUCCH format 4 may be used. Here, UL control information #1 may be a reference Fig.15 The UL control information #1 and UL control information #2 described above can be referenced Fig.15 UL control information #2 described, and UL control channel #1 may be in Fig.15 UL control channel #1 shown in .
[0276] Fig.19 is a conceptual diagram showing a fourth embodiment of a method of mapping UL control information in a communication system.
[0277] refer to Fig.19 , the remappable resource element may be located in the first symbol of the UL control channel #1. Two remappable resource elements may be located continuously on the frequency axis. The terminal may perform a coding operation on the CSI part 1 and the HARQ response constituting the UL control information #1, and may map the coded HARQ response and the CSI part 1 to the remaining resource elements except the remappable resource element among the resource elements located in the first symbol of the UL control channel #1. The coded HARQ response and the CSI part 1 may be mapped to the UL control channel #1 based on a spreading code scheme.
[0278] In addition, the terminal may perform a coding operation on CSI part 2 constituting UL control information #1, and after completing the mapping of the coded HARQ response and CSI part 1, the terminal may map the coded CSI part 2 to UL control channel #1. The coded CSI part 2 may be mapped to UL control channel #1 based on a spreading code scheme, and may also be mapped to a remappable resource element.
[0279] After the mapping operation of UL control information #1 is completed, the terminal can map the encoded UL control information #2 to the remappable resource elements in UL control channel #1. The encoded UL control information #2 can be mapped to UL control channel #1 based on the spreading code scheme. In this case, UL control information #2 can be remapped to some remappable resource elements instead of UL control information #1.
[0280] The mapping scheme of UL control information #1 including HARQ response may be different from the mapping scheme of UL control information #1 including HARQ response and channel information. Since channel information is transmitted periodically or at the request of the base station, the terminal can know the time slot to which the channel information is mapped. Fig.19 The illustrated embodiment can be applied to a time slot for transmitting channel information. Fig.19 The illustrated embodiment may not be applied to time slots that are not used to transmit channel information. Fig.19 The illustrated embodiment can be applied not only to time slots used for transmitting channel information but also to time slots not used for transmitting channel information.
[0281] Fig. 20 is a conceptual diagram showing a fifth embodiment of a method of mapping UL control information in a communication system.
[0282] refer to Fig. 20 , the remappable resource element may be located in the last symbol of UL control channel #1. 2 remappable resource elements may be located continuously on the frequency axis. The terminal may perform a coding operation on CSI part 1 and HARQ response constituting UL control information #1, and may map the coded HARQ response and CSI part 1 from the first symbol of UL control channel #1. The coded HARQ response and CSI part 1 may be mapped to UL control channel #1 based on a spreading code scheme. The starting resource element of the coded HARQ response and CSI part 1 may be resource element #0 in the first symbol in UL control channel #1. The mapping order of the coded HARQ response and CSI part 1 may not change.
[0283] In addition, the terminal may perform a coding operation on CSI part 2 constituting UL control information #1, and after completing the mapping of the coded HARQ response and CSI part 1, the terminal may map the coded CSI part 2 to UL control channel #1. The coded CSI part 2 may be mapped to UL control channel #1 based on a spreading code scheme, and may also be mapped to a remappable resource element.
[0284] After the mapping operation of UL control information #1 is completed, the terminal can map the encoded UL control information #2 to the remappable resource elements in UL control channel #1. The encoded UL control information #2 can be mapped to UL control channel #1 based on the spreading code scheme. In this case, UL control information #2 can be remapped to some remappable resource elements instead of UL control information #1.
[0285] ■UL grant after DL resource allocation
[0286] The base station may send an UL grant after sending resource allocation information for the DL data channel. In this case, the HARQ response for the DL data channel may be sent through the UL data channel indicated by the UL grant. For example, the following Fig.21 The illustrated embodiment is used to perform UL transmission.
[0287] Fig.21 is a conceptual diagram showing a ninth embodiment of a UL transmission method in a communication system.
[0288] refer to Fig.21, the base station may sequentially send DL control channel #1 and DL control channel #2 to one terminal. DL control channel #1 may include resource allocation information for DL data channel #1, and DL control channel #2 may include resource allocation information for UL data channel #2. A HARQ response for DL data channel #1 may be sent via UL control channel #1, and the starting time resource (e.g., starting time slot or starting symbol) of UL control channel #1 may be the same as the starting time resource (e.g., starting time slot or starting symbol) of UL data channel #2. In this case, the terminal may send a HARQ response for DL data channel #1 via UL data channel #2 instead of UL control channel #1. Therefore, a transport block (e.g., UL data) and a HARQ response may be mapped to UL data channel #2.
[0289] The DL control channel #1 may include an indicator indicating the size of the UL control information #1 (e.g., the size of the UL control information #1 to be transmitted through the UL control channel #1). The terminal receiving the DL control channel #1 may recognize the size of the UL control information #1 based on the indicator included in the DL control channel #1. In addition, the terminal may receive the DL control channel #2 from the base station and determine the size of the resource to which the UL control information #1 is mapped in the UL data channel #2 indicated by the DL control channel #2.
[0290] In the case where the terminal receives DL control channel #2 before DL control channel #1, it may not be easy to transmit UL control information #1 as a response to DL data channel #1 through UL data channel #2. The reason is that the terminal does not know the size of UL control information #1 and therefore may not calculate the size of resources occupied by UL control information #1 in UL data channel #2. However, the terminal can estimate the size of UL control information #1 based on the following method.
[0291] In the proposed method, the terminal may assume that the size of the UL control information #1 is a predetermined maximum size (e.g., 2 bits), and may calculate the size of resources occupied by the UL control information #1 having the maximum size in the UL data channel #2. The terminal may map the UL control information #1 to the UL data channel #2 based on the above method.
[0292] Fig. 22 is a conceptual diagram showing a tenth embodiment of a UL transmission method in a communication system.
[0293] refer to Fig. 22, the base station may send a DL control channel #1 including resource allocation information for a DL data channel #1, a DL control channel #2 including resource allocation information for a UL data channel #2, and a DL control channel #3 including resource allocation information for a DL control channel #3.
[0294] The base station may expect that UL control information #1 for DL data channel #1 is included in UL data channel #2. UL data channel #2 may be configured in consideration of the size of UL control information #1 and the size of a transport block (e.g., a transport block scheduled by DL control channel #2), and resource allocation information for UL data channel #2 may be included in DL control channel #2. The terminal may map UL control information #1 to UL data channel #2 in consideration of the type and size of UL control information #1, and may map the transport block to the remaining resource elements to which UL control information #1 is not mapped among the resource elements constituting UL data channel #2.
[0295] UL control information #1 may include various types of control information. For example, UL control information #1 may include HARQ response and / or channel information. In the NR communication system, the mapping procedure of the transport block and the channel information may vary according to the size of the HARQ response.
[0296] For example, when the size of the HARQ response is 1 bit or 2 bits, the terminal may calculate the number of resource elements to which the HARQ response is mapped among the resource elements constituting the UL data channel, and may map the channel information to the remaining resource elements except for the resource elements to which the HARQ response is mapped among the resource elements constituting the UL data channel. Thereafter, the terminal may map the transport block to the resource elements to which the channel information is not mapped among the resource elements constituting the UL data channel. Thereafter, the terminal may map the HARQ response to the UL data channel. In this case, the HARQ response may be remapped to a specific resource element belonging to the UL data channel instead of the transport block.
[0297] For example, when the size of the HARQ response is 3 bits, the terminal can map the HARQ response to the UL data channel, can map the channel information to the remaining resource elements among the resource elements constituting the UL data channel to which the HARQ response is not mapped, and can map the transport block to the remaining resource elements among the resource elements constituting the UL data channel to which the HARQ response and the channel information are not mapped.
[0298] When UL data channel #2 is sent based on a frequency hopping scheme, a portion of UL control information #1 (e.g., 1 / 2 of UL control information #1) may be mapped to UL data channel #2 corresponding to the first frequency hopping, and the remainder of UL control information #1 may be mapped to UL data channel #2 corresponding to the second frequency hopping.
[0299] However, when DL control channel #3 is received after DL control channel #2 is received, the mapping procedure of UL data channel #2 may need to be changed. When the processing capability of the terminal is insufficient, UL control information #3 for DL data channel #3 may not be generated quickly. In this case, in the procedure for generating UL data channel #2, it may be difficult to map both UL control information #1 and UL control information #3 to UL data channel #2. In order to solve this problem, after sending DL control channel #2 including resource allocation information of UL data channel #2, DL control channel #3 including resource allocation information of DL data channel #3 may be defined as not to be sent.
