Wind power blade segmented web bonding butt joint position control tool and use method
By designing the wind power blade segmented web bonding and docking position control tooling, the web position is accurately controlled by using clamping and guiding structures, the problem of insufficient bonding accuracy is solved, efficiency and quality are improved, and costs and risks are reduced.
Patent Information
- Application Number
- CN202411312819.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-12-17
AI Technical Summary
The control accuracy of the bonding and docking position of the wind power blade segmented web is insufficient, resulting in long forming time, high production cost and high quality risks.
Design a wind power blade segmented web bonding and docking position control tool, including a first clamping tool and a second clamping tool, and ensures between the root web and the pointed web by the cooperation of the clamping mechanism and the guide groove. The angle and relative position are precisely controlled to form a guide structure perpendicular to the length of the blade.
It significantly improves the bonding efficiency, reduces the amount of adhesive and production costs, ensures the bonding quality, reduces the risk of cracking in the docking position of segmented webs during blade operation, and improves the operating stability of the blade.
Smart Images

Figure CN119141890A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of non-metal composite material processing and forming, and in particular to a wind turbine blade segmented web bonding and docking position control tool and a use method thereof. Background Art
[0002] With the development of larger blades, the length of blade webs is getting longer and longer, and the area of web molds in the workshop is getting larger and larger. In order to reduce the use area of the web workshop, the industry usually divides the webs into sections at about 60m, and the root tip webs are made separately. In this way, the root tip web molds can be arranged reasonably, greatly reducing the area occupied by the web mold workshop. At the same time, the height of the tip web is smaller, and a simple press-down tooling can be used instead of the overall press-down tooling to save tooling costs.
[0003] The current control scheme for segmented web bonding in the industry is:
[0004] 1) After making the apical section webs respectively, see Figure 1 , apply adhesive to the PS surface beam area of the main shell half according to the process requirements, use the integral pressing tool to lift the root web, move it to the root position of the PS surface of the main shell half, and install the integral pressing tool on the base at the corresponding position of the main mold and then fix it and press it down, so that the root web is bonded to the beam area with adhesive to complete the bonding of the root web.
[0005] 2) See Figure 2 , use the lifting beam to lift the tip web and move it to the tip of the PS surface of the main shell half, manually adjust the root of the tip web to align with the tip of the root web, and gradually drop it until the tip web completely falls on the adhesive to complete the docking of the tip web and the root web. Figure 4 Finally, after removing the lifting beam, install the simple pressing tool for the tip web from the root to the tip to complete the tip web bonding. When the lifting beam lifts the tip web, there is an angle between the tip web and the root web. In order to ensure that the tip web can be bonded smoothly, this angle is offset upward from the tip side of the tip web. Figure 3 This angle will cause the tip web to fall down and after bonding is completed, there will be a butt gap H between its root side and the tip side of the root web, see Figure 5The process requirement for the butt gap H is ≤10mm. In actual production, the butt gap H is often 20-30mm, which exceeds the standard requirement. If it is adjusted, it is necessary to use a lifting beam to lift the tip web again and re-apply adhesive for bonding. Moreover, it cannot be completely guaranteed that the butt gap H is adjusted to a qualified level in one go, which greatly affects the molding time. The cost will also increase with the increase in adhesive usage. Therefore, some manufacturers make concessions on the problem of out-of-tolerance butt gap H and do not make adjustments. If the butt gap H is too large, it will affect the stiffness transmission of the web at the butt joint position, which may cause cracks in the butt joint position of the segmented web during subsequent blade operation. In severe cases, it may cause blade damage and breakage, which has a greater impact.
[0006] Therefore, the existing technology suffers from insufficient control accuracy in the bonding position of the segmented webs of wind turbine blades, angle and position deviations during the bonding process of the tip webs, resulting in problems such as out-of-tolerance joints and increased use of adhesive, which greatly affects the molding time, increases production costs, and even causes cracks in the bonding position of the segmented webs during blade operation. Summary of the invention
[0007] In view of this, the present invention aims to propose a wind turbine blade segmented web bonding docking position control tooling and a method of use, so as to solve the problem of insufficient docking position control accuracy during bonding of wind turbine blade segmented webs in the prior art, resulting in long molding time, high production cost and high quality risk.
[0008] The technical solution of the present invention is implemented as follows: a wind turbine blade segmented web bonding and docking position control tool, used to control the angle and relative position between the root web and the tip web, including a first clamping tool and a second clamping tool, one of which is fixed on the root web and the other is fixed on the tip web. During the bonding process of the root web and the tip web, the first clamping tool cooperates with the second clamping tool to form a guide structure perpendicular to the length direction of the blade.
[0009] Furthermore, the first clamping tool includes the first bracket, the first clamping mechanism and the guide groove, the first clamping mechanism and the guide groove are arranged on the first bracket, the first clamping mechanism is used to fix the first clamping tool on the root web, and the guide groove is used to cooperate with the second clamping tool to form a guiding structure perpendicular to the length direction of the blade.
[0010] Furthermore, the first bracket includes a first branch pipe, a second branch pipe and a first transverse pipe, the first branch pipe and the second branch pipe are arranged in parallel, and one end of the first branch pipe and the second branch pipe are connected via the first transverse pipe.
[0011] Furthermore, the first clamping mechanism includes a fixed end, a movable end and at least two clamping pads, the fixed end and the movable end are coaxially arranged, and the clamping pads are arranged at the ends of the fixed end and the movable end to increase the friction between the first clamping mechanism and the root web.
