Assembled slurry box device and integrated environment-friendly purification circulating slurry system comprising same

Through the assembled mud box device and an integrated environmentally friendly purification circulation mud system, the problems of mud pool excavation and backfill during pile foundation construction are solved, efficient mud separation and recycling are achieved, and construction costs and environmental impact are reduced.

CN119195673APending Publication Date: 2024-12-27CHINA RAILWAY SHANGHAI ENGINEERING GROUP NO 5 ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411307045.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

In pile foundation drilling construction, the existing technology requires excavation of a large number of mud pools at the construction site, resulting in a long construction cycle and high labor costs, and subsequent backfilling treatment is required, and sand and stone separation in the mud is inconvenient, affecting mud recycling.

Method used

A assembled mud box device and an integrated environmentally friendly purification circulating mud system were designed. The pre-processed mud box was assembled at the construction site, and the separation of mud and sand and stone was achieved by using multi-stage sedimentation and sediment separator, reducing on-site opening Dig and backfill work and reduce material waste through removable connections.

Benefits of technology

It shortens the construction cycle, reduces construction costs, realizes efficient collection, purification and recycling of mud, reduces mud on site and is environmentally friendly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119195673A_ABST
    Figure CN119195673A_ABST
Patent Text Reader

Abstract

The invention discloses a split mounting type slurry box device and an integrated environment-friendly purification circulating slurry system comprising the split mounting type slurry box device. The assembled slurry box device comprises at least two slurry boxes, a slurry inlet pipe is arranged at the bottom of the foremost slurry box, and a first slurry pump is arranged at the bottom of the rearmost slurry box; water passing pipe sections are arranged on the upper portion of one side or the upper portions of the two sides of each slurry box, and the outer ends of the water passing pipe sections are connected with outer end flanges of the water passing pipe sections of the adjacent slurry boxes. The integrated environment-friendly circulating mud purification system comprises an initial mud pit, a silt separator, a mud box device and a slag collecting box, the silt separator is used for treating mud pumped out of the initial mud pit, and the mud box device is used for treating mud separated out of the silt separator. The mud pit can be machined in advance and assembled on the construction site, the construction cost of pile foundation construction is reduced, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mud treatment, in particular to an assembled mud box device and an integrated environmentally friendly purification circulating mud system comprising the device. Background Art

[0002] In the process of pile foundation drilling construction, mud plays a very important role. Mud has a certain viscosity and density, which can fit closely to the hole wall and effectively prevent the hole wall from collapsing. At the same time, mud can also cool the drill bit, reduce drill bit wear, and improve drilling efficiency. The mud in pile foundation drilling construction can be recycled, but the mud discharged from the construction pile foundation contains a lot of sand and stones, which cannot be directly used for mud circulation. It needs to be pumped to the mud pool first, and the mud is separated from the sand and stones before being transported to the construction pile foundation. Therefore, a mud pool needs to be set up at the pile foundation construction site for mud circulation to meet the requirements of engineering construction.

[0003] During pile foundation construction, most mud pools are excavated from the ground. For example, the invention patent CN 113738275 A discloses a method for anti-pollution construction of bored piles in pile foundation engineering. If the length of the bridge in the project is long, the number of excavated mud pools needs to be matched more, including: setting a mud pool on one side of the pile hole of the bored pile, and the mud pool includes a secondary sedimentation pool, which is divided into a primary sedimentation area and a secondary sedimentation area by an overflow plate. The mud pools are all excavated at the construction site, with a long construction period and high labor costs. After the subsequent construction is completed, additional mud pool backfilling is required. Summary of the invention

[0004] The utility model discloses an assembled mud box device and an integrated environmentally friendly purification circulating mud system comprising the device. The mud pool can be pre-processed and assembled on the construction site, thereby reducing the construction cost and shortening the construction period.