[0300] In the proposed method, the size of UL control information #3 may be limited to a specific size, and the terminal may change the position of the resource element to which UL control information #1 is mapped in the mapping procedure of UL data channel #2. The base station may send a high-layer message including information indicating the execution of the proposed method (e.g., the mapping method of UL data channel #2) to the terminal. The terminal may receive the high-layer message and execute the method indicated by the high-layer message (e.g., the mapping method of UL data channel #2). Here, the proposed method (e.g., the mapping method of UL data channel #2) may be activated or deactivated by a high-layer message, a MAC CE, or a DCI.
[0301] In order to ensure the reception quality of UL control information #1, UL control information #1 may be mapped to a resource element adjacent to the resource element to which the reference signal is mapped. In addition, UL control information #3 may be mapped to a resource element adjacent to the resource element to which the reference signal is mapped. In the proposed method, the position of the starting mapping resource (e.g., subcarrier or resource block) of UL control information #1 may be changed. For example, UL control information #1 may be mapped to a resource element to which UL control information #3 is not mapped among the resource elements constituting DL data channel #2.
[0302] In order to apply the proposed method, the size of the UL control information included in the UL data channel #2 may preferably be 1 bit or 2 bits. The base station may limit the number of DL control channels (e.g., DL control channels including resource allocation information of DL data channels) to 1 or 2. When the number of DL control channels including resource allocation information of DL data channels is 1, the base station may limit the number of transport blocks transmitted through the corresponding DL data channel to 1 or 2.
[0303] Optionally, if there is no restriction on the number of DL control channels, the base station may use high-layer signaling to configure HARQ bundling to the terminal. In this case, the terminal may generate UL control information of a size of 1 bit by performing a logical AND operation on the HARQ response.
[0304] When multiple antennas are used, the base station may send a high-level message to the terminal, the high-level message including information indicating that a reception operation of two transport blocks is performed. The terminal may receive the high-level message from the base station and may operate based on the information included in the high-level message. For example, the terminal may generate 1 bit of UL control information for each space.
[0305] The base station may send a high-level message to the terminal, the high-level message including information indicating the execution of a CBG-based transport block reception operation and a CBG-based UL control channel generation operation. The terminal may receive a high-level message from the base station and may operate based on the information included in the high-level message. For example, the terminal may generate a HARQ response with a size of 1 bit for each transport block instead of a CBG. Here, the terminal may perform a logical AND operation on the HARQ responses for all CBGs belonging to one transport block, thereby generating a 1-bit-sized HARQ response for each transport block.
[0306] In the proposed method, even before receiving the DL control channel #3, the terminal may assume that the size of the UL control information #3 through the DL data channel #3 is not 0. For example, the terminal may assume that the size of the UL control information #3 is 1 bit or 2 bits. Under the assumption that the UL control information #3 exists, the terminal may map the UL control information #1 and the transport block to the UL data channel #2. Therefore, regardless of whether the actual UL control information #3 exists, the terminal may map the UL control information #1 and the transport block to the UL data channel #2, so that the mapping operation of the UL data channel #2 may be performed regardless of whether the decoding operation on the DL data channel #3 is completed.
[0307] The terminal can calculate the number of resource elements to which the corresponding UL control information #1 is mapped according to the type of UL control information #1 (e.g., HARQ response, channel information). In order to apply the proposed method, the reference number of resource elements per symbol can be redefined. For example, the number of resource elements to which UL control information #3 is mapped can be obtained from Excluded.
[0308] The number of resource elements to which UL control information #3 is mapped may be determined based on a mathematical equation defined in the technical specification. The terminal may reuse β applied to UL control information #3 and β applied to the HARQ response belonging to UL control information #1. offset In order to apply a high coding rate to UL control information #3, the terminal may use the value β configured by high-layer signaling. Since the base station does not have UL control information #3, the base station may not be able to use β through DL control channel #2. offset Notify the terminal.
[0309] For example, β may be defined as β relative to the β applied to the HARQ response belonging to UL control information #1. offset In order to apply a higher coding rate than the coding rate of the HARQ response belonging to UL control information #1 to the HARQ response belonging to UL control information #3, β applied to the HARQ response belonging to UL control information #3 may have a value greater than 1. However, in order to support the case where the priority of the UL control information is lower than the priority of the UL data channel, β may be set to be less than 1.
[0310] Alternatively, β may be expressed as a value relative to a transport block or CBG. β may be applied to a scenario where UL control information #1 does not exist but a transport block or CBG exists, or a scenario where UL control information #1 exists and channel information is transmitted through UL data channel #2.
[0311] Fig.23 It shows that according to Fig. 22 A conceptual diagram of a first embodiment of a UL data channel #2 of a UL transmission method shown in FIG. Fig.24 It shows that according to Fig. 22 A conceptual diagram of a second embodiment of a UL data channel #2 of a UL transmission method is shown.
[0312] refer to Fig.23 , the terminal may first map UL control information #1 and transport block (or CBG) to UL data channel #2, and further map UL control information #3 to UL data channel #2. Here, UL control information #1 may include HARQ response and channel information.
[0313] refer to Fig.24 , the terminal may first map UL control information #1 to UL data channel #2, and further map UL control information #3 to UL data channel #2. Here, UL control information #1 may include HARQ response and channel information, and the transport block (or CBG) may not be mapped to UL data channel #2.
[0314] In the proposed method, the position of the starting resource element to which the UL control information #1 is mapped can be changed. In the following embodiment, a method of generating a UL data channel #2 will be described. The following embodiment can be applied to a scenario in which there is a transport block (e.g., UL data), UL control information #1, and UL control information #3.
[0315] In the first step, the terminal may map UL control information #1 to UL data channel #2 based on the method defined in the technical specification. Here, the terminal may calculate the starting resource element of UL control information #1 and may not map UL control information #1 to the resource element before the starting resource element.
[0316] In the second step, the terminal may map the transport block (or CBG) to UL data channel #2. The transport block (or CBG) may be mapped to the remaining resource elements except for the resource elements to which UL control information #1 and reference signals are mapped among all resource elements constituting UL data channel #2. The transport block (or CBG) may be mapped based on the method defined in the technical specification. The transport block (or CBG) may be mapped from the resource element after the resource element to which UL control information #1 is mapped. The transport block (or CBG) may also be mapped to a resource element whose mapping is maintained due to the presence of UL control information #1 (e.g., 1 bit or 2 bits of a HARQ response) or UL control information #3.
[0317] In the third step, the terminal may map the UL control information #3 to the UL data channel #2. The UL control information #3 may be remapped to the resource element (e.g., Fig.23 ) or the resource element to which the channel information belonging to UL control information #1 is mapped (for example, Fig.24 In this case, UL control information #3 may be mapped to a specific resource element instead of the transport block or UL control information #1.
[0318] When there is no transport block or CBG, the second step can be omitted. When UL control information #3 does not exist, the third step can be omitted. Therefore, if there is no transport block (e.g., UL data) and UL control information #3, the terminal can only perform the first step to generate UL data channel #2. Optionally, when there is no transport block (e.g., UL data), the terminal can perform the first step and the third step to generate UL data channel #2. Optionally, when UL control information #1 and UL control information #3 do not exist, the terminal can only perform the second step to generate UL data channel #2. Optionally, when there is no UL control information #3, the terminal can only perform the first step and the second step to generate UL data channel #2.
[0319] The base station may use high-layer signaling to configure the frequency hopping for UL data channel #2 to the terminal. In this case, the terminal may send a portion of UL control information #1 in UL data channel #2 corresponding to the first frequency hopping, and send the rest of UL control information #1 in UL data channel #2 corresponding to the second frequency hopping.
[0320] For example, UL control information #3 may be sent in UL data channel #2 corresponding to the first frequency hopping, and may not be sent in UL data channel #2 corresponding to the second frequency hopping. In this case, the base station can quickly acquire UL control information #3. Alternatively, UL control information #3 may be sent in UL data channel #2 corresponding to the second frequency hopping as well as the first frequency hopping. In this case, the error rate of UL control information #3 at the base station may be reduced by frequency reuse gain.
[0321] √PUCCH repetition and PUSCH bundling
[0322] The terminal may use the same time slot or different time slots to send UL control information and UL data. The base station may send a high-layer message to the terminal, the high-layer message including information indicating the number of repeated transmissions of the HARQ response for the DL data channel. The terminal may receive the high-layer message from the base station and identify the number of repeated transmissions of the HARQ response for the DL data channel based on the information included in the high-layer message. The number of repeated transmissions of the HARQ response for the DL data channel may be an integer equal to or greater than 1.
