Electric power standard construction method and equipment
By automatically obtaining and optimizing power standard data and generating target power standard documents, the problems of long time, low accuracy and untimely updates in the existing technology of manual construction of power system standards are solved, and more efficient and accurate power standard construction is achieved.
Patent Information
- Application Number
- CN202411683256.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2044-11-22
AI Technical Summary
The existing technology relies on manual labor when building a standard system for power systems, resulting in long time periods, low accuracy and untimely updates.
By automatically obtaining the power demand information of the target construction object, determining the power standard keyword, obtaining power standard data, generating initial power standard files, and optimizing the target power standard files to generate the target power standard files.
It improves the accuracy and generation efficiency of power standard documents, reduces the influence of human factors, and ensures timely updates of the standard system.
Smart Images

Figure CN119180472B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power standards, and in particular to an electric power standard construction method and computing equipment. Background Art
[0002] Accelerating the construction of a new power system is a key carrier to help achieve the "dual carbon" goal, and it is also an effective measure to cope with the challenges of power transformation. At the same time, it also puts forward new requirements for the construction of the power system standard system. In the existing technology, when constructing the power system standard system, it is necessary to rely on manual methods, which takes a long time. From the collection of relevant policies and regulations of the standard system, standard documents, to the generation of standard system structure diagrams, standard detailed tables, etc., all are done manually and take a long time. Due to the great influence of human factors and insufficient level of informatization. The construction of the standard system requires standardization personnel to master the basic knowledge of standardization, so the output results of the standard system will vary from person to person. Due to the large number of human factors, the constructed power system standard system is inaccurate, or the power system standard system cannot be updated in time. Summary of the invention
[0003] In order to improve the existing technical problems, the embodiments of the present invention provide a method and a computing device for constructing an electric power standard, which can improve the accuracy of the electric power standard file of the target construction object, and can improve the efficiency of generating the electric power standard file.
[0004] The technical solution of the embodiment of the present invention is achieved as follows:
[0005] In a first aspect, a method for constructing an electric power standard is provided, comprising: obtaining electric power demand information of a target construction object; determining electric power standard keywords based on the electric power demand information, and obtaining electric power standard data of the target construction object based on the electric power standard keywords; generating an initial electric power standard file of the target construction object based on the electric power standard data; obtaining a reference electric power standard file; generating a target electric power standard file of the target construction object based on the initial electric power standard file and the reference electric power standard file, and outputting the target electric power standard file.
[0006] In a second aspect, a computing device is provided, including:
[0007] Memory, used to store computer programs;
[0008] A processor is used to execute the computer program to implement the power standard construction method as described in any embodiment of the present application.
[0009] The power standard construction method and electronic device provided in the embodiments of the present application have at least the following beneficial effects:
[0010] The embodiment of the present application automatically obtains the power demand information of the target construction object, and automatically obtains the power standard keywords based on the power demand information, obtains the power standard data of the target construction object based on the power standard keywords, generates the initial power standard file of the target construction object based on the power standard data, and obtains the reference power standard file used as a reference when optimizing the initial power standard file. Since the reference power standard file is a normative power standard file, the target power standard file of the target construction object can be quickly generated based on the initial power standard file and the reference power standard file. Since the whole process mainly involves the computer automatically obtaining data and generating power standard files, the accuracy of the power standard file of the target construction object can be improved, which can improve the efficiency of generating power standard files. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 A schematic diagram of an optional application scenario of a method for constructing a power standard in an embodiment;
[0012] Figure 2 is a flow chart of a method for constructing an electric power standard in one embodiment;
[0013] Figure 3 is a schematic diagram of a standard detail list in one embodiment;
[0014] Figure 4 is a schematic diagram of a power standard system architecture in one embodiment;
[0015] Figure 5 is a schematic diagram of a power standard construction device in one embodiment;
[0016] Figure 6 Schematic diagram of the structure of a control device in one embodiment. DETAILED DESCRIPTION
[0017] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0018] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the scope of protection of the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0019] In the following description, reference is made to “some embodiments”, which describes a subset of all possible embodiments, but it should be understood that “some embodiments” may be the same subset or different subsets of all possible embodiments and may be combined with each other without conflict.
[0020] See also Figure 1 , is a schematic diagram of an optional application scenario of the power standard construction method provided in an embodiment of the present application, the application scenario diagram includes a computing device 10 and a terminal device 20, the computing device 10 is used to obtain power demand information, construct a power standard according to the power demand information, and output the power standard. The computing device 10 and the terminal device 20 can communicate through a wired network or a wireless network. The terminal device 20 can interact with the computing device 10, and the user can input power demand information, manually review and modify some data, etc. through the terminal device 20. The user can also request the constructed power standard from the computing device 10 through the terminal device 20, etc. The terminal device 20 can be one or more, and different users correspond to different terminal devices 20.
