Hanging basket device of large-area inclined glass curtain wall and construction method
By designing the roof mesh structure and hanging basket device, combined with fixed pulleys, manual hoists and hanging basket direction control equipment, the problems of low efficiency and high cost of installation of inclined glass curtain walls in large buildings are solved, and an efficient and safe construction process is achieved.
Patent Information
- Application Number
- CN202411509998.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2024-12-13
AI Technical Summary
The installation of inclined glass curtain walls in large buildings has problems of low construction efficiency and high cost, especially the difficulty in controlling the direction of the hanging basket and moving trajectory, resulting in a reduction in construction efficiency.
A hanging basket device including roof mesh structure, lifting rope and traction rope was designed. The traction rope adjustment is achieved through fixed pulleys and manual hoists, and the hanging basket direction control equipment and safety lock are combined to ensure the stability and safety of the hanging basket. and use independent safety ropes and fall protection devices during construction.
It improves construction efficiency and safety, significantly reduces construction costs, strong adaptability, reduces the impact on other construction processes, and simplifies glass installation operations.
Smart Images

Figure CN119122250A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a hanging basket device and a construction method for a large-area inclined glass curtain wall. Background Art
[0002] Glass curtain walls are commonly used in large buildings. To meet the requirements of architectural design, inclined glass curtain walls are widely used. The curtain walls of large buildings are generally large in area and the installation conditions are relatively difficult. When the glass curtain wall is designed to be outward-inclined, the method of setting up ground scaffolding is often used for construction, but there are the following shortcomings: First, the scaffolding construction work is huge, time-consuming and labor-intensive; second, during the construction of the glass curtain wall, the cross-working surface of the roof, equipment, and civil engineering secondary masonry is limited, and the scaffolding is set high, and it is difficult to achieve large-scale construction when the lower part is a road. The outward-inclined curtain wall can be constructed by the hanging basket method, but there is a problem that it is difficult to control the direction and movement trajectory of the hanging basket, which reduces the construction efficiency. Summary of the invention
[0003] The object of the present invention is to provide a hanging basket device and a construction method for a large-area inclined glass curtain wall, so as to solve the problems of low installation efficiency and high cost in the prior art.
[0004] To achieve the above-mentioned purpose, the specific technical scheme of a hanging basket device and a construction method of a large-area inclined glass curtain wall of the present invention is as follows:
[0005] A hanging basket device for a large-area inclined glass curtain wall comprises a roof grid structure as a main load-bearing structure and a hanging basket assembly arranged on the roof grid structure, the hanging basket assembly comprises a lifting rope and a traction rope, the lifting rope and the traction rope connect the roof grid structure and a ground platform, the lifting rope is arranged on the left side of the traction rope, the hanging basket body is arranged on the lifting rope and the traction rope, the lower end of the traction rope is provided with a fixed pulley, the ground platform is also provided with a manual hoist for use with the fixed pulley, the lower end of the traction rope passes through the fixed pulley and is connected to the manual hoist, and the lifting rope and the traction rope are arranged in parallel.
[0006] Furthermore, hoists for controlling the lifting of the basket are arranged at both ends of the basket body, an electric control box for controlling the operation of the hoist and a safety lock for preventing the basket from accidentally sliding down are arranged above the basket body, and the basket and the lifting rope are connected to each other through a connecting device.
[0007] Furthermore, the connections between the traction rope and the lifting rope and the roof truss structure are all connected via straps, and the straps are mounted on the steel frame of the roof truss structure. The connecting parts of the straps, traction rope and lifting rope are all circular rings, and the straps are connected to the traction rope and the lifting rope via shackles.
[0008] Furthermore, the fixed pulley and the manual hoist are both fixed to the ground platform through rear embedded plates and bolts.
[0009] Furthermore, the manual hoist and the traction rope are fixed by a shackle and a small ear plate on the rear embedded plate.
[0010] The present invention also provides a large-area inclined glass curtain wall hanging basket construction method, comprising:
[0011] S1: Install the hanging basket device. After installation, hoist the hanging basket from the outside and the curtain wall glass from the inside;
[0012] S2: Connect the upper end of the traction rope to the roof grid structure, and use the fixed pulley and manual hoist at the lower end to make the two traction ropes straight and consistent with the inclination of the glass curtain wall;
[0013] S3: Adjust the traction rope through the lifting rope and the hanging basket direction control device to achieve the inclined rise or fall of the outdoor hanging basket body and the indoor inclined glass curtain wall;
[0014] S4: After installing all the panel connectors of the curtain wall within a range of 6m on the hanging basket, lower the hanging basket;
[0015] S5: Tilt the hanging basket up to another area and then lift it up for installation again;
[0016] S6: Repeat the above steps until the construction of the entire area is completed;
[0017] S7: After installation is completed, the platform is dismantled.