[0323] In the following embodiments, DL control channel #U may include resource allocation information for UL data channel #U. DL control channel #D may be divided into two types. For example, DL control channel #D1 may indicate a DL control channel received before DL control channel #U at the terminal, and DL control channel #D2 may indicate a DL control channel received after DL control channel #U at the terminal. Here, there may be one or more DL control channels #D1 and one or more DL control channels #D2.
[0324] Fig.25 is a conceptual diagram showing an eleventh embodiment of a UL transmission method in a communication system.
[0325] refer to Fig.25 , the base station may send a DL control channel #D1 including resource allocation information of a DL data channel #D1 to the terminal, may send a DL control channel #U including resource allocation information of a UL data channel #U to the terminal, and may send a DL control channel #D2 including resource allocation information of a DL data channel #D2 to the terminal.
[0326] The base station may use high-layer signaling to configure information for dynamically determining the size of the HARQ response codebook (e.g., HARQ-ACK codebook) to the terminal. Each of DL control channel #D1, DL control channel #U, and DL control channel #D2 may include a calculated downlink allocation index (C-DAI) and / or a total DAI (T-DAI). For example, DCI format 0_0 may not include both C-DAI and T-DAI, DCI format 0_1 may include T-DAI, DCI format 1_0 may include C-DAI, and DCI format 1_1 may include both C-DAI and T-DAI.
[0327] In addition, the UL data channel #U allocated by the DL control channel #U can be used not only to send UL data, but also to send HARQ responses (e.g., HARQ responses for DL data channels #D1 and #D2). The base station can configure the configuration information for mapping the UL control information to the UL data channel #U to the terminal using high-layer signaling. In this case, the terminal can map the UL control information to the UL data channel #U based on the information configured by the high-layer signaling.
[0328] When receiving the DL data channel #D1 allocated by the DL control channel #D1, the terminal may generate UL control information #D1 for the DL data channel #D1. The size of the UL control information #D1 may be indicated by the T-DAI #1 included in the DL control channel #D1. The terminal may perform an operation of generating the UL control channel #D1 including the UL control information #D1. Thereafter, the terminal may receive a DL control channel #U from the base station. The DL control channel #U may include a T-DAI #1 indicating the size of the UL control information #D1. The terminal may perform an operation of generating the UL data channel #U. When the starting resource (e.g., the starting symbol or the starting time slot) of the UL control channel #D1 is equal to the starting resource (e.g., the starting symbol or the starting time slot) of the UL data channel #U, the terminal may map the UL control information #D1 to the UL data channel #U. Optionally, the terminal may map the UL control information #D1 to the UL data channel #U according to a request from the base station or an operation defined in the technical specification.
[0329] When receiving the DL control channel #D2 after receiving the DL control channel #U, the terminal may not map the UL control information #D2 for the DL data channel #D2 allocated by the DL control channel #D2 to the UL data channel #. Therefore, the terminal may generate the UL data channel #U by encoding the transport block based on the T-DAI #1 included in the DL control channel #U.
[0330] On the other hand, in the proposed method, when the DL control channel #D2 is received after receiving the DL control channel #U, the terminal can map the UL control information #D2 for the UL control information #D2 allocated by the DL control channel #D2 to the UL data channel #U.
[0331] In the first proposed method, the terminal can receive one or more DL control channels #D2, receive one or more transport blocks (e.g., DL data) through one or more DL data channels #D2 allocated by the one or more DL control channels D2#, and generate UL control information #D2 for one or more DL data channels #D2 in a limited amount.
[0332] Here, the size of the UL control information #D2 for the DL data channel #D2 may be limited to a certain size. For example, the size of the UL control information #D2 may be limited to 1 bit or 2 bits. The maximum size of the UL control information #D2 may be defined in a technical standard known to the base station and the terminal. Optionally, the base station may send a high-layer message including information indicating the maximum size of the UL control information #D2 to the terminal. The number of transmissions of the DL control channel #D2 (e.g., a DL control channel sent after the DL control channel #U) may be limited to 1 or 2.
[0333] In addition, the base station may send a high-layer message including information required for bundling HARQ responses to the terminal. When the HARQ responses are bundled, the size of the UL control information may be compressed. Since the mapping operation of the UL data channel #U is performed based on T-DAI #1, the mapping operation of the UL data channel #U may not be affected by the DL control channel #D2.
[0334] In the second proposed method, the terminal can receive a DL control channel #D2 including T-DAI #2, and can generate a UL data channel #U by encoding a transport block based on the last acquired T-DAI (e.g., T-DAI #2). The application time (e.g., symbol or time slot) of the T-DAI can vary according to the processing capability of the terminal. The terminal can encode the transport block by applying a different T-DAI to each time slot in which the UL data channel #U is transmitted, and map the encoded transport block to the UL data channel #U. The second proposed method can be performed as follows.
[0335] Fig.26 is a conceptual diagram showing a twelfth embodiment of a UL transmission method in a communication system.
[0336] refer to Fig.26 , each of the UL control channels #D1 and #D2 may be repeatedly transmitted four times, and the UL data channel #U may be repeatedly transmitted eight times. Fig.26 Each of the DL control channel #D1, DL control channel #U, DL control channel #D2, DL data channel #D1 and DL data channel #D2 shown in may be the same as DL control channel #U, DL control channel #D2, DL data channel #D1 and DL data channel #D2.
[0337] A different T-DAI may be applied to each UL data channel #U. For example, T-DAI #1 may be applied to the first UL data channel #U and the second UL data channel #U. T-DAI #1 may be indicated by DL control channel #D1 or DL control channel #U. T-DAI #2 may be applied to the third UL data channel #U and the fourth UL data channel #U. T-DAI #2 may be indicated by DL control channel #D2. T-DAI #2 may be represented by a value relative to T-DAI #1. Optionally, T-DAI #2 may be a value indicating the size of all UL control information included in UL data channel #U.
[0338] T-DAI #3 may be applied to the fifth UL data channel #U and the sixth UL data channel #U. T-DAI #3 may be configured through the DL control channel #D1. T-DAI #3 may indicate the size of the UL control information #D2 additionally generated by the DL control channel #D2. When T-DAI #2 is expressed as a value relative to T-DAI #1, T-DAI #3 may be the same as T-DAI #2. When T-DAI #2 indicates the size of all UL control information included in the UL data channel #U, T-DAI #3 may be the difference between T-DAI #1 and T-DAI #2.
[0339] T-DAI#4 may be applied to the seventh UL data channel #U and the eighth UL data channel #U. T-DAI#4 may indicate that there is no UL control information. The terminal may derive T-DAI#4 by comparing the number of repeated transmissions of the UL control information and the number of repeated transmissions of the UL data channel.
[0340] Without T-DAI
[0341] Some DCI formats may not include C-DAI and T-DAI. For example, DCI format 0_0 may not include T-DAI. When a UL data channel is allocated through DCI format 0_0, the terminal may obtain T-DAI from a DL control channel including resource allocation information of the DL data channel, and may perform an operation of mapping the UL data channel based on the obtained T-DAI.
[0342] DCI format 1_0 and DCI format 1_1 (e.g., DCI format 1_1 when carrier aggregation (CA) is not used) may include only C-DAI. All DCIs may include transmit power information (e.g., transmit power control (TPC)) of a UL control channel. For example, DCI format 1_0 and DCI format 1_1 may include a TPC having a size of 2 bits. In order to map UL control information to a UL data channel, a specific field (e.g., TPC) included in DCI format 1_0 and DCI format 1_1 may be used for another purpose.
[0343] When the starting resource (e.g., symbol or time slot) of the UL data channel is equal to the starting resource (e.g., symbol or time slot) of the UL control channel, the terminal and the base station may determine that the HARQ response is mapped to the UL data channel instead of the UL control channel. Optionally, when the UL data channel is repeatedly transmitted and the time slot in which the UL data channel is transmitted overlaps with the time slot in which the UL control channel is transmitted, the terminal and the base station may determine that the HARQ response is mapped to the UL data channel instead of the UL control channel.
