Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

84 results about "Drainage design" patented technology

A high-rise residential area forced arrangement scheme generation design method based on a conditional generative adversarial network

The invention provides a high-rise residential area forced arrangement scheme generation design method based on a conditional generative adversarial network. The method comprises the steps of constructing a high-rise residential area conditional generative adversarial network structure model according to a design task book; Generating a data set under supervised pairing training and calling a Python language to adjust the picture size; Performing alternate iterative training on the network until a Nash equilibrium state is reached, and taking the high-rise residential area contour picture to be planned as an input condition to obtain a high-rise residential area forced arrangement scheme total plane graph; Calling a Python language to obtain a pixel gray scale value of the total plane graph so as to construct a high-rise residential area building geometric model; And establishing a building sunshine, fire-fighting performance and urban skyline combined evaluation system through computer simulation analysis and an expert evaluation method. The high-rise residential area forced drainage design scheme can be supported to make a decision, and meanwhile subjective and objective joint evaluation is carried out on the high-rise residential area forced drainage design scheme through building sunshine, fire-fighting performance and urban skyline analysis.
Owner:HARBIN INST OF TECH

Multifunctional water purifier

The invention relates to the technical field of water purification equipment, and particularly relates to a multifunctional water purifier with the functions of sterilization, disinfection, preservation, energy conservation, environment protection and the like. The water purifier adopts a dual-membrane, dual-water and dual-drainage design of an ultrafiltration membrane and a reverse osmosis membrane, an ozone and ultraviolet sterilization, disinfection and preservation design, a filter element exchange reminding function design, a water-saving design, a multifunctional filter element design, an ultrafiltration water, purified water, ozone water, clear water and functional water drainage design, a transparent housing design, and a leakage protection design. The multifunctional water purifier is designed into dual-membrane and dual-row drainage by adopting the dual-membrane, dual-water and dual-drainage design of the ultrafiltration membrane and the reverse osmosis membrane; the drainage capacity can be up to 100%; a plurality of one-way valves are designed in the device; the valves play a plurality of water control requirements; each control switch is properly turned on and off, so as to achieve purified water outlet drainage or ozone water outlet drainage or clear water outlet drainage or functional water outlet drainage or reverse osmosis membrane drain outlet drainage or ultrafiltration membrane drain outlet drainage or leakage protection start.
Owner:王金春

Tunnel counter-slope drainage design method based on water inflow estimation and dynamic monitoring

The invention discloses a tunnel counter-slope drainage design method based on water inflow estimation and dynamic monitoring. The method comprises the following steps that on-site geological survey is carried out, geological conditions of sections where a tunnel is located are learned, and water burst risk assessment is carried out on all the sections through first investigation data; based on power minimization optimization, water inflow of all the sections of the tunnel is estimated, a power minimization optimization method is adopted for carrying out grading calculation on pump stations, and optimal water pump power is selected; the power of the pump stations is set according to the optimal water pump power, it is ensured that the power of all the pump stations is set to correspond to the actual water outlet amount of the tunnel, and a counter-slope drainage scheme is set; a TEM transient electromagnetic method and an induced polarization method are adopted for accurately locating water containing areas of the water containing sections of the tunnel, the water content is estimated, the water inflow of the tunnel face can be dynamically monitored in real time, and the set of the counter-slope drainage arrangement is adjusted according to the water inflow, the water inflow change rate and the estimated water content. The water containing areas before the excavated tunnel face can be located accurately, and the water inflow can be estimated accurately.
Owner:THE FIFTH PROJECT OF CHINA RAILWAY BUREAU 14 GROUP +1

Plane-vertical-horizontal collaborative railroad bed drainage design method

The invention discloses a plane-vertical-horizontal collaborative railroad bed drainage design method. The method includes (S1) constructing a rail track plane custom entity, (S2) constructing a railroad bed engineering custom dictionary, (S3) constructing three view ports in railroad bed drainage plane, vertical and horizontal, (S4) constructing a railroad bed horizontal section custom entity, (S5) designing a drainage ditch horizontal section custom entity, (S6) constructing a drainage ditch plane custom entity and performing drainage ditch plane design, (S7) constructing drainage ditch vertical section custom entity and a drainage ditch slope line custom entity and performing drainage ditch vertical slope design, (S8) performing drainage ditch plane-vertical-horizontal collaborative design, (S9) performing drainage engineering quantity computation and result form output, and (S10) drawing a railroad bed drainage system diagram. By the method, the plane, longitudinal section and horizontal section of a railroad bed drainage ditch are combined organically, vertical-horizontal collaborative drainage design is realized, the design is visual and optimal, random error of manual operation can be avoided effectively, reasonability in plane-vertical-horizontal design is guaranteed, and the method has obvious popularization and application value.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

Determination method for effective resilience moduli of bituminous pavement and bituminous roadbed