[0021] The computing device 10 includes but is not limited to a desktop computer, a laptop computer, a tablet computer, a handheld computer, a smart speaker, a server, etc., a mobile phone (e.g., a smart phone, a wireless phone, etc.), a wearable device (e.g., a pair of smart glasses or a smart watch), or a similar device. The terminal device 20 includes but is not limited to a desktop computer, a laptop computer, a tablet computer, a handheld computer, a mobile phone (e.g., a smart phone, a wireless phone, etc.), a wearable device (e.g., a pair of smart glasses or a smart watch), or a similar device.
[0022] See also Figure 2 , which is a method for constructing an electric power standard provided in an embodiment of the present application, and can be applied to Figure 1 The computing device 10 shown includes the following steps:
[0023] S10. Obtaining power demand information of the target construction object.
[0024] In this embodiment, the target construction object indicates the object for which the power standard needs to be established. The target construction object can be a country, region, etc. The power demand information indicates the demand data of the target construction object for the power standard that needs to be established. The power demand information includes but is not limited to business field requirements, standard category requirements, standard level requirements, etc. For example, the user can enter the power demand information on the user interface of the terminal device 20. After the terminal device 20 obtains the power demand information entered by the user, it sends it to the computing device 10. In some embodiments, the power demand information can also be directly entered on the user interface provided by the computing device 10. The input power demand information can be a paragraph, or it can be a power standard keyword, etc.
[0025] S11. Based on the power demand information, determine power standard keywords, and obtain power standard data of the target construction object using the power standard keywords.
[0026] In this embodiment, when the power demand information is composed of multiple keywords, the multiple keywords can be directly used as power standard keywords. When the power demand information is a text description, text analysis and natural language processing methods can be used to identify multiple keywords in the power demand information, and then the identified multiple keywords are used as power standard keywords.
[0027] In some embodiments, crawler technology can also be used to search for associated data related to power standard keywords on the Internet, and the associated data includes but is not limited to power standard documents, policy and regulatory documents, etc. Text analysis and natural language processing methods are used to extract relevant content of various standard categories from the associated data, so as to classify the associated data and obtain the power standard data of the target construction object. The text analysis and natural language processing methods include but are not limited to: word segmentation, semantic analysis, syntactic analysis, text classification, keyword extraction, etc. The standard categories include but are not limited to basic standards, method standards, product, process and service standards, parts and components standards, raw material standards, safety, health and environmental protection standards and other standards. Each standard category can also be further subdivided into standard subcategories.
[0028] In some embodiments, the power standard data may be stored in a database, including but not limited to a NoSql database, a MySql database, a SqlServer or an Oracle database.
[0029] S12. Generate an initial power standard file for the target construction object based on the power standard data.
[0030] In this embodiment, the initial power standard file can be presented in the form of a standard two-dimensional table. The initial power standard file includes but is not limited to information such as standard category, standard name, standard level, standard number, implementation date, etc. That is, the standard two-dimensional table can be an Excel table, for example, the standard category, standard name, standard level, standard number, and implementation date are respectively located in the cells in the first row of the Excel table.
[0031] In some embodiments, before generating the initial power standard file, the power standard data needs to be preprocessed. Since the automatically collected power standard data may contain missing information, duplicate data, erroneous data, invalid data, etc., the preprocessing operation includes but is not limited to deduplication, checking whether the power standard data is the latest standard, checking whether the power standard data is formal power standard data, etc., whether the power standard data is complete, and whether the power standard data has errors. Invalid data includes but is not limited to power standard data that is not the latest time and informal power standard data. For example, multiple standard data can be automatically deduplicated; time data is obtained from the power standard data, and whether it is the latest power standard data is determined based on the time data; when keywords indicating informal standard files are obtained from the power standard data, the power standard data is determined to be informal power standard data. For example, keywords of informal standard files include but are not limited to draft opinions, draft consultations, etc. The power standard data is provided with preset formats and content items. When there is a blank content item in the power standard data, it indicates that the power standard data is incomplete; each content item is configured with a corresponding format. When the format of the content item in the power standard data is different from the preset format, or the content of the content condition does not match the preset keyword, it indicates that the power standard data is wrong. For incomplete power standard data or erroneous power standard data, these power standard data can be sent to the terminal device 20, and the expert user of the terminal device 20 can modify and verify these power standard data on the provided user interface. The terminal device 20 obtains the power standard data modified by the expert user, and sends the modified power standard data to the computing device 10, and the computing device 10 updates the power standard data according to the modified power standard data.