[0344] In the proposed method, the TPC included in the DCI may indicate T-DAI instead of transmit power. When the HARQ response is mapped to the UL data channel, the terminal may interpret the value indicated by the TPC included in the DCI as T-DAI. In order to apply the proposed method, when the DL control channel #D2 after the DL control channel #U includes C-DAI, the terminal may interpret the C-DAI included in the DL control channel #D2 as T-DAI. In this case, after sending the DL control channel #U, the base station may generate a C-DAI indicating the size of the UL control information to be additionally sent by the terminal. For example, when T-DAI #2 is represented as a relative value for T-DAI #1, the base station may generate a C-DAI indicating the size of the UL control information to be further sent by the terminal.
[0345] When the DL control channel #U including the resource allocation information of the UL data channel #U is not received (for example, Fig.25 or Fig.26 When the DL control channel #U is shown, since the terminal cannot send the UL data channel #U, the terminal can map the HARQ response to the UL control channel.
[0346] However, since the information indicated by T-DAI is different from the transmit power of the UL control channel, when TPC is interpreted as indicating T-DAI instead of transmit power, there may be a problem that the transmit power or T-DAI is misunderstood.
[0347] For example, TPC set to "00" can indicate -1dB, TPC set to "01" can indicate 0dB, TPC set to "10" can indicate +1dB, and TPC set to "11" can indicate +3dB. C-DAI or T-DAI can indicate the size of Y pieces (i.e., Y>=1) of UL control information. DAI set to "00" can indicate that Y satisfies "(Y-1)mod4+1=1", DAI set to "01" can indicate that Y satisfies "(Y-1)mod4+1=2", DAI set to "10" can indicate that Y satisfies "(Y-1)mod4+1=3", and DAI set to '11' can indicate that Y satisfies "(Y-1)mod4+1=4".
[0348] When a DL control channel including a DAI is received, the DAI included in the corresponding DL control channel may be a value increased by 1 from the DAI included in the previous DL control channel. However, the TPC of the UL control channel may be set to a specific value among 4 values (e.g., '00', '01', '10', and '11').
[0349] For example, when the current TPC is equal to the previous TPC, when the difference between the current TPC and the previous TPC is less than or equal to -1, or when the previous TPC is set to '11' and the current TPC is set to a value other than '00', the terminal may determine that the TPC indicates the transmit power. On the other hand, when the difference between the current TPC and the previous TPC is +1, the terminal may interpret the TPC as indicating T-DAI. However, even when the difference between the value indicated by the current TPC and the value indicated by the previous TPC is +1, the terminal may misinterpret the TPC as indicating the transmit power.
[0350] In this case, since the terminal increases the transmit power of the UL control channel by 0 dB, +1 dB, or +3 dB, the reception performance of the UL control channel at the base station can be improved, and the interference caused by the UL control channel at the adjacent base station may increase. However, since the increased transmit power is not large, the UL control channel transmitted with the increased transmit power may not have much impact on the communication system.
[0351] ■ Sounding Reference Signal (SRS) transmission method
[0352] The terminal may send SRS periodically or non-periodically. SRS may be sent using (one or more) UL symbols included in a time slot. Each symbol constituting a time slot may be configured as a DL symbol, a flexible symbol, or a UL symbol. For example, the type of symbol constituting a time slot (e.g., a DL symbol, a flexible symbol, or a UL symbol) may be configured by high-level signaling and may be dynamically changed by a DCI (e.g., DCI format 2_0) including an SFI. In this case, SRS may be sent as follows.
[0353] Fig. 27 is a sequence diagram showing a first embodiment of an SRS transmission method in a communication system.
[0354] refer to Fig. 27 , the communication system may include a base station and a terminal. The base station may be Figure 1 The base stations 110-1, 110-2, 110-3, 120-1 or 120-2 are shown, and the terminal may be Figure 1 The terminals 130-1, 130-2, 130-3, 130-4, 130-5 or 130-6 are shown. Each of the base station and the terminal may be configured to communicate with Figure 2 The communication nodes 200 shown are the same or similar.
[0355] The base station may send a high-layer message (e.g., RRC message) including SFI (e.g., SFI information) to the terminal (S2710). When using a normal CP, the SFI included in the high-layer message may be classified into a mode commonly applied to all terminals and a mode applied only to a specific terminal.
[0356] A commonly applied mode (e.g., 'TDD-UL-DL-ConfigCommon') may include (one or more) time slot modes (e.g., mode 1) indicated by the base station to the terminal through system information and a reference subcarrier spacing as a reference for (one or more) time slot modes. The pattern configured in the terminal may be repeated according to a specific period P. For example, the period P may be 0.5ms, 0.625ms, 1ms, 1.25ms, 2ms, 2.5ms, 5ms, or 10ms. Depending on the subcarrier spacing, some periods P may not be applied.
[0357] The number S of time slots belonging to one period P may be different according to the subcarrier spacing. Consecutive DL time slots may be located in the front region within the time slot interval according to one period P, and consecutive UL time slots may be located in the rear region within the time slot interval according to one period P. The number of consecutive DL time slots may be indicated by 'nrofDownlinkSlots' included in a higher layer message, and the number of consecutive UL time slots may be indicated by 'nrofUplinkSlots' included in a higher layer message.
[0358] Each time slot belonging to the middle area of the time slot interval according to one period P may include at least one of a DL symbol, a flexible (FL) symbol, and a UL symbol. For example, the order of symbols in each time slot belonging to the middle area of the time slot interval according to one period P may be 'DL symbol→flexible (FL) symbol→UL symbol'. The base station may notify the terminal of the number of DL symbols, the number of flexible symbols, and the number of UL symbols included in the time slot, respectively.
[0359] Therefore, consecutive DL symbols may be located in the next slot of the DL slot. Consecutive DL symbols may be located starting from the start symbol in the slot, and the number of consecutive DL symbols may be indicated by 'nrofDownlinkSymbols' included in the high-level message. Consecutive UL symbols may be located in the previous slot of the UL slot. Consecutive UL symbols may be located in the rear region of the slot, and the number of consecutive UL symbols may be indicated by 'nrofUplinkSymbols' included in the high-level message. The terminal may regard symbols other than DL symbols and UL symbols among the symbols included in the slot as flexible (FL) symbols.
[0360] In addition, when indicating a commonly applied mode, the base station may notify the terminal of two time slot modes (e.g., mode 1 and mode 2). Each mode of the time slot may have a different period. For example, the period of mode 1 may be P, and the period of mode 2 may be P2. The number of DL time slots, the number of UL time slots, the number of DL symbols, and the number of UL symbols may be configured separately according to the time slot mode. However, one subcarrier spacing may be applied to two time slot modes. The terminal may assume that the two time slot modes occur continuously, and the period of the continuous time slot mode may be assumed to be the sum of the periods of the two time slot modes (e.g., P+P2).
[0361] Therefore, for the number S of time slots belonging to the first time slot mode, consecutive DL time slots (e.g., 'nrofDownlinkSlots' for the first time slot mode), consecutive DL symbols (e.g., 'nrofDownlinkSymbols' for the first time slot mode), consecutive flexible symbols (e.g., symbols that are not configured as DL symbols or UL symbols according to the first time slot mode), consecutive UL symbols (e.g., 'nrofUplinkSymbols' for the first time slot mode) and consecutive UL time slots (e.g., 'nrofUplinkSlots' for the first time slot mode) may appear in sequence.
[0362] For the number S2 of time slots belonging to the second time slot mode, consecutive DL time slots (e.g., 'nrofDownlinkSlots' for the second time slot mode), consecutive DL symbols (e.g., 'nrofDownlinkSymbols' for the second time slot mode), consecutive flexible symbols (e.g., symbols that are not configured as DL symbols or UL symbols according to the second time slot mode), consecutive UL symbols (e.g., 'nrofUplinkSymbols' for the second time slot mode) and consecutive UL time slots (e.g., 'nrofUplinkSlots' for the second time slot mode) may appear in sequence.
[0363] The base station may further configure a mode (e.g., 'TDD-UL-DL-ConfigDedicated') that is applied only to a specific terminal through high-layer signaling. The mode further indicated to the terminal may be used to reconfigure the flexible (FL) symbols among the symbols configured by the common application mode as DL symbols, flexible (FL) symbols, or UL symbols. Among the symbols configured by the common application mode, symbols other than the flexible (FL) symbols may be indicated by a mode that is applied only to a specific terminal, thereby being maintained as DL symbols or UL symbols. The base station may configure the terminal through high-layer signaling so that all symbols belonging to a specific time slot are DL symbols or UL symbols. In addition, the base station may configure the terminal through high-layer signaling so that a specific time slot includes continuous DL symbols, continuous flexible symbols, and continuous UL symbols.
