Secondary equipment cost management system based on LCC cost calculation
By designing a secondary equipment cost management system based on LCC cost calculation, the problem that the existing technology cannot monitor and optimize the entire process of secondary equipment is solved, scientific calculation and optimization of the entire life cycle cost is achieved, and cost control and maintenance flexibility is improved. and timely.
Patent Information
- Application Number
- CN202411156665.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-12-13
AI Technical Summary
The cost management system of the secondary equipment with general LCC cost calculation on the market cannot monitor the entire process of secondary equipment from procurement to decommissioning, and is inconvenient for optimization during cost control.
设计了一种基于LCC成本测算的二次设备成本管理系统,包括数据采集模块、LCC测算模块、成本分析模块、预算管理模块、策略优化模块、安全指数分析模块、维修感知模块和预备模块,通过 These modules realize cost calculating, optimizing and monitoring of the entire life cycle of secondary equipment.
It realizes the scientific and accurate calculation of the entire life cycle cost of secondary equipment, optimizes the full cycle operation process, improves the cost control effect, and improves the flexibility and timeliness of the maintenance plan through safety index analysis and maintenance perception modules.
Smart Images

Figure CN119130509A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cost calculation, and in particular to a secondary equipment cost management system based on LCC cost calculation. Background Art
[0002] Cost is a value category of commodity economy and a component of commodity value. People must consume certain resources to carry out production and operation activities or achieve certain goals. The monetary expression of the consumed resources and their objectification are called costs. With the continuous development of commodity economy, the connotation and extension of the concept of cost are constantly changing and developing. From another perspective, cost can also be the price that must be paid for making a certain choice. When people give up fish and take bear's paw, "fish" is people's cost. When merchants invest, the money they pay is the cost of their investment.
[0003] The general LCC cost calculation secondary equipment cost management system on the market cannot monitor the entire process of secondary equipment from procurement to decommissioning when performing cost calculation, and it is inconvenient to optimize the entire process of secondary equipment from procurement to decommissioning, which is inconvenient for cost control. For this reason, we propose a secondary equipment cost management system based on LCC cost calculation. Summary of the invention
[0004] The object of the present invention is to provide a secondary equipment cost management system based on LCC cost estimation.
[0005] In order to solve the problems raised in the above background technology, the present invention provides the following technical solutions: a secondary equipment cost management system based on LCC cost calculation, the secondary equipment cost management system based on LCC cost calculation includes a data acquisition module, an LCC calculation module, a cost analysis module, a budget management module, a strategy optimization module, a safety index analysis module, a maintenance perception module and a preparation module;
[0006] Data acquisition module, used to collect information of secondary equipment;
[0007] LCC calculation module, which builds LCC calculation model based on the information collected by the data acquisition module;
[0008] Cost analysis module, used to analyze the cost calculated by LCC calculation module in multiple dimensions;
[0009] The budget management module formulates the full-cycle operation process of the secondary equipment according to the cost calculated by the cost analysis module, and monitors the overall operation of the secondary equipment by the staff in real time;
[0010] Strategy optimization module, which optimizes the overall operation process of the staff to perform secondary equipment, thus forming an optimization plan;
[0011] The safety index analysis module can obtain different solutions when analyzing the costs calculated by the LCC calculation module in multiple dimensions, and then convert all the solutions into safety values;
[0012] Maintenance perception module predicts the status change of secondary equipment within a set time period and determines the maintenance time of secondary equipment;
[0013] The preparation module analyzes the time to contact the maintenance personnel in advance to go to the maintenance site.
[0014] As a further solution of the present invention: the data acquisition module can collect relevant cost data of secondary equipment from procurement, installation, operation, maintenance to decommissioning, and can also collect the price, installation cost, operating energy consumption and repair and maintenance cost of the secondary equipment. The data acquisition module has an information input column, and the user enters his or her needs in the information input column, and the data acquisition module will retrieve the user-entered demand information from the Internet.
[0015] As a further solution of the present invention: the LCC calculation module can collect common calculation models, and then optimize the model according to the information of the secondary equipment, so as to obtain an LCC calculation model suitable for the secondary equipment. The LCC calculation model can comprehensively consider the time value factor and accurately calculate the full life cycle budget cost of the secondary equipment, and then transmit the LCC calculation module processed information to the cost analysis module.