[0012] Furthermore, the first threaded hole is provided on the first branch pipe, one end of the movable end passes through the first threaded hole and is connected to the clamping pad, the tightening block is provided on the end of the movable end away from the clamping pad, the fixed end is provided on the second branch pipe, and the end of the fixed end away from the second branch pipe is connected to the clamping pad.
[0013] Furthermore, the guide groove is arranged in parallel with the first branch pipe, and the guide groove and the first branch pipe are connected at point J via a first connecting rod, and the vertical distance from point J to the first transverse pipe is not greater than half the length of the first branch pipe.
[0014] Furthermore, the second clamping tool includes the second bracket, the second clamping mechanism and the guide rod, the second clamping mechanism and the guide rod are arranged on the second bracket, the second clamping mechanism is used to fix the second clamping tool on the tip belly plate, and the guide rod is used to cooperate with the guide groove to form a guide structure perpendicular to the length direction of the blade.
[0015] Furthermore, the second bracket includes the third branch pipe, the fourth branch pipe and the second transverse pipe, the third branch pipe and the fourth branch pipe are arranged in parallel, and one end of the third branch pipe and the fourth branch pipe are connected via the second transverse pipe.
[0016] Furthermore, the guide rod is arranged in parallel with the third branch pipe, and the guide rod and the third branch pipe are respectively connected at point N via a second connecting rod, and the vertical distance from point N to the second transverse pipe is not greater than half the length of the third branch pipe.
[0017] A method for using a wind turbine blade segmented web bonding and docking position control tooling is based on any of the above-mentioned wind turbine blade segmented web bonding and docking position control tooling, and includes the following specific steps:
[0018] S1: preparing a web; performing layer laying, pouring and curing, and demoulding according to a segmented web process to obtain the root web and the tip web;
[0019] S2: Apply adhesive; apply adhesive to the PS surface beam area of the main shell half according to the process requirements;
[0020] S3: Install the root web; use an integrated pressing tool to lift the root web, move it to the root position of the PS surface of the main shell half, install the integrated pressing tool on the mold base at the corresponding position of the main mold and fix it to press down, so that the root web is bonded to the beam area by adhesive;
[0021] S4: Fix the installation tool; the opening of the first clamping tool is moved downward, so that the first branch pipe and the second branch pipe are respectively located on both sides of the root web, the guide groove is adjacent to the position of the tip web, and the first clamping mechanism is tightened; the second clamping tool is fixedly installed on the tip web, and the guide rod is adjacent to the intersection of the tip web and the root web;
[0022] S5: docking; use a lifting beam to lift the tip web and move it to the tip of the PS surface of the main shell half, slowly drop it and adjust the guide rod of the second clamping tool to insert it into the guide groove of the first clamping tool, and then continue to drop it until the tip web is placed on the adhesive, completing the docking of the tip web and the root web;
[0023] S6: bonding the tip web; after removing the hanging beam, according to the process requirements, a simple pressing tool for the tip web is installed from the root to the tip to complete the bonding of the tip web;
[0024] S7: mold closing and curing: after hand lay-up reinforcement, heating and curing, and mold closing and curing according to the process requirements, a segmented web blade with a butt gap H≤10mm can be obtained.
[0025] Compared with the prior art, the wind turbine blade segmented web bonding and docking position control tooling and use method of the present invention have the following advantages:
[0026] 1. The present invention can significantly improve the bonding efficiency of the segmented webs of wind turbine blades through precise clamping and guiding designs, reduce time wasted due to repeated position adjustments, effectively shorten blade molding time, reduce adhesive usage, and reduce production costs.
[0027] 2. The present invention controls the angle and position of the tip web during the falling bonding process through tooling, thereby ensuring the stability and accuracy of the web during the bonding process, eliminating the problem of excessive gap in the butt joint when bonding the segmented webs of the wind turbine blade, effectively improving the bonding quality, and reducing the risk of cracking at the butt joint of the segmented webs during the operation of the blades, thereby improving the quality of the blades and improving the stability of the blade operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0029] Figure 1 It is a schematic diagram of root web bonding in the prior art;
[0030] Figure 2 This is a schematic diagram of the pre-bonding of the tip web hoisting in the prior art;
[0031] Figure 3 It is a partial detail enlarged diagram of the schematic diagram of the tip web hoisting and bonding in the prior art;
[0032] Figure 4 It is a schematic diagram of the bonding of the tip web in the prior art;
[0033] Figure 5 It is a partial detail enlarged diagram of the tip web bonding schematic diagram of the prior art;
[0034] Figure 6 It is a left side view of the first clamping tool of the present invention;
[0035] Figure 7 This is a front view of the first clamping tool of the present invention;
[0036] Figure 8 It is a left side view of the second clamping tool of the present invention;
[0037] Fig. 9 This is a front view of the second clamping tool of the present invention;
[0038] Fig.10 This is a schematic diagram of the pre-bonding of the tip web hoisting of the present invention;
[0039] Fig.11 It is a partial detail enlarged diagram of the schematic diagram of the pre-bonding of the tip web hoisting of the present invention;
[0040] Fig.12 This is a schematic diagram of the tip web bonding of the present invention;
[0041] Fig.13 It is a partial detail enlarged view of the schematic diagram of the bonding of the tip web of the present invention;
[0042] Fig.14 It is a schematic diagram of the AA section of the present invention;
[0043] Fig.15 It is a schematic diagram of the BB section of the present invention;
[0044] Fig.16 This is a schematic diagram of the overall structure of Embodiment 2 of the present invention;
[0045] Fig.17 This is a schematic diagram of the first clamping tool of Example 2 of the present invention;
[0046] Fig.18 This is a schematic diagram of a second clamping tool according to Embodiment 2 of the present invention;
[0047] Fig.19 It is a schematic diagram of the positioning lines of the first clamping tool and the second clamping tool of the present invention.