[0364] The slot format may be indicated to the terminal by a high-level message. In addition, the slot format may be indicated to the terminal by a dynamic signaling message as well as a high-level message. The base station may configure the terminal to monitor DCI of a specific format (e.g., DCI format 2_0) by using high-level signaling. The terminal may monitor DCI of a specific format (e.g., DCI format 2_0) according to the configuration of the high-level signaling. DCI may not change the slot format configured by the high-level message. DCI may indicate that the flexible (FL) symbol configured by the high-level signaling is overwritten as a DL symbol, a UL symbol, or a flexible (FL) symbol. In order to indicate the format of (one or more) slots to (one or more) terminals, the base station may connect one or more pieces of information that a specific terminal should interpret to configure the payload of DCI of a specific format (e.g., DCI format 2_0). The terminal may use a value (e.g., 'slotFormatCombinationId') indicated in a specific position (e.g., 'positionInDCI') in the DCI to identify the format of (one or more) slots. For example, the base station may use high-layer signaling to configure the format of (one or more) time slots to the terminal in the form of a sequence (e.g., 'slotFormatCombinations'). An element constituting the sequence may be identified by an index (e.g., 'slotFormatCombinationId'), and the index may include a series of formats of one or more time slots (e.g., 'slotFormats').
[0365] A slot format (eg, 'slotFormats') may indicate one or more of formats #0 to #55 described in the following Tables 1 to 3. In Tables 1 to 3, D may indicate a DL symbol, F may indicate a flexible symbol, and U may indicate a UL symbol.
[0366] [Table 1]
[0367]
[0368] [Table 2]
[0369]
[0370] [Table 3]
[0371]
[0372] In the case where the symbol type configured by high-layer signaling is dynamically changed through DCI, the high-layer message may include information (e.g., information related to CORESET (e.g., time and frequency resources of CORESET), information related to search space (e.g., periodicity of search space), RNTI required for receiving DCI including SFI (e.g., DCI format 2_0). The information required for receiving DCI including SFI (e.g., DCI format 2_0) may be sent through the high-layer message of step S2710. Optionally, the information required for receiving DCI including SFI (e.g., DCI format 2_0) may be sent through a high-layer message different from the high-layer message in step S2710.
[0373] The terminal may receive a high-layer message from the base station and identify the SFI included in the high-layer message. Therefore, the terminal may confirm the type of symbols constituting the time slot (eg, DL symbol, flexible symbol, or UL symbol) based on the SFI configured by the high-layer signaling (S2720).
[0374] In addition, when the transmission of DCI (e.g., DCI format 2_0) including SFI is configured by high-layer signaling, the terminal can determine that DCI (e.g., DCI format 2_0) including SFI is sent. For example, the terminal can identify the information required to receive DCI (e.g., DCI format 2_0) included in the high-layer message, and perform a decoding operation (e.g., a blind decoding operation) to obtain DCI in the search space within the CORESET indicated by the identified information.
[0375] In addition, the base station may send a DCI (e.g., DCI format 2_0) including an SFI (S2730). For example, the base station may send a DCI (e.g., DCI format 2_0) including an SFI in a search space within a CORESET configured by high-level signaling. The SFI included in the DCI (e.g., DCI format 2_0) may be set to one of the formats #0 to #55 described in Tables 1 to 3. Optionally, the SFI included in the DCI (e.g., DCI format 2_0) may indicate the type of (one or more) symbols configured as flexible symbols by high-level signaling (e.g., DL symbols, flexible symbols, or UL symbols). For example, when a high-level message indicates that the first and second symbols in a specific time slot are DL symbols and the remaining symbols are flexible symbols, the index included in the DCI (e.g., DCI format 2_0) may indicate the SFI of multiple time slots including the corresponding time slot, and may indicate the type of one or more symbols among symbols #2 to #13 in the corresponding time slot.
[0376] The terminal may receive DCI (e.g., DCI format 2_0) by performing a decoding operation in a search space within a CORESET configured by high-level signaling. The terminal may identify the type of symbols constituting (one or more) time slots (e.g., DL symbols, flexible symbols, or UL symbols) based on the index included in the DCI (e.g., DCI format 2_0) (S2740). That is, the terminal may determine the type of symbols constituting the time slot based on the format of (one or more) time slots included in the high-level message and the index included in the DCI format 2_0. For example, the symbol type may be determined as follows.
[0377] Fig.28 is a conceptual diagram showing a first embodiment of a method for determining a symbol type in a communication system.
[0378] refer to Fig. 27 and Fig.28 In step S2710, the terminal may receive first SFI information indicating n flexible symbols from the base station. Here, when 14 symbols are included in one time slot, n may be a natural number from 1 to 14. Fig.28 In the illustrated embodiment, the first SFI information (eg, SFI#17) may indicate 12 flexible symbols (eg, symbols #2 to #13). Fig.28 In the example, the first SFI information (e.g., SFI#17) may be a high-level parameter indicating that the first and second symbols (e.g., symbols #0 and #1) in the corresponding time slot are DL symbols and the remaining symbols (e.g., symbols #2 to #13) are flexible symbols.
[0379] Return to reference Fig. 27 and Fig.28In step S2730, the terminal may receive second SFI information from the base station, where the second SFI information re-indicates or overwrites m symbols among the n flexible symbols as (multiple) UL symbols. Here, m may be a natural number less than or equal to n. Fig.28 In the illustrated embodiment, the second SFI information may re-indicate or overwrite 2 symbols (e.g., symbols #12 and #13) among the 12 flexible symbols (e.g., symbols #2 to #13) as UL symbols. Fig.28 In the DCI format 2_0, the second SFI information may be SFI#17, which indicates that symbol #0 and symbol #1 are DL symbols, symbols #2 to #11 are flexible symbols, and symbols #12 and #13 are UL symbols in the corresponding time slot. The second SFI information (e.g., SFI#23) may be included in the DCI format 2_0 and transmitted to the terminal.
[0380] In step S2730, the terminal may receive a DCI format 2_0 (e.g., SFI#23) including an index indicating the format of the corresponding time slot, or a DCI format 2_0 including an index of an SFI indicating the type of symbols #2 to #13 (e.g., symbols configured as flexible symbols by high-level signaling) of the corresponding time slot. For example, when receiving a DCI format 2_0 (which is the format of the corresponding time slot) including an index indicating SFI#23, the terminal may determine that symbols #0 and #1 are DL symbols, and symbols #2 to #11 are flexible symbols, and #12 and #13 are UL symbols. Therefore, symbols #0 and #1 configured as DL symbols by high-level signaling may be maintained as DL symbols. Symbols #2 to #11 configured as flexible symbols by high-level signaling may be maintained as flexible symbols. Symbols #12 and #13 configured as flexible symbols by high-level signaling may be overwritten by DCI format 2_0 as UL symbols.
[0381] Optionally, when the index included in DCI format 2_0 indicates that the SFI applied to the corresponding time slot uses symbols #12 and #13 as UL symbols, the terminal can reconfigure symbols #12 and #13 configured as flexible symbols by high-layer signaling as UL symbols. In this case, symbols #0 and #1 can be maintained as DL symbols according to high-layer signaling, and symbols #2 to #11 can be maintained as flexible symbols according to high-layer signaling.
[0382] Return to reference Fig. 27, the base station may send a high-level message (e.g., an SRS configuration message) including configuration information of the SRS. The SRS configuration message may be used to configure SRS transmission. The configuration information of the SRS may include at least one of information indicating a starting symbol among symbols used for SRS transmission, information indicating the number of symbols used for SRS transmission (e.g., 2 or 4), and information indicating a transmission period of the SRS. In step S2710, the configuration information of the SRS may be sent via a high-level message. Optionally, the configuration information of the SRS may be sent via a high-level message different from the high-level message in step S2710.
[0383] The terminal may receive a high-layer message from a base station and identify SRS configuration information included in the high-layer message. The terminal may send SRS according to the SRS configuration information (S2750). The terminal may send SRS using a symbol configured as a UL symbol among (one or more) symbols configured for SRS transmission, and may not send SRS in a symbol configured as a flexible symbol among (one or more) symbols configured for SRS transmission.
