High-stability corridor structure
Through the corridor structure and automatic adjustment mechanism made of welding on the ground, the installation and connection stability of high-altitude corridors is solved, efficient and safe installation and automatic detection and repair are achieved, and the stability performance and safety of the corridors are improved.
Patent Information
- Application Number
- CN202411580728.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2024-12-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing high-altitude corridors have difficulties in installation and connection stability. The cost of manual construction is high and the safety risks are high. When the connection is not firm, there is a lack of automatic warning and repair mechanism, resulting in insufficient safety performance.
A high-stable corridor structure was designed, and the corridor made of welding on the ground was hoisted and installed, using steel, cast beams, connecting sleeves and steel cable connection devices, combined with automatic adjustment mechanism and pressure detection device to achieve rapid Positioning and automatic adjustment and early warning functions.
It simplifies the installation process, reduces costs, improves the stability performance and safety of the corridor, realizes automatic detection and repair, and reduces the risk of high-altitude operations.
Smart Images

Figure CN119145284A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of corridors, in particular to a corridor structure with high stability. Background Art
[0002] The existing corridor structures are all made of welded steel structures and fixed between two buildings. The buildings and the corridors are integrated to ensure the stability of the corridors. For some corridors that are lower than the ground, the bottom support method is used to improve the stability of the corridors. However, for some corridors that are higher than the ground, it is not practical to support the corridors by setting supports on the ground. Therefore, there are the following problems with the existing high-altitude corridors: 1. The installation is inconvenient. Most of them adopt the method of manually building a platform and then welding. This method has high labor costs, high-altitude operations have safety hazards, and the construction cost is also high; 2. The connection stability between the corridor and the two buildings is poor, and multiple means cannot be used to strengthen the connection between the corridor and the building; 3. The existing corridors do not have real-time detection equipment. When the corridor connection is not firm, it cannot automatically realize early warning and automatic repair, and the safety performance of the corridor cannot be increased. Summary of the invention
[0003] The purpose of the present invention is to provide a corridor structure with high stability in view of the defects of the prior art, so as to solve the problems raised by the above-mentioned background technology.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a high-stability corridor structure, comprising a corridor, the corridor is arranged between two buildings, the inner side of the casting beam of the building is provided with a steel section, the outer side of the casting beam is provided with a connecting sleeve, both ends of the corridor are welded with connecting plates matching the connecting sleeve, the top and bottom of the connecting plate are provided with a plurality of through rectangular plug holes, the upper end and the lower end of one side of the connecting sleeve are provided with a plurality of U-shaped plug plates matching the rectangular plug holes, the top of the corridor is installed with a plurality of steel cable connecting seats, and the steel cable connecting seats are connected to the steel cable connecting and fastening devices on the casting beam through steel cables;
[0005] The steel cable connection and fastening device is composed of an automatic adjustment mechanism and a first U-shaped connection seat, in which a first steel cable fixing head for connecting the steel cable is installed;
[0006] The steel cable connecting seat is composed of a mounting seat and a second U-shaped connecting seat, a second steel cable fixing head for connecting the steel cable is installed in the second U-shaped connecting seat, and pressure detection devices are installed on the first steel cable fixing head and the second steel cable fixing head for detecting the traction force of the steel cable;
[0007] The U-shaped inserting plate is connected to the automatic adjustment mechanism on the casting beam and is used for adjusting the telescopic distance of the U-shaped inserting plate.
[0008] As a preferred technical solution of the present invention, the automatic adjustment mechanism includes an adjustment box, two movable grooves are arranged on both sides of the interior of the adjustment box, a reduction box is installed at one end of the movable groove, a motor is installed on one side of the reduction box, a screw rod is connected to the other side of the reduction box, one end of the screw rod is connected to a bearing, a slider is threadedly connected to the screw rod, the slider is welded on both sides of the movable plate, a telescopic rod is welded to the middle part of the movable plate, and one end of the telescopic rod passes through one end surface of the adjustment box and is fixedly connected to the first U-shaped connecting seat.
[0009] As a preferred technical solution of the present invention, the adjustment box is installed on the casting beam through mounting plates welded at both ends, the casting beam and the connecting sleeve are provided with through holes for the telescopic rod to pass through, and the first U-shaped connecting seat and the U-shaped plug plate are both welded to one end of the telescopic rod.
[0010] As a preferred technical solution of the present invention, the second steel cable fixing head is installed on the second U-shaped connecting seat through a connecting shaft and a bearing, and is pivotally connected to the second U-shaped connecting seat through a connecting shaft and a bearing. The second U-shaped connecting seat is welded to the mounting seat, and the mounting seat is welded to the keel at the top of the corridor.