[0005] To achieve the above object, the technical solution of the present invention is: An assembled mud box device comprises at least two mud boxes, wherein a slurry inlet pipe is arranged at the bottom of the frontmost mud box, and a first mud pump is arranged at the bottom of the rearmost mud box; a water pipe segment is arranged at the upper part of one side or both sides of the mud box, and the outer end of the water pipe segment is connected with the outer end flange of the water pipe segment of the adjacent mud box to form a water pipe for accommodating the passage of mud.

[0006] Preferably, water pipe segments are provided on upper portions of both sides of the mud box, and the water pipe segments are provided at diagonal corners of the mud box.

[0007] Preferably, an openable and closable drain pipe is provided at the bottom of the mud box.

[0008] Preferably, a pulling seat is provided at the upper part and / or the lower part of the mud box, and a pulling rod passes through the pulling seat of adjacent mud boxes, and the pulling rod is fixed by a detachable fixing part, so that the adjacent mud boxes are fixed together.

[0009] Preferably, a lifting ring is provided on the top of the mud box.

[0010] The present invention also provides an integrated environmentally friendly purification circulating mud system including the assembled mud box device described above, comprising: An initial mud pool, which is formed by driving a steel casing into the ground, with a second mud pump at the bottom; A mud and sand separator, which is used to process the mud pumped out by the second mud pump and initially separate the coarse mud and sand and gravel; A mud box device, which introduces the coarse mud separated by the mud separator through the mud inlet pipe; A slag collecting box is arranged on one side of the silt separator and is used for storing the sand and stones separated by the silt separator.

[0011] Preferably, a first platform is provided on one side above the frontmost mud box, the mud and sand separator is provided on the first platform, a first ladder is provided on the outside, and the lower end of the first ladder extends to the ground.

[0012] Preferably, a second platform is provided on one side of the middle portion above the rearmost mud box, a second ladder is provided on the outer side of the second platform, and the lower end of the second ladder extends to the ground.

[0013] Preferably, the mud box device includes three mud boxes, each of which has a capacity of not less than 22m 3 .

[0014] Preferably, a third ladder is arranged in front of or behind the mud box in the middle.

[0015] The mud box device described above is connected to each other by a water pipe arranged on the upper part. The mud is settled step by step in the mud box of the mud box device, and the sand and gravel are settled at the bottom of the mud box. The upper mud flows into the mud box behind it through the water pipe until it reaches the mud 2 at the back. Multi-stage sedimentation allows the mud to be better separated from the sand and gravel.

[0016] In the integrated environmentally friendly purification circulating mud system described above, when bored piles are drilled, the mud in the construction pile foundation circulates and overflows to the initial mud pool, and is pumped to the mud-sand separator by the second mud pump; the mud-sand separator separates the pumped mud and sand and gravel, and the mud flows into the mud box at the front and the sand and gravel separation slag box, and the sand and gravel are promptly transported away by a dump truck; the mud is fully precipitated through multiple mud boxes in the mud box device, and finally the sand content in the rear mud box reaches the standard requirement, and the mud that meets the standard requirement is pumped into the construction pile foundation by the first mud pump to realize mud circulation.

[0017] The present invention has the following advantages: (1) The mud box of the present invention can be pre-processed in the factory and then assembled at the construction site. There is no need to excavate a large mud pool at the construction site and backfill the mud pool after the construction is completed. This can effectively shorten the construction period. The mud sedimentation is mainly carried out in the mud box mechanism placed on the ground, which is not easy to cause mud on the site and is more environmentally friendly.

[0018] (2) The mud box of the present invention adopts a detachable connection and can be reused multiple times, which is beneficial to reducing material waste and lowering construction costs.

[0019] (3) The mud system of the present invention can realize the collection, purification and recycling of mud by separating mud sand and gravel and settling in multi-stage mud boxes. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the main structure of a mud box device according to an embodiment.

[0021] Figure 2 yes Figure 1 Schematic diagram of the top view structure.