[0384] The SRS may be transmitted in one or more of the last six symbols (e.g., symbols #8 to #13) in the time slot. For example, when the starting symbol for SRS transmission is #10 and the number of symbols for SRS transmission is 4, symbols #10 to #13 in the time slot may be used for SRS transmission. Fig.28 In the case of the configuration as shown, the terminal may not send SRS with flexible symbols #10 and #11, and may send SRS with symbols #12 and #13 re-indicated as UL symbols. That is, the terminal may use some symbols among all symbols configured for SRS transmission to send SRS. In addition, the terminal may not perform DL reception operation and UL transmission operation and SRS transmission operation with flexible symbols.
[0385] The base station may receive the SRS from the terminal in (one or more) symbols configured for SRS transmission. The base station may not expect to receive the SRS in symbols configured as flexible symbols by high-level messages and / or DCI, and may expect to receive the SRS in symbols configured as UL symbols by high-level messages and / or DCI. That is, the base station may receive the SRS from the terminal through UL symbols, and may not perform the SRS reception operation in flexible symbols.
[0386] ■UL control channel and UL data channel
[0387] The base station may use high-layer signaling to configure the information required for the frequency hopping operation to the terminal. When the frequency hopping operation is configured by high-layer signaling, the terminal may perform the frequency hopping operation based on the information configured by the high-layer signaling. In one time slot, frequency hopping may be performed once.
[0388] In the proposed method, if the resource region according to the frequency hopping pattern includes flexible symbols, the terminal may not transmit the UL control channel and / or the UL data channel in the resource region including the flexible symbols. When the resource region according to the frequency hopping pattern includes only UL symbols, the terminal may transmit the UL control channel and / or the UL data channel in the resource region including only UL symbols.
[0389] For example, if resource region #1 according to the first frequency hopping includes flexible symbols and resource region #2 according to the second frequency hopping includes only UL symbols, the terminal may transmit a UL control channel and / or a UL data channel in resource region #2.
[0390] When the terminal transmits a UL control channel including periodic channel information in resource area #1, the base station does not perform a decoding operation on the UL control channel received in resource area #1. In addition, when a UL data channel including periodic UL data is in resource area #1, the base station does not perform a decoding operation on the UL data channel received in resource area #1. However, when a UL control channel including a scheduling request (SR) is transmitted in resource area #1, the base station may perform a decoding operation on the UL control channel received in resource area #1.
[0391] ■Method for transmitting PUSCH including SR
[0392] In order to report the buffer status information, the base station may allocate sufficient time for the terminal to pad the buffer status information to UL data #1 (e.g., transport block). However, if new UL data #2 is generated after the buffer status information is padded to UL data #1, the terminal may not reflect the existence of UL data #2 in the buffer status information. In addition, since the corresponding UL data #1 is sent as in the retransmission procedure of UL data #1, even if UL data #2 is generated, the terminal may not map the buffer status information reflecting the existence of UL data #2 to the UL data channel to which the retransmitted UL data #1 is mapped.
[0393] In order to solve such a problem, the physical layer of the terminal (e.g., an entity that performs the function of the physical layer) should be able to notify the base station of the existence of UL data #2. UL data channel #1 may include only UL data #1, and UL data #2 may not be mapped to UL data channel #1. The base station may send a DL control channel including resource allocation information for UL data #2 to the terminal. The terminal may send UL data #2 and the changed buffer status information through the UL data channel #2 indicated by the DL control channel.
[0394] Fig.29 is a conceptual diagram showing a thirteenth embodiment of a UL transmission method in a communication system.
[0395] refer to Fig.29 , a scheduling request (SR) and UL data may be sent through one UL data channel (e.g., PUSCH). The SR may be sent through the UL data channel because it may be considered as one of the UL control information. When the time resources of the UL control channel including the SR overlap with the time resources of the UL data channel, the SR may be mapped to the UL data channel instead of the UL control channel. For example, the SR may be included in a payload, and the payload may be mapped to the UL data channel.
[0396] The base station may use high-level signaling to configure an SR corresponding to a logical channel group (LCG) to the terminal. In this case, the terminal may map a specific SR configured by high-level signaling to the UL data channel. Optionally, when each of the K UL control channels corresponding to the K SRs overlaps with the UL data channel on the time axis, the terminal may map the SR corresponding to the highest level to the UL data channel without separate high-level signaling. This can be accomplished by including the number of bits in the payload of the UL data channel. To indicate the index of the generated SR (positive SR). A bitmap consisting of only 0s may mean that all SRs among the K SRs will not appear (negative SR).
[0397] Optionally, the terminal may map only L SRs among the K SRs or fewer SRs corresponding to a portion of the K SRs to the UL data channel. It may be included in the payload in the UL data channel. In this case, the base station may send a high-layer message including L to the terminal. The terminal may receive the high-layer message from the base station and may identify L included in the high-layer message. Each of K and L may be an integer equal to or greater than 1.
[0398] √ Scheme #1 for mapping SR to resource elements
[0399] The terminal may map the SR to the resource element in the same manner as conventional UL control information. When the size of the UL control information including the SR (e.g., 1, L, or K SRs) and other information (e.g., HARQ response, CSI part 1, and / or CSI part 2) is 1 bit or 2 bits, the terminal may puncture the transport block in the UL data channel to map the UL control information to the UL data channel. When the size of the UL control information including the SR (e.g., 1, L, or K SRs) and other information (e.g., HARQ response, CSI part 1, and / or CSI part 2) is equal to or greater than 3 bits, the terminal may perform a rate matching operation on the transport block in the UL data channel to map the UL control information to the UL data channel.
[0400] √ Scheme #2 for mapping SR to resource elements
[0401] When the size of other information (e.g., HARQ response, CSI part 1 and / or CSI part 2) other than SR (e.g., 1, L or K SRs) is 1 bit or 2 bits, the terminal may puncture the transport block in the UL data channel to map the UL control information to the UL data channel. When the size of other information (e.g., HARQ response, CSI part 1 and / or CSI part 2) other than SR (e.g., 1, L or K SRs) is equal to or greater than 3 bits, the terminal may perform rate matching on the transport block in the UL data channel to map the UL control information to the UL data channel.
[0402] The terminal may map other information (e.g., HARQ response, CSI part 1 and / or CSI part 2) to the UL data channel regardless of the presence of the SR, and then map the transport block (e.g., UL data) to the UL data channel. A separate resource element may be allocated for the transmission of the SR. The number of resource elements used for the transmission of the SR may be determined based on the following method.
[0403] Since the terminal does not know whether the SR is sent before the predetermined time point, the number of bits representing the SR or the number of resource elements to which the SR is mapped can be determined before mapping other UL control information or transport blocks to the UL data channel. The terminal can then map other UL control information or transport blocks to the UL data channel by performing a rate matching operation.
[0404] The SR may be mapped to (one or more) resource elements in a symbol after the symbol in which the reference signal is located. The resource elements to which the SR is mapped may not be continuous on the frequency axis. Other UL control information and transport blocks may not be mapped to (one or more) resource elements in a symbol after the symbol in which the reference signal is located. Alternatively, the transport block may be mapped to (one or more) resource elements in a symbol after the symbol in which the reference signal is located. In the following embodiments, a method for mapping UL control information and transport blocks will be described.
[0405] After mapping other information (e.g., HARQ response, CSI part 1, and / or CSI part 2) and transport blocks other than the SR (e.g., 1, L, or K SRs) to the UL data channel, the SR may be mapped to the UL data channel. In this case, the method for mapping the SR may vary according to the number of resource elements occupied by the SR. For example, a mapping method for a case where the number of resource elements to which the SR is mapped is equal to or less than a specific value may be different from a mapping method for a case where the number of resource elements to which the SR is mapped exceeds a specific value.
[0406] When the number of resource elements to which the SR is mapped is less than or equal to a specific value (e.g., 2 bits), the SR may be mapped to the resource elements occupied by the transport block. When the number of resource elements to which the SR is mapped exceeds a specific value (e.g., 2 bits), the SR may be mapped to the resource elements not occupied by the transport block. Here, the specific value may be configured to the terminal through high-layer signaling. Optionally, the base station may send a UL grant including a specific value to the terminal. Optionally, the specific value may be predefined in a technical specification known to the base station and the terminal.
[0407] The starting position to which other information (e.g., HARQ response, CSI part 1 and / or CSI part 2) and the transport block are mapped may vary according to a specific value. When other UL control information or the transport block is punctured to map the SR, the coding rate of the other UL control information or the coding rate of the transport block may not change. Since some resource elements are punctured to send the SR, the reception error rate at the base station increases. In order to send S, the resource elements to which the retransmittable transport block is mapped may preferably be punctured.
[0408] Fig.30 is a conceptual diagram showing a sixth embodiment of a method of mapping UL control information in a communication system.