[0011] As a preferred technical solution of the present invention, the first steel cable fixing head is pivotally connected to the first U-shaped connecting seat through a connecting shaft and a bearing, the steel cable passes through the first steel cable fixing head and the second steel cable fixing head and is fixedly connected to the steel cable connecting plate, and a pressure detection device is installed at the contact position between the steel cable connecting plate and the first steel cable fixing head and the second steel cable fixing head, and a pressure detection device is also installed on the inner side of the U-shaped plug plate. The pressure detection device is a pressure sensor, and the pressure detection device is electrically connected to the alarm and the motor through a controller.
[0012] As a preferred technical solution of the present invention, the connecting sleeve is made of welded steel plates, the connecting sleeve is welded to the steel section through a plurality of connecting frames, the connecting sleeve is also fixed to the casting beam by bolts, and the steel section and the casting beam are fixedly connected by bolts.
[0013] As a preferred technical solution of the present invention, the connecting sleeve is U-shaped, a first connecting hole is provided on the connecting sleeve, a second connecting hole matching the first connecting hole is provided on the connecting plate, and the connecting plate and the connecting sleeve are connected by plugging.
[0014] As a preferred technical solution of the present invention, the U-shaped plug board is plug-connected to the rectangular plug hole.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] 1. This corridor is welded on the ground and then installed between two buildings by hoisting. The installation is very simple and convenient. The connecting plates at both ends of the corridor are inserted into the connecting sleeves on the building to achieve rapid positioning, improve efficiency, save costs, and reduce the safety issues of long-term high-altitude operations;
[0017] 2. The corridor of the present invention is connected to the building in a variety of ways. A plurality of steel sections and cast beams are used as the connection basis. The inclined steel cables, the connecting sleeves of the corridor, the U-shaped inserts and a large number of bolts are used to firmly connect the corridor and the building together, thereby improving the stability of the corridor.
[0018] 3. The corridor of the present invention is provided with pressure detection modules on the inclined steel cables and the U-shaped plug plates. When the corridor becomes loose, the tightness can be automatically adjusted through the adjustment box provided by the present invention, and an early warning can be issued to remind the maintenance personnel, which brings great safety to the use of the corridor. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the connection structure between the corridor and the building of the present invention;
[0020] Figure 2 It is a structural schematic diagram of the corridor of the present invention;
[0021] Figure 3 It is a structural schematic diagram of the connecting sleeve of the present invention;
[0022] Figure 4 It is a structural schematic diagram of the steel cable connection and fastening device of the present invention;
[0023] Figure 5 It is a structural schematic diagram of the steel cable connecting seat of the present invention;
[0024] Figure 6 It is a schematic diagram of the connection structure between the U-shaped plug board and the adjustment box of the present invention.
[0025] In the figure: 1, corridor; 2, building; 3, cast beam; 4, connecting sleeve; 5, steel; 6, steel cable; 7, steel cable connection and fastening device; 8, steel cable connecting seat; 9, connecting frame; 10, first connecting hole; 11, connecting plate; 12, second connecting hole; 13, U-shaped plug plate; 14, rectangular plug hole; 701, automatic adjustment mechanism; 702, adjustment box; 703, movable groove; 704, slider; 705, screw rod; 706, telescopic rod; 707, reduction box; 708, motor; 709, mounting plate; 710, first U-shaped connecting seat; 711, first steel cable fixing head; 712, movable plate; 801, mounting seat; 802, second U-shaped connecting seat; 803, second steel cable fixing head; 804, pressure detection device; 805, rotating shaft; 806, steel cable fixing plate. DETAILED DESCRIPTION
[0026] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.