[0018] Furthermore, before the hanging basket is installed and used, an independent safety rope is set from the roof steel structure to prevent workers from falling.
[0019] Furthermore, the S3: adjusting the traction rope through the lifting rope and the hanging basket direction control device to achieve the inclined rise or fall of the outdoor hanging basket body and the indoor inclined glass curtain wall; includes:
[0020] The hanging basket direction control device includes two pulleys, which are respectively arranged on the top of both sides of the hanging basket body. The first one is put on the traction rope to make the hanging basket body rise or fall along the inclined glass curtain wall. The second one is put on the hanging rope so that the hanging rope can be divided into two sections. The lower section is always parallel to the hanging basket body, and the upper section is connected to the roof steel structure.
[0021] Furthermore, the S5: before the hanging basket is installed and used, an independent safety rope is set from the roof steel structure; specifically includes:
[0022] Before the hanging basket is installed and used, an independent safety rope must be set from the roof steel structure, and a fall arrester must be installed on the safety rope. During construction, construction workers must fasten their safety belts to the fall arrester on the safety rope to prevent the hanging basket from falling due to a malfunction.
[0023] Further, the S7: after the installation is completed, the platform is dismantled; specifically, it includes: firstly lowering the hanging basket and the hanging basket body, and then completely loosening and unloading the lifting rope and the traction rope, and after the unloading is completed, removing the wire rope, and then removing other accessories, and finally cleaning the materials.
[0024] The hanging basket device and construction method of a large-area inclined glass curtain wall provided by the present invention have the following advantages:
[0025] 1. Improve construction efficiency: The hanging basket system can flexibly adjust its position to adapt to glass curtain walls with different inclination angles, greatly improving installation efficiency.
[0026] 2. Improve construction safety: The specially designed basket direction control device and safety lock ensure the stability and safety of the basket on the inclined surface. At the same time, the independent safety rope and fall arrester further ensure the safety of the operator.
[0027] 3. Save construction costs: Compared with the traditional scaffolding erection method, the present invention greatly reduces the workload of setting up auxiliary facilities and significantly reduces the construction cost.
[0028] 4. Strong adaptability: This system can be flexibly adjusted according to different building structures and curtain wall inclination angles, and has a wide range of applications.
[0029] 5. Easy to operate: The hanging basket has a reasonable design, which is convenient for workers to install glass and reduces their labor intensity.
[0030] 6. Reduce the impact on other construction: This device does not occupy ground space, reducing the impact on other construction processes such as roofing and equipment installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A schematic diagram of the hanging basket device provided by the present invention;
[0032] Figure 2 A bottom connection diagram of the hanging basket device provided by the present invention;
[0033] Figure 3 A top connection diagram of the hanging basket device provided by the present invention;
[0034] Figure 4 A schematic diagram of a hanging basket provided by the present invention when it is located at the bottom;
[0035] Figure 5A schematic diagram of a hanging basket provided by the present invention when it is located at the top;
[0036] Figure 6 A schematic diagram of the structure of a hanging basket provided by the present invention;
[0037] Figure 7 A schematic diagram of the curtain wall glass hoisting state provided by the present invention;
[0038] Figure 8 A schematic diagram of the installation state of the curtain wall glass provided by the present invention;
[0039] Fig. 9 This is an enlarged view of the connection part when the hanging basket provided by the present invention is located at the top.