[0048] Description of reference numerals:
[0049] 1. Root web; 2. Tip web; 3. First clamping fixture; 4. First bracket; 401. First branch pipe; 402. Second branch pipe; 403. First transverse pipe; 404. First threaded hole; 5. First clamping mechanism; 501. Fixed end; 502. Moving end; 5021. Tightening block; 503. Clamping pad; 6. Guide groove; 7. Connecting rod; 8. Second bracket; 801. Third branch pipe; 802. Fourth branch pipe; 803. Second transverse pipe; 9. Second clamping mechanism; 10. Guide rod; 11. Second clamping fixture; 12. Integral pressing fixture; 13. Hanging beam; 15. Adhesive; 16. Beam area; 17. Guide limit block; 18. Height limit rod; 19. Support screw; 20. Second connecting rod. DETAILED DESCRIPTION
[0050] In order to make the technical means, objectives and effects of the present invention easy to understand, the embodiments of the present invention are described in detail below with reference to specific drawings.
[0051] It should be noted that all the terms used in the present invention to indicate directionality and position, such as "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "inside", "outside", "top", "lower", "lateral", "longitudinal", "center", etc., are only used to explain the relative positional relationship and connection status between the components in a certain state, and are only for the convenience of describing the present invention, rather than requiring the present invention to be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes, and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features.
[0052] In the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0053] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0054] The present invention discloses a wind turbine blade segmented web bonding and docking position control tool, which is used to control the angle and relative position between a root web 1 and a tip web 2, and comprises a first clamping tool 3 and a second clamping tool 11. The first clamping tool 3 is fixed on the root web 1, and the second clamping tool 11 is fixed on the tip web 2. During the bonding process of the root web 1 and the tip web 2, the first clamping tool 3 cooperates with the second clamping tool 11 to form a guiding structure perpendicular to the length direction of the blade.
[0055] The present invention fixes the first clamping tool 3 and the second clamping tool 11 on the root web 1 and the tip web 2 respectively, and through precise fixture design, it can ensure that the position of the webs before bonding is accurate; during the bonding process, the first clamping tool 3 and the second clamping tool 11 cooperate to form a guiding structure perpendicular to the length direction of the blade, and this structure can ensure that the webs continue along the predetermined direction perpendicular to the length direction of the blade when docking, effectively preventing the webs from deflecting and tilting during the bonding process.
[0056] Through precise clamping and guiding design, this setting can significantly improve the bonding efficiency of the segmented webs of wind turbine blades, reduce the time wasted due to repeated position adjustment, effectively shorten the blade molding time, reduce the amount of adhesive 15, and reduce production costs; at the same time, it ensures the stability and accuracy of the webs during the bonding process, effectively improves the bonding quality, and thus improves the quality of the blades.
[0057] Specifically, the second clamping tool 11 can also be fixed on the root web 1 , and the first clamping tool 3 can be fixed on the tip web 2 .
[0058] This setting can facilitate the use and installation of tooling and improve convenience.
[0059] Specifically, the first clamping tool 3 includes a first bracket 4, a first clamping mechanism 5 and a guide groove 6. The first clamping mechanism 5 and the guide groove 6 are arranged on the first bracket 4. The first clamping mechanism 5 is used to fix the first clamping tool 3 on the root web 1, and the guide groove 6 is used to cooperate with the second clamping tool 11 to form a guiding structure perpendicular to the length direction of the blade.
[0060] The first clamping tool 3 includes three parts: a first bracket 4, a first clamping mechanism 5 and a guide groove 6. The first bracket 4 provides sufficient strength and rigidity to support and fix the first clamping mechanism 5 and the guide groove 6, ensuring that they will not be displaced or deformed during operation; the first clamping mechanism 5 can provide high-precision positioning to ensure that the relative position of the first clamping tool 3 and the root web 1 remains unchanged; the guide groove 6 is affected by the force caused by the position change of the tip web 2 during the bonding and falling process, and the guide groove 6 transfers the impact force to the first clamping mechanism 5 through the first bracket 4, and then transfers it to the root web 1 through the first clamping mechanism 5 to ensure the relative position relationship between the root web 1 and the tip web 2.
[0061] The overall structure of the first clamping tool 3 is simple and efficient, with high precision, which can effectively improve the bonding efficiency and quality and reduce labor costs and operating difficulties.
[0062] Specifically, the first bracket 4 includes a first branch pipe 401 , a second branch pipe 402 and a first transverse pipe 403 . The first branch pipe 401 and the second branch pipe 402 are arranged in parallel. One end of the first branch pipe 401 and the second branch pipe 402 are connected via the first transverse pipe 403 .
[0063] The first bracket 4 includes a first branch pipe 401, a second branch pipe 402 and a first transverse pipe 403, which are connected as a whole, so that the first bracket 4 has a certain flexibility and can be adjusted and optimized according to wind turbine blades of different specifications and sizes to adapt to a variety of different production needs and application scenarios.
[0064] The structure of the arrangement is simple, and the first clamping mechanism 5 can be easily installed and fixed to adapt to wind turbine blades of different specifications and sizes. The arrangement is also easy to process and has low production costs.
[0065] Preferably, two first transverse tubes 403 are provided. This arrangement can improve the structural rigidity of the first bracket 4.
