Football field lawn and construction method

By designing a multi-layer structure in the football field lawn, including horizontally arranged drainage pipes and trapezoidal drainage holes, the problems of slow and sunken drainage in large areas of lawns are solved, and rapid drainage and durability are achieved.

CN119145266APending Publication Date: 2024-12-17SHANXI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411649639.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-19
Publication Date
2024-12-17

AI Technical Summary

Technical Problem

In large-area football field lawns, existing drainage systems are prone to sinking when water is removed and long-term trampled, resulting in slow drainage of the lawn and difficult to maintain durability.

Method used

A football field lawn structure was designed, consisting of grass layer, shock absorption layer, concrete layer, gravel layer and plain soil layer. Multiple groups of horizontally arranged drainage pipes and seepage parts are set up in the gravel layer, and the grass layer is laid. Fill particles to enhance conductive protection, trapezoidal drainage holes and seepage holes are provided in the concrete and gravel layers to promote rapid drainage.

Benefits of technology

It realizes rapid drainage capacity in the middle and edge areas of the lawn, increases the comfort and durability of the lawn, avoids water accumulation, and extends the service life of the lawn.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119145266A_ABST
    Figure CN119145266A_ABST
Patent Text Reader

Abstract

The invention discloses a football field lawn and a construction method, the lawn is sequentially composed of a grass layer, a damping layer, a concrete layer, a gravel layer and a plain soil layer from top to bottom, and a drainage mechanism is arranged in the gravel layer; the drainage structure comprises a plurality of drainage pipelines, the drainage pipelines are arranged and inserted between the gravel layers in the horizontal direction, and a plurality of water seepage parts are arranged at the tops of the drainage pipelines and used for draining water into the drainage pipelines from multiple points; and filling particles are laid in the grass layer. Drainage design is carried out on the structure of the lawn, firstly, multiple sets of drainage pipelines are arranged between the gravel layers in the horizontal direction, the number of drainage pipelines is increased, drainage paths are increased, meanwhile, in order to facilitate drainage of the middle area of the lawn, multiple sets of water seepage parts are further arranged at the tops of all sets of drainage pipelines, and therefore drainage of the middle area of the lawn is facilitated. Therefore, in combination with water seepage among the layers, the middle and edge areas of the whole lawn have the rapid water drainage capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of lawns, and in particular to a lawn for a football field and a construction method thereof. Background Art

[0002] The football stadium is a place for sports activities for teachers and students of the school. The middle part of the field is the football field lawn. In order to increase the durability of the existing football field lawn, artificial grass will be used for laying, thus ensuring that the lawn can be durable.

[0003] The existing football field lawn is composed of a lawn layer, a filling layer, a base, a drainage system and a supporting structure. The drainage system is mostly set at the base. By laying drainage pipes on the side of the base, the lawn is laid with a slope of 1% to 2%, and the low slope area is at the edge of the lawn. In this way, the accumulated water on the lawn will flow to the edge and then be drained by the drainage pipe. This lawn drainage method is more convenient in the drainage treatment of small lawns, but when draining lawns with an area of ​​more than 6,400 square meters, the drainage process of the accumulated water in the middle of the lawn is long, and the lawn will inevitably sink in some areas under long-term trampling, which will accumulate water and make the lawn drain more slowly. In view of this, this plan proposes a football field lawn and a construction method to solve the above problems. Summary of the invention

[0004] The object of the present invention is to provide a football field lawn and a construction method to solve the problems raised in the above background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a football field lawn, the lawn is composed of a grass layer, a shock-absorbing layer, a concrete layer, a crushed stone layer and a plain soil layer from top to bottom, and a drainage mechanism is arranged in the crushed stone layer; The drainage structure comprises a plurality of drainage pipes, the plurality of drainage pipes are arranged in a horizontal direction and interspersed between the gravel layers, and a plurality of water seepage parts are arranged on the top of the drainage pipes, and the plurality of water seepage parts are used to drain water into the drainage pipes at multiple points; Filling particles are laid in the grass layer, and the filling particles are used for trampling and conductive protection of the grass layer.

[0006] Preferably, the grass layer is composed of a rubber base and artificial grass in sequence from bottom to top, a plurality of artificial grass arrays are laid on the top of the rubber base, a plurality of water seepage holes are vertically opened in the middle of the rubber base and between the gaps between the plurality of artificial grasses, and the filling particles are filled to the top of the rubber base.