ActiveCN103245577AAccurately reflect the law of seasonal changes in intensitySure reasonableMaterial strength using repeated/pulsating forcesCarrying capacityDrainage design
The invention discloses a determination method for effective resilience moduli of a bituminous pavement and a bituminous roadbed. The method comprises the following steps that: I, roadbed strength parameters in different seasons are determined; II, a relation between each roadbed resilience moduli in different seasons and a corresponding influence degree of the roadbed resilience moduli on the carrying capacity of the roadbed is established; and III, the effective resilience modulus of the roadbed variable in the different seasons is determined. Based on the effective resilience modulus of the roadbed with flexure, an influence of different water contents of the roadbed in the different seasons on the roadbed and pavement design flexure can be considered, and a rule of seasonal variation of the roadbed strength can be accurately reflected, so that the determination of design parameters of the roadbed is reasonable, and a bituminous pavement structure design and a roadbed and pavement waterproof and drainage design can be guided well. According to a mutual influence relation of the roadbed and the pavement, the influence degree of the roadbed resilience moduli in the different seasons on the pavement design flexure can be determined, so that the effective resilience modulus of the roadbed can be determined.
Owner:ENG DETECTION & REINFORCING CO LTD OF HENAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD

Farmland underground water drainage design method

The invention relates to a farmland underground water drainage design method. Underground water drainage ditches are vertically distributed in a check field along the water irrigation direction, and the tail ends of the underground water drainage ditches which are vertically distributed are communicated with underground water drainage ditches which are transversely arranged, wherein the depth of each underground water drainage ditch is 0.8-1.2m; each underground water drainage ditch is internally and fully paved by straws or wheat straw fillers to be rolled for 3-5 times back and forth along the ditch by using a stone roller, and soil is gradually filled to be compacted layer by layer after the rolling; a general water drainage pipe is arranged at the middle positions of the underground water drainage ditches which are transversely arranged and an outlet is placed into a farming ditch; and surplus farmland underground water is discharged out. The farmland underground water drainage design method can effectively solve the problem of reducing immersion of a southern region farmland, improves a farmland soil-steam ratio, and increases the ground temperature; and meanwhile, a simple and feasible operation method is provided for comprehensive utilization of the straws. Compared with the prior art, the farmland underground water drainage design method utilizes the pure natural straws or wheat straws, uses local materials, is simple to construct and has a low construction cost, so that materials and used lands are saved; the water drainage effect is obvious; and the farmland underground water drainage design method is good for increasing the production of grains and can be popularized and applied in a large area.
Owner:HOHAI UNIV

On-line spray type quenching equipment for steel tubes

The invention discloses on-line spray type quenching equipment for steel tubes and belongs to the technical field of steel rolling. The on-line spray type quenching equipment aims at achieving the effects that the on-line spray type quenching equipment and method applicable to the steel tubes are provided; an outer spray water supply system and an inner spray water supply system of a spray type steel tube quenching device can adopt the normally-open mode; the scale of water supply and drainage design is a half or more smaller than that of conventional design; constructional investment cost is saved; and production cost and maintenance cost are lowered. The equipment comprises an inner spray water supply water returning device, an outer spray water supply water returning device, the spray type quenching device, an oxidized iron sheet groove device, a water returning treatment device, a cold water pool device and a control device. The invention further discloses another type of quenching equipment which comprises an inner spray water supply water returning device, an outer spray water supply water returning device, the spray type quenching device, an oxidized iron sheet groove device, a cold water pool device and a control device. The equipment is particularly applicable to on-line quenching of the steel tubes.
Owner:UNIV OF SCI & TECH BEIJING

Ultra-clean anti-microbial washing machine and control method thereof

The invention discloses an ultra-clean anti-microbial washing machine and a control method thereof. The washing machine includes a cover plate, a dehydrating drum and a motor, wherein the dehydratingdrum is connected with the motor through a dehydrating shaft, the drum wall of the dehydrating drum is gradually unfolded outwards from bottom to top to form a slant angle, and the bottom of the dehydrating drum is sealed; the upper portion of the dehydrating drum is provided with a drainage hole and a centrifugal valve, and a water containing drum is arranged outside the dehydrating drum; the dehydrating drum is provided with a weighing sensor or a water level sensor. According to the washing machine, the inner and outer drum structures and bottom drainage design of existing washing machinescan be completely changed, the inner and outer drums are integrated to form the dehydrating drum with a sealed bottom, and meanwhile, by utilizing the slant drum wall, forming the drainage hole in theupper portion of the dehydrating drum and arranging the centrifugal valve on the upper portion of the dehydrating drum for conducting drainage, it is ensured that the outer bottom structure of the dehydrating drum maintains dry, the problems of stains and microorganism breeding on the inner and outer drum walls of the existing washing machines can be effectively solved, and secondary contamination of clothes can be avoided; moreover, the washing machine does not need to be cleaned frequently, and is capable of saving water and providing more convenience for users to use.
Owner:上海竟旭机械科技有限公司