[0016] As a further solution of the present invention: the cost analysis module can perform a multi-dimensional analysis on the measurement structure, so as to calculate the budget cost of different secondary equipment, and can also calculate the budget cost of secondary equipment under different usage scenarios, and then compare the obtained multi-dimensional budget costs to check the budget cost differences under different equipment types and different usage scenarios. At the same time, different maintenance plans can be obtained according to different secondary equipment maintenance methods, and then the budget costs of different maintenance plans are calculated, and the information processed by the cost analysis module is transmitted to the budget management module.
[0017] As a further solution of the present invention: the budget management module can formulate a full-cycle operation process according to the budget cost calculated by the LCC calculation model. The full-cycle operation process refers to the entire process from purchase to retirement of secondary equipment. The staff needs to operate according to the full-cycle operation process from purchase to retirement of secondary equipment, and the staff's operations need to be monitored in real time when executing the full-cycle operation process. At the same time, the staff can also urgently adjust the content of the full-cycle operation process to deal with the occurrence of different situations, and then transmit the information processed by the budget management module to the strategy optimization module.
[0018] As a further solution of the present invention: the strategy optimization module can record the full-cycle operation process of the secondary equipment, and then propose an optimization strategy for the recorded full-cycle operation process, thereby forming an optimization plan and calculating the budget cost of the optimization plan, so as to better manage costs, and then transmit the information processed by the strategy optimization module to the safety index analysis module.
[0019] As a further solution of the present invention: the safety index analysis module can receive the full-cycle operation process recorded by the budget management module and the optimization plan proposed by the strategy optimization module, and then analyze the safety index of different maintenance tools in different maintenance plans according to the usage scenario of the secondary equipment, and set the safety index of the problem solved by different maintenance as Q A , assuming the safety rate of different maintenance tools is J A , assuming the safety value of different maintenance tools is G A , let the safety average of different maintenance plans, different full-cycle operation processes and optimized plans be A S ;
[0020] G A =Q A ×J A
[0021]
[0022] According to the above formula, the value of the safety mean can be obtained, and then all the safety means can be sorted to obtain a safety mean table. Then, according to the safety values of different tools and the cost used to solve the problem, the maintenance cost-effectiveness is calculated, and a replacement plan is analyzed for the staff.
[0023] As a further solution of the present invention: the maintenance perception module can obtain the secondary equipment information collected by the data acquisition module, so as to obtain the initial state information, current state information, maintenance state information and retirement state information of the secondary equipment, and then analyze the loss rate of the secondary equipment according to the initial state information, current state information, maintenance state information and retirement state information of the secondary equipment, and set a predicted time period at the same time, and predict the state change of the secondary equipment within the set time period according to the current state information and the loss rate of the secondary equipment; when the state of the secondary equipment reaches the maintenance state within the set time period, the maintenance signal will be transmitted to the preparation module; when the state of the secondary equipment does not reach the maintenance state within the set time period, the maintenance signal will be deleted.
[0024] As a further solution of the present invention: the preparation module is used to collect weather conditions. When the preparation module receives a maintenance signal, it will analyze the time point when the status of the secondary equipment reaches the maintenance state, and then calculate the time when different maintenance personnel need to go to the maintenance site in advance according to the changes in weather conditions, so that the maintenance personnel can arrive at the maintenance site in advance.
[0025] By adopting the above technical solution, compared with the prior art, the beneficial effects of the present invention are:
[0026] 1. The present invention sets the LCC calculation module. When it is necessary to calculate the cost of the full-cycle operation process of the secondary equipment, the LCC calculation module can scientifically and accurately calculate the cost of the full life cycle of the secondary equipment. The setting of the budget management module can understand the full-cycle operation process of the secondary equipment in more detail. The strategy optimization module can optimize and improve the full-cycle operation process of the secondary equipment, thereby forming an optimization plan, which can further reduce the cost of the full-cycle operation process of the secondary equipment next time;
[0027] 2. The present invention can calculate the safety index of different secondary equipment during maintenance through the safety index analysis module. At the same time, there are different maintenance plans for the same equipment. In this case, the safety index analysis module can calculate the safety index of all maintenance plans, so that the staff can know more maintenance plans. When the maintenance personnel are repairing, they can choose different maintenance methods for maintenance, so that the way of receiving fault problems is more flexible;
[0028] 3. The present invention can predict the next maintenance time of the secondary equipment through the maintenance perception module, so as to provide preparation for the maintenance of the secondary equipment in advance and increase the maintenance effect of the secondary equipment. At the same time, the preparation module can calculate the time required for maintenance personnel to go to the maintenance site according to weather and other reasons, so as to enable maintenance personnel to go to the maintenance site in advance, so that the secondary equipment can be repaired more timely. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the overall process in an embodiment of the present invention. DETAILED DESCRIPTION
[0030] The specific embodiments of the present invention will be further described below in conjunction with the accompanying drawings. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.