[0007] Preferably, the side cross-section of the water seepage hole is trapezoidal, and the hole diameter at the top of the water seepage hole is 1.5-2 times the hole diameter at the bottom.

[0008] Preferably, the laying height of the artificial grass on the top of the rubber base is 40-50 mm, the laying needle count of the artificial grass is 11000-12000, and the laying weight of the artificial grass is 7000-7500 pounds.

[0009] Preferably, the filling particles include: Silica sand particles, the silica sand particles are laid on the top of the rubber base and located between the plurality of artificial grasses; Copper particles are laid on the top of the glue base and located between the silica sand particles.

[0010] Preferably, the shock absorbing layer comprises a resin shock absorbing pad, a plurality of water guide grooves are provided at the top of the resin shock absorbing pad, a plurality of water guide grooves are provided at the bottom ends of the plurality of water guide grooves, and a plurality of reinforcing strips are provided on the top inner walls of the plurality of water guide grooves.

[0011] Preferably, a plurality of drainage holes are provided in the middle of the concrete layer in the vertical direction, the side cross-section of the drainage holes is trapezoidal, and the bottom hole diameter of the drainage holes is 2.5-3 times the top hole diameter.

[0012] Preferably, the gravel layer comprises a cement frame, the drainage pipeline is inserted and connected in the cement frame, and gravel particles are laid in the cement frame and around the drainage pipeline, and the gravel particles are used to shield the water seepage part.

[0013] Preferably, the drainage pipeline includes a high-density polyethylene pipe, which is inserted and connected in a cement frame, and both ends of the high-density polyethylene pipe are connected to both sides of the cement frame, and a plurality of water inlets are provided on the top of the high-density polyethylene pipe, and the water seepage part includes a water seepage filter plate, which is filled at the water inlet, and a plurality of filter holes are provided on the top of the water seepage filter plate.

[0014] A method for constructing a football field lawn, used for constructing the football field lawn, the method comprising the following steps: S1, conduct a survey of the lawn construction site and plan the land area required for construction; S2, constructing the bare soil layer, clearing the weeds, stones and garbage in the planned area, and then using a tiller to till the soil, and then breaking up the turned soil and mixing it with sand to form mixed soil, and finally paving the mixed soil and tamping it with a tamping machine to construct the bare soil layer; S3, laying the gravel layer and drainage pipes, first use cement to build a frame on the surface of the plain soil layer, then lay a layer of gravel at the bottom of the frame, set the drainage pipe on the top of the gravel and pass both ends of the drainage pipe through the frame, set the seepage part on the top of the drainage pipe, lay gravel again, fill the frame and level it; S4, laying the concrete layer, first build a concrete formwork according to the designed area and requirements, then pour the concrete, and after pouring, use a vibrator to vibrate and level it; S5, laying the shock-absorbing layer, first cutting the resin block according to the area to be laid, then opening a slot on the top of the resin block, and then after the concrete layer is cured, using an adhesive to splice and stick the resin block on the top of the concrete layer; S6, laying the grass layer, gluing and laying the processed grass layer along the top of the shock-absorbing layer, and then laying filling particles on the top of the grass layer and brushing the filling particles flat; S7, inspect and maintain the lawn, check the joints and edges of the lawn, and water it after confirming that it is firmly adhered.

[0015] Technical effects and advantages of the present invention: The present invention carries out drainage design for the structure of lawn. First, multiple groups of drainage pipes are arranged in a horizontal direction between gravel layers, which increases the amount of drainage pipes and increases the drainage path. At the same time, in order to facilitate the drainage of the middle area of ​​the lawn, multiple groups of seepage parts are arranged on the top of each group of drainage pipes. In this way, combined with the seepage between the layers, the middle and edge areas of the entire lawn have the ability to drain water quickly, so that the lawn of this scheme can be drained quickly, thereby increasing the comfort of lawn use, avoiding water accumulation and making the lawn more durable. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the lawn of the present invention.

[0017] Figure 2 It is a schematic diagram of the overall interlayer structure of the lawn of the present invention.

[0018] Figure 3 For the present invention Figure 2 A schematic diagram of the enlarged structure at point A in the middle.

[0019] Figure 4 For the present invention Figure 2 A magnified schematic diagram of the structure at point B in the middle.

[0020] Figure 5 This is a schematic diagram of the overall structure of the lawn of the present invention after artificial grass and filling particles are removed.

[0021] Figure 6 The figure is a schematic diagram of the overall structure of the lawn shock-absorbing layer of the present invention.

