BOM management system special for wind power cabin cover
By designing a special BOM management system for wind turbine cabin covers and integrating multiple systems and departments, the problems of single functions and data deviation in the existing technology are solved, and the accurate data standards and management basis of the wind turbine cabin covers industry are realized. Management provides efficient resource control.
Patent Information
- Application Number
- CN202411152109.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-12-13
AI Technical Summary
The existing wind turbine cabin BOM management system has a single function and cannot be applied to the wind turbine cabin industry, which makes it difficult to build and track BOMs and cannot provide accurate data standards and management basis, resulting in increased errors.
A special BOM management system for wind turbine cabin cover is designed, including database, BOM underlying data structure and monitoring analyzer. Through the mutual cooperation of multiple functional modules, multiple systems and departments are integrated for new project quotation, process guidance, Material procurement, material collection management, material management and working hours management form a comprehensive query system to reduce errors and provide accurate data standards and management basis.
It improves the system functionality, reduces errors in the production management process, provides accurate data standards and management basis for project management, realizes timeliness and correctness of resources, and solves the problems of difficulty in building hierarchical structures and data deviations.
Smart Images

Figure CN119130356A_ABST
Abstract
Description
Technical field:
[0001] The invention relates to a special BOM management system for a wind turbine cabin cover. Background technology:
[0002] BOM, or physical inventory, is a technical document that describes the composition of a company's products. It is used to record the components required for a product and is of great significance for early cost management. However, in the wind turbine nacelle industry, the inevitable program changes, uncertainties, and repetitiveness of new projects make BOM construction and cost tracking more difficult, and a large amount of resource investment cannot guarantee timeliness and accuracy.
[0003] At present, the existing BOM management system for wind turbine nacelles is relatively simple, with single overall functionality. It can only be applied to material procurement and material collection, fails to provide relevant guidance for other departments, is prone to large deviations, and cannot provide data standards and management basis for project management. The hierarchical structure is difficult to build, which makes it not fully applicable to the wind turbine nacelle industry. Summary of the invention:
[0004] The embodiment of the present invention provides a special BOM management system for wind turbine nacelles. It has a reasonable structural design, integrates multiple systems and multiple departments based on the mutual cooperation of multiple functional modules, and can be applied to different scenarios such as new project quotation, process guidance, material procurement, material collection management, material management and working time management. It improves the overall functionality of the system, reduces the errors generated in the production management process, provides accurate data standards and management basis for project management, and uniformly regulates and controls multiple systems and departments, solving the problems existing in the prior art.
[0005] The technical solution adopted by the present invention to solve the above technical problems is:
[0006] A BOM management system dedicated to a wind turbine nacelle cover, the management system comprising:
[0007] A database, which is created based on the material data information used by different customers of the company and contains historical data information of all projects of the company;
[0008] BOM underlying data structure, the BOM underlying data structure matches the new project based on database information, summarizes the matched data, and forms underlying data; the BOM underlying data structure includes a main BOM component, a sub-BOM component, and an ancillary BOM component;
[0009] A monitoring analyzer is used to make a quotation based on this BOM and monitor and analyze the subsequent costs.
[0010] The database is classified according to the characteristics or models of materials and accessories according to unified standards, and the corresponding categories and identification information are set. Then, based on the material data information used by different customers of the company, the materials and accessories used in different projects are summarized and entered into the ERP system.
[0011] The historical data information includes product data information of products in production and product data information of new quotation items.
[0012] The underlying data includes basic information required for target cost control, and the basic information includes project code, material code, working time data, transport packaging data package, fiber sleeve cutting and foam sleeve cutting data package and accessory data package.
[0013] The BOM underlying data structure is a bottom-up architecture, which combines the matching data in the database to form the underlying data, and outputs the cost data of each single BOM by calculating the underlying data.