[0022] Figure 3 It is a structural schematic diagram of an embodiment of an integrated environmentally friendly purification circulating mud system.

[0023] In the figure, the first platform 1, the mud box 2, the water pipe 3, the second platform 4, the second platform guardrail 5, the second ladder 6, the second ladder guardrail 7, the drainage pipe 8, the pull rod 9, the pulling seat 10, the third ladder 11, the first ladder guardrail 12, the first ladder 13, the first platform guardrail 14, the first mud pump 15, the construction pile foundation 16, the initial mud pool 17, the second mud pump 18, the sediment separator 19, and the slag collecting box 20. DETAILED DESCRIPTION

[0024] The technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all of the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] In the description of the present invention, it should be noted that the terms "upper" and "lower" etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use. These are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the present invention.

[0026] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances. Example 1

[0027] A mud box device, combined with Figure 1 and Figure 2 As shown (for easy viewing, Figure 1 and Figure 2 Each is rotated 90°), including at least two mud boxes 2, wherein the frontmost mud box 2 is provided with a slurry inlet pipe at the bottom, and the rearmost mud box 2 is provided with a first mud pump 15 at the bottom, and a water pipe segment is provided on one side or the upper part of both sides of the mud box 2, and the outer end of the water pipe segment is connected with the outer end flange of the water pipe segment of the adjacent mud box to form a water pipe 3 for accommodating the passage of mud, so that the two adjacent mud boxes 2 are connected. When the mud box device includes two mud boxes 2, the two mud boxes 2 are both provided with water pipe segments at the corresponding positions on one side, so that the water pipe segments of the two mud boxes 2 can be connected by flanges; when the mud box device includes three or more mud boxes 2, the frontmost and rearmost mud boxes 2 are provided with water pipe segments at the corresponding positions on one side, and water pipe segments are provided at the corresponding positions on both sides of the middle mud box 2, so that the water pipe segments of three or more mud boxes 2 can be connected by flanges. Of course, the mud boxes 2 at the front and the rear can also be provided with water pipe segments at corresponding positions on both sides, and the water pipe segments that are not needed on one side can be blocked to prevent mud leakage.

[0028] Preferably, for the setting method of the flange of the water pipe segment, the present invention provides a specific embodiment, in which the outer end of the water pipe segment is connected with a flange plate. During assembly, the water pipe segments are connected together by flange plate bolts to form a water pipe 3, which is convenient for installation and removal.

[0029] The mud boxes 2 are connected by a water pipe 3 arranged at the upper part thereof. The mud is precipitated step by step in the mud box 2 of the mud box device, and the sand and gravel are precipitated at the bottom of the mud box 2. The upper mud flows into the mud box 2 behind it through the water pipe 3 until it reaches the mud box 2 at the rear. The multi-stage sedimentation makes the mud and the sand and gravel separate better. The front mud box 2 and the rear mud box 2 mentioned here refer to the front and back order of processing the mud.

[0030] Preferably, when water pipe segments are provided at the upper parts of both sides of the mud box 2, the water pipe segments are provided at the diagonal corners of the mud box 2, such as Figure 3 As shown, the water pipes 3 on the left and right sides of the middle mud box 2 are arranged at its diagonal positions, so that the path for the mud to flow in is longer and the mud and sand and gravel can be separated better.

[0031] Preferably, an openable and closable drain pipe 8 is provided at the bottom of the mud box 2, which can facilitate the discharge of water and sand and gravel settled at the bottom when the mud box 2 is flushed.