[0022] Figure 7 It is a schematic diagram of the structural connection between the cement frame and the drainage pipeline of the present invention.

[0023] Figure 8This is an operation flow chart of the lawn construction method of the present invention.

[0024] In the figure: 1. grass layer; 101. rubber seat; 102. water seepage hole; 103. artificial grass; 2. shock-absorbing layer; 201. resin shock-absorbing pad; 202. water guide groove; 203. water guide hole; 204. reinforcement strip; 3. concrete layer; 301. drainage hole; 4. gravel layer; 401. cement frame; 402. gravel particles; 5. soil layer; 6. high-density polyethylene pipe; 601. water seepage filter plate; 602. filter hole; 7. silica sand particles; 8. copper particles. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] Embodiment 1, the present invention provides as follows Figure 1-7 A football field lawn is shown, which is composed of a grass layer 1, a shock-absorbing layer 2, a concrete layer 3, a crushed stone layer 4 and a plain soil layer 5 from top to bottom, and a drainage mechanism is provided in the crushed stone layer 4; Specifically, the grass layer 1 is composed of a rubber base 101 and artificial grass 103 from bottom to top, a plurality of artificial grasses 103 are laid on the top of the rubber base 101 in an array, and a plurality of water seepage holes 102 are vertically opened in the middle of the rubber base 101 and between the gaps of the plurality of artificial grasses 103 .

[0027] Furthermore, the side cross-section of the water seepage hole 102 is a trapezoid, and the hole diameter at the top of the water seepage hole 102 is 1.5-2 times the hole diameter at the bottom; The laying height of the artificial grass 103 on the top of the rubber base 101 is 40-50 mm, the laying needle count of the artificial grass 103 is 11000-12000, and the laying weight of the artificial grass 103 is 7000-7500 pounds.

[0028] It should be noted that the water seepage hole 102 is provided at the rubber seat 101 so that when the lawn is raining or watered, the accumulated water falling on the artificial grass 103 and the top of the rubber seat 101 can fall and be discharged through the water seepage hole 102, and the water seepage hole 102 is provided in a trapezoidal cross-section with a larger upper portion and a smaller lower portion, so as to facilitate the rapid accumulation and fall of the accumulated water on the top of the rubber seat 101; The rubber base 101 is made of polyester material. Polyester has high strength and toughness, can remain stable within a certain temperature range, is suitable for thermoforming, and has good resistance to a variety of chemicals (such as acids and alkalis). Therefore, polyester material is used as the base part of the grass layer 1, and the artificial grass 103 can be made of polypropylene or nylon. The artificial grass 103 prepared in this way can have better durability.

[0029] Specifically, the shock absorbing layer 2 includes a resin shock absorbing pad 201 , a plurality of water guide grooves 202 are provided at the top of the resin shock absorbing pad 201 , a plurality of water guide holes 203 are provided at the bottom of the plurality of water guide grooves 202 , and a plurality of reinforcing strips 204 are provided on the top inner walls of the plurality of water guide grooves 202 .

[0030] It should be noted that the main body of the shock-absorbing layer 2 adopts the resin shock-absorbing pad 201 to provide better support and cushioning effects, and to achieve a better user experience with the full artificial grass 103. At the same time, the water guide groove 202 is opened on the top of the resin shock-absorbing pad 201 to reduce the use of materials, and at the same time, the water flow seeping from the water seepage hole 102 can be guided and discharged. In order to enable the water guide groove 202 to better guide and drain water, the middle part of the water guide groove 202 is higher than the side, and the water guide hole 203 is used to quickly discharge the water flow; At the same time, after the resin shock-absorbing pad 201 is opened with the water guide groove 202, the deformation space in the middle area is increased, so that it can better absorb shock and buffer when being stepped on. At the same time, in order to strengthen the structural strength of the resin shock-absorbing pad 201, a reinforcement strip 204 is added. The reinforcement strip 204 is used to stabilize the shape of the water guide groove 202 to prevent it from being unable to return to its original shape after being deformed when being stepped on.

[0031] Specifically, a plurality of drainage holes 301 are provided in the middle of the concrete layer 3 along the vertical direction. The side cross-section of the drainage hole 301 is trapezoidal, and the bottom hole diameter of the drainage hole 301 is 2.5-3 times the top hole diameter.