[0409] refer to Fig.30 , the terminal may determine the starting resource element and may map other information (e.g., HARQ response, CSI part 1, and / or CSI part 2) and the transport block from the starting resource element. The transport block may be mapped to the resource element used to transmit the SR. Alternatively, the transport block may not be mapped to the resource element used to transmit the SR. The terminal may map the coded SR instead of the transport block to the resource element used to transmit the SR. The number of resource elements used to transmit the SR may be determined based on the number of SRs mapped to the UL data channel and the number of resource elements to which the SRs are mapped.
[0410] √ Method used to determine the coding rate of SR
[0411] In the procedure of mapping the UL control information to the UL data channel, the terminal may derive the number of resource elements Q' to encode the UL control information. The terminal may determine the coding rate of the UL control information based on Q'. Q' may be sent from the base station to the terminal via DCI (e.g., UL grant) or a high-layer message. When the UL data channel includes a transport block (e.g., UL data), the terminal may calculate Q' based on equations 6 to 8 below.
[0412] [Equation 6]
[0413]
[0414] [Equation 7]
[0415]
[0416] [Equation 8]
[0417]
[0418] Q' may be defined differently according to the type of UL control information. Q' ACK It may indicate the number of resource elements to which the HARQ response is mapped. ′CSi-1 It can indicate the number of resource elements to which CSI part 1 is mapped. Q′ CSI-2 The number of resource elements to which CSI part 2 is mapped may be indicated.
[0419] When the UL data channel does not include a transport block (eg, UL data), the terminal may calculate Q′ based on the following Equations 9 to 12.
[0420] [Equation 9]
[0421]
[0422] [Equation 10]
[0423]
[0424] [Equation 11]
[0425]
[0426] [Equation 12]
[0427]
[0428] The base station may transmit a high-layer message including a list indicating candidate Q′, and transmit a DCI (e.g., UL grant) including information indicating one Q′ among the candidate Q′ included in the list. The terminal may identify the list indicating candidate Q′ by receiving a high-layer message from the base station, and may receive a DCI (e.g., UL grant) indicating one Q′ among the candidate Q′ from the base station. Therefore, the terminal may confirm the number Q′ of resource elements to which the UL control information is mapped through the high-layer message and the DCI.
[0429] In the proposed method, the terminal can derive the number of resource elements Q′ to which the SR is mapped SR The terminal can be based on Q′ SR To determine the coding rate of SR, and SR can be encoded based on the determined coding rate. SR , the terminal may reuse the information indicated by the UL grant under the assumption that the coding rate of the SR is equal to one of the coding rates of other UL control information (eg, HARQ response, CSI part 1, CSI part 2).
[0430] In order to map the SR and other UL control information (e.g., HARQ response, CSI part 1, CSI part 2) to the UL data channel, the terminal may perform a puncturing operation or a rate matching operation on the UL data channel in the following manner: a ratio β that is the same as a ratio β of predetermined UL control information among the UL control information is applied to the SR. In this case, the maximum value of the resource element to which the channel information (e.g., CSI part 1 and / or CSI part 2) is mapped may be changed, and its maximum value may be calculated as a remainder value obtained by subtracting the number of resource elements to which the SR is mapped and the number of resource elements to which the HARQ response is mapped. For example, the remainder value may be calculated based on the following equation 13.
[0431] [Equation 13]
[0432]
[0433] In addition, one code block may include both the SR and other UL control information (e.g., HARQ response, CSI part 1, CSI part 2). Optionally, the code block including the SR may be different from the code block including other UL control information (e.g., HARQ response, CSI part 1, CSI part 2). For example, the SR may be encoded with the HARQ response. Alternatively, the SR may be encoded with the HARQ response and CSI part 1. Alternatively, the SR may be encoded independently of the HARQ response or CSI part 1.
[0434] In order to determine Q′ SRIn the proposed method, the ratio of the number of resource elements to which the SR is mapped can be configured to be different from the ratio of the number of resource elements to which other UL control information is mapped. For example, other UL control information other than the SR may be UL control information generated to support eMBB services, and the SR may be UL control information generated to support URLLC services. Therefore, the coding rate of the SR may be different from the coding rate of other UL control information. The base station may require a method to notify the terminal of the coding rate of the SR. The SR may be encoded together with other UL control information. In this case, the SR and other UL control information may be included in the same code block. Optionally, each of the SR and other UL control information may be independently encoded so that the code block including the SR may be different from the code block including other UL control information.
[0435] In the proposed method, the base station may derive the number of resource elements to which the SR is mapped using a ratio γ of the number of resource elements configured by high-level signaling. The terminal may encode the SR using the ratio γ configured by high-level signaling, and may map the encoded SR to the resource element. Here, the number of ratios configured by the base station to the terminal may be one or more. When two or more ratios are configured, one of the two or more ratios may be indicated by a field included in the UL authorization. When the UL authorization does not include a field indicating a ratio γ, the terminal may use a preconfigured ratio.
[0436] In addition, the terminal may encode other UL control information other than the SR using a ratio β indicated by the UL grant or a ratio β configured by high-level signaling, and map the encoded other UL control information to resource elements. When the UL data channel does not include other UL control information other than the SR, the terminal may encode the SR using a ratio γ configured by high-level signaling, and map the encoded SR to resource elements.
[0437] In another proposed method, the base station may specify other UL control information in addition to the SR to define the ratio of the number of resource elements to which the SR is mapped, and the ratio of the number of resource elements to which the SR is mapped may be defined as a relative value δ of the ratio of the number of resource elements to which other control information is mapped. The base station may send a higher layer message including δ to the terminal.
[0438] The terminal can identify δ by receiving a high-layer message from the base station, and add δ to β indicated by the UL grant to derive 'β+δ' as the ratio of the number of resource elements to which the SR is mapped. When the UL grant indicating β is not received, the terminal can derive 'β+δ' based on β and δ configured by high-layer signaling, encode the SR by using 'β+δ', and map the encoded SR to the resource element. Here, the SR can be encoded together with other UL control information. In this case, the SR and other UL control information can be included in the same code block. Optionally, each of the SR and other UL control information can be independently encoded so that the code block including the SR can be different from the code block including other UL control information.
[0439] √ Coding scheme suitable for SR
[0440] In the case where the UL control channel corresponding to K SRs overlaps with the UL data channel, the terminal may send bits or bits. Here, K may be L or greater. In this case, the number of available resource elements may be represented as Q′. SR may be represented using 1 bit or 2 bits. SR may be spread according to the modulation rate, and the spreading code may consist of only 1s. For example, the spreading code may be '11111…11'.
[0441] ■Method for triggering HARQ response codebook
[0442] In order to support services with different reliability requests (e.g., eMBB services, URLLC services), the terminal may generate independent UL control information for each service. Specifically, when the terminal supports eMBB services and URLLC services, the codebook used for the eMBB service (e.g., a codebook for multiplexing a HARQ response for a DL data channel) may be distinguished from the codebook used for the URLLC service (e.g., a codebook for multiplexing a HARQ response for a DL data channel).
[0443] In the case where the terminal supports DL transmission with different reliability requests, the HARQ response codebook may be configured with a HARQ response for the DL data of each service. In addition, the priority of the codebook for the eMBB service may be different from the priority of the codebook for the URLLC service. The priority of the HARQ response codebook may be determined according to the priority of the DL data associated with the HARQ response. For example, the priority of the HARQ response codebook may be determined based on the transmission request (e.g., reliability, error rate, delay, etc.) of the DL data.
[0444] The base station may use high-layer signaling to configure the priority of the HARQ response codebook (e.g., the priority of DL data) to the terminal. Optionally, the priority of the HARQ response codebook (e.g., the priority of DL data) may be defined in a technical specification known to the base station and the terminal. The terminal may multiplex the HARQ response codebook according to the priority and map the multiplexed HARQ response codebook to a UL channel (e.g., a UL data channel or a UL control channel). Optionally, the terminal may select a HARQ response codebook (e.g., a HARQ response codebook with the highest priority) from the HARQ response codebook according to the priority and map the selected HARQ response codebook to a UL channel (e.g., a UL data channel or a UL control channel).
[0445] The terminal may select a HARQ response codebook from the HARQ response codebook using different criteria instead of the priority of the DL data. Here, the terminal may confirm the type of DL data received through the DL control channel. For example, the base station may send DL data #1 and #2 with different transmission requests through different DL data channels #1 and #2.