Multi-branch horizontal well gas drainage technology in goaf of coal mine

The invention discloses a multi-branch horizontal well gas drainage technology in a goaf of coal mine, which comprises the following steps: (1) calculating the height of caving zones and fracture zones on the upper part of the goaf, determining a gas-rich area in the goaf, and determining a location layout plan for drill wells; (2) selecting well structures; (3) selecting a reasonable drilling tool assembly; (4) calculating a wellbore trajectory according to the location layout plan for drill wells in the step (1); (5) selecting appropriate drilling parameters according to the selected drilling tool assembly and formation lithology to be drilled; (6) optimizing structural parameters of main branches of wells referring to the location layout plan for drill wells in the step (1) as well as the length and width of working faces of the goaf; (7) completing the drilling according to the well design; (8) connecting and assembling ground drainage equipment; and (9) determining reasonable negative pressure extraction and gas drainage procedures according to gas concentration and permeability of a drainage interval, and completing the gas drainage in a target area. According to the invention, drainage design parameters of multi-branch horizontal wells are optimized, so that the total amount of gas drainage can be increased.
Owner:XISHAN COAL ELECTRICITY GRP +1

Gutter inlet with built-in gratings

InactiveCN106703165AImprove flow capacitySolve the problem of being prone to garbage interferenceSewerage structuresGratingDrainage design
The invention discloses a gutter inlet with built-in gratings. The gutter inlet comprises a pond, two assembly partitions and two built-in grating parts, and three cover seats are formed on the pond. Three maintenance cover plates are arranged on the three cover seats respectively. The assembly partitions are arranged on the two sides of the pond respectively and divide the pond body into three areas, two areas on the two sides are water inlet areas, and the area between the water inlet areas is a water outlet area. Dirt interception hanging baskets are arranged on the upper sides of the two water inlet areas respectively. Each built-in grating part comprises a II type cast iron grating and a I type cast iron grating, and the two built-in grating parts are mounted on the two assembly partitions respectively. According to the gutter inlet with the built-in gratings, the advantages of being convenient to clear away, facilitating driving, being safe and reliable and the like are kept, meanwhile, the discharge section area is increased, a water inlet is not likely to be blocked, the requirement of articles of the outdoor drainage design specification are met, garbage is effectively intercepted, the urban landscape environment is considered, and the function need for urban road rainwater collection and drainage and road drainage ecological landscape needs are met.
Owner:SHANGHAI MUNICIPAL TRANSPORTATION DESIGN INST

Coal seam macroscopic fracture advantage development azimuth prediction method

The invention discloses a coal seam macroscopic facture advantage development azimuth prediction method, and belongs to the technical field of the coal main security. The method comprises the following steps: step A, tracking advance of the mining working face, and performing facture photographing on the coal wall of the coal-mining working face and the coal wall of a transportation tunnel to acquire coal wall facture photos; B, processing the coal wall facture photos to highlight pixel display; C, importing the processed coal wall fracture photos into AutoCAD drawing software, and respectively measuring the coal wall facture trace dip information in the 0 to 90 DEG or 0 to -90 DEG according to preset reference azimuth angle; D, drawing the coal wall fracture trace dip angle rose pattern,and dividing the advantage development group; E, according to the advantage development group condition of the step D, predicting the possibly existent fracture face type of the coal seam space; F, establishing the fracture occurrence computation mathematic model according to the space relation between the coal wall of the coal-mining working face and the coal wall of the transportation tunnel; and G, selecting the underground representative coal wall fracture to measure, thereby providing theoretic reference for the coal seam efficient drainage design at a test area.
Owner:GUIZHOU UNIV OF ENG SCI

Hidden self-drainage anti-overflow device for clothing production rinsing sedimentation pool

The invention discloses a hidden self-drainage anti-overflow device for a clothing production rinsing sedimentation pool. The invention relates to the technical field of clothing and apparel. The device comprises a pool body, a water inlet pipe is fixedly connected to the left side of the pool body, a water inlet valve is movably connected to the outer side of the water inlet pipe, a drainage pipeis fixedly connected to the right side of the pool body, an anti-overflow dam is arranged on the outer side of the pool body, and a buffer area is arranged in the anti-overflow dam. According to thehidden self-drainage anti-overflow device for the clothing production rinsing sedimentation pool, the anti-overflow design is matched with the self-drainage design; when the water level in a rinsing pool is increased, the height is automatically increased, the liquid in the pool is effectively prevented from overflowing, the safety of the equipment during use is greatly improved, the equipment canautomatically return to the original position after the water level drops, manual reset is not needed, the operation time is saved, the operation difficulty is reduced, the production efficiency is further improved, and the enterprise income is increased.
Owner:湖州益浩毛纺原料有限公司