[0031] In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0032] Please see attached Figure 1The present invention provides a secondary equipment cost management system based on LCC cost calculation, and the secondary equipment cost management system based on LCC cost calculation includes a data acquisition module, an LCC calculation module, a cost analysis module, a budget management module, a strategy optimization module, a safety index analysis module, a maintenance perception module and a preparation module;
[0033] Data acquisition module, used to collect information of secondary equipment;
[0034] LCC calculation module, which builds LCC calculation model based on the information collected by the data acquisition module;
[0035] Cost analysis module, used to analyze the cost calculated by LCC calculation module in multiple dimensions;
[0036] The budget management module formulates the full-cycle operation process of the secondary equipment according to the cost calculated by the cost analysis module, and monitors the overall operation of the secondary equipment by the staff in real time;
[0037] Strategy optimization module, which optimizes the overall operation process of the staff to perform secondary equipment, thus forming an optimization plan;
[0038] The safety index analysis module can obtain different solutions when analyzing the costs calculated by the LCC calculation module in multiple dimensions, and then convert all the solutions into safety values;
[0039] Maintenance perception module predicts the status change of secondary equipment within a set time period and determines the maintenance time of secondary equipment;
[0040] The preparation module analyzes the time to contact the maintenance personnel in advance to go to the maintenance site.
[0041] In one embodiment of the present invention: the data acquisition module can collect relevant cost data of secondary equipment from procurement, installation, operation, maintenance to decommissioning, and can also collect the price, installation cost, operating energy consumption and repair and maintenance cost of the secondary equipment, and the data acquisition module has an information input column. The user enters his or her needs in the information input column, and the data acquisition module will retrieve the user-entered demand information from the Internet.
[0042] In one embodiment of the present invention: the LCC calculation module can collect common calculation models, and then optimize the model according to the information of the secondary equipment, so as to obtain an LCC calculation model suitable for the secondary equipment. The LCC calculation model can comprehensively consider the time value factor and accurately calculate the full life cycle budget cost of the secondary equipment, and then transmit the processed information of the LCC calculation module to the cost analysis module.
[0043] In one embodiment of the present invention: the cost analysis module can perform a multi-dimensional analysis on the measurement structure, so as to calculate the budget cost of different secondary equipment, and can also calculate the budget cost of secondary equipment under different usage scenarios, and then compare the obtained multi-dimensional budget costs to view the budget cost differences under different equipment types and different usage scenarios. At the same time, different maintenance plans can be obtained according to different secondary equipment maintenance methods, and then the budget costs of different maintenance plans are calculated, and the information processed by the cost analysis module is transmitted to the budget management module.
[0044] In one embodiment of the present invention: the budget management module can formulate a full-cycle operation process according to the budget cost calculated by the LCC calculation model. The full-cycle operation process refers to the entire process from purchase to retirement of secondary equipment. The staff needs to operate according to the full-cycle operation process in the operation from purchase to retirement of secondary equipment, and the staff's operations need to be monitored in real time when executing the full-cycle operation process. At the same time, the staff can also urgently adjust the content of the full-cycle operation process to deal with the occurrence of different situations, and then transmit the information processed by the budget management module to the strategy optimization module.
[0045] In one embodiment of the present invention: the strategy optimization module can record the full-cycle operation process of the secondary equipment, and then propose an optimization strategy for the recorded full-cycle operation process, thereby forming an optimization plan and calculating the budget cost of the optimization plan to better manage costs, and then transmit the information processed by the strategy optimization module to the safety index analysis module.
[0046] In one embodiment of the present invention, the safety index analysis module can receive the full-cycle operation process recorded by the budget management module and the optimization plan proposed by the strategy optimization module, and then analyze the safety index of different maintenance tools in different maintenance plans according to the usage scenario of the secondary equipment. The safety index of the problem solved by different maintenance is Q A , assuming the safety rate of different maintenance tools is J A , assuming the safety value of different maintenance tools is G A , let the safety average of different maintenance plans, different full-cycle operation processes and optimized plans be A S ;
[0047] G A =Q A ×J A
[0048]
[0049] According to the above formula, the value of the safety mean can be obtained, and then all the safety means can be sorted to obtain a safety mean table. Then, according to the safety values of different tools and the cost used to solve the problem, the maintenance cost-effectiveness is calculated, and a replacement plan is analyzed for the staff.