[0032] It should be noted that the drainage holes 301 of the concrete layer 3 are designed to cooperate with the water guide holes 203 to facilitate the rapid fall of accumulated water, so that the accumulated water in the middle area of ​​the lawn can be quickly removed.

[0033] The drainage structure includes multiple sets of drainage pipes, which are arranged in the horizontal direction and interspersed between the gravel layers 4. Multiple sets of water seepage parts are arranged on the top of the drainage pipes, and the multiple sets of water seepage parts are used to drain water into the drainage pipes at multiple points; Specifically, the gravel layer 4 includes a cement frame 401 , the drainage pipeline is inserted and connected in the cement frame 401 , and gravel particles 402 are laid in the cement frame 401 and around the drainage pipeline, and the gravel particles 402 are used to shield the water seepage part.

[0034] It should be noted that, first, a cement frame 401 is established to limit the area and shape of the crushed stone layer 4. With such a structural setting, after the crushed stone particles 402 are laid in the cement frame 401, the restraint of the crushed stone particles 402 can be better achieved, thereby ensuring the stability of the structure of the crushed stone layer 4, and further protecting the drainage pipes interspersed in the cement frame 401, thereby preventing the crushed stone particles 402 from rolling after being stepped on and causing scratches on the drainage pipes. The crushed stone particles 402 can be crushed stones or gravel, and the purpose is to improve drainage.

[0035] Furthermore, the drainage pipeline includes a high-density polyethylene pipe 6, which is inserted and connected in the cement frame 401, and both ends of the high-density polyethylene pipe 6 are connected to both sides of the cement frame 401. A plurality of water inlets are provided on the top of the high-density polyethylene pipe 6, and the seepage part includes a seepage filter plate 601, which is filled at the water inlet, and a plurality of filter holes 602 are provided on the top of the seepage filter plate 601.

[0036] It should be noted that, by setting up multiple high-density polyethylene pipes 6, the accumulated water that seeps can be discharged through multiple channels. At the same time, a group of seepage filter plates 601 are set at the top of each high-density polyethylene pipe 6. Such a setting enables the high-density polyethylene pipe 6 to have multiple water inlet channels for water conduction and drainage.

[0037] Filling particles are laid in the grass layer 1 , and the filling particles are used for trampling and conductive protection of the grass layer 1 . The filling particles are filled to the top of the rubber seat 101 .

[0038] Specifically, the filling particles include: Silica sand particles 7, which are laid on the top of the rubber base 101 and are located between the plurality of artificial grasses 103; Copper particles 8 are laid on the top of the adhesive base 101 and are located between the silica sand particles 7 .

[0039] It should be noted that the silica sand particles 7 are used because they have the following functions, including drainage. The particle structure and porosity of silica sand make it have good drainage performance, which can effectively prevent water accumulation and keep the lawn dry; stability. The silica sand particles are hard and can provide good support to help the grass stay upright and extend the service life of the lawn; wear resistance. Silica sand has high wear resistance and is suitable for use in high-intensity sports venues and can withstand frequent trampling and friction; non-toxicity. Silica sand is a natural material, does not contain harmful chemicals, is safe and environmentally friendly, and is suitable for use in various occasions; The use of copper particles 8 has the following functions, including antibacterial properties. Copper has natural antibacterial properties and can inhibit the growth of certain bacteria and fungi, which helps to reduce the occurrence of diseases on the lawn; wear resistance. Copper particles 8 usually have good wear resistance and can withstand the mechanical force when stepped on; conductivity. The conductivity of the top surface of the lawn is increased by mixing copper particles 8, which reduces the generation of static electricity and increases the service life of the lawn.

[0040] Embodiment 2, this scheme provides as follows Figure 8 The method for constructing a football field lawn shown is used to construct the football field lawn in Example 1. The method comprises the following steps: S1, conduct a survey of the lawn construction site and plan the land area required for construction; It should be noted that after the construction site is selected, the shape and size of the lawn should be designed according to the space and needs, and a marking device should be used for wiring calibration. This will allow for more accurate site confirmation and provide auxiliary reference for subsequent construction processes.

[0041] S2, constructing the plain soil layer 5, clearing weeds, stones and garbage in the planned area, and then using a tiller to till the soil, and then breaking up the turned soil and mixing it with sand to form mixed soil, and finally paving the mixed soil and tamping it with a tamping machine to construct the plain soil layer 5; It should be noted that when constructing the raw soil layer 5, the debris and obstacles in the planned area are cleared first to ensure that the site is flat. The soil is turned over and crushed and then mixed with sand to improve the soil and increase its air permeability and drainage. After that, it is compacted with a compactor to ensure that the raw soil layer 5 is laid flat.