[0040] In the figure: 1. roof grid structure; 2. ground platform; 3. traction rope; 4. lifting rope; 5. hanging basket body; 6. fixed pulley; 7. manual hoist; 8. binding belt; 9. shackle; 10. rear embedded plate; 11. hoist; 12. electric control box; 13. safety lock; 14. hanging basket direction control device; 15. curtain wall glass finish surface; 16. curtain wall column; 17. hook; 18. curtain wall glass; 19. winch; 20. second fixed pulley. DETAILED DESCRIPTION
[0041] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0042] See also Figure 1-6The present invention provides a hanging basket device for a large-area inclined glass curtain wall, which is used for the installation of the glass curtain wall. The hanging basket device for a large-area inclined glass curtain wall comprises a roof grid structure 1 as a main load-bearing structure and a hanging basket assembly arranged on the roof grid structure 1, wherein the roof grid structure 1 is a steel grid structure of a roof system; the hanging basket assembly comprises a lifting rope 4 and a traction rope 3, and the lifting rope 4 and the traction rope 3 connect the roof grid structure 1 with a ground platform 2; the connection between the traction rope 3 and the lifting rope 4 and the roof grid structure 1 is connected by a binding belt 8, and the binding belt 8 is sleeved on the steel frame of the roof grid structure 1, and the connection parts of the binding belt 8, the traction rope 3 and the lifting rope 4 are all circular rings, and the binding belt 8 is connected to the traction rope 3 and the lifting rope 4 by a shackle 9, and the shackle 9 is passed through the ferrule of the binding belt 8 and the traction rope 3 or the binding belt 8 and the lifting rope 4 to complete the connection and fixation of the roof grid structure 1 and the lifting rope 4 and the traction rope 3. The lifting rope 4 is arranged on the left side of the traction rope 3, and the hanging basket body 5 is arranged on the lifting rope 4 and the traction rope 3. The lower end of the traction rope 3 is provided with a fixed pulley 6 for changing the direction of the traction rope 3. The ground platform 2 is also provided with a manual hoist 7 for use with the fixed pulley 6. The manual hoist 7 is used in conjunction with the fixed pulley 6 to adjust the tension and angle of the traction rope 3. The fixed pulley 6 and the manual hoist 7 are both fixed to the ground platform 2 by a rear embedded plate 10 and bolts. The traction rope 3 and the manual hoist 7 are fixed by a shackle 9 and a small ear plate on the rear embedded plate 10. The lifting rope 4 and the traction rope 3 are arranged in parallel during transportation.
[0043] See also Figure 6 Hoists 11 for controlling the lifting of the basket are arranged at both ends of the basket body 5, an electric control box 12 for controlling the operation of the hoist 11 and a safety lock 13 for preventing the basket from accidentally sliding down are arranged above the basket body 5, and the basket is connected to the lifting rope 4 through a connecting device.
[0044] In one embodiment: the hanging basket body 5 adopts a ZLP630 standard hanging basket with a length of 6m, a width of 0.69m, and a height of 1.16m, and the overall deadweight is about 350kg. The construction design load is 1.2kN / m2, which can be operated by 2 people at the same time, and each person is calculated as 100kg, and the actual use load does not exceed 0.3kN / m2.
[0045] The lifting of the basket body 5 requires the vertical upward contraction of the hoist 11, but the basket body 5 can move up and down along the tilt angle, so the basket direction control device 14 is designed above the hoist 11 to realize the direction conversion. The basket direction control device 14 includes two pulleys at the top of the basket body 5 on both sides, the first one is sleeved on the traction rope 3, so that the basket body 5 can be tilted up or down along the inclined glass curtain wall, and the second one is sleeved on the suspension rope, so that the suspension rope can be divided into two sections, the lower section is always parallel to the basket body 5 to ensure safe operation, and the upper section is connected to the roof steel structure to ensure the lifting height of the basket body 5. The traction rope 3 is fixed by a 3t fixed pulley 6 and a 3t manual hoist 7 at the bottom.
[0046] The construction process of the hanging basket is: installing the traction rope 3 and the hanging rope → lifting and installing the hanging basket platform → debugging the hanging basket → normal construction operations.
[0047] Install the traction rope 3:
[0048] Two lifting ropes and two traction ropes 3 are used on each hanging basket platform, all of which are tied and fixed on the roof steel grid structure. After being fixed, they are straightened by manual hoists 7 and hoists 11. The lap length of the wire rope is not less than 24d (d is the diameter of the wire rope). When clamping is used, there are no less than 3 clamps (the diameter of the wire rope ≤ 18mm).
[0049] When the steel wire rope is tied and fixed to the grid ball node, the grid rods are protected by wrapping them with a layer of rubber or aluminum foil to prevent damage to the grid coating layer.
[0050] Lifting and installation of hanging basket platform:
[0051] Two hoists 11 are used at both ends of the hanging basket lifting platform to lift the hanging basket to the required position.
[0052] The parameters for improvement are as follows:
[0053]
[0054] Debugging of hanging basket:
[0055] After the installation work is completed, the installer connects the cable to the electric control box 12 and connects it to the special electric box power supply provided on site. After the staff completes the experiment in the hanging basket, they install the wire rope into the hoist 11 and the safety lock 13. After completing the above work, the hanging basket is raised and lowered 3-5 times, and the height of each rise is about 3m. Then each installer checks the installation of each connection point again, and uses it after inspection and acceptance.
[0056] Normal construction work:
[0057] Before the hanging basket is installed and used, an independent safety rope must be set from the roof steel structure, and a fall arrester must be installed on the safety rope. During construction, construction workers must wear safety belts on the fall arrester on the safety rope to prevent the hanging basket from falling due to a malfunction.