[0050] In one embodiment of the present invention: the maintenance perception module can obtain the secondary equipment information collected by the data acquisition module, so as to obtain the initial state information, current state information, maintenance state information and retirement state information of the secondary equipment, and then analyze the loss rate of the secondary equipment according to the initial state information, current state information, maintenance state information and retirement state information of the secondary equipment, and set a predicted time period at the same time, and predict the state change of the secondary equipment within the set time period according to the current state information and the loss rate of the secondary equipment. When the state of the secondary equipment reaches the maintenance state within the set time period, the maintenance signal will be transmitted to the preparation module. When the state of the secondary equipment does not reach the maintenance state within the set time period, the maintenance signal will be deleted.
[0051] In one embodiment of the present invention: the preparation module is used to collect weather conditions. When the preparation module receives a maintenance signal, it will analyze the time point when the status of the secondary equipment reaches the maintenance state, and then calculate the time when different maintenance personnel need to go to the maintenance location in advance according to the changes in weather conditions, so that the maintenance personnel can arrive at the maintenance location in advance.
[0052] Example 1, please refer to the attached Figure 1 The data collection module can collect all the required data through various means to meet the needs of cost estimation. When collecting data, it can give priority to collecting data from nationally certified websites to improve the authenticity of the data. When calculating costs, some factors that cause cost changes can be added to improve the accuracy of cost estimation.
[0053] Example 2, please refer to the attached Figure 1 The budget management module can monitor the entire process of secondary equipment from purchase to retirement in real time, so as to facilitate the management of secondary equipment when needed and better control the costs generated in the full cycle operation process of secondary equipment.
[0054] Example 3, please refer to the attached Figure 1When the maintenance perception module predicts the time of the next maintenance, the staff can directly input the maintenance time of the secondary equipment into the maintenance perception module. At this time, the maintenance perception module no longer needs to calculate the next maintenance time. At the same time, the maintenance time set by the staff will not cover the predicted maintenance time. When the maintenance time set by the staff is after the predicted maintenance time, the predicted maintenance time can send information reminders to the staff. At the same time, the staff can input other factors that affect the time it takes for the maintenance personnel to go to the maintenance location into the preparation module, so that the time consumed by the maintenance personnel to go to the maintenance location can be analyzed more accurately.
[0055] Specifically, through the setting of the LCC calculation module, when it is necessary to calculate the cost of the full cycle operation process of secondary equipment, the LCC calculation module can scientifically and accurately calculate the cost of the full life cycle of secondary equipment. Through the setting of the budget management module, the full cycle operation process of secondary equipment can be understood in more detail. The strategy optimization module can optimize and improve the full cycle operation process of secondary equipment, thereby forming an optimization plan, which can further reduce the cost of the next full cycle operation process of secondary equipment.
[0056] Specifically, the safety index analysis module can calculate the safety index of different secondary equipment during maintenance. At the same time, there are different maintenance plans for the same equipment. At this time, the safety index analysis module can calculate the safety index of all maintenance plans, so that the staff can understand more maintenance plans and can choose different maintenance methods when maintenance personnel are repairing, making the way of receiving fault problems more flexible.
[0057] Specifically, the maintenance perception module can predict the next maintenance time of the secondary equipment, so that preparation can be made for the maintenance of the secondary equipment in advance, increasing the effect of the maintenance of the secondary equipment. At the same time, the preparation module can calculate the time required for maintenance personnel to go to the maintenance site based on weather and other reasons, so that maintenance personnel can go to the maintenance site in advance, so that the secondary equipment can be repaired more timely.
[0058] Working principle:
[0059] First, obtain the relevant cost data of the full-cycle operation process of the secondary equipment, then establish a scientific and accurate LCC calculation model, and accurately calculate the full life cycle cost of the secondary equipment, then conduct a multi-dimensional analysis of the calculation results, and then analyze different maintenance plans for different secondary equipment and different problems, and then analyze the costs of different maintenance plans, and be able to monitor the full-cycle operation process of the secondary equipment, so that the full-cycle operation process of the secondary equipment can be managed more conveniently. When the staff executes the full-cycle operation process of the secondary equipment, they can urgently adjust the content of the full-cycle operation process of the secondary equipment. Finally, optimize the full-cycle operation process of the secondary equipment and obtain an optimization plan, so as to facilitate cost control, and then analyze the safety index of different maintenance plans, and obtain the safety index values of different plans. When the secondary equipment is in use, it can predict the time when the secondary equipment needs to be repaired next time, so that it can prepare for the maintenance of the secondary equipment in advance, and can calculate the time for different maintenance personnel to go to the maintenance place, so that the maintenance personnel can go to the maintenance place in advance, so as to repair the secondary equipment in time, and the whole workflow ends here.