[0032] S13. Obtain reference power standard files.
[0033] In this embodiment, the reference power standard file is a reference file for constructing the power standard of the target construction object. The reference power standard file is a standardized power standard.
[0034] S14. Generate a target power standard file of the target construction object based on the initial power standard file and the reference power standard file, and output the target power standard file.
[0035] In this embodiment, the target power standard file is a power standard file that is automatically improved based on the reference power standard file. The output form of the target power standard file includes but is not limited to a standard table. Figure 3 As shown, Figure 3 This is an example of a standard specification in an embodiment; each standard category and standard subcategory can correspond to a unique number. Figure 3This is just an illustration, other data may also be included in the standard schedule.
[0036] In this embodiment, the target power standard file is generated based on the power standard architecture, where the power standard architecture includes standard categories and standard subcategories under each standard category. The power standard architecture can also be output in the form of JPEG, TIFF, PNG and other formats. For example, Figure 4 As shown, Figure 4 It is a schematic diagram of a certain electric power standard system structure in one embodiment. The electric power standard system structure includes two major standard categories, technical basic standards and technical professional standards, and the technical benchmark standards include multiple subcategories.
[0037] In the above embodiment, the power demand information of the target construction object is automatically obtained, and the power standard keywords are automatically obtained based on the power demand information. Based on the power standard keywords, the power standard data of the target construction object is obtained, and based on the power standard data, the initial power standard file of the target construction object is generated, and a reference power standard file used as a reference when optimizing the initial power standard file is obtained. Since the reference power standard file is a normative power standard file, the target power standard file of the target construction object can be quickly generated based on the initial power standard file and the reference power standard file. Since the entire process mainly involves the computer automatically acquiring data and generating power standard files, the accuracy of the power standard file of the target construction object can be improved, which can improve the efficiency of generating power standard files.
[0038] In some embodiments, the initial electricity standard file and the reference electricity standard file include at least one of the following: standard category, standard name, standard level, business field, wherein the standard level includes at least one of the following: international standard, national standard, industry standard, local standard and group standard.
[0039] In this embodiment, the standard category indicates the category of each standard. The standard name is the name of each standard, the standard level is the level to which each standard belongs, and the business field is the field to which each standard belongs. The business field includes but is not limited to power generation, transmission, transformation, distribution, power consumption, standby, energy storage and hydrogen energy.
[0040] In some embodiments, generating a target power standard file of the target construction object based on the initial power standard file and the reference power standard file, and outputting the target power standard file includes:
[0041] Based on the initial power standard file and the reference power standard file, according to at least one screening keyword, the association standard with the at least one screening keyword is screened, and based on the association standard, the target power standard file is output, wherein the at least one screening keyword includes: business field keywords, standard category keywords, standard name keywords, standard level keywords, keywords corresponding to the screening keywords in the translated version of the standard, and keyword identifiers indicating important key keywords.
[0042] In this embodiment, a variety of different translation versions can be configured for the initial power standard file and the reference power standard file, and each translation version corresponds to its own screening keyword. For the screening keywords, a keyword identifier can be configured. For example, for the business field keywords, a keyword identifier can be configured. The keyword identifier can indicate whether it is important or not. When the keywords in a certain business field are indicated as important, the keywords in the business field are the key keywords. If the keywords in the business field are screened, it means that the business field is an important business field. For example, national standard keywords such as IEC, ISO, etc.; national standard keywords such as GB, DL, DB, etc.
[0043] In the above embodiment, based on the initial power standard file and the reference power standard file, according to at least one screening keyword, the association standard with the at least one screening keyword is screened, and based on the association standard, the target power standard file is output. The association standard can be screened based on a variety of different screening keywords, which can improve the accuracy of the power standard file of the target construction object, and can improve the efficiency of generating power standard files.
[0044] In some embodiments, based on the initial power standard file and the reference power standard file, according to at least one screening keyword, screening the association standard with the at least one screening keyword, and outputting the target power standard file based on the association standard, includes:
[0045] According to at least one screening keyword, a first target standard category is obtained from the initial power standard file, wherein the first target standard category satisfies a first preset condition, and the first preset condition includes that the standard level corresponding to the first target standard category in the initial power standard file and the reference power standard file includes an international standard;
[0046] Acquire a first international standard corresponding to the first target standard category;
[0047] According to the first international standard, matching a first reference category where the first international standard is located in the reference power standard file;
[0048] The standard data corresponding to the first target standard category is stored in the standard data corresponding to the first reference category to form the target standard data of the first target standard category in the target power standard file.