[0042] S3, laying the gravel layer 4 and the drainage pipeline, first use cement to build a frame on the surface of the plain soil layer 5, then lay a layer of gravel at the bottom of the frame, set the drainage pipeline on the top of the gravel and pass both ends of the drainage pipeline through the frame, set the seepage part on the top of the drainage pipeline, lay gravel again, fill the frame and level it; It should be noted that when constructing the gravel layer 4, first, cement is used to pile up a cement frame 401 to form a bearing trough structure, and then through holes are reserved on both sides of the cement frame 401. After that, the bottom layer of the cement frame 401 is paved with gravel particles 402, and then the high-density polyethylene pipe 6 is buried, and the two ends of the high-density polyethylene pipe 6 are passed through the through holes reserved in the cement frame 401, and the water inlet at the top of the high-density polyethylene pipe 6 is covered with a seepage filter plate 601, and then the gravel particles 402 are laid, and the gravel particles 402 are compacted and leveled.

[0043] S4, laying the concrete layer 3, firstly build a concrete formwork according to the designed area and requirements, then pour the concrete, and after pouring, use a vibrator to vibrate and level it; It should be noted that when laying the concrete layer 3, foam is used to make the shape of the drainage hole 301 in the concrete template, and then after the concrete is injected and vibrated and leveled, the concrete layer 3 is cured. At this time, the concrete layer 3 needs to be watered and cured. After six to eight days of curing, the foam blocks are crushed and taken out to form the drainage hole 301 structure in the concrete layer 3.

[0044] S5, laying the shock-absorbing layer 2, first cutting the resin block according to the area to be laid, then opening a slot on the top of the resin block, and then after the concrete layer 3 is cured, using an adhesive to splice and stick the resin block on the top of the concrete layer 3; It should be noted that the shock-absorbing layer 2 is connected to the top of the concrete layer 3 in the form of block splicing. When connecting the shock-absorbing layer 2, glue is first brushed on the surface of the concrete layer 3, and then the water guide hole 203 is aligned with the drainage hole 301 as much as possible, and then the shock-absorbing layer 2 is completely laid.

[0045] S6, laying the grass layer 1, gluing and laying the processed grass layer 1 along the top of the shock-absorbing layer 2, and then laying filling particles on the top of the grass layer 1, and brushing the filling particles flat; It should be noted that the rubber seat 101 of the grass layer 1 is also fixed to the top of the shock-absorbing layer 2 by gluing, and the seepage hole 102 is arranged above the water guide groove 202 as much as possible, so as to facilitate water conduction and drainage. After the grass layer 1 is laid, the grass layer 1 is fixed to the shock-absorbing layer 2 with lawn nails. The distance between the nails is generally 20-30 cm to ensure that the grass layer 1 is not easy to move. Finally, the copper particles 8 are mixed with the silica sand particles 7 and laid on the top of the rubber seat 101. The filling material is brushed flat with a broom to make it evenly distributed, thereby ensuring the appearance and performance of the lawn, helping the lawn to stay upright and increase stability.

[0046] S7, inspect and maintain the lawn, check the joints and edges of the lawn, and water it after confirming that it is firmly adhered.

[0047] It should be noted that the inspection of the lawn is to check the flatness, joints, edges and uniformity of filling materials, clean up the construction site, remove excess materials and tools, and when it is found that the lawn is unevenly laid, especially when the grass layer 1, shock-absorbing layer 2 and filling particles are uneven, first adjust the irregularities and then water the lawn to help the grass fibers restore their elasticity. It is also necessary to regularly clean up the debris on the lawn and check the condition of the lawn to maintain the beauty and performance of the lawn.

[0048] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A football field lawn, It is characterized in that The lawn is composed of a grass layer (1), a shock-absorbing layer (2), a concrete layer (3), a crushed stone layer (4) and a plain soil layer (5) from top to bottom, and a drainage mechanism is provided in the crushed stone layer (4); The drainage structure comprises a plurality of drainage pipes, the plurality of drainage pipes being arranged in a horizontal direction and interlaced between the gravel layers (4), the tops of the drainage pipes being provided with a plurality of water seepage parts, the plurality of water seepage parts being used to drain water into the drainage pipes at multiple points; Filling particles are laid in the grass layer (1), and the filling particles are used for trampling and conductive protection of the grass layer (1).

