The invention relates to the technical field of intelligent manufacturing, in particular to an intelligent building
system and method based on BIM, and the
system comprises a key node sorting module, a continuity index calculation module, a node
coupling judgment module, a resource period regulation and control module and a node path rearrangement module. According to the method, through aggregation
processing of the total number of construction node stages, the number of follow-up dependency levels and
risk exposure values, node key levels are ranked through an
analytic hierarchy process model, a construction task priority basis is constructed, a continuity index is formed in combination with task interval duration, a task
switching time ratio and an equipment idle period, and state calibration is carried out; a node
coupling imbalance relationship is judged through a continuity index difference value and a threshold value, a
resource utilization rate is calculated based on a resource calling number, a path load and a
neutral position number to judge a compression and release state, a conflict is identified based on a
task parallelism degree and an equipment occupation conflict rate, and a task
sequence structure is recombined by utilizing a
genetic algorithm. And the
adaptive capacity of the path to resource configuration is enhanced.