[0014] The main BOM components include cost calculation BOM, process unit BOM, manufacturing assembly BOM, labor time BOM and procurement BOM; the sub-BOM components include transport packaging BOM, fiberglass sleeve cutting and foam sleeve cutting BOM and change BOM; the subsidiary BOM components include financial BOM, procurement BOM, project BOM, process BOM, production BOM and quality BOM;
[0015] The cost calculation BOM is used to intuitively display the project cost; the process unit BOM is used to summarize the data of the manufacturing process, process sequence, materials used and labor costs of single products in each project; the manufacturing assembly BOM is used to allocate assembly time data for a set of assembly parts with assembly levels; the working time BOM is used to summarize the total project working time, project process working time and assembly level working time; the procurement BOM is used to collect data for purchased materials; the transport packaging BOM is used to summarize the transport packaging plan and the required materials and working time data.
[0016] The labor time BOM is divided into process labor time BOM, KIT labor time BOM and project labor time BOM. The process labor time BOM splits the BOM of each product according to the production process, and defines the labor time for each process and each operation activity; the KIT labor time BOM classifies products in different locations according to different functional components to form an assembly KIT, and summarizes the labor time; the project labor time BOM collects the labor time data of the entire set of products according to the production process.
[0017] The cost calculation BOM is divided into finished product BOM, KIT level BOM and project level BOM. The finished product BOM collects the materials, accessories and working time data of each single product according to the production process, from material preparation to finished product completion; the KIT level classifies products in different positions according to different functional components to form an assembly KIT, and summarizes the materials, accessories and working time data used for assembling the KIT; the project level BOM collects the materials, accessories and working time data used for the whole set of products according to the production process.
[0018] The management method of the management system comprises the following steps:
[0019] S1, creating a company database based on the material data information used by different customers of the company, the database contains the historical data information of all projects of the company, and is aggregated to form a comprehensive query system;
[0020] S2, based on the company database information, matches the new project, summarizes the matched data to form the underlying data, reconfirms the unmatched data, and creates new projects to add to the underlying data structure;
[0021] S3, the project-level BOM is solved to form the initial BOM for cost calculation used in the project quotation. The initial BOM is solved to form material and working time data, and can also be solved to process classification summary data;
[0022] S4, the solved single-piece BOM is used as the basis for cost control of technical and process guidance production; the solved manufacturing assembly BOM is used for production and assembly, as the basis for controlling assembly costs; the solved process flow structure working time BOM is used to provide a management basis for the working time of each process; the solved procurement BOM is used for procurement inquiries, price comparisons and procurement of materials; the solved CN change BOM is used to form comparative data on cost changes at different times; the solved transportation tooling and packaging BOM provides data basis for welding tooling and product packaging and transportation; the solved fiberglass foam set cutting BOM forms data basis for product set processing; the solved project BOM system provides data call capture for the subsidiary BOM to ensure data consistency;
[0023] S5, when a new project is started, the corresponding underlying data is imported to form a single and independent project BOM, and quotation work is carried out based on this BOM, and the corresponding cost and CN update analysis are monitored and analyzed to achieve the purpose of new project cost control.
[0024] The present invention adopts the above structure, creates a company database based on the material data information used by different customers of the company, and aggregates them into a comprehensive query system; matches new projects based on the company database information, establishes a BOM underlying data structure to aggregate the matched data, and forms underlying data; performs BOM cost calculations by referencing related data packages such as the same materials, parts, etc. in different projects to BOM systems at different levels; designs through a bottom-up architecture, splits each single item, matches the data in the company database, and forms the underlying data of the BOM system, which has the advantages of being accurate, practical, unified and efficient. Description of the drawings:
[0025] Figure 1 It is a structural schematic diagram of the present invention.
[0026] Figure 2 It is a structural schematic diagram of the working time BOM of the present invention.
[0027] Figure 3 It is a schematic diagram of the structure of the cost calculation BOM of the present invention.
[0028] Figure 4 It is a schematic diagram of the process of the management method of the present invention. Specific implementation method:
[0029] In order to clearly illustrate the technical features of the present solution, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings.