[0032] Preferably, combined Figure 2 and Figure 3 As shown, the upper and / or lower parts of the mud box 2 are provided with a pull seat 10, and the pull rod 9 passes through the pull seat 10 of the adjacent mud box 2, and the pull rod 9 is fixed by a detachable fixing part, so that the adjacent mud boxes 2 are fixed together, and the detachable fixing part can be a nut. In this embodiment, the upper and lower parts of the front and rear sides of the mud box 2 are provided with a pull seat 10, and the upper and lower parts of the mud box 2 in the middle are connected to the adjacent mud box 2 by the pull rod 9 at both the front and rear sides, that is, they are fixed by eight pull rods 9, and the mud box 2 at the front and rear are provided with a pull seat 10 at the upper and lower parts on the side close to the adjacent mud box 2 at the front and rear, and are connected to the adjacent mud box 2 by the pull rod 9, that is, they are fixed by four pull rods 9. The mud box 2 is generally arranged in a cubic shape. Since the mud box 2 and the mud therein are heavy, the adjacent mud boxes 2 are fixed together in combination with the pull rod 9 to ensure that the mud box 2 does not move.

[0033] Preferably, a lifting ring is provided on the top of the mud box 2, such as lifting rings are provided on both sides of the top of the mud box 2, or a connecting rod is welded on the top of the mud box 2 and then a lifting ring is provided. When the mud box 2 needs to be adjusted, the pull rod 9 can be removed, and then the lifting ring or the wire rope tied to the lifting ring can be hooked by the lifting equipment to move the mud box 2 away. When it needs to be installed, the lifting ring or the wire rope tied to the lifting ring can be hooked by the lifting equipment to move the mud box 2 to the specified position. Example 2

[0034] This embodiment provides an integrated environmentally friendly purification circulating mud system including the assembled mud box device described above, combined with Figure 1 As shown, it includes an initial mud pool 17, a sediment separator 19, a mud box device and a slag box 20, wherein: the initial mud pool 17 is formed by driving a steel casing into the ground, and a second mud pump 18 is arranged at the bottom. The initial mud pool 17 is connected to the top of the construction pile foundation 16, and the mud with drilling debris overflowing from the drilling hole in the construction pile foundation 16 flows into the initial mud pool 17 under the action of gravity; the sediment separator 19 is used to process the mud pumped out by the second mud pump 18, and preliminarily separate the coarse mud and sand and gravel. The second mud pump 18 is connected to the inlet end of the sediment separator 19 through a pipeline; the mud box device introduces the coarse mud separated by the sediment separator 19 through a slurry inlet pipe, and precipitates the coarse mud step by step; the slag box 20 is arranged on one side of the sediment separator 19, and is used to store the sand and gravel separated by the sediment separator 19. When bored piles are drilled, the mud in the construction pile foundation 16 circulates and overflows to the initial mud pool 17, and is pumped to the mud-sand separator 19 by the second mud pump 18; the mud-sand separator 19 separates the pumped mud and sand and gravel, and the mud flows into the mud box 2 at the front and the sand and gravel separation slag box 20, and the sand and gravel are promptly transported away by a dregs truck; the mud flows into the multiple mud boxes 2 in the mud box device in sequence, so that the smaller sand and gravel particles that have not been separated in the mud are fully precipitated, and finally the sand content in the mud box 2 at the back reaches the standard requirement, and the mud that meets the standard requirement is pumped into the construction pile foundation 16 by the first mud pump 15 to realize mud circulation.

[0035] by Figure 2 and Figure 3 Taking one of the embodiments shown in the figure as an example, in this embodiment, the mud box device includes three mud boxes 2, and the volume of each mud box 2 is not less than 22m 3 Three mud boxes 2 are set up, and the mud flows from the front mud box 2 to the middle mud box 2 and then to the rear mud box 2, that is, after three-stage sedimentation treatment, it can better ensure that the sand content of the mud box 2 meets the standard requirements.

[0036] Preferably, a first platform 1 is provided on one side above the frontmost mud box 2, a first ladder 13 is provided on the outside of the first platform 1, the lower end of the first ladder 13 extends to the ground, and a silt separator 19 can be placed on the first platform 1 to save the overall floor space. If a fault occurs, it can be handled on the first platform 1 in time, and it is also convenient for personnel to observe the situation in the mud box 2. More preferably, first ladder guardrails 12 are provided on both sides of the first ladder 13, and first platform guardrails 14 are provided on the periphery of the first platform 1. Of course, the first platform guardrail 14 is not provided at the position where the first platform 1 is connected to the first ladder 13, and the first ladder guardrail 12 and the first platform guardrail 14 can provide safety protection for the operator.