[0027] Example: See Figure 1-6 The present invention provides a technical solution: a corridor structure with high stability, including a corridor 1, which is arranged between two buildings 2 and is used to connect the two buildings. A steel section 5 is arranged on the inner side of the pouring beam 3 of the building 2, and the steel section 5 is fixed on the pouring beam 3. The steel section 5 is provided with a plurality of pieces and a connecting base connected to the corridor 1 is formed with the plurality of pouring beams 3. The base has good stability and a firm structure. A connecting sleeve 4 is arranged on the outer side of the pouring beam 3. Connecting plates 11 matching the connecting sleeve 4 are welded at both ends of the corridor 1. The corridor 1 is positioned and connected by inserting the connecting plate 11 on the connecting sleeve 4. The top and bottom of the connecting plate 11 are A plurality of through rectangular plug holes 14 are provided, and a plurality of U-shaped plug plates 13 matching the rectangular plug holes 14 are provided at the upper and lower ends of one side of the connecting sleeve 4. The U-shaped plug plates 13 are inserted into the rectangular plug holes 14, and the size of the rectangular plug holes 14 is larger than the U-shaped plug plates 13, so that the U-shaped plug plates 13 and the connecting plates 11 are integrated to adjust the lateral pulling force of the connecting base on the connecting plates 11. A plurality of steel cable connecting seats 8 are installed on the top of the corridor 1, and the steel cable connecting seats 8 are connected to the steel cable connecting and fastening devices 7 on the casting beams 3 through the steel cables 6. The middle part of the corridor is made more stable by the inclined steel cables, so that part of the gravity in the middle part of the corridor is distributed to the casting beams 3, thereby reducing the load-bearing pressure of the connecting sleeve 4;
[0028] like Figure 4 As shown: the steel cable connection and fastening device 7 is composed of an automatic adjustment mechanism 701 and a first U-shaped connection seat 710, and a first steel cable fixing head 711 for connecting the steel cable 6 is installed in the first U-shaped connection seat 710;
[0029] like Figure 5 As shown: the steel cable connecting seat 8 is composed of a mounting seat 801 and a second U-shaped connecting seat 802, a second steel cable fixing head 803 for connecting the steel cable 6 is installed in the second U-shaped connecting seat 802, and a pressure detection device 804 is installed on the first steel cable fixing head 711 and the second steel cable fixing head 803 for detecting the traction force of the steel cable 6; the steel cable is connected by the steel cable connecting fastening device 7 and the steel cable connecting seat 8, which is convenient for installation;
[0030] like Figure 6As shown: the U-shaped plug plate 13 is connected to the automatic adjustment mechanism 701 on the casting beam 3, which is used to adjust the telescopic distance of the U-shaped plug plate 13, so that when the corridor is installed, the U-shaped plug plate 13 can be accurately aligned with the rectangular plug hole 14, and a lateral pulling force can be applied to the corridor to improve the stability of the corridor.
[0031] like Figure 4 As shown: the automatic adjustment mechanism 701 includes an adjustment box 702, two movable grooves 703 are arranged on both sides of the interior of the adjustment box 702, a reduction box 707 is installed at one end of the movable groove 703, a motor 708 is installed on one side of the reduction box 707, and a screw rod 705 is connected to the other side of the reduction box 707. The length extension direction of the screw rod 705 is parallel to the horizontal direction of the corridor 1, one end of the screw rod 705 is connected to a bearing, and a slider 704 is connected to the screw rod 705 through a thread, the screw rods 705 in the two movable grooves 703 are symmetrically distributed about the movable plate 712, the sliders 704 are welded on both sides of the movable plate 712, and a telescopic rod 706 is welded to the middle part of the movable plate 712, and one end of the telescopic rod 706 passes through one end surface of the adjustment box 702 and is fixedly connected to the first U-shaped connecting seat 710.
[0032] The motor 708 works to drive the gears in the reduction box 707 to rotate, thereby driving the screw rod 705 to rotate in the bearing, allowing the slider 704 on the screw rod 705 to move in the movable groove 703, thereby driving the telescopic rod 706 on the movable plate 712 to move, and the telescopic rod 706 is retracted by the reverse rotation of the motor, and the telescopic rod 706 is extended by the forward rotation of the motor. The extension and retraction of the telescopic rod 706 is used to adjust the tension of the steel cable and the U-shaped plug plate 13.
[0033] The regulating box 702 is installed on the casting beam 3 through the mounting plates 709 welded at both ends. The casting beam 3 and the connecting sleeve 4 are provided with through holes for the telescopic rod 706 to pass through the casting beam 3, so that the telescopic rod 706 can extend and retract through the casting beam 3. The first U-shaped connecting seat 710 and the U-shaped plug plate 13 are both welded to one end of the telescopic rod 706 to improve firmness.
[0034] The second steel cable fixing head 803 is pivotally connected to the second U-shaped connecting seat 802 through a connecting shaft and a bearing. The second U-shaped connecting seat 802 is welded to the mounting seat 801. The mounting seat 801 is welded to the keel at the top of the corridor 1, so that the mounting seat 801 is integrated with the main structure of the corridor to improve stability.