[0049] In this embodiment, for the first target standard category, the standard levels corresponding to this category in the initial power standard file and the reference power standard file all include international standards. For example, if the target construction object is object T, the reference power standard file is the power standard system of object Z, and the first target standard category is A1, for a category A1 of object T, this category A1 has an international standard B1. According to the keywords of the international standard B1, the category where the international standard B1 is located is searched in the reference power standard file of object Z, and the standard data of category A1 corresponding to the international standard B1 of object T is put into the category where the international standard B1 of object Z is located in the reference power standard file of object Z as a category, forming the standard clause content of this category A1 in the target power standard file of object T.
[0050] In the above embodiment, for the standard levels corresponding to this category in the initial power standard file and the reference power standard file, both include international standards, the standard data corresponding to the first target standard category is stored in the standard data corresponding to the first reference category to form the target standard data of the first target standard category in the target power standard file, which can improve the accuracy of the power standard file of the target construction object and improve the efficiency of generating the power standard file.
[0051] In some embodiments, based on the initial power standard file and the reference power standard file, according to at least one screening keyword, screening the association standard with the at least one screening keyword, and outputting the target power standard file based on the association standard, includes:
[0052] According to at least one screening keyword, a second target standard category is obtained from the initial power standard file, wherein the second target standard category satisfies a second preset condition, the second preset condition including that the standard level corresponding to the second target standard category in the initial power standard file does not include an international standard, and the standard level corresponding to the second target standard category in the reference power standard file includes an international standard;
[0053] According to the keywords of the second target standard category, searching the reference power standard file for a second international standard corresponding to the keywords of the second target standard category, and obtaining a second reference category corresponding to the second international standard in the reference power standard file;
[0054] The standard data of the second target standard category is stored in the standard data corresponding to the second reference category to form the target standard data of the second target standard category in the target power standard file.
[0055] In this embodiment, the standard level corresponding to the second target standard category in the initial power standard file does not include international standards, and the standard level corresponding to the second target standard category in the reference power standard file includes international standards. Since the standard level corresponding to the second target standard category in the reference power standard file includes international standards, it means that the second target standard category in the reference power standard file is more standardized, so the standard data corresponding to the second target standard category can be obtained according to the reference power standard file. For example, if the target construction object is object T, the reference power standard file is the power standard system of object Z, the second target standard category is A2, and category A2 uses national standards but does not use international standards. According to the keywords of category A2, the international standard B2 corresponding to the keyword of category A2 in the reference power standard file of object Z is searched, and the content corresponding to category A2 is placed in the category where the international standard B2 of object Z in the reference power standard file of object Z is located, forming the standard data of category A2 in the target power standard file.
[0056] In the above embodiment, for a category, there is no international standard in the standard level corresponding to the initial power standard file, but in the reference power standard file, the standard level corresponding to the category includes an international standard, then the corresponding international standard is searched in the reference power standard file according to the category keyword, and the reference category corresponding to the international standard is obtained, and the standard data of the category is placed in the standard data corresponding to the reference category, thereby improving the accuracy of the power standard file of the target construction object, which can improve the efficiency of generating power standard files.
[0057] In some embodiments, based on the initial power standard file and the reference power standard file, according to at least one screening keyword, screening the association standard with the at least one screening keyword, and outputting the target power standard file based on the association standard, includes:
[0058] According to at least one screening keyword, a third target standard category is obtained from the initial power standard file, wherein the third target standard category satisfies a third preset condition, and the third preset condition includes that the standard level corresponding to the third target standard category in the initial power standard file and the reference power standard file does not include an international standard;
[0059] According to the keywords of the third target standard category, searching the reference power standard file for the first national standard corresponding to the keywords of the third target standard category, and obtaining the third reference category corresponding to the first national standard in the reference power standard file;
[0060] The standard data of the third target standard category is stored in the standard data corresponding to the third reference category to form the target standard data of the third target standard category in the target power standard file.
[0061] In this embodiment, for a standard category, when the corresponding standard level in the initial power standard file and the reference power standard file does not include an international standard, the standard data of the standard category can be established based on the standard data of the reference category under the national standard corresponding to the standard category in the reference power standard file. For example, if the target construction object is object T, the reference power standard file is the power standard system of object Z, and the third target standard category is A3, category A3 uses the object T standard in the initial power standard file and the object Z standard in the reference power standard file. Therefore, the national standard D1 corresponding to the keyword of category A3 can be searched in the reference power standard file of object Z according to the keyword of category A3, and the standard content corresponding to category A3 is placed in the category where the national standard D1 of object Z is located in the reference power standard file of object Z, forming the standard data corresponding to category A3 in the target power standard file.