[0066] Specifically, a height limiting rod 18 is provided at the lower end of the first transverse tube 403 to ensure the relative position of the first clamping tool 3 and the root web 1 in a direction perpendicular to the blade length. The height limiting rod 18 is convenient for the operator to use, and can quickly determine the position of the first clamping tool 3, thereby improving the tool installation efficiency.
[0067] Specifically, the first clamping mechanism 5 includes a fixed end 501, a movable end 502 and a plurality of clamping pads 503. The fixed end 501 and the movable end 502 are coaxially arranged. The clamping pads 503 are arranged at the ends of the fixed end 501 and the movable end 502 to increase the friction between the first clamping mechanism 5 and the root web 1.
[0068] The fixed end 501 serves as the basic part of the clamping mechanism and is fixed on the first bracket 4. The movable end 502 is arranged on the other side of the first bracket 4. The fixed end 501 and the movable end 502 are coaxial, which can ensure that the applied preload force is located on the same axis, thereby avoiding deformation of the root web 1 caused by unbalanced force; the clamping pad 503 can increase the friction between the first clamping mechanism 5 and the root web 1, thereby avoiding displacement or falling off during the bonding process.
[0069] The first clamping mechanism 5 is arranged with high stability, ensuring that the relative position relationship between the first clamping tool 3 and the root web 1 does not change; it can adapt to root webs 1 of different shapes, sizes and materials, improving the versatility and flexibility of the tool; it has a simple structure, is easy to maintain and replace, and has high device reliability.
[0070] Preferably, the fixed end 501 and the movable end 502 are rod-shaped structures, and the movable end 502 is provided with threads on the outside.
[0071] The fixed end 501 and the movable end 502 are arranged as rod-shaped structures, so that the fixed end 501 and the movable end 502 can be processed conveniently and quickly, and the production cost is low.
[0072] Preferably, the first clamping mechanism 5 can be a hydraulic or pneumatic device for clamping the web.
[0073] This setting can improve the automation level of the device, reduce the moving distance of manual operation, and improve work efficiency.
[0074] Preferably, a grid or pattern is provided on the contact surface between the clamping pad 503 and the web.
[0075] This arrangement helps to increase the roughness between the clamping pad 503 and the web, better withstand impact force, and improve the overall stability and reliability of the device.
[0076] Specifically, a first threaded hole 404 is provided on the first branch pipe 401, one end of the movable end 502 passes through the first threaded hole 404 and is connected to the clamping pad 503, a tightening block 5021 is provided at the end of the movable end 502 away from the clamping pad 503, and the fixed end 501 is provided on the second branch pipe 402, and the end of the fixed end 501 away from the second branch pipe 402 is connected to the clamping pad 503.
[0077] One end of the movable end 502 passes through the first threaded hole 404 and is connected to the clamping pad 503, so that the movable end 502 can rotate freely in the threaded hole and move axially, and the fixed end 501 is arranged on the second branch pipe 402, and the movable end 502 and the fixed end 501 are on the same axis. By adjusting the movable end 502, the first clamping mechanism 5 can adapt to root webs 1 of different specifications and sizes; the tightening block 5021 facilitates the user to rotate the movable end 502, thereby adjusting its position in the first threaded hole 404, thereby realizing the relative position adjustment between the clamping pad 503 and the first branch pipe 401; at the same time, the clamping force and stability of the clamping pad 503 on the target object are adjusted.
[0078] This setting can adapt to target objects of different sizes and shapes, improve the flexibility and adaptability of use, have high stability and reliability, and prevent it from loosening or falling off during use; the entire structure is compactly designed and occupies little space, which is convenient for connection and fixation in a limited space; the threaded connection used is relatively simple to install and disassemble, and does not require a complicated assembly process.
[0079] Specifically, the guide groove 6 is arranged in parallel with the first branch pipe 401 , and the guide groove 6 and the first branch pipe 401 are connected via the first connecting rod 7 .
[0080] The guide groove 6 is connected to the first branch pipe 401 through the first connecting rod 7, which helps to transfer the load to the first branch pipe 401 and provide support for the guide groove 6 to prevent the guide groove 6 from deflecting when impacted by the load, and unable to maintain a suitable position and angle, affecting the formation of a guide structure with the second clamping tool 11.
[0081] This arrangement improves the structural stability and reliability, can ensure the formation of the guide structure, increase the construction speed of the segmented web bonding, and reduce the construction difficulty and cost.
[0082] Preferably, one first connecting rod 7 is provided, and the first connecting rod 7 is connected to the first branch pipe 401 at point J.
[0083] Preferably, two first connecting rods 7 are arranged in parallel, and the first connecting rods 7 of adjacent first transverse tubes 403 are connected to the first branch tube 401 at point J.
[0084] The arrangement of two first connecting rods 7 can better decompose and transfer the impact load on the guide groove 6 to the first branch pipe 401, better provide support for the guide groove 6, avoid single-point force on the first branch pipe 401, help to extend its service life, and reduce the frequency of maintenance and replacement.
[0085] Specifically, two guide grooves 6 are arranged in parallel, and the other guide groove 6 is connected to the second branch pipe 402 at point K via the first connecting rod 7 , and point K is adjacent to the first transverse pipe 403 .
[0086] The two guide grooves 6 can better decompose and transfer the impact load to the first bracket 4, better provide support for the guide groove 6, and reduce the stress on the guide groove 6; at the same time, the two guide grooves 6 can better ensure that the tip web 2 moves downward at a suitable angle and gap, avoiding the insufficient angle control of a single guide groove 6.
[0087] This setting helps to extend its service life, reduce the frequency of maintenance and replacement, improve the control accuracy of the docking position control tooling, and ensure the bonding quality of the blade segment web.