[0035] like Figure 4-6As shown: the first steel cable fixing head 711 is pivotally connected to the first U-shaped connecting seat 710 through a connecting shaft and a bearing, the steel cable 6 passes through the first steel cable fixing head 711 and the second steel cable fixing head 803 and is fixedly connected to the steel cable connecting plate 806, and a pressure detection device 804 is installed at the contact position between the steel cable connecting plate and the first steel cable fixing head 711 and the second steel cable fixing head 803, and a pressure detection device 804 is also installed on the inner side of the U-shaped plug plate 13. The pressure detection device 804 is a pressure sensor, which is electrically connected to the alarm and the motor 708 through the controller, and uses the pressure sensor to detect the tension of the steel cable and the U-shaped plug plate 1 3. The tension of the corridor is specifically as follows: when the steel cable 6 is tightened, the tension of the steel cable 6 on the steel cable connecting plate 806 causes the steel cable connecting plate 806 to generate pressure on the pressure detection device 804, and the electrical signal transmitted to the controller by the pressure detection device 804 is used to detect the tension of the steel cable; when the motor 708 rotates in the reverse direction, the telescopic rod 706 connected to the U-shaped plug plate 13 is driven to be retracted into the inside of the adjustment box 702, thereby driving the pressure detection device 804 on the U-shaped plug plate 13 to generate pressure on the inner wall of the rectangular plug hole 14, and the electrical signal transmitted to the controller by the pressure detection device 804 is used to detect the tension of the U-shaped plug plate 13.
[0036] like Figure 3 As shown: the connecting sleeve 4 is made of welded steel plates, the connecting sleeve 4 is welded to the steel section 5 through a number of connecting frames 9, the connecting sleeve 4 is also fixed to the casting beam 3 by bolts, and the steel section 5 is fixed to the casting beam 3 by bolts, thereby improving the firmness of the connection between the connecting sleeve 4 and the connecting base.
[0037] The connecting sleeve 4 is U-shaped, and is provided with a first connecting hole 10 . The connecting plate 11 is provided with a second connecting hole 12 matching the first connecting hole 10 . The connecting plate 11 is connected to the connecting sleeve 4 by plugging.
[0038] The U-shaped plug plate 13 is plugged and connected with the rectangular plug hole 14 to achieve accurate positioning of the corridor installation.
[0039] A high-stability corridor structure, the specific steps of installation are as follows:
[0040] The first step: lift the corridor 1 to a height higher than the connecting sleeve 4 by a crane or a gantry, and then slowly lower the corridor 1 by a crane, so that the connecting plates 11 at both ends of the corridor 1 are inserted into the connecting sleeve 4. During the insertion, the U-shaped plug plate 13 at the top of the connecting sleeve 4 is retracted into the adjustment box 702, and the U-shaped plug plate 13 at the bottom of the connecting sleeve 4 is extended to a set distance. When the rectangular plug hole 14 at the bottom of the connecting plate 11 drops to the upper end of the U-shaped plug plate 13 at the bottom of the connecting sleeve 4, the U-shaped plug plate 13 at the top of the connecting sleeve 4 is extended to a set distance, so that the U-shaped plug plate 13 at the top of the connecting sleeve 4 is aligned with the rectangular plug hole 14 at the top of the connecting plate 11, and then the connecting plate 11 is slowly lowered, so that the rectangular plug hole 14 is inserted on the U-shaped plug plate 13, and then the pressure detection device 804 on the inner side of the U-shaped plug plate 13 is tightly fitted with the inner wall of the rectangular plug hole 14 by contracting the U-shaped plug plate 13;
[0041] Step 2: Connect the steel cable 6 connected to the steel cable connection and fastening device 7 to the steel cable connection seat 8 at the top of the corridor 1, and then use multiple bolts to fix the connecting sleeve 4 and the connecting plate 11 together;
[0042] The third step, after the installation is completed, the telescopic rod 706 is moved by the steel cable connection fastening device 7, so that the telescopic rod 706 drives the first U-shaped connecting seat 710 to move, and the first U-shaped connecting seat 710 is moved to tighten the steel cable 6. The value of the pulling force can be intuitively seen through the pressure detection device 804, and it is set as a safe value and recorded in the system. At the same time, the automatic adjustment mechanism 701 is used to drive the U-shaped plug plate 13 to move, so that the pressure detection device 804 on the inner side of the U-shaped plug plate 13 squeezes the inner wall of the rectangular plug hole 14. The pressure detection device 804 can detect the squeezing force and record it in the system. The pressure detection device 804 is used for real-time detection. When the detection value is less than the set value, the controller controls the motor 708 to work, thereby realizing automatic reinforcement of the corridor 1 and improving safety performance.
[0043] The above embodiments only express the implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention.