[0062] In the above embodiment, for a standard category, when the corresponding standard levels in the initial power standard file and the reference power standard file do not include international standards, the standard data of the standard category can be established based on the standard data of the reference category under the national standard corresponding to the standard category in the reference power standard file, thereby improving the accuracy of the power standard file of the target construction object, which can improve the efficiency of generating power standard files.
[0063] In some embodiments, based on the initial power standard file and the reference power standard file, according to at least one screening keyword, screening the association standard with the at least one screening keyword, and outputting the target power standard file based on the association standard, includes:
[0064] According to at least one screening keyword, a fourth target standard category is obtained from the reference power standard file, wherein the fourth target standard category satisfies a fourth preset condition, and the fourth preset condition includes that the fourth target standard category does not exist in the initial power standard file, but the fourth target standard category exists in the reference power standard file, and there is an international standard in the standard level corresponding to the fourth target standard category;
[0065] The standard data corresponding to the fourth target standard category is acquired from the reference power standard file, and the standard data corresponding to the fourth target standard category is stored in the target power standard file.
[0066] In this embodiment, for a standard category, it exists in the reference power standard file, and there is an international standard in the corresponding standard level, but the standard category does not exist in the initial power standard file, which means that the standard category has been internationally standardized in the country or region corresponding to the reference power standard file, and the standard data of the standard category corresponding to the target construction object can be generated based on the standard data of the standard category in the reference power standard file. For example, if the target construction object is object T, the reference power standard file is the power standard system of object Z, the fourth target standard category is A4, object T does not have this category A4, and there is this category A4 in the reference power standard file of object Z, and there is an international standard, then the standard data of this category A4 is added to the target power file of object T.
[0067] In the above embodiment, for a standard category, it exists in the reference power standard file, and there is an international standard in the corresponding standard level, but the standard category does not exist in the initial power standard file, which means that the standard category has been internationally standardized in the country or region corresponding to the reference power standard file. The standard data of the standard category corresponding to the target construction object can be generated based on the standard data of the standard category in the reference power standard file, thereby improving the accuracy of the power standard file of the target construction object, which can improve the efficiency of generating power standard files.
[0068] In some embodiments, based on the initial power standard file and the reference power standard file, according to at least one screening keyword, screening the association standard with the at least one screening keyword, and outputting the target power standard file based on the association standard, includes:
[0069] According to at least one screening keyword, a fifth target standard category is obtained from the reference power standard file, wherein the fifth target standard category satisfies a fifth preset condition, and the fifth preset condition includes that the fifth target standard category does not exist in the initial power standard file, but the fifth target standard category exists in the reference power standard file; the standard level of the fifth target standard category in the reference power standard file has no international standard, but has a national standard; the keyword identification of the business field corresponding to the fifth target standard category indicates that it is a key keyword; the standard data of the fifth target standard category matches the preset file content corresponding to the target construction object;
[0070] The standard data corresponding to the fifth target standard category is acquired from the reference power standard file, and the standard data corresponding to the fifth target standard category is stored in the target power standard file.
[0071] In this embodiment, for a standard category, which does not exist in the initial power standard file but exists in the reference power standard file, there is no international standard for the standard category, but the business field of the standard category in the reference power standard file is identified as a key field, then the standard data of the standard category in the target power standard file can be established based on the standard data of the standard category in the reference power standard file. The preset file content includes but is not limited to policy documents and regulatory documents. The computing device 10 can send the standard data of the fifth target standard category to the terminal device 20 of the expert user, and the expert user verifies on the user interface of the terminal device 20 to determine whether the standard data of the fifth target standard category matches the preset file content corresponding to the target construction object. In some optional implementations, text analysis and natural language processing methods can also be used to semantically match the standard data corresponding to the fifth target standard category with the preset file content. When the similarity is greater than the preset similarity threshold, it means that the standard data corresponding to the fifth target standard category successfully matches the preset file content.
[0072] For example, if the target construction object is object T, the reference power standard file is the power standard system of object Z, the fifth target standard category is A5, object T does not have this category A5, and the reference power standard file of object Z has this category A5. There is no international standard, but there is a national standard, and this category A5 belongs to a key area, and the standard content corresponding to this category A5 complies with the policy and regulatory documents of object T, then the standard clause content corresponding to category A5 is added to the target power standard file of object T.
[0073] In the above embodiment, for a standard category that does not exist in the initial power standard file but exists in the reference power standard file, the standard category has no international standard, but the business field of the standard category in the reference power standard file is identified as a key field. Then, the standard data of the standard category in the target power standard file can be established based on the standard data of the standard category in the reference power standard file, thereby improving the accuracy of the power standard file of the target construction object, which can improve the efficiency of generating power standard files.