[0088] Specifically, the vertical distances from point J and point K to the first transverse pipe 403 are not greater than half the length of the first branch pipe 401 .
[0089] This setting can limit the length of the guide groove 6 within the projection range of the first branch pipe 401 and the second branch pipe 402, and control the support area of the first branch pipe 401 on the guide groove 6. The impact force generated by the internal components of the guide structure during the bonding process can be evenly decomposed onto the first clamping fixture 3 and the second clamping fixture 11, avoiding a single component from being subjected to a large torque and extending the service life of the component.
[0090] Specifically, the first connecting rod 7 is threadedly connected to the support screw 19 perpendicular to the length direction of the blade, and the end of the support screw 19 away from the first connecting rod 7 can be fixed to the blade to improve the structural strength of the first clamping tool 3. The support screw 19 is connected to the first connecting rod 7 at one end and the blade at the other end, which can decompose the impact force to the first bracket 4 and the blade, and help improve the structural rigidity and stability of the first clamping tool 3.
[0091] Preferably, two support screws 19 are provided.
[0092] Specifically, the first clamping fixture 3 and the second clamping fixture 11 are similar in structure.
[0093] This setting helps to reduce the difficulty of design and processing, improve production efficiency and reduce production costs.
[0094] Specifically, the second clamping tool 11 includes a second bracket 8, a second clamping mechanism 9 and a guide rod 10. The second clamping mechanism 9 and the guide rod 10 are arranged on the second bracket 8. The second clamping mechanism 9 is used to fix the second clamping tool 11 on the tip web 2, and the guide rod 10 is used to cooperate with the guide groove 6 to form a guide structure perpendicular to the length direction of the blade.
[0095] The second clamping tool 11 has a simple and efficient overall structure with high precision, which can effectively improve the bonding efficiency and quality and reduce labor costs and operating difficulties.
[0096] Specifically, the second bracket 8 includes a third branch pipe 801 , a fourth branch pipe 802 and a second transverse pipe 803 . The third branch pipe 801 and the fourth branch pipe 802 are arranged in parallel, and one end of the third branch pipe 801 and the fourth branch pipe 802 are connected via the second transverse pipe 803 .
[0097] The second bracket 8 includes a third branch pipe 801, a fourth branch pipe 802 and a second transverse pipe 803, which are connected as a whole, so that the second bracket 8 has a certain flexibility and can be adjusted and optimized according to wind turbine blades of different specifications and sizes to adapt to a variety of different production needs and application scenarios.
[0098] The structure of the arrangement is simple, and the second clamping mechanism 9 can be easily installed and fixed to adapt to wind turbine blades of different specifications and sizes. The arrangement is also easy to process and has low production costs.
[0099] Specifically, a height limiting rod 18 is provided at the lower end of the second transverse tube 803 to ensure the relative position of the second clamping tool 11 and the tip web 2 in a direction perpendicular to the blade length. The height limiting rod 18 is convenient for the operator to use, and can quickly determine the position of the second clamping tool 11, thereby improving the tool installation efficiency.
[0100] Specifically, a plurality of second brackets 8 and second clamping mechanisms 9 are arranged in parallel to improve the structural rigidity of the second clamping tool 11 .
[0101] The provision of a plurality of second brackets 8 and second clamping mechanisms 9 increases the contact area between the second clamping fixture 11 and the tip web 2, helps to increase the holding force, can better withstand the impact force, and improves reliability.
[0102] Preferably, two groups of the second bracket 8 and the second clamping mechanism 9 are provided.
[0103] This arrangement can improve the structural rigidity of the second clamping tool 11 while reducing the difficulty of processing, reducing weight, and further controlling production costs.
[0104] Specifically, the guide rod 10 is arranged in parallel with the third branch pipe 801 , and the guide rod 10 is connected to the third branch pipe 801 via the second connecting rod 20 .
[0105] The guide rod 10 is connected to the third branch pipe 801 through the second connecting rod 20, which helps to decompose and transfer the load to the third branch pipe 801, and can provide support for the guide rod 10 to prevent the guide rod 10 from deflecting when it is impacted by the load, and unable to maintain a suitable position and angle, affecting the formation of a guide structure with the first clamping tool 3.
[0106] This arrangement improves the structural stability and reliability, can ensure the formation of the guide structure, increase the construction speed of the segmented web bonding, and reduce the construction difficulty and cost.
[0107] Preferably, one second connecting rod 20 is provided, and the connection point between the second connecting rod 20 and the second transverse tube 803 is point N.
[0108] Preferably, two second connecting rods 20 are arranged in parallel, and the connection point between the second connecting rod 20 far away from the second transverse pipe 803 and the third branch pipe 801 is point N.
[0109] The arrangement of two second connecting rods 20 can better decompose and transfer the impact load on the guide rod 10 to the third branch pipe 801, better provide support for the guide rod 10, avoid single-point force on the third branch pipe 801, help extend its service life, and reduce the frequency of maintenance and replacement.
[0110] Specifically, one end of the guide rod 10 is configured to be tapered.
[0111] This arrangement can facilitate the guide rod 10 to smoothly enter the guide groove 6, avoid the difficulty of the guide rod 10 entering the guide groove 6 due to manufacturing errors or unstable lifting, reduce the difficulty of assembly, and improve the production efficiency of the bonding process.
[0112] Specifically, two guide rods 10 are provided, and the other guide rod 10 is connected to the third branch pipe 801 via two second connecting rods 20 , including a connection point far away from the second transverse pipe 803 as point P.