Design method of anti-seepage drainage structure for aircraft fuselage equipment compartment

The invention belongs to an anti-seepage drainage design technology for an aircraft structure, and relates to a design method of an anti-seepage drainage structure for an aircraft fuselage equipment compartment. The design method comprises the following steps: 1) a sealing design at the joint of an opening cover and an opening frame, namely sealing the overlapped area of the opening cover and the opening frame by virtue of a compressible sponge rubber sheet and preventing direct seepage of rainwater; 2) an infiltrated rainwater drainage design, namely arranging an inclined flow guide groove of which the section is U-shaped below an opening of the opening cover of the equipment compartment, connecting the lowest point of the flow guide groove with a drainage pipe for discharging slowly infiltrating water out of the aircraft; 3) an infiltrated rainwater seepage design, forming a plurality of drainage holes in the lowest point of the lower surface of the equipment compartment, and leaking the water infiltrating into the equipment compartment out of the aircraft. According to the design method, the water infiltrating into the equipment compartment is timely discharged when water is effectively prevented; and the design method is simple in implementation process, low in cost, and simple and easy to maintain.
Owner:SHENYANG AIRCRAFT DESIGN INST AVIATION IND CORP OF CHINA

BIM-based transformer substation heating ventilation and water supply and drainage design method

The invention relates to a BIM-based transformer substation heating ventilation and water supply and drainage design method. The method comprises the following steps: S1, constructing a transformer substation BIM three-dimensional model; S2, establishing a heating and ventilation BIM three-dimensional model according to the transformer substation BIM three-dimensional model; S3, establishing a water supply and drainage BIM three-dimensional model according to the transformer substation BIM three-dimensional model; S4, uploading the substation BIM three-dimensional model, the heating and ventilation BIM three-dimensional model and the water supply and drainage BIM three-dimensional model to a server; S5, performing three-dimensional model verification on the equipment on the construction site, and acquiring three-dimensional model modification information; and S7, modifying the heating and ventilation BIM three-dimensional model and the water supply and drainage BIM three-dimensional model according to the three-dimensional model modification information. Compared with the prior art, the BIM three-dimensional model is established, and the collision problem is effectively avoided, and double verification ensures that the three-dimensional model conforms to on-site practice, so that the construction quality and efficiency are effectively improved.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

Pipeline penetrating plate fixing structure based on spring pushing type water supply and drainage design

The invention provides a spring pushing type water supply and drainage design pipeline penetrating plate fixing structure, and relates to the technical field of building construction, the spring pushing type water supply and drainage design pipeline penetrating plate fixing structure comprises two groups of lower end covers, and the two groups of lower end covers are located on the two sides of a penetrating plate respectively; the upper end cover is connected to the upper end face of the lower end cover in an inserted mode through a spring pushing clamping assembly, the upper end cover and the lower end cover form a flange-shaped end cover structure, and the outer side of a drainage pipeline is sleeved with the flange-shaped end cover structure; the dismounting operation block is connected to the upper part of the upper end cover in a sliding manner; and the middle block is located in the middle of the two sets of tight supporting blocks, and the drainage pipeline is sleeved with the middle block. According to the pipeline centering device, multidirectional fixing is achieved, the fixing effect is improved, meanwhile, the good centering effect is achieved, the pipeline is effectively prevented from moving, use and operation are easy, the problem that operation is troublesome is solved, and it is difficult to guarantee that the pipeline has good centering performance due to the fact that a flange hole gap is large in the using process.
Owner:吴飞飞

Square well bottom drainage design method

The invention provides a square well bottom drainage design method. The square well bottom drainage design method comprises the following steps of 1, a square well foundation pit is excavated; 2, water guide blind ditches are formed in the periphery of the bottom of the square well; 3, the water guide blind ditches are backfilled with gravels; 4, a drainage pipe bundle is arranged on the outer side of the square well wall, the bottom of the drainage pipe bundle is connected with the water guide blind ditches, and the top of the drainage pipe bundle is connected with the periphery of the top of the square well wall; 5, a cushion layer is fully poured at the bottom of the square well to seal the bottom and seal and cover the water guide blind ditches; 6, the square well is poured; 7, concrete is backfilled around the well wall of the square well to seal a water body, and the drainage pipe bundle is wrapped in the concrete; and 8, a drainage open trench is built on the periphery of the top of the well wall of the square well, and the drainage pipe bundle is fixed to the trench wall of the drainage open trench. The construction difficulty of a traditional masonry structure square well in a high-water-content stratum can be reduced, and the risk that the square well is damaged by a closed water body in the later period and a wellhead device is flooded due to stratum water seepage can be avoided for a long time.
Owner:CHINA PETROLEUM & CHEM CORP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products