[0030] like Figure 1-4 As shown in, a BOM management system dedicated to wind turbine nacelle covers, the management system includes:
[0031] A database, which is created based on the material data information used by different customers of the company and contains historical data information of all projects of the company;
[0032] BOM underlying data structure, the BOM underlying data structure matches the new project based on database information, summarizes the matched data, and forms underlying data; the BOM underlying data structure includes a main BOM component, a sub-BOM component, and an ancillary BOM component;
[0033] A monitoring analyzer is used to make a quotation based on this BOM and monitor and analyze the subsequent costs.
[0034] The database is classified according to the characteristics or models of materials and accessories according to unified standards, and the corresponding categories and identification information are set. Then, based on the material data information used by different customers of the company, the materials and accessories used in different projects are summarized and entered into the ERP system.
[0035] The historical data information includes product data information of products in production and product data information of new quotation items.
[0036] The underlying data includes basic information required for target cost control, and the basic information includes project code, material code, working time data, transport packaging data package, fiber sleeve cutting and foam sleeve cutting data package and accessory data package.
[0037] The BOM underlying data structure is a bottom-up architecture, which combines the matching data in the database to form the underlying data, and outputs the cost data of each single BOM by calculating the underlying data.
[0038] The main BOM components include cost calculation BOM, process unit BOM, manufacturing assembly BOM, labor time BOM and procurement BOM; the sub-BOM components include transport packaging BOM, fiberglass sleeve cutting and foam sleeve cutting BOM and change BOM; the subsidiary BOM components include financial BOM, procurement BOM, project BOM, process BOM, production BOM and quality BOM;
[0039] The cost calculation BOM is used to intuitively display the project cost; the process unit BOM is used to summarize the data of the manufacturing process, process sequence, materials used and labor costs of single products in each project; the manufacturing assembly BOM is used to allocate assembly time data for a set of assembly parts with assembly levels; the working time BOM is used to summarize the total project working time, project process working time and assembly level working time; the procurement BOM is used to collect data for purchased materials; the transport packaging BOM is used to summarize the transport packaging plan and the required materials and working time data.
[0040] The labor time BOM is divided into process labor time BOM, KIT labor time BOM and project labor time BOM. The process labor time BOM splits the BOM of each product according to the production process, and defines the labor time for each process and each operation activity; the KIT labor time BOM classifies products in different locations according to different functional components to form an assembly KIT, and summarizes the labor time; the project labor time BOM collects the labor time data of the entire set of products according to the production process.
[0041] The cost calculation BOM is divided into finished product BOM, KIT level BOM and project level BOM. The finished product BOM collects the materials, accessories and working time data of each single product according to the production process, from material preparation to finished product completion; the KIT level classifies products in different positions according to different functional components to form an assembly KIT, and summarizes the materials, accessories and working time data used for assembling the KIT; the project level BOM collects the materials, accessories and working time data used for the whole set of products according to the production process.
[0042] The management method of the management system comprises the following steps:
[0043] S1, creating a company database based on the material data information used by different customers of the company, the database contains the historical data information of all projects of the company, and is aggregated to form a comprehensive query system;
[0044] S2, based on the company database information, matches the new project, summarizes the matched data to form the underlying data, reconfirms the unmatched data, and creates new projects to add to the underlying data structure;
[0045] S3, the project-level BOM is solved to form the initial BOM for cost calculation used in the project quotation. The initial BOM is solved to form material and working time data, and can also be solved to process classification summary data;
[0046] S4, the solved single-piece BOM is used as the basis for cost control of technical and process guidance production; the solved manufacturing assembly BOM is used for production and assembly, as the basis for controlling assembly costs; the solved process flow structure working time BOM is used to provide a management basis for the working time of each process; the solved procurement BOM is used for procurement inquiries, price comparisons and procurement of materials; the solved CN change BOM is used to form comparative data on cost changes at different times; the solved transportation tooling and packaging BOM provides data basis for welding tooling and product packaging and transportation; the solved fiberglass foam set cutting BOM forms data basis for product set processing; the solved project BOM system provides data call capture for the subsidiary BOM to ensure data consistency;
[0047] S5, when a new project is started, the corresponding underlying data is imported to form a single and independent project BOM, and quotation work is carried out based on this BOM, and the corresponding cost and CN update analysis are monitored and analyzed to achieve the purpose of new project cost control.