[0074] In some embodiments, the method further comprises:
[0075] Based on the target power standard file, a three-dimensional power standard model is generated, wherein the three dimensions of the standard three-dimensional model include business field, standard category, and standard level;
[0076] Based on the electric power standard three-dimensional model, three-dimensional coordinate positioning marking is performed.
[0077] In this embodiment, the target power standard file can be presented in the form of a standard two-dimensional table. After identifying the business field keywords, standard category keywords, and standard level keywords from the target power standard file, an electric power standard reference model is established based on the business field keywords, standard category keywords, and standard level keywords, and three-dimensional coordinate positioning marking is performed.
[0078] In the above embodiment, a standard three-dimensional model is established through the three dimensions of business field, standard category, and standard level, which can intuitively facilitate users to quickly locate the standard data of each dimension and can be displayed intuitively to improve user experience.
[0079] In some embodiments, the method further comprises:
[0080] Acquire the latest power standard data; and update the target power standard file according to the latest power standard data.
[0081] Since the standards are constantly updated, the latest power standard data can be searched from the Internet according to the preset update conditions, and the target power standard file can be updated in real time. This eliminates the need for manpower to search for information, and automatically matches the latest power standard data with the target power standard file, and updates the target power standard file, thereby improving the accuracy of the target power standard file.
[0082] On the other hand, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the power standard construction method described in any embodiment of the present application.
[0083] Among them, in the computer program product, the optional implementation form of the program module architecture of the computer program that implements each step of the method can be an electric power standard construction device. Figure 5 On the other hand, an embodiment of the present application provides an electric power standard construction device, including: an acquisition module 61, used to acquire electric power demand information of a target construction object; a determination module 62, used to determine electric power standard keywords based on the electric power demand information, and acquire electric power standard data of the target construction object based on the electric power standard keywords; a generation module 63, used to generate an initial electric power standard file of the target construction object based on the electric power standard data; the acquisition module 61 is also used to acquire a reference electric power standard file; an output module 64, used to generate a target electric power standard file of the target construction object based on the initial electric power standard file and the reference electric power standard file, and output the target electric power standard file.
[0084] Optionally, the initial electricity standard file and the reference electricity standard file include at least one of the following: standard category, standard name, standard level, and business field, wherein the standard level includes at least one of the following: international standards, national standards, industry standards, local standards, and group standards.
[0085] Optionally, the output module 64 is further used for:
[0086] Based on the initial power standard file and the reference power standard file, according to at least one screening keyword, the association standard with the at least one screening keyword is screened, and based on the association standard, the target power standard file is output, wherein the at least one screening keyword includes: business field keywords, standard category keywords, standard name keywords, standard level keywords, keywords corresponding to the screening keywords in the translated version of the standard, and keyword identifiers indicating important key keywords.
[0087] Optionally, the output module 64 is further used for:
[0088] According to at least one screening keyword, a first target standard category is obtained from the initial power standard file, wherein the first target standard category satisfies a first preset condition, and the first preset condition includes that the standard level corresponding to the first target standard category in the initial power standard file and the reference power standard file includes an international standard;
[0089] Acquire a first international standard corresponding to the first target standard category;
[0090] According to the first international standard, matching a first reference category where the first international standard is located in the reference power standard file;
[0091] The standard data corresponding to the first target standard category is stored in the standard data corresponding to the first reference category to form the target standard data of the first target standard category in the target power standard file.
[0092] Optionally, the output module 64 is further used for:
[0093] According to at least one screening keyword, a second target standard category is obtained from the initial power standard file, wherein the second target standard category satisfies a second preset condition, the second preset condition including that the standard level corresponding to the second target standard category in the initial power standard file does not include an international standard, and the standard level corresponding to the second target standard category in the reference power standard file includes an international standard;
[0094] According to the keywords of the second target standard category, searching the reference power standard file for a second international standard corresponding to the keywords of the second target standard category, and obtaining a second reference category corresponding to the second international standard in the reference power standard file;
[0095] The standard data of the second target standard category is stored in the standard data corresponding to the second reference category to form the target standard data of the second target standard category in the target power standard file.
[0096] Optionally, the output module 64 is further used for:
[0097] According to at least one screening keyword, a third target standard category is obtained from the initial power standard file, wherein the third target standard category satisfies a third preset condition, and the third preset condition includes that the standard level corresponding to the third target standard category in the initial power standard file and the reference power standard file does not include an international standard;
[0098] According to the keywords of the third target standard category, searching the reference power standard file for the first national standard corresponding to the keywords of the third target standard category, and obtaining the third reference category corresponding to the first national standard in the reference power standard file;
[0099] The standard data of the third target standard category is stored in the standard data corresponding to the third reference category to form the target standard data of the third target standard category in the target power standard file.
