The invention discloses a gas injection displacement flow-increasing gas extraction pipeline quick connecting
system which comprises a gas
injection device, a filtering device and a gas metering device, a gas injection opening of the gas
injection device is connected with a gas injection hole sealing
pipe, and a gas inlet of the gas
injection device is connected with a gas injection main
pipe in an underground
coal mine. A gas inlet of the filtering device is connected with an extraction hole sealing
pipe of the gas extraction
system, a gas outlet of the filtering device is connected with a gas inlet of the gas metering device, and the gas outlet of the filtering device is connected with an extraction main pipe in an underground roadway of a
coal mine. The front filter and the sealed water tank are arranged at the front end of the multi-parameter
gas meter and the front end of the
gas meter, the problem that equipment is damaged due to the fact that impurities such as pulverized
coal and condensate water in a pipeline enter the multi-parameter
gas meter and the gas meter is solved, the resistance of an extraction
system is not affected, and therefore accurate measurement for increasing the gas flow is achieved. The pipelines are all of a quick connection structure, firstly, the sealing effect is guaranteed, and the production efficiency is greatly improved.