[0113] The two guide rods 10 can better decompose and transfer the impact load to the second bracket 8, better provide support for the guide rod 10, and reduce the stress on the guide rod 10; at the same time, the two guide rods 10 can better ensure that the tip web 2 moves downward at a suitable angle and gap, avoiding the insufficient angle control of a single guide rod 10.
[0114] This setting helps to extend its service life, reduce the frequency of maintenance and replacement, improve the control accuracy of the docking position control tooling, and ensure the bonding quality of the blade segment web.
[0115] Specifically, the guide rod 10 is provided with a guide limit block 17 for ensuring the falling height of the second clamping tool 11. The provision of the guide limit block 17 can ensure the stability of the falling height of the second clamping tool 11, avoid errors generated during multiple operations, and help improve the stability of the blade web bonding quality.
[0116] Specifically, the vertical distances from point N and point P to the second transverse pipe 803 are not greater than half the length of the third branch pipe 801 .
[0117] This setting can limit the length of the guide rod 10 within the projection range of the third branch 801 and the fourth branch 802, control the support area of the third branch 801 and the fourth branch 802 on the guide rod 10, and the impact force generated by the internal components of the guide structure during the bonding process can be evenly decomposed to the first clamping fixture 3 and the second clamping fixture 11, avoiding a single component from being subjected to a large torque and extending the service life of the component.
[0118] Specifically, the clamping pad 503 may be made of alloy steel, elastic rubber, or a high molecular polymer, and the remaining parts may be made of stainless steel, alloy steel, engineering plastic, or a composite material.
[0119] Preferably, the wind turbine blade segment web bonding and docking position control tooling is made of steel. The device is easy to process and has a low production cost.
[0120] A method for using a wind turbine blade segmented web bonding and docking position control tooling comprises the following specific steps:
[0121] S1: preparing the web; performing layer laying, pouring and curing, and demoulding according to the segmented web process to obtain the root web 1 and the tip web 2;
[0122] S2: Apply adhesive 15; Apply adhesive 15 to the PS surface beam area 16 of the main shell half according to the process requirements;
[0123] S3: Install the root web 1; use the integrated pressing tool 12 to lift the root web 1, move it to the root position of the PS surface of the main shell half, install the integrated pressing tool 12 on the mold base at the corresponding position of the main mold and fix it to press down, so that the root web 1 is bonded to the beam area 16 by the adhesive 15;
[0124] S4: Fix the installation tool; the opening of the first clamping tool 3 is moved downward, so that the first branch pipe 401 and the second branch pipe 402 are respectively located on both sides of the root web 1, the guide groove 6 is adjacent to the position of the tip web 2, and the first clamping mechanism 5 is tightened; the second clamping tool 11 is fixedly installed on the tip web 2, and the guide rod 10 is adjacent to the intersection of the tip web 2 and the root web 1;
[0125] S5: docking; use the lifting beam 13 to lift the tip web 2 and move it to the tip of the PS surface of the main shell half, slowly drop and adjust the guide rod 10 of the second clamping tool 11 to insert it into the guide groove 6 of the first clamping tool 3, and then continue to drop until the tip web 2 is placed on the adhesive 15, completing the docking of the tip web 2 and the root web 1;
[0126] S6: bonding of the tip web 2; after removing the hanging beam 13, according to the process requirements, a simple pressing tool for the tip web 2 is installed from the root to the tip to complete the bonding of the tip web 2;
[0127] S7: mold closing and curing: after hand lay-up reinforcement, heating and curing, and mold closing and curing according to the process requirements, a segmented web blade with a butt gap H≤10mm can be obtained.
[0128] The tooling method uses the first clamping tool 3 and the second clamping tool 11, especially the precise docking of the guide groove 6 and the guide rod 10, which greatly improves the docking accuracy between the root web 1 and the tip web 2, ensures that the docking gap H is controlled within ≤10mm, and meets the requirements of high-precision manufacturing of wind turbine blades; it can optimize the production process, reduce the use of the adhesive 15, avoid repeated construction, and reduce production costs.
[0129] This arrangement achieves high-precision docking of segmented webs through a precisely designed docking mechanism and a strict operating procedure, thereby improving the overall performance and service life of the blade; avoiding repeated construction, reducing the use of adhesive 15, shortening the blade molding time, and reducing production costs.
[0130] Specifically, in step S3, before fixing the installation tool, the tool positioning lines are drawn on the root web 1 and the tip web 2 to fix the installation positions of the first clamping tool 3 and the second clamping tool 11 in the blade length direction. This setting helps to quickly install the first clamping tool 3 and the second clamping tool 11, ensure the relative stability of the installation positions of the first clamping tool 3 and the second clamping tool 11 during mass production, ensure the bonding gap between the root web 1 and the tip web 2, and improve the bonding quality of the root web 1 and the tip web 2.
[0131] Specifically, the distance from the first branch pipe 401 to the edge of the root web 1 is L1, and the distance from the third branch pipe 801 to the edge of the tip web 2 is L2.
[0132] Example 1
[0133] like Figure 6-9 As shown, a wind turbine blade segmented web bonding and docking position control tool comprises a first clamping tool 3 and a second clamping tool 11. The first clamping tool 3 is fixed on the root web 1, and the second clamping tool 11 is fixed on the tip web 2.