[0048] The working principle of a special BOM management system for wind turbine nacelle covers in an embodiment of the present invention is: based on the mutual cooperation of multiple functional modules, multiple systems and multiple departments are integrated, and it can be applied to different scenarios such as new project quotation, process guidance, material procurement, material collection management, material management and working time management, etc., to improve the overall functionality of the system, reduce the errors generated in the production management process, provide accurate data standards and management basis for project management, and unify the regulation and control of multiple systems and departments.
[0049] Furthermore, the management system reduces the deviation caused by the quotation system based only on the estimated weight multiplication coefficient, avoids the formation of blind spots, and reduces the difficulty of building a hierarchical structure.
[0050] The present application provides a BOM standardization method dedicated to the wind turbine nacelle industry to achieve comparative analysis and monitoring of project estimated costs, target costs, and actual costs, so as to achieve information integration, resource sharing, and improve the accuracy and timeliness of information and data.
[0051] In the overall solution, the management system includes:
[0052] A database, which is created based on the material data information used by the company's different customers and contains historical data information of all the company's projects; a BOM underlying data structure, which matches new projects based on database information and aggregates the matched data to form underlying data; the BOM underlying data structure includes main BOM components, sub-BOM components and subsidiary BOM components; a monitoring analyzer, which is used to make quotations based on this BOM and monitor and analyze subsequent costs.
[0053] Preferably, the database can classify materials and accessories according to their characteristics or models according to unified standards, set corresponding categories and identification information, and then summarize the materials and accessories used in different projects based on the material data information used by different customers of the company and enter them into the ERP system.
[0054] The underlying data includes basic information required for target cost control, and the basic information includes project code, material code, working time data, transport packaging data package, fiber sleeve cutting and foam sleeve cutting data package and accessory data package.
[0055] In the company database, materials or accessories are classified according to unified standards based on their characteristics or models, and corresponding categories and identification information are set. Then, based on the material data information used by different customers of the company, the materials and accessories used in different projects are summarized and entered into the ERP system to create a company database. Historical product data and data information of products in production are included, forming a company-level database system that can be comprehensively queried.
[0056] This management system is designed according to a bottom-up architecture. Each single item is split and the data is matched in the company database to form the underlying data of the BOM system. The cost data of each single BOM is output by calculating the underlying data. The collection of all single BOMs constitutes the cost data of the entire project.
[0057] The main BOM components include cost calculation BOM, process unit BOM, manufacturing assembly BOM, labor time BOM and procurement BOM; the sub-BOM components include transport packaging BOM, glass fiber sleeve cutting and foam sleeve cutting BOM and change BOM; the subsidiary BOM components include financial BOM, procurement BOM, project BOM, process BOM, production BOM and quality BOM; the cost calculation BOM is used to intuitively display the project cost, the process unit BOM is used to summarize the manufacturing process, process sequence, materials used and labor costs of single products in each project; the manufacturing assembly BOM is used to allocate assembly labor time for the assembly accessories with assembly level; the labor time BOM is used to summarize the data of total project labor time, project process labor time and assembly level labor time; the procurement BOM is used to collect data for purchased materials; the transport packaging BOM is used to summarize the transport packaging plan and the required materials and labor time data.
[0058] Preferably, the labor time BOM is divided into process labor time BOM, KIT labor time BOM and project labor time BOM. The process labor time BOM splits the BOM of each product according to the production process, and defines the labor time for each process and each operation activity; the KIT labor time BOM classifies products at different positions according to different functional components to form an assembly KIT, and summarizes the labor time; the project labor time BOM collects the labor time data of the whole set of products according to the production process; the cost calculation BOM is divided into finished product BOM, KIT level BOM and project level BOM. The finished product BOM collects the materials, accessories and labor time data of each single product according to the production process, from material preparation to finished product completion; the KIT level classifies products at different positions according to different functional components to form an assembly KIT, which summarizes the materials, accessories and labor time data used for the assembly KIT; the project level BOM collects the materials, accessories and labor time data used for the whole set of products according to the production process.