[0058] See also Figure 1-8 , a method for installing a hanging basket for a large-area inclined glass curtain wall, comprising the following steps:
[0059] S1: Install the hanging basket device. After the installation is completed, the hanging basket is hoisted from the outside, and the curtain wall glass 18 is hoisted from the inside;
[0060] S2: The upper ends of the traction ropes 3 are connected to the roof grid structure 1, and the lower ends are connected through the fixed pulley 6 and the manual hoist 7 so that the two traction ropes 3 are straightened and consistent with the inclination of the glass curtain wall;
[0061] S3: adjusting the traction rope 3 through the lifting rope 4 and the hanging basket direction control device 14 to achieve the inclined rise or fall of the outdoor hanging basket body 5 and the indoor inclined glass curtain wall;
[0062] S4: After installing all the panel connectors of the curtain wall within a range of 6m on the hanging basket, lower the hanging basket;
[0063] S5: Tilt the hanging basket up to another area and then lift it up for installation again;
[0064] S6: Repeat the above steps until the construction of the entire area is completed;
[0065] S7: After installation is completed, the platform is dismantled.
[0066] When installing the glass curtain wall outdoors, first install the hanging basket device. After the installation is completed, start synchronous lifting at the same time indoors and outdoors of the curtain wall. First, connect the upper end of the traction rope 3 to the roof grid structure 1, and make the two traction ropes 3 with a diameter of Φ16mm straight and parallel to the inclination of the glass curtain wall through the fixed pulley 6 and the manual hoist 7 below, and then adjust the traction rope 3 through the lifting rope 4 and the hanging basket direction control device 14 to achieve the outdoor hanging basket basket body 5 and the indoor inclined glass curtain wall to rise or fall in an inclined manner; the hanging basket direction control device 14 includes two pulleys arranged on the top of the two sides of the hanging basket basket body 5, the first one is sleeved on the traction rope 3, so that the hanging basket basket body 5 rises or falls along the inclined glass curtain wall, and the second one is sleeved on the hanging rope, so that the hanging rope can be divided into two sections, the lower section is always parallel to the hanging basket basket body 5, and the upper section is connected to the roof steel structure. Then it is hoisted to the specific installation location. After arriving at the location, the curtain wall is installed in the hanging basket 5. The installation range of a hoisting area is 6m. After installing all the curtain wall panel connectors within the 6m range, the hanging basket is lowered, and then moved to another required installation area through the lifting rope 4 and the hanging basket direction control device 14, and then lifted and installed again. Repeat the above operations until the construction of the entire area is completed.
[0067] It should be noted that before the hanging basket is installed and used, an independent safety rope must be set from the roof steel structure, and a fall arrester must be installed on the safety rope. During construction, construction workers must fasten their safety belts to the fall arrester on the safety rope to prevent the hanging basket from falling due to a malfunction.
[0068] When installing the glass curtain wall indoors: the glass is hoisted from indoors, using a winch 19 and two second fixed pulleys 20, so that the glass can be moved vertically and horizontally. A second fixed pulley 6 is placed vertically above the floor slab for the purpose of hoisting the glass plate, and the other second fixed pulley 6 is placed above the outermost side of the inclined glass curtain wall for the purpose of allowing the glass to move parallely. During operation, the glass is first hoisted to a certain position, and then the hook 17 is slowly released. The glass will move outward and downward under the influence of its own weight. Through the tight coordination of the winch 19 and the hook 17, the glass reaches the predetermined position, and then the operator in the hanging basket performs specific positioning and installation.
[0069] After all areas are installed, the platform needs to be dismantled. The platform dismantling process is exactly the opposite of the installation process. The first installed ones are dismantled last, and the last installed ones are dismantled first. The specific process is to first lower the hanging basket hanging basket body 5, then completely loosen the lifting rope 4 and the traction rope 3 to unload, remove the wire rope after unloading, then remove other accessories, and finally clean up the materials.
[0070] During the disassembly process:
[0071] (1) Disassembly must be carried out according to the work process. Special attention should be paid to the fact that it is strictly forbidden to dismantle related accessories before the platform is landed and the wire rope is completely unloaded.
[0072] (2) During the disassembly process, any objects such as tools and accessories must not be thrown. In particular, wire ropes and cables must not be thrown when being dismantled. Instead, they must be held with a strong nylon rope and slowly released from a height and lowered to the ground.
[0073] (3) Warning signs should be set up below the disassembly work, and a designated person should be responsible for supervision.
[0074] (4) If the platform needs to be recycled after disassembly, all accessories must be rechecked.