[0060] At the same time, the present application uses specific words to describe the embodiments of the present application. For example, "one embodiment", "an embodiment", and / or "some embodiments" refer to a certain feature, structure or characteristic related to at least one embodiment of the present application. Therefore, it should be emphasized and noted that "one embodiment" or "an embodiment" or "an alternative embodiment" mentioned twice or more in different positions in this specification does not necessarily refer to the same embodiment. In addition, certain features, structures or characteristics in one or more embodiments of the present application can be appropriately combined.
[0061] Some aspects of the present application may be performed entirely by hardware, entirely by software (including firmware, resident software, microcode, etc.), or by a combination of hardware and software. The above hardware or software may be referred to as "data blocks", "modules", "engines", "units", "components" or "systems". The processor may be one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DAPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors, or combinations thereof. In addition, various aspects of the present application may be expressed as computer products located in one or more computer-readable media, which include computer-readable program codes. For example, computer-readable media may include, but are not limited to, magnetic storage devices (e.g., hard disks, floppy disks, tapes ...), optical disks (e.g., compact disks CDs, digital versatile disks DVDs ...), smart cards, and flash memory devices (e.g., cards, sticks, key drives ...).
[0062] A computer-readable medium may include a propagated data signal containing computer program code, such as in baseband or as part of a carrier wave. The propagated signal may have a variety of manifestations, including electromagnetic, optical, etc., or a suitable combination. A computer-readable medium may be any computer-readable medium other than a computer-readable storage medium, which may be connected to an instruction execution system, device or apparatus to communicate, propagate or transmit a program for use. The program code on the computer-readable medium may be propagated through any suitable medium, including radio, cable, fiber optic cable, radio frequency signal, or similar medium, or a combination of any of the above mediums.
[0063] Similarly, it should be noted that in order to simplify the description disclosed in this application, so as to help understand one or more embodiments of the invention, in the above description of the embodiments of the present application, sometimes multiple features are merged into one embodiment, drawings or descriptions thereof. However, this disclosure method does not mean that the features required by the object of the present application are more than the features mentioned in the claims. In fact, the features of the embodiment are less than all the features of the single embodiment disclosed above. In some embodiments, numbers describing the number of components and attributes are used. It should be understood that such numbers used in the description of the embodiments are modified by the modifiers "approximately", "approximately" or "substantially" in some examples. Unless otherwise specified, "approximately", "approximately" or "substantially" indicate that the number allows a variation of ±20%. Accordingly, in some embodiments, the numerical parameters used in the specification and claims are approximate values, which may change according to the characteristics required by individual embodiments. In some embodiments, the numerical parameters should take into account the specified significant digits and adopt the general method of retaining the digits. Although the numerical domains and parameters used to confirm the breadth of their range in some embodiments of the present application are approximate values, in specific embodiments, such numerical settings are as accurate as possible within the feasible range.
[0064] Although the present invention is disclosed as above in terms of preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art may make possible changes and modifications without departing from the spirit and scope of the present invention. Therefore, any modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the scope of protection defined by the claims of the present invention.
Claims
1. A secondary equipment cost management system based on LCC cost calculation, characterized by: The secondary equipment cost management system for LCC cost calculation includes a data acquisition module, an LCC calculation module, a cost analysis module, a budget management module, a strategy optimization module, a safety index analysis module, a maintenance perception module and a preparation module; Data acquisition module, used to collect information of secondary equipment; LCC calculation module, which builds LCC calculation model based on the information collected by the data acquisition module; Cost analysis module, used to analyze the cost calculated by LCC calculation module in multiple dimensions; The budget management module formulates the full-cycle operation process of the secondary equipment according to the cost calculated by the cost analysis module, and monitors the overall operation of the secondary equipment by the staff in real time; Strategy optimization module, which optimizes the overall operation process of the staff to perform secondary equipment, thus forming an optimization plan; The safety index analysis module can obtain different solutions when analyzing the costs calculated by the LCC calculation module in multiple dimensions, and then convert all the solutions into safety values; Maintenance perception module predicts the status change of secondary equipment within a set time period and determines the maintenance time of secondary equipment; The preparation module analyzes the time to contact the maintenance personnel in advance to go to the maintenance site.