Claims
1. A corridor structure with high stability, comprising a corridor (1), characterized in that: The corridor (1) is arranged between two buildings (2); a steel section (5) is arranged on the inner side of the pouring beam (3) of the building (2); a connecting sleeve (4) is arranged on the outer side of the pouring beam (3); connecting plates (11) matching the connecting sleeve (4) are welded at both ends of the corridor (1); a plurality of through rectangular plug holes (14) are arranged on the top and bottom of the connecting plate (11); a plurality of U-shaped plug plates (13) matching the rectangular plug holes (14) are arranged on the upper and lower ends of one side of the connecting sleeve (4); a plurality of steel cable connecting seats (8) are installed on the top of the corridor (1); the steel cable connecting seats (8) are connected to the steel cable connecting and fastening device (7) on the pouring beam (3) through a steel cable (6); The steel cable connection and fastening device (7) is composed of an automatic adjustment mechanism (701) and a first U-shaped connection seat (710), wherein a first steel cable fixing head (711) for connecting the steel cable (6) is installed in the first U-shaped connection seat (710); The steel cable connecting seat (8) is composed of a mounting seat (801) and a second U-shaped connecting seat (802); a second steel cable fixing head (803) for connecting the steel cable (6) is installed in the second U-shaped connecting seat (802); and a pressure detection device (804) is installed on both the first steel cable fixing head (711) and the second steel cable fixing head (803) for detecting the traction force of the steel cable (6); The U-shaped inserting plate (13) is connected to an automatic adjustment mechanism (701) on the casting beam (3) and is used to adjust the telescopic distance of the U-shaped inserting plate (13).
2. The high stability corridor structure according to claim 1 is characterized in that: The automatic adjustment mechanism (701) comprises an adjustment box (702), two movable grooves (703) are arranged on both sides of the inside of the adjustment box (702), a reduction box (707) is installed at one end of the movable groove (703), a motor (708) is installed at one side of the reduction box (707), a screw rod (705) is connected to the other side of the reduction box (707), one end of the screw rod (705) is connected to a bearing, a slider (704) is connected to the screw rod (705) through a thread, the slider (704) is welded to both sides of a movable plate (712), a telescopic rod (706) is welded to the middle part of the movable plate (712), and one end of the telescopic rod (706) passes through one end surface of the adjustment box (702) and is fixedly connected to a first U-shaped connecting seat (710).
3. The high stability corridor structure according to claim 2 is characterized in that: The regulating box (702) is mounted on the casting beam (3) via mounting plates (709) welded at both ends; the casting beam (3) and the connecting sleeve (4) are both provided with through holes for the telescopic rod (706) to pass through; the first U-shaped connecting seat (710) and the U-shaped plug plate (13) are both welded to one end of the telescopic rod (706).
4. The high stability corridor structure according to claim 3 is characterized by: The second steel cable fixing head (803) is pivotally connected to the second U-shaped connecting seat (802) via a connecting shaft and a bearing. The second U-shaped connecting seat (802) is welded to the mounting seat (801), and the mounting seat (801) is welded to the keel at the top of the corridor (1).
5. The high stability corridor structure according to claim 4 is characterized in that: The first steel cable fixing head (711) is pivotally connected to the first U-shaped connecting seat (710) via a connecting shaft and a bearing; the steel cable (6) passes through the first steel cable fixing head (711) and the second steel cable fixing head (803) and is fixedly connected to the steel cable connecting plate (806); a pressure detection device (804) is installed at the contact position between the steel cable connecting plate and the first steel cable fixing head (711) and the second steel cable fixing head (803); a pressure detection device (804) is also installed on the inner side of the U-shaped plug plate (13); the pressure detection device (804) is a pressure sensor, and the pressure detection device (804) is electrically connected to the alarm and the motor (708) via a controller.
6. The high-stability corridor structure according to claim 1 is characterized by: The connecting sleeve (4) is made of welded steel plates, the connecting sleeve (4) is welded to the steel section (5) via a plurality of connecting frames (9), the connecting sleeve (4) is also fixed to the casting beam (3) via bolts, and the steel section (5) is fixed to the casting beam (3) via bolts.
7. The high stability corridor structure according to claim 1 is characterized by: The connecting sleeve (4) is U-shaped, a first connecting hole (10) is provided on the connecting sleeve (4), a second connecting hole (12) matching the first connecting hole (10) is provided on the connecting plate (11), and the connecting plate (11) and the connecting sleeve (4) are connected in a plug-in manner.
8. The high-stability corridor structure according to claim 1 is characterized by: The U-shaped plug board (13) is plug-connected to the rectangular plug hole (14).
Citation Information
Cited By
Quick mounting structure and method for steel structure corridor
CN119593496A
Quick installation structure and method of steel structure corridor
CN119593496B