[0446] The terminal may receive DL data #1 through DL data channel #1, and then receive DL data #2 through DL data channel #2. The terminal may determine the priority based on the types of DL data #1 and #2. For example, the terminal may determine that the priority of DL data #2 is higher than the priority of DL data #1. The terminal may select one of the HARQ response codebooks based on the priorities of DL data #1 and #2.
[0447] In the proposed method, the terminal may determine the priority of the HARQ response codebooks and select one of the HARQ response codebooks based on the determined priority. The terminal may send the selected HARQ response codebook through an UL channel (e.g., a UL data channel or a UL control channel). The HARQ response codebook not selected by the terminal may not be sent through the UL channel.
[0448] When a HARQ response codebook for a HARQ process is received, the base station may perform a (retransmission) procedure based on the received HARQ response codebook. Alternatively, when a HARQ response codebook for a specific HARQ process is not received, the base station may perform the method proposed below.
[0449] In the proposed method, when the HARQ response codebook for HARQ process ID#n is not received, the base station may assume that the HARQ response for HARQ process ID#n is NACK or DTX. Therefore, the base station may perform a retransmission procedure for HARQ process ID#n.
[0450] When the size of the HARQ response codebook is small, the above method can be applied. When the communication between the base station and the terminal is performed based on a carrier aggregation (CA) scheme or a time division duplex (TDD) scheme, the size of the HARQ response codebook may be large, and the number of HARQ processes may be large. In this case, a large amount of time and frequency resources (e.g., DL resources) may be required in the retransmission procedure. Therefore, since the HARQ response codebook is not received due to a poor quality radio channel, the base station may request to retransmit the HARQ response codebook to the terminal.
[0451] In another proposed method, the base station may send information requesting the terminal to transmit a HARQ response codebook. The terminal may send the HARQ response codebook using a UL channel (e.g., a UL control channel or a UL data channel) according to a request from the base station. In this case, the HARQ response codebook may be sent dynamically.
[0452] When the transmission of three different DL data #1 to #3 is supported, or when the transmission of two different DL data #1 and #2 is supported and the HARQ response codebook for one of the DL data #1 and #2 needs to be retransmitted, the number of HARQ response codebooks that the terminal should retransmit may be equal to or greater than 2.
[0453] In another proposed method, the base station may send information requesting the terminal to transmit a specific HARQ response codebook. For example, the base station may send one or more indexes for identifying one or more HARQ response codebooks through a DL control channel. The terminal may receive the one or more indexes through a DL control channel, and may send (one or more) HARQ response codebooks indicated by the one or more indexes through a UL channel.
[0454] In the case where the size of the HARQ response codebook is semi-statically configured, the size of the HARQ response codebook retransmitted by the terminal (e.g., the total size of the HARQ response) may be determined based on the (one or more) indexes received through the DL control channel. In the case where the size of the HARQ response codebook is dynamically configured, the size of the HARQ response codebook retransmitted by the terminal (e.g., the total size of the HARQ response) may be uncertain. In the procedure for generating the HARQ response codebook, if the terminal erroneously knows the size of the HARQ response codebook (e.g., if the terminal does not receive the last DL control channel), the size of the HARQ response codebook may be uncertain.
[0455] In another proposed method, the base station may send information requesting transmission of all HARQ response codebooks to the terminal. In this case, all HARQ responses corresponding to the number of HARQ processes may be sent. This method may be applied even if the size of the HARQ response codebook is semi-statically or dynamically configured. Therefore, a problem that occurs in a demodulation and decoding procedure due to the size of the HARQ response codebook known to the terminal being different from the size of the HARQ response codebook known to the base station may be solved.
[0456] Here, when a UL data channel is received as a UL channel, the base station may indicate a HARQ response in a specific field (e.g., UL grant) of a DL control channel. For example, an existing field (e.g., UL grant) in a DL control channel may be used to indicate a HARQ response. Alternatively, a new field indicating a HARQ response may be introduced into a DL control channel (e.g., UL grant).
[0457] In one embodiment, a field (e.g., UL-SCH indicator) indicating that a UL data channel is configured using only UL control information rather than a transport block among the fields included in the UL grant can be used to indicate a HARQ response. When the corresponding field (e.g., UL-SCH indicator) included in the UL grant is set to a first value, the terminal can configure the UL data channel to include a transport block and UL control information (e.g., CSI, HARQ response, or CSI / HARQ response). On the other hand, when the corresponding field (e.g., UL-SCH indicator) included in the UL grant is set to a second value, the terminal can configure the UL data channel to include UL control information (e.g., CSI, HARQ response, or CSI / HARQ response) rather than a transport block. The corresponding field (e.g., UL-SCH indicator) included in the UL grant can be set to 0 or 1.
[0458] When the field for CBG is configured in the terminal through high-layer signaling, the terminal may interpret the indicator for CBG in the UL authorization (e.g., CBGTI, CBGFI) as an indicator for the HARQ response codebook. The indicator for CBG may consist of a bitmap, and one bit in the bitmap may indicate whether a HARQ codebook group (e.g., a group consisting of one or more HARQ response codebooks) is sent. The terminal may configure the UL data channel using only UL control information instead of a transport block, and may send only a portion of the HARQ codebook group. In addition, for the transmission of the HARQ codebook group, the existing fields of the UL authorization (e.g., the transmission indicator of CBG) may be reused.
[0459] In another embodiment, a field indicating that a HARQ response is included in a UL data channel may be newly introduced into a UL grant. When the new field included in the UL grant is set to a first value, the terminal may configure a UL data channel including a transport block and a HARQ response. On the other hand, when the new field included in the UL grant is set to a second value, the terminal may configure a UL data channel including a HARQ response instead of a transport block. For example, the field indicating whether a HARQ response is included in a UL data channel may be set to 0 or 1.
[0460] The embodiments of the present disclosure may be implemented as program instructions that can be run by various computers and recorded on a computer-readable medium. The computer-readable medium may include program instructions, data files, data structures, or a combination thereof. The program instructions recorded on the computer-readable medium may be specifically designed and configured for the present disclosure, or may be well-known and available to those skilled in the art of computer software.
[0461] Examples of computer-readable media may include hardware devices such as ROM, RAM, and flash memory, which are specifically configured to store and run program instructions. Examples of program instructions include machine codes, such as those generated by a compiler, and high-level language codes that can be run by a computer using an interpreter. The above exemplary hardware devices may be configured to operate as at least one software module to perform embodiments of the present disclosure, and vice versa.
[0462] Although the embodiments of the present disclosure and its advantages have been described in detail, it should be understood that various changes, substitutions, and alterations can be made herein without departing from the scope of the disclosure.
Claims
1. A method for operating a terminal in a communication system, the method comprising: include: receiving, from a base station, first downlink control information (DCI) including first resource allocation information for a first transport block; receiving, from the base station, a second DCI including second resource allocation information for the first transport block; as well as sending the first transport block to the base station through a second physical uplink shared channel PUSCH indicated by the second resource allocation information, The resources occupied by the first PUSCH indicated by the first resource allocation information are different from the resources occupied by the second PUSCH.
2. The operating method according to claim 1, in, When the first PUSCH is allocated for transmission of uplink control information UCI, the first PUSCH is not transmitted.
3. The operating method according to claim 1, in, When the first PUSCH is allocated for transmission of UCI, the UCI is transmitted through a physical uplink control channel PUCCH instead of the first PUSCH.
4. The operating method according to claim 1, in, When the first PUSCH is allocated for transmission of UCI, the UCI is transmitted through the second PUSCH instead of the first PUSCH.
5. The operating method according to claim 1, in, When a first code block for the first transport block is generated based on the first DCI, the first code block is mapped to a second PUSCH indicated by the second DCI instead of the first PUSCH.
6. The operating method according to claim 1, in, Each of a hybrid automatic repeat request HARQ process identifier and a new data indicator NDI included in the first DCI is equal to each of the HARQ process identifier and the NDI included in the second DCI.
7. The operating method according to claim 1, in, When the time resources occupied by the first PUSCH are the same as the time resources occupied by the second PUSCH, the second resource allocation information includes an offset between a starting frequency resource of the first PUSCH and a starting frequency resource of the second PUSCH.
8. The operating method according to claim 1, in, When the frequency resources occupied by the first PUSCH are the same as the frequency resources occupied by the second PUSCH, the second resource allocation information includes an offset between a starting time resource of the first PUSCH and a starting time resource of the second PUSCH.
9. The operating method according to claim 1, in, The first PUSCH is used for another purpose instead of transmitting the first transport block.