[0134] The first clamping fixture 3 includes a first bracket 4, a first clamping mechanism 5 and a guide groove 6, and the first clamping mechanism 5 and the guide groove 6 are arranged on the first bracket 4. The first bracket 4 includes a first branch pipe 401, a second branch pipe 402 and two first transverse pipes 403, the first branch pipe 401 and the second branch pipe 402 are arranged in parallel, and one end of the first branch pipe 401 and the second branch pipe 402 are connected through the first transverse pipe 403 to form a U-shaped structure; the first clamping mechanism 5 includes a fixed end 501, a movable end 502 and a plurality of clamping pads 503, the fixed end 501 and the movable end 502 are coaxially arranged, and the clamping pads 503 are arranged at the ends of the fixed end 501 and the movable end 502; the fixed end 501 and the movable end 502 are rod-shaped structures, and the movable end 502 is provided with a thread on the outside; a first threaded hole 404 is provided on the first branch pipe 401, and one end of the movable end 502 passes through the first threaded hole 404 and is clamped The guide groove 6 is arranged in parallel with the first branch pipe 401, and the guide groove 6 is connected to the first branch pipe 401 through two first connecting rods 7. The first connecting rod 7 of the adjacent first transverse pipe 403 is connected to the first branch pipe 401 at point J, and the vertical distance from point J to the first transverse pipe 403 is not greater than half the length of the first branch pipe 401; two guide grooves 6 are arranged in parallel, and the other guide groove 6 is connected to the second branch pipe 402 at point K through the second connecting rod 20, and point K is adjacent to the first transverse pipe 403.
[0135] The first clamping fixture 3 and the second clamping fixture 11 have similar structures.
[0136] The clamping pad 503 may be made of elastic rubber, and the remaining parts may be made of stainless steel.
[0137] Example 2
[0138] like Figure 16-19 As shown, a wind turbine blade segmented web bonding and docking position control tool comprises a first clamping tool 3 and a second clamping tool 11. The first clamping tool 3 is fixed on the root web 1, and the second clamping tool 11 is fixed on the tip web 2.
[0139] A height limiting rod 18 is provided at the lower end of the first transverse tube 403 to ensure the relative position of the first clamping fixture 3 and the root web 1 in a direction perpendicular to the length of the blade. The first connecting rod 7 is threadedly connected to a support screw 19 perpendicular to the length of the blade. The end of the support screw 19 away from the first connecting rod 7 can be fixed to the blade to improve the structural strength of the first clamping fixture 3. A height limiting rod 18 is provided at the lower end of the second transverse tube 803 to ensure the relative position of the second clamping fixture 11 and the tip web 2 in a direction perpendicular to the length of the blade. The guide rod 10 is provided with a guide limiting block 17 to ensure the falling height of the second clamping fixture 11. A plurality of second brackets 8 and second clamping mechanisms 9 are provided in parallel to improve the structural rigidity of the second clamping fixture 11.
[0140] The distance from the first branch pipe 401 to the edge of the root web 1 is L1, and the distance from the third branch pipe 801 to the edge of the tip web 2 is L2; before fixing the installation tooling, draw tooling positioning lines on the root web 1 and the tip web 2 to fix the installation positions of the first clamping tooling 3 and the second clamping tooling 11 in the length direction of the blade.
[0141] The first clamping fixture 3 and the second clamping fixture 11 can be fixed at interchangeable positions. At this time, the support screw 19 and other structures are arranged on the second clamping fixture.
[0142] A method for using a wind turbine blade segmented web bonding and docking position control tooling comprises the following specific steps:
[0143] S1: preparing the web; performing layer laying, pouring and curing, and demoulding according to the segmented web process to obtain the root web 1 and the tip web 2;
[0144] S2: Apply adhesive 15; Apply adhesive 15 to the PS surface beam area 16 of the main shell half according to the process requirements;
[0145] S3: Install the root web 1; use the integrated pressing tool 12 to lift the root web 1, move it to the root position of the PS surface of the main shell half, install the integrated pressing tool 12 on the mold base at the corresponding position of the main mold and fix it to press down, so that the root web 1 is bonded to the beam area 16 by the adhesive 15;
[0146] S4: Fix the installation tool; draw the tool positioning lines on the root web 1 and the tip web 2, move the opening of the first clamping tool 3 downward, so that the first branch pipe 401 and the second branch pipe 402 are respectively located on both sides of the root web 1, and the guide groove 6 is adjacent to the position of the tip web 2, until the height limit rod 18 abuts against the root web 1, tighten the first clamping mechanism 5, rotate the support screw 19, and connect the support screw 19 to the blade; the second clamping tool 11 is fixedly installed on the tip web 2, and the guide rod 10 is close to the intersection of the tip web 2 and the root web 1, so that the height limit rod 18 on the second clamping tool 11 abuts against the tip web 2;
[0147] S5: docking; use the lifting beam 13 to lift the tip web 2 and move it to the tip of the PS surface of the main shell half, slowly drop and adjust the guide rod 10 of the second clamping tool 11 to insert it into the guide groove 6 of the first clamping tool 3, and then continue to drop until the guide limit block 17 abuts against the guide groove 6, completing the docking of the tip web 2 and the root web 1;
[0148] S6: bonding of the tip web 2; after removing the hanging beam 13, according to the process requirements, a simple pressing tool for the tip web 2 is installed from the root to the tip to complete the bonding of the tip web 2;
[0149] S7: mold closing and curing: after hand lay-up reinforcement, heating and curing, and mold closing and curing according to the process requirements, a segmented web blade with a butt gap H≤10mm can be obtained.
[0150] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A wind turbine blade segmented web bonding and docking position control tool, used to control the angle and relative position between the root web (1) and the tip web (2), characterized in that: It comprises a first clamping tool (3) and a second clamping tool (11), one of which is fixed on the root web (1) and the other is fixed on the tip web (2), and during the process of bonding the root web (1) and the tip web (2), the first clamping tool (3) cooperates with the second clamping tool (11) to form a guiding structure perpendicular to the length direction of the blade.