[0037] Preferably, a second platform 4 is provided on one side of the middle part above the rearmost mud box 2, a second ladder 6 is provided on the outside of the second platform 4, and the lower end of the second ladder 6 extends to the ground. The mud in the rearmost mud box 2 can be sampled and tested through the second platform 4, and if the mud does not meet the requirements, it can be dealt with in time, and the operation of the first mud pump 15 can also be observed. More preferably, second ladder guardrails 7 are provided on both sides of the second ladder 6, and second platform guardrails 5 are provided on the periphery of the second platform 4. Similarly, the second platform guardrail 5 is not provided at the position where the second platform 4 is connected to the second ladder 6. The second ladder guardrail 7 and the second platform guardrail 5 can be provided to protect the operator.

[0038] Preferably, a third ladder 11 may be provided in front of or behind the middle mud box 2 to allow an operator to climb to one side of the mud box 2 and observe the situation of the middle mud box 2. Of course, third ladder guardrails may also be provided on both sides of the third ladder 11 to ensure the safety of the operator.

Claims

1. An assembled mud box device, characterized in that: It comprises at least two mud boxes, wherein a slurry inlet pipe is arranged at the bottom of the frontmost mud box, and a first mud pump is arranged at the bottom of the rearmost mud box; a water pipe segment is arranged at the upper part of one side or both sides of the mud box, and the outer end of the water pipe segment is connected with the outer end flange of the water pipe segment of the adjacent mud box to form a water pipe for accommodating the passage of mud.

2. The assembled mud box device according to claim 1, characterized in that: Water pipe segments are arranged on the upper parts of both sides of the mud box, and the water pipe segments are arranged at the diagonals of the mud box.

3. The integrated environmentally friendly purification circulating mud system according to claim 1 is characterized by: The bottom of the mud box is provided with an openable and closable drain pipe.

4. The integrated environmentally friendly purification circulating mud system according to claim 1 is characterized by: The upper part and / or the lower part of the mud box is provided with a pulling seat, and a pulling rod passes through the pulling seat of the adjacent mud boxes, and the pulling rod is fixed by a detachable fixing part, so that the adjacent mud boxes are fixed together.

5. The integrated environmentally friendly purification circulating mud system according to claim 1 is characterized by: A lifting ring is arranged on the top of the mud box.

6. An integrated environmentally friendly purification circulating mud system comprising the assembled mud box device according to any one of claims 1 to 5, characterized in that include: An initial mud pool, which is formed by driving a steel casing into the ground, with a second mud pump at the bottom; A mud and sand separator, which is used to process the mud pumped out by the second mud pump and initially separate the coarse mud and sand and gravel; A mud box device, which introduces the coarse mud separated by the mud separator through the mud inlet pipe; A slag collecting box is arranged on one side of the silt separator and is used for storing the sand and stones separated by the silt separator.

7. The assembled mud box device according to claim 6, characterized in that: A first platform is arranged on one side above the mud box at the front, the mud and sand separator is arranged on the first platform, and a first ladder is arranged on the outside, and the lower end of the first ladder extends to the ground.

8. The integrated environmentally friendly purification circulating mud system according to claim 6 is characterized by: A second platform is arranged on one side of the middle part above the rearmost mud box, a second ladder is arranged on the outer side of the second platform, and the lower end of the second ladder extends to the ground.

9. The assembled mud box device according to claim 6, characterized in that: The mud box device includes three mud boxes, each of which has a capacity of not less than 22m 3 .

10. The assembled mud box device according to claim 9, characterized in that: A third ladder is arranged in front of or behind the mud box in the middle.