[0075] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A hanging basket device for a large-area inclined glass curtain wall, comprising a roof grid structure (1) as a main load-bearing structure and a hanging basket assembly arranged on the roof grid structure (1), characterized in that: The hanging basket assembly comprises a lifting rope (4) and a traction rope (3), wherein the lifting rope (4) and the traction rope (3) connect the roof grid structure (1) and the ground platform (2), wherein the lifting rope (4) is arranged on the left side of the traction rope (3), and the hanging basket body (5) is arranged on the lifting rope (4) and the traction rope (3), wherein a fixed pulley (6) is arranged at the lower end of the traction rope (3), and a manual hoist (7) for use in conjunction with the fixed pulley (6) is also arranged on the ground platform (2), wherein the lower end of the traction rope (3) passes through the fixed pulley (6) and is connected to the manual hoist (7), and the lifting rope (4) and the traction rope (3) are arranged in parallel.
2. The hanging basket device for a large-area inclined glass curtain wall according to claim 1 is characterized in that: Hoists (11) for controlling the lifting of the hanging basket are arranged at both ends of the hanging basket body (5); an electric control box (12) for controlling the operation of the hoist (11) and a safety lock (13) for preventing the hanging basket from accidentally sliding down are arranged above the hanging basket body (5); the hanging basket and the lifting rope (4) are connected to each other through a connecting device.
3. The hanging basket device for a large-area inclined glass curtain wall according to claim 1 is characterized in that: The connection points between the traction rope (3) and the lifting rope (4) and the roof grid structure (1) are all connected by means of binding straps, and the binding straps are sleeved on the steel frame of the roof grid structure (1). The connection points between the binding straps, the traction rope (3) and the lifting rope (4) are all circular rings, and the binding straps are connected to the traction rope (3) and the lifting rope (4) by means of shackles (9).
4. The hanging basket device for a large-area inclined glass curtain wall according to claim 1 is characterized in that: The fixed pulley (6) and the manual hoist (7) are both fixed on the ground platform (2) via a rear embedded plate (10) and bolts.
5. The hanging basket device for a large-area inclined glass curtain wall according to claim 4 is characterized in that: The manual hoist (7) and the traction rope (3) are fixed via a shackle (9) and a small ear plate on a rear embedded plate (10).
6. A construction method for a large-area inclined glass curtain wall hanging basket device, characterized in that: The following steps are involved: S1: Install the hanging basket device. After the installation is completed, the hanging basket is hoisted from the outside, and the curtain wall glass (18) is hoisted from the inside; S2: The upper ends of the traction ropes (3) are connected to the roof grid structure (1), and the lower ends are connected through a fixed pulley (6) and a manual hoist (7) so that the two traction ropes (3) are straightened and aligned with the inclination of the glass curtain wall; S3: adjusting the traction rope (3) through the lifting rope (4) and the hanging basket direction control device (14) to achieve the inclined rise or fall of the outdoor hanging basket body (5) and the indoor inclined glass curtain wall; S4: After installing all the panel connectors of the curtain wall within a range of 6m on the hanging basket, lower the hanging basket; S5: Tilt the hanging basket up to another area and then lift it up for installation again; S6: Repeat the above steps until the construction of the entire area is completed; S7: After installation is completed, the platform is dismantled.
7. The construction method of the large-area inclined glass curtain wall hanging basket device according to claim 6 is characterized in that: Before the hanging basket is installed and used, an independent safety rope is set from the roof steel structure to prevent workers from falling.
8. The construction method of the large-area inclined glass curtain wall hanging basket device according to claim 6 is characterized in that: S3: adjusting the traction rope (3) through the lifting rope (4) and the hanging basket direction control device (14) to achieve the inclined rise or fall of the outdoor hanging basket body (5) and the indoor inclined glass curtain wall; including: The hanging basket direction control device (14) comprises two pulleys, which are respectively arranged at the top of both sides of the hanging basket body (5). The first pulley is mounted on the traction rope (3) so that the hanging basket body (5) can be smoothly inclined up or down along the inclined glass curtain wall. The second pulley is mounted on the suspension rope so that the suspension rope can be divided into two sections. The lower section is always parallel to the hanging basket body (5) and the upper section is connected to the roof steel structure.
9. The construction method of the large-area inclined glass curtain wall hanging basket device according to claim 6 is characterized in that: S7: after the installation is completed, the platform is dismantled; specifically, it includes: firstly lowering the hanging basket and the hanging basket body (5), then completely loosening and unloading the lifting rope (4) and the traction rope (3), after the unloading is completed, removing the wire rope, then removing other accessories, and finally cleaning the materials.
Citation Information