[0059] As for the corresponding practical scenarios, the process labor time BOM controls the labor time consumption of each product in each production link and plays a role in exceeding or saving monitoring; the KIT labor time BOM controls and monitors the labor time consumption of the group when the production scenarios change, such as project group production and group outsourcing; the project labor time BOM controls and monitors the labor time consumption of the overall project quotation and the production of a whole set of products; the finished product BOM controls the material, accessories and labor time consumption of each product in each production link and plays a role in exceeding or saving monitoring; the KIT-level BOM controls and monitors the material, accessories and labor time consumption of the group when the production scenarios change, such as project group quotation, group production, group outsourcing, etc.; the project-level BOM controls and monitors the labor time consumption of the overall project quotation and the production of a whole set of products.
[0060] The corresponding management method mainly includes the following steps: creating a company database based on the material data information used by different customers of the company, the database contains the historical data information of all projects of the company, and forms a comprehensive query system after aggregation; matching new projects based on the company database information, aggregating the matching data to form the underlying data, reconfirming the unmatched data, and creating new projects to add to the underlying data structure; forming the initial BOM for cost calculation used in project quotations through project-level BOM solution, the initial BOM is solved to form material and working hour data, and can also be solved into process classification summary data; the solved single-piece BOM is used as the basis for cost control of technical and process guidance production; the solved manufacturing assembly BOM is used for production and assembly, As the basis for controlling assembly costs; the solved process flow structure working time BOM is used to provide a management basis for the working hours of each process; the solved procurement BOM is used for procurement inquiries, price comparisons and procurement of materials; the solved CN change BOM is used to form comparative data on cost changes at different times; the solved transportation tooling and packaging BOM provides data basis for welding tooling and product packaging and transportation; the solved fiberglass foam sleeve cutting BOM forms data basis for product kit processing; the solved project BOM system provides data call capture for the subsidiary BOM to ensure data consistency; when a new project is started, the corresponding underlying data will be imported to form a single and independent project BOM, and quotation work will be carried out based on this BOM, and the corresponding costs and CN update analysis will be monitored and analyzed to achieve the purpose of new project cost control.
[0061] It should be noted that this application can also realize the measurement, tracking and management of the initial material and labor costs of the project, the data integration and synchronous updating of various departments, realize resource sharing and ensure the timeliness and accuracy of data, provide accurate data information for project operations and the ability of various departments to coordinate monitoring.
[0062] To sum up, a special BOM management system for wind turbine nacelle covers in an embodiment of the present invention is based on the mutual cooperation of multiple functional modules, integrates multiple systems and multiple departments, and can be applied to different scenarios such as new project quotation, process guidance, material procurement, material collection management, material management and working time management, etc., to improve the overall functionality of the system, reduce the errors generated in the production management process, provide accurate data standards and management basis for project management, and unify the regulation and control of multiple systems and departments.
[0063] The above specific implementation manner cannot be used as a limitation on the protection scope of the present invention. For those skilled in the art, any substitution, improvement or change made to the implementation manner of the present invention falls within the protection scope of the present invention.
[0064] The matters not described in detail in the present invention are all known technologies to those skilled in the art.
Claims
1. A BOM management system for wind turbine nacelles. It is characterized in that The management system comprises: A database, which is created based on the material data information used by different customers of the company and contains historical data information of all projects of the company; BOM underlying data structure, the BOM underlying data structure matches the new project based on database information, summarizes the matched data, and forms underlying data; the BOM underlying data structure includes a main BOM component, a sub-BOM component, and an ancillary BOM component; A monitoring analyzer is used to make a quotation based on this BOM and monitor and analyze the subsequent costs.
2. A wind turbine nacelle cover dedicated BOM management system according to claim 1, Features: The database is classified according to the characteristics or models of materials and accessories according to unified standards, and the corresponding categories and identification information are set. Then, based on the material data information used by different customers of the company, the materials and accessories used in different projects are summarized and entered into the ERP system.