2. A football field lawn according to claim 1, It is characterized in that The grass layer (1) is composed of a rubber base (101) and artificial grass (103) in sequence from bottom to top, a plurality of artificial grasses (103) are laid in an array on the top of the rubber base (101), a plurality of water seepage holes (102) are vertically opened in the middle of the rubber base (101) and between the gaps between the plurality of artificial grasses (103), and the filling particles are filled to the top of the rubber base (101).

3. A football field lawn according to claim 2, It is characterized in that The side cross-section of the water seepage hole (102) is trapezoidal, and the hole diameter at the top of the water seepage hole (102) is 1.5 to 2 times the hole diameter at the bottom.

4. A football field lawn according to claim 2, It is characterized in that The laying height of the artificial grass (103) on the top of the rubber base (101) is 40-50 mm, the laying needle count of the artificial grass (103) is 11000-12000, and the laying weight of the artificial grass (103) is 7000-7500 pounds.

5. A football field lawn according to claim 2, It is characterized in that The filling particles include: Silica sand particles (7), the silica sand particles (7) being laid on the top of the rubber base (101) and located between the plurality of artificial grasses (103); Copper particles (8), the copper particles (8) being laid on the top of the glue base (101) and located between the silica sand particles (7).

6. A football field lawn according to claim 1, It is characterized in that The shock-absorbing layer (2) comprises a resin shock-absorbing pad (201), a plurality of water guide grooves (202) are provided at the top of the resin shock-absorbing pad (201), a plurality of water guide holes (203) are provided at the bottom of the plurality of water guide grooves (202), and a plurality of reinforcing strips (204) are provided on the top inner walls of the plurality of water guide grooves (202).

7. A football field lawn according to claim 1, It is characterized in that A plurality of drainage holes (301) are provided in the middle of the concrete layer (3) in the vertical direction, the side cross-section of the drainage hole (301) is trapezoidal, and the bottom hole diameter of the drainage hole (301) is 2.5-3 times the top hole diameter.

8. The football field lawn according to claim 1, It is characterized in that The gravel layer (4) comprises a cement frame (401), the drainage pipeline is inserted and connected in the cement frame (401), and gravel particles (402) are laid in the cement frame (401) and around the drainage pipeline, and the gravel particles (402) are used to cover the water seepage part.

9. A football field lawn according to claim 8, It is characterized in that The drainage pipeline comprises a high-density polyethylene pipe (6), the high-density polyethylene pipe (6) is inserted and connected in the cement frame (401), and the two ends of the high-density polyethylene pipe (6) are connected to the two sides of the cement frame (401), and the top of the high-density polyethylene pipe (6) is provided with a plurality of water inlets, and the water seepage part comprises a water seepage filter plate (601), the water seepage filter plate (601) is filled at the water inlet, and the top of the water seepage filter plate (601) is provided with a plurality of filter holes (602).

10. A method for constructing a football field lawn, used for constructing the football field lawn according to any one of claims 1 to 9, It is characterized in that The construction method comprises the following steps: S1, conduct a survey of the lawn construction site and plan the land area required for construction; S2, constructing the plain soil layer (5), clearing weeds, stones and garbage in the planned area, and then using a tiller to till the soil, then breaking up the tilled soil and mixing it with sand to form mixed soil, and finally paving the mixed soil and tamping it with a tamping machine to construct the plain soil layer (5); S3, laying the gravel layer (4) and the drainage pipe, first use cement to build a frame on the surface of the plain soil layer (5), then lay a layer of gravel at the bottom of the frame, set the drainage pipe on the top of the gravel and let both ends of the drainage pipe pass through the frame, set the seepage part on the top of the drainage pipe, lay gravel again, fill the frame and then level it; S4, laying the concrete layer (3), firstly building a concrete formwork according to the designed area and requirements, then pouring the concrete, and after pouring, using a vibrator to vibrate and level the concrete; S5, laying the shock-absorbing layer (2), first cutting the resin block according to the area to be laid, then opening a slot on the top of the resin block, and then after the concrete layer (3) is cured, using an adhesive to splice and stick the resin block on the top of the concrete layer (3); S6, laying the grass layer (1), gluing and laying the processed grass layer (1) along the top of the shock-absorbing layer (2), and then laying filling particles on the top of the grass layer (1), and brushing the filling particles flat; S7, inspect and maintain the lawn, check the joints and edges of the lawn, and water it after confirming that it is firmly adhered.