[0100] Optionally, the output module 64 is further used for:
[0101] According to at least one screening keyword, a fourth target standard category is obtained from the reference power standard file, wherein the fourth target standard category satisfies a fourth preset condition, and the fourth preset condition includes that the fourth target standard category does not exist in the initial power standard file, but the fourth target standard category exists in the reference power standard file, and there is an international standard in the standard level corresponding to the fourth target standard category;
[0102] The standard data corresponding to the fourth target standard category is acquired from the reference power standard file, and the standard data corresponding to the fourth target standard category is stored in the target power standard file.
[0103] Optionally, the output module 64 is further used for:
[0104] According to at least one screening keyword, a fifth target standard category is obtained from the reference power standard file, wherein the fifth target standard category satisfies a fifth preset condition, and the fifth preset condition includes that the fifth target standard category does not exist in the initial power standard file, but the fifth target standard category exists in the reference power standard file; the standard level of the fifth target standard category in the reference power standard file has no international standard, but has a national standard; the keyword identification of the business field corresponding to the fifth target standard category indicates that it is a key keyword; the standard data of the fifth target standard category matches the preset file content corresponding to the target construction object;
[0105] The standard data corresponding to the fifth target standard category is acquired from the reference power standard file, and the standard data corresponding to the fifth target standard category is stored in the target power standard file.
[0106] Optionally, the output module 64 is further used for:
[0107] Based on the target power standard file, a three-dimensional power standard model is generated, wherein the three dimensions of the standard three-dimensional model include business field, standard category, and standard level;
[0108] Based on the electric power standard three-dimensional model, three-dimensional coordinate positioning marking is performed.
[0109] It should be noted that the structure provided in the embodiment of the present application does not constitute a limitation on the power standard construction device, and the various modules can be implemented in whole or in part by software, hardware, and a combination thereof. The above modules can be embedded in or independent of the controller in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the controller can call and execute the operations corresponding to the above modules. In other embodiments, the power standard construction device may include more or fewer modules than shown in the figure.
[0110] See also Figure 6 On the other hand, the present application provides a computing device 10, which includes a memory 3011 of one or more computer-readable storage media and a processor 3012 of one or more processing cores. Those skilled in the art will understand that Figure 6 The control device structure shown in the figure does not constitute a limitation on the computing device 10, and may include more or fewer components than shown in the figure, or combine certain components, or arrange components differently. The memory 3011 stores a computer program, and when the computer program is executed by the processor 3012, the processor 3012 executes the power standard construction method provided in any of the above embodiments of the present application.
[0111] The processor 3012 is the control center of the control device, which uses various interfaces and lines to connect various parts of the entire computer device, and executes various functions of the computer device and processes data by running or executing software programs and / or modules stored in the memory 3011, and calling data stored in the memory 3011. Optionally, the processor 3012 may include one or more processing cores; preferably, the processor 3012 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user pages and application programs, etc., and the modem processor mainly processes wireless communications. It is understandable that the above-mentioned modem processor may not be integrated into the processor 3012.
[0112] The memory 3011 can be used to store software programs and modules. The processor 3012 executes various functional applications and data processing by running the software programs and modules stored in the memory 3011. The memory 3011 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 3011 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices. Accordingly, the memory 3011 may also include a memory controller to provide the processor 3012 with access to the memory 3011.
[0113] On the other hand, an embodiment of the present application further provides a storage medium storing a computer program. When the computer program is executed by a processor, the processor executes the power standard construction method provided in any of the above embodiments of the present application.
[0114] Those skilled in the art can understand that all or part of the processes in the methods provided in the above embodiments can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in the present application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0115] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. The protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A method for constructing power standards, characterized in that: include: Obtain power demand information of target construction objects; Based on the power demand information, determine power standard keywords, and based on the power standard keywords, acquire power standard data of the target construction object; Based on the power standard data, generating an initial power standard file for the target construction object; Obtaining a reference power standard file, wherein the reference power standard file is a normative power standard file, including a standardized power standard; Based on the initial power standard file and the reference power standard file, according to at least one screening keyword, screening the association standard with the at least one screening keyword, and outputting the target power standard file based on the association standard, wherein based on the initial power standard file and the reference power standard file, according to at least one screening keyword, screening the association standard with the at least one screening keyword, and outputting the target power standard file based on the association standard, comprises: According to at least one screening keyword, a first target standard category is obtained from the initial power standard file, wherein the first target standard category satisfies a first preset condition, and the first preset condition includes that the standard level corresponding to the first target standard category in the initial power standard file and the reference power standard file includes an international standard; obtaining a first international standard corresponding to the first target standard category; matching a first reference category where the first international standard is located in the reference power standard file according to the first international standard; storing the standard data corresponding to the first target standard category in the standard data corresponding to the first reference category as a category, and forming the target standard data of the first target standard category in the target power standard file; According to at least one screening keyword, a second target standard category is obtained from the initial power standard file, wherein the second target standard category satisfies a second preset condition, the second preset condition including that the standard level corresponding to the second target standard category in the initial power standard file does not include international standards, and the standard level corresponding to the second target standard category in the reference power standard file includes international standards; according to the keyword of the second target standard category, the second international standard corresponding to the keyword of the second target standard category is searched in the reference power standard file, and a second reference category corresponding to the second international standard is obtained in the reference power standard file; the content corresponding to the second target standard category is stored in the second reference category to form target standard data of the second target standard category in the target power standard file.