3. A BOM management system for wind turbine nacelles according to claim 2, Features: The historical data information includes product data information of products in production and product data information of new quotation items.
4. According to claim 1, a BOM management system for wind turbine nacelles, Features: The underlying data includes basic information required for target cost control, and the basic information includes project code, material code, working time data, transport packaging data package, fiber sleeve cutting and foam sleeve cutting data package and accessory data package.
5. According to claim 1, a BOM management system for wind turbine nacelles, Features: The BOM underlying data structure is a bottom-up architecture, which combines the matching data in the database to form the underlying data, and outputs the cost data of each single BOM by calculating the underlying data.
6. A wind turbine nacelle cover dedicated BOM management system according to claim 1, Features: The main BOM components include cost calculation BOM, process unit BOM, manufacturing assembly BOM, labor time BOM and procurement BOM; The sub-BOM components include transport packaging BOM, fiberglass sleeve cutting and foam sleeve cutting BOM and change BOM; The subsidiary BOM components include financial BOM, procurement BOM, project BOM, process BOM, production BOM and quality BOM; The cost calculation BOM is used to intuitively display the project cost; the process unit BOM is used to summarize the manufacturing process, process sequence, materials used and labor costs of a single product in each project; the manufacturing assembly BOM is used to allocate assembly time data for a collection of assembly parts with assembly levels; The work time BOM is used to summarize the data of total project work time, project process work time and assembly level work time; The procurement BOM is used to collect data for procurement materials; The transport packaging BOM is used to summarize the transport packaging solution and the required materials and work time data.
7. A wind turbine nacelle cover dedicated BOM management system according to claim 6, Features: The labor time BOM is divided into process labor time BOM, KIT labor time BOM and project labor time BOM. The process labor time BOM splits the BOM of each product according to the production process, and defines the labor time for each process and each operation activity; the KIT labor time BOM classifies products in different locations according to different functional components to form an assembly KIT, and summarizes the labor time; the project labor time BOM collects the labor time data of the entire set of products according to the production process.
8. A BOM management system for wind turbine nacelles according to claim 6, Features: The cost calculation BOM is divided into finished product BOM, KIT-level BOM and project-level BOM. The finished product BOM collects the materials, accessories and working time data of each single product according to the production process, from material preparation to finished product completion; the KIT level classifies products in different positions according to different functional components to form an assembly KIT, and summarizes the materials, accessories and working time data used for the assembly KIT; the project-level BOM collects the materials, accessories and working time data used for the entire set of products according to the production process.
9. A wind turbine nacelle cover dedicated BOM management system according to claim 1, It is characterized in that Management method of the management system The following steps are involved: S1, creating a company database based on the material data information used by different customers of the company, the database contains the historical data information of all projects of the company, and is aggregated to form a comprehensive query system; S2, based on the company database information, matches the new project, summarizes the matched data to form the underlying data, reconfirms the unmatched data, and creates new projects to add to the underlying data structure; S3, the project-level BOM is solved to form the initial BOM for cost calculation used in the project quotation. The initial BOM is solved to form material and working time data, and can also be solved to process classification summary data; S4, the solved single-piece BOM is used as the basis for cost control in production guidance for technology and process; the solved manufacturing assembly BOM is used for production and assembly, as the basis for controlling assembly costs; The calculated process flow structure working hours BOM is used to provide a management basis for the working hours of each process; the calculated purchase BOM is used for purchase inquiries, price comparisons and purchase of materials; The solved CN change BOM is used to form the comparison data of the change cost at different times; the solved transport tooling and packaging BOM provides the data basis for welding tooling and product packaging and transportation; the solved fiberglass foam sleeve cutting BOM forms the data basis for product sleeve processing; the solved project BOM system provides data call and capture for the subsidiary BOM to ensure data consistency; S5, when a new project is started, the corresponding underlying data is imported to form a single and independent project BOM, and quotation work is carried out based on this BOM, and the corresponding cost and CN update analysis are monitored and analyzed to achieve the purpose of new project cost control.