2. The wind turbine blade segmented web bonding and docking position control tooling according to claim 1 is characterized in that: The first clamping tool (3) comprises a first bracket (4), a first clamping mechanism (5) and a guide groove (6); the first clamping mechanism (5) and the guide groove (6) are arranged on the first bracket (4); the first clamping mechanism (5) is used to fix the first clamping tool (3) on the root web (1); and the guide groove (6) is used to cooperate with the second clamping tool (11) to form a guide structure perpendicular to the length direction of the blade.
3. The wind turbine blade segmented web bonding and docking position control tooling according to claim 2 is characterized in that: The first bracket (4) comprises a first branch pipe (401), a second branch pipe (402) and a first transverse pipe (403); the first branch pipe (401) and the second branch pipe (402) are arranged in parallel; one end of the first branch pipe (401) and one end of the second branch pipe (402) are connected via the first transverse pipe (403).
4. The wind turbine blade segmented web bonding and docking position control tooling according to claim 3 is characterized in that: The first clamping mechanism (5) comprises a fixed end (501), a movable end (502) and at least two clamping pads (503), wherein the fixed end (501) and the movable end (502) are coaxially arranged, and the clamping pads (503) are arranged at the ends of the fixed end (501) and the movable end (502) to increase the friction between the first clamping mechanism (5) and the root web (1).
5. The wind turbine blade segmented web bonding and docking position control tooling according to claim 4 is characterized in that: A first threaded hole (404) is provided on the first branch pipe (401), one end of the movable end (502) passes through the first threaded hole (404) and is connected to the clamping pad (503), a tightening block (5021) is provided at the end of the movable end (502) away from the clamping pad (503), and the fixed end (501) is provided on the second branch pipe (402), and the end of the fixed end (501) away from the second branch pipe (402) is connected to the clamping pad (503).
6. The wind turbine blade segmented web bonding and docking position control tooling according to claim 5, characterized in that: The guide groove (6) is arranged in parallel with the first branch pipe (401), and the guide groove (6) and the first branch pipe (401) are connected via a first connecting rod (7). The connection point between the first connecting rod (7) and the first branch pipe (401) includes a point J, and the vertical distance from the point J to the first transverse pipe (403) is not greater than half the length of the first branch pipe (401).
7. The wind turbine blade segment web bonding and docking position control tooling according to claim 1, characterized in that: The second clamping tool (11) comprises a second bracket (8), a second clamping mechanism (9) and a guide rod (10); the second clamping mechanism (9) and the guide rod (10) are arranged on the second bracket (8); the second clamping mechanism (9) is used to fix the second clamping tool (11) on the tip web (2); and the guide rod (10) is used to cooperate with the guide groove (6) to form a guide structure perpendicular to the length direction of the blade.
8. The wind turbine blade segmented web bonding and docking position control tooling according to claim 7, characterized in that: The second bracket (8) comprises a third branch pipe (801), a fourth branch pipe (802) and a second transverse pipe (803); the third branch pipe (801) and the fourth branch pipe (802) are arranged in parallel; one end of the third branch pipe (801) and one end of the fourth branch pipe (802) are connected via the second transverse pipe (803).
9. The wind turbine blade segment web bonding and docking position control tooling according to claim 8, characterized in that: The guide rod (10) is arranged in parallel with the third branch pipe (801), and the guide rod (10) and the third branch pipe (801) are connected via a second connecting rod (20). The connection points between the second connecting rod (20) and the third branch pipe (801) include point N, and the vertical distance from point N to the second transverse pipe (803) is not greater than half the length of the third branch pipe (801).
10. A method for using a wind turbine blade segmented web bonding and docking position control tool, characterized in that: The wind turbine blade segment web bonding and docking position control tooling according to any one of claims 1 to 9 comprises the following specific steps: S1: preparing a web; performing layer laying, pouring and curing, and demoulding according to a segmented web process to obtain a root web (1) and a tip web (2); S2: Apply adhesive; apply adhesive to the PS surface beam area of the main shell half according to the process requirements; S3: Install the root web (1); use an integrated pressing tool to lift the root web (1), move it to the root position of the PS surface of the main shell half, install the integrated pressing tool on the mold base at the corresponding position of the main mold and fix it to press down, so that the root web (1) is bonded to the beam area by adhesive; S4: Fix the installation tool; the opening of the first clamping tool (3) is moved downward, so that the first branch pipe (401) and the second branch pipe (402) are respectively located on both sides of the root web (1), the guide groove (6) is adjacent to the position of the tip web (2), and the first clamping mechanism (5) is tightened; the second clamping tool (11) is fixedly installed on the tip web (2), and the guide rod (10) is close to the intersection surface between the tip web (2) and the root web (1); S5: docking; use a lifting beam to lift the tip web (2) and move it to the tip of the PS surface of the main shell half, slowly drop it and adjust the guide rod (10) of the second clamping tool (11) to insert it into the guide groove (6) of the first clamping tool (3), and then continue to drop it until the tip web (2) is placed on the adhesive, completing the docking of the tip web (2) and the root web (1); S6: bonding of the tip web (2); After removing the hanging beam, according to the process requirements, install the simple pressing tool for the tip web from the root to the tip to complete the bonding of the tip web (2); S7: mold closing and curing; After hand lay-up reinforcement, heat curing and mold curing according to the process requirements, a segmented web blade with a butt gap H≤10mm can be obtained.