2. The method for constructing power standards according to claim 1, characterized in that: The initial power standard file and the reference power standard file include at least one of the following: standard category, standard name, standard level, and business field, wherein the standard level includes at least one of the following: international standard, national standard, industry standard, local standard, and group standard.
3. The method for constructing electric power standards according to claim 1, characterized in that: The method of screening the association standard with the at least one screening keyword based on the initial power standard file and the reference power standard file, and outputting the target power standard file based on the association standard, includes: According to at least one screening keyword, a third target standard category is obtained from the initial power standard file, wherein the third target standard category satisfies a third preset condition, and the third preset condition includes that the standard level corresponding to the third target standard category in the initial power standard file and the reference power standard file does not include an international standard; According to the keywords of the third target standard category, searching the reference power standard file for the first national standard corresponding to the keywords of the third target standard category, and obtaining the third reference category corresponding to the first national standard in the reference power standard file; The standard data of the third target standard category is stored in the standard data corresponding to the third reference category to form the target standard data of the third target standard category in the target power standard file.
4. The method for constructing electric power standards according to claim 1, characterized in that: The method of screening the association standard with the at least one screening keyword based on the initial power standard file and the reference power standard file, and outputting the target power standard file based on the association standard, includes: According to at least one screening keyword, a fourth target standard category is obtained from the reference power standard file, wherein the fourth target standard category satisfies a fourth preset condition, and the fourth preset condition includes that the fourth target standard category does not exist in the initial power standard file, but the fourth target standard category exists in the reference power standard file, and there is an international standard in the standard level corresponding to the fourth target standard category; The standard data corresponding to the fourth target standard category is acquired from the reference power standard file, and the standard data corresponding to the fourth target standard category is stored in the target power standard file.
5. The method for constructing electric power standards according to claim 1, characterized in that: The method of screening the association standard with the at least one screening keyword based on the initial power standard file and the reference power standard file, and outputting the target power standard file based on the association standard, includes: According to at least one screening keyword, a fifth target standard category is obtained from the reference power standard file, wherein the fifth target standard category satisfies a fifth preset condition, and the fifth preset condition includes that the fifth target standard category does not exist in the initial power standard file, but the fifth target standard category exists in the reference power standard file; the standard level of the fifth target standard category in the reference power standard file has no international standard, but has a national standard; the keyword identification of the business field corresponding to the fifth target standard category indicates that it is a key keyword; the standard data of the fifth target standard category matches the preset file content corresponding to the target construction object; The standard data corresponding to the fifth target standard category is acquired from the reference power standard file, and the standard data corresponding to the fifth target standard category is stored in the target power standard file.
6. The method for constructing electric power standards according to claim 1, characterized in that: The at least one screening keyword includes: business field keywords, standard category keywords, standard name keywords, standard level keywords, keywords corresponding to the screening keywords in the translation version standard, and keyword identifiers indicating important key keywords.
7. The method for constructing electric power standards according to claim 1, characterized in that: The method further comprises: Based on the target power standard file, a three-dimensional power standard model is generated, wherein the three dimensions of the standard three-dimensional model include business field, standard category, and standard level; based on the power standard three-dimensional model, three-dimensional coordinate positioning marking is performed, wherein the target power standard file is generated based on the power standard system structure, and the output form of the target power standard file includes a standard detailed list, wherein the power standard system structure includes standard categories and standard subcategories under each standard category.
8. A computing device, characterized in that include: Memory, used to store computer programs; A processor, configured to execute the computer program to implement the method for establishing an electric power standard as claimed in any one of claims 1 to 7.
Citation Information
Patent Citations
Template creation method and device, electronic equipment and storage medium
CN110619115A
Standard file editing system, method and equipment
CN117436421A