2. According to claim 1, a secondary equipment cost management system based on LCC cost calculation is characterized in that: The data collection module can collect relevant cost data of secondary equipment from procurement, installation, operation, maintenance to decommissioning, and can also collect the price, installation cost, operating energy consumption and repair and maintenance cost of secondary equipment. The data collection module has an information input column. Users type their needs in the information input column, and the data collection module will retrieve the user-entered demand information from the Internet.
3. The secondary equipment cost management system based on LCC cost calculation according to claim 1 is characterized in that: The LCC calculation module can collect common calculation models, and then optimize the model according to the information of the secondary equipment, so as to obtain an LCC calculation model suitable for the secondary equipment. The LCC calculation model can comprehensively consider the time value factor and accurately calculate the full life cycle budget cost of the secondary equipment. Then, the information processed by the LCC calculation module is transmitted to the cost analysis module.
4. The secondary equipment cost management system based on LCC cost calculation according to claim 3 is characterized by: The cost analysis module can perform multi-dimensional analysis on the calculation results, so as to calculate the budget cost of different secondary equipment, and can also calculate the budget cost of secondary equipment under different usage scenarios, and then compare the obtained multi-dimensional budget costs to check the budget cost differences under different equipment types and different usage scenarios. At the same time, different maintenance plans can be obtained according to different secondary equipment maintenance methods, and then the budget costs of different maintenance plans can be calculated, and the information processed by the cost analysis module can be transmitted to the budget management module.
5. The secondary equipment cost management system based on LCC cost calculation according to claim 4 is characterized in that: The budget management module can formulate a full-cycle operation process based on the budget cost calculated by the LCC calculation model. The full-cycle operation process refers to the entire process from purchase to retirement of secondary equipment. Staff members need to follow the full-cycle operation process in the operation from purchase to retirement of secondary equipment, and staff members need to monitor their operations in real time when executing the full-cycle operation process. At the same time, staff members can also urgently adjust the content of the full-cycle operation process to deal with different situations, and then transmit the information processed by the budget management module to the strategy optimization module.
6. The secondary equipment cost management system based on LCC cost calculation according to claim 5 is characterized by: The strategy optimization module can record the full-cycle operation process of the secondary equipment, and then propose an optimization strategy for the recorded full-cycle operation process, thereby forming an optimization plan and calculating the budget cost of the optimization plan to better control costs. The information processed by the strategy optimization module is then transmitted to the safety index analysis module.
7. The secondary equipment cost management system based on LCC cost calculation according to claim 6 is characterized by: The safety index analysis module can receive the full-cycle operation process recorded by the budget management module and the optimization plan proposed by the strategy optimization module, and then analyze the safety index of different maintenance tools in different maintenance plans according to the usage scenarios of the secondary equipment. The safety index of the problem solved by different maintenance is Q A , assuming the safety rate of different maintenance tools is J A , assuming the safety value of different maintenance tools is G A , let the safety average of different maintenance plans, different full-cycle operation processes and optimized plans be A S ; G A =Q A ×J A According to the above formula, the value of the safety mean can be obtained, and then all the safety means can be sorted to obtain a safety mean table. Then, according to the safety values of different tools and the cost used to solve the problem, the maintenance cost-effectiveness is calculated, and a replacement plan is analyzed for the staff.
8. The secondary equipment cost management system based on LCC cost calculation according to claim 1 is characterized by: The maintenance perception module can obtain the secondary equipment information collected by the data acquisition module, so as to obtain the initial state information, current state information, maintenance state information and retirement state information of the secondary equipment, and then analyze the loss rate of the secondary equipment according to the initial state information, current state information, maintenance state information and retirement state information of the secondary equipment, and set a predicted time period at the same time, and predict the state change of the secondary equipment within the set time period according to the current state information and loss rate of the secondary equipment. When the state of the secondary equipment reaches the maintenance state within the set time period, the maintenance signal will be transmitted to the preparation module. When the state of the secondary equipment does not reach the maintenance state within the set time period, the maintenance signal will be deleted.
9. The secondary equipment cost management system based on LCC cost calculation according to claim 8 is characterized in that: The preparation module is used to collect weather conditions. When the preparation module receives a maintenance signal, it will analyze the time point when the status of the secondary equipment reaches the maintenance state, and then calculate the time when different maintenance personnel need to go to the maintenance site in advance according to changes in weather conditions, so that the maintenance personnel can arrive at the